Loading...
03-08-10 CC Reg AgPCITY OF S O EWOO CITY COUNCIL RE GULAR MEE'T'ING MONDAY, MARCH 8, 2010 5755 COUNTRY CLUB ROAD COUNCIL CHAMBERS 7800 P.M. 1. CONVENE REGULAR CITY COUNCIL MEETING A. Roll Call B. Review Agenda 2. APPROVAL OF MINUTES A. City Council Work Session Minutes, February 22, 2010 kj 4. 5. 6. 7. 8. Mayor Lizee Bailey _ Turgeon _ Woodruff_ Zerby _ Minutes B. City Council Regular Meeting Minutes, February 22, 2010 Minutes CONSENT AGENDA - Motion to approve items on Consent Agenda & Adopt Resolutions Therein: NOTE: Give the public an opportunity to request an item be removed from the Consent Agenda. Comments can be taken or questions asked following removal from Consent Agenda A. Approval of the Verified Claims List Claims List B. Award Contract for Badger Tennis Courts Overlay Park Coord. memo C. Resolutions formalizing the Planning and Park Commission Appointments Administrator's made on February 22, 2010 CAF, 2 Resolutions MATTERS FROM THE FLOOR (No Council action will be taken) PUBLIC HEARING REPORTS AND PRESENTATIONS A. Report on LMCD Activities by Representative Richard Woodruff Report PARKS PLANNING - Report by Representative CITY COUNCIL REGULAR MEETING AGENDA - -- Mare $, 2010 Page 2 of 11. STAFF AND COUNCIL REPORTS A. Administrator and Staff B. Mayor and City Council 12. RECESS TO EXECUTIVE SESSION A. Update on Ron Johnson Litigation 13. RECONVENE REGULAR CITY COUNCIL MEETING 14. ADJOURN Executive Summary Shorewood City Council Regular Meeting Monday, 8 March, 2010 7000 p.m. Agenda Item #3A: Enclosed is the Verified Claims List for Council approval. Agenda Item #313: This item is a recommendation to accept the quote and award the contract for tennis court overlay at Badger Park to DermCo LaVine for an estimated amount of $7,675. Agenda Item #3C: City code states that the Park and Planning Commission appointments are to be made by resolution; two resolutions are provided to formalize the appointments made by motion at the February 22 council meeting. Agenda Item #5A: There are no public hearings this evening. Agenda Item #6A: Representative Richard Woodruff will provide a report on recent Lake Minnetonka Conservation District activities. Agenda Item #7: There are no park items this evening. Agenda Item #8: A representative will report on planning commission activities. Agenda Item #9A: Plans, specifications and Engineer's estimate for the Meadowview Road, Wild Rose Lane reconstruction and Nelsine Drive reclamation projects are presented for approval. Staff recommends approving a resolution ordering the project, approving the plans, specifications and Engineer's estimate, and authorizing the Advertisement for Bid. Agenda Item #I OA: Council asked staff to look into the cost of installing an automatic door opener at City Hall to accommodate physically challenged individuals. The Office of the Secretary of State (OSS) has a grant available to improve access to polling places for persons with disabilities. A Resolution authorizing submittal of a grant application for automatic door openers is due by March 19. The total estimated cost of the improvement is $5,435; the grant request is for $4,595 (it does not include a card reader system, which is not a benefit to voters, so cannot be included in the grant). The grant application indicates that it is expected grants will be large enough to cover the vast majority of the costs for automatic doors. The difference between the amount of grant and the cost of the improvement will be funded from the Building Maintenance fund. Staff anticipates the completion of the project by the end of May 2010. Executive Summary — City Council Meethig of March 8,2010 Bags 2 of 2 Agenda Item #10B; The results are in and the deer are up. The Council should direct staff as to whether the deer removal effort should be reinstated for 2010, Agenda Item #12: Executive Session to receive an update on Ikon Johnson litigation, CITE' OF SHORE WOOD CITE' COUNCIL WORK SESSION MONDAY, FEBRUARY 22, 2010 5755 COUNTRY CLUB ROAD COUNCIL CHAMBERS 6800 P.M. A. Roll Cali Present: Mayor Lizee; Councilmembers Bailey, TurgeoiI", Woodruff and Zerby; Administrator Heck; Finance Director Burton; Plann,tg Director Nielsen; Director of Public Works Brown; and Engineer Landini Absent: None B. Review Agenda Turgeon moved, Zerby seconded, approving tb�agenda as 00sented. Motion passed 4/0. 2. PARK COMMISShON,;CANDIDATE PHONE LNTERVIEW.: -.JOHN TRENT Mayor Lizee stated a plipiie i itervi6v was conducted with'the fi 3. WATER Heck stated tllg Cou cih has been �Jscussing to do ' iih the city's water ordinance and water charges. _. Councili`h I rs requ'dWd-.addrtr6hal information_ :on the history of the water connection fee and information �on what other calununiti`es charge. He noted staff discussed connection fees. He asked for Council il how to proceed Mayor Lizee sug&e 'stud the Council id"view the seven questions beginning with whether everyone should pay the same amount for weer service "derby believed $10,000 seems too high. He was unsure where we are going with this and Nv 6 her there' is , plan to expand the water service this year. Bailey asked why we would want to change. Tut goq,tted if you are going to assess someone, it should be for the value. If the project doesn't cost $10,000, "yi�u houldn't charge them $10,000. Lizee asked if there should be a separation of fees for the assessment and the connection. She indicated she feels there should be a clarification between the two. She noted there are fixed costs associated with the connection while the assessment is a by project cost. Woodruff understood if the service is already in the street, the homeowner has to buy a meter and pay an additional fee. Brown stated that is correct. The permit fee, meter cost, and hardware add up to around $250. Woodruff believes the current system is working and shouldn't be changed. Zerby noted everyone in the city has water already whether it is city water or a well. Bailey asked Finance Director Burton whether other cities had a policy similar to Shorewood's where there is an option to connect or not connect. Burton stated they are asking what other cities do. She did review what the city of Arden Hills' policy is for improvements and who is assessed. She stated staff is looking at the connection fee and not the accompanying costs. Copies of all the policies will CITY OF SHOREWOOD WORK SESSION MEETING MINUTES February 22, 2010 Page 2 of Lizee asked what the current interest rate is and what is percent, and residents can borrow from their banks at charge more than two percent higher than the cost of the Bailey stated at some point we will grandfather people it would be to raise the connection fee and send a letter to we would change policies would people pay more. N .. done. Brown stated at the time the Smithtown Road rE were done. If we chose to raise the rate, thpy would have Turgeon stated if everyone is comfortable Wit], AN is helpful to have as much information as possible with the current policy. The next question is pKavi( asked whether that is something staff should piirsu kind of information to residents as Wd: move forw< Neck stated staff could work with outside sources worthwhile to explore that depending an,'the cost. Brown stated there, is still work to do Gila' clear Lizee asked. how many 'Qt th stated he didn't want to chant to actual eost,,but she went w 4. ADJOijkN_, Councilmember Tui Work Session of Feb Clare T. Link, Recorder ATTEST: ommended. Burton stated the current rate is six er interest rates. If we issue bonds, we cannot ids: the $10,000. Nielsen stated one of the strategies 200 to connect at the old rate. Turgeon stated if i stated once the connedtion fee is paid, they are tents paid; they were under the impression they X10,000, Couttel should move forward. Bailey stated it Deck stated it appears most members are comfortable inginforrnation oii`why city water is a good idea, and he ;. Woodruff= stated it would be important to provide that rd., Curgeon stated it needs to be factual but very plain. to b p with the information. Bailey stated it would be Jecks,stated he would bring back additional information. up trie.orginance. Councembers are �.oay with the $1 0,000 connection charge. Woodruff it, and derby_ concurred. Turgeon stated she would rather see it separated out .the maiorrtv'of the council. Lizee concurred. ouncilmember Zerby seconded, Adjourning the City Council at 6:55 P.M. Motion passed 5/0. Christine Lizee, Mayor Brian Heck, City Administrator /Clerk # J CITY OF SHOREWOOD 5755 COUNTRY CLUB ROAD CITY CO CIL REGULAR MEETING COUNCIL CHAMBERS MONDAY, FEBRUARY 22, 2010 7:00 P.M. 1. CONVENE CITE' COUNCIL REGULAR MEETING Mayor Lizee called the meeting to order at 7:04 P.M. A. Roll Call Present: Mayor Lizee; Couneilmembers Bailey, Turgeon, Woodruff and Zerby; Administrator Fleck; Finance Director Burton; Planning Director Nielsen; Director of Public Works Brown; and Engineer Landini Absent: None Turgeon moved, Zerby seconded,iApproving the City Council Npecial ivieetmg ivimutes of repruary 1, 2010, with an amendmentto I the time of adjournment from 7:15 p.m. to 8:15 p.m. Motion passed 5/0. 3. CONSENT AGENDA Mayor Lizee reviewed the items on the Consent Agenda. Turgeon moved, Woodruff seconded, Approving the Motions Contained on the Consent Agenda and Adopting the Resolutions Therein. A. Approval of the Verified Claims List B. Accept Proposal for Portable Restroom Facilities C1T 'Elf{ SHOREWOOD REGULAR COUNCIL NCIL MEETING MlNurEs February 22m 2010 Page 2 of 7 C. Approve the Purchase of 10 Picnic Tables for the Parks D. Community Rec Resources 2009 Fear -End Report E. 2010 Concession Agreement Motion passed 5/0. 4. MATTERS FROM THE FLOOR There were no matters from the floor presented this even Kaylee Burns and Anna Voss were in attendance 411101""1 1.111 to am I WAI I'll I y A. Water Ordinance Mayor Lizee opened the public hearing at 7:0$ p Lizee There w&r public amending the, existing ordinance to allow the p rqng. He indicated following a work session nce unchanged. 'He then stated there are a couple ating water meters. He noted this section should Section 903.09 subd. 1, paragraph a(2) relating to ded it be deleted as well. for comments. Lizee closed the?nblic Testimony portion and' "losed the Public Hearing at 7:12 p.m. Turgeon moved, Barl± seconded Approving ORDINANCE NO. 464, "An Ordinance Amending Chapter 903 of the Shorewood City °Code." Motion passed 5 /0. 6. REPORTS AND PRESENTATIONS None 7. PARKS Commissioner Edmondson reported on the Park Commission meeting, as detailed in the minutes of those meetings. He stated the commissioners have embraced having two meetings a month. He discussed recent Park Commission items from the February 9 Park Commission meeting. He updated the Council on the Arctic Fever celebration, proposed shelter at Manor Park, and new picnic tables. CITY OF SHOREWOOD REGULAR COUNCIL EETI C MINUTES February 22, 2010 Page 3 of `T A. arctic Fever Cost Summary Turgeon moved, Woodruff seconded, accepting the Arctic Fever cost summary. Motion passed /0, . PLANNING Commissioner Arnst reported on matters considered and actions taken at the February 16, 2010, Planning Commission meeting (as detailed in the minutes of that meeting). 1` • X9=0 Heck stated no motion was required on this item. B. Quotes for Financing Consulting Road Improvement Financing Plan Heck stated staff would like to have a worksession with the City Council to lay out scenarios to fund road improvements. He didn't think we are at the point to bring in a consultant. He suggested a worksession be held in March. Woodruff agreed, noting the importance of creating objectives first. Bailey was concerned about getting more consultant help on the scope and not just the funding. Zerby agreed with previous comments made. CITY OF SHOR +;WOOD REGULAR COUNCIL CIL, MEETING MINUTE February 22, 2010 Page 4 of 7 C. Making Planning and Park Commission Appointments Lizee stated there are three openings on the Planning Commission and the Park Commission. Turgeon suggested taking the appointments one at a time. Woodruff stated he was not at the interview session a couple weeks ago but did interview them all by telephone. Woodruff moved, Turgeon seconded, to appoint Tom Geng passed 5/0. Turgeon moved, Zerby seconded, to appoint David passed 5/0. Bailey moved, Woodruff seconded, to appoint Sue O nvis to the 4/1, with Zerby dissenting. Councilmember Bailey recused himself from the voti spouse is one of the candidates. Zerby moved, Lizee seconded, to appoir#t Bridg�t`Donahue 2/2, with Turgeon and Woodruff dissenting. appoint n. Motion passed Commissi as his Park Commission. Motion failed ission. to Mr. Trent's attendance at meetings. The last ting Suzanne Gaidos to the Park Commission. Motion to appoint Molly Grove to the Park Commission. dissenting. Lizee stated she did not suppatfMs. Grove's appointment, as she is new to the community; Lizee also believes there is the perception of a conflict of interest as Ms. Grove is the spouse of a councilmember; for these reasons Lizee favors Ms. Donahue, who has resided and been involved in the community for many years. Turgeon stated she would support the appointment as she believes her background would bring a lot of knowledge and insight to the Commission. Zerby stated he supports Ms. Donahue because she has much experience working in community events; such as her involvement with Art on the Lake. Woodruff moved, Turgeon seconded, authorizing staff to advertise the Park Commission opening for additional applicants. Motion carried 5/0. Heck stated Travis DeMers has expressed an interest in serving on the Park Commission but was not CITY OF SHOREWOOD REGULAR COUNCIL NIL ME TINE MINUTES February 22, 2010 Page 5 of 7 available for an interview. Lizee stated it appeared to the council, from Mr. DeMers most recent memo, that he was not really interested in re for the position. Bailey stated Ile was deeply concerned about the Council's action on Ms. Grove's rejection as a Park Commission member. Lizee clarified her preference for candidate Donahue because she has shown devotion to serving the community for many years. Zerby stated his major concern with Ms. Grove was the length of residence of Ms. Grove compared to the other applicants. Bailey stated if