Ryan Contracting Co.myan contracting Co.
Bidder: ?6480 France Ave.
O Box 246
P3
Address: �
�Aarlfet,
Telephone No.:
City, State, Zip:
Fax No.:
ADDENDUM NO.2
PROPOSAL FORM
2016 TRUNK WATERMAIN EXTENSION PROJECT
CITY OF SHOREWOOD, MN PROJECT NO. 16 -04
WSB PROJECT NO. 2925 -16
Opening Time: 10:00 a.m.
Opening Date: Thursday, September 15, 2016
City of Shorewood
5755 Country Club Road
Shorewood, MN 55331
Dear Council Members:
1. The following proposal is made for furnishing and installing all labor and materials necessary for the 2016
Trunk Watermain Extension Project for the City of Shorewood, Minnesota.
2. The undersigned certifies that the Contract Documents listed in the Instructions to Bidders have been carefully
examined, and that the site of the work has been personally inspected. The undersigned declares that the amount
and nature of the work to be done is understood, and that at no time will misunderstanding of the Contract
Documents be pleaded. On the basis of the Contract Documents, the undersigned proposes to furnish all
necessary apparatus and other means of construction, to do all the work and furnish all the materials in the manner
specified, and to accept as full compensation therefore the sum of the various products obtained by multiplying
each unit price herein bid for the work or materials, by quantities thereof actually incorporated in the completed
project, as determined by the Engineer. The undersigned understands that the quantities mentioned herein are
approximate only, and are subject to increase or decrease, and hereby proposes to perform all work as either
increased or decreased, in accordance with the provisions of the specification, at the unit prices bid in the
following proposal schedule, unless such schedule designates lump sum bids.
3. PROPOSED SCHEDULE: The Bidder agrees to perform all work described in the specifications and shown
on the plans for the following unit prices:
Page 1
ADDENDUM NO. 2 - 2016 TRUNK WATERMAIN EXTENSION PROJECT
CITY OF SHOREWOOD, MN PROJECT NO.6 -04
WSB PROJECT NUMBER. 2925 -16
No. Mat. No. Item Units Quantity Unit Price Total Price
SCHEDULE A - WATERMAIN IMPROVEMENTS
1 2021.501 MOBILIZATION LS
2 2104.501 REMOVE WATER MAIN L F
3 2104.509 REMOVE GATE VALVE & BOX EACH
4 2451.509
AGGREGATE BEDDING (CV)
C Y
5 2503.603
TELEVISE SANITARY SEWER
L F
6 2503.603 24" STEEL CASING PIPE (JACKED) L F
7 2503.608 DUCTILE IRON FITTINGS LB
8 2504.602 RECONNECT WATER SERVICE EACH
9 2504.602 CONNECT TO EXISTING WATER MAIN EACH
10 2504.602 HYDRANT EACH
11 2504.602 V CORPORATION STOP EACH
12 2504.602 6" GATE VALVE & BOX EACH
13 2504.602 8" GATE VALVE & BOX EACH
14 2504.602 12" GATE VALVE & BOX EACH
15 2504.602 16" GATE VALVE & BOX EACH
16 2504.602 1" CURB STOP & BOX EACH
17
2504.603
1" TYPE K COPPER PIPE
L F
18
2504.603
6" WATERMAIN DUCTILE IRON CL 52
L F
33
$ $ '5
W /POLY WRAP"
19
2504.603
8 WATERMAIN DUCTILE IRON CL 52
L F
2
$ 9,000=' $ (Sim'
W /POLY WRAP"
$ OD— $ kplsw
20
2504.603
"10" WATERMAIN DUCTILE IRON CL 52
L F
140
$ 607 $ L d b
W /POLY WRAP"
$ �A $ Mu
21
2504.603
12" WATERMAIN DUCTILE IRON CL 52
L F
W /POLY WRAP'
Page 2
200 $
IV-
Ur $_ 00
2210 $ $
200 $ $ �jo -
7000
$ V • $ tUV 0
,z,o a
2
$$
$ 600
9
$ DOO: $
33
$ $ '5
3
$ c7t $ u/
2
$ 9,000=' $ (Sim'
33
$ OD— $ kplsw
700
$ ol-0— $ 14, Ub
150
$ 00- $ � 70
140
$ 607 $ L d b
30
$ �A $ Mu
2600
$ lzl— $_ �oq
No. Mat. No.
