Loading...
040488pkaCITY OF SHOREWOOD PARR COMMISSION MEETING MONDAY,APRIL 4, 1988 0 AGENDA CALL TO ORDER APPROVAL OF MINUTES A. March 7, 1988 B. March 21, 1988 1. PARK DEDICATION DECISION - STRAWBERRY FIELDS 2. PARK DEDICATION DECISION - NEAR MOUNTAIN P.U.D. 3. BMX TRACK BLEACHER LOCATION IN BADGER PARK i 4. FREEMAN PARK - SHAPE OF PARKING LOTS 5. MANOR PARK WARMING HOUSE /PAVILION 6. BUDGET REVIEW 7. MATTERS FROM THE FLOOR 8. REPORTS 9. ADJOURNMENT COUNCIL CHAMBERS 5755 COUNTRY CLUB ROAD 7:00 PM APRIL 11 LIAISON - JAKEL APRIL 25 LIAISON - JAKEL VOGEL LINDSTROM JAKEL LABEREE CHRISTENSEN ANDRUS WEATHERLY 0 CITY OF MAYOR Robert Rascop COUNCI L Jan Haugen Kristi Stover Robert Gagne Barb Brancel ADMINISTRATOR Daniel J. Vogt SHOREWOOD 5755 COUNTRY CLUB ROAD • SHOREWOOD, MINNESOTA 55331 • (612) 474 -3236 TO: FROM: DATE: RE : PARK COMMISSION AND COUNCIL LIAISON BRANCEL SUE NICCUN APRIL 1, 1988 MISCELLANEOUS PARK ISSUES FREEMAN PARK WATER The Engineer is working on a cost estimate regarding hooking up to Shorewood Oaks water. Regarding digging a well ...... the Commission is asked to consider the fact that it would require a larger well than a residential, it would require installation of electricity to run the well, and maintenance could be quite costly. FREEMAN PARK FENCING This is difficult to work out at this time, it can be considered after the lots are done. FREEMAN PARK INFIELDS /PARKING AREA CLASS V See OSM's Preconstruction meeting report included in your packets - page 3, 14B. WARMING HOUSE /PAVILION - MANOR PARK Attorney Froberg said if the cost runs below $15,000 there isn't any problem. The person Dan has to talk to at NSP is on vacation. Dan will talk to him when he returns. Dan will talk to two other similar companies regarding price. Brad will review the plan from whatever contractor is chosen, there will not be any additional cost for doing new plans. CHANHASSEN EASEMENT Chanhassen will talk to NSP is any problem regarding this. There will not be any grade to provide better drainage. condition. They will favor at least 9i' on the bouleva about underground utilities, they do not foresee Protecting the trees will be in the contract. change, in fact it may be lowered in some places The area will be fully restored to its original the east regarding the road and try to leave rd. They are willing to do a driveway cut. A Residential Community on Lake Minnetonka's South Shore 1 FUNDING SOURC:6t PF = Park Fund G = Grants C = Contributions PROJECT TITLE CATHCART PARK Hockey Rink Replacement MANOR PARK Finish work on field CATHCART PARK Well Building CATHCART, MANOR, FREEMAN, BADGER AND SILVERWOOD PARKS Picnic facilities Acquisition or Replacement CATHCART, MANOR, FREEMAN, BADGER AND SILVERWOOD PARKS Landscaping and Reforestation FREEMAN PARK Trails, Road, Parking, Signs, Site Improvement and Landscaping FREEMAN PARK 2 Softball Fields BADGER PARK Hockey Rink Replacement MANOR PARK