Loading...
Rivera Ln/Shorewood Ln Recon Slideshow (color) Riviera Lane and Shorewood Lane Street and Utility Improvement Project Neighborhood Meeting March 2, 2017 Agenda Project Location  Proposed Improvements  FAQs  Preliminary Project Schedule  Next Steps  Questions  Project Location Proposed Improvements Proposed Improvements Complete Street Reconstruction  28’ wide  New bituminous street with concrete curb and gutter  Excavation to 3’ and re-building of roadbed  Storm sewer installation to improve area drainage:  Standing water/icing in street  Accelerated pavement deterioration  Proposed Improvements Proposed Improvements City Utilities  Sanitary sewer  Reduce inflow and infiltration  Spot repairs as needed  WatermainExtension  Extend 8-inch watermain  Currently served by on-site wells  New services installed to the right-of-way  Property owners responsibility to connect into system from  home to right-of-way Proposed Improvements Watermain Extension –Shorewood Lane Proposed Improvements Watermain Extension –Riviera Lane Option 1 Proposed Improvements Watermain Extension –Riviera Lane Option 2 Project Funding Street Reconstruction Fund  Storm Water Fund  Sanitary Sewer Fund  WatermainFund  Special Assessments (watermainONLY)  FAQs Trees / Turf and Driveway Restoration  Driveway Access  Special Needs / Events  Sprinkler Systems / Invisible Fencing  Mail / Garbage Service  Water Service Locations  FAQs NEW connection into Municipal Water (currently serviced  by onsite wells): Property owners responsibility to connect into system from  home to right-of-way Property owner’s responsibility to disconnect their well and  abandon in accordance with State Statutes if it will no longer to be used as an irrigation well. FAQs Shorewood Municipal Water Billing Rates  $17.50 per quarter for the first 5,000 gallons.  $2.95 -$4.25 per 1,000 gallons  Preliminary Project Schedule NeighborhoodOpenHouseMarch2,2017  PresentFeasibilityReporttoCityCouncilMarch13,2017  PublicImprovementHearing/OrderProjectApril24,2017  ApprovePlans/AuthorizeBidsJune2017  OpenBidsJuly2017  AwardConstructionContractAugust2017  ConstructionAugust–October2017  DeclareCosts/SetAssessmentHearingSeptember2017  AssessmentHearingOctober2017  CertifyAssessmentstoCountyNovember2017  FinalCompletionSpring/Summer2018  Next Steps Present Feasibility Report to City Council and Set Public  Hearing date and time Proposed Public Hearing April 24, 2017  Questions?