Section VISECTION A VI. IMPLEMENTATION PRIORITIES /IMPLEMENTATION PROGRAM Based on the information developed in Sections III through V, the City has developed a Water Resource Management Plan that reflects the needs and concerns of the City Council, City Staff, citizens, and the funding capabilities of the City. A prioritized listing of the studies, programs and capital improvements that have been identified as necessary to respond to the water resource needs within the City is outlined on the following tables. The City anticipates implementing at least to some extent the regulatory programs, studies, or improvements identified within this plan within the next 10 years. The City has developed a method to prioritize capital improvement projects. A three - tiered approach has been adopted that prioritizes projects as "High ", "Medium ", or "Low ". Prioritized projects are shown on Figure III -7. This method is based on the following criteria: High Priority: Projects meet one or more of the following criteria: • Projects with the highest Benefit relative to Project Cost. • Projects that should be completed soon to meet regulatory or permit requirements. • Projects that are needed to address significant public safety concerns. Projects that are needed to finish or upgrade the construction of the City's storm water • infrastructure system to meet long -term improvement plans. • Projects that should be constructed now so as to be in conjunction with other projects that will result in a reduction in cost or impact to the public. • • Projects for which funding is now available or will be available in the next few years. Medium Priority: Projects meet one or more of the following criteria: • Projects with a high Benefit relative to Project Cost. • Projects that must be completed soon, but not immediately to meet regulatory or permit requirements. • Projects that are needed to address public safety concerns. • Projects that are needed to finish or upgrade the construction of the City's storm water infrastructure system to meet long term improvement plans, but timing for construction should be delayed to accommodate other planning or project work. • Projects that should be constructed soon and /or scheduled so as to be in conjunction with other projects that will result in a reduction in cost or impact to the public. City of Shorewood WSB Project No. 1459 -23 March 2008 Section VI — Page 1 SECTION VI J • • Low Priority: These projects meet the criteria listed above, but are not urgent, have lower Benefit to Cost Ratios, can be delayed until other work can be done at the same time, or must be delayed until funds become available. Table VI -1 contains Storm Water Capital Improvement Projects (CIP), Table VI -2 contains Storm Water Management Programs (SMP), and Table VI -3 contains Storm Water Management Studies (SMS). Table VI-4 summarizes the information from all of these tables. The costs associated with these items reflect year 2008 costs and do not take into account inflation. These tables are for planning and budgeting purposes and are considered rough estimates. It is anticipated that these cost estimates will be reviewed annually and updated as needed. City of Shorewood WSB Project No. 1459 -23 March 2008 Section VI — Page 2 • V SECTIVI • TABLE VI -1 CAPITAL IMPROVEMENT PROJECTS Capital Improvement Projects Proposed Expenses for Year Potential CIP Cost Funding 2013 - No. Priority Project Description Estimate' Sources 2008 2009 2010 2011 2012 2017 Comments 1 High Project (TBD) to address $100,000 Storm Water $100,000 Corrective Action IV -B1 flooding problems in the City Utility Fund Harding Lane Drainage: MCWD Grants / 2 High Involves installation of the $97,000 Storm Water $97,000 lines, catch basin structure Utility Fund and culvert. a Stratford PI Drainage: Storm Water 3 High Involves installation of riprap $30,000 Utility Fund $30,000 Corrective Action IV -B1 slope stabilization Lake South Auto Drainage: MCWD Grants / 4 High Involves installation of file $21,000 Storm Water $21,000 Corrective Action IV -B1 lines, catch basin structure Utility Fund a and culvert. 