Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
020403 PK WS AgP
CITY OF SHOREWOOD 5755 COUNTRY CLUB ROAD PARK COMMISSION WORK SESSION CITY HALL TUESDAY, FEBRUARY 4, 2003 7:00 P.M. • AGENDA 1. CONVENE PARK COMMISSION WORK SESSION A. Roll Call B. Review Agenda 2. DISCUSS GOAL IDEAS FOR 2003 (Att. #2) Callies Bartlett Meyer Palesch Young Arnst Davis 3. REVIEW THE DATA COLLECTED FROM THE SMITHTOWN ROAD OPEN HOUSE (Att. #3) A. Agree on Criteria for Discussion B. Review Criteria C. Discuss Concensus for Recommendation to Council 4. ADJOURN TO REGULAR MEETING • 11 �. To: Park Commission From: Larry Brown, Public Works Director Date: January 24, 2003 Re: Goals for 2003 We will be discussing the Park Commission goals and objectives for 2003 at the work session. If there are goals and objectives that you would like to address please bring them with you. • #a • CITY OF SHOREWOOD 5755 COUNTRY CLUB ROAD • SHOREWOOD, MINNESOTA 55331 -8927 • (952) 474 -3236 FAX (952) 474 -0128 • www.ci.shorewood.mn.us • cityha11@ci.shorewood.mn.us MEMORANDUM TO: Park Commission FROM: Larry Brown, Director of Public Works 13 f DATE: February 3, 2003 RE: Right of Way Response West of the LRT During discussion of the responses received for the Smithtown Road project, it was requested that Staff tally up the number of responses obtained for those residents west of the Light Rail Trail (LRT). The attached tally indicates the total number of properties and the number responding for each category. Also requested was an estimate of anticipated right of way costs. Staff will present this at Tuesday night's meeting. • =� PRINTED ON RECYCLED PAPER 03 • Resident Responses From Property Adjacent to Right of Wa West of LRT and Smithtown Road Open House - 1 February 23, 1999 11 / 87 = 12% Trail Walk - 2 Aril 10, 1999 6/87= 7% Card Survey - 3 July 7, 2000 24 / 87 = 28% Open House - 4 Aril 4, 2002 3 / 87 = 3% Open House - 5 January 14, 2003 15 / 87 = 17% 39 Residents have returned comments out of 87 total properties affected in project area West of LRT. - - • r _ t1►• 1� To: Park Commission From: Larry Brown, Public Works Director Date: January 22, 2003 Re: Smithtown Road Comment Sheet Following is a breakdown of the comments received from the Open House on January 14, 2003 for questions 7, 8 and 9 of the comment sheet. Staff has broken it down within the three sections: Smithtown Road West of LRT, Smithtown Road East of LRT and Project Information. Also included is the breakdown from the April 2002 open house that residents were invited to. For both open houses 336 notices were mailed out. Smithtown Road West of the LRT (Green) There were 21 responses. Of those 21 responses 15 were on the north /west side of the trail and 6 were on the south side. North/West Side Comments: Question 7: Responses Not in Favor of a trail segment on the West portion of Smithtown Road 8 Prefer an 5.0 foot wide concrete walk 4 Prefer an 8 foot wide asphalt walk 1 Either a 5 or 8 foot walk is acceptable 2 Coinrnents: - Seems trail would just "dead end" at Victoria — this would encourage more bike traffic west of the trail being dumped out on the road at Victoria. #3 Page 2 - Whichever works best for the safety of walkers and bikers. - Doesn't matter as long as it is plowed. - Already a path to walk on; thousands of dollars was spent to make the LRT a path so why spend thousands more. - Trail /sidewalk should be in place for the entire length of Smithtown Rd — if, in the future the kids are required to walk to school within 2 miles? We need to plan for this. - Have a trail now — don't need two trails. - Properties along Smithtown should have evergreen trees put along walkway. No 4 foot shoulders would be acceptable with any trail, 2 ft. shoulder w/ 5 ft. trail ok. Question 8: Responses Do not want Smithtown Rd to be reconstructed. The roadway is find 5 ust the way it is. Roadway needs to be upgraded as long as pavement widths can be 9 minimized to help keep the speed of vehicles to a minimum. Roadway should be upgraded with wider lanes and shoulders. Other. - No 4 ft shoulders on north side. No parking on Smithtown Rd. Need to place "No Parking" signs up. - Repave only. - People drive to fast now on Smithtown Rd — don't need to make it so they can drive faster. - Road should be upgraded to meet safety standards required for current and projected daily traffic needs for the next 10 years. Speed is a traffic enforcement issue. Size of roadway is a traffic /engineering /safety issue & should be determined by the engineer. - Roadway upgraded would be nice but if is adds a lot to taxes or creates more traffic I can get along just fine Question 9: • Indicate any concerns that you nnay have regarding this proposal: is Page 3 I] • - Like to see some kind of sign near the curve right after the 2 nd Boulder Bridge entrance going West on Smithtown. It is a sharp curve and people don't seem to slow down for it. 1. Cost to Residents. This topic has been under discussion for so long, sometimes prefaced with the concept the state would pay for much of it. With the state budget issues and rising project costs — we need to know what assessments are being considered. 2. Using only a painted line to segregate driving lanes from peds walk lanes is a little safety, there's no significant improvement. - Trail/sidewalk proposal should not be determined by the property owners along Smithtown Rd — this is a city safety issue. City should try to accommodate reasonable requests by property owners, but safety improvements should be made. - Do not want to be responsible for a paftin front of my property and paying to have it installed. - Time to complete — hopefully can be done to minimize detours. 1. Very concerned about the traffic /access to the school if work is not completed while school is not is session. 2. Parking @ school events is dangerous. I would like to be involved in discussions w /police /city officials about designated area for parking along Smithtown and Strawberry Lane. 3. I'm very interested in flashing lights @ school during arrival /dismissal to slow traffic down. Preference is to have the trail along the South side up to Cajed Lane and cross to the N. side. It would avoid the entrances to Boulder Br and only run along the back yds of the house and cemetary. Second choice would be to have the trail on the north side but at Howards Pt run behind the 3 houses. Provide more scenic route . Would prefer a 2 ft shoulder on both sides of road or at least on North side. South Side Comments: Question 7: Not in favor of a trail segment on the West portion of Smithtown Road. Prefer a 5.0 foot wide concrete walk. Prefer a 8 foot wide asphalt walk. Has no preference but do want some kind of walking right away for peds Question 8: Responses 3 Responses Do not want Smithtown Rd to be reconstructed. Roadway is fine the way it is. 0 Page 4 Roadway needs to be upgraded as long as pavement widths can be minimized 2 to help keep the speed of vehicles to a minimum. The roadway should be upgraded with wider lanes and shoulders. 3 Other: - Lanes stay the same w /4' shoulder on South side, the 2' shoulder on the north side w /5' concrete walkway. 