2004 Tree Preservation and Replacement Policy
City of Shorewood
Tree Preservation
Tree Preservation
and Replacement
and Replacement
Policy
Policy
Prepared by the Shorewood Planning Department
TREE PRESERVATION AND REPLACEMENT POLICY
CITY OF SHOREWOOD
Purpose.
I. It is the policy of the City of Shorewood to recognize and preserve
existing natural resources of the community. In its effort to maintain the wooded
character of the area, the City finds that trees provide numerous benefits including, but not
limited to: stabilization of the soil by the prevention of erosion and sedimentation,
reduction of storm water runoff, improvement of air quality, reduction of noise pollution,
control of urban heat island effect, protection and increase of property values, protection
of privacy, energy conservation through natural insulation, providing habitat for birds and
other wildlife and conservation and enhancement of the city’s physical and aesthetic
environment.
The purpose of this policy is to preserve and protect significant trees or stands of trees
whose loss due to land disturbances associated with the process of development or
construction would adversely affect the character of neighborhoods, subdivisions, public
or semipublic projects and commercial developments. This policy also recognizes that,
despite the best efforts of the City and property owners, trees may occasionally be lost in
the development or construction process. In those cases tree replacement or reforestation
shall be required.
Applicability.
II. This policy shall apply to any person or entity that would disturb
land areas and impact significant trees or stands of trees in neighborhoods, subdivisions,
commercial building developments, public and semipublic projects such as streets, utilities
and parks whether disturbed by a public agency or private developer; except when the City
Council may waive these requirements where there would be greater public need for the
project than to meet the requirements of this policy. The terms and provisions of this
Policy, in conjunction with the Shorewood Tree Preservation Ordinance No. 324, shall
apply to all activity which requires the issuance of a Land Disturbance Permit.
Definitions.
III. All words in this Policy have their customary dictionary
definition except as specifically defined herein. The word “shall” is mandatory and the
words “should” and “may” are permissive. Technical terms used in this Policy are defined
in Appendix A.
Buildable Area: The portion of a lot which is not located within any minimum required
yard, landscape strip/area, or buffer; that portion of a lot wherein a building may be
located, as prescribed by the Shorewood Zoning Code.
Caliper: The American Association of Nurserymen standard for trunk measurement of
nursery stock, whereby the diameter of the trunk is measured 6 inches above ground for
stock up to 4 inches in caliper size.
DBH (Diameter-at-Breast-Height): A standard measure of tree size, whereby a tree trunk
diameter is measured in inches at a height of four and one-half feet (4 1/2’) above ground.
If a tree splits into multiple trunks below four and one-half feet (4 1/2’), then the trunk is
measured at its most narrow point beneath the split.
1
Dripline: A vertical line extending from the outer surface of a tree’s branch tips down to
the ground.
Land Disturbance Permit: An official authorization issued by the Zoning Administrator,
allowing defoliation or alteration of the site for the commencement of any construction.
Protection Zone: All lands that fall outside the buildable area of a parcel.
Significant Trees: Any healthy long-lived hardwood deciduous tree measuring eight
inches (8”) DBH or greater; any healthy softwood deciduous tree measuring twelve inches
(12”) DBH or greater; or any healthy coniferous tree measuring eight feet (8’) or more in
height. Box-elder, cottonwood, and willow trees shall not be considered to be significant
trees.
Specimen Tree or Stand: Any tree or grouping of trees which has been determined to be
of a high value by the Zoning Administrator because of its species, size, age, or other
professional criteria.
Structure: Anything which is built, constructed or erected; an edifice or building of any
kind or any piece of work artificially built up or composed of parts jointed together in
some definite manner whether temporary or permanent in character.
Tree: Any self supporting woody plant, usually having a single woody trunk, and a
potential DBH of two inches (2”) or more.
Tree Preservation Plan: A plan established in Section IV(B) of this Policy. See
Appendices B and C.
Zoning Administrator: The agent of the City of Shorewood having the primary
responsibilities of administration and enforcement of this Policy.
Procedures
IV.