5830 Echo Road Drainage: MCWD Grants / 5 High Involves installation of file $33,000 Storm Water $33,000 Corrective Action IV -B1 lines, catch basin structure Utility Fund a and culvert. 6180 Chaska Rd Drainage: 6 High Involves installation of tile $4,000 Storm Water $4,000 Corrective Action IV -B1 lines, catch basin structure Utility Fund and culvert. TABLE V -4 City of Sho ood SECTION VI March 20( Page 1 0 a 0 SECTION VI CAPITAL IMPROVEMENT PROJECTS Capital Improvement Projects Proposed Expenses for Year Potential CIP Cost Funding 2013 - No. Priority Project Description Estimate' Sources 2008 2009 2010 2011 2012 2017 Comments Nelsine Dr Drainage: Involves Storm Water 7 High installation of tile lines, catch $16,000 Utility Fund $16,000 basin structure and culvert. 6180 Murray Hill Road 8 High Drainage: Involves installation $36,000 Storm Water $36,000 Corrective Action IV -B1 of tile lines, catch basin Utility Fund structure and culvert. 5925 Grant Drainage: 9 High Involves installation of tile $49,000 Storm Water $49,000 Corrective Action IV -B1 lines, catch basin structure Utility Fund and culvert. Lake Mary Outlet: Currently Lake Mary is landlocked. This MCWD Grants / 10 High project provides an $505,000 Storm Water $505,000 Corrective Action IV -B1 emergency overflow to reduce Utility Fund flooding potential. Rampart Ct. Drainage: 11 High Involves installation of tile $8,000 Storm Water $8,000 lines, catch basin structure Utility Fund and culvert. Meadowview Rd Storm: 12 Medium Involves installation of tile $15,000 Storm Water $15,000 lines, catch basin structure Utility and culvert. TABLE V -4 City of Shore pod SECTION VI March 20pd • 0 ge 2 0 SECT VI • CAPITAL IMPROVEMENT PROJECTS Capital Improvement Projects Proposed Expenses for Year Potential CIP Cost Funding 2013 - No. Priority Project Description Estimate' Sources 2008 2009 2010 2011 2012 2017 Comments Star Circle Storm: 13 Medium Involves installation of tile $89,000 Storm Water $89,000 lines, catch basin structure Utility and culvert. 23350 Academy Ave. Storm: 14 Medium Involves installation of tile $55,000 Storm Water $55,000 Corrective Action IV -61 lines, catch basin structure Utility and culvert. Undertake projects to restore 15 Medium potential wetlands outlined in $50,000 MCWD Grants/ the MCWD Functional Developers Assessment Report $1,108,000 TOTAL $100,000 $185,000 $116,000 $602,000 $55,000 $0 1) Cost estimates provided are for planning purposes only. Detailed feasibility analyses have not been completed for these projects; therefore, cost estimates are subject to change upon final design High Priority Medium Priority Low Priority TABLE V -4 City of S000d SECTION VI March 2 • Page 3 i 0 9 SECTION VI TABLE VI -2 STORM WATER MANAGEMENT PROGRAMS Storm Water Management Programs Proposed Expenses for Year Potential Cost Funding 2013 - No. Priority Project Description Estimate' Sources 2008 2009 2010 2011 2012 2017 1 Comments MCM 1 - Public Education and Outreach Prepare and distribute annual newsletter and distribute 1 information in City mailing $4,000 MCWD Grants / $400 $400 $400 $400 $400 $2,000 SWPPP BMP #1c -1 regarding surface water Storm Water management Utility Fund Maintain and update website for 2 surface water management $3,000 Storm Water $300 $300 $300 $300 $300 $1,500 SWPPP BMP #1 a-1, 1b -1, 1c -3 education per NPDES permit Utility Fund Hold annual public meetings to 3 educate residents and business owners on surface water $4,000 Storm Water $400 $400 $400 $400 $400 $2,000 SWPPP BMP #1c -2 management Utility Fund Provide annual training 4 workshops to educate City staff $8,000 Storm Water $800 $800 $800 $800 $800 $4,000 SWPPP BMP #1c-4, 1c -5, 1c -6 about surface water management Utility Fund Subtotals for MCIVI 1 $19,000 $1,900 $1,900 $1,900 $1,900 $1,900 $9,500 TABLE V -4 City of Shore ood SECTION VI March 200 • age 4 • SECTICSN VI • TABLE VI -2 STORM WATER MANAGEMENT PROGRAMS Storm Water Management Programs Proposed Expenses for Year Potential Cost Funding 2013 - No. PrioritV Project Description Estimate' Sources 2008 