4' shoulder on the south side would help the north side not be so wide w /the inclusion of a sidewalk, less invasive. - Perhaps a 4' shoulder on both sides. It does not pit neighbor vs. neighbor, both have same condition. Also 2' is to narrow and close to traffic. - Need to address safety & people not stopping at crosswalks. 20 mph restriction when light is flashing. Question 9: Indicate any other concerns you may have regarding proposal: - Project is not drawn out for many weeks. - Proper ped and bike rules. Involve use of both sides of road. 2' is to narrow. Check out shoulder widths in Mtka. 4' is safer. - Enforce speed limit. Smithtown Road East of LRT (Yellow) There were 6 responses. Of those 6 responses 3 were on the north side of the trail and 3 were on the south side. North Side: Question 7: Responses Not in favor of a trail segment on the West portion of Smithtown Rd. 0 Perfer a 5 foot wide concrete walk. 0 Prefer a 8 foot wide asphalt walk. 2 Did not check anything. 1 Page 5 Question 8: Responses Do not want Smithtown Rd to be constructed. Roadway is fine just way it is. 0 Roadway needs to be upgraded as long as pavement widths can be 2 minimized to help keep the speed of vehicles to a minimum. Roadway should be upgraded with wider lanes and shoulders. 1 Question 9: Any other concerns that you nnay have regarding this proposal: - Traffic is very heavy & wide road would mean faster traffic. There already is a regional trail. Residence shouldn't have to accommodate the whole area. Who will pay, we have already been accessed for water. - Perhaps cross over to swamp area instead of Boulder Bridge. Would like trail regardless of side. South Side: Question 7: Not in favor of a trail segment on the west portion of Smithtown Rd. Prefers a 5 foot wide concrete walk. Received one e-mail that is in favor of widening and expanding Smithtown Rd. Coninients: - It should be up to the people that live on that end. Question 8: Do not want Smithtown Rd to be reconstructed. Roadway is fine just way it is Roadway needs to be upgraded as long as pavement widths can be minimized to help keep speed of vehicles to minimum. Project Information (Blue) Responses 1 1 Responses 1 2 0 There were 36 responses. Page 6 Question 7: Responses Are not in favor of a trail segment on the West portion of Smithtown Rd. 3 Prefer a 5 foot wide concrete walk. 9 Prefer a 8 foot wide asphalt walk. 10 Prefers either 5 or 8 foot walk. 1 We received 13 a -mails in which all are in favor of some type of walking path. Question 8: Responses Is in the middle for not wanting Smithtown Rd reconstructed and to 1 have the road upgraded as long as pavement widths can be minimized to help keep the speed of vehicles to a minimum. Roadway needs to be upgraded as long as pavement widths can be 9 minimized to help keep the speed of vehicles to a minimum. Roadway should be upgraded with wider lanes and shoulders. 9 Other: 0 - Elevation of the rd could be evened out so the hill east of Wedgewood to the trail crossing & Eureka north of Smithtown are more level or less steep. - Consider ways to slow down traffic (speed bumps, stop signs). - Roadway needs to be upgraded for safety. Shorewood has no community feeling. - Wider but maintain speed! - Level of traffic and excessive speed makes this roadway dangerous as is. Question 9: Any other concerns that you may have regarding this proposal: - This issue is both East & West of the LRT. It needs to be upgraded — keeping safety #1; speed #2 and the road #3. - Would it be a 11' road, 4' shoulder, plus the 5 or 8' trail? This is a lot of space and concerned how my property line would be affected, both from space & visual perspective. is Page 7 . - It is absolutely critical that the trail stretches the entire portion of Smithtown and not "jump" over the section between Country Club and the trail. - When the police & fire station move to this end of town will there be more activity as they try to get to 7? - Shorewood needs to be assertive about improving the roadway. - Concerns are that it won't be done due to the upcoming state budget contraints. Will MSA funding allow Shorewood to do some type of landscaping between residents and trail. - Consider ways to slow down traffic in front of school. - Shorewood should not impose something on the people that live on the road. April 2002 Open House There were 64 responses. Of those 64 responses 10 were on west side of the trail and 8 were on the east side, 46 were resident comments. C� • 2. Address: `7 W y 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7, The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side Smithtown Road Comment hneet ' January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill out the following comment sheet. 1. Name: ..1 "'- 2. Address: 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? -L/ 6. If you live West oG a Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side A,.m +ioa Pb ;terms or characteristics that you would like to see maintained on or about Smithtown Road? utlit&U%.0 itY 1�VtiY \..Vttittarlt4 ..Jltv44 " January 14, 2043 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to out the following comment sheet. Name: 2. Address: C� /gr2f � � p p � LO -UNE 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: /3 617 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this t O roje ct? t� f� �) �'..J� 7`� O V�1?�">�. � ��!/� � f .�✓ � C`�4 = � , C 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7, The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.o foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side L711LL{.LL4V TV LL 1 \t/N4 \- %JLLLLLL...LLL LJMVL4 } January 14, 2003 r ; f To better define the goals and priorities of the Smithtown Road Improvement Prdject, ple"eel &eM fill ' out the following comment sheet. r t ; ` � I / M f _ .... �....... v. w:.r' 7 1. Name: l -�• �......._.w 2. Address: �J^ 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. . -xa. e • 8.0 foot wide asphalt walk continued on the reverse side 1 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 2. Addre; 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. Th City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk 8.0 foot wide asphalt walk conditued on the reverse side 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this L11111LULUW11 11VsiLL t..V111111Cpl OUCCI January 14, 2003 To better define the goals and priorities of the Sr iithtown Road Improvement Project, please feel free to out the following comment sheet. 1. Name: 77 r � Fre 2. Address: ,r Xc X10 t 3. OPTIONAL Telephone or e-mail address if you would like someone - to contact you regarding t s project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide. - concrete. walk -': -. 8.0 foot wide asphalt walk continued on the reverse side bn1ILnLOWn AOa(L t-011L MILL allCCL January 14, 2003 p To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to out the following comment sheet. 