Warming House /Picnic Pavilion MANOR PARK Parking Lot - Gravel MANOR PARK Wall- Replace FREEMAN PARK Playground Equipment FREEMAN PARK Family Area, Skating Area, and Soccer Field SILVERWOOD PARK Improvements FREEMAN PARK Special Land Acquisition i.e. Expand Passive Nature Trail PROJECT COST $ 5,000 2,000 2,300 25,000 25,000 100,000 25,000 5,000 500 8,000 10,000 50,000 75,000 10,000 CITY OF SHOD PARKS AND RECREATION CAPITAL 1MPROVEMENTS PROGRAM 1986 1987 1988 2,000 (PF) 2,300 (PF) 5,000 (PF)(C) 5,000 (PF)(C) 5,000 (PF)(C) 5,000 (PF)(C) 5,000 (PF)(C) 5,000 (PF)(C) 100,000 (PF)(G)(C) , 25,000 (PF)(G)(C) 500 (PF) • 1989 1990 $ 5,000 5,000 (PF)(C) 5,000 (PF)(C) 5,000 (PF)(C) 5,000 (PF)(C) 5,000 8,000 (PF)(G)(C) 10,000 (PF)(G)(C) 10,000 (PF)(G)(C) 10,000 (PF)(G)(C) 20,000 (PF)(G)(C) 10,000 (PF)(G)(C) 5,000 (PF)(G)(C) 30,000 (PF)(G)(C) 40,000 (PF)(G)(C) 10,000 (PF)(G)(C) 0 PARK TRAILS J ACCESS TO RAILROAD YEAR DONE 7g$$ 0 -0- ITEM EXISTING NEW WHAT NEEDS TO BE DONE WHEN COST SMITHTOWN ROAD BIKE BATH COLLECTOR STREETS BIKE PATHS VINE HILL EUREKA YELLOWSTONE COUNTRY CLUB COVINGTON ROAD PARR CATHCART i YEAR DONE 1988 i ITEM EXISTING NEW WHAT NEEDS TO BE D ONE WHEN COST WATER TREE MOVING RELOCATION OF BALLFIELD PER PLAN NEW PARR SHELTER LANDSCAPING PARKING LOT • PARK BADGER 0 YEAR DONE 1988 C� ITEM EXISTING NEW WHAT NEEDS TO BE DONE WHEN COST NEW HOCKEY RINK (REBUILD & MOVE OVER) WALKING TRAILS PARKING LIGHTING FURTHER DEVELOPMENT OF PICNIC AREA VOLLEYBALL COURTS SIGNAGE WORKOUT STATIONS (WITH WALKING TRAIL) _ BENCHES LANDSCAPING (BRAD'S PLAN) FOOTBALL FIELD SALT CORRECTION • PARK MANOR . YEAR DONE 1988 • ITEM EXISTING NEW WHAT NEEDS TO BE DONE WHEN COST WARMING HOUSE /PICNIC SHELTER WATER SEWER PARKING LOT SURFACE DEVELOPMENT OF PICNIC AREA REMOVE OR FIX FENCE ON NEW AREA LANDSCAPING VOLLEYBALL COURT BOARDS ( ?) LIMESTONE POND CLEANING BIRD HOUSES BENCHES TRASH EDGING VOLLEYBALL COURT & PLAYGROUND GRILLS PAGE 1 OF 1 • PARK FREEMAN . YEAR DONE 1988 ITE14 EXISTING NEW WHAT NEEDS TO BE DONE WHEN COST BRIDGES HOCKEY RINK FENCES FOR BASEBALL FIELD BACKSTOP TRAILS CUT IN WATER SEWER ELECTRICITY LIGHTS WARMING HOUSE /PAVILION PARKING LOTS SIGNAGE PLAYGROUND EQUIPMENT PICNIC TABLES BLEACHERS ENTRYWAY DEVELOPMENT LAND ACQUISITION BENCHES BIRD HOUSES HORSESHOE PITS AND EQUIPMENT FITNESS TRAIL • PAGE 2 OF 1 PARR FREEMAN • YEAR DONE 1988 ITEM EXISTING NEW WHAT NEEDS TO BE DONE WHEN COST BALLFIELD MOUNDS BALLFIELD SEEDING ADDITIONAL WOODCHIPS FOR TRAILS FOOTBALL /SOCCER FIELD CONCESSION AREA ROADS LANDSCAPING TRASH CONTAINERS SATELLITES GRILLS FENCES MAINTENANCE $80,000 - $100,000 IN RESERVE FUND • PARK SILVERWOOD a YEAR DONE 1988 i ITEM I EXISTING I NEW I WHAT NEEDS TO BE DONE I WHEN I COST I PLAN TRAILS / FITNESS SHELTER PARKING 0 PARK CRESCENT BEACH • YEAR DONE 1988 ITEM EXISTING NEW WHAT NEEDS TO BE DONE WHEN COST • PARK SHADY HILLS YEAR DONE 7988 • ITEM EXISTING NEW WHAT NEEDS TO BE DONE. WHEN COST