2009 2010 2011 2012 2017 Comments MCM 2 - Public Participation /Involvement Submit a public notice 30 days in advance of holding annual 5 public meeting to review $4,000 $400 $400 $400 $400 $400 $2,000 SWPPP, Surface Water Storm Water Management Plan and BMPs. Utility Fund Hold annual public meetings to review SWPPP, Surface Water 6 Management Plan and BMPs. $13,600 $1,360 $1,360 $1,360 $1,360 $1,360 $6,800 SWPPP BMP #2a1, 2b -1, 2c -1 Collect and consider public Storm Water input. Utility Fund Subtotals for MCM 2 $17,600 $1,760 $1,760 $1,760 $1,760 $1,760 $8,800 MCM 3 - Illicit Discharge Maintain and update GIS 7 database, storm sewer map, $65,000 Storm Water $6,500 $6,500 $6,500 $6,500 $6,500 $32,500 SWPPP BMP #3a -1 and hydrologic model Utility Fund 8 Sponsor City Spring Clean Up Day $80,000 Storm Water $8,000 $8,000 $8,000 $8,000 $8,000 $40,000 SWPPP BMP #3c -1, 3d -1 Utility Fund Conduct inspections and clean 9 up of illicit discharges and illegal $76,800 Storm Water $7,680 $7,680 $7,680 $7,680 $7,680 $38,400 SWPPP BMP #3e -1 dumping within the City Utility Fund Subtotals for M(:M 3 $221,800 $22,180 $22,180 $22,180 $22,180 $22,180 $110,900 TABLE V -4 City of S ood SECTION VI March 2 • • Page 5 0 0 SECTION VI • TABLE VI -2 STORM WATER MANAGEMENT PROGRAMS Storm Water Management Programs Proposed Expenses for Year Potential Cost Funding 2013 - No. Prior!ty Project Description Estimate' Sources 2008 2009 2010 2011 2012 2017 Comments MCM 4 - Construction Site Storm Water Runoff Control 10 Conduct erosion control inspections of construction sites $52,000 Storm Water $5,200 $5,200 $5,200 $5,200 $5,200 $26,000 SWPPP BMP #4a -1, 4b-1,4c-1 Utility Fund Review construction plans for 11 conformance to City storm water $74,000 Storm Water $7,400 $7,400 $7,400 $7,400 $7,400 $37,000 SWPPP BMP #4d -1, 4e -1 management policies. Utility Fund Conduct pre- construction 12 meetings with contractors to $20,500 $2,050 $2,050 $2,050 $2,050 $2,050 $10,250 SWPPP BMP #4f -1 review erosion control methods Storm Water and inspections. Utility Fund Subtotals for MGM 4 $146,500 1 $14,650 $14,650 $14,650 $14,650 $14,650 $73,250 TABLE V -4 City of Sh ood SECTION VI March 20* Is *age 6 SECTION VI • TABLE VI -2 STORM WATER MANAGEMENT PROGRAMS Storm Water Management Programs Proposed Expenses for Year Potential Cost Funding 2013 - No. Priority Project Description Estimate' Sources 2008 2009 2010 2011 2012 2017 Comments MCM 5 - Post Construction Storm Water Management Plan review and inspection of 13 long term operation and $68,400 Storm Water $6,840 $6,840 $6,840 $6,840 $6,840 $34,200 SWPPP BMP #5b -1, 5c -1 maintenance of BMPs. Utility Fund Subtotals for MCM 5 $68,400 $6,840 $6,840 $6,840 $6,840 $6,840 $34,200 - MCM 6 - Pollution Prevention /Good Housekeeping Inspect 20% of storm sewer 14 system including outfalls, ponds, and structural pollution control $77,000 Storm Water $7,700 $7,700 $7,700 $7,700 $7,700 $38,500 SWPPP BMP #6b -3, 6b -5, 6b -7 devices Utility Fund Inspect all identified structural 15 pollution control devices and $10,000 Storm Water $1,000 $1,000 $1,000 $1,000 $1,000 $5,000 SWPPP BMP #6a -1, 6b -2, 6b -4 BMPs once per year. Utility Fund 16 Sweep streets each spring $264,000 Storm Water $26,400 $26,400 $26,400 $26,400 $26,400 $132,000 SWPPP BMP #6a -2 Utility Fund Clean Water 17 Sweep streets in strategic areas $264,000 Legacy Fund/ $26,400 $26,400 $26,400 $26,400 $26,400 $132,000 SWPPP BMP #6a -2 each fall Storm Water Utility Fund Prepare and submit annual 18 SWPPP report and MCWD $5,000 Storm Water $500 $500 $500 $500 $500 $2,500 SWPPP BMP #6b -6, 6b -8, 6b -9 report Utility Fund Subtotals for MCM 6 $620,000 $62,000 $62,000 $62,000 $62,000 $62,000 $310,000 TABLE V -4 City of S ood � SECTION VI March 2 0 Page 7 0 • • SECTION VI TABLE VI -2 STORM WATER MANAGEMENT PROGRAMS Storm Water Management Programs Proposed Expenses for Year Potential Cost Funding 2013 - No. Priority Project Description Estimate' Sources 2008 2009 2010 2011 2012 2017 Comments Additional Non -SWPPP Programs Monitor erosion control MCWD Grants / 19 problems at Footprint Lake