Loading...
10-052CITY OF SHOREWOOD RESOLUTION NO. 10 -052 A RESOLUTION APPROVING A CHANGE ORDER I FOR THE SCADA SYSTEM AND ELECTRICAL CONTROL PANEL PROJECT, CITY PROJECT 10 -19 WHEREAS, on June 14, 2010 the City of Shorewood entered into a contract for the development of a SCADA control system and manufacture of control panels with Electric Pump, Inc., for City Project 10 -19; and WHEREAS, Electric Pump, Inc. has prepared Change Order 1 attached hereto as Exhibit A, for additional work outside of the original contract; and WHEREAS, the Director of Public Works has reviewed said Change Order and found it to be cost effective for the project. NOW, THEREFORE BE IT RESOLVED by the City of Shorewood to approve Change Order Number 1 with , Electric Pump Inc., that incorporates services outlined in Change Order 1, attached hereto as Exhibit A. ADOPTED by the City Council of the City of Shorewood this 8th day of November, 2010. ATTEST: L,, Christine Lizee, Mayor 4 eL: Crnlc PUMP Sale Representative Tray D. Heimeil C414 6i2- 840.940 To: City of Shorewood 5755 Country Club Road Shorewood, MN Attn: Larry Brown Ref. RFP Information Lift.fation No_ 15 & to 17 Control Parill PTOp'gs'a3 (2) PowerPack Express Model FP1 control panels that will monitor a process variable (wet well level) and provide controls for two pumps in a pump -down more of operation. Panels to include the following: • UL 698 A serialized label • 16 AWG minimum control wiring • NEMA 3R 304 stainless steel enclosure with 3 -point padlocking handle and aluminum inner door • Service Entrance rained Main Power disconnect with Emergency Power disconnect • NEMA rated x -line combination motor starters with solid state adjustable overload relay incorporating — Class 10 overload relay trip curve for 5 hp submersible pumps • Green "Pump Running" indicating lamps • H -O -A selector switches • "Pump OL Reset" pushbuttons • Running Time Meter for each pump along with third running time meter for combined running time of both pumps running together • Sealed atmospheric pressure equalization system • Model LC150 solid state controller; 0 -10' range • Model Al 000i 4 -20mA submersible transducer • Link2Site cellular telemetry and internet based monitoring modem /system • Model CB 1000 float back up module with 3 Floats • Phase Failure Protection Module • Single Phase Lightning Arrestor • Condensation Heater • GFI Convenience Receptacle • Flygt Mini -Cas modules for moisture and pump thermal overload protection • Emergency Disconnect with Sliding Mechanical Interlock • Style 1 Crouse Hinds 100 amp generator receptacle (1) Lot of freight & start-up services EXHIBIT A (4) Sets for As -built drawings TOTAL DELIVERED SELLING PRICE: $29,558.00 plus tax U Q U J Z tY Ul d Z Q 2 V The Basic Link2Site Service Plan The Basic plan offers instant alarm notification with two scheduled updates a day in addition to having up to 30 user activated "Update Now" a month. The Basic plan includes communication monitoring between the controller and the cellular modem and the cellular modem and the web page. The Basic plan includes the easy to navigate Web Interface, alarm summary/history log, maintenance alerts, rainfall reports, site access log, connection reports, pump control features and exportability of reports, graphs and alarm logs to Excel. Flow totals are kept track at the station and the web page daily flow totals are updated the following / day. Pump runtimes /starts are kept track at the station and the web page daily totals are updated the following day. Limiting the station to the two scheduled updates limits the web sites trending ability for levels and flows. Pricing is as follows: • One time set up fee of $50.00 • $240.00 per year per unit Control Modifications for Lift Stations #5, #11 & #12 (1) Lot of control panel modifications for the above referenced lift stations. Control panel modifications to include the following: LC150 controllers (at #5 & #11) Float back up modules (at #5 & #11) A1000i submersible transducers (all lift stations) Intrinsically Safe Barriers for transducers (all lift stations) Separate control box for components (at #5) Link2Site telemetry & antennas (all lift stations) Misc. wiring, connectors & conduit Labor to install components (all lift stations) Sell Price for lift station control modifications: $19,500.00 plus tax Exclusions: Unless specifically referenced above Electric Pump excludes: • All taxes, fees, permits, lien waivers, bonds and licenses. • Onsite installation supervision. • Receipt, storage, setting in place, installing or terminating any equipment or instrument. • The supply of any mechanical appurtenances for panels or instruments. This includes, but is not limited to power company transformers /metering, pumps, motors, pull boxes, junction boxes, conduit, piping, tubing, valves, fighting panels, transformers, anchors, support stands, ground cables or rods, stilling wells, chemical feed equipment, flow meters, etc. • The supply of interconnecting materials external to enclosures, i.e. wiring, cable, conduit, pressure taps, tubing, telemetry or phone lines, or special cables. • The supply of or installation of separate mounting brackets, bases, stands, pushbutton stations, power fuses, pilot control switches, disconnects, manual starters or disconnect panels unless specifically listed in our scope of supply. • Any demolition, removal, transfer or disposal. • Concrete work of any type. • Installation and final termination of all wires or cables. • Any specialty electrical testing, including but not limited to insulation, resistance, grounding. If you have any questions or require additional information please feel free to give me a call. Respectfully submitted, ELECTRIC PUMP Troy D. Heimerl Please fill out the appropriate information on page 3 of this proposal. This will act as a purchase agreement for this proposal. If you want us to refer to a purchase order number on our invoice to you please indicate this as well. Main Contact for this project: Phone Number.• E -Mail Address: (if you wish to be contacted this way...) Purchase order or job number to reference (if required):