17-04 2017 Street Improvements- Riviera Lane & Shorewood Lanerr; AP` 477 Temperance Street I St. Paul, MN 55101 1 (651) 286 -8450 January 5, 2017 Honorable Mayor and City Council City of Shorewood 5755 Country Club Road Shorewood, MN 55331 Re: Professional Services Proposal Feasibility Report and Preliminary Design Services - Riviera Lane and Shorewood Lane Street and Utility Improvement Project City Project No. 17 -04 WSB Project 2925 -240 Dear Honorable Mayor and Council Members: WSB & Associates, Inc. is pleased to provide you with our proposal for the preparation of a Feasibility Report and Preliminary Design for the Riviera Lane and Shorewood Lane Street and Utility Improvement Project. The proposed improvements are for the reconstruction of Riviera Lane from Yellowstone Rd to Cul -de -sac, and Shorewood Lane from Smithtown Road to Cul -de -sac in accordance with the City's 2017 Capital Improvement Plan and Pavement Management Plan. Project Understanding The condition of the street along Riviera Lane and Shorewood Lane has deteriorated to a point in which the City has requested a review of reconstruction options for both the street pavements and utilities along this corridor. To complete this task, the City has requested a proposal to assist in reviewing the condition of both the street and utility systems. We anticipate the following scope items for the preliminary design and Feasibility Report preparation to include the following items. Proposed Services Our proposed services include preparing a feasibility report, completing a topographic survey, and providing the appropriate level of preliminary design services to consider street and utility reconstruction options. Feasibility Report: ® Review the existing conditions of the street pavements, underlying soil conditions, utilities, and drainage characteristics. ® Review opportunities to improve area drainage. ® Prepare a detailed preliminary opinion of potential construction and indirect project costs with contingencies but excluding costs of acquisition of land due to the variability in land costs Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com KA02925- 240WdmimDocs \Riviera Ln and Shorewood LnTeasiblity and Prelim Design - Riviera Ln, Shorewood Ln.docx Riviera Lane and Shorewood Lane Street and Utility Improvement Project — Feasibility Report January 5, 2017 Page 2 • Identify potential for funding sources. • Identify owners of parcels along the proposed improvement corridor that may be impacted by construction. • Identify potential need for the acquisition of permanent and temporary easements. ■ Identify the necessary permitting agencies and requirements. ■ Prepare preliminary project schedule. ■ Prepare a Feasibility Report depicting the improvement corridor existing conditions, proposed improvements, funding requirements and resources, figures depicting the improvements, and feasibility statements regarding the improvements. ■ Review the determination of the necessity, feasibility, and cost - effectiveness of the project. Preliminary Design: ■ Complete a topographic survey to identify surficial information /landmarks, existing grades, property corners /lines, public /private utility locations. This information will not constitute an official boundary survey. ■ Provide a preliminary horizontal and vertical alignment for the street reconstruction including preliminary earthwork calculations. ■ Provide preliminary horizontal and vertical alignments for proposed sanitary sewer, watermain, and storm sewer improvements only as needed. ■ Coordinate location of private utility company facilities within the improvement corridor. This coordination will include performing a utility design locate request to provide a quality level D location for existing utilities. ■ Prepare preliminary layout and design based upon public comments, City staff review and engineering judgment for discussion with the Council. Preliminary layout will be a representation of horizontal and vertical alignments with potential construction limits shown and potential construction conflicts. Make minor revisions based upon Council direction. ■ Conduct a feasibility level drainage design. Public Involvement and Project Management: • Project management and coordination /meetings with City staff and the City Council. • Attendance of two public information meetings with residents to discuss the project and receive comments regarding the design approach and proposed design. The goal is to have an informational meeting before beginning preliminary design and one meeting prior to Feasibility Report presentation to the Council. • Attend one Public Hearing and provide a brief presentation on the Feasibility Report. Proposed Fee We are proposing to complete the work on a cost - reimbursable basis in accordance with our current fee schedule. Estimated fees for: Preliminary Design /Feasibility Report Preparation $21,847 Geotechnical Report $ 4,800 Topographic Survey $ 3,772 Sanitary Sewer Televising $ 2,700 Total Fee In the Amount of $33,119 Thank you for this opportunity to provide professional consulting services to the City of Shorewood. If this proposal is acceptable, please execute the signature block below and return as our authorization to proceed. K102925- 240 \Admin \Dots \Riviera Ln and Shorewood LnWessiblity and Prelim Design - Riviera Ln, Shorewood Ln.docx Riviera Lane and Shorewood Lane Street and Utility Improvement Project — Faasibi|ityReport January 5.2O17 Page ' Please do not hesitate to contact me at 651-286-8468 if you have any questions. NSB& Associates, Inc NickGuUUams, P.E. Project Manager PROPO6ALFOR: Paul Honnby,PZ. City Engineer Feasibility Report and Preliminary Design Services — Riviera Lone and Shorewood Lone Street and Utility Improvement Project. ACCEPTED BY: City of Shorewood, K8N Title Date