Property ID No. 3311723110048
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
A VANDERLINDE/D VANDERLINDE
5625 STAR LA
SHOREWOOD, MN 55331
Property ID No. 3311723110049
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
HENNING R DUBLIN &THOMAS ELLIOTT
5520 SHOREWOOD LA
SHOREWOOD, MN 55331
Property ID No. 3311723110050
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
STEPHEN & ELAINE DEVRIES
5515 SHOREWOOD LANE
SHOREWOOD, MN 55331
Property ID No. 3311723110051
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
JOSHUA PATTERSON
2025 INNSBRUCK PKWY
MINNEAPOLIS , MN 55421
Property ID No. 3311723110054
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
ST JOE PROPERTIES LLC
4060 LAKERIDGE RD
EXCELSIOR, MN 55331
Property ID No. 3311723110055
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
DAVID C & MARY B PHILP
5575 SHOREWOOD LA
SHOREWOOD, MN 55331
Property ID No. 3311723110056
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
TIMOTHY F MCGLENNEN
130 11TH AVE S
HOPKINS, MN 55343
Property ID No. 3311723140036
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
BRET&TRACY HILLSTROM
6030 RIVIERA LA
SHOREWOOD, MN 55331
Property ID No. 3311723440003
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
SCOTT&TARA HAWKS
6040 RIVIERA LA
SHOREWOOD, MN 55331
Property ID No. 3311723440004
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
KATHERINE M LAMBERT
6060 RIVIERA LA
SHOREWOOD, MN 55331
Property ID No. 3311723440005
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
JASON DREW& BECKY DREW
6080 RIVIERA LA
SHOREWOOD, MN 55331
Property ID No. 3311723440006
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
DEBORAH ANN WINGERT
6100 RIVERA LA
SHOREWOOD, MN 55331
Property ID No. 3311723440007
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
JAMES E &JANET M MCFARLAND
6120 RIVIERA LA
SHOREWOOD, MN 55331
Property ID No. 3311723440030
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
MICHAEL C LEIGHTON & HEIDI C LEIGHTON
24185 WOOD DR
SHOREWOOD, MN 55331
Property ID No. 3311723440031
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
LISA I YOUNGBLOOD
6180 RIVIERA LA
EXCELSIOR, MN 55331
Property ID No. 3311723440017
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
ROBERT A MEESE
6185 RIVIERA LA
SHOREWOOD, MN 55331
Property ID No. 3311723440046
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
ANDREW N FISCHER
6175 RIVIERA LA
SHOREWOOD, MN 55331
Property ID No. 3311723440045
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
KAREN ANN BOYNTON
6155 RIVIERA LA
SHOREWOOD, MN 55331
Property ID No. 3311723440044
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
ELIZABETH M REID
6115 RIVIERA LA
SHOREWOOD, MN 55331
Property ID No. 3311723440023
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
THOMAS E & SANDRA M AHLSTROM
6085 RIVIERA LA
SHOREWOOD, MN 55331
Property ID No. 3311723440022
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
ERIC B & SANDRA J JACOBSON
6055 RIVIERA LA
SHOREWOOD, MN 55331
Property ID No. 3311723440021
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331-8927 • (952) 960-7900
Fax: (952)474-0128•www.d.shorewood.mmus•dtyhall @d.shorewood.mn.us
March 30, 2017
PAUL T EIDSNESS
6025 RIVIERA LA
SHOREWOOD , MN 55331
Property ID No. 3311723440020
Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project
City of Shorewood Project No. 17-04
WSB Project No. 2925-24
Dear Property Owner(s):
On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera
Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be
held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club
Road, to consider the project improvements.
Since your property is included in the project, the City is required by state statute to provide you with the
following notice pertaining to the hearing on the improvements for the Project:
NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT
(CITY PROJECT NO. 17-04)
Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at
5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17-
04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane
north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete
curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the
improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration
into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§429.011 to 429.111.
The area proposed to be assessed for watermain improvements are the properties abutting the proposed
improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for
watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with reference to the
proposed improvement will be heard at this meeting.
If you have any questions, please contact me at(651)286-8453. Thank you.
Sincerely,
Paul Hornby, PE
City Engineer
cc: Nick Guilliams, WSB &Associates, Inc.
Katie Koscielak, WSB &Associates, Inc.
Greg Lerud, City of Shorewood
kkp