Loading...
09-033CITY OF SHOREWOOD RESOLUTION NO. 0 -033 A RESOLUTION ACCEPTING BID AND AWARDING CONTRACT FOR THE 2009 BITUMINOUS MILL, OVERLAYS AND APPURTENANT WORK FOR FOREST DRIVE, FERNCROFT DRIVE, CAJED LANE, BEVERLY DRIVE • 1 STRATFORD PROJECT CITY 09-04 WHEREAS, pursuant to an advertisement for bids for local improvements designated as the 2009 Bituminous Mill, Overlays and Appurtenant Work for Forest Drive, Ferncroft Drvie, Cajed Lane, Beverly Drive and Stratford Place, City Project No. 09 -04, bids were received, opened on June 3, 2009 and tabulated according to law, and such tabulation is attached hereto and made a part hereof as Exhibit A; and WHEREAS, the City Council has determined that Midwest Asphalt Corp. is the lowest bidder in compliance with the specifications. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Shorewood as follows: 1. That the Mayor and City Administrator /Clerk are hereby authorized and directed to enter into a contract Midwest Asphalt Corp. in the name of the City of Shorewood, Project No. 09 -04, according to the plans and specifications therefore approved by the City Council on file in the office of the City Administrator /Clerk. 2. That the City Administrator /Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except for the deposits of the successful bidder and the next two lowest bidders, which shall be retained until a contract has been signed. ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 8th day of June, 2009. ATTEST: B e dministrator /Clerk C C Lizee, Mayor City of Shorewood,Tonka Bay and Excelsior Bid Tabulation Mill and Overlay Shorewood City Project No. 09 ® 04 Bid Date: 1 0:00a.m. Weds June 3rd, 2009 Engineer: City of hors oo Addendum: Bid Bond h 1 MN plan room 2 William Mueller and sons X X $ 156,935.00 3 Valley paving 4 Midwest Asphalt X X $ 145,531.20 5 Northwest Asphalt X X $ 153,619.00 6 Rum River Contracting X X $ 165,223.04 7 Safety Signs 8 Prior Lake Blacktop 9 Hard Drives, Inc. X X $ 187,211.76 10 Commercial Asphalt 11 Geyer Signal of St. Cloud 12 Mn Roadways X X $ 149,246.92 13 Barber Construction X X $ 188,475.60 14 Bituminous Roadways X X $ 213,549.00 15 gmh X X $ 147,005.50 16 FPI Paving Contractors X X $ 164,028.00 17 18 I hereby certify that this tabulation is a correct and true representation of the bids received on this date for this Improvement Project James Landini City Engineer 6-3-o7 Date can Panchyshyn r Deputy CierWExecutive Secretary Date Exhibit A