Loading...
Badger Park Improvement Survey and Soil Exploration#7B MEETING TYPE City of Shorewood Council Meeting Item Regular Meeting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Title / Subject: Badger Park Improvement Project — Survey and Soil Exploration Meeting Date: 13 January 2014 Prepared by: Brad Nielsen Reviewed by: Jean Panchyshyn Attachments: AET — Geotechnical Proposal WSB — Survey Proposal Policy Consideration: Should the City go forward with the necessary survey and soil exploration work to keep moving on plans for the improvement of Badger Park? Background: At its last meeting, the City Council reviewed concept plans for improvements to Badger Park. The plans were continued for further discussion at an upcoming work session. Meanwhile, the Park Commission and staff have recommended proceeding with the necessary survey and soil work that will need to be done, regardless of which concept is ultimately approved. With respect to the soils exploration, Engineering and Public Works have enough previous information on the site to only necessitate one additional boring, as noted in the AET proposal attached. The survey proposal includes options of boundary surveying. Although it would be ideal to have this information, none of the proposed improvements are located close to any boundaries as to make this essential. Financial or Budget Considerations: The AET proposal anticipates a relatively deep boring at a cost not to exceed $4350. The survey work (topo only) is estimated to cost $5400. Options: Direct staff and the consultants to commence the background engineering work to keep the project moving; delay this work until the concept plan is completely resolved; or do nothing. Recommendation / Action Requested: As mentioned above, the work proposed will be necessary regardless of which concept is approved. Staff recommends approval of the soils exploration and survey work. Next Steps and Timelines: Staff has mentioned that Badger Park may not end up being a 2014 project. However, depending on which concept is ultimately approved, it may be possible to begin grading work this year. As such, the background work should commence as soon as possible. Connection to Vision / Mission: Attractive amenities. Mission Statement: The City of Shorewood is committed to providing residents quality public services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial management through effective, efficient, and visionary leadership. Page 1 AMERICAN ENGINEERING VESTING, INC. December 11, 2013 City of Shorewood 5755 Country Club Road Shorewood, MN 55331 Attn: Paul Hornby, City Engineer RE: Proposal for Geotechnical Services Badger Park Improvements Shorewood, Minnesota Dear Mr. Hornby: CONSULTANTS • ENVIRONMENTAL • GEOTECHNICAL • MATERIALS • FORENSICS American Engineering Testing, Inc. (AET) is pleased to submit this Letter Proposal to conduct the following scope of services: Scope: Fieldwork • Drill one standard penetration test boring in the proposed building area to a depth on the order of 80 feet to evaluate for a possible pile foundation system. • Clear underground public utilities through the Gopher State One Call system. • Measure and document the boring location and surface elevation. Laboratory • Visually - manually classify the soils per the Unified Soil Classification System. • Conduct water content tests on cohesive soils (hourly, during lab logging). • Conduct other unit price soil index testing ($120 budget, allowing for two organic content tests). Report • A log of the test boring, including N- values and laboratory results. • Descriptions of drilling, sampling, testing, and classification methods. • Review of soil and ground -water conditions encountered. • Recommendations for building foundation type, depth, and bearing or pile capacity (to be within assumed or given tolerable settlement levels); grading procedures to prepare structural areas; suitability of on -site soils for re -use as fill; floor slab support; and building backfilling. 