A. Development Standards. Developments shall be designed to preserve large
trees where such preservation would not affect the public health, safety or
welfare. The City may prohibit removal of all or part of a stand of trees.
In addition, nothing in this policy shall prevent building on an existing lot of
record, provided that such building shall be designed to save as many trees
as possible. This decision shall be based on, but not limited to, the
following criteria:
1. Size of trees.
2. Species, health and attractiveness of the trees including:
a. Sensitivity to disease
b. Life span
c. Nuisance characteristics
d. Sensitivity to grading
2
3. Potential for transplanting.
4. Need for thinning a stand of trees.
5. Effect on the functioning of a development.
B. Land Disturbance Permit.
1. A tree survey, prepared by a registered land surveyor or landscape
architect, shall be submitted showing size, species and location of
significant trees.
2. A Tree Preservation Plan shall be submitted with the following:
a. Preliminary plat for the subdivision of property.
b. Other permit drawings as a part of the building permit
process for the construction of new principal buildings.
c. Nonresidential site plans, either as a separate drawing or as
part of the landscape plan.
3. The Tree Preservation Plan shall be certified by a forester, arborist,
or registered landscape architect and shall include the following
information:
a. Identification of spatial limits:
(1) Limits of land disturbance, clearing, grading and
trenching
(2) Tree protection zones
(3) Specimen trees or stands of trees
(4) Location of significant trees which will be saved
(5) Location of significant trees which will be removed
(6) Location of trees to be transplanted
(7) Location of replacement trees
b. Detail drawings of tree protection measures as provided for
in Section VI. of this Policy (where applicable):
(1) Protective tree fencing
(2) Tree protection signs
c. Drawings indicating location of applicable utilities:
(1) City water or well
(2) City sewer
(3) Electricity
3
(4) Gas
(5) Cable TV
(6) Telephone
4. These plans shall be reviewed by the Zoning Administrator for
conformance with this Policy, in conjunction with the Shorewood
Tree Preservation Ordinance No. 324, and will either be approved,
or returned for revisions. Reasons for denial shall be noted on the
Tree Preservation Plan, or otherwise stated in writing.
5. Issuance of the Land Disturbance Permit is contingent upon
approval of preliminary plats, or metes and bounds subdivision
approval for the subdivision of property, or approval of the Tree
Preservation Plan for other building permit processes or
nonresidential site plans.
6. A fee as provided in Chapter 1302 of the City Code shall be
charged for review of Tree Preservation Plans. Any costs incurred
by the City in reviewing plans for plats and nonresidential site plans
shall be charged to the developer. The Zoning Administrator may
submit the plan to a consulting forester for a recommendation, the
costs of which shall be paid by the developer or builder.
7. All tree protection measures shall be installed prior to beginning
building construction and inspected by the Zoning Administrator or
his agent.
8. The Zoning Administrator or his agent will conduct follow-up site
inspections for enforcement of this Policy, in conjunction with the
Shorewood Tree Preservation Ordinance No. 324.
9. If any significant tree in a development or on a building site is cut,
damaged, or the area within the tree’s dripline has been encroached
upon by grading equipment, without City authorization, the City
shall require replacement pursuant to 10. below. In addition, if the
City determines that a damaged tree will probably not survive, it
shall be removed by the developer or builder.
10. Except as provided in IV.13. of this Policy, all significant trees
removed or damaged during the process of land development or
construction activities shall be replaced on site. The removal of
trees on public right-of-way, conducted by or on behalf of a
governmental agency in pursuance of its lawful activities or
functions, shall be exempt from this replacement.
4
a. Any trees required to be planted shall be varied in species,
shall maximize the use of species native to the area, shall not
include any species under disease epidemic, and shall be
hardy under local conditions.
b. Tree Replacement Ratio.
(1) Significant deciduous trees eight inches (8”) DBH or
greater shall be replaced by two (2), three (3) inch
caliper or greater deciduous trees or two, six-foot
(6’) high coniferous trees.
(2) Significant deciduous trees twelve inches (12”) DBH
or greater shall be replaced by three (3), three (3)
inch caliper or greater deciduous trees or three (3),
six-foot (6’) high coniferous trees.