1 01. Name• �( S �► �} 2. Address: DW IJ 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics ofS mithtown Road that you would like to see changed as n A -9'i. A .n ✓' l e--� (7 ( _ v II Lr .. r - y � . project? u r... )art of this 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side 6. If you live West of the Regional frail, are you in xavor ox a uaii along ..)rrumtown xcoau: x "i 5mttntown .ttoaa t;omment 5neet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill out the following comment sheet. - 1. Name: t L 2. Address: U - qtr 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. A there items or characteristics that you would like to see maintained on or about Smithtown Road? 6od kota A rLr—'; � tp �t to-4 ylrtc3.rt� —� . Ga��G� g �} t (' t1R i J� - '� .[fin r1�- (j�� C i ( 2 r 4.4 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? i 6. If you � live i West of the Regional Trail, are you in favor of a trail - along Smithtown Road? l.J 41 l k f l . e - JC3 11� k� bj�o C . Cj I I L �,� y���u1 rz5 ►�U' '06L t C' � `' 1 S an V. W14bft(j) 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk continued on the reverse side vutaauwrru A %M"LL �Vii�iLa�+L{4 V ti�+44 " January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fi out the following comment sheet. ,j N`(AJ Q . Name: �p n i53 D/ 2. Addres 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this *project? 6. if you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? NO 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.4 foot wide concrete walls • 8.0 foot wide asphalt walk continued on the reverse side 2. Address: � ` I TIN 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there item or characteristics that you would like to see maintained on or about Smithtown Road? 5. A there items or characteristics of Smithtown Road that you would like to see changed as part of this project? IT J 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? W IS14L ern a RO A W7'Ab t3 ,Ni tJ v'� ' 4-k'i- kmoz 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the fallowing minimum sections be utilized. 5.0 foot wide concrete walk c) 7 1 C.,( &x- RNV W G - Y - \-4 u 'z 8.0 foot 'V ide asphalt walk continued on the reverse side Carl US . 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? '' Sri , 2cNV — - �Uc 6 T cQi 5i SUIc- t_ 6. If you live West of the Regional Trail, are you in favor of a, trail along Smithtown Road? 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk 011111ULUW11 11.U4U %- V11111cG1t6 OAACCi January 14, 2003 w To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to out the following comment sheet. N 0 1. Name: 2. Address:- 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: r kaA". m Ch 5 . cat� 0.1 &Uct� no am, rtes fb continued on the reverse side D1111fULUWLL INMAU. %,U11U1At;UL OUCC1 January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please fee free to out the following comment sheet. 1. Name: 1 w t (1 2. Address: = 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: z- -� -200) a3- . x, 1 opt nu- �6a\.cM 4. Are there items or characteristics that you would (' 1r\M Ar' h l ' ( � � � C MCI to see maintained on or about Smithtown Road? f y J 5. Are there iteins o charac o f S mithtown Road tha you would liijke- -t -Q. see cha as p of this ! ro3 'ect ? G � t 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 4_11 fnnt wide concrete walk • 8.0 foot wide asphalt walk • continued on the reverse side bmitntown xoaa �.urnmCUL OuCCL January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project; please feel free to fil out the following comment sheet. JA 1 ?�03 Name: 2.. Addres 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 951:�- - 1 -1 '7 '7 q � I 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? ^_-5 Are'trere items or charact of Smithtown Road that you would like to se changed as part of this is project. K J Ck r r 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? i� 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. D rr . 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk continued on the reverse side LAAA "16V.f LL iv.V Kaa v VAAIAAAVLLa v LLVVa It LL ?JJ �. January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement;Prgject, ` 969 & e to fill out the following comment sheet. ��� °` E ..' 1. Name: 2. Address: 3. OPTIONAL Telephone or e -mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this a project? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? A/ 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk continued on the reverse side January 14, 2003 JAN 17 2003 To better defuse the goals and priorities of the Smithtown Road Improvement'oject, please feel free to filil out the following comment sheet. x e._...�...�....- -- ..�_._w_ .... . Name: C- 2. Addres 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side IJ LALAiiLiV \1 LA..LO.VM.i VVAAAAAa4Aiw .✓ January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill out the following comment sheet: eB� k i . Name: 2. Address: f�l 3. OPTIONAL Telephone or e-mail address if you wou d like someone to contact you regarding this project: 1 4. here 1te or characteri 'cs t� would like to see maintain o or ab t Smithtown Road? a� "� 5. Are there items or c t acteristics of project? 0) you would like to see changed as part of this it 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following nntmri sections ber�ttihzet. 5.0 foot wide concrete walk ` .f 8.0 foot wide asphalt walk JAN 2003 Li ` continued on the reverse side ° ° °""' - �••� 0111LLULVYr11 AXUALL VVLLALkA%;UL L AI%.L.L January 14, 2003 4 To better define the goals and priorities of the Smithtown Road out the following comment sheet. 1, Name: 2. Address: r 3. OPTIONAL Telephone or e-mail address if you would like someone to JAN 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this I I* proj ect? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? _ 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk continued on the reverse side bmitntown tcoaa %-or ment bneet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, ease feel free to out the following comment sheet. 1 . j 0 2 003 1. Name: d -W Ld T_ 2. Address: 7 d 9 t Tic T ` c, L'a A A d , 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this pr oject: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this prof ect? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? . l Ale 7' rx , `1C ��� li / \.I 1 /'d b OL �` 1 L7 T V Lt h i v 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.4 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free�to fill out the following comment sheet. I. J 4 0 1. Name: 2. Address: ?�{7 ��- i' 3. OPTIONAL Telephone or e-mail address if you would like somepne contact you regarding 4 s project- 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? r!+to M A % 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? v S y1 * oT 7. The City will consider a trail segment along the west ,p ortion of Smithtown Road, if State Aid funds can be used To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk continued on the reverse side I.?1111444V TT4 1 \4.QU lr {J 1114141. U114.�+.. y January 14, 2003 w. To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fi ll out the following comment sheet. w � `- 1. Name: 1 6 ' 2043 0 "fqIbWtJ PIP 2. Address: Y"! 