550 Cleveland Avenue North I St. Paul, MIN 55114 Phone 651• -659 -90011 Toll Free 800- 972 -63641 Fax 651 -659 -13791 www.amengtest.com I AA /EE 0 T'hls document shall not be felbicduced, except in full, wi lua!ut wr4ten approvau from Ame.rican Engineering Testing, inc. City of Shorewood December 11, 2013 Page 2 of 2 The scope of work defined in this proposal is intended for geotechnical purposes only, and not to explore for the presence or extent of environmental contamination at the site. However, we will note obvious contamination encountered. Fee: Our services will be performed on a time - and - materials basis per the attached fee schedule. For the scope described (assumed to be one full day of drilling), we will establish $4,350 as a not -to- exceed fee. Schedule: Based on our current backlog, we anticipate drilling can be performed within about two weeks after receiving authorization to proceed. Verbal results can be provided shortly after drilling. The report should follow the fieldwork by about two to three weeks. Terms /Conditions: Our services will be performed per the Contract Agreement Between the City of Shorewood and American Engineering Testing, Inc. For Professional Services, dated September 13, 1999. Acceptance: Please indicate your acceptance of this proposal by endorsing the enclosed copy and returning it to us. The original proposal is intended for your records. Sincerely, Jeffery K. Voyen, PE Vice President /Principal Engineer Phone #651- 659 -1305 Cell #612- 961 -9186 jvoyen@amengtest.com Attachments: 2013 Geotechnical Fee Schedule PROPOSAL ACCEPTANCE BY: Signature: Printed Name: Date: I. Personnel Hourly Rates 6. Slope Stability (ReSSA) A. Word Processing Specialist 62.00/hr. B. Engr. or Env. Technician I 68.00 /hr. C. Engr. or Env. Technician II 79.00 /hr. D. Drill Technician /Geo Lab Technician 89.00/hr. E. Senior Engineering Technician 95.00/hr. F. Engineering Assistant 105.00 /hr. G. Engineer I /Geologist I 113.00 /hr, H. Engineer II /Geologist II /Sr. Engr. Assistant 128.00 /hr. I. Senior Engineer /Geologist 144.00 /hr. J. Principal Engineer /Geologist 172.00 /hr. II. Vehicle Mileage 6. Slope Stability (ReSSA) A. Personal Automobile /Truck 0.75 /mile B. Auxiliary Truck Vehicle 1.00 /mile C. Truck with Coring Equipment 1.10 /mile D. Truck with Warning Sign /Crash Trailer 1.20 /mile E. 1 -ton Truck with Drill Rig 1.20 /mile F. 1' /z to 2%z -ton Truck with Drill Rig 1.35 /mile G. CPT Truck Rig (20 -ton push capacity) 1.60 /mile H. Tractor /Lowboy Trailer 1.80 /mile IH. Equipment Rental A. Drill Rig Rental b) HQ 1. Rotary Drill on 1 -ton Truck 67.00 /hr. 2. Rotary Drill on 1' /2 to 2' /z -ton Truck 77.00 /hr. hourly 3. Rotary Drill on All- Terrain Vehicle 107.00 /hr. 55.00 /test 4. Portable, Non -rotary Rig 77.00 /hr. B. Auxiliary /Specialty Vehicle Rental 1. Plasticity Index 105.00 /test 1. Auxiliary Truck Vehicle 16.60 /hr. 88.00 /test 2. Truck with Warning Sign /Crash Trailer 27.00 /hr. 95.00 /test 3. Truck with Coring Equipment 42.00 /hr. C. Cone (CPT) Rig/Equipment Rental Thermal Resistivity w/Proctor (ASTM:D5334) 1. CPT Rig (Truck or ATV) 137.00 /hr. 2. Electronic Cone w /Computer 40.00 /hr. G. 3. Soil Sampler 3.50 /hr. H. 4. Water Sampler 20.00/hr. D. Miscellaneous Equipment Rental 1. With P -e curves only 1. Field Vane Shear 310.00 /day 2. With P -e curves, time curves 2. Field Electrical Resistivity 225.00 /day Unconfined Compression (incl. we /density) 3. Field Seismic Refraction (ReMi) 390.00 /day Hand Penetrometer 4. Inclinometer Reading Equipment 320.00 /day Organic Content of Soil 5. Pneumatic Transducer Reading 160.00 /day Topsoil Borrow Test (Mn /DOT 3877) 6. Bore Hole Permeability M. R -value (Hveem Stabilometer) a. Open End Casing Method 130.00 /day California Bearing Ratio b. HQ Wireline Packer 320.00 /day 1. Granular 7. Borehole Pressuremeter 65.00 /hr. 2. Cohesive 8. Iowa Borehole Shear Tester 325.00 /day Proctor Tests (Methods A or B) 9. Double Ring Infiltrometer 250.00 /day 1. Standard 10. Photoionization Detector (PID) 115.00 /day 2. Modified 11. GPS Mapping System 15.00/hr. pH, choride ion, soluble sulfates, sulfides, 12. Pile Driving Analyzer (PDA) 720.00 /day 13. Calibrated SPT Rod 190:00 /day 14. Portable Concrete Coring Equipment 40.00 /hr. 15. Pavement Testing (FWD includes Truck) a. Falling Weight Deflectometer 155.00/hr. b. , Light Weight Deflectometer 55.00 /hr. E. Geotechnical Software Rental 1. Geo Studio Finite Element 55.00 /hr. 2. CAPWAP 30.00 /hr. 3. AutoCAD or Microstation 25.00/hr. 4. Wave Equation (WEAP) 15.00 /hr. 5. LPILE or GROUP 15.00 /hr. 2013 GEOTECHNICAL FEE SCHEDULE V. Expenses A. Direct Project Expenses: includes out -of- Cost + 15% town per diem; plowing & towing; special materials & supplies; special travel, transportation & freight; subcontracted services, and miscellaneous costs B. Equipment Replacement (when abandonment Cost is more feasible than recovery) C. Equipment Recovery (when required by Cost + 15% regulatory agencies or project specifications) The rates presented are portal -to -portal with vehicle mileage, expenses and equipment rentals being additional. Overtime for personnel charged at above cost plus 25% for over 8 hours per day or Saturday; and at above cost plus 50% for