Item
ADDENDUM NO. 2 - 2016 TRUNK WATERMAIN EXTENSION PROJECT
CITY OF SIIOREWOOD, MN PROJECT NO.6 -04
WSB PROJECT NUMBER. 2925 -16
Units Quantity Unit Price Total Price
22 2504.603 16" WATERMAIN DUCTILE IRON CL 50 L F 920 $1� $
WIPOLY WRAP"
23 2504.603 1" TYPE K COPPER SERVICE (BORED) L F 230 $
24 2504.604 4" POLYSTYRENE INSULATION S Y 100 $ $ �i 6
Total SCHEDULE A - WATERMAIN IMPROVEMENTS $ " � d q q o
SCHEDULE B - SURFACE IMPROVEMENTS
25
2021.501
MOBILIZATION
LS
1
$ °�$
„® ® ®0 r
26
2101.501
CLEARING
ACRE
0.6
27
2101.502
CLEARING
TREE
5
$_ 56 - $
28
2101.506
GRUBBING
ACRE
0.6
$ bm —$
.
--°
29
2101.507
GRUBBING
TREE
5
$ d $
30
2104.503
REMOVE CONCRETE WALK
S F
20
$ ( ®A $
!�
31
2104.505
REMOVE CONCRETE DRIVEWAY
S Y
30
$ 10—s
PAVEMENT
32
2104.505
REMOVE BITUMINOUS DRIVEWAY
S Y
440
$
ss��
PAVEMENT
33
2104.505
REMOVE BITUMINOUS PAVEMENT
S Y
8100
$ $
34
2104.509
REMOVE SIGN
EACH
10
$ t o — $
35
2104.509
REMOVE MAIL BOX SUPPORT
EACH
5
$ 50—$
A � o —
36
2104.511
SAWING CONCRETE PAVEMENT (FULL
L F
30
$ $
DEPTH)
37
2104.513
SAWING BITUMINOUS PAVEMENT (FULL
L F
1500
$ J $
1 Sbb
DEPTH)
38
21.04.523
SALVAGE CASTING
EACH
2
$ %(�� $
Pte°
39
2104.523
SALVAGE SIGN PANEL TYPE SPECIAL
EACH
6
$ ° $
6°
40
21.04.601
SALVAGE AND REINSTALL LANDSCAPE
LS
1
$ Q , ®' $
000
STRUCTURES
r
41
2104.602
SALVAGE AND REINSTALL MAILBOX
EACH
20
$
Page 3
ADDENDUM NO. 2 - 2016 TRUNK WATERMAIN EXTENSION PROJECT
CITY OE SHOREWOOD, MN PROJECT NO.6 -04
WSB PROJECT NUMBER. 2925 -16
No.
Mat. No.
Item
Units
Quantity
Unit Price Total Price
42
2104.602
SALVAGE AND REINSTALL MAIL, BOX
EACH
1
$�� $
(SPECIAL)
43
2105.501
COMMON EXCAVATION
C Y
2000
$ $ 6kO
_
?,go
44
2112.501
SUBGRADE PREPARATION
RDST
32
45
2123.610
STREET SWEEPER (WITH PICKUP BROOM)
HOUR
20
$ qa
46
2130.501
WATER
MGAL
20
$ I r $
47
221.501
AGGREGATE BASE CLASS 5 ( 100%
TON
4100
�q
$ $
CRUSHED LIMESTONE)
48
2232.501
MILL BITUMINOUS SURFACE (2.0 ")
S Y
1100
$ $ 5,5-00
49
2357.502
BITUMINOUS MATERIAL FOR TACK COAT
GAL
500
$ $ �%�o
50
2360.501
TYPE SP 9.5 WEARING COURSE MIX (2,C)
TON
1100
$ $ ��, -7
51
2360.502
TYPE SP 12.5 NON WEAR COURSE MIX
TON
1000
$- 0 w
$_J/�
(2,C)
- - -��,
52
2360.503
TYPE SP 9.5 WEARING COURSE MIX (2,C)
SQ YD
500
$
3.0" THICK
53
2504.602
ADJUST GATE VALVE & BOX
EACH
1
$ $
54
2504.602
IRRIGATION SYSTEM REPAIR
EACH
5
$ $
55
2505.601
UTILITY COORDINATION
L S
1
$ .� $
6 3
56
2506.516
CASTING ASSEMBLY
EACH
2
$ $
57
2506.602
ADJUST FRAME & RING CASTING
EACH
13
$ 3Eo ®$ c5 v�®
58
2506.602
CHIMNEY
A6b— "®
SEALS
EACH
13
$ $
59
2521.501
4" CONCRETE WALK
S F
20
$ $
60
2531.501
CONCRETE CURB & GUTTER DESIGN B618
L F
1440
$ $ �t ,u4D �
61
2531.507
6" CONCRETE DRIVEWAY PAVEMENT
S Y
30
a- $_�
62
2535.501
BITUMINOUS CURB
L F
200
$_ $
63
2540.602
MAIL BOX SUPPORT
EACH
5
$ 00— $
Page 4
ADDENDUM NO. 2 - 2016 TRUNK WATERMAIN EXTENSION PROJECT
CITY OF SHOREWOOD, MN PROJECT NO.6 -04
WSB PROJECT NUMBER, 2925 -16
No.
