Loading...
Notice of Public HearingMarch 30, 2017 5755 Country Club Road • Shorewood, Minnesota 55331 -8927 • (952) 960 -7900 Fax: (952) 474 -0128 • www.ci.shorewood.mn.us ® cityha11@d.shorewood.mn.us SHOREWOOD PROPERTIES LLC C/O MATTHEW TIERNEY 1549 FOX HUNT WAY VICTORIA, MN 55386 Property ID No. 3311723110048 Re: Riviera Lane and Shorewood Lane Street and Utility Improvement Project City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 Dear Property Owner(s): On March 13, 2017, the City of Shorewood City Council accepted the feasibility report for the Riviera Lane and Shorewood Lane Street and Utility Improvement Project and called for a public hearing to be held on Monday, April 24, 2017, at 7:00 p.m. at the Shorewood City Hall, located at 5755 Country Club Road, to consider the project improvements. Since your property is included in the project, the City is required by state statute to provide you with the following notice pertaining to the hearing on the improvements for the Project: NOTICE OF PUBLIC HEARING ON THE RIVIERA LANE AND SHOREWOOD LANE STREET AND UTILITY IMPROVEMENT PROJECT (CITY PROJECT NO. 17 -04) Notice is hereby given that the Shorewood City Council will meet at the Shorewood City Hall located at 5755 Country Club Road, at 7:00 p.m. on April 24, 2017, to consider the making of improvement No. 17- 04, the street and utility improvements of Riviera Lane south of Yellowstone Trail and Shorewood Lane north of Smithtown Road. The improvements include reconstructing the existing roadway with concrete curb and gutter, storm sewer, extension of watermain, hydrants and services to each parcel in the improvement area, and minor sanitary sewer improvements related to reduction in inflow and infiltration into the system along Riviera Lane and Shorewood Lane pursuant to Minn. Stat. §§ 429.011 to 429.111. The area proposed to be assessed for watermain improvements are the properties abutting the proposed improvements. The estimated total cost of the roadway and utility improvement is $2,312,500 for watermain Option 1 and $2,284,800 for watermain Option 2. A reasonable estimate of the impact of the assessment will be available at the hearing. Such persons as desire to be heard with reference to the proposed improvement will be heard at this meeting. If you have any questions, please contact me at (651) 286 -8453. Thank you. Sincerely, Paul Hornby, PE City Engineer cc: Nick Guilliams, WSB & Associates, Inc. Katie Koscielak, WSB & Associates, Inc. Greg Lerud, City of Shorewood kkp