(3) Significant coniferous trees six feet (6’) high or
greater shall be replaced by one (1) six-foot (6’)
high or greater coniferous tree.
(4) Significant coniferous trees twelve feet (12’) high or
greater shall be replaced by two (2) six-foot (6’)
high or greater coniferous trees.
(5) In no case will the total number of replacement trees
exceed eight (8) trees per acre.
c. Before any construction takes place, tree protection
measures as set forth in VI.B. of this Policy shall be placed
around tree protection zones and around the driplines of
significant trees to be preserved. Signs shall be placed along
fence lines prohibiting grading beyond the fence line.
d. Any trees required to be planted shall be replaced if they die
or appear to be dying within two (2) full growing seasons of
planting by the person responsible for the planting.
e. Replacement trees shall be of a similar species to the trees
which are lost or removed and shall include those species
shown on the following list:
5
Deciduous Trees
Mountain Ash - Sorbus spp. Black Locust - Robinia
River Birch - Betula nigra psuedoacacia
Kentucky Coffeetree - Gymnocladus dioicus Amur Maple - acer ginnala
Amur Corktree - Phellodendron amurense Norway Maple - Acer platanoides
Flowering Crabapple - Malus spp. Red Maple - Acer rubrum
Ginkgo (male only) - Ginkgo biloba Silver Queen Maple (seedless) - Acer
Hackberry - Celtis occidentalis saccharinum ‘Silver Queen’
Hawthorn - Crataegus spp. Sugar Maple - acer saccharum
Shagbark Hickory - Carya ovata Northern Catalpa - Catalpa speciosi
Honeylocust - Gleditsia Hatriacanthos Bur Oak - Quercus macrocarpa
Ironwood - Ostrya virginiana Pin Oak - Quereus palustris
Japanese Tree Lilac - Syringa amurensis Red Oak - Quercus rubra
japonica Swamp White Oak - Quercus bicolor
American Linden - Tilia americana White Oak - Quercus alba
Littleleaf Linden - Tilia cordata Ohio Buckeye - Aesculus glabra
Redmond Linden - Tilia americana Russian Olive - Eleagnus
‘Redmond’ angustifolia
Black Walnut - Juglans nigra
Conifers
American Arborvitae - Thuja occidentalis Red Pine - Pinus resinosa
Balsam Fir - Abies balsamea Scotch Pine - Pinus sylvestris
Douglas Fir - Pseudotsuga menziesii White Pine - Pinus strobus
White Fir - Abies concolor Black Hills Spruce - Picea glauca densata
Canadian Hemlock - Tsuga canadensis Colorado Spruce - Picea pungens
European Larch - Larix decidua Norway Spruce - Picea abies
Austrian Pine - Pinus nigra White Spruce - Picea glauca
Norway Pine - Pinus resinosa Tamarack - Larix laricina
11. Financial Guarantee - Subdividers.
a. Subdividers shall provide a financial guarantee as part of the
development contract to ensure replacement of significant
trees lost in the development process. The amount of the
financial guarantee shall be determined by the Zoning
Administrator, based upon estimates made by the
subdivider’s registered landscape architect or actual bids
prepared by a certified nurseryman. This shall be a
separate line item in the development contract and shall be
the basis for a development contract where the lack of
6
public improvements would otherwise not require a
contract.
This financial guarantee shall be held for at least two (2) full
growing seasons beyond the date of installation of the last
replacement tree or beyond the last date of site activity that
may impact tree survival.
b. In addition to a. above subdividers shall provide a financial
guarantee as part of the development contract to ensure
protection of all significant trees to be saved. For each mass
graded lot with at least one (1) significant tree to be saved
and each custom graded lot with at least one (1) significant
tree, the subdivider shall pay a fee as established in Chapter
1302 of the Shorewood City Code.
This financial guarantee will be released upon 1)
certification in writing by the subdivider’s forester, arborist,
or landscape architect indicating that tree protection
measures were installed on mass graded lots and tree
replacement is completed, if necessary and/or 2) the builders
have posted security for the custom graded lots.