Mat. No.
Item
Units
Quantity
Unit Price Total Price
64
2540.602
MAIL BOX (TEMPORARY)
EACH
31
$ /ja ® $ cu
65
2557.602
REPAIR DOG FENCE
EACH
5
$ 90'-s
66
2563.601
TRAFFIC CONTROL
LS
I
$ 010 $ qcic7
67
2564.531
SIGN PANELS TYPE C
S F
47
$ — $
68
2571.501
CONIFEROUS TREE 8' HT B &B
TREE
5
$ ��� $
69
2571.502
DECIDUOUS TREE 2.5" CAL B &B
TREE
5
$ $ !%y0
70
2573.502
SILT FENCE, TYPE MS
L F
5000
$ $
71
2573.530
STORM DRAIN INLET PROTECTION
EACH
10
$ / v $
72
2573.533
SEDIMENT CONTROL LOG TYPE WOOD
L F
5000
$ I $ catzo —
FIBER
73
2573.535
TEMPORARY ROCK CONSTRUCTION
EACH
I 1
$ (_OD $ 1 6-b
ENTRANCE
74
2574.525
COMMON TOPSOIL BORROW
C Y
100
$ $
75
2575.502
SEED MIXTURE 21 -111
LB
60
$ $
76
2575.502
SEED MIXTURE 21 -112
LB
60
$ $ '36b
77
2575.502
SEED MIXTURE 25 -131
LB
290
$ 5— $
78
2575.502
SEED MIXTURE 25 -141
LB
10
$ $
79
2575.563
HYDRAULIC MATRIX TYPE MULCH
S Y
11600
$ $
80
2575.604
SEEDING (INCL TOPSOIL & FERT)
ACRE
1.7
$ --$
81
2575.604
SEEDING (INCL FERT)
ACRE
1.1
$ 1/ 000' $
82
2575.608
SEED MIXTURE 34
POUND
10
-262
$
Total SCHEDULE B - SURFACE IMPROVEMENTS
SCHEDULE C - STORM SEWER IMPROVEMENTS
83 2021.501 MOBILIZATION LS 1 $ $
Page 5
ADDENDUM NO. 2 - 2016 TRUNK WATERMAIN EXTENSION PROJECT
CITY OF SI IOREWOOD, MN PROJECT NO.6 -04
WSB PROJECT NUMBER, 2925 -16
No. Mat. No. Item Units Quantity Unit Price Total Price
84 2104.501 REMOVE SEWER PIPE (STORM)
85 2104.509 REMOVE DRAINAGE STRUCTURE
86 2105.604 GEOTEXTILE FABRIC TYPE IV
87 2451.609 GRANULAR FOUNDATION AND /OR
BEDDING
88 2501.51.1 12" RC PIPE CULVERT CLASS V
L 770 $ 2)— $ %iw
EACH 4 $ �o $ 9J
S Y 100 $ O�— $ an
TON
L
89 2501.515 24" RC PIPE APRON WITH TRASH GUARD EACH
90 2501.567 36" RC SAFETY APRON & GRATE DES 3132 EACH
91
2501.602
12" RC PIPE APRON W/ TRASH GUARD
EACH
6
$ / -1 $
92
2502.501
8" PRECAST CONCRETE HEADWALL
EACH
2
$ �$
93
2502.521
8" PVC PIPE DRAIN
L F
40
$ �~~�$
94
2503.541
18" RC PIPE SEWER DES 3006 CL III
L F
160
$ 45J -s n�
95
2503.541
24" RC PIPE SEWER DES 3006 CL III
L F
100
$
96
2503.541
36" RC PIPE SEWER DES 3006 CL III
L F
440
$
97
2506.501
CONST DRAINAGE STRUCTURE DES 48-
L F
24
$ 23 W :-s
4020
98
2506.501
CONST DRAINAGE STRUCTURE DES 84-
L F
19
$ ®$ 00
4020
99
2506.502
CONST DRAINAGE STRUCTURE DESIGN G
EACH
3
$�°-$
100
2506.502
CONST DRAINAGE STRUCTURE DESIGN
EACH
1
$ 22-007s
SPECIAL
101
2506.516
CASTING ASSEMBLY
EACH
5
$ (00-s
1.02 2511.501 RANDOM RIPRAP CLASS III C Y
Total SCHEDULE C - STORM SEWER IMPROVEMENTS
GRAND TOTAL BID
Page 6
ADDENDUM NO. 2 - 2016 TRUNK WATERMAIN EXTENSION PROJECT
CITY OF SROREWOOD, MN PROJECT NO. 16 -04
WSI3 PROJECT NO. 2925 -16
4. RESPONSIBLE CONTRACTOR: The provisions of Minn. Stat. 16C.285 are imposed as a requirement of this
contract. All bidders and persons or companies providing a response /submission to the Advertisement for
Bids /RFP of the Owner shall comply with the provisions of the statute.
