10-025CITY OF SHOREWOOD
RESOLUTION NO. 10-025
A RESOLUTION APPROVING A CHANGE ORDER 1 FOR THE
2010 NELSINE DRIVE, MEA'DOWVIEW ROAD AND WILD ROSE LANE
STREET, DRAINAGE AND UTILITY IMPROVEMENTS.
CITY PROJECT NO. 10 -01, 10 -02
WHEREAS, on April 12th, 2010, the City of Shorewood entered into a contract
for construction with W. M. Mueller & Sons, Inc, for the 2010 Street, Drainage, and
Utility Improvements Project, City Project No. 10 -01 and 10 -02; and
WHEREAS, staff has prepared Change Order 1 attached hereto as Exhibit A, for
changes to the work specified in the original contract; and
WHEREAS, the Director of Public Works has reviewed said Change Order and
found it to be cost effective for the project.
NOW, THEREFORE BE IT RESOLVED by the City of Shorewood to approve
Change Order Number I with W. M. Mueller & Sons, Inc., that incorporates services
outlined in Change Order 1, attached hereto as Exhibit A.
ADOPTED by the City Council of the City of Shorewood this 24th day of May,
2010.
3 W -4 1
ATTEST: Christine Lizee, Mayor
CHANGE ORDER NO. 1
2010 STREET, DRAINAGE, AND 5/1012010
UTILITY IMPROVEMENTS
CITY OF SHOREWOOD, MN
TKDA JOB #14536.000
OWNER:
CITY OF SHOREWOOD
5755 COUNTRY CLUB ROAD
SHOREWOOD, MN 55331
CONTRACTOR:
W. M. MUELLER AND SONS INC.
831 PARK AVENUE P.O. BOX 247
HAMBURG, MN 55339
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION:
CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL.
Storm Sewer Revisions
Contract Definition Revision
IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM
ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME:
ORIGINAL CONTRACT PRICE:
$404,697.18
ORIGINAL COMPLETION DATE (SUBSTANTIAL):
6/10/2011
PREVIOUS CHANGE ORDERS: N/A
$0.00
NET CHANGE FROM PREVIOUS CHANGE ORDERS:
NONE
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER:
$404,697.18
COMPLETION DATE PRIOR TO THIS CHANGE ORDER:
6/10/2011
NET INCREASE OF THIS CHANGE ORDER:
- $8,132.13
NET INCREASE OF CHANGE ORDER:
NONE
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS:
$396,565.05
COMPLETION DATE WITH APPROVED CHANGE ORDER:
6/10/2011
RECOMMENDED BY:
APPROVED BY:
JAMES A. LANDINI, P.E., CITY ENGINEER
CITY OF SHOREWOOD
CITY ENGINEER
CONTRACTOR SIGNATURE
W. M. MUELLER & SONS, INC.
CONTRACTOR
APPROVED BY:
PUBLIC WORKS DIRECTOR, CITY OF SHOREWOOD
DATE
CITY ADMINISTRATOR, CITY OF SHOREWOOD
DATE
Change Order No. 1 Detail
2010 STREET, DRAINAGE, AND May 10, 2010
UTILITY IMPROVEMENTS
CITY OF SHOREWOOD, MN
TKDA JOB #14536.000
ITEM CONTRACT CHANGE IN REVISED REVISED
NO. DESCRIPTION UNIT QUANTITY QUANTITY QUANTITY COST
NELSINE DRIVE
DIVISION I - GENERAL
1 SILT FENCE LF 413 (140) 273 $ ( 301.00)
2
REMOVE TREE INCLUDING STUMP (OVER 4 ")
EA
6
(6)
- $
(1,140.00)
3
CLEAR AND GRUB
AC
0.10
(0.10)
0.00 $
(350.00)
4
SEEDING
AC
0.10
(0.01)
0.09 $
(450.00)
5
WOOD FIBER BLANKET
SY
498
(53)
445 $
(84.10)
DIVISION III - STORM SEWER
1
15" RCP CL. 5 STORM SEWER PIPE
LF
164 308
472 $ 7,546.00
2
18" RCP CL. 5 STORM SEWER PIPE
LF
38 144
182 $ 3,816.00
3
15' HDPE, DR 17 DIPS INSTALLED BY HDD
LF
210 (210)
0 $ (19,635.00)
4
48" DIAMETER MANHOLE, TYPE 409
EA
1 1
2 $ 1,500.00
DIVISION IV - STREETS & RESTORATION
1 REMOVE & DISPOSE OF EXIST. BITUMINOUS
PAVEMENT, DRIVEWAYS
SY
97.00
33
130
$
107.25
2 CL.5 AGGREGATE BASE, 100% CRUSHED
STONE AGG.
TN
380
12
392
$
168.72
3 SPWEB240B BITUMINOUS WEARING
COURSE, DRIVEWAYS
TN
18
6
24
$
540.00
4 SALVAGE & REINSTALL POST & SIGN
EA
0
2
2
$
150.00
$ (8,132.13)
Article 1— Definitions and Terminology change the language for Engineer from "TKDA, 444
Cedar Street, Suite 1500, Saint Paul, MN 55101- 2140" to read " Engineer shall mean the City
ENGINEER of the City of Shorewood, or the ENGINEER representing the OWNER on the project."
Page 1