Pay Voucher No. 1Owner: City of Shorewood 5756 Country Club Road Shorewood, MN 65331-8926 For Period: 4/2612016 to 813012016 Contractor: GMH Asphalt Corporation 9180 Laketown Road Chaska, MN 56318 Pay Voucher SHOR - 2016 Mill and Overlay Improvement Project Client Contract No.: Project No.: 02925-09 Client Project No.: Pro kqSummer I Original Contract Amount $217,971.50 2 Contract Changes - Addition $0.00 3 �Contract Changes - Deduction $0.00 4 Revised Contract Amount $217,971.50 5 Value Completed to Date $204,593.68 6 Material on Hand $0.00 7 Amount Earned $204,593.68 8 Less Retainage 5% $10,229.68 9 Subtotal $194,364.00 10 Less Amount Paid Previously -Liquidated $0,00 11 Damages $0.00 1-2 AMOUNT DUE THIS PAY VOUCHER NO. 1 $194,364.001 THIS IS TO CERTIFY THAT THE ITEMS OF WORK SHOWN IN THIS CERTIFICATE OF PARTIAL PAYMENT HAVE BEEN ACTUALLY FINISHED FOR THE WORK COMPRISING THE ABOVE MENTIONED PROJECTS IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS HERETOFORE APPROVED. Recommended for Approval by: 58-&-AAS clates, Inc. Approve pprove y Contract G halt Co a on v- Specified Contract Completion Date: 15/2016 Comment: Construction Observer Project Material Status Item No. Item I Description I Units I Unit Price I I contract Quantity I Quantity to Date I Current Quantity Amount to Date SCHEDULE ­.­..._,1.... A. - SURFACE IMPROVEMENTS 1 2021.501 IMOBILIZATION LS 1$6,100-00 1 1 1 $6,100.00 2 2104.501 REMOVE BITUMINOUS CURB L 1 $1.50 120 118 118 $177.00 3 2104.505 REMOVE CONCRETE DRIVEWAY PAVEMENT S 1 $12.00 10 0 0 $0.00 4 2104.505 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y $4.00 80 147.1 147.1 $588.40 5 2104.505 REMOVE BITUMINOUS PAVEMENT S Y $4.00 70 116.6 116.6 $466.40 6 2104.509 REMOVE CASTING EACH $200.00 2 0 0 $0.00 7 2104.5111 SAWING CONCRETE PAVEMENT (FULL DEPTH) L F $5.00 20 0 0 $0.00 8 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) L F $2.50 200 1527 1527 $3,817.50 9 2104.601 REMOVE & REPLACE CONCRETE CURB & GUTTER L F 1 $28.45 910 1005 1005 $28,59225 10 2104.602 SALVAGE AND REINSTALL MAIL BOX EACH $120.00 10 0, 0 $0.00 11 2105.523 COMMON BORROW (LV) C Y $20.00 10 20 20 $400= 12 2105.603 MINOR GRADING S Y $3.00 70 0 0 $0.00 13 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR $1.00 10 11 11, $11.00 14 2231.501 BITUMINOUS PATCHING MIXTURE , $100.00 10 55.84 55.84 $5,584.00 15 2232.501 ----TON MILL BITUMINOUS SURFACE S $1.10 9000- ­­76-0-9 7909 $8,699.90* 16 2331.601 JOINT ADHESIVE -MASTIC L $0.60 9100 3140 3146--j-1,884.00 17 2357.502, BITUMINOUS MATERIAL FOR TACK COAT GAL $2.80 1310 850, 850 $2,380.00 18 2360.501 ITYPE SP 9.5 WEARING COURSE MIX (2,B) TON $61.05 2030 1742.79 1742.79 $106,397.33 19 2360.503 TYPE SP 9.5 WEARING COURSE MIX (2,B) 3.0" THICK S Y $35.00 80 147.1 147.1 $5,148.50 20 2360,601 BITUMINOUS SPILLWAY EACH $250.00 1 3 -3 $750.00 21 2503.602 CHIMNEY SEALS (EXTERNAL) EACH $166.00 24 30 30 $4,950.00 22 2504,602 ADJUST GATE VALVE EACH $270.00 5 61 6 $1,620.00 23 .2506.516 CASTING ASSEMBLY EACH $700.00 2 0 0 $0.00 24 2506.522 ADJUST FRAME & RING CASTING EACH $500.00 12 18 18 -$9,000.00 25 2506.522 ADJUST FRAME & RING CASTING (STORM) EACH $315.00 8 8 8 $2,520.00 26 2506.602 ADJUST FRAME & RING CASTING (SPECIAL) EACH $475.00 12 6 6 $2,850.00 27 2511.501 -RANDOM RIPRAP CLASS 11 - C Y $180.00 0.5 1.4. 1.4 $252.00 2531.501 C ONCRETE CURB& GUTTER DESIGN 8618 $19.95 140 154 154 $3,072.30 29 2531.50716" _LF CONCRETE DRIVEWAY ­PA V E M E NT S Y $75.95 10 0 0 $0.00 30 2535.501 BITUMINOUS CURB L F $6.50 120 151 151 $981.50 31 2557.602 REPAIR DOG FENCE EACH $90.00 5 8 8, $720.0_0 32 2563.601 TRAFFIC CONTROL LS $2,500.00 1- 1 1 $2,500.00 33 2573.530 STORM DRAIN INLET PROTECTION EACH $150.00 9 9 9 $1,350.00 34 2575.505, SODDING TYPE LAWN S Y $11.601 500 326 326 $3,781.60 Totals For SCHEDULE A. - SURFACE IMPROVEMENTS: $204,693.68 ----- ----- Project Totals: $204,593,6.8 Project Payment Status Owner: City of Shorewood Client Project No.: Client Contract No.: Project No.: 02925-09 Contractor: GIVIH Asphalt Corporation Contract Chan es No. Type Date Description Change Order Totals: 1 -$0-00 Payment Summary --7 No. From From To Date T Payment Total Payment Retainage Per Payment Total Retainage Total Payment + Retainage Work Certified Per Payment Total Work Certified 1 14/25/201618/30120161$194,364.00 $194,364.00 $10,229.68 $10,229.68 $204,593.68 $204,593.68 $204,593.68 Payment Totals: $194,364.00 $10,229.68 $204,593.68 $204,593.68 Project Summary Material On Hand: Total Payment to Date: Total Retainage: Total Amount Earned: $0.00 $194,364.00 Original Contract: $10,229.68 Contract Changes: $204,593.68 Revised Contract: