Loading...
05-27-14 CC-Park WS Mtg AgendaCITY OF SHOREWOOD WORK SESSION OF THE CITY COUNCIL & PARK COMMISSION TUESDAY, MAY 27, 2014 1. 2. CONVENE WORK SESSION MEETING A. Roll Call Citv Council Mavor Zerbv Hotvet Siakel Sundberg Woodruff B. Review Agenda AGENDA Park Commission Mangold Hartmann Dietz Savaell Ische DISCUSS BADGER PARK MASTER PLAN 3. ADJOURN — 7:00 p.m. 5755 COUNTRY CLUB ROAD COUNCIL CHAMBERS _5 :30 P.M. Planning Director's memo CITY OF SHOREWOOD 5755 COUNTRY CLUB ROAD - SHOREWOOD, MINNESOTA 55331 -8927 - (952).960 -7900 FAX (952) 474 -0128 - www.ci.shorewood.mn.us - cityhaII @ci.shorewood.mn.us MEMORANDUM TO: Mayor, City Council, and Park Commission FROM: Brad Nielsen, Paul Hornby DATE: 22 May 2014 RE: Badger Park Concept Plans — Current Cost Estimates FILE NO. Parks (Badger) Staff was directed to update and compare the costs of the two proposed concepts for Badger Field. While the cost of the two alternatives is very close to being the same, both are in excess of earlier estimates. Line item estimates for the two plans are attached as Exhibits A and B. ,Concept I is estimated to cost $1,273,000 and Concept II is estimated to cost $1,325,000. Unfortunately, these figures are actually more than what was originally proposed in the previous TKDA plans (approximately $1,230,000). There are several factors that contribute to the discrepancy between the current estimates and the very preliminary estimates that have been discussed over the past year or, so: • The TKDA estimates and the numbers from the 2010 CIP are now five years old. Several of the costs have doubled since then. • Staff used the figures originally included in the CIP to derive certain cost savings. For some reason, various costs in the CIP were either overestimated (e.g. tennis courts - $245,000), or underestimated (e.g. shelter - $80,000 vs $250,000). These were essentially resulted in false assumptions on our part. None of the three staff members who prepared the initial CIP are around to explain the rationale for that CIP. • Current staff uses more conservative (realistic) estimating than was previously the practice. .. �. «� PRINTED ON RECYCLED PAPER Memorandum Re: Badger Park — Current Cost Estimates 22 May 2014 Moving forward, staff has identified three potential options relative to Badger Field improvements: 1. Scale Back. This option involves reprioritizing the various elements of the improvement project. In no particular order: ➢ Eliminate the additional parking (but at least straighten the driveway leading to the SSCC). ➢ Construct a very simple picnic shelter (e.g. Silverwood Park shelter) ➢ Use portable toilets vs. permanent with sewer and water ➢ Eliminate trail(s) ➢ Eliminate the "village green" ➢ Eliminate decorative paving areas 2. Phase In. This option does not reduce costs, but simply spreads them out over a period of years. Arguably, the costs could increase due to lost economy of scale and inflation. Various elements could be phased as follows: ➢ Field /parking (these two elements could potentially be done separately, doing the field first, followed by parking) ➢ Play area ➢ Shelter ➢ Overlook ➢ Loop trail ➢ Additional building (gazebo — Concept I) 3. Bond for Improvements. If the City opts to go forward with the project, based on the current estimates, bonding is one way to achieve it. This option also presents an opportunity to include money for trails, funding for which has been depleted once the Smithtown (East) trail has been built. The Finance Director will explain this option under separate cover. Badger Park is the topic of a joint meeting of the City Council and Park Commission, scheduled for Tuesday, 27 May 2014. Cc: Bill Joynes Bruce DeJong Larry Brown -2- Badger Park Athletic Field Options - City of Shorewood Estimated Construction Cost Comparison WSB Project #01459 -840 Concept 1: By: RS Item Description Est. Cost 1 Removals $40,000 2 Extend southern edge of field / site grading / earthwork & erosion control $70,000 3 Sanitary Sewer Improvements $8,350 4 Water Main Improvements $21,900 5 Storm Sewer Improvements $52,910 6 Irrigation system - assumes booster pump is not required and that city pressure is sufficient $32,500 7 Lighting re- aiming $5,000 8 Shelter with restroom $250,000 9 Play area and equipment $130,000 10 Aggregate nature trail $16,680 11 1 Bituminous trails $81,250 12 Parking lot (asphalt paving with 2' soil correction, concrete