a. Any prime contractor or subcontractor that does not meet the minimum criteria established for a "responsible
contractor" as defined in Minn. Stat. § 16C.285, subd. 3, or fails to verify that it meets those criteria is not a
responsible contractor and is not eligible to be awarded a construction contract for the Project or to perform work
on the Project.
b. A responding contractor shall submit to the Owner a signed statement under oath by an owner or officer
verifying compliance with each of the minimum criteria in clauses (1) -(6) of Minn. Stat. § 16C.285, subd. 3, at the
time that it responds to this solicitation document. A responding contractor must also submit a list of first -tier
subcontractors it intends to retain on the project, at the time that it responds to this solicitation document.
c. Prior to being awarded a contract, the apparent successful prime contractor must submit a supplemental
verification under oath confirming that all subcontractors and motor carriers meet the minimum criteria of Minn.
Stat. § 16C.285, subd. 3. The apparent successful prime contractor has an ongoing duty to submit supplemental
verification forms for each additional subcontractor retained for the project.
d. A false statement under oath verifying compliance with any of the minimum criteria shall make the prime
contractor or subcontractor that makes the false statement ineligible to be awarded a construction project and may
result in termination of a contract awarded to a prime contractor or subcontractor that submits a false statement.
The basis of award of the Contract will be on the Total Bid. The Owner reserves the right to delete any item prior
to final contract.
The undersigned further proposes to execute the Contract Agreement and to furnish satisfactory bond within
ten (10) days after notice of the award of contract has been received. The undersigned further proposes to begin
work as specified, to complete the work on or before date specified, and to maintain at all times performance and
payment bonds, approved by the Owner, in an amount equal to the total bid.
7. Accompanying this proposal is the Bid Security, in the amount of five percent (5 %), required to be furnished by
the Contract Documents, the same being subject to forfeiture in the event of default by the undersigned.
8. In submitting this proposal, it is understood that the right reserved by the Owner to reject any or all proposals and
to waive informalities.
9. In submitting this proposal, the Undersigned acknowledges receipt of and has considered the following Addenda
issued to the Contract Documents:
10 Addendum No. Dated Addendum No. 3 Dated 94M It,
Addendum No. D ed Iq l 1p Addendum No. Dated
Signed ...�
If any Addenda r e fired ')determined by the Engineer, it is the responsibility of the Contractor to
verify the issuance and receipt of any Addenda, and to properly acknowledge such Addenda in the
appropriate location on the Proposal Form.
11. If a corporation, what is the state of incorporation?
12. If a partnership, state full name of all co- partners.
Offic
Date
Page 7
ADDENDUM
AFFIDAVIT AND INFORMATION REQUIRED OF BIDDERS
Affidavit of Nan - Collusion:
I hereby swear (or affirm) under the penalty for perjury:
(1) That I am the bidder (if the bidder is an individual), a partner in the bidder (if the bidder is a
partnership), or an officer or employee of the bidding corporation having authority to sign on its
behalf (if the bidder is a corporation).
(2) That the attached bid or bids have been arrived at by the bidder independently, and have been
submitted without collusion with, and without any agreement, understanding, or planned common
course of action with, any other vendor of materials, supplies, equipment or services described in
the invitation to bid, designed to limit independent bidding or competition;
(3) That the contents of the bid or bids have not been communicated by the bidder or its surety on
any bond furnished with the bid or bids, and will not be communicated to any such person prior to
the official opening of the bid or bids; and
Bidder's E.I. Number:
(Number used on employer's quarterly federal tax return, U.S. Treasury Department Form 941):
Fair Trade Items:
List below each item upon which a bid is made, the price of which is affected by a resale price
maintenance or "fair trade" contract between the bidder and the person or firm supplying the item to the
bidder. (Use reverse side if necessary.)
