Rivera Ln/Shorewood Ln Recon Slideshow (color)
Riviera Lane and Shorewood Lane
Street and Utility Improvement Project
Neighborhood Meeting
March 2, 2017
Agenda
Project Location
Proposed Improvements
FAQs
Preliminary Project Schedule
Next Steps
Questions
Project Location
Proposed Improvements
Proposed Improvements
Complete Street Reconstruction
28’ wide
New bituminous street with concrete curb and gutter
Excavation to 3’ and re-building of roadbed
Storm sewer installation to improve area drainage:
Standing water/icing in street
Accelerated pavement deterioration
Proposed Improvements
Proposed Improvements
City Utilities
Sanitary sewer
Reduce inflow and infiltration
Spot repairs as needed
WatermainExtension
Extend 8-inch watermain
Currently served by on-site wells
New services installed to the right-of-way
Property owners responsibility to connect into system from
home to right-of-way
Proposed Improvements
Watermain Extension –Shorewood Lane
Proposed Improvements
Watermain Extension –Riviera Lane Option 1
Proposed Improvements
Watermain Extension –Riviera Lane Option 2
Project Funding
Street Reconstruction Fund
Storm Water Fund
Sanitary Sewer Fund
WatermainFund
Special Assessments (watermainONLY)
FAQs
Trees / Turf and Driveway Restoration
Driveway Access
Special Needs / Events
Sprinkler Systems / Invisible Fencing
Mail / Garbage Service
Water Service Locations
FAQs
NEW connection into Municipal Water (currently serviced
by onsite wells):
Property owners responsibility to connect into system from
home to right-of-way
Property owner’s responsibility to disconnect their well and
abandon in accordance with State Statutes if it will no longer
to be used as an irrigation well.
FAQs
Shorewood Municipal Water Billing Rates
$17.50 per quarter for the first 5,000 gallons.
$2.95 -$4.25 per 1,000 gallons
Preliminary Project Schedule
NeighborhoodOpenHouseMarch2,2017
PresentFeasibilityReporttoCityCouncilMarch13,2017
PublicImprovementHearing/OrderProjectApril24,2017
ApprovePlans/AuthorizeBidsJune2017
OpenBidsJuly2017
AwardConstructionContractAugust2017
ConstructionAugust–October2017
DeclareCosts/SetAssessmentHearingSeptember2017
AssessmentHearingOctober2017
CertifyAssessmentstoCountyNovember2017
FinalCompletionSpring/Summer2018
Next Steps
Present Feasibility Report to City Council and Set Public
Hearing date and time
Proposed Public Hearing April 24, 2017
Questions?