3. PT ONAL Telephone'or e address if you t w _ ould lake someone to contact you regarding this.project ....w._ . ll�rt s e 4. Are there items. or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side ' 0HUMLOWU nu7au %_Utuulcut. uucca January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill out the following comment sheet. C; C_ a ft0 (.1 - r �l. Name' "- %, 1'i�� �, ;. 2. Address: � - 7 (� C �U� . '{ c3 w n �- � y e � C ��yl ,�► a S �3 . 3 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? (d tt G• J AA t �. �� l.H � .'C �NIt �' �' r\ I i J t t L '4 e' , ;e u), ;)U G�V�� r � cJ 1 a r e OAS 5, Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side i s To better define the goals and pric out the following comment sheet. 1. Name: C, i , lit January 14, 2003 ;•!I )cities of the Smithtown Road Improvement Project, please feel free to fill 2 8-ovt -a w � I l'�'l. tjt r ( / 2. Address: cQ 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this pr . Coen 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? LU S hc>cc31 EY(7. n 7 s it, . _ t4 19 )9�p- cea.Cp+=O .) — TH`r+A) - -T��u 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 'U 6-: ON Srn I4h 4.6 w -,) i3oax s, i IV S 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? ,— Nd ELM lit riJ - - 14 �, Ro cx 0t Lk f- A,V-U) r JP sr --, -I - S - . AI t r .�. 7. The City will consider a trail segment along the west o ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk continued on the reverse side PatFaschin9 _...._ _.... _....__.. _. _.._ _- _........_...__ _.._.._ ..:.... From: ALSIP @aol.com Sent: Monday, January 13, 2003 6:21 PM To: cityhall @ci.shorewood.mn.us N W Cc: shorewoodcarvers @hotmail.com; kerickson @visi.com Subject: Smithtown Road Comment Sheet John Alsip 27940 Smithtown Road e -mail Alsip @aol.com I am not in town to attend and would like to give you my input. 4. Maintain country road character. 5. Create walk and bikeway where possible. 6. Yes, I would use such a trail almost daily. 7. 8 foot wide asphalt walk 8. I do not want Smithtown Road reconstructed. 9. I believe a trail would greatly enchance living in this area and would complement Regional Trail which I use almost daily. Thanks, John Alsip 1/14/03 Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill ut the following comment sheet. 1. Namet. � 2. Address: , : - j -:�= �r c''� - A, ' 3, OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? • 5, Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • . 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side d/IJ YI '. 1 . 1 - C. f Smithtown Road Comment Sheet f January 14, 2003 JAN 10 2003 To better define the goals and priorities of the Smithtown Road Improvement Prcjat, p lease feel free to fill,,',/ i s out the following comment sheet. 1. Name: X" C 4 a L e--� k P• FTJI�,!� 2. Address: c:2SIL? �X f if l 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this projectl 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7, The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk C continued on the reverse side co 01, «,v5 Smithtown Road Comment Sheet ' ``-' u ' - 2 - Q - 4 Sc,> 1 K January 14, 2003 ,� � +k4 Y1 - r -; er define the goals and priorities of the Smithtown Road ImprovementUject, please "feeF4 to i" e following comment sheet. • Name: 1. .. 2. Addres 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? eD" titif © UJ c J �` k �-F i� S fit" - GU_r ca m p ctn t 5. Are there items or characteristics of Smithtown Road that you would like to see changed asp of this is project? - 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • • 5.0 foot wide concrete walk 8.0 foot wide as halt walk continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 " To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free'to fill out the Z5�1 following co ent sheet. L �-- ( �. 1. Name: L.. C� C c 1�1 � 1 . 2. Address: S�� S J T r l b C�J � ' �- 3 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regdtd u' tg this projedfti r ..� s 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? c' �t-� L :5 EE ,uo P_C . a&)M ti_� MrAJ i+J (0a9M) SI T" 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? .0 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk 8.0 foot wide asphalt walk LJ continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill !ut the following comment sheet. 1. Name: �.�. .� ��... 2. Address: � F '.` 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Ate tl�ere or char cteristics that you would like to see maintained on or ab ---- - ----- &-s C • 5. Are there s or project? g� ti �.t Smithtown Road? r y lCZ�.� _ - - . _ � 1 1 •1 t _ _ _ _ �16`4�- _. _ _ as part of this I - 57e- : j A --- �4—c G��5 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • . 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side Page 1 of I o � � Pat Faschin From: BRNITZ@aol.com Sent: Wednesday, January 15.30039:20AM ~-- To: oit/ho||@ci.ohqravvood.nnn.ua Subject: smithtown road 2-5015 I am writing in regard to expansion or widening of Smithtown Road. As a resident of Smithtown Rood |amin favor of the expansion and any wa lane that may give us easier and safer access to the trail. Thank you, Beth Ndz 0 1/1r%/0q Smithtown Road Comment Sheet January 14, 2003 t To better define the goals and priorities of the Smithtown Road O t the following c�� t• � 1. Name: ttA�o�ect, please feel free to ' r' JAN 22 2003 2. Address: l.? 3. OPTIONAL Telephone or e-mail address if you wel like someone to contact you regarding 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 0 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this 6. if you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? O 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 >; 1 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel. free to fill . out the following comment sheet. 1. Name: VIM 1 6 2003 j 2. Address: cz e, 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 0-0 4. Are there items or characteristics that yoJu / would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? r 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk 8.0 foot wide asphalt walk • continued on the reverse side Smithtown Road Comment Sheet F .021. • January 14, 2003 m i 4 �Fr. To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill t the following comment sheet. 1. Name: 2. Address: - O 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? . _ 4. _ a/In a N F m ,a 1) r. \ An ►c A--- - ? !("' `1t1 A (� � fI 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of �t Q.. 4 1& 0`•- GL O pro ect? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Proje U Tease feel e tl } out the following comment sheet. n ` ---- ---- w- - - -- .. `' ' 1. Name: 2. Address 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 0 5. Are there items or characterinscs of SmithtowA Road that you would like to see changed as part of this proj ect? 4 0 r 4 o Arc 4-v-D 6. If you live West of the Regional Trail, are you in favor of a trail along Smi�h�own Road? KC) ' L. 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wid concrete walk )' , 1� h p • 8.0 foot wide asphalt walk continued on the reverse side 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement out the following comment sheet. 