Sundays or Holidays. Hazardous work charged at an additional 25 %. Night time shift work will include a premium charge of $30.00 per person per shift. O1DPM021.13 (01/13) AMERICAN ENGINEERING TESTING, INC. 6. Slope Stability (ReSSA) 15.00 /hr. 7. Stabilized Earth Slopes & Walls 15.00 /hr. 8. Settlement (FoSSA) 15.00/hr. 9. SHAFT 15.00 /hr. F. Bit Wear- Rock Coring 1. Diamond Bit - Sedimentary Rock a) B, NQ 10.00 /foot b) HQ 12.00 /foot 2. Diamond Bit - Metamorphic & Igneous a) B, NQ 17.00 /foot b) HQ 20.00 /foot IV. Laboratory Tests of Soil A. Water Content hourly B. Dry Density (includes water content) 55.00 /test C. Atterberg Limits (ASTM:D4318) 1. Plasticity Index 105.00 /test 2. Liquid Limit or Plastic Limit Separately 88.00 /test D. Sieve Analysis (includes 4200) 95.00 /test E. Hydrometer Analysis (sieve included) 190.00 /test F. Thermal Resistivity w/Proctor (ASTM:D5334) I . As Received and Oven Dried (2 pts) 950.00 /test 2. Dry Out Curve (4 pts) 1185.00 /test G. Electrical Resistivity (ASTM:G57 -Soil Box) 92.00 /test H. Corrosion /Concrete Attack Series* 210.00 /series I. Consolidation (up to 32 tsf) 1. With P -e curves only 450.00 /test 2. With P -e curves, time curves 565.00 /test I. Unconfined Compression (incl. we /density) 88.00 /test J. Hand Penetrometer 10.00 /test K. Organic Content of Soil 60.00 /test L. Topsoil Borrow Test (Mn /DOT 3877) 280.00 /test M. R -value (Hveem Stabilometer) 370.00 /test N. California Bearing Ratio 1. Granular 585.00 /test 2. Cohesive 660.00 /test O. Proctor Tests (Methods A or B) 1. Standard 120.00 /test 2. Modified 130.00 /test *includes pH, choride ion, soluble sulfates, sulfides, redox potential (resistivity not included). V. Expenses A. Direct Project Expenses: includes out -of- Cost + 15% town per diem; plowing & towing; special materials & supplies; special travel, transportation & freight; subcontracted services, and miscellaneous costs B. Equipment Replacement (when abandonment Cost is more feasible than recovery) C. Equipment Recovery (when required by Cost + 15% regulatory agencies or project specifications) The rates presented are portal -to -portal with vehicle mileage, expenses and equipment rentals being additional. Overtime for personnel charged at above cost plus 25% for over 8 hours per day or Saturday; and at above cost plus 50% for Sundays or Holidays. Hazardous work charged at an additional 25 %. Night time shift work will include a premium charge of $30.00 per person per shift. O1DPM021.13 (01/13) AMERICAN ENGINEERING TESTING, INC. "'dz A..r..rr December 16, 2013 Mr. Brad Nielsen City of Shorewood 5755 Country Club Road Shorewood, MN 55331 Re: Topographic Survey Proposal for Badger Park Improvements WSB Project No. 01459 -84 Dear Mr. Nielsen: 477 Temperance Street St. Paul, MN 55101 Tel : 651 - 286 -8450 Fax 651-286-8488 The City of Shorewood Park Commission and Council are considering improvements to Badger Park as part of the Park Capital Improvement Plan for 2014 and 2015. WSB recommends the City complete a topographic survey of the Park area and City staff has expressed a desire to have the site that includes City Hall and the parking areas to be included in the survey. WSB staff has reviewed the project site and propose to perform a topographic survey of the Badger Park and City Hall site that includes: ■ Topographic site survey (estimated fee $5,400) • Ground survey in a grid pattern over large open field areas • Site utilities as field marked through Gopher State One Call and record plans • Curb and gutter, parking areas, buildings and other site amenities • Storm water pond and ditch that traverse the site ■ Boundary Survey (Optional) • Identify the site boundary utilizing legal descriptions and the partial boundary survey performed with the South Shore Center (estimated fee $800) • Boundary Survey utilizing title work (estimated fee $800) Our proposed fees are estimated on an hourly rate basis in accordance with our 2014 fee schedule, not to exceed the amounts stated for each work item above. We appreciate the opportunity to perform this project survey and can start upon your authorization. St. Cloud • Minneapolis • St. Paul Equal Opportunity Employer wsbeng.com h X01159 -810 9 hnn, Contl hoposal - Topozaphi, and Boun&a Stu— - 121613 -PTH. dock Mr. Brad Nielsen December 16, 2013 Page 2 Sincerely, W,VB & Associates, Inc. Paul Hornby, P.E. Senior Project Manager Enclosure: 2014 Fee Schedule pth ACCEPTED BY: Proposal for Topographic Survey Proposal for Badger Park Improvements City of Shorewood, MN Name Title Date h X01159 -810 9 hnn, C-had hop—,I - Topozaphi, and Boun&- Stu— - 121613 -PTH. dock