length of residence in the city is a preferred requirement, this should be communicated to applicants in the application process. D. Electronic Council Packets Heck stated staff is still interested in testing electronic Coonejl packets. Staff would like to purchase a laptop or tablet and have it set up and let each Councilmember try it to see how they like it. If it works out, we will seek authorization to move forward. Lizee asked for Council comments. Zerby noted the °r3 -year questioned the cost for Adobe Acrobat and other software . agreed the warranty cost is rather high. He was conce recommended it be cut back to around $750, plus tax and moving forward, as additional units woLild be"_needed in the and three other staff members. Heck stated�as computers a choice of a laptop or a desk top computer. :Lizee stated, recording secretary a computer.; Heck stated during the't6st:period, a p ' er packet Woodruff moved, Zerby s approving the council packets ..:. Heck stated" all Council Motion passe€t 4 /1, with Tu E. Cotiriucil Chambe the motion. warranty is half the c 1 st of the laptop. He also Heck discussed the softwware needs. Woodruff 'ned about the availability, in the U.S. He &'a . test. Turgeon stated 'she had a concern filtiire for the recording secretary, city attorney •e replaced for staff members, they will get the ;he was notin favor of the city providing the be of $750 plus tax for a laptop to test electronic to see how they like it. Heck stated the city has liad organizations wanting to use the Council Chambers and city hall. Staff is of the opinion the Community Center should be used. On rare occasions when the Center is not available, we could find a way to accommodate them at City Hall. Attorney Tietjen stated she would follow up with bond counsel on the use of the facility, as there may be some issues with renting when tax exempt bonding was used to finance the project. She indicated if the Council decides to rent city hall, written agreements would be necessary, similar to what is provided for the Southshore Community Center. Bailey asked if that would also be the case if there is no charge for rental. Tietjen stated it would be. Zerby moved, Woodruff seconded to table this item. Motion passed 5/0. F. Minnehaha Creek Watershed District Rules D and F Heck stated the MC" has been working on several of their Rules, and the City Engineer has been CITE' OF SHOREWOOD REGULAR COUNCIL MEETING MINUTE February 22, 2010 Page 6 of 7 Zerby moved, Woodruff seconded to continue to work with other communities. Motion passed 510. G. Rev Trak On -line e- Commerce Proposal Director Burton stated staff is looking at the possibility of utilizing on -line registrations and payments. She stated Rev Trak is used by many cities throughout the Metro area. They are certified for high security and will train all necessary personnel. Rev Trak would -tike the city to sign a one -year contract. An on -line convenience fee can be charged; it has to be the wine ,fee for all transactions, Burton suggested charging a $1.00 fee until the level of interest is determined. Staff - s-seeking authorization to b�gIft. is attractive be p, °the start costs are absorbed by Rev ze. done by phori�; x. in person; Burton indicated customers d fhe:'amount of the;ppayment is often limited, so transactions e noted'some cities have a $1,000 limit, and we will want to ce. Burton stated the primary user would be Center; it would also be used for payment of ,'s summer park programs and park user fees. Woodruff state is ptre"tty standard, but he�fiad a concern about the $1 fee because it would not coven the fee charged by Rev Tick iu asked w at the Council would be comfortable using, noting some oflas a cost of proviriztg this service. Zerby asked if there is an administrative cost of processing a payment made check. Burton stated them as and is looking into what other cities do. Zerby asked if we eap charge for a credit card use. Burton stated cities are permitted to have a convenience fee for all transactions.,:, Zerby moved, Woodruff seCpnded 'to authorize staff to begin use of the program. Woodruff stated he would like a list of the charges'aind fees first. Motion passed 5/0. 11. STAFF AND COUNCIL REPORTS A. Administrator and Staff 1. Upcoming Public Information Meetings An informational memo was provided in the meeting packet regarding upcoming meetings. 2. Water Tower Rehabilitation Project Financial Summary CITY OF SHOREWOOD REGULAR COUNCIL MEETING MIN(JTES February 22, 2010 Page 7 of 7 Brown stated Zerby had asked for financial information on the water tower rehabilitation project, and it is provided in the Council packet. He explained the structural repair costs in answer to a question from Zerby. He noted there is a cost down the line to protect the equipment whenever we allow a cellular provider on the tower. Heck noted Greenwood has made a contribution to removed near the tennis courts. Brown stated there,, tangled in the electric lines. We will be moving"l Center. B. Mayor and City Liz6e stated resident David Cochran 12. ADJOURN Councilmember Turge 'moved,'Co 'cilmemb Regular Meeting of Febi17— nary 22 2010 ; at 9:00 P r seconded, ' - Adjourning the City Council passed 5/0. Clare T ATTEST: Christine Liz6e, Mayor Brian Heck, City Administrator/Clerk COUNCIL ACTION FORM Department Council Meeting Item Number Finance March 08, 2010 3A Item Description: Verified Claims �rom: Michelle NguyEFn Bonnie Burton Brian Heck BE Claims for council authorization. The attached claims list includes checks numbered 49655 through 49730 & EDA check numbered 1213 totaling $278,174.19. Staff Recommendation Staff recommends approval of the claims list. 3/04/2010 :3., AM A/C ii1S'P0RY CHECK REPORT" V ENDOR SE 91 Ci tv of Sno- e� -,Toc i DANK: ._ BEACON BANK DATE RANGE: 2 /23/2010 THRU 99/99/9999 CHECK VENDOR T.D. NAME STATUS DATE 00051 EFTPS - FEDERAL W/H D 3/02/2010 00092 MN DEPT OF REVENUE D 3/02/2010 19966 NORTHLAND SECURITIES, INC. R 3/08/2010 00086 AFSCME COUNCIL 5 R 3/02/2010 00053 ICMA RETIREMENT TRUST - 302131 -4 R 3/02/2010 00052 PERA R 3/02/2010 20005 WELLS FARGO HEALTH BENEFIT SVC R 3/02/2010 29257 CLASSIC PROTECTIVE COATINGS R 3/02/2010 00550 A -1 MINNETONKA RENTAL R 3/08/2010 10576 ADVANCED IMAGING SOLUTIONS INC R 3/08/2010 29306 ALLIED WASTE SERVICES #894 R 3/08/2010 16275 AMERICAN MESSAGING R 3/08/2010 02860 BARNES DISTRIBUTION R 3/08/2010 03325 BOYER TRUCK PARTS DISTRIBUTION R 3/08/2010 17300 CENTERPOINT ENERGY R 3/08/2010 1 CHAMPION PLUMBING R 3/08/2010 29278 CLASSIC CLEANING COMPANY R 3/08/2010 05305 COMMUNITY REC RESOURCES R 3/08/2010 29298 CONNIE BLANCHARD OF BLANCHARDS R 3/08/2010 29317 DESIGNER'S OUTLOOK, LLC R 3/08/2010 07383 ELECTRICAL INSTALLATION & MAIN R 3/08/2010 12125 FEDEX KINKO'S R 3/08/2010 PAGE: CHECK CHEC'K CHECK AMOUNT DISCOUNT NO STATUS AMOUNT 000000 12,932.89 000000 2,158.10 001213 1,550.00 049666 301.12 049667 1,418.90 049668 6,894.05 049670 1,199.13 049671 23,851.13 049672 19.85 049673 160.65 049674 13,840.20 049675 17.97 049676 354.81 049677 60.19 049678 432.72 049679 15.50 049680 847.47 049681 2,439.00 049682 715.00 049683 53.33 049684 600.00 049685 19.31 3/04/2010 1 1:33 AM A/P HISTORY CRECK REPORTT ,7T`,N,)0P SET: 07, City of S 049686 916.91 i BRACON BANK 30.45 DATE PANIGE : 2/23/2010 THRU 99/99/9999 049689 42.40 049690 CHECK VENDOR I.D. NAME STATUS DATE 08712 G & K SERVICES R 3/08/2010 09400 GOPHER STATE ONE-CALL, IN R 3/08/2010 09601 GOVERNMENT TRAINING SERVICES R 3/08/2010 27195 GRAINGER, INC R 3/08/2010 29232 HECK, BRIAN R 3/08/2010 29151 HENN COUNTY-FINANCIAL MGMT & A R 3/08/2010 11055 TNFRATECH R 3/08/2010 11650 KENNEDY & GRAVEN, CHARTERED R 3/08/2010 12250 KLM ENGINEERING INC R 3/08/2010 13320 LEE PEST CONTROL INC R 3/08/2010 13525 LINK, CLARE T. R 3/08/2010 15403 MAMA R 3/08/2010 14475 MANN MADE PRODUCTS R 3/08/2010 00079 MEDICA R 3/08/2010 15176 MENARDS R 3/08/2010 15300 METRO SALES, INC. R 3/08/2010 15885 MIDWEST MAILING SYSTEMS INC R 3/08/2010 06960 MN DEPT. OF PUBLIC SAFETY R 3/08/2010 06650 MN DNR WATERS R 3/08/2010 19445 NGUYEN, MICHELLE R 3/08/2010 20268 PANCHYSHYN, JEAN R 3/08/2010 20300 PAZANDAK, JOSEPH R 3/08/2010 AMOUNT DISCOUNT PAGE CHECK CHECK ."HECK NO STATUS AMOUNT 049686 916.91 049687 30.45 049688 2,331.00 049689 42.40 049690 164.49 049691 210.00 049692 3,885.00 049693 1,875.08 049694 2,300.00 049695 70.00 049696 250.00 049697 20.00 049698 79.50 049699 11,739.17 049700 360.08 049701 819,81 049702 345.66 049703 4,020.73 049704 2,472.45 049705 76.00 049706 120.00 049707 503.79 3/04/2010 11:33 AM P, /P :HISTORY C TECK REPORT VENDOR ..ET: 0 _ If Shore:w';oc 765.68 049710 i A:: \K: 1 �EA( HANK 049712 337.04 DATE RANGE: 2/23/2010 THRU 99/ °9/999'3 78,904.00 049715 3,131.17 049716 5,245.00 049717 CHECK VENDOR S.D. 33.08 NAME STATUS DATE 20950 049721. POTTS, KENNETH N. R 3/08/2010 29251 343.78 PRINCIPAL FINANCIAL GROUP R 3/08/2010 29301 049726 PROFESSIONAL WIRELESS COMMUNIC R 3/08/2010 22160 11,705.21 ROGERS, DON R 3/08/2010 22482 SAM'S CLUB R 3/08/2010 83501 SCHWAAB, INC R 3/08/2010 23500 SO LK MTKA POLICE DEPT R 3/08/2010 23725 SPEEDWAY SUPERAMERICA LLC R 3/08/2010 29318 STERNBERG LANTERNS, INC. R 3/08/2010 29101 SUN NEWSPAPERS R 3/08/2010 17200 SUN PATRIOT NEWSPAPERS R 3/08/2010 23738 T- MOBILE R 3/08/2010 25000 TOTAL PRINTING SERVICES R 3/08/2010 29154 UNIQUE PAVING MATERIALS CORP. R 3/08/2010 00085 UNUM LIFE INSURANCE CO R 3/08/2010 70200 VERIZON WIRELESS R 3/08/2010 22901 VIKING LAND TREE CARE INC R 3/08/2010 29269 WARNER CONNECT R 3/08/2010 27590 WESTSIDE WHOLESALE TIRE R 3/08/2010 18500 WM. MUELLER & SONS, INC. R 3/08/2010 19800 XCEL ENERGY R 3/08/2010 29000 ZEP SALES & SERVICE R 3/08/2010 PACT: 4 CHECK C.'HECK CHECK AMOUNT DISCOUNT NO STATUS AROUNT 049708 2,291.66 049709 765.68 049710 480.62 049711. 178.00 049712 337.04 049713 111.03 049714 78,904.00 049715 3,131.17 049716 5,245.00 049717 1,238.08 049718 33.08 049719 35.08 049720 868.80 049721. 1,982.53 049722 1,235.20 049723 343.78 049724 4,881.02 049725 4,013.44 049726 168.02 049727 2,397.72 049728 11,705.21 049730 92.22 3/0?/2010 17.:',3 AM t2'i of _ro._ -ewood BANK: _. BEACON BANK DAT H' RANGE: 2/23/2010 THRU 99/9,0/9999; VENDOR S.D. NAME ** T O T A L S REGULAR CHECKS: HAND CHECKS: DRAFTS: EFT: NON CHECKS: VOID CHECKS: TOTAL ERRORS: 0 VENDOR SET: 01 BANK: 1 BANK: 1 TOTALS: REPORT TOTALS: /P HISTOR" Cfi CK REPORT CHECK CHECK CHECK CHECK STATUS DATE Alm 0 U N DISCOUNT NO .STATUS AMOUNT NO CHECK AMOUNT DISCOUNTS TOTAL APPLIED 64 207,861.23 0.00 207,861.23 0 0.00 0.00 0.00 2 15,090.99 0.00 15,090.99 0 0.00 0.00 0.00 0 0.00 0.00 0.00 VOID DEBITS VOID DISCOUNTS VOID CREDITS 0 0.00 0.00 0.00 TOTAL 66 222,952.22 0.00 222,952.22 66 222,952.22 0.00 222,952.22 68 222,952.22 0.00 222,952.22 03 -04 -2010 _ 1 1:3 - 1 AM C U N C r. REaOR" D7 V' -N OR - MAR 08, 2 010 PAGE: 1.. ,IENDOR SORT KEY f AT E CTSCRIPT 1oN FUND llEPART.tEIJT AMOUNT A -:'_ MINNETONKA RENTAL 3/08/10 LP GAS General rund Streets & Roadways 19.85 TOTAL: 19.85 ADVANCED IMAGING SOLUTIONS INC 3/08/10 SVC 01/06 -02/06 General Fund Municipal Buildings 160.65 TOTAL: 160.65 AFSCME COUNCIL 5 3/02/10 P/R DEDUCTS - UNION DUES General Fund NON- DEPARTMENTAL 301.12 TOTAL: 301.12 ALLIED WASTE SERVICES 4894 3/08/10 MAR RECYCLING SVC Recycling Utility Recycling 13,840.20 TOTAL: 13,840.20 AMERICAN MESSAGING 3/08/10 MAR PAGER General Fund Public Works 8.99 3/08/10 MAR PAGER Water Utility Water 4.49 3/08/10 MAR PAGER Sanitary Sewer Uti Sewer 4.49 TOTAL: 17.97 BARNES DISTRIBUTION 3/08/10 BOLTS /NUTS /HARDWARE General Fund Public Works 354.81 TOTAL: 354.81 BOYER TRUCK PARTS DISTRIBUTION CTR. 3/08/10 BELT General Fund Public Works 14.56 3/08/10 BELT General Fund Public Works 45.63 TOTAL: 60.19 CENTERPOINT ENERGY 3/08/10 5735 CTRY CLUB RD- 01/18 -02 Southshore Communi Senior Community Cente 432.72 TOTAL: 432.72 CLASSIC CLEANING COMPANY 3/08/10 FEB SVC General Fund Municipal Buildings 0.00 3/08/10 FEB SVC General Fund Public Works 531.01 3/08/10 FEB SVC General Fund Public Works 316.46 TOTAL: 847.47 CLASSIC PROTECTIVE COATINGS 3/02/10 P.V. #2 -S.E. WATER TOWER Water Utility Water 23,851.13 TOTAL: 23,851.13 COMMUNITY REC RESOURCES 3/08/10 PARK COORDINATOR SVC 2/15- General Fund Parks & Recreation 2,205.00 3/08/10 SSCC ASSISTANT- 02/18 -02/25 Southshore Communi Senior Community Cente 234. TOTAL: 2,439.00 CONNIE BLANCHARD OF BLANCHARDS CATERIN 3/08/10 VALENTINE COOKING CLASS Southshore Communi Senior Community Cente 715. TOTAL: 715.00 DESIGNER'S OUTLOOK, LLC 3/08/10 SSCC - YARD SIGN Southshore Communi Senior Community Cente 53.33 TOTAL: 53.33 EFTPS - FEDERAL W/H 3/02/10 FEDERAL W/H General Fund NON - DEPARTMENTAL 4,808.75 3/02/10 FICA W/H General Fund NON- DEPARTMENTAL 3,292.15 3/02/10 MEDICARE W/H General Fund NON - DEPARTMENTAL 769.92 3/02/10 FICA W/H General Fund Administration 268.04 3/02/10 MEDICARE W/H General Fund Administration 62.69 3/02/10 FICA W/H General Fund General Government 459.60 3/02/10 MEDICARE W/H General Fund General Government 107.48 3/02/10 FICA W/H General Fund Finance 337.02 3/02/10 MEDICARE W/H General Fund Finance 78.82 3/02/10 FICA W/H General Fund Planning 303.06 3/02/10 MEDICARE W/H General Fund Planning 70.88 03 -04 -2010 1-1-:31 i_ 0 ,S 10 C I h REPOR! By VENDOR - MAR 02, 2010 . PAGE. 2 - = DOR SORT KEY DA'C'E DESCRi P PION , UND DEnARI r ,v•_- Ar0UP'i• 3/02/10 MCA W/H General Fund Protective Inspections 173.52 3/02/10 MEDICARE W/H General Fund Protective Inspections 40.58 3/02/10 FICA W/H General Fund City Engineer 174.65 3/02/10 MEDICARE W/H General Fund City Engineer 40.84 3/02/10 FICA W/H General Fund Public Works 583.41 3/02/10 MEDICARE W/H General Fund Public Works 136.44 3/02/10 FICA W/H General Fund Streets & Roadways 150.57 3/02/10 MEDICARE W/H General Fund Streets & Roadways 35.22 3/02/10 FICA W/H General Fund Ice & Snow Removal 202.15 3/02/10 MEDICARE W/H General Fund Ice & Snow Removal 47.27 3/02/10 FICA W/H General Fund Parks & Recreation 376.81 3/02/10 MEDICARE W/H General Fund Parks & Recreation 88.11 3/02/10 FICA W/H Water Utility Water 140.79 3/02/10 MEDICARE W/H Water Utility Water 32.93 3/02/10 FICA W/H Sanitary Sewer Uti Sewer 59.86 3/02/10 MEDICARE W/H Sanitary Sewer Uti Sewer 14.01 3/02/10 FICA W/H Recycling Utility Recycling 12.37 3/02/10 MEDICARE W/H Recycling Utility Recycling 2.89 3/02/10 FICA W/H Stormwater Managem STORMWATER MANAGEMENT 50.30 3/02/10 MEDICARE W/H Stormwater Managem STORMWATER MANAGEMENT 11.76 TOTAL: 12,932.89 ELECTRICAL INSTALLATION & MAINTENANCE 3/08/10 LIGHT REPLACE Street Capital Imp Street Capt Improvemen 600.00 TOTAL: 600.00 FEDEX KINKO'S 3/08/10 PLANS COPY RETURN General Fund Protective Inspections 38.62- 3/08/10 PLANS COPY General Fund Protective Inspections 38.62 3/08/10 6045 WHITNEY CIR PLANS COP General Fund Protective Inspections 19.31 TOTAL: 19.31 G & K SERVICES 3/08/10 CH SVC General Fund Municipal Buildings 146.92 3/08/10 PW SVC General Fund Public Works 769.99 TOTAL: 916.91 GOPHER STATE ONE -CALL, IN 3/08/10 FEB SVC Water Utility Water 15.23 3/08/10 FEB SVC Sanitary Sewer Uti Sewer 15.22 TOTAL: 30.45 GOVERNMENT TRAINING SERVICES 3/08/10 LAND USE PENS TRAINING O1/ General Fund Planning 2,331.00 TOTAL: 2,331.00 GRAINGER, INC 3/08/10 SWITCH & GASKET Water Utility Water 42.40 TOTAL: 42.40 HECK, BRIAN 3/08/10 MILEAGE General Fund Administration 44.50 3/08/10 CELL PHONE General Fund Administration 79.99 3/08/10 WELLNESS General Fund Administration 40.00 TOTAL: 164.49 HENN COUNTY - FINANCIAL MGMT & ACCTG. 