1 . Name: ►ll. 4 kqj n 2. Address: 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? — 3; Are ere items or charac eriss cs of�Smfth�own Roa3�hat you wouldZ ce to see change as part o thus - 1 6pro'ect? 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk bra �27 please feel free to N, JAN MM contracted on the reverse side 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free t out the following comment sheet. 1. Name: f llr 1 L� f` 2. Address: 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: QA ,,1 R -I..; A , h e-1 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west b ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk 8.0 foot wide asphalt walk • continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free t ut the following comment sheet. 0 * ` / 01 C 1 1. Name. of rn V f" 2. Address: S S t1i i t'" 7o wo e i rc 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? !V 4 4 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? �/ i''ti° 0 •<tl �e edg t o d 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk continued on the reverse side V70iS•P Smithtown Road Comment Sheet 1. Name: 2. Address: 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like t( � � r J.. 5. Are there items or charactepstics of Smithtc project? see main exre- tained on or about ( Smithtown Road? you would like to see changed as part of this 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill W t the following comment sheet. 1. Name: J { " r. 2. Address: _�r ; 61 kI Gt 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: eta 4. Are there items or that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? I/ 7. The City will consider a trail segment along the w est p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 9 • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk ,� Vi n., -��• j'��! �""' , continued on the reverse side Smithtown Road Comment Sheet $° January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill" out the following comment sheet. 1. Name: 2003 2. Address: 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 1 0 - IYle- W1r"e 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk continued on the reverse side 6. if you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? Smithtown Road Comment Sheet January 14, 2003 Fr } To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill M ut the following comment sheet. 1. Name: C/ 2. Address • S4 �7 �� � � � ' �`'�}_.__ 3. OPTIONAL Telephone or e address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this F l r V,"-,17- Sfi- vim, % ��, - - -� r. � S�tc�vf Yv G al— ) - I + c - 7 o , " 1Qi1° C' S' j D/) s 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 01 ' 5 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to out the following comment sheet. 1. Name: 2. Address: X200 ga y4-n rIc- . F- kett.'Ke 44 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part 9 his _.. project? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? Y — (J i ,�J �•L t"lf 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fil �ut the following comment sheet. 1. Name: �� c g S �`-� a 2. Address: �'/'9 / %/s/c fo.inre 3. OPTIO Telephone or / e -mail address if you would like someone to contact you regarding this project: ,,�a 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of S 'tht wn oad that you oul li e to ee ch as part of this 1 /r /Q / 7 ',�G d c'J 7I'r a ec project? �/•' d G �t �f nSitOc� / l M .lr� / e 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west portion of Srnitl tgv�n oad; tf State Ald Buii can be used. To use these funds, the State mandates that the one of the follow"'m minimum sections be utilized. • 5.0 foot wide concrete walk ;; `,.. JAN 14 2003 • 8.0 foot wide asphalt walk continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 o etter define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill out the following comment sheet. 1. Name: 2. Address: 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? CA r. yy G'i c � t h %-�� '-.'' ,. v 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk 46 • 8.0 foot wide asphalt walk continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to *ut the following comment sheet. 1. Name: 2. Address: 4 51� 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4, Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? `� r�J2 — J - '1 , ,t I„ n e fL C +n r L.� v� .. • t t) p (L t 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? n b 7. The City will consider a trail segment along the Elst portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill out the following comment sheet. 1. Name: 2. Address: 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? - o - 1by" � b e.. -S 4 e+ - V<-.CA -t 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this proj ect? o t``t - i - vy w :4.c . W C '� c , S c A# 6. If you live Wet of the Regional Trail, are you in favor of a trail along Smithtown Road? 1 1 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 To better ke#ne the goals and priorities of the Smithtown Road Improvement Project, please feel free to flh lo ut the following comment sheet. Ck - e5 Qtncl P 1. Name 2. Address: b7 ! f r�v-cj i'✓f L� S wv4lCf 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: L� -7 4-�- daY / 9 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? f 1 +1e 4 .5.675 lj emeh'ng Lane, u nd e ve v y da y we 4 vy 40 p ut/ Q .4- � �� � �!� �-d w fl al he C"d Kne n f yV P c� q� bVcr E/d c� n C/ S i'' �j� ��J n'1//!'1 �- A e YP !' s q s ll•c1h4 hill / -IL ye r y haY��U s' -Cc- 1 7 C a c"ar We is � a� , •h c � M -� �' 1 /� � 4 / ds'� �S Yi � � :t- �`n r Un � d d� , 4s we ll y dan ve7 G . . 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk 8.0 foot wide asphalt walk continued on the reverse side Smithtown Road Comment Sheet - January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project; please 40 t out the following comment sheet. 1. Name: �` '(� C � LS E✓ 2. Address: c ST'A— 2 t 1�.� . T _5 FtyJ?—&C 1 01l 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? o �_)Z)= uftJ& E-5T A N U W ff y YO .- - - rzlbC A& U i " QJ C.. 5 T / O F 7At �2 �r EUUY S5i II-� L( vE S o,v 7 A—I? t _A &I F /C / f2. (EXCE 7-YA .r 1 / VE S '17te- PE77 T70 (0 7Z) VJ fti.tGwrat- -- t v ?;`7 Fev -f - n Af G J l 7. The City will consider a trail segment along iiie west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that tie one of the following minimum sections be utilized. • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk • continued on the reverse side Smithtown Road Comment Sheet J 14 2003 anuary , To better define the goals and priorities of the Smithtown Road hnprovement Project, please feel free to ut the following comment sheet.