and $10,000 Storm Water $1,000 $1,000 $1,000 $1,000 $1,000 $5,000 Corrective Action IV -E2 Waterford Place drainage way Utility Fund Work with MCWD to monitor shoreline conditions on 20 Christmas Lake and educate $10,000 Corrective Action IV -E3 private property owners on maintenance and improvement options. MCWD Grants Subtotals for Non -SWPPP $20,000 $1,000 $1,000 $1,000 $1,000 $1,000 $5,000 Programs Storm Water Management Programs $1,113,300 TOTAL $110,330 $110,330 $110,330 $110,330 $110,330 $551,650 1) Cost estimates provided are for planning purposes only. Cost estimates are subject to change and /or updates. TABLE V-4 City of Sho ood SECTION VI March 20� � 0age 8 0 SECT VI TABLE VI -3 STORM WATER MANAGEMENT STUDIES Water Resources Studies Proposed Expenses for Year Potential Cost Funding 2013 - No. Priority Project Description Estimate' Sources 2008 2009 2010 2011 2012 2017 Comments MCWD Grants / Coordinate with MCWD in the $20000 Storm Water $10,000 $10,000 development of TMDL's , Utility Fund / Clean Water 1 High Legacy Fund Corrective Action IV -A1 Complete feasibility study to MCWD identify methods to improve $20,000 Grants / $7,500 Manor Park Pond Storm Water 3 High Utility Fund Corrective Action IV -A4 Complete a wetland functions $50,000 $50,000 and values assessment for RPBCWD 4 High wetlands within the RPBCWD Grant MCWD Grants / $10,000 $10,000 Develop and implement Illicit Storm Water 5 High Discharge ordinance Utility Fund SWPPP BMP #3b -1 Review planning and zoning MCWD policies and update as Grants / needed to comply with $10,000 $10,000 Surface Water Management Storm Water 7 Medium Plan. I I Utility Fund SWPPP BMP #5a -1 TABLE V -4 City of S #ood SECTION VI March 2 • • Page 9 • • 0 SECTION VI STORM WATER MANAGEMENT STUDIES Water Resources Studies Proposed Expenses for Year City of Shoi od SECTION VI March 20rW • Potential Cost Funding 2013 - No. Priority Project Description Estimate' Sources 2008 2009 2010 2011 2012 2017 Comments MCWD Develop and implement a $10,000 Grants / $10,000 storm water management Storm Water 8 Medium lordinance Utility Fund Grants / Medium Develop and implement an $10,000 Storm Water $10,000 Corrective Action IV -E1 erosion control ordinance 9 Utility Fund Review mowing, fertilizing, MCWD and herbicide application Grants / practices and review $8,000 $2,000 $2,000 $4,000 alternative products (as Storm Water 10 Medium available) Utility Fund MCWD Review road salt application Grants / practices and review $8,000 $2,000 $2,000 $4,000 alternative products (as Storm Water 11 Medium available) Utility Fund MCWD Medium Develop wellhead protection $10,000 Grants / $10,000 plan Storm Water 12 Utility Fund Medium Develop Water Quality $50,000 MCWD $5,000 $5,000 $5,000 $5,000 $5,000 $25,000 Corrective Action IV -D1 Monitoring Program 13 Grants $206,000 TOTAL $25,000 $39,000 $22,500 $59,000 $15,000 $33,000 TABLE V -4 City of Shoi od SECTION VI March 20rW • - ge 10 0 • SECTION VI STORM WATER MANAGEMENT STUDIES Water Resources Studies Proposed Expenses for Year Potential Cost Funding 2013 - No. Priority Project Description Estimate' Sources 2008 2009 2010 2011 2012 2017 Comments 1) Cost estimates provided are for planning purposes only. Cost estimates are subject to change and /or updates. TABLE V -4 City of�wood SECTION VI March • 0 Page 11 0 • • SECTION A TABLE VI4 SUMMARY Proposed Expenses for Year Improvements, Programs, and Studies Totals' 2008 2009 2010 2011 2012 2013 - 2017 Comments Totals for Capital Improvements: $1,108,000 $100,000 $185,000 $116,000 $602,000 $55,000 $0 Totals for Management Programs: $1,113,300 $110,330 $110,330 $110,330 $110,330 $110,330 $551,650 Totals for Management Studies: $206,000 $25,000 $39,000 $22,500 $59,000 $15,000 $33,000 Grand Totals: $2,427,300 [ E [ E1E1E1E 1 E 1) Cost estimates provided are for planning purposes only. Detailed feasibility analyses have not been completed for these projects, programs, and studies; therefore, cost estimates are subject to change upon final design and /or updated information. TABLE V -4 City of Sho ood SECTION VI March 20r "age 12