Loading...
Pay Voucher No. 7 CITY OF SHOREWOOD AdL 5755 Country Club Road " Shorewood, MN 55331-8926 Project 02925-16-SHOR-2016 Water Main Extension roject WSB Pay Voucher No. 7 t Contractor: Widmer Construction, LL Contract No.C Vendor No. 9455 County Road 15 For Period: 6/13/2017-7/31/2017 Maple Plain, MN 55359 Warrant# Date I Contract Amounts Funds Encumbered Original Contract $1,102,856.13 Original $1,102,856.13 Contract Changes $52,018.47 Additional N/A Revised Contract $1,154,874.60 Total $1,102,856.13 Work Certified To Date I Base Bid Items $830,875.96 i Backsheet $0.00 Change Order $54,306.42 Supplemental Agreement $0.00 Work Order $0.00 Material On Hand $0.00 Total $885,182.38 Work Certified Work Certified Less Amount Less Previous Amount Paid Total Amount This Pay Voucher To Date Retained Payments This Pay Voucher Paid To Date 02925-16 $26,119.45 $885,182.38 $44,259.12 $816,109.78 $24,813.48 $840,923.26 Percent Retained: 5% Percent Complete: 76.6475% Amount Paid This Pay Voucher $24,813.48 This is to certify that the items of work shown in this certificate of Pay Voucher have been actually furnished for the work comprising the above mentioned projects in accordance with the plans and specifications heretofore approved. Approved By Approved By Widmer Construction, LLC Project Engineer Contra for Date Date Approved By City of Shorewoo Date CITY OF SHOREWOOD 5755 Country Club Road Shorewood, MN 55331-8926 Project No. 02925-16 Pay Voucher No. 7 02925-16 Payment Summa No. From Date To Date Work Certified Amount Retained Amount Paid Per Pay Voucher Per Pay Voucher Per Pay Voucher 1 09/26/2016 11/08/2016 $461,796.69 $23,089.83 $438,706.86 2 11/09/2016 11/30/2016 $94,273.56 $4,713.68 $89,559.88 3 12/01/2016 02/21/2017 $41,461.97 $2,073.10 $39,388.87 4 02/22/2017 03/21/2017 $98,716.75 $4,935.84 $93,780.91 5 03/22/2017 04/30/2017 $97,001.71 $4,850.08 $92,151.63 6 05/01/2017 06/12/2017 $65,812.25 $3,290.62 $62,521.63 7 06/13/2017 07/31/2017 $26,119.45 $1,305.97 $24,813.48 Totals: $885,182.38 $44,259.12 $840,923.26 02925-16 Funding Category Report Funding Work Less Less Amount Paid Total Category Certified Amount Previous This Amount Paid No. To Date Retained Payments Pay Voucher To Date UNF 885,182.37 44,259.12 816,109.77 24,813.48 840,923.25 Totals: $885,182.37 $44,259.12 $816,109.77 $24,813.48 $840,923.25 I 02925-16 Funding Source Report Accounting Funding Amount Paid Revised Funds Paid To No. Source This Contract Encumbered Contractor Pay Voucher Amount To Date To Date UNF Unfunded 24,813.48 1,154,874.60 1,102,856.13 840,923.25 j Totals: $24,813.48 $1,154,874.60 $1,102,856.13 $840,923.25 i s i i i i i I I I i I CITY OF SHOREWOOD 5755 Country Club Road Shorewood, MN 55331-8926 Project No. 02925-16 Pay Voucher No 7 02925-16 Pr®iect Material Status Quantity Amount Line Item Description Units Unit Price Contract This This Quantity Amount Quantity Pay Pay To Date To Date Voucher Voucher i SCHEDULE A -WATERMAIN IMPROVEMENTS j 1 2021.501 MOBILIZATION LS $14,000.00 1 0 $0.00 0.75 $10,500.00 REMOVE 2 2104.501 WATER MAIN L F $6.00 100 0 $0.00 14 $84.00 3 2104.509 REMOVE GATE EACH $100.00 1 0 $0.00 0 $0.00 VALVE & BOX 4 2451.509 AGGREGATE C Y $0.01 200 0 $0.00 0 $0.00 BEDDING (CV) TELEVISE 5 2503.603 SANITARY L F $2.00 2210 0 $0.00 1682 $3,364.00 SEWER 24" STEEL 6 2503.603 CASING PIPE L F $432.00 200 0 $0.00 180 $77,760.00 (JACKED) { 7 2503.608 DUCTILE IRON LB $4.00 7000 0 $0.00 4764.5 $19,058.00 FITTINGS i RECONNECT 8 2504.602 WATER EACH $500.00 2 0 $0.00 0 $0.00 SERVICE CONNECT TO 9 2504.602 EXISTING EACH $8,500.00 1 0 $0.00 1 $8,500.00 WATER MAIN 10 2504.602 HYDRANT EACH $3,207.00 9 0 $0.00 6 $19,242.00 11 2504.602 CORPORATION EACH $396.00 33 0 $0.00 24 $9,504.00 STOP 12 2504.602 6" GATE VALVE EACH $1,198.00 9 0 $0.00 5 $5,990.00 