^` 1. Name: 2. Addres 3. OPTION hone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Sine town Road? / /G A, � .EI z2& - 5. Are there items or characteristics of Smithtown Road that you would like to see changed aas / part of this project? l 4 6. If you live West o a Renal Frail, are , u in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk 8.0 foot wide asphalt walk contincced on the reverse side Smithtown Road Comment Sheet January 14, 2003 - To better define the goals and priorities of the Smithtown Road Improvement Project, free to fill F out the following comment sheet. -- , tw '!f 1. Name: �y1J�ce f� -C..y� 3 . JAN 16 2003 i 2. Address: 3. OPTIONAL Telephone or e-mail address if you would like someone to -, ri I -- 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk continued on the reverse side Please indicate the following: W I (We) are not in favor of a trail segment on the West portion of Smithtown Road. ❑ If a walk is to be considered on the West portion of Smithtown Road, I (We) prefer a 5.0 foot wide concrete walk. 8. Please check one of the items that best fits your feelings about the project ❑ I do not want Smithtown Road to be reconstructed. The roadway is fine just the way it is today. — g p _ - _._.--.--• -- to - - - -. . ❑ The eeds'to�e a. - acted as�i as avemen widths can be ininuruzo help keep the speed of vehicles to a minimum. 9. Please indicate any other concerns that you may have reizardina this uronosal: ' L& < - yJ - If a walk is to be considered on the West portion of Smithtown Road, I (We) prefer an 8 foot wide asphalt walk. ❑ The roadway should be upgraded with wider lanes and shoulders. Smithtown Road Comment Sheet January 14 2003 l To better define the goals and priorities of the Smithtown Road Improvement Pr t '" t;, please feel free to fill out the following comment sheet. JAN 0 2003 1. Name: 2. Address: I e-b7 3de r 4 � A • . _ __ 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this projec . 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? 0 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk 0 8.0 foot wide asphalt walk continued on the reverse side Smithtown Road Comment Sheet January 14, 2003 x To better define the goals and priorities of the Smithtown Road Improvement Project; pleasa l yep t2D@l ut the following comment sheet. 1. Name: 4 2. Address: 3. OPTIONAL Telephone o ail address if you would like someone to contact you regarding this project: r"ZI N +7o ,,, o A A5 ' a, a 0 AD L • w6 u.va-d- Mot- be ? `f� , ✓ d, e, � 1t. 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this 0 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk conthuced on the reverse side smitt'►town Koaa %- UUUucu%' 0AIVv a, r V January 14, 2043 To better define the goats and priorities of the Smithtown Road Improvement Project, please feel free to fill µ' out the following comment sheet. 1. Name: 2. Address: �� r w - 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? g, Are there itexris or characteristics of Smithtown Road that you would like to see changed as part of this project? - � nn C,-i 1 �- n• .. . ?G . jDo r tovi G�J �Ji�1.•f G'I 61-I�f u live K * „1 d � 0 E7 f7 "AO V`T� Ifly4 A ct tai Cl1Cz... c' . tM c.t.CllL . d, vgJ vt w� Gvo t.t.C cQ. +�`f C.u��t. 'I��e� 5� i c.v;V a3 Trail, are you m favor of a trail along Smithtown Road? 0. �i u .1_ d� r,, Y 7. The City will consider a trail segment along the westtp ortion of Smithtown Road, if State Aid funds can be. ,v ced. To use these funds, the State mandates that the one of the following minimum sections be utilized. . • ' 5.0 foot wide concrete walk .- 8.0 foot wide asphalt walk continued an the reverse side 't i S.. `` JAN 13 2003 Page 1 of 1 Pat Fasching .............. From: BironMN@aol.com Sent: Tuesday, January 14, 2003 12:54 PM To: Cityhall @ci.shorewood.mn.us Subject: walking trail From: Ann and Dave Biron 27035 Noble Rd Shorewood, MN 55331 952 -470 -4480 Please vote yes to a walking trail on Smithtown Road. Look to the furture and think of the families that this would benefit. Thank You • • /I am'A Page 1 of 1 Pa t Faschinl From: DStein470@aol.com Sent: Tuesday, January 14, 2003 12:07 PM To: cityhall @ci.shorewood.mn.us Subject: Smithtown Walking Trail To Whom it may concern; As a lifelong area resident I have seen Smithtown road grow from a sleepy country road, to a very busy commuter road. Growing up, we could ride our bikes 5 and 6 abreast to the Minnetonka Plaza and never see a car. Now I feel very uncormfortble walking on the side of the road, and never let my children ride or walk alone due to traffic. I strongly encourage the City of Shorewood to install a walkway for the safety of our children. Chris Stein 26790 Noble Rd Shorewood, Mn 952 -470 -1395 • • 1 i1 n rnz Pat Fasch Michael Histon [mike.histon@lejeunesteel.com] Won m t: Tuesday, January 14, 2003 2:03 PM To: cityhall@ci.shorewood.mn.us Subject: Smithtown Road To: City of Shorewood From: Mike and Ketti Histon 26220 Wildrose Lane Shorewood, MN 55331 952 - 401 -3872 We are not able to attend the meeting tonight. However, I would like to express a positive consideration for the construction of a sidewalk / trail, along Smithtown Road. if a type of construction will be discussed at the meeting; We would favor a 8' non -paved trail. Thanks, r� • .rage i.ori Pat Fasching _:_....._. From: Caroline Anderson [ caroline .anderson @teamwheretolive.com] Sent: Tuesday, January 14, 2003 10:42 AM To: cityhall @ci.shorewood.mn.us Subject: Smithtown Road.. I would just like to express my concern regarding walkways on Smithtown Road. I've learned there will be a meeting at city hall tonight that I cannot attend. I feel it is a necessity to have walkways along Smithtown Road for the safety of our communityU Both drivers and pedestriansil My vote is YES to walkways along Smithtown Roadil Sincerely, Caroline Anderson 26940 West 62nd St. Shorewood, MN 55331 • • 1/14/03 Pat Fasching lW om: Les(ee.G.McGraw @gsk.com nt: Tuesday, January 14, 2003 2:38 PM To: cityhall @ci.shorewood.mn.us Cc: HUMPHREYHOME @cs.com Subject: Smithtown Rd Project •Z (o `) 3 5 m A P-50 . Ptv„rF& & a 4r I strongly support the following : SMITHTOWN RD. BETWEEN THE REGIONAL TRAIL & VICTORIA CITY LIMITS; - Two 11 foot driving lanes (one in each direction) - one 2 foot shoulder on the South side of Smithtown Rd. - One 4 ft. shoulder on the North side of Smithtown Rd. - Consideration of a trail on the North side of Smithtown Rd. that can range in width between 5 -8 feet, dependent upon public input. Leslee McGraw L • Pat Faschi From: HUMPHREYHOME @cs.com Sent: Tuesday, January 14, 2003 3:06 PM To: cityhall @ci.shorewood.mn.us Subject: Smithtown Project To Whom It May Concern, I strongly believe that Smithtown Road needs to have a safe place for pedestrians/bikes. I am very concerned that reconstructing the road may lead to increased speeding and would be in favor of any ideas to keep cars from speeding. However, there is already a speeding problem on the road and currently no safe area for pedestrians /bikes. I live WEST of the regional trail and I am in favor of a trail segmentl I prefer the 8 ft. asphalt. But, would be O.K. with the 5 ft. concrete. WE NEED SOMETHING for pedestrian /bike safety! Thanks! Pam Humphrey 26825 Marsh Pointe Circle Shorewood, MN 55331 • Page 1 of 1 • Pat Faschi • From: Wehling, Terry [twehling @mgipharma.com] Sent: Tuesday, January 14, 2003 3:43 PM To: 'cityhall @ci.shorewood.mn.us' Subject: Smithtown road improvements To Whom It May Concern: My name is Terry Wehling and I reside, with my wife and son, at 5675 Marsh Pointe Drive. I am