3/08/10 2010 HAZARDOUS WASTE LIC General Fund Public Works 210.00 TOTAL: 210.00 ICMA RETIREMENT TRUST - 3021.31 -457 3/02/10 P/R DEDUCTS - DEFERRED COM General Fund NON- DEPARTMENTAL 1,075.00 3/02/10 P/R DEDUCTS - DEFERRED COM General Fund NON- DEPARTMENTAL 343.90 TOTAL: 1,418.90 O? 0'­2010 1.1:31 AM i' O U N C I. i..., R7-POR" BY VENDOR - MAR. 08, 2010 PI 3 `JEN 7UR SORT sfi'.Y )A'r D ES' 'C_ <2:( I T SON L UND 'J EPAR T�irN =' AMOI,'NT 1NFR.ATE Ci -i 3/08/10 EMERGENCY SEWER REPAIR C.R Sanitary Sewe - - Ut- Sewer 2,310.00 3/08/10 EMERGENCY SEWER REPAIR -CR Sanitary Sewer Uti Sewer 1,575.00 TOTAT 3,885.00 KENNEDY & GRAVEN, CHARTERED 3/08/10 JAN- GEN RETAINER General Fund Professional Svcs 1,583.20 3/08/10 JAN- RON JOHNSON LITIGATIO General Fund Professional Svcs 291.88 TOTAL: 1,875.08 KLM ENGINEERING INC 3/08/10 AT &T ANT REINSTALL -OLD MKT General Fund NON - DEPARTMENTAL 2,300.00 TOTAL: 2,300.00 LEE PEST CONTROL INC 3/08/10 SSCC - SVC Southshore Communi Senior Community Cents 70.00 TOTAL: 70.00 LINK, CLARE T. 3/08/10 RECORDING SVC- 02/22/10 General Fund General Government 250.00 TOTAL: 250.00 MAMA 3/08/10 BEYOND THE YELLOW RIBON 2/ General Fund Administration 20.00 TOTAL: 20.00 MANN MADE PRODUCTS 3/08/10 METAL & BENDING General Fund Public Works 79.50 TOTAL: 79.50 MEDICA 3/08/10 JAN ADJ General Fund Unallocated Expenses 537.58 3/08/10 MAR MEDICAL General Fund Unallocated Expenses 12,682.83 3/08/10 JAN -FEB ADJ General Fund Unallocated Expenses 1,481.24 - TOTAL: 11,739.17 MENARDS 3/08/10 BADGER WARMING HOUSE -SHEET General Fund Parks & Recreation 214.26 3/08/10 BADGER WARMING HOUSE General Fund Parks & Recreation 126.60 3/08/10 BADGER WARMING HOME General Fund Parks & Recreation 19.22 TOTAL: 360.08 METRO SALES, INC. 3/08/10 COPIER MAINT General Fund Municipal Buildings 165.81 3/08/10 SVC 02/06 -10- 05/06/10 General Fund Municipal Buildings 654. 00_ TOTAL: 819.81 MIDWEST MAILING SYSTEMS INC 3/08/10 MAR ADDT'L POSTAGE General Fund General Government 5.62 3/08/10 MAR NEWSLETTER SVC General Fund General Government 340.04 TOTAL: 345.66 MISC. VENDOR CHAMPION PLUMBING 3/08/10 6263 CHASKA ROAD- PERMIT RE General Fund NON - DEPARTMENTAL 15.00 CHAMPION PLUMBING 3/08/10 6263 CHASKA ROAD- PERMIT RE General Fund NON - DEPARTMENTAL 0.50 TOTAL: 15.50 MN DEPT OF REVENUE 3/02/10 STATE W/H General Fund NON- DEPARTMENTAL 2,158.10 TOTAL: 2,158.10 MN DEPT. OF PUBLIC SAFETY 3/08/10 2010 FORD -F350 Equipment Replacem Equipment Replacement 1,726.02 3/08/10 2010 FORD -F550 Equipment Replacem Equipment Replacement 2,294.71 TOTAL: 4,020.73 MN DNR WATERS 3/08/10 2009 M DNR REPORT Water Utility Water 2,472.45 TOTAL: 2,472.45 NGUYEN, MICHELLE 3/08/10 FEB MILEAGE General Fund Finance 76.00 03 -0'. -2010 1 . i ,1 ,OOI C O L N C 1 L REPORT BY 'JFNDOR - MAR Oi' - -, , i,' PACT VENDOR SORT. KEY DATE D S CR; . -T FUND DT PART ME_vT AMOUNT TOTAL: X0.00 NORTHLAND SECURITIES, INC. 3/08/10 CONTINUING DISCLOSURE REPO 2003 Public Safety Public Safety Bldg Deb 1,5 TOTAL: 1,550.00 PANCHYSITYN, JEAN 3/08/1.0 JAN -MAR WELLNESS REIM General Fund General Government -- ----- - 120.00 TOTAL: 120.00 PAZANDAK, JOSEPH 3/08/10 MILEAGE & BLDG SEMINAR O1/ General Fund Municipal Buildings 120.79 3/08/10 MILEAGE & BLDG SEMINAR O1/ General Fund Protective Inspections 383.00 TOTAL: 503.79 PERA 3/02/10 P/R DEDUCTS -PERA General Fund NON - DEPARTMENTAL 3,181.89 3/02/10 P/R DEDUCTS -PERA General Fund Administration 310.77 3/02/10 P/R DEDUCTS -PERA General Fund General Government 519.97 3/02/10 P/R DEDUCTS -PERA General Fund Finance 380.85 3/02/10 P/R DEDUCTS -PERA General Fund Planning 385.95 3/02/10 P/R DEDUCTS -PERA General Fund Protective Inspections 226.28 3/02/10 P/R DEDUCTS -PERA General Fund City Engineer 197.85 3/02/10 P/R DEDUCTS -PERA General Fund Public Works 687.76 3/02/10 P/R DEDUCTS -PERA General Fund Streets & Roadways 170.66 3/02/10 P/R DEDUCTS -PERA General Fund Ice & Snow Removal 231.61 3/02/10 P/R DEDUCTS -PERA General Fund Parks & Recreation 295.18 3/02/10 P/R DEDUCTS -PERA Water Utility Water 165.24 3/02/10 P/R DEDUCTS -PERA Sanitary Sewer Uti Sewer 69.27 3/02/10 P/R DEDUCTS -PERA Recycling Utility Recycling 13.96 3/02/10 P/R DEDUCTS -PERA Stormwater Managem STORMWATER MANAGEMENT 56.81 TOTAL: 6,894.05 POTTS, KENNETH N. 3/08/10 FEB PROSECUTIONS General Fund Professional Svcs ___ TOTAL: 2,291.66 PRINCIPAL FINANCIAL GROUP 3/08/10 MAR DENTAL General Fund Unallocated Expenses 765.68 TOTAL: 765.68 PROFESSIONAL WIRELESS COMMUNICATIONS 3/08/10 RADIO NEW TRUCK Equipment Replacem Equipment Replacement 480.62 TOTAL: 480.62 ROGERS, DON 3/08/10 MILEAGE General Fund General Government 58.00 3/08/10 PACKETS General Fund General Government 120.00 TOTAL: 178.00 SAM'S CLUB 3/08/10 CITY HALL General Fund Municipal Buildings 146.93 3/08/10 PUBLIC WORK General Fund Public Works 190.11 TOTAL: 337.04 SCHWAAB, INC 3/08/10 NOTARY STAMPS General Fund General Government _ _ _ 111.03 TOTAL: 111.03 SO LK MTKA POLICE DEPT 3/08/10,L HENN CTY PROCESSING BE General Fund Police Protection 75.00 3/08/10 MAR OPERATING BUDGET EXP General Fund Police Protection 78,829.00 TOTAL: 78,904.00 SPEEDWAY SUPERAMERICA LLC 3/08/10 GAS General Fund Public Works 3,131.17 TOTAL: 3,131.17 03-04-201-0 ,:31- AN 0 0 :; N C C T ': RE sf '.VENDOR. - 1 1,1AR 08, 2010 P PAGE ` `- VENDOR SORT < Y 1 1J' -,TE D DE SCR i_ rION F FUND F F F'F:� t M ;N "�' A AMC>UN'i' 03.04...20'0 11:3_ AM C O U N rC T L !?EPORT BY VENDOR - MAR 08, 2010 PAGE: 6 VENDOR SORT KEY DATE DESCRIPT 1 O FU7>SD I)E PA Id PM ^,NT AMOUN" 3;08/10 STATEMENT y2.290778H1 Water Utility Water '749.24 3/O8/10 STATEMENT 4229077881 Water. Utility Water 971.82 3/08/10 STATEMENT 4229077887. Water Utility Water 2,263.51 3/08/10 STATEMENT 4229077881 Sanitary Sewer Uti Sewer 583.73 TOTAL: 11,705.21 ZEP SALES & SERVICE 3 /08/10 CLEANERS General Fund Public Works 92.22 TOTAL: 92.22 —PAYROLL EXPENSES 3/01/2010 - 99/99/9999 General Fund Administration 4,439.56 General Fund General Government 7,428.10 General Fund Finance 5,440.72 General Fund Planning 5,513.63 General Fund Protective Inspections 3,232.66 General Fund City Engineer 2,826.30 General Fund Public Works 9,825.35 General Fund Streets & Roadways 2,438.07 General Fund Ice & Snow Removal 3,308.90 General Fund Parks & Recreation 6,407.36 Water Utility Water 2,360.68 Sanitary Sewer Uti Sewer 989.32 Recycling Utility Recycling 199.52 Stormwater Managem STORMWATER MANAGEMENT 811.80 TOTAL: 55,221.97 FUND TOTALS =_______________ 101 General Fund 207,977.96 305 2003 Public Safety Bldg S 1,550.00 403 Equipment Replacement 4,501.35 404 Street Capital Improvemen 5,845.00 490 Southshore Community Ctr. 3,444.05 601 Water Utility 34,002.99 611 Sanitary Sewer Utility 5,853.23 621 Recycling Utility 14,068.94 631 Stormwater ManagementUtil 930.67 GRAND TOTAL: 278,174.19 TOTAL PAGES: 6 ..._ 03 - -04 2010 -" :,7 AM :� O _j N C I i.: RFPORT Ev DEPART .. MAE O8, 20 i 0 PA GE .. DEP 'MENT f VENDOR NAM!. L.A'TE Dk SCx ­ P r0jj AMOUNT NON - DEPARTMENTAL General Fund 1 FEDERAL, W / II 3/02/10 FEDERAL W /11 4,808.75 3/02/10 FICA W/H 3,292.15 3/02/10 MEDICARE W /H. 769.92 PERA 3/02/10 P/R DEDUCTS -PERA 3,181.89 ICMA RETIREMENT TRUST - 302131 -457 3/02/10 P/R DEDUCTS- DEFERRED COM 1,075.00 3/02/10 P/R DEDUCTS- DEFERRED COM 343.90 AFSCME COUNCIL 5 3/02/10 P/R DEDUCTS - UNION DUES 301.12 MN DEPT OF REVENUE 3/02/10 STATE W/H 2,158.10 MISC. VENDOR CHAMPION PLUMBING 3/08/10 6263 CHASKA ROAD- PERMIT RE 15.00 CHAMPION PLUMBING 3/08/10 6263 CHASKA ROAD - PERMIT RE 0.50 KLM ENGINEERING INC 3/08/10 AT &T ANT REINSTALL -OLD MKT 2,300.00 WELLS FARGO HEALTH BENEFIT SVCS 3/02/10 P/R DEDUCTS -HSA 1,103.13 TOTAL: 19,349.46 Administration General Fund EFTPS - FEDERAL W/H 3/02/10 FICA W/H 268.04 3/02/10 MEDICARE W/H 62.69 PERA 3/02/10 P/R DEDUCTS -PERA 310.77 MAMA 3/08/10 BEYOND THE YELLOW RIBON 2/ 20.00 HECK, BRIAN 3/08/10 MILEAGE 44.50 3/08/10 CELL PHONE 79.99 3/08/10 WELLNESS 40.00 * *PAYROLL EXPENSES 3/01/2010 - 99/99/9999 4,439.56 TOTAL: 5,265.55 General Government General Fund EFTPS - FEDERAL W/H 3/02/10 FICA W/H 459.60 3/02/10 MEDICARE W/H 107.48 PERA 3/02/10 P/R DEDUCTS -PERA 519.97 LINK, CLARE T. 3/08/10 RECORDING SVC- 02/22/10 250.00 MIDWEST MAILING SYSTEMS INC 3/08/10 MAR ADDT'L POSTAGE 5.62 3/08/10 MAR NEWSLETTER SVC 340.04 SUN PATRIOT NEWSPAPERS 3/08/10 MEADOWVIEW HRG 11/07/09 33.08 WELLS FARGO HEALTH BENEFIT SVCS 3/02/10 P/R DEDUCTS -HSA 96.00 PANCHYSITYN, JEAN 3/08/10 JAN -MAR WELLNESS REIM 120.00 ROGERS, DON 3/08/10 MILEAGE 58.00 3/08/10 PACKETS 120.00 TOTAL PRINTING SERVICES 3/08/10 MAR NEWSLETTER SVC 868.80 WARNER CONNECT 3/08/10 HP -6000 PRO MT E8500 -JULIE 1,213.44 SCHWAAB, INC 3/08/10 NOTARY STAMPS 111.03 * *PAYROLL EXPENSES 3/01/2010 - 99/99/9999 7,428.10 TOTAL: 11,731.16 Finance General Fund EFTPS - FEDERAL W/H 3/02/10 FICA W/H 337.02 3/02/10 MEDICARE W/H '78.82 PERA 3/02/10 P/R DEDUCTS -PERA 380.85 NGUYEN, MICHELLE 3/08/10 FEB MILEAGE 76.00 * *PAYROLL EXPENSES 3/01/2010 - 99/99/9999 5,440.72 TOTAL: 6,313.41 Professional Svcs General Fund KENNEDY & GRAVEN, CHARTERED 3/08/10 JAN- GEN RETAINER 1,583.20 3/08/10 JAN- RON JOHNSON LITIGATIO 291.88 POTTS, KENNETH N. 3/08/10 FEB PROSECUTIONS 2,291.6 TOTAL: 4,166.74 Planning General Fund EFTPS - FEDERAL W/H 3/02/10 FICA W/H 303.06 3/02/10 MEDICARE W/H 70.88 PERA 3/02/10 P/R DEDUCTS -PERA 385.95 03 _ -_2010 11:3F' C o u N C T 3: i 1 3POR' - : BY DEPARTMENT MAR c&, 2010 PRG =,: 2 EPAR;MEN'T POND VENDOR NAME DATE DES CRI P'' 1 ( 0N GOVERNMENT TRAINING SERVICES 3/08/10 LAND USE PLUG TRAINING 01/ 2,331..00 VERIZON WIRELESS 3/08/10 BRAD N. CELL SVC 01/11 -02/ 111.45 * *PAYROLL EXPENSES 3/01/2010 - 99/99/9999 5,513.63 TOTAL: 8,715.97 Municipal Buildings General Fund G & K SERVICES 3/08/10 CH SVC 146.92 ADVANCED IMAGING SOLUTIONS INC 3/08/10 SVC 01/06 -02/06 160.65 METRO SALES, INC. 3/08/10 COPIER MAINT 165.81 3/08/10 SVC 02/06 -10- 05/06/10 654.00 XCEL ENERGY 3/08/10 STATEMENT 4229077881 615.44 PAZANDAK, JOSEPH 3/06/10 MILEAGE & BLDG SEMINAR O1/ 120.79 SAM'S CLUB 3/08/10 CITY HALL 146.93 WARNER CONNECT 3/08/10 MAR MAINT SVC 2,800.00 CLASSIC CLEANING COMPANY 3/08/10 FEB SVC 0.00 TOTAL: 4,810.54 Police Protection General Fund XCEL ENERGY 3/08/10 STATEMENT 4229077881 3.53 SO LK MTKA POLICE DEPT 3/08/10 JUL HENN CTY PROCESSING FE 75.00 3/08/10 MAR OPERATING BUDGET EXP 78,829.00 TOTAL: 78,907.53 Protective Inspections General Fund EFTPS - FEDERAL W/H 3/02/10 FICA W/H 173.52 3/02/10 MEDICARE W/H 40.58 PERA 3/02/10 P/R DEDUCTS -PERA 226.28 FEDEX KINKO'S 3/08/10 PLANS COPY RETURN 38.62- 3/08/10 PLANS COPY 38.62 3/08/10 6045 WHITNEY CIR PLANS COP 19.31 PAZANDAK, JOSEPH 3/08/10 MILEAGE & BLDG SEMINAR O1/ 383.00 T- MOBILE 3/08/10 JOE P.'S CELL - 01/21 -02/2 35.08 * *PAYROLL EXPENSES 3/01/2010 - 99/99/9999 3,232.66 TOTAL: 4,110.43 City Engineer General Fund EFTPS - FEDERAL W/H 3/02/10 FICA W/H 174.65 3/02/10 MEDICARE W/H 40.84 PERA 3/02/10 P/R DEDUCTS -PERA 197.85 * *PAYROLL EXPENSES 3/01/2010 - 99/99/9999 2,826.30 TOTAL: 3,239.64 Public Works General Fund EFTPS - FEDERAL W/H 3/02/10 FICA W/H 583.41 3/02/10 MEDICARE W/H 136.44 PERA 3/02/10 P/R DEDUCTS -PERA 687.76 BARNES DISTRIBUTION 3/08/10 BOLTS /NUTS /HARDWARE 354.81 BOYER TRUCK PARTS DISTRIBUTION CTR. 3/08/10 BELT 14.56 3/08/10 BELT 45.63 G & K SERVICES 3/08/10 PW SVC 769.99 MANN MADE PRODUCTS 3/08/10 METAL & BENDING 79.50 AMERICAN MESSAGING 3/08/10 MAR PAGER 8.99 XCEL ENERGY 3/08/10 STATEMENT 4229077881 551.23 SAM'S CLUB 3/08/10 PUBLIC WORK 190.11 SPEEDWAY SUPERAMERICA LLC 3/08/10 GAS 3,131.17 WESTSIDE WHOLESALE TIRE 3/08/10 TIRES TRAILER 168.02 ZEP SALES & SERVICE 3/08/10 CLEANERS 92.22 HENN COUNTY- FINANCIAL MGMT & ACCTG. 3/08/10 2010 HAZARDOUS WASTE LIC 210.00 CLASSIC CLEANING COMPANY 3/08/10 FEB SVC 531.01 3/08/10 FEB SVC 316.46 0'. -G +__2010 __.: 30 AM C 0 U S4 C I "1, REPORT BY DEPARTMENT - MAR 08, 20100 PAGE 3 DEP_ -12 TME'_v'T rUN VENDOR tiz ?ME DA'!: t DHSCP AMOUNT "PA` ?ROT,L EXPENSES 3 /01/2010 - 99/99/9999 9,825.35 TOTAL: 17,696.66 Streets & Roadways General Fund EFTPS - FEDERAL W/H 3/02/10 FICA W/H 150.57 3/02/10 MEDICARE W/H 35.22 PERA 3/02/10 P/R DEDUC'T'S -PERA 170.66 A -1 MINNETONKA RENTAL 3/08/10 LP GAS 19.85 UNIQUE PAVING MATERIALS CORP. 3/08/10 ROAD PATCH MATERIALS 296.58 3/08/10 ROAD PATCH MATERIALS 853.66 3/08/10 ROAD PATCH MATERIALS 832.29 —PAYROLL EXPENSES 3/01/2010 - 99/99/9999 2,438.07 TOTAL: 4,796.90 Ice & Snow Removal General Fund EFTPS - FEDERAL W/H 3/02/10 FICA W/H 202.15 3/02/10 MEDICARE W/H 47.27 PERA 3/02/10 P/R DEDUCTS -PERA 231.61 WM. MUELLER & SONS, INC. 3/08/10 FEB SNOW -SALT & SAND 2,397.72 —PAYROLL EXPENSES 3/01/2010 - 99/99/9999 3,308.90 TOTAL: 6,187.65 Traffic Control /Str Li General Fund XCEL ENERGY 3/08/10 STATEMENT 4229077881 23.32 3/08/10 STATEMENT 4229077881 3,287.62 TOTAL: 3,310.94 Tree Maintenance General Fund VIKING LAND TREE CARE INC 3/08/10 TREE REMOVAL AT PARKS 4,881.02 TOTAL: 4,881.02 Parks & Recreation General Fund EFTPS - FEDERAL W/H 3/02/10 FICA W/H 376.81 3/02/10 MEDICARE W/H 88.11 PERA 3/02/10 P/R DEDUCTS -PERA 295.18 COMMUNITY REC RESOURCES 3/08/10 PARK COORDINATOR SVC 2/15- 2,205.00 MENARDS 3/08/10 BADGER WARMING HOUSE -SHEET 214.26 3/08/10 BADGER WARMING HOUSE 126.60 3/08/10 BADGER WARMING HOME 19.22 XCEL ENERGY 3/08/10 STATEMENT 4229077881 1,021.77 —PAYROLL EXPENSES 3/01/2010 - 99/99/9999 6,407.36 TOTAL: 10,754.31 Unallocated Expenses General Fund MEDICA 3/08/10 JAN ADJ 537.58 3/08/10 MAR MEDICAL 12,682.83 3/08/10 JAN -FEB ADJ 1,481.24 - UNUM LIFE INSURANCE CO 3/08/10 MAR LIFE INS 1,235.20 PRINCIPAL FINANCIAL GROUP 3/08/10 MAR DENTAL 765.68 TOTAL: 13,740.05 Public Safety Bldg Deb 2003 Public Safety NORTHLAND SECURITIES, INC. 3/08/10 CONTINUING DISCLOSURE REPO 1,550.00 TOTAL: 1,550.00 Equipment Replacement Equipment Replacem MDT DEPT. OF PUBLIC SAFETY 3/08/10 2010 FORD -F350 1,726.02 3/08/10 2010 FORD -F550 2,294.71 PROFESSIONAL WIRELESS COMMUNICATIONS 3/08/10 RADIO NEW TRUCK 480.62 TOTAL: 4,501.35 Street Capt Improvemen Street Capital Imp ELECTRICAL INSTALLATION & MAINTENANCE 3/08/10 LIGHT REPLACE 600.00 STERNBERG LANTERNS, INC. 3/08/10 GLEN RD LIGHT REPLACE 5,245.00 TOTAL: 5,845.00 73 -0 2010 30 AM C O 1; N C - 1 REPORT BY DEPA`. TENT - MICR O8, 2010 P.G_;: _ DEPARTMENT TENT Ft vD VENDOR NAME DA`C'E DESCRIPTJ ON -__ ._ -. MICUV`L Se ri ar Community Cente Southshore Communi COMMUil -TY REC RESOURCES 3/08/10 SSCC ASSISTANT - 02/18- 02/25 234.00 LEE PEST CONTROL INC 3/08/10 SSCC - SVC '70.00 CENTERPOINT ENERGY 3/08/10 5735 CTRY CLUB RD- 01 /18 -02 =432.72 XCEL ENERGY 3/08/10 5735 CTRY CLUB RD - 01/25 --0 700.92 SUN NEWSPAPERS 3/08/10 SSCC 02/11 50.00 3/08/10 SSCC 02/1.1 519.04 3/08/10 SSCC 02/18 519.04 3/08/10 SSCC 02/18 50.00 3/08/10 SSCC 02/20 100.00 CONNIE BLANCHARD OF BLANCHARDS CATERIN 3/08/10 VALENTINE COOKING CLASS 715.00 DESIGNER'S OUTLOOK, LEG 3/08/10 SSCC - YARD SIGN 53.33 TOTAL: 3,444.05 Water Water Utility EFTPS - FEDERAL W/H 3/02/10 FICA W/H 140.79 3/02/10 MEDICARE W/H 32.93 PERA 3/02/10 P/R DEDUCTS -PERA 165.24 MN DNR WATERS 3/08/10 2009 M DNR REPORT 2,472.45 GOPHER STATE ONE -CALL, IN 3/08/10 FEB SVC 15.23 AMERICAN MESSAGING 3/08/10 MAR PAGER 4.49 XCEL ENERGY 3/08/10 24253 SMITHTOWN RD 933.08 3/08/10 STATEMENT 4229077881 749.24 3/08/10 STATEMENT #229077881 971.82 3/08/10 STATEMENT 4229077881 2,263.51 GRAINGER, INC 3/08/10 SWITCH & GASKET 42.40 CLASSIC PROTECTIVE COATINGS 3/02/10 P.V. 42 -S.E. WATER TOWER 23,851.13 * *PAYROLL EXPENSES 3/01/2010 - 99/99/9999 2,360.68 TOTAL: 34,002.99 Sewer Sanitary Sewer Uti EFTPS - FEDERAL W/H 3/02/10 FICA W/H 59.86 3/02/10 MEDICARE W/H 14.01 PERA 3/02/10 P/R DEDUCTS -PERA 69.27 GOPHER STATE ONE -CALL, IN 3/08/10 FEB SVC 15.22 INFRATECH 3/08/10 EMERGENCY SEWER REPAIR C.R 2,310.00 3/08/10 EMERGENCY SEWER REPAIR -CR 1,575.00 AMERICAN MESSAGING 3/08/10 MAR PAGER 4.49 XCEL ENERGY 3/08/10 STATEMENT 4229077881 583.73 VERIZON WIRELESS 3/08/10 L.S. SVC 01/22 -02/21 232.33 * *PAYROLL EXPENSES 3/01/2010 - 99/99/9999 989.32 TOTAL: 5,853.23 Recycling Recycling Utility EFTPS - FEDERAL W/H 3/02/10 FICA W/H 12.37 3/02/10 MEDICARE W/H 2.89 PERA 3/02/10 P/R DEDUCTS -PERA 13.96 ALLIED WASTE SERVICES #894 3/08/10 MAR RECYCLING SVC 13,840.20 * *PAYROLL EXPENSES 3/01/2010 - 99/99/9999 199.5 TOTAL: 14,068.94 STORMWATER MANAGEMENT Stormwater Managem EFTPS - FEDERAL W/H 3/02/10 FICA W/H 50.30 3/02/10 MEDICARE W/H 11.76 PERA 3/02/10 P/R DEDUCTS -PERA 56.81 * *PAYROLL EXPENSES 3/01/2010 - 99/99/9999 811.80 TOTAL, 930.67 03..0 - 2015 :_1:30 Ain 3Fpt P MINT FU1ID 101 305 403 404 490 601 611 621 631 O U i C I. T REPORT 87 DSPARTYSN,'NT - MATZ O8 2010 P ,(37: r. II L;Ok .d, =•N'li r)A i - E' Dr.cC B. 'i Did AIMOU?v' ___ FUND TOTALS _ ------------- General Fund 207,977.96 2003 Public Safety Bldg S 1,550.00 Equipment Replacement 4,501.35 Street Capital Improvemen 5,845.00 Southshore Community Ctr. 3,444.05 Water Utility 34,002.99 Sanitary Sewer Utility 5,853.23 Recycling Utility 14,068.94 Stormwater ManagementUtil 930.67 GRAND TOTAL: 278,174.19 --- -------------------- -------- TOTAL PAGES: 5 To: Mayor and City Council From: Twila (trout — Park Secretary Kristi Anderson — Community Rec Resources Date: March 3, 2010 Re: Estimate for DermCo LaVine Badger Park Tennis Court Overlay In 2009, the City resurfaced the Manor and Cathcart Tennis Courts with the intent to overlay Badger tennis courts the spring of 2010. Staff contacted DermCo LaVine to obtain the estimate for Badger park courts and received an estimate of $10,574.00 The Park Commission moved at its February 9"' meeting to recommend to City Council that the contract be awarded to DermCo LaVine and that staff negotiate with the contractor to come in below the $10,000 amount budgeted within the CIP. Staff contacted the contractor and asked them to meet the proposed budget. DermCo LaVine indicated that they would do so. It was during this conversation with the contractor that staff realized that, based on his previous year's notes and estimates, the contractor believed it was a three court complex as opposed to 2 courts. With this correction, the contractor indicated that he would indeed fall well below the original $10,000 estimate, the amount recommended for approval. Attached is DermCo LaVine's revised estimate for the two court complex at Badger Park totaling $7,675.00 STAFF RECOMMENDATION: Staff recommends that the City Council award the contract to DermCo LaVine for the overlay of the 2 Badger Tennis Courts for anestimated $7,675.00, as it falls well below the $10,000 budgeted within the CIP recommended by the Park Commission. Christi City of Shorewood 5755 Country Club Ind, Shorewood, IAN, 55331 NROPOSAL Date: Resurface 2 tennis courts Courts by City Hall Total: Seven Thousand Six hundred Seventy Five and no /100 -----------------®_--__®_®_®__-------- ___--- _---- ____- __--- - - - -_( 7675,00 } NOTE : Structural cracks will start to reappear within the first year, We would want to look at the courts again once the snow is gone to see what this winter might have done to the surface to confirm this price. A 1/3 deposit is required prior to starting the job in the spring. Dermco-LaVine, The Mid-west's Recreational 91 C(L x x. .' n k E n `F x F c.F lv i. x, Cunt { Sj f f'4 t o ( ACTION FORM At its meeting nn February 2Z,Z01O the City Council made the Planning and Park Commission appointments by motion. The City Code states that the Planning and Park Commission appointments are tobe made byResolution. The attached two Resolutions formalize the Planning and Park Commission appointments made bythe City Council on February 22, 2010. Staff Recommendation A motion to adopt a Resolution making Planning Commission appointments; and A motion to adopt a Resolution making Park Commission Appointments Council Action: CITY OF SHOREWOOD RESOLUTION NO. 10 -006 A RESOLUTION MAKING PLANNING COMMISSION APPOINTMENTS WHEREAS, the City of Shorewood has advertised for Shorewood residents to apply to serve on the Planning Commission; and WHEREAS, the City Council did complete the selection procedure for appointment to said Commission, and at is February 22, 2010 meeting, made a motion to appoint the candidates as indicated below. NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Shorewood hereby makes the following appointments to the Planning Commission effective March 1, 2010, with the term expiration as indicated: Planning Commission: Member Term 1. Thomas Geng 2. David Hutchins 3. Sue Davis February 28, 2013 February 28, 2013 February 28, 2013 Said appointments complete the seven member Planning Commission which consists of the following additional members: Member Term 4. William C. Ruoff 5. Missy Villet 6. Pat Arnst 7. Ed Hasek February 28, 2011 February 28, 2011 February 29, 2012 February 29, 2012 ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 8th day of March, 2010, Christine Lizee, Mayor ATTEST Brian Heck, City Administrator /Clerk CITY OF SHOREWOOD RESOLUTION NO. 10-007 A RESOLUTION MAKING PARK COMMISSION APPOINTMENTS WHEREAS, the City of Shorewood has advertised for Shorewood residents to apply to s ' # WHEREAS, the City Council did complete the selection procedure for appointment to said Commission, and at is February 22, 2010 meeting, made a motion to appoint the candidates as indicated below. NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Shorewood hereby makes the following appointments to the Park Commission effective March 1, 2010, with the term expiration as indicated: Park Commission: Member Term Expiring 1. Josh Trent 2. Suzanne Gaidos February 28, 2013 February 28, 2013 Said appointments are added to the current Park Commission which consists of the following additional members: Member Term Expiring 3. Jeremy Norman February 28, 2011 4. Steve Quinlan 5. Bob Edmondson 6. Thomas Robb February 28, 2011 February 29, 2012 February 29, 2012 ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 8th day of March, 2010. ATTEST: Christine Liz6e, Mayor Brian Heck, City Administrator /Clerk Report on Lake Minnetonka Conservation District For Shorewood City Council March 8, 2010 By: Dick Woodruff Report covers January and February, 2010 -Working on “rebranding” Save the Lake Committee Re-energize the concept, the image and the community o Increase donations so more grants can be made o Implementation to begin in 2Q10 o -Approved grant requests from Save the Lake funds Received $115K of grant requests o Funded $48.5K of grants and $4K of ongoing LMCD projects o Sheriff’s Water Patrol Safety Equipment $3.5K 3-Bay milfoil 2010 treatment program $30K Museum of Lk Mtka Steamboat Minnehaha refurb $15K $2K each for Save the Lake banquet and solar lights Balance available to spend in 2010 is $6.2K (per policy) -Conducted public forum on boat storage and operation in shallow waters Technical Action Committee findings indicate risk of ecological damage o Board to consider if new or revised regulations are appropriate o Excellent public attendance (about 100 people) o TAC and Board will evaluate input in coming months o -Exotics Task Force Continuing to work on AIS prevention plan, have draft of 2010 plan in o review Reviewed RFP for 3-bay milfoil treatment and bid responses (no costs) o Decided to revise RFP to specify treatment protocol and request new bids o Will review new bids at 3/12 meeting o Final Army COE report on 2009 3-bay treatment was released o Dick Woodruff named co-chair of Task Force o -Approved the Strategic Plan (see attached) Staff now finalizing work plans for 2010 and beyond o Attendance: -2 of 4 regular Board meetings -1 of 2 Exotics TF meetings Lake Minnetonka Conservation District Strategic Plan (Approved) Vision To protect and preserve Lake Minnetonka. Mission Statement The LMCD provides leadership in protecting, improving, and managing Lake Minnetonka. This is accomplished through administration and regulation; promoting cooperation and partnerships; through innovation and education; and effective stewardship of public and private funds. Objective 1 Objective 2 Objective 3 Objective 4 Reduce the levels of existing Prevent the introduction of new AIS Ensure that LMCD ordinances and Maintain a strong financial Aquatic Invasive Species (AIS) policies are relevant and enforceable foundation Goals No matting of Eurasian Watermilfoil (EWM) and curlyleaf pondweed (CLP) that impedes public navigation from Memorial Day through Labor Day Goals Inspect incoming watercraft at 11 designated public accesses, from mid May through mid September, from sunrise to sunset (18,942 hours) Goals Identify problematic ordinances, with recommended solutions Review Management Plan by 4/30/10 to see if Plan should be updated Goals Establish Fund Balance policies Manage three bay herbicide treatment pilot project on Carmans, Grays and Phelps Bays (2010 -2012) Objective 5 Promote public access to Lake Minnetonka Goals Document current car /trailer spaces on Lake Minnetonka Evaluate the adequacy of car/ trailer spaces for public accesses Document the number of incoming watercraft launches at the 11 desig- nated public accesses during a boating season Evaluate and document all types of public access Educate lake users and service providers on prevention of AIS EWM /Exotics Task Force to create annual comprehensive AIS Plan Obiective 6 Ensure that Lake Minnetonka is safe Goals Annual assessment for condition and adequacy of navigational buoys on Lake Minnetonka Promote public safety education Coordinate annual meeting with the Hennepin County Sheriffs Water Patrol Establish annual enforcement plan Review and update Strategic Plan annually Objective 7 Improve public awareness of the LMCD Increase Save the Lake revenues to match current year expenditures Objective Protect the Lake's ecological systems Goals Publish two newsletters annually Redesign and regularly update the LMCD's website Utilize local newspapers Utilize cable television programming Provide annual Report to member cities Visit with the member city councils annually Goal Develop policies and ordinances based on the recommendations of the LMCD Environmental Technical Advisory Committee COUNCIL ACTION FORM Department Engineering Council Meeting 3/3/10 Item Number: From. James Landini, P.E. Item escri tion o Approve flans, Specifications and Estimate and Authorize Advertisement for Bids for the 2010 Road Improvement Project for Nelsine Drive, Meadowview Road and Mild Bose Lane Reconstruction Project, and Nelsine Drive Road Reclamation Project. The plans for Nelsine Drive do not include a watermain extension. The plans for Meadowview Road and Wild Rose Lane do include a watermain extension. Attachment 2 is the Engineer's Estimate for the entire project. Most improvements will be funded using City funding sources. The watermain extension, if approved, will be assessed to abutting properties. During the public plan review meeting, two residents offered drainage and utility easements for a drainage swale. The Swale would aid drainage in the area. I have instructed TKDA to add this as a bid alternate and we will have to wait until the snow melts to create easement documents and plans. The steps for the project to be considered at this time include the following: ♦ Select components of the project, Order the improvement, Approve plans, specifications and Engineer's estimate, Authorize Advertisement for Bid (Exhibit A) A couple of resolutions ordering the improvement, approving the plans, specifications and Engineer's estimate, and authorizing the Advertisement for Bids are included for your consideration. Options 1. Authorize all components of the project, assess abutting properties for watermain extension. 2. Authorize most components of the project, direct staff to discard watermain extension. 