12. Financial Guarantee - Builders.
a. Homebuilders shall provide a financial guarantee as part of
the building permit application to ensure protection of all
significant trees to be saved. For all lots with at least one
(1) significant tree to be saved the builder shall provide a
letter of credit or cash escrow as established by Chapter
1302 of the City Code.
b. Prior to the issuance of a certificate of occupancy or release
of the tree protection guarantee, the builder’s forester,
arborist, or landscape architect shall certify to the City in
writing that all the tree protection measures identified on the
tree preservation plan were installed from the start of
construction to the end of construction and tree replacement
is completed, if necessary.
c. The Building Official will monitor the tree protection
measures at the time of routine inspections.
d. Builders are liable for subcontractors which destroy or
damage significant trees which were indicated to be saved
on the individual lot tree preservation plan.
13. Tree Replacement Fund.
7
a. In cases where it can be demonstrated that a construction
site can not accommodate additional trees, a builder or
developer may place replacement trees on public property at
the direction of the Zoning Administrator. The City shall
maintain a list of public properties where replacement trees
may be planted.
b. As an alternative to placing trees on public property, the
City may require a builder or developer to contribute to a
City tree replacement fund. This fund shall be used solely
for the purpose of planting trees on public property. The
Zoning Administrator shall annually establish a fee schedule
for replacement trees, based upon market conditions.
. Tree & Site Related Disturbances.
V
A. Tree protection zones, specimen trees or stands of trees designated to be
saved must be protected from the following damages which may occur
during all phases of land disturbance and construction processes. Methods
of tree protection and disturbance prevention are provided in Section VI.
1. Direct physical root damage
2. Indirect root damage
3. Trunk and crown disturbance
B. Direct physical root damage most frequently occurs during site clearing
and grading operations, where transport or feeder roots are cut, torn, or
removed.
1. Transport and feeder roots tend to tangle and fuse among the roots
of adjacent trees. The removal of trees with heavy machinery along
the outer periphery of a tree save area causes root damage.
2. The most substantial form of root damage for all root types occurs
in the form of cut roots. Roots are cut in grade reduction, or from
trenching for underground utilities, sanitary sewer, or storm sewer
lines.
3. A more subtle type of root damage is the loss of feeder roots.
Feeder roots normally occur within the organic layer, and the
surface four inches (4”) of top soil, subsequently, these roots can be
easily damaged by the track action from a single bulldozer pass.
The stripping of top soil within a tree’s critical root zone can totally
eliminate its feeder root system.
8
C. Indirect root damage through site modification can result from positive
grade changes, temporary storage of fill material, the sedimentation of
erosion materials, soil compaction, and soil chemical changes.
1. Positive grade changes from fill and sedimentation causes a
decrease in soil oxygen levels. An increase in soil carbon dioxide
and other toxic gases can also occur, leading to large areas of
anaerobic conditions. Anaerobic soil conditions cause a decrease in
the root respiration process which is essential for the uptake and
transport of minerals and nutrients.
2. Anaerobic soil conditions are also produced by soil compaction, the
increase in soil bulk density with a decrease in soil spore space.
Compacted soil is also impervious to root penetration, and thus
inhibits root development. Soil compaction is generally caused by
the weight and vibrations of heavy machinery, vehicle parking, and
the storage of fill and/or construction materials within the critical
root zones of trees.
3. Changes in soil chemistry will adversely affect tree survival. The
most frequent occurrence is the change (decrease) in soil acidity by
concrete washout. The leakage or spillage of toxic materials such
as fuels or paints can be fatal for trees.
D. Trunk and crown disturbances are generally mechanical in nature and are
either caused directly by clearing and grading machinery, or indirectly by
debris being cleared and falling into trees marked for protection.
1. Common forms of damage include stripped bark and cambium, split
trunks, and broken limbs.
2. Damage also occurs from the posting of signs such as building
permits, or survey markers on trees.
3. Indirect damage can be caused by the placement of burn holes or
debris fires too close to trees. The possible range of damages
include scorched trunks with some cambial dieback, the loss of
foliage due to evaporative heat stress (leaf desiccation), and
completely burned trunks and crowns.
