Loading...
10-013CITY OF SHOREWOO RESOLUTION NO. 0 ®013 A RESOLUTION ACCEPTING BID AND AWARDING C NT ACT FOR THE 2010 NELSINE DRIVE, MEADOWVIEW ROAD AND WILD SE LANE STREET, DRAINAGE AND UTILITY IMPROVEMENTS. CITY PROJECT NO. 10® 1, 10-02 WHEREAS, pursuant to an advertisement for bids for local improvements designated as the 2010 Nelsine Drive, Meadowview Road and Wild Rose Lane Street, Drainage and Utility Improvements, City Project No. 10 -01, 10 -02, bids were received, opened on April 7, 2010 and tabulated according to law, and such tabulation is attached hereto and made a part hereof as Exhibit Ag and WHEREAS, the City Council has determined that W. M. Mueller & Sons, Inc. is the lowest bidder in compliance with the specifications. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Shorewood as follows: 1. That the Mayor and City Administrator /Clerk are hereby authorized and directed to enter into a contract W. M. Mueller & Sons, Inc. in the name of the City of Shorewood, Project No. 10 -01 and 10 -02, according to the plans and specifications therefore approved by the City Council on file in the office of the City Administrator /Clerk. 2. That the City Administrator /Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except for the deposits of the successful bidder and the next two lowest bidders, which shall be retained until a contract has been signed. ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 12th day of April, 2010. ojiik Christine Lizee, Mayor ATTEST: Administrator /Clerk Cl y of Shorewood Bid Tabulation 2010 Street, Drainage, and Utility Improvements City Project 10-01, 10-02 ids Opened: 10:00 A.M. 7-Apr-1 0 ngineer: TKDA 1 G L Contracting Inc X $ 525,353.83 2 W. M. Mueller & Sons X $ 404,697.18 3 — orthwest Asphalt Inc. X --$ 454,446.66 4 Thomas & Sons Construction X $ 569,688.73 5 Minger Construction, Inc. X $ 493,967.30 6 Valley Paving, Inc. X $ 487,908.48 7 , Northdale Construction Company, Inc. X $ 498,948.00 8 Midwest Ashpalt Corp. X $ 518,759.50 9 Geislinger & Sons X $ 560,961.45 10 S R Weidema, Inc. X $ 523,743.53 11 GMH Asphalt Corp. X $ 487,668.84 12 13 14 15 16 Engineers Estimate 606,610.00 I hereby certify that this tabulation is a correct and true representation of the bids received on this date for this Improvement Project f James Landini City Engineer � -7_/ o Date Jean Panchyshyn Deputy Clerk LL 7-10 Date Exhibit A