3. Do nothing. Staff Recommendation • Order the improvement by resolution • Approve plans, specifications and Engineer's estimate • Authorize Advertisement for Bid (Exhibit A) Council Action: CITY OF SHOREWOOD STREET DRAINAGE & UTILITY IMPROVEMENTS PROJECT LOCATION T117N, R23W SECTIONS 32,33 v IS LA ND VIEW /O RD. s DR. / KATHLEEN BRYNMAWR `--- C . PL. / SR 1 0c F O(,R J 0° B RI BOULDER mR / OCE CIR, C DRAWING INDEX SHEET DESCRIPTION GENERAL 1 TITLE SHEET 2.3 LEGEND & ESTIMATED QUANTITIES 4 TYPICAL SECTIONS 5 -7 DETAILS 8 STORM SEWER CONSTRUCTION CHART 9 RIGHT -OF -WAY & EASEMENTS 10 EROSION CONTROL 11 EXISTING CONDITIONS & REMOVALS 12 PROPOSED STREET ALIGNMENTS 13 DRAINTILE IMPROVEMENTS 14 INTERSECTION GRADES WILD ROSE LANE 15 WATERMAIN IMPROVEMENTS 16 STREET & STORM SEWER IMPROVEMENTS 17 -18 CROSS SECTIONS MEADOWVIEW ROAD 19 WATERMAIN IMPROVEMENTS 20 STREET & STORM SEWER IMPROVEMENTS 21 -22 CROSS SECTIONS NELSINE DRIVE 23 STREET & STORM SEWER IMPROVEMENTS I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED. BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA oE m o odd EXISTING UTILITY LOCATIONS Z 0 C� l� � �,. BEVERLY �) DR, F ElM R I 0 � G CIR. RD. 3 ,AYOGE CIR. � ,Q 2 AVE. ST. R`D CC nN- L_ G CIR Off A 1 ¢ AMLEE RD, ALLEYWODO RD. NELSINE - S w SUNNY S 3 VALE to DR, - GLEN RD. A. 3 HA DING ° ° a AV STAR CIR. 3 g SMRHTOWN RD. 3 w a MANN LA. U U DR. �C TR. N WILLSEY LA. TRU "IVY T ^_ Gl0' G ECHO E j RIDGE POINT CIR - (R o � � rE LE Dw sT °� o I THE CONTRACTOR SHALL VERIFY ALL EXISTING UNDERGROUND UTILITY LOCATIONS AND ELEVATIONS PRIOR TO CONSTRUCTION. ALL INPLACE UTILITIES MAY NOT BE SHOWN ON THIS PLAN & THOSE THAT ARE SHOWN, MAY NOT BE SHOWN IN THE EXACT LOCATIONS. THE SUBSURFACE UTILITY INFORMATION IN THIS PLANSET IS UTILITY QUALITY LEVELS "C" & "D" AS DEFINED IN ASCE "STANDARD GUIDELINE FOR THE DEPICTION OF EXISTING SUBSURFACE UTILITY DATA ". GOPHER STATE ONE CALL: 1- 800 -252 -1166 SPECIFICATION REFERENCE THE 2005 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION ", DIVISIONS II & III, AND ALL AMENDMENTS THERETO, SUPPLEMENTAL SPECIFICATIONS, AND THE "STANDARD UTILITIES SPECIFICATIONS FOR SANITARY SEWER, STORM DRAIN AND WATERMAIN INSTALLATIONS" AS PROPOSED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA, 1999 EDITION. (X�1X.16@}(�RE DATE LIC. NO. 41616 TKD Attachment #1 R/W VARIES R/W SOD WITH MIN. 1133' 13.33' 4" TOPSOIL (TYPICAL) (BACK OF CURB) (BACK OF CURB) VARIES 11 11' VARIES AR �eS SURMOUNTABLE "S" SURMOUNTABLE PROFILE CE 4 " TOPSOIL CURB & GUTTER CURB & GUTTER VPR1E5 2,O%, MIN 2.0 %, MAX 4:1 6„ 6" GEOTEXTILE FABRIC (Mn /DOT 3733,TYPE 1) — 2.00% 2.00 % --_ TO COVER THE TOP OF THE 3/8" TO 3/4' ROCK MIN 2.0 %, MAX 4:1 �,. io 4" TOPSOIL &SOD COARSE FILTER AGGREGATE (MN /DOT SPEC. 3149.2H) COARSE FILTER AGGREGATE (MN /DOT SPEC. 3149.2H) 4" PVC PERFORATED EDGE 4" PVC PERFORATED EDGE DRAIN WITH HOLES AT 8 DRAIN WITH HOLES AT 8 AND 4 O'CLOCK MNDOT AND 4 O'CLOCK MNDOT SPEC 3245. TYPE 1 GEOTEXTILE SPEC 3245. TYPE 1 GEOTEXTILE SOCK ( MNDOT SPEC. 3733) 2" 2360 TYPE LV 4 BITUMINOUS WEARING COURSE SOCK ( MNDOT SPEC. 3733) 12" RECLAIMED DEPTH TACK COAT 2" -2360 TYPE LV 3 BIT. NON- WEARING COURSE GEOTEXTILE FABRIC (Mn /DOT 3733,TYPE 1) 2357 BITUMINOUS TACK COAT 2" -2360 TYPE LV 4 BIT. WEARING COURSE 2" 2360 TYPE LV 3 BITUMINOUS NON -WEAR COURSE 8" CLASS 5 AGGREGATE BASE (100% CRUSHED ROCK) 24" SELECT GRANULAR MATERIAL GEOTEXTILE FABRIC (Mn /DOT 3733,TYPE V) TYPICAL SECTION TYPICAL SECTION NELSINE STREET MEADOWVIEW ROAD & WILD ROSE LANE 0 o E CLC AJM PROFESSIONAL ENGINEER 2010 STREETS, DRAINAGE & UTILITY MINNESOTA IMPROVEMENTS ° ARA L. GEHERE" DESIGNERSQ DRAWN I S H O R E W OO D MINNESOTA P NO. AM A CERTIFY THIS PLAN WAS P DU Fj F� A�tEO TKDA 536. UN THE LA RMV HAT TYPICAL SECTIONS 14536.000 I AM A DULY LICENSED - UNDER THE LAWS OF THE STATE OF CHECKED RECORD NO. DATE LIC. NO. jNO..TEV DESCRIPTION OF REVISIONS CLIENT NO. .SAND. SHEET NO. 4 OF 22 SHEETS Y �x 0 - ft x ® - r—/77�%7r ,I 1 r - 7— r rr r 1 `,r° �/1i /il+' - !,�`": � tY.' �77// �f:f / / /r ✓ / :fL /rte � ?55H0 ^"/. J Y F 25775 � " „ ?„ ,• 11,E f��� �,_,,'.' I� I lr J 077Tl 1 f a LEGEND ° ® INLET CONTROL ® - SILT FENCE -4” TOPSOIL & SOD, CLEAR & GRUB "} TREE REMOVAL a =- r I ` � � I ✓ E +7,' i7T /� asscn 7h� z � r xa } > yi FT :r� /_ l'Cl_ I /( r NEISINE DRIVE' <.. rL /SCe t�l /i ,. � i 1 I r 2 5555 "'"'i (I 25505 t .f�l j - - - - - - - - - _ - - - - - - - - - _ Q ' 1 P� T TORS AGENCY CON DUCT BEST MANAGEMENT M NEAP) TO CONTROL E/ 1 T CONTRp ALL REM 5 AND OENGES ONLY AFTER R s' SIT E SILTATION AND EROSIOMINTO DRAINAGE WAYS. THE CONTRACTOR SHALL ENGINEER APWiOVAL. ALL DEBRIS. STAINES, AND 9U5, ALONG SILT FENCES SHALL COMPLY WITH ALL CONDITIONS AND COMPLETION DATES RELATIVE TO ALL BE REMOVED AND DISPOSED OFF SRN. THE CONTRACTOR SHALL HAND RAKE SUED yV' ' E , A PERMITS ISSUED FOR THE WORK TO BE COMPLETED. THE ENGINEER MAY. AREA L ALONG THE FENCE LOCATIONS TO PROVIDE A SMOOTH FINAL GRADE AND U,7�N 1 V�I..G L/'E ISSUE A STOP WORK ORDER FOR ALL DEVELOPMENT WORK AND BUILDING SHALL flESiORE THE GROUND SURFACE WITH SEED OR SOO, AS REOUIREO. TO y 1 II 1 W CONSTRUCTION FOR NONCOMPLIANCE WITH THESE MEASURES. MATCH THE FINISHED GRADE TO THE ADJACENT AREA , 177- T . r 2. SEQUENCING. ALL SILT FENCE AND OTHER EROSION CONTROL MEASURES: SHALL BE 12. FINAL STORM SEWER SYSTEM. AT THE COMPLETION OF THE WORK AND BEFORE THE IN PLACE AND APPROVED BY ENGINEER PRIOR TO ANY REMOVALS. EXCAVATION OR FINAL WALK THROUGH. THE CONTRACTOR SHALL REMOVE STORM SEWER INLET c; Cl"STR ClION AND SHALL BE MAINTAINED UNTIL VWBLE TURF OR GROUND COVER PROTECTION MEASURES AND THOROUGHLY FLUSH THE STORM SEWER SYSTEM. /%rr/ . HAS BEEN ESTABLISHED AND APPROVED BY THE ENGINEER. SEDIMENT AND DEBRIS S SHALL BE COMPLETELY REMOVED A CLEANED AT THE INLETS, I I I r1L GGr1fIG OUTLETS. AND DOWNSTREAM OF EACH OUTLET. RIPRAP AND GEOTEXTILE FABRIC MAY 3 29765 . SILT FENCE. THE CONTRACTOR SHALL INSTALL SILT FENCE AT THE LOCATIONS SHOWN REOUIRE REPLACEMENT AS DIRECTED BY ME ENGINEER TO OBTAIN A LIKE NEW I - ON THE PLANS AND IN ACCORDANCE NTH THE IN STANDARD FAILS. ':SILT FENCE INSTALLATION ACCEPTABLE TO THE CITY. g 1fG?f ' l DONS AND INTERIM SUMPS SHALL BE PLACED TO INTERCEPT SILT T FROM Eli I I " / CONCENTRATED RUNOFF FROM OPEN GRADED AREAS. ADDITIONAL SILT FENCE SHALL 13. CONCRETE 8E WASHOUT ONSITE: ALL UOU{D AND SOLID WASTES GENERATED BY CONCRETE I REQUIRED AS DIRECTED BY THE ENGINEER. WASHOUT OPERATIONS NU ST BE CONTAINED IN A LEAK -PROOF CONTAINMENT FA.001TY y�� Ofl IMPERMEABLE UNER. A COMPACTED CLAY LINER THAT DOES NOT ALLOW WASHOUT II 4. STOCKPILES. ALL STOCKPILE AREAS SHALL HAVE SILT FENCE OR SEDIMENT TRAPPING UOUIDS TO ENTER GROUND WATER IS CONSIDERED AN IMPERMEABLE UNER. THE UOUID Iy�� I .,Y f , SYSTEMS PLACED AROUND THE ENTIRE PERIMETER, AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR AREAS. UOUID AND SOLID y INLET PROTECTION. THE CONTRACTOR SHALL INSTALL INLET PROTECTION WR ALL WASTES NU I T BE DISPOSED Of PROPERLY AND IN'COMPLMNCE WITH MPCA 1 - -' - - - -- - - "- - - -- - - -- - -- - -- - - - EXISTING M STOR SEWER INLETS - IN' ACCORDANCE -WITH THE -- CITY - STANDARD - DETAILS. _ REGULATIONS. A "IN 1157 BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INLET PROTECTION SHALL ALSO SE PROVIDED ON ALL PROPOSED STORM SEWER - -- -- INFORM CONCRETE EQUIPMENT OPERATORS To ANUZE - THE - PROPER FACILITIES. II INLETS IMMEDIATELY FOLLOWING CONSTRUCTION OF THE INLET. B. ROCK CONSTRUCTION ENTRANCE. A ROCK ENTRANCE SHALL BE CONSTRUCTED AND 1C t MAIWANED AS SHOWN ON THE PLANS TO REDUCE TRACKING OF III AND DIRT ONTO () l THE PUBLIC STREETS. A GEOTEXTILE FABRIC SHALL BE PLACED UNDERNEATH THE ROCK. THE ROCK SHALL BE PERIODICALLY REPLENISHED TO MAINTAIN THE INTENDED PERFORMANCE. MUD AND DEBRIS SHALL BE REMOVED OR SCRAPED FROM TIRES II E� �11 ��". r / ?. l , r L'r✓. AND VEHICLE UNDERCARRIAGE PRIOR TO LEAVING THE SITE. ']. './ r STREET SWEEPING. ALL STREETS USED FOR ACCESS TO THE SITE AND HALL ROUTES III T 25786 25gg0 USED NOR CONSTRULTION EOUIPNENT AND MATERIAL SUPPLIES SHALL BE CLEANED AT THE END OF EACH WOWING DAY. THE CITY OR ENGINEER MAY ORDER ADDITIONAL 25720 .� / SWEEPING OF THE STREETS AS DEEMED REQUIRED l� �T ( 111<'LL S. POSITIVE DRAINAGE AND PROTECTION. THE CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE THROUGHOUT THE SITE AT ALL TIMES. LOW POINTS WITHIN AND ALONG ROADWAYS ARE EXPRESS LY PROHIBITED. THE CONTRACTOR SMALL BE RESPONSIBLE FOR TEMPORARY CHE T. PIPING OTHER MEANS TO FACILITATE PROPER DRAINAGE - I I m ' ,r- DURING CONSTRUCTION. PRO PROTECT ELY GRADED AREAS FROM EROSION. .�T - „ { ,I -'L WOOD FIBER BLANKET SHALL BE PLACED IMMEDI ATELY STEEP SLOPES EROSION, -_�.I - III -III -1 t 1 - 1�1I I i 8 I- III - ) I - III -III - I ( afu �1� � J11 � I GREAT ERI AND EMBANKMENTS, PERMANENT AND TEMPORARY PONDS, D L r � LL � SILT IN T iHE RUNOFF. A O U LETS AND OVERFLOWS TO PROTECT THE COMPLETED GRADE AND MINIMIZE a M i - TURF ESTABLISHMENT. ALL EXPOSED SOILS MUST BE STABILIZED WITHIN 14 CALENDAR /' T - r DAYS AFTER CONSTRUCTION - ACTIVITY IN THAT PORTION -OF- THE -SITE. HAS TEMPORARILY T'- - 71-17 N --Tr - 111 .-III- ' _ f'I+mI I :.:.; - - - - - - t� OR PERMANENTLY CEASED. WHEN A DISCHARGE POINT OF THE PROJECT LIES WITHIN ONE -'IT - - -- -- -.._ - -. -. ) _' ' I_I -@9M 1 "'- g:7 _- - - ( i I I i I T I I ( 1) I I I I "1= � -�' j Mtt MILE OF AN IMPAIRED WATER AS DEFINED BY MPCA EXPOSED SOILS MUST BE STABILIZED I JJJ�LLIM M: I IL�U�1 I u III e ... I 1i;1` -.I I:1 (1 - 111 i 1 i 11 -1. � -1i1 -III WITHIN ]DAYS AFTER CONSTRUCTION ACT IN THAT PORTION OF THE SITE HAS TEMPORARILY _ _ I OR PERMANENTLY CEASED. 1 v r g IO.MAIMENANCE ARID INSPECTION. EROSION CONTROL MEASURES SHALL BE MANTAMEO A THROUGHOUT THE CONSTRUCTION AND UNTIL SATISFACTORY ESTABLISHMENT OF $ PERMANENT GROUND COVER 15 OBTAINED. SILT FENCE SHALL BE INSPECTED WEEKLY WITH REPAIRS MADE ON THE SAME DAY OR FOLLOWING DAY OF THE INSPECTION, - - - -- UNSATISFACTORY CONDITIONS NOT REPAIRED OR CLEANED UP WITHIN 48-HOURS if OF NOTIFICATION SHALL RESULT IN A STOP WORK ORDER, AND /OR SAID WORK SHALL 0 50 100 1 BE COMPLETED AT CONTRACTOR'S EXPENSE. SCALE IN FEET^ A DESIGNED DRAWN IHEHE OR UNDER BY UND T y DIRECT DIRECT SUPERVISION AND T-m".m 2010 STREET, DRAINAGE &UTILITY PR OJECT N BY ME ER R My DIRECT THAT CLG AJM IAMADUL LAENSED P ROFES S IO NAL MINN EN GINEER IMPROVEMENTS EROSION CONTROL 14536.000 UNDER CHECKED RSG CARALGEHEREN :1 \r IL����I11 :i:�•'111y1 ��' :L''I „ SHOREWOOD REC NO. DATE wxwzoTO uG.NG. aTSTS MINNESOTA NO. DATE 3Y DESCRIPTION OF REVISIONS CLIENT NO. MSANO. SHEET NO. 10 OF 22 SHEETS xsssa r r / ' 9 O Q 2 I lr J 077Tl 1 f a LEGEND ° ® INLET CONTROL ® - SILT FENCE -4” TOPSOIL & SOD, CLEAR & GRUB "} TREE REMOVAL a =- r I ` � � I ✓ E +7,' i7T /� asscn 7h� z � r xa } > yi FT :r� /_ l'Cl_ I /( r NEISINE DRIVE' <.. rL /SCe t�l /i ,. � i 1 I r 2 5555 "'"'i (I 25505 t .f�l j - - - - - - - - - _ - - - - - - - - - _ Q ' 1 P� T TORS AGENCY CON DUCT BEST MANAGEMENT M NEAP) TO CONTROL E/ 1 T CONTRp ALL REM 5 AND OENGES ONLY AFTER R s' SIT E SILTATION AND EROSIOMINTO DRAINAGE WAYS. THE CONTRACTOR SHALL ENGINEER APWiOVAL. ALL DEBRIS. STAINES, AND 9U5, ALONG SILT FENCES SHALL COMPLY WITH ALL CONDITIONS AND COMPLETION DATES RELATIVE TO ALL BE REMOVED AND DISPOSED OFF SRN. THE CONTRACTOR SHALL HAND RAKE SUED yV' ' E , A PERMITS ISSUED FOR THE WORK TO BE COMPLETED. THE ENGINEER MAY. AREA L ALONG THE FENCE LOCATIONS TO PROVIDE A SMOOTH FINAL GRADE AND U,7�N 1 V�I..G L/'E ISSUE A STOP WORK ORDER FOR ALL DEVELOPMENT WORK AND BUILDING SHALL flESiORE THE GROUND SURFACE WITH SEED OR SOO, AS REOUIREO. TO y 1 II 1 W CONSTRUCTION FOR NONCOMPLIANCE WITH THESE MEASURES. MATCH THE FINISHED GRADE TO THE ADJACENT AREA , 177- T . r 2. SEQUENCING. ALL SILT FENCE AND OTHER EROSION CONTROL MEASURES: SHALL BE 12. FINAL STORM SEWER SYSTEM. AT THE COMPLETION OF THE WORK AND BEFORE THE IN PLACE AND APPROVED BY ENGINEER PRIOR TO ANY REMOVALS. EXCAVATION OR FINAL WALK THROUGH. THE CONTRACTOR SHALL REMOVE STORM SEWER INLET c; Cl"STR ClION AND SHALL BE MAINTAINED UNTIL VWBLE TURF OR GROUND COVER PROTECTION MEASURES AND THOROUGHLY FLUSH THE STORM SEWER SYSTEM. /%rr/ . HAS BEEN ESTABLISHED AND APPROVED BY THE ENGINEER. SEDIMENT AND DEBRIS S SHALL BE COMPLETELY REMOVED A CLEANED AT THE INLETS, I I I r1L GGr1fIG OUTLETS. AND DOWNSTREAM OF EACH OUTLET. RIPRAP AND GEOTEXTILE FABRIC MAY 3 29765 . SILT FENCE. THE CONTRACTOR SHALL INSTALL SILT FENCE AT THE LOCATIONS SHOWN REOUIRE REPLACEMENT AS DIRECTED BY ME ENGINEER TO OBTAIN A LIKE NEW I - ON THE PLANS AND IN ACCORDANCE NTH THE IN STANDARD FAILS. ':SILT FENCE INSTALLATION ACCEPTABLE TO THE CITY. g 1fG?f ' l DONS AND INTERIM SUMPS SHALL BE PLACED TO INTERCEPT SILT T FROM Eli I I " / CONCENTRATED RUNOFF FROM OPEN GRADED AREAS. ADDITIONAL SILT FENCE SHALL 13. CONCRETE 8E WASHOUT ONSITE: ALL UOU{D AND SOLID WASTES GENERATED BY CONCRETE I REQUIRED AS DIRECTED BY THE ENGINEER. WASHOUT OPERATIONS NU ST BE CONTAINED IN A LEAK -PROOF CONTAINMENT FA.001TY y�� Ofl IMPERMEABLE UNER. A COMPACTED CLAY LINER THAT DOES NOT ALLOW WASHOUT II 4. STOCKPILES. ALL STOCKPILE AREAS SHALL HAVE SILT FENCE OR SEDIMENT TRAPPING UOUIDS TO ENTER GROUND WATER IS CONSIDERED AN IMPERMEABLE UNER. THE UOUID Iy�� I .,Y f , SYSTEMS PLACED AROUND THE ENTIRE PERIMETER, AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR AREAS. UOUID AND SOLID y INLET PROTECTION. THE CONTRACTOR SHALL INSTALL INLET PROTECTION WR ALL WASTES NU I T BE DISPOSED Of PROPERLY AND IN'COMPLMNCE WITH MPCA 1 - -' - - - -- - - "- - - -- - - -- - -- - -- - - - EXISTING M STOR SEWER INLETS - IN' ACCORDANCE -WITH THE -- CITY - STANDARD - DETAILS. _ REGULATIONS. A "IN 1157 BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INLET PROTECTION SHALL ALSO SE PROVIDED ON ALL PROPOSED STORM SEWER - -- -- INFORM CONCRETE EQUIPMENT OPERATORS To ANUZE - THE - PROPER FACILITIES. II INLETS IMMEDIATELY FOLLOWING CONSTRUCTION OF THE INLET. B. ROCK CONSTRUCTION ENTRANCE. A ROCK ENTRANCE SHALL BE CONSTRUCTED AND 1C t MAIWANED AS SHOWN ON THE PLANS TO REDUCE TRACKING OF III AND DIRT ONTO () l THE PUBLIC STREETS. A GEOTEXTILE FABRIC SHALL BE PLACED UNDERNEATH THE ROCK. THE ROCK SHALL BE PERIODICALLY REPLENISHED TO MAINTAIN THE INTENDED PERFORMANCE. MUD AND DEBRIS SHALL BE REMOVED OR SCRAPED FROM TIRES II E� �11 ��". r / ?. l , r L'r✓. AND VEHICLE UNDERCARRIAGE PRIOR TO LEAVING THE SITE. ']. './ r STREET SWEEPING. ALL STREETS USED FOR ACCESS TO THE SITE AND HALL ROUTES III T 25786 25gg0 USED NOR CONSTRULTION EOUIPNENT AND MATERIAL SUPPLIES SHALL BE CLEANED AT THE END OF EACH WOWING DAY. THE CITY OR ENGINEER MAY ORDER ADDITIONAL 25720 .