Methods of Tree Protection.
VI.
A. Planning and considerations. Tree space is the most critical factor in tree
protection throughout the development process. The root system of trees
can easily extend beyond the dripline of the tree canopy (Figure 1). The
root system within the dripline region is generally considered to be the
protected root zone. Disturbance within this zone can directly affect a
9
tree’s chances of survival. With reference to root zones, the following
standards shall apply:
1. The use of tree save islands and stands is encouraged rather than
the protection of individual (nonspecimen) trees scattered
throughout a site. This will facilitate ease in overall site
organization as related to tree protection.
2. The protective zone of specimen trees or stands of trees or
otherwise designated tree save areas shall include no less than the
total area beneath the tree(s) canopy as defined by the farthest
canopy dripline of the tree(s). In some instances, the Zoning
Administrator may require a protective zone in excess of the area
defined by the tree’s dripline.
3. Layout of the project site utility and grading plans shall
accommodate the required tree protective zones. Utilities must be
placed along corridors between tree protective zones.
4. Construction site activities such as parking, material storage,
concrete washout, hole placement, etc., shall be arranged so as to
prevent disturbances within tree protective zones.
5. Alterations to the protective zone of the specimen trees or stands of
trees must be approved by the Zoning Administrator.
B. Protective Barriers.
1. Active protective tree fencing shall be installed along the outer edge
of and completely surrounding the critical root zones of all
specimen trees or stands of trees, or otherwise designated tree
protective zones, prior to any building construction.
2. These fences will be a minimum four feet (4’) high. Four-feet (4’)
high orange polyethylene laminar safety fencing is acceptable
(Figure 2).
3. All tree protection zones should be designated as such with “Tree
Save Area” signs posted visibly on all sides of the fenced area.
These signs are intended to inform subcontractors of the tree
protection process. Signs requesting subcontractor cooperation
and compliance with tree protection standards are recommended
for site entrances.
4. All tree fencing barriers must be installed prior to and maintained
throughout building construction and should not be removed until
completion of construction and until landscaping is installed.
10
C. Encroachment. Most trees can tolerate only a small percentage of critical
root zone loss. If encroachment is anticipated within the critical root zones
of specimen trees, stands of trees, or otherwise designated tree protective
zones, the following preventive measures shall be employed:
1. Clearing Activities: Roots often fuse and tangle amongst trees.
The removal of trees adjacent to tree save areas can cause
inadvertent damage to the protected trees. Wherever possible, it is
advisable to cut minimum two foot (2’) trenches (e.g., with a
“ditch-witch”) along the limits of land disturbances, so as to cut,
rather than tear, roots. Directionally felling trees outward into
disturbance areas and grinding stumps is also acceptable.
2. It is very strongly suggested that all clearing in oak stands be done
before May 1st and after July 1st of each season. This will help to
prevent the inadvertent wounding of trees with the consequential
spread of oak wilt. If clearing has to be done at this time, all
stumps and wounded trees shall have the wound areas painted
thoroughly with a tree paint. To be effective, the painting shall be
performed within the same day of cutting. Should oak wilt get
started as a result of construction during the months of May and
June, then the developer/builder shall pay for all additional on-site
oak wilt control measures needed to control the disease.
3. Where the Zoning Administrator has determined that irreparable
damage has occurred to trees within tree protective zones, they
must be removed and replaced by the developer/builder as provided
in Section IV(B)9.
D. Reclamation of the Growing Site. A tree’s ability for adequate root
development, and ultimately its chances for survival, are improved with
reclamation of the growing site. Whenever possible, the soil should be
brought back to its natural grade. Unnecessary fill, erosion sedimentation,
concrete washout, and construction debris should be removed. When
machinery is required for site improvement, it is recommended that a
“rubber-tired skid steer loader” or similar light weight rubber tire vehicle be
used so as to minimize soil compaction.
11
TREE PRESERVATION POLICY
CITY OF SHOREWOOD
APPENDIX A
Technical Terms
:
Cambium: The tissue within the woody portion of trees and shrubs which gives rise to the woody
water and nutrient conducting system, and the energy substrate transport system in trees.