2016 TRUNK WATERMAIN EXTENSION PROJECT AFFIDAVIT
CITY OF SHOREWOOD, MN PROJECT NO. 16 -04
WSB PROJECT NO. 2925 -16
ADDENDUM NO. 2
CONTRACTOR VERIFICATION OF COMPLIANCA
By signing this document I certify that I am an owner or officer of the company, and I swear
under oath that:
My company meets each of the minimum criteria in subclauses (1) — (6) of Minn. Stat. §
16C.285, subd. 3, the Responsible Contractor statute.
The undersigned understands that a failure to meet or verify compliance with the
minimum criteria established for a "responsible contractor" as defined in Minn. Stat. § 16C.285,
subd. 3, renders a bidder ineligible to be awarded a construction contract for the Project or to
perform work on the Project.
The undersigned understands that a false statement under oath verifying compliance with
any of the minimum criteria shall make the undersigned, ineligible to be awarded a construction
project and may result in termination of a contract awarded to the undersigned. A contracting
authority shall not be liable for declining to award a contract or terminating a contract based on a
reasonable determination that the contractor failed to verify compliance with the minimum criteria
or falsely stated that it meets the minimum criteria.
The undersigned understands that, if the undersigned is the apparent low bidder, the
undersigned will be required to submit a supplemental verification under oath as a condition
precedent to the execution of the contract. If the undersigned fails to provide the required
supplemental verification, it could forfeit its bid bond.
I have attached a list of all of my company's first -tier subcontractors that it intends to
retain for work on the project.
Date: q I Is—/ 1 to
Contractor:
koan "ckoo UU
i
Signat
Its
2016 TRUNK WATERMAIN EXTENSION PROJECT INITIAL VERIFICATION
CITY OF SHOREWOOD, MN PROJECT NO. 16 -04
WSB PROJECT NO. 2925 -16
ADDENDUM NO. 2
SUBCONTRACTORS LIST
Attach Additional Sheets if Necessary
Contract r:
:10
Signat
Its
2016 TRUNK WATERMAIN EXTENSION PROJECT SUBCONTRACTOR LIST
CITY OF SHOREWOOD, IVIN PROJECT NO. 16-04
WSB PROJECT NO. 2925-16
By signing this document I certify that I am an owner or officer of the company, and I swear under
oath that:
My company meets each of the minimum criteria of Minn. Stat. § 16C.285, subd. 3, the
Responsible Contractor statute.
Pursuant to Stat. § 16C.285, subd. 3(7), my company has obtained from all
subcontractors and motor carriers with which it will have a direct contractual relationship a signed
statement under oath by an owner or officer verifying that they meet all of the minimum criteria in
subdivision 3 prior to execution of a construction contract with each subcontractor or motor
carrier.
The undersigned agrees that, if it retains additional subcontractors on the project after
submitting its verification of compliance, it shall obtain verifications of compliance from each
additional subcontractor with which it has a direct contractual relationship and shall submit a
supplemental verification confirming compliance with Minn. Stat. § 16C.285, subd. 3(7), within 14
days of retaining the additional subcontractors.
Upon request, the undersigned shall submit to the contracting authority copies of the
signed verifications of compliance from all subcontractors of any tier and all motor carriers
providing for -hire transportation of materials, equipment, or supplies for a project.
The undersigned understands that a failure to meet or verify compliance with the
minimum criteria established for a "responsible contractor" as defined in Minn. Stat. § 16C.285,
subd. 3, renders a bidder ineligible to be awarded a construction contract for the Project or to
perform work on the Project.
The undersigned understands that a false statement under oath verifying compliance with
any of the minimum criteria shall make the undersigned, ineligible to be awarded a construction
project and may result in termination of a contract awarded to the undersigned. A contracting
authority shall not be liable for declining to award a contract or terminating a contract based on a
reasonable determination that the contractor failed to verify compliance with the minimum criteria
or falsely stated that it meets the minimum criteria.
Date: l < J
Contract
In
Signature
Its
2016 TRUNK WATERMAIN EXTENSION PROJECT SUPPLEMENTAL VERIFICATION
CITY OF SHOREWOOD, MN PROJECT NO. 16 -04
WSB PROJECT NO. 2925 -16