very interested in seeing a sufficient shoulder (at least 4 feet) on one side of the road. Many other children live in our neighborhood and this road is very dangerous in its present state. As this is the main way in and out of our neighborhood, my son's safety is of up most concern. There is no safe way to walk, ride or run along Smithtown road. This must be corrected to allow all children a safe way to get to surrounding areas. Thanks for taking the initiative to improve this roadway. Regards, Terry J. Wehling 5675 Marsh Pointe Drive Shorewood, MN 55331 1/14/03 Pat Faschi From: Frank & Sabrina Harvey [fsharvey @msn.com] Sent: Tuesday, January 14, 2003 4:06 PM To: cityhall @ci.shorewood.mn.us Subject: SMithtown Walking Trail L(0t055 nresr RP Page 1 of 1 I can't be at the meeting tonight but I did want to register my support for a walking trail - for as much of the length of Smithtown as possible but particularly from Grant Lorenz Howard's Point. I also think there should be doggy bags and poop receptacles along the route. I don't think it even has to be paved, although that would be nice. Just maintained hard pack gravel would be great. Sabrina Harvey 1/14/01 I Pat Fasching Mom: Ilga Alexander [ilga @transactual.com] 'Went: Tuesday, January 14, 2003 8:49 PM To: cityhall @ci.shorewood.mn.us Subject: Smithtown Road Good Morning! I was not able to attend the open house last night concerning Smithtown Road, but would like my opinion on the project noted. There is no question that Smithtown Road is an accident waiting to happen. From the perspective of a walker, I often have jumped into the ditch when two cars -- both often traveling in excess of the speed limit and one most always heading directly into the sun -- meet in the road right where I'm walking. On family bike rides with our elementary-age children, we must ride on some portion of Smithtown to get to the trail or a safer side street and we must position one parent in front of the kids and one parent behind for safety sake. We do not enjoy the portion of our outings that take place on Smithtown Road because we must be on constant alert for our safety. I believe that the only way to make Smithtown Road safer is to add a sidewalk to be used by walkers or bikers. I appreciate that some homeowners vho live right on Smithtown and whose property is affected have issues with this project and I encourage the city to work with them to impose as little as necessary on them to make this a safer community for all of us. Thank you. Ilga Alexander 5575 Marsh Pointe Dr. Shorewood, MN. 55331 k n U Page 1 of 1 Pat Faschin From: lorridonlin @msn.com Sent: Tuesday, January 14, 2003 9:04 PM To: cityhail @ci.shorewood.mn.us Cc: HUMPHREYHOME @cs.com Subject: Smithtown Project Dear City Manager and Council Members, 1 am a resident of the Marsh Pointe neighborhood. I am writing to express my strong support for a walking /running /biking trail along Smithtown road between the regional trail and the Victoria City limits. I think everyone agrees that Smithtown is currently a very dangerous road for pedestrians, and the debate is whether to go with a shoulder or a separate trail. I believe the separate trail is the best option for the obvious safety reasons, and I also believe it will foster increased usage of the regional trail (a fantastic local asset). As among the options, I am in favor of the wider (8 ft.) trail. As a runner, and the father of three young children, I can speak first hand of the dangers of the current situation. I strongly urge you to approve a separate 8 ft. trail for the "west end" of Smithtown Road. Sincerely, David L. Donlin 26855 Marsh Pointe Circle Shorewood, MN 55331 1/1V(11A Proposal for Smithtown Rd Page 1 of 1 Pat Fasching . ........ ...... From: Hunter, Jodie [CNTUS] [JHunter@cntus.jnj.com] Sent: Tuesday, January 14, 2003 7:49 PM To: 'cityh all @ci.shorewood.mn.us' Subject: Proposal for Smithtown Rd importance: High Dear City Of Shorewood, I am a resident of Shorewood residing at 5675 Marsh Pointe Drive, Shorewood Mn. The decision to be made concerning Smithtown Rd will directly effect safety and convenience for my family, and our neighborhood. I fully support a four foot shoulder on the North Side of Smithtown Road, both between Cty Rd 19 all the way to Victoria City Limits. Currently, it is an extreme hazard for all pedestrians to venture out onto Smithtown Road. Access to the Regional Trial is impaired due to the extremely dangerous narrow road. Due to the safety concerns, we currently have to drive and park off of Smithtown to gain access to the Regional trail, when we live only a few blocks away. Minnewashta Public Elementary School children are also at extreme risk with no walkway or shoulder on Smithtown. we owe it to our children in this community to create a safe.walkway. The value of a safer community outweighs the potential costs of purchasing the land and construction costs. Please consider this as my official vote for the 4 foot shoulder on the North Side of Smithtown Rd. If you have any questions, please don't hesitate to call. Thank You, Jodie Wehling 5675 Marsh Pointe Drive Shorewood, Mn 55331 952-474-0866 • 1 /1 r%lf)q Pat Faschi From: Lori Wright (I wright30 a@hotmail.com] . Sent: Tuesday, January 14, 2003 7:38 PM To: cityhall@ci.shorewood.mn.us Subject: Smithtown Road Remodel Names: Cal and Lori Wright 28065 Boulder Bridge Dr., Shorewood, MN 55331 We are unable to attend the open house. We are in favor of a trail along Smithtown Rd. if a walk is to be considered, we prefer a 5.0 wide concrete walk. We feel the roadway needs to be upgraded with wider shoulders. Thank you. The new MSN 8 is here: Try it free* for 2 months http: / /join.msn.com /'?page= dept /dialup • 1 • January 16, 2003 Mr. Larry Brown, City Engineer City of Shorewood 5755 Country Club Road Shorewood, MN 55331 1; ®r;; JA N 2 2 2003 Herb A. Margolis, President _' Boulder Bridge Farm Homeowner$ Assoc. - 28045 Boulder Bridge Drive Shorewood, MN 55331 Dear Mr. Brown, • Please find attached a copy of our April 2002 correspondence to you relating to improvements on Smithtown Road and specifically the idea and need for a trail. Once again on behalf of the 44 homeowners within Boulder Bridge Farm. Homeowners Association of Shorewood we heartily support the need for an upgrade to Smithtown Road and the need fora separate pedestrian/bile trail system However, as our previous correspondence stated we feel the location of the trail is best placed on the south side of Smithtown Road as it adjoins Victoria, thus running the trail adjacent to the wetland area and in the rear yards of those neighbors along 'Virginia Highlands and along the cemetery area. It could then cross Smithtown Road at the inter- section of Cajed Lane and continuing on the north side of Smithtown running along the wetland area than past Minnewashta School to interconnect with the trail at $ureka. It does not appear in the planning process that our input was taken into consideration. Our first concern is of the trail being to tight to our existing hedge row between our two main entrances. Secondly, concerns on crossing Howard's Point Road, a busier