Cambial dieback: The irreparable radial of vertical interruption of a tree’s cambium, usually
caused by mechanical damage, such as “skinning bark”, or from excessive heat.
Coniferous: Belonging to the group of cone-bearing evergreen trees or shrubs.
Deciduous: Not persistent; the shedding of leaves annually.
Feeder roots: A complex system of small annual roots growing outward and predominantly
upward from the system of “transport roots”. These roots branch four or more times to form fans
or mats of thousands of fine, short, non-woody tips. Many of these small roots and their multiple
tips are 0.2 to 1mm or less in diameter, and less than 1 to 2mm long. These roots constitute the
major fraction of a tree’s root system surface area, and are the primary sites of absorption of
water and nutrients.
Major Woody Roots: First order tree roots originating at the “root collar” and growing
horizontally in the soil to a distance of between 3 and 15 feet from the tree’s trunk. These roots
branch and decrease in diameter to give rise to “rope roots”. The primary function of major
woody roots include anchorage, structural support, the storage of food reserves, and the transport
of minerals and nutrients.
Protected Root Zone: The rooting area of a tree established to limit root disturbances. This zone
is generally defined as a circle with a radius extending from a tree’s trunk to a point no less than
the furthest crown dripline. Disturbances within this zone will directly affect a tree’s chance for
survival.
Root Collar: The point of attachment of major woody roots to the tree trunk, usually at or near
the groundline and associated with a marked swelling of the tree trunk.
Root Respiration: An active process occurring throughout the feeder root system of trees, and
involving the consumption of oxygen and sugars with the release of energy and carbon-dioxide.
Root respiration facilitates the uptake and transport of minerals and nutrients essential for tree
survival.
Rope Roots: An extensive network of woody second order roots arising from major woody
roots, occurring within the surface 12 to 18 inches of local soils, and with an average size ranging
from .25 to 1 inch in diameter. The primary function of rope roots is the transport of water and
nutrients, and the storage of food reserves.
12
Soil Compaction: A change in soil physical properties which includes an increase in soil weight
per unit volume, and a decrease in soil pore space. Soil compaction is caused by repeated
vibrations, frequent traffic and weight. As related to tree roots, compacted soil can cause physical
root damage, a decrease in soil oxygen levels with an increase in toxic gases, and can be
impervious to new root development.
Transport Roots: The system or framework of tree roots comprised of major roots and rope
roots.
13
TREE PRESERVATION POLICY
CITY OF SHOREWOOD
APPENDIX B
Checklist for Tree Protection Plan:
1. Tree Protection Plans.
a. Provisions for tree protection on the site shall be, at minimum, in conformance
with the requirements of the City of Shorewood Tree Preservation Policy in
conjunction with the Shorewood Tree Preservation Ordinance No. 324.
b. A Tree Preservation Plan shall be submitted either as part of a landscape plan,
preliminary plat, or as a separate drawing, to include the following:
(1) All tree protection zones
(2) Approximate location of all specimen trees or stands of trees
(3) Approximate location of all specimen trees when their preservation is
questionable, or might result in a change of the site design
(4) Identification of specimen trees to be removed. (Removal of specimen
trees is subject to Zoning Administrator approval.)
(5) Limits of clearing and land disturbance such as grading, trenching, etc.
where these disturbances may affect tree protection zones.
(6) Proposed location of underground utilities.
(7) Methods of tree protection shall be indicated for all tree protection zones,
aeration systems, staking, signage, etc.
(8) The plan should indicate staging areas for parking, material storage,
concrete washout, and burial holes where these areas might affect tree
protection.
c. The following notes shall be indicated on both tree preservation plans and grading
plans in large letters:
(1) Contact the City Planning Department at 474-3236 to arrange a
preconstruction conference with the City Zoning Administrator prior to any
land disturbance.
(2) All tree protection measures shall be installed prior to building
construction.
(3) Contact the City of Shorewood Planning Department at 474-3236 for a
Site Inspection upon completion of landscape installation.