� / SWEEPING OF THE STREETS AS DEEMED REQUIRED l� �T ( 111<'LL S. POSITIVE DRAINAGE AND PROTECTION. THE CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE THROUGHOUT THE SITE AT ALL TIMES. LOW POINTS WITHIN AND ALONG ROADWAYS ARE EXPRESS LY PROHIBITED. THE CONTRACTOR SMALL BE RESPONSIBLE FOR TEMPORARY CHE T. PIPING OTHER MEANS TO FACILITATE PROPER DRAINAGE - I I m ' ,r- DURING CONSTRUCTION. PRO PROTECT ELY GRADED AREAS FROM EROSION. .�T - „ { ,I -'L WOOD FIBER BLANKET SHALL BE PLACED IMMEDI ATELY STEEP SLOPES EROSION, -_�.I - III -III -1 t 1 - 1�1I I i 8 I- III - ) I - III -III - I ( afu �1� � J11 � I GREAT ERI AND EMBANKMENTS, PERMANENT AND TEMPORARY PONDS, D L r � LL � SILT IN T iHE RUNOFF. A O U LETS AND OVERFLOWS TO PROTECT THE COMPLETED GRADE AND MINIMIZE a M i - TURF ESTABLISHMENT. ALL EXPOSED SOILS MUST BE STABILIZED WITHIN 14 CALENDAR /' T - r DAYS AFTER CONSTRUCTION - ACTIVITY IN THAT PORTION -OF- THE -SITE. HAS TEMPORARILY T'- - 71-17 N --Tr - 111 .-III- ' _ f'I+mI I :.:.; - - - - - - t� OR PERMANENTLY CEASED. WHEN A DISCHARGE POINT OF THE PROJECT LIES WITHIN ONE -'IT - - -- -- -.._ - -. -. ) _' ' I_I -@9M 1 "'- g:7 _- - - ( i I I i I T I I ( 1) I I I I "1= � -�' j Mtt MILE OF AN IMPAIRED WATER AS DEFINED BY MPCA EXPOSED SOILS MUST BE STABILIZED I JJJ�LLIM M: I IL�U�1 I u III e ... I 1i;1` -.I I:1 (1 - 111 i 1 i 11 -1. � -1i1 -III WITHIN ]DAYS AFTER CONSTRUCTION ACT IN THAT PORTION OF THE SITE HAS TEMPORARILY _ _ I OR PERMANENTLY CEASED. 1 v r g IO.MAIMENANCE ARID INSPECTION. EROSION CONTROL MEASURES SHALL BE MANTAMEO A THROUGHOUT THE CONSTRUCTION AND UNTIL SATISFACTORY ESTABLISHMENT OF $ PERMANENT GROUND COVER 15 OBTAINED. SILT FENCE SHALL BE INSPECTED WEEKLY WITH REPAIRS MADE ON THE SAME DAY OR FOLLOWING DAY OF THE INSPECTION, - - - -- UNSATISFACTORY CONDITIONS NOT REPAIRED OR CLEANED UP WITHIN 48-HOURS if OF NOTIFICATION SHALL RESULT IN A STOP WORK ORDER, AND /OR SAID WORK SHALL 0 50 100 1 BE COMPLETED AT CONTRACTOR'S EXPENSE. SCALE IN FEET^ A DESIGNED DRAWN IHEHE OR UNDER BY UND T y DIRECT DIRECT SUPERVISION AND T-m".m 2010 STREET, DRAINAGE &UTILITY PR OJECT N BY ME ER R My DIRECT THAT CLG AJM IAMADUL LAENSED P ROFES S IO NAL MINN EN GINEER IMPROVEMENTS EROSION CONTROL 14536.000 UNDER CHECKED RSG CARALGEHEREN :1 \r IL����I11 :i:�•'111y1 ��' :L''I „ SHOREWOOD REC NO. DATE wxwzoTO uG.NG. aTSTS MINNESOTA NO. DATE 3Y DESCRIPTION OF REVISIONS CLIENT NO. MSANO. SHEET NO. 10 OF 22 SHEETS 83 vi y m b n SEE SNEE7 0! 1, A J i T �. 2s7sD NO - - -- o - T 16 -1 16 -2 7 'r 0,J r,J � 25745 I1 fl v m i m W n m n 1 m 0 m N N IO N O 0' N �a m V _m N iD S OD M O m N O n N n m N IR ` d,.0] 17 M M m O O n t` O r ry '� n N ^ m m e mo ao to m n m m n n n n nn n n n m m m m m m m m m m m m m mm m m m m m m m.. O m m m m m 16 -1 i6 -2 � i6 -4 ifi 5 78 -7 RIM 963.42 RIM 962.65 RIM 963.46 RIM 963.45 RIM 969.34 INV 959.92 INV 959.15(W) w INV 958.77((E) INV 959.21(N,E,W) INV 964.60(N,W) 958.37 N 0 957.53(W) 010 957.33((N)) 16 - 3 w zm RIM 962.74 990 INV 958.24 (.4 0 F I 1 I 700.0000' vc 100.0000' vc PI = 4 +00 wIt 990 PI = 2 +50 PI EL. = 969.15 D! 85.4800' vc �- I PI EL. = 967.85 AD 0.83 PI= 1 +00 AD = -2.10 K = 120.49 EXISTING K 47.62 CE N PI El. 963.40 o . 9 . 80 .. AD =. 2.36 = 0 ry ^ o PROFILE K- 3 98O 6.25 ^ °o n o M m a an PROPOSED CE N a ry .n "' '� °' m n u PROFILE n v � N m II II II II 970 o + m it v w 731 - F -15" RCP, n a w - - -- - - - - -- - - -- $ 970 _0_82 % -- CL. 5 @ 1.05% a w - - -- It @ 1.77% RCP CL. �I 960 -- - -- 15' _ - 305LF- _ - -__ -- -- - - - _ - - =_ -_= -- 960 76_6 6t . 5 A= 2.Y0% - SEE ABOVE RIM 969.34 � -t5= $GP,_ -- INV 964.84 950 CL. ® 1 50% ,s -s 950 RIM 963.95 INV 959.45 91-F -15 RCP, CL. 5 @ 1.50% a q 24LF -12" RCP, '-f: �� r 241-F-12" RCP, CL. 5 ®9.00% o �° �� M J CL. 5 ® 1.00% 'n �� 0 1 2 3 4 5 6 7 8 DESIGNED DRAWN I HEREO B Y T DI CERTIFY YDI E LAN EPA SU AN W PL WAS PREPARED TzxrDA 2010 STREET, DRAINAGE &UTILITY WILD ROSE LANE RRDJEGr NO. RYME UNDER R ECT EPA THAT GLG MOB I AM A DULY LICENSED PROFESSIONAL ENGINEER IMPROVEMENTS From Meadowview Road to Eureka Road 14536.000 UNDER THE LAWS OF THE STATE OF MINNESOTA STREET & STORM SEWER CHECKED RSG CAR L. GE HEREN ,.:p', _;t��' SHOREWOOD MINNESOTA IMPROVEMENTS RECORD NO. Dare X/XX /zo7o uC.NO. 41616 il- .yl:G' NO. DATE ]BY DESCRIPTION OF REVISIONS CLIENT NO. MSA NO. SHEET NO. 16 OF 23 SHEETS u I i I ° II ° SSTD 1 I 1 n Y m r ° a m o @ a SEE SHEET 16 i 0 50 100 150 SCALE IN FEET M O N. n N, V . N °N °O a 'a N n 7 M N N N n M M n ry .n �n o ao m n o ao m M.m m ° n 'D M "' u1 t ,OO a� fop mUn"1 N �N NN �� O °m UC W00. y N 'ne rj MN °O m N "'a a a a a ma a ma `ta M MM m ED RIM 963.46 + 100.0000' VC I EXISTING RIM 949.57 RIM 947.46 RIM 963.42 RIM 963.42 INV 932.00 INV 958.77((E) ° O 0 1p PI = 11 +00 PROFILE INV 945.07 INV 943.02 1W) INV 939.90 SE) INV 933.38((5) 957.53(W) , °, + o PI EL. = 957.50 PROPOSED 942.96 SE) 938.76RN) 932.90(E,W) 957:33 N w ° m AD = 2.38 942.52 S)) ( ( ( ( D_ PROFILE 93278 NE) K = 41.98 ° � 942.32 N 928.78 SUMP) i + 100.0000' VC -►- 960 PI = 13 +00 1 I I I{ ry N PI EL. = 949.50 n 100.0000' VC 64.3600' VC 960 AD =1.13 N °. ° M PI 14 +50 PI = 16 +00 it K = 88.24 n ° 6 PI EL. 945.20 1 EL. 937.9 g`�Q rn AD = .-2.00 0 950 N. AD = 3.31 �� II 11 K = 50.00 + r m n K = 19.43 F_ - � _ _ °' `'' a w m ,m „ ° 950 _ 4 09 _ - ~ 940 -66 �.. � a , a W a w 940 ` - ry _� -�� ►^-E3- r 1Q 24LF -12 "RCP, 20 -4 _ CL3 ® g ?47 {F_ ` RIM 949.00 20 -7 '�c -� 1 �' CL.S ® 1.00% INV 945.50 _ - - =' CL•3 p 930 RIM 949.01 1 _ Q 30LF- 15RCP, IN 944.38 o tp" -= :Z=Z�zJj 1 551F- 30 "RC 930 CL.5 @ 4.75% 20 -9 RIM 943.52 - CL.3 ® 0.507 20-6 INV 940.02 Q3 24LF -15 "RCP, RIM 947.76 RIM 949.24 p -ta 920 CL.S ® 1.50% NV 943.26 INV 944.74 RIM 937.40 - INV 933.14 920 4Q 12LF -12 "RCP, 20 -5 I o -13 CL.S 1.00% Q RIM 948.36 RIM 936.50 NV 944.86 I CL.5 @2 1.00% "RCP, INV 933.00 CL5 31 LF -15 „ RCP, A4 CL.S ® 7.39% 24LF -12 "RCP, F CL.5 Cnl 1.00% 10LF -12 "RCP, 00 m F- Q1 H tf1 F- rn F- 17 h O F- Q F- M] F_: I+7 t- �. 00 - 00 O' 1f1 J N Or M IY x O Bf t0 D_' cp O_ J �� NI +• +• +. +• +_ +. +• +_ +. +• + +• °. CL.S C� 1.00 %+ cr CC N N M N M N 10 11 12 13 14 15 16 17 DESIGNED DRAWN IREFE Y CERTIFY THA DI T PLAN WAS PR EPA R ED T 2010 STREET, DRAINAGE &UTILITY MEADOWVIEW ROAD PROJECT NO. BYMEF DIRECT CT SUPERVISION AND AND TH AT CLG MOB I AM A DULY LICENSED PROFESSIONAL ENGINEER IMPROVEMENTS From Wild Rose Lane to Valleywood Lane 14536.000 UNDER THE LAWS OF THE STATE OF MINNESOTA STREET & STORM SEWER CHECKED RSG DATE CARA L. ORDERED LJC. NO. 41616 ::•'. a . ► SHOREWOOD MINNESOTA IMPROVEMENTS RECORD NO. L NO. DATE BV DESCRIPTION OF REVISIONS Y� • CLIENT NO. NSA NO. SHEET N0,19 OF 22 SHEETS 23-T - 7 23 . . . . . . . T M 00 �� 25540 ED j� 21-1 m 5 W!� E77 k " , V` 4%24- z 2 �4 4 T 23 2 -T- T ;U L p � »ii F72iii)» T)' NELSINE DRIVE NORTH/SOUTH EASEMENT 101 1 51 100 150 SCALE IN FEET C � Fo O a -R w I N .,d o LD LD D 1 . 1 9 1 0 cd 1 M 1 n . . 2 C, ( ED RIM 954.23 RIM 954.92 INV 949.29�S� INV 951.10 S) RIM 954.23 INV 949.5 RIM 938.60 INV 934.22 INV 934.80 S) 944.23 N 950.20 N,W) 940.23 SUMP) 944.2 N 940.23 SUMP) 934.60 N) 100.0000' VC - PI 21+00 23 -2 o 970 PI EL. = 953.95 SEE BELOW AD -1.50 LO 970 960 960 + K 66.67 PROPOSED CE II PROFILE EXISTING 960 a w j a LU 132LF-15"RCP, a: PROFILE CL.5 0 0.52% 960 950 950 1 0 0.50% .97% 950 950 940 , _ ` 940 (0) `� 15 CL-5 940 1 INV 954.92 RIM 954.70 RIM 950.42 INV 951.10(S) 940 930 4.49 Z RIM 954 930 INV 949,51(E,N) 930 � 22LF - "RCP,. CL.5 @ 1.00% 1 OLF- 1 5"RCP, 930 920 38LF-18"RCP, CL.5 @ 1.00% 920 221-F- 1 5"RCP, CL.5 @ 1.00% CL.5 @ 1.00% 0) 0) D_ 0) 0) F� + - I 20 21 22 23 24 25 26 DESIGNED DRAWN CLG MOB CHECIED FSQ I CERTIFY THAT THIS PLAN WAS PREPARED Y ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA T KDA .,kkkkk .............. 201 STREET, DRAINAGE & UTILITY IMPROVEMENTS SHOREWOOD MINNESOTA NELSINE DRIVE From Eureka Lane to Cul-De-Sac STREET & STORM SEWER IMPROVEMENTS PROJ NO. 1 4536.000 - DATE CARA L. GEREPER LIC. NO. 41616 RECORD NO. NO, DESCRIPTION OF REVISIONS CLIENT NO MSA NO. S SHEET NO.22 OF 22 SHEETS STREET, DRAINAGE & UTILITY IMPROVEMENTS it TOTAL PROJECT COSTS $ 664,080 STREET IMPROVEMENTS $ 379,580 STORM SEWER IMPROVEMENTS $ 134,550 SANITARY SEWER IMPROVEMENTS $ 6,950 WATER SYSTEM IMPROVEMENTS $ 142,990 WATER SYSTEM BENEFITTING PROPERTY OWNERS 15 WATER SYSTEM ASSESSMENT (BY LOT UNIT) $ 9,530 NELSINE COST BREAKDOWN SUMMARY TOTAL PROJECT COSTS $ 151,810 STREET IMPROVEMENTS $ 86,820 STORM SEWER IMPROVEMENTS $ 61,610 SANITARY SEWER IMPROVEMENTS $ 3,380 Attachment 2 DOCUMENT 00030 ADVERTISEMENT FOR BIDS Notice is hereby given that sealed bids will be received, publicly opened, and read aloud by representatives of the Qty of Shorewood. Minnesota, at the City HeU, 5755 Country Club Road, Shorewood, Minnesota 55331 in said City at 10:00 AM, on VVednesday. April 7. 2010 for furnishing all work and materials for the construction of the 2010 Street, Drainage, and Utility Improvements, consisting of the following approximate quantities: 1.400 LF 8^ DIP, Cl. 52VVahannain 1.900 LF 12^to24^ Storm Sewer 3.400 LF 4^ PVC Perforated Edge Drain 5.000 CY Common Excavation 18 RS SubgrodePreparedon 3.000 CY Select Granular Borrow 2.400 TN Class 5 Aggregate Base 2.600 LF Concrete Curb and Gutter 1.400 TN Bituminous Surfacing 1.400 SY Reclaim Ex. Bit. and Base Materials, 12-Inch Depth 4.800 SY Sodding Proposal fonns, contract documents, drawings and specifications as prepared byTKDA. are on file for inspection in the office of the City Clerk and in the office of the Engineens, whose address is 444 Cedar Street, Suite 15O0. Saint Paul, Minnesota 55101-2140. Complete digital Proposal Fonna. Plans, and Specifications for use by Contractors submitting a bid are available on . You may download the digital plan documents for a non-refundable price of $25.00. Please contact Quest Construction Data Network, LLC at (952) 2334632 or for assistance in free membership n*gistnation, down|oading, and working with this digital project information. Contractors desiring paper drawings, specifications and related documents for the purpose of submitting a bid may secure them from the Engineers upon deposit ofSeventy-Five Dollars ($75.00) for each sot. The deposit for one set of drawings and specifications will not berefunded. No bid will be considered unless it is securely sealed in an envelope and filed with the City Clerk prior to the time noted above for the closing of bids. Each bid must be accompanied by bid bond or cashier's check payable to the City ofShorewood in an amount not |aoe than five percent (5Y6) of the total bid as a guarantee that the bidder. ifsuccessful, will enter into a contract with the Owner for the work described in the proposal. This deposit will be subject hn forfeiture as provided by law. The deposits for the three lowest bidders will be retained by the Owner until the contract has been awarded and executed but not longer than sixty (GO) days. No bid may be withdrawn for a period of sixty (G0) days following the bid opening. The Owner reserves the right to reject any or all bids, tn waive informalities orto award the contract hothe lowest responsible bidder, in the best interest of the Owner. The City Council will consider award of contracts at a regular meeting to be held on April 12, 2010. Brian Heck City Administrator Dated: March 8, 2010 Pub|ishodbwimainShorewood8unSoi|or-VV*ehsofMaroh18.2O10andMarch25.2O10 Published twice in Construction Bulletin - Weeks of March 15, 2010 and March 22, 2010 Exhibit A 00030-1 14536.000 CITY OF SHOREWOOD RESOLUTION NO. WHEREAS, Resolution 09 -063, adopted by the City Council Nov 23, 2009, authorized the creation of plans and specifications of the Meadowview Road and Wild Rose Lane reconstruction project with the installation of Watermain, and WHEREAS, Resolution 09 -057, adopted by the City Council Oct 26, 2009, authorized the creation of plans and specifications of the Nelsine Drive Reclamation project, and WHEREAS, ten days mailed notice and two weeks' published notice of the hearing was given, and the hearing was held thereon on the 23 day of Nov, 2009 at which all persons desiring to be heard were given the opportunity to be heard thereon, NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Shorewood, Minnesota: 1. Such improvement is necessary, cost - effective, and feasible as detailed in the feasibility report. 2. Such improvement is hereby ordered as Meadowview Road and Wild Rose Lane street reconstruction with watermain and Nelsine Drive reclamation without watermain. 3. Plans and specifications prepared by TKDA, engineer for such improvement pursuant to Council direction, a copy of excerpts of plans and specifications is attached hereto and made part hereof, are hereby approved and shall be filed with the city clerk. 4. The City Clerk shall prepare and cause to be inserted in the official paper and in Construction Bulletin an advertisement for bids, attached hereto as Exhibit A, upon the making of such improvement under such approved plans and specifications. The advertisement shall be published for 2 weeks, shall specify the work to be done, shall state that bids will be opened and considered by the Council at 10:00 a.m. on April 7, 2010, in the City Hall Council Chambers, and that no bids will be considered unless sealed and filed with the Clerk and accompanied by a cash deposit, cashier's check bid bond, or certified check payable to the Clerk for 5 percent of the amount of each bid. 5. Watermain improvement on Meadowview Road and Wild Rose Lane will be assessed to the eligible abutting properties. ADOPTED BY WE CITY COUNCIL OF THE CITY OF SHOREWOOD this 4th day of March, 2010. Christine Liz6e, Mayor a. ' TKIN 1 CITE' OF SHOREWOOD RESOLUTION NO® WHEREAS, Resolution 09 -063, adopted by the City Council Nov 23, 2009, authorized the creation of plans and specifications of the Meadowview Road and Wild Rose Lane reconstruction project with the installation of Watermain, and, WHEREAS, Resolution 09 -057, adopted by the City Council Oct 26, 2009, authorized the creation of plans and specifications of the Nelsine Drive Reclamation project, and WHEREAS, ten days mailed notice and two weeks' published notice of the hearing was given, and the hearing was held thereon on the 23 day of Nov, 2009 at which all persons desiring to be heard were given the opportunity to be heard thereon, NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Shorewood, Minnesota: 1. Such improvement is necessary, cost - effective, and feasible as detailed in the feasibility report. 