intersection than Cajed Lane and the fact that Howard's Point Road has restricted vision at the intersection. We would ask that more consideration be given to the trail being planned on the south side of Smithtown following the wetland area. Our desire is that the trail be 5 feet in width so as not to appear as another driving lane for teenage pranksters who have driven on Boulder Bridge Farm Trails in the past. Please keep us informed as to further plan developments as they progress since this is an important issue to our neighborhood. meowners Assoc. • cc: Mayor Woody Love 4 April 16, 2002 Herb A. Margolis, President ? . JAN 2 2 2003 Boulder Bridge Farm Homeowners Association 28045 Boulder Bridge Drive Shorewood, MN 55331 _ ._..... Mr. Larry Brown, City Engineer City of Shorewood 5755 Country Club Road Shorewood, MN 55331 Dear Mr. Brown, Boulder Bridge Farm Homeowners Association represents forty -four residents of Shorewood On April 6, 2002, we held our annual homeowners meeting. The Smithtown Road proposal was discussed at length. All residents were enthusiastic concerning the overdue need to reconstruct and resurface Smithtown Road. After analyzing the proposed plan, the residents expressed an overwhelming concern that a separate pedestrian walkway was not included in the plan. Our primary concerns are for the safety of our children walking, running and biking not only to M'innewashta Elementary School, but also to gain access to the trail system at Eureka Road. School budget cuts are looming, possibly eliminating bus transportation within two miles of any school. It is not a safe alternative for motorists dodging pedestrians on the shoulder of a heavily trafficked roadway. Research has been confirmed that Shorewood is reaching maximum population. Thus safety must be in the forefront of our city planning. We support and encourage the City of Shorewood to revise its existing plan to include a separate 5-6' wide trail. Beginning at Shorewood's westerly boundary with Victoria. This trail could follow the wetland area on the south side of Smithtown Road up to the cemetery where it could then cross Smithtown Road via crosshatch markings. Then proceeding up the wetland area on the North side of Smithtown Road to travel past Mirmewashta School to the trail intercept at Eureka Road. A motion was unanimously passed representing our forty -four tax paying Shorewood residents, in support for the aforementioned road and trail improvements. We are anticipating our voices to be heard and considered in your upcoming review. Please keep us informed of your progress and intentions as plans are developed. Since y, 4-- tZ Herb Margolis, Presi4e Boulder Bridge Farm Homeowners Association cc: Mayor Woody Love • ! MO Db • 0 Memorandum To: Park Commission From: Twila Date: 02/03/03 Re: Smithtown Road Comment Sheets Attached are comment sheets that I have received after the packet had been assembled. Twila • • 1 Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill ut the following comment sheet. 1 1. Name: /�. �1 k U'9 C 2. Address: a(� ��> 5In t i H <t) L- / Z-- /L'����?�o y 5 S ��er =/ 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: '96 q� — dal') cz /)r 4s to/) r _YU ro 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. *roj ect? 91 If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? 7. The City will consider a trail segment along the west p ortion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk p JAN 3 1 2003 continued on the reverse side Are there items or characteristics of Smithtown Road that you would like to see changed as part of this Please indicate the following: ❑ I (We) are not in favor of a trail segment on the West portion of Smithtown Road. • � - ® • .,, , z-- If a walk is to be considered on the West portion of Smithtown Road, I (We) prefer a 5.0 foot wide a concrete walk. If a walk is to be considered on the West portion of Smithtown Road, I (We) prefer an 8 foot wide asphalt walk. 1 8. Please check one of the items that best fits your feelings about the project ❑ I do not want Smithtown Road to be reconstructed. The roadway is fine just the way it is today. Ll The roadway needs to be upgraded as long as pavement widths can be minimize to kdep the speed of vehicles to a minimum. • ❑ The roadway should be upgraded with wider lanes and shoulders. Other: G��/LZ 2L / .Te' t� - c ; �u� f Q 9. Please indicate any other concerns that you may have regarding this proposal: Smithtown Road Comment Sheet January 14, 2003 To better define the goals and priorities of the Smithtown Road Improvement Project, please feel free to fill ut the following comment sheet. JAN 2 8 2003 1. Name: hGL 1 2. Address: Y 3. OPTIONAL Telephone or e-mail address if you would like someone to contact you regarding this project: q�a - tOg - q ( i 1) 4. Are there items or characteristics that you would like to see maintained on or about Smithtown Road? 5. Are there items or characteristics of Smithtown Road that you would like to see changed as part of this project? mrt)4 6. If you live West of the Regional Trail, are you in favor of a trail along Smithtown Road? % 1 �-� r / A - __1 I .. J i I / __ / e_, 6t t 7. The City will consider a trail segment along the west portion of Smithtown Road, if State Aid funds can be used. To use these funds, the State mandates that the one of the following minimum sections be utilized. • • 5.0 foot wide concrete walk • 8.0 foot wide asphalt walk continued on the reverse side Please indicate the following: ❑ I`(We)',are'not in favor of a trail segment on the West portion of Smithtown Road. If a walk is to be considered on the West portion of Smithtown Road, I (We) prefer a 5.0 foot wide concrete walk. 8. Please check one of the items that best fits your feelings about the project ❑ I do not want Smithtown Road to be reconstructed. The roadway is fine just the way it is today. j The roadway needs to be upgraded as long as pavement widths can be minimized td keep the speed of vehicles to a minimum. i ❑ The roadway should be upgraded with wider lanes and shoulders. they: C m d � �A� 9. Please indicate any other concerns that you may have regarding this proposal: )e /11 r ❑ If a walk is to be considered on the West portion of Smithtown Road, I (We) prefer an 8 foot wide asphalt walk. I r Pat Fasching N rom: Amy Oppegaard [aoppegaard @wehmann.com] ent: Sunday, February 02, 2003 3 :25 PM To: cityhall @ci.shorewood.mn.us Subject: Smithtown Project To Whom It May Concern- I don't know if these comments are too late or not, but I was unable to attend the open house on January 14th and thought I would try to send some comments via email instead. Basically, it's simple. I am 100W all for the proposal! I believe the shoulder, sidewalk and or trail is very important to Smithtown. I just moved out here from Southwest Minneapolis where sidewalks are everywhere. I truly believe having a sidewalk /trail is the safest way to travel on foot or bike (for little ones especially). Smithtown is becoming very, very busy. I believe it would be a mistake NOT TO put these trails /sidewalks into place. Thanks for listening and I hope this helps! Amy Oppegaard • • 1