curb & gutter, striping, signage) $138,500 13 Concrete walks and plaza areas $36,360 14 Wooden foot bridge $3,500 15 Wooden overlook $30,000 16 Site Furnishings $25,000 17 Lawn seeding $9,000 18 Athletic field seeding $15,000 19 Landscape enhancements / ornamental plantings $25,000 20 Erosion control blanket and restoration on steep side slopes at southern edge of field $15,000 Subtotal $1,005,950 Recommended Contingency (10 %) $100,595 Estimated Administrative Costs (15 %) $165,982 Concept 1- Estimated Total $1,272,527 Concept 1 Extras: Item Description Est. Cost 1 Optional: Draintile System at field $35,000 2 Optional: Custom blended peat /sand topsoil mixture at field $60,000 * * * ** These estimates are based on master planning level design work for the purpose of establishing reasonable budgeting. It should be anticipated that costs will need to be refined as the design progresses with greater detail, higher level of basemapping and geotechnical investigations. Exhibit A 5/21/2014 Page 1 of 2 K: 101459- 8401QuantitylPreliminary11459 -840 Badger Park Estimates.xlsx Badger Park Athletic Field Options - City of Shorewood Estimated Construction Cost Comparison WSB Project #01459 -840 Concept 2: By: RS Item Description Est. Cost 1 Removals $40,000 2 Relocate field grading / site grading / earthwork & erosion control $82,000 3 Sanitary Sewer Improvements $8,350 4 lWater Main Improvements $27,690 5 Storm Sewer Improvements $52,910 6 Irrigation system - assumes booster pump is not required and that city pressure is sufficient $32,500 7 Remove /Relocate Lighting $45,000 8 IShelter with restroom $250,000 9 Play area and equipment $130,000 10 Aggregate nature trail $24,000 11 Bituminous trails $60,000 12 Parking lot (asphalt paving with 2' soil correction, concrete curb & gutter, striping, signage) $153,500 13 JConcrete walks and plaza areas $24,000 14 Wooden foot bridge $3,500 15 Arbor Structure and fencing at play area $25,000 16 Site Furnishings $25,000 17 Lawn seeding $9,000 18 JAthletic field seeding $15,000 19 Landscape enhancements / ornamental plantings $25,000 20 Erosion control blanket and restoration on steep side slopes at southern edge of field $15,000 Subtotal $1,047,450 Recommended Contingency (10 %) $104,745 Estimated Administrative Costs (15 %) $172,829 Concept 2 -Estimated Total $1,325,024 Concept 2 Extras: Item Description Est. Cost 1 Optional: Draintile System at field $35,000 2 Optional: Custom blended peat /sand topsoil mixture at field $60,000 * * * ** These estimates are based on master planning level design work for the purpose of establishing reasonable budgeting. It should be anticipated that costs will need to be refined as the design progresses with greater detail, higher level of basemapping and geotechnical investigations. Exhibit B 5/21/2014 Page 2 of 2 K: 101459- 8401QuantitylPreliminary11459 -840 Badger Park Estimates.xlsx City of Shorewood, Minnesota Capital Improvement Program 2014 thru 2023 PROJECTS BY SOURCE Source 9 Priority 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total 402 -Park Improvements Gideon Glen Signage & Parking Lot x'0003 5 15,000 15,000 Freeman Plaza P0100 5 5,000 5,000 Freeman North Playground P0102 4 55,000 55,000 Equipment Freeman Parking Lot wl MCWD P0103 5 50,000 50,000 Freeman Ball Field Lights P0104 5 75,000 75,000 Freeman Picnic Shelter Re -Roof P0105 4 3,000 3,000 Freeman Park - Eddy Station P0108 4 3,000 3,000 Freeman - Waterline for Community P0111 4 8,000 8,000 Garden Cathcart Park- Resurface P0200 1 6,500 7,000 7,000 20,500 Tennis /Basketball Courts Cathcart Park Hockey Boards P0201 3 40,000 40,000 Cathcart Park Tot Lot P0202 5 50,000 50,000 Cathcart Parking Lot P0203 5 100,000 100,000 Badger Park - Creek Crossing P0300 3 10,000 10,000 Badger Park Tennis Courts P0301 2 8,000 8,000 8,000 24,000 Badger Park Field Improvements P0302 n1a 100,000 70,000 170,000 Badger Park Parking & Road P0303 2 178,000 178,000 Badger Park Amenities P0304 2 157,000 157,000 Manor Park- Shelter Outside Floor P0402 1 5,400 5,400 & Stoops Silverwood Park - Resurface 112 court P0500 2 2,000 2,500 2,500 7,000 Silverwood Park Equipment P0501 3 60,000 00,000 Silvenvood Park Swing Set P0502 3 14,000 14,000 Skate Park Rehab P0600 3 75,000 75,000 Skate Park Picnic Shelter P0601 5 15,000 15,000 402 - Park Improvements Total 133,000 413,500 118,000 121,000 194,500 19,000 128,400 9,500 3,000 1,139,900 Tuesday, May 27, 2014