2. Such improvement is hereby ordered as Meadowview Road and Wild Rose Lane street reconstruction without watermain and Nelsine Drive reclamation without watermain. 3. Plans and specifications prepared by TKDA, engineer for such improvement pursuant to Council direction, a copy of excerpts of plans and specifications is attached hereto and made part hereof, are hereby approved and shall be filed with the city clerk. 4. The City Clerk shall prepare and cause to be inserted in the official paper and in Construction Bulletin an advertisement for bids, attached hereto as Exhibit A, upon the making of such improvement under such approved plans and specifications. The advertisement shall be published for 2 weeks, shall specify the work to be done, shall state that bids will be opened and considered by the Council at 10:00 a.m. on April 7, 2010, in the City Hall Council Chambers, and that no bids will be considered unless sealed and filed with the Clerk and accompanied by a cash deposit, cashier's check bid bond, or certified check payable to the Clerk for 5 percent of the amount of each bid. ADOPTED BY WE CITY COUNCIL OF THE CITY OF SHOREWOOD this 8th day of March, 2010, Christine Liz6e, Mayor Brian Heck, City Administrator/Clerk Background / Previous Action: The Council asked staff to look into the cost of installing an automatic door opener at City Hall to accommodate physically challenged individuals. Staff received quotes for an automatic door opener and the estimate for the automatic door opener system, electrical work, card access, and installation is approximately $5,435. Joe Pazandak, Building Official, who is managing the project, indicated the low quote is also the best option (see Attachment 1). In addition, there is a grant opportunity from the Office of the Secretary of State to improve access to polling places for persons with disabilities. The grant money is specifically for automatic door openers. Staff is requesting a grant for $4,595. The grant request does not include the cost of the card reader system, as this is more of a benefit to the City and not necessarily voters. Attachment 2 is the grant application. City Hall serves as a polling place for absentee voters, and it is estimated approximately 25% of those individuals entering the building to absentee vote (about 150 persons) could benefit from automatic doors. It is also possible that city hall may serve as a polling place for precinct 3 in the future; if this were to happen, it is estimated approximately 25% of those voters, about 337, would benefit. The grant application is due no later than March 19, and notification of awards will be made at the end of April. Council must adopt a resolution authorizing submittal of the grant application. A draft resolution is attached. All improvements must be completed by August 6. The work to be done and the payment amount must be specifically agreed upon in a grant contract entered into by the City and the Office of the Secretary of State (OSS) prior to the start for work. The grant stipulates that the local jurisdiction must provide funds to cover the difference between the amount of the grant awarded and the cost of the improvement. The grant application indicates that it is expected grants will be large enough to cover the vast majority of the costs for automatic doors. Options 1. Adopt a Resolution authorizing the submittal of a grant application for automatic door openers. If the grant is awarded, staff will enter into a contract with the OSS. The difference between the amount of grant and the total cost of the improvement will be funded from the Building Maintenance fund. The total cost of the improvement is $5,435. Staff anticipates the completion of the project by the end of May 2010. 2. Do nothing. Staff Recommendation Staff recommends Council choose Option 1. Council Action: Shorewood City Hall, HC door opener system Prepared by: Joe Pazandak Project Estimate Bid Sheet Date: 3.4.2010 Notes: 1) Scope of project: Install a powered door opener system. 2)Location Shorewood City Hall Front doors. 3)Purpose or project: Assist entry to and exit from City Hall for people with limited physical abilities. Attachment 91 Iii tip for Election Assistance for Individuals with Disabilities (EAI ) Grant Program DEADLINE: ALL SUBMISSIONS MUST BE RECEIVED 4:00 P.M., March 19 2010 In accordance with the requirements of Title II, Subtitle D, Section 261 of Help America dote Act (42 USC 15461) Contents A. General Instructions — Page I B. Administrative Questions — Page 2 C. Application Questions — Page 3 D. Improvements Worksheet — Page 4 E. Certification — Page 5 A. General Instructions The State of Minnesota Office of the Secretary of State (OSS) is currently soliciting grant proposals from cities, townships, and counties for specifically for automatic door openers to make polling places in Minnesota more accessible. The work to be done and the payment amount must be specifically agreed upon in a grant contract entered into by the political subdivision and the OSS prior to commencement of work The Department of Health and Human Services, Administration on Developmental Disabilities (ADD), Administration for Children and Families (ACF), Election Assistance for Individuals with Disabilities (EAID) has allocated to the OSS monies to be given in grants to local governments. These funds are available to pay for automatic door openers to make polling places more accessible to individuals with disabilities. Unlike past years we effect that the grants will be lame enough to cover the vast majority of the costs associated with purchasing and installing a typical automatic door Automatic door control switches must be installed in accordance with Minnesota Rules, Chapter 1341, Section 308 (in addition to state electrical code requirements.) Please note that the local jurisdiction will have to provide funds to cover any remaining balance. Political subdivisions will be responsible for selecting a contractor or staff to produce the awarded accessibility improvement and to pay the contractor, including any cost overruns. The political subdivision will report the expenditures for the specific accessibility improvement to OSS in order to receive reimbursements up to the amount awarded. Political subdivisions will also be required to fully cooperate in any and all federal audits of the grant fiends. We expect to notify grantees of the awards in late April If a grant contract has not been signed by all parties by May 31 2010 the award will be withdrawn. In order to apply for these SAID fiends political subdivisions must answer all questions fully and completely and provide a resolution of support from the governing body. An unanswered question or lack of a resolution could result in the disqualification of the application. If there is a question(s) that is not applicable, please indicate. See last page of this document for contact information. Attachment #2 B. Admini _ t No Questions Response 1. Application date: March 9, 2010 - -- 1 Name of political subdivision: City of Shorewood 1 Federal Tax ID #: 41- 6005142 4. Name of the County(s) in which the political subdivision in located: Hennepin 5. Name of individual completing this application: Jean Panchyshyn 6. Title of individual completing this application and their telephone number: Deputy Clerk 952- 960 -7911 7. In the spaces below, list names and contact information for the individuals and offices of your political subdivision responsible for: Administering & implementing the grant: Authorizing the procurement or purchase of accessibility improvements: Name: Jean Panchyshyn Brian Heck Title: Deputy Cleric City Administrator Address: 5755 Country Club Road Shorewood, MN 55331 5755 Country Club Road Shorewood, MN 55331 Phone: 952- 960 -7911 952- 960 -7905 E- Mail: jpanchyshyn(cr ei.shorewood.mn.Lis bheck�d�ci.shorewood.mn.us Fax: 952- 474 -0128 952- 474 -0128 C. Application Questions Federal law requires that all grantees receiving Federal funds, including State and local governments shall clearly state the dollar amount of the total costs of the project or program and the percentage of the total cost that will be financed by nongovernmental sources. No Question es ponce 8, Total cost of improvement project. $49595.00 9. Total amount of funds requested: (Total all SAID $49595.00 Grant Program Application Worksheets): 10. If any, total amount of additional non-grant funds $ to be determined, as to be used for the project grant: needed to complete (Local funds are not required.) the work 11. If any, name the source(s) of non-grant funds: The city's building maintenance fund 12. Has your political subdivision previously applied No for this grant? If yes, date of previous application? 13. Attach a proposed timeline for procuring or purchasing and implementing this accessibility improvement. — See attached (page 6) 14. Attach a resolution of support from the governing body, and if applicable, list any amount appropriated by the governing board of the political subdivision submitting this application. See attached Resolution (page 7) 15. j If applicable, attach commitment letter or resolution from other sources. Not Applicable 3 D. Improvements Worksheet Complete this worksheet (one worksheet for each polling place) explaining the proposed improvements to be made to the polling place. 1. Street address of polling place for which application is being submitted. 2. Number of registered voters in the polling place: Note: This is the absentee voting polling place for the City of Shorewood. It used to serve as a polling place until the 2008 election, and may again in the future. For absentee voting, the city had approximately 600 walk -in absentee voters in 2008. For the precinct polling place, there are 1350 registered voters 3. Estimated number of registered voters who may benefit from the automatic doors: Note: It is estimated automatic doors would benefit 25% of the AB voters, or about 150 absentee voters. Should this site serve as the precinct polling place in the future, it is estimated that 25% of the registered voters, or about 337 voters, would benefit. l and 1,350 Registered Voters 150 AB voters 337 Polling Place Voters Polling Places may have multiple improvements. List each proposed improvement in a box below. Describe the job requirements specifically for each proposed improvement, for example, "install adequate electrical and an automatic door opener on the font door of the public library." U „nri nlptP riacorint;nn r1nP.s ,nAt fit in one box_ continue in next box or attach additional sheets. 0 Proposed Improvements Cost 1 Install adequate electrical for automatic door opener on the front door of Shorewood City Hall, 5755 Country Club Road, Shorewood, MN 55331 $600.00 2 Purchase and Installation of Door Opener System on the front door of Shorewood City Hall, 5755 Country Club Road, Shorewood, MN 55331 $3,995.00 3 4 Total: $4,595.00 0 E. Certification I certify that Election Assistance to Individuals with Disabilities (LAID) Grant funds will be used only for the polling places listed on the attached worksheet(s) and only to purchase and install automatic doors for polling places in Minnesota. t. . All questions must be completely answered and a resolution of support from the governing body must be provided. An unanswered question or lack of a resolution could result in the disqualification of the application. All information must be submitted in writing as part of this application. If a question is not applicable, please indicate. Forward completed applications via email to elections.dept i ,state.mn.us Attention: Adam Aanerud. If necessary, fax or mail completed application and all accompanying worksheets and documents to: MN Secretary of State Attention: Adam Aanerud 180 State Office Building 100 Rev. Dr. Martin Luther King Jr. Blvd. St. Paul, MN 55155 -1299 Fax: 651- 296 -9073 All submissions must be received by 4:00 p.m. on Friday, March 19, 2010. All work must be completed no later than August 6, 2010. 5 City of Shorewood C. Application Questions Attachment for Item 913 Proposed finteline for procuring or purchasing and implementing this accessibility improvement® SCIPIO • By May 14 — Signed Contract sent to the Office of the Secretary of State By May 31 — Installation of automatic doors completed. 0 CITY OF SHOREWOOD RESOLUTION NO. 109 A RESOLUTION AUTHORIZING A GRANT APPLICATION FOR AUTOMATIC DOOR OPENERS WHEREAS, the City Council of the City of Shorewood hereby authorizes: A) The application for a grant from the Office of the Secretary of State of Minnesota for Federal funds pursuant to Title 11, Section 261 of the Help American Vote Act for the sole purpose of improving access to polling places in the city for persons with disabilities; B) To enter into an agreement with the Office of the Secretary of State governing the receipt, expenditure, reimbursement and reporting of such a grant; C) To receive and account separately in a manner sufficient to meet generally accepted government accounting principles sufficient to pass federal audit; and D) To expend any sums received in the manner indicated in the grant application and agreement with the Office of the Secretary of State. NOW THEREFORE, BE IT RESOLVED no further action by a city council meeting is required for actions related to this grant. ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 8th day of March, 2010. Christine Lizee, Mayor ATTEST Brian Heck, City Administrator /Clerk 7 COUNCIL ACTION FORM Department: Planning Council Meeting 3/8/10 item Number: 10B From: Brad Nielsen, Planning Director ftem Description: Deer Management 2010 Last year the City Council suspended its deer removal program, pending the results ofthis year's aerial survey, flown inFebruary. The good news is, vve have no deer on Gales island! Otherwise, the count on the mainland is 106 for this year, up from 64 in 2009. The Council must now decide if it wants to reinstate the removal program, using K8BRB, or to leave the suspension inplace. Staff has suggested some numerical thresholds that may be useful in making this decision (see attached staff report\. Do nothing; continue the suspension of the deer removal program; or reinstate the removal program, using MBRB for controlled hunts. Staff Recommendation |F (big if) the Council agrees with the numerical goal suggested hv staff (or some other numerical goal), it should direct staff to contact IVIBRB to arrange a removal program for this fall. Staff can then develop o formal policy for adoption by the Council. Council Action: CITY OF SHOREWOOD 5755 COUNTRY CLUB ROAD W SHOREWOOD, MINNESOTA 55331 -5927 - (952) 474 -3236 FAX (952) 474 -0128 ° www.d.shorewood.mn.us - dtyha11@d.shorewood.mn.us TO: Mayor and City Council FRONT: Brad Nielsen DATE: 4 March 2010 RE: Deer Management 2010 FILE NO. 405(DMP 2010) In response to resident complaints that increasing deer populations in Shorewood were damaging landscaping in the community and in some cases were being hit by cars, the City initiated a Deer Management Program (DMP) in 2007. The plan began with an aerial survey conducted by Three Rivers Park District in February of that year. Since then Shorewood has contracted for aerial surveys each February. The City then contracted with Metro Bowhunters Resource Base (MBRB), a non - profit organization of bowhunters to conduct a series of controlled hunts in 2007 and 2008 at select locations throughout the City. Following are aerial survey counts for each year as well as the number of deer removed in the controlled hunts: Year Deer Count Deer Removed 2007 121 26 (11*) 2008 74 23 2009 64 N/A 2010 106 TBD *In addition to the controlled hunts commissioned by the City, the Minnetonka Country Club was authorized to conduct a trap and dispatch program which removed 11 deer. ®� � PRINTED ON RECYCLED PAPER Memorandum Re; Deer Management 2010 4 March 2010 In 2009 the City Council agreed to suspend the controlled hunts and see what if any effect it might have on the deer population. It is worth a reminder at this time that while the aerial surveys provide an indication of the deer population, they are only "snapshots" of a given day. The City uses the surveys, combined with resident complaints to gauge the relative increase and decrease in deer population. The 2010 aerial deer survey results are in — the count is 106, up 42 from last year. The map on Exhibit A shows the distribution of deer throughout the community. We received a number of deer complaints in 2009, copies of which are attached for your review as Exhibit B. Obviously, since the removal program was suspended, we did not receive any complaints about the program. One of the criticisms of opponents to the DMP, and a factor in suspending the controlled hunts, was that there seemed to be no overall goal for the program. Was 121 deer too many deer for a community of this size? Was 64 too few? To try and answer these questions, staff has researched Minnesota Department of Natural Resources (DNR) information and the studies conducted by other cities — Shorewood is not the only city with deer issues! In addition, we have received some suggestions from harry Gillette, the Wildlife Manager for Three Rivers Park District. Some cities have done some very in -depth studies and developed very elaborate management plans. One of the better ones we have seen was done by the City of Burnsville. The report is too long to reprint here, but it is available online and we will forward an electronic copy to you for your review. IF the City is to continue its management program, a format similar to that used in the Shorewood Comprehensive Plan is suggested (issues, goals /objectives /policies and plan). With respect to issues, these seem to be fairly well defined and for the most part consist of deer depredation of landscaping and vegetation, and to a lesser degree, car /deer collisions. In the second case, there does not seem to be a great deal of evidence of such accidents, however, the DNR and other studies suggest that many of these incidents may go unreported. These problems should be balanced with the recreational pleasure that many people get from having the deer around. The DNR, in its long range plan for the management of white - tailed deer in the Metro region (1996), sets forth a goal and certain objectives that could be used by the City as the basis for its management program: Goal: Manage white - tailed deer populations within the city at socially acceptable levels that provide recreational and educational opportunities as well as provide opportunity for maintaining a healthy (natural regeneration) of woodland habitat. N Memorandum Re: Leer Management 2010 d March 2010 With respect to "acceptable limits ", selecting an "ideal' deer population is inherently somewhat arbitrary. Three Rivers Parks attempts to keep the population in its parks to 20 -25 per square mile. Realize that these parks are almost entirely deer habitat. Larry Gillette suggests that the number of deer found in Shorewood is undoubtedly too high for a residential community. He goes on to say that a "socially acceptable" population might be as low as five deer per square mile, which strikes us as being a bit low. In looking at what other cities have settled on, a number on the order of 15 per square mile appears to be reasonable. Since Shorewood contains approximately five square miles of land and wetlands (not including lakes), a total population of 75 (the 2008 count) might be appropriate. Whatever the number that may be agreed upon, IF the City decides to manage that number, a controlled hunt is the approach recommended by this department. The two years using MBRB to conduct the hunts were considered safe, efficient and effective. IF the City determines that the removal program should be reinstated for 2010, staff suggests that the hunts be limited to the areas of greatest deer concentration: 1) the Lake Virginia vicinity on the west end of the city; 2) the "Black Lake" /Eureka Road vicinity; and 3) the areas on both sides of Christmas Lake. We also suggest hunts similar to the 07 and 08 efforts for this year, after which a scaled down maintenance effort should be scheduled for 2011. IF the removal program is to be continued, staff needs to be in touch with MBRB by some time in May — the earlier the better. Finally, based on the recommendations of the Planning Commission, staff has published one article in the newsletter relative to supplemental feeding of deer. That will be followed by a second article next month and a third next fall. Cc: Brian Heck Larry Brown -3- 7� ff I RE Q �4 o 0 a. 1,800 Fee� 16- Map prepared by Three Rivers Park District Department of Natural Resources STH February 5. 2010 N W +E S 4-4 H., MEN X Ef Magm- 31 'KIM Shorewood and Big Island January 22 & 29 201 Surveyed by Carol Carter & Brian Fredlund Tnt.qi npinr (ni infinri - 119 N M W, 3 C7 7 W U, NO V Exhibit A 2- _2 ALE COPY Exhibit B Brad Nielsen . From: mbjnieben@cmmoam.net Sent: Saturday, October 24.2UOA 1O�52PK8 To: Brad Nielsen Subject: Fwd: deer hunt ---Forwarded Message ----- F[DDl: "Jean PaOchVShVD To: "Brad Nielsen" <abinielsen@comcast.net> Cc: "Brian HeCk"<BHeck@C(.8hU[eVVOOd.[0D.US) Sent: Monday, October 1g,200q1:59:40PM GMT -06:00 US/Canada Central Subject: deer hunt Don and Lori MuUenbachof Strawberry Lane 63) stopped into the office today to inquire if the city was going to do a deer hunt this year, and they would like to be one of the sites for deer removal (counted 7 deer on their property over the weekend). | told them the city was not doing this program this year, but ! would pass their info unto Brad in case there isa deer hunt next year. They feel that there should bea deer hunt. Jean Pam Deputy Clerk City ofShorewood Ph: 952-960-7911 Fax: 952-474-0128 � z ��-� 'T r! Brad Nielsen From, Brian Heck Sent: Monday, September 21.2UOQ8:14AM To: KennethDaUman Co: Brad Nielsen Subject: RE Question - Deer Jackie, Thank you for the note regarding the deer hunt the City has held in the past couple of year. The Council made adecision last year to forgo the hunt this year and assess the overall impact on the deer herd via aerial survey in the spring. Following the results, the Council will decide whether or not to have the hunt in 2010. I have passed this on to Brad Nielsen as he is the one who works with the bow hunters in organizing the program. BRIAN W. HECK - ICIVIA - CM CITY ADMINISTRATOR CITY OF SHOREWOOD 5755 COUNTRY CLUB RD. SHOREWOOD, MN 55331 From: Kenneth DoUrnon[maiho:kdaUman@mchsi.con1 Sent: Friday, September 18, 2009 7:07 PM To: Brian Heck Cc: Jackie & Ken DoUman Subject: RE: Ouestion - Deer Importance: High Hello Brian, Wondering if the City of Shorewood will be requesting the DNR for a "controlled" shoot of deer this fall. We have quite a large population in our area —we see herds of no less than 6 run thru multiple times daily. Pretty though they may be, they are quite destructive with residents plants, bushes, and more, not to mention the traffic hazard. Your response i»appreciated. Thanks ]ackieDaUnnan �� � � ��� �.? - � Brad Nielsen From Dick Woodruff [dick. wood ruff @yahoo.comI Sent: Sunday, June 14, 2009 12:56 PM To: Brad Nielsen Subject: RE: RE: Deer Control Brad. Critter control should be in your 2010 work plan and listed in the Mission. Goals, etc. discussions we're havitlg. Please consider if $ are needed for this in 2010. If possibly yes, there should be a line in some budget, placed there by you, to fund the effort. If the $ don't fit into the zero levy increase direction, identify the line and the as additional spending to be considered by Council. Thanks. Dick - -- On Sun, 6/14/09, Brad Nielsen < BNie lseii(a)ci.shor•ewood.nirz.us wrote: From: Brad Nielsen < BNielsen a ci.shorewood.lnn.us Subject: RE: RE: Deer Control To: "Dick Woodruff' < dick.woodruff2yahoo.com > Date: Sunday, June 14, 2009, 8:51 AM Good Morning Dick, Very interesting paper. It is the first thing I have seen that actually suggest a target reduction (50 %) and maintenance program. The issue of feeding deer is something that should be further explored. It is too ironic for the City to be reducing deer popultations while some folks are feeding them. -bjn- From: Dick Woodruff [ mailto:dick.woodruff @yahoo.com] Sent: Sat 6/13/2009 1:55 PM To: Brad Nielsen; Brian Heck Subject: Fw: RE: Deer Control See my other email to Mr. Werner on this topic. - -- On Wed, 6/10/09, Werner, James R < ihn.wernei�& - Jip.cotn > wrote: From: Werner, James R < jim.wernerhp.com > Subject: RE: Deer Control To: "Werner, James R" < jim.werner c hp.com >, " clizee@)ci.shorewood.nnn.us " < clizee�ci.shorewood.inn.us >, " szerby /ct)c.i.shorewood.mn.us < szerby(:t�ci. Shorewood. mn.us >, " dwoodruff(�6ci.shorewood.mn.us < dwoodruffa,ci .shorewood.nul.us >, " IturgeonRc ci.shorewood.mn.us < Itul veon��ci.shorewood.mn.us Cc: 1 welm5l(D,,(- , mail.com " < > Date: Wednesday, June 10, 2009, 9:55 AM Excellent article, clearly identifies the obstacles. A public discussion around an 'informed' paper such as this would be helpful. thanks tot listcnI1111x Jim Werner Storage ASM Cell 612-963-6458 ----- Orlainat Message---- - From: Werner, James R Sent: Wednesday, June 10, 2009 9:39 AM To: 'ct1zee@c1.shorewood.mn.us' 'szei 'Ittirc Cc: I @omail.corn' Subject: Deer Control All, I'm at wits end, what can I do to manage the nightly deer damage to my yard. I am sensitive to the loss of deer habitat and the various public/private positions of the people in our community, but this continues to be a problem. I've tried all the home remedies, while moderately successful, their effectiveness does fade over time. At this point Prri at a loss. I would like to know what the city is doing to address the problem. 1. Harvesting 2. Birth Control Measures 3. Public education 4. Discourage feeding of the wildlife. Fines, tickets 5. Effective remedies, Invite experts to present and publish recommendations that could moderate the issue. I love the wildlife and the beauty of our city, but we are not doing anyone a Jim Werner Storage ASM Cell 612-963-6458 Brad Nielsen From: RLeaf27@201.COM Sent: Sunday, April 05, 2009 7:53 PM To: Christine Lizee, Jeff Bailey Laura Turgeon Dick Woodruff; Scott Zerby Cc: Brad Nielsen Subject Deer management program I was disappointed to learn of the council's decision to suspend the deer management program for 2009 at the March 9 meeting. I have resided at 19790 Near Mountain Boulevard for 18 years. We have always had a deer population in our immediate area. Until 2008, there were typically 2-4 deer that would regularly be present on or around our lot. We have tolerated damage to shrubs and lawn, and endured the annual spring cleanup of waste, recognizing that the deer are a part of our environment. We have found it impossible to maintain a vegetable garden, and have made changes to our landscaping at considerable cost to remove plants that have been sources of food, and regularly treat remaining plants with a repellant. In spite of the deer harvesting that has occurred during the past two years, the deer population in our immediate area has increased. This winter, we regularly had 4-8 deer present on our lot almost every day. As evidenced by tracks in the snow, and frequent sightings at all hours of the day, these deer are not confining their roaming to the wooded area and wetland behind our lot, but are frequenting lots on both sides of Near Mountain Boulevard. I have witnessed on numerous occasions a procession of deer crossing the street, sometimes at a leisurely pace, and sometimes darting out after being startled. This should be viewed as a public safety issue. A larger deer population freely roaming across city streets creates a greater likelihood of a collison involving a car. I would urge the council to reconsider its decision to suspend the deer management program for 2009, and continue to harvest the deer as has been done in the past. This is a useful service that has the potential to reduce accidents and costs for residents of the city. 13l Im Worried about job security? Check out the 5 safest lobs in a recession.