j & BOX 13 2504.602 8" GATE VALVE EACH $1,632.00 3 0 $0.00 4 $6,528.00 & BOX r 14 2504.602 12"GATE VALVE& BOX EACH $2,802.00 5 0 $0.00 5 $14,010.00 j 16" GATE VALVE 15 2504.602 & BOX EACH $8,038.00 2 0 $0.00 2 $16,076.00 I 1" CURB STOP & 16 2504.602 BOX EACH $466.00 33 0 $0.00 24 $11,184.00 17 2504.603 1"TYPE K L F $28.60 700 0 $0.00 667 $19,076.20 COPPER PIPE WATERMAIN 18 2504.603 DUCTILE IRON CL 52 W/POLY L F $36.79 150 0 $0.00 89 $3,274.31 WRAP WATERMAIN 19 2504.603 DUCTILE IRON L F $43.00 140 0 $0.00 108 $4,644.00 CL 52 W/POLY WRAP 10"WATERMAIN 20 2504.603 DUCTILE IRON L F $49.45 30 23 $1,137.35 23 $1,137.35 CL 52 W/POLY WRAP I I CITY OF SHOREWOOD 5755 Country Club Road Shorewood, MN 55331-8926 Project No. 02925-16 Pay Voucher No. 7 02925-16 Project Material Status Quantity Amount Line Item Description Units Unit Price Contract This This Quantity Amount Quantity Pay Pay To Date To Date Voucher Voucher "12" WATERMAIN } 21 2504.603 DUCTILE IRON L F $56.45 2600 0 $0.00 2251 $127,068.95 C CL 52 W/POLY WRAP" WATERMAIN 22 2504,603 DUCTILE IRON CL 50 W/POLY L F $64.25 920 0 $0.00 901 $57,889.25 ' WRAP 1" TYPE K 23 2504.603 COPPER SERVICE L F $60.00 230 0 $0.00 0 $0.00 (BORED) 4" 24 2504.604 POLYSTYRENE S Y $31.50 100 0 $0.00 17.8 $560.70 INSULATION r Totals For Section SCHEDULE A-WATERMAIN c IMPROVEMENTS: $1,137.35 $415,450.76 SCHEDULE B -SURFACE IMPROVEMENTS I 25 2021.501 MOBILIZATION LS $17,250.00 1 0 $0.00 0.5 $8,625.00 26 2101.501 CLEARING ACRE $4,080.00 0.6 0 $0.00 0.2 $816.00 27 2101.502 CLEARING TREE $1,020.00 5 0 $0.00 11 $11,220.00 28 2101.506 GRUBBING ACRE $4,080.00 0.6 0 $0.00 0.1 $408.00 29 2101.507 GRUBBING TREE $612.00 5 0 $0.00 4 $2,448.00 REMOVE 30 2104.503 CONCRETE SF $6.50 20 0 $0.00 0 $0.00 WALK G REMOVE 31 2104.505 DRIVEWAY S Y $6.50 30 0 $0.00 0 $0.00 PAVEMENT REMOVE 32 2104.505 BITUMINOUS S Y $4.05 440 0 $0.00 279.8 $1,133.19 DRIVEWAY PAVEMENT REMOVE 33 2104.505 BITUMINOUS S Y $2.10 8100 0 $0.00 8695.6 $18,260.76 PAVEMENT 34 2104.509 REMOVE SIGN EACH $25.50 10 0 $0.00 0 $0.00 j 35 2104.509 REMOVE MAIL EACH $100.00 5 0 $0.00 1 $100.00 BOX SUPPORT SAWING 36 2104.511 CONCRETE L F $7.00 30 0 $0.00 0 $0.00 PAVEMENT (FULL DEPTH) SAWING 37 2104.513 BITUMINOUS L F $3.00 1500 0 $0.00 1379.5 $4,138.50 PAVEMENT (FULL DEPTH) 38 2104.523 SALVAGE EACH $115.00 2 0 $0.00 0 $0.00 CASTING CITY OF SHOREWOOD 5755 Country Club Road Shorewood, MN 55331-8926 Project No. 02925-16 Pay Voucher No. 7 02925-16 Project Material Status Quantity Amount Line Item Description Units Unit Price Contract This This Quantity Amount Quantity Pay Pay To Date To Date Voucher Voucher SALVAGE SIGN 39 2104.523 PANEL TYPE EACH $25.50 6 0 $0.00 0 $0.00 SPECIAL SALVAGE AND 40 2104.601 REINSTALL LS $12,075.00 1 0 $0.00 0 $0.00 LANDSCAPE STRUCTURES SALVAGE AND 41 2104.602 REINSTALL EACH $125.00 20 0 $0.00 9 $1,125.00 MAILBOX SALVAGE AND 42 2104.602 REINSTALL MAIL EACH $500.00 1 0 $0.00 0 $0.00 BOX (SPECIAL) I 43 2105.501 COMMON C Y $30.00 2000 0 $0.00 1880 $56,400.00 EXCAVATION 44 2112.501 PREPARATION RDST $396.00 32 0 $0.00 26.25 $10,395.00 STREET 45 2123.610 SWEEPER HOUR $105.00 20 0 $0.00 16.25 $1,706.25 (WITH PICKUP BROOM) j 46 2130.501 WATER MGAL $2.00 20 0 $0.00 0 $0.00 AGGREGATE BASE CLASS 5 47 221.501 (100% TON $16.75 4100 0 $0.00 3615.67 $60,562.47 CRUSHED LIMESTONE) MILL 48 2232.501 BITUMINOUS S Y $3.86 1100 0 $0.00 0 $0.00 SURFACE (2.0") BITUMINOUS 49 2357.502 MATERIAL FOR GAL $3.05 500 0 $0.00 475 $1,448.75 TACK COAT TYPE SP 9.5 E E 50 2360.501 WEARING COURSE MIX TON $70.80 1100 0 $0.00 836.81 $59,246.15 (2,C) TYPE SP 12.5 51 2360.502 NON WEAR TON $65.62 1000 0 $0.00 987.12 $64,774.81 COURSE MIX (2,C) TYPE SP 9.5 52 2360.503 WEARING SQ YD $3.05 500 0 $0.00 362.7 $1,106.24 COURSE MIX (2,C) 3.0"THICK i 53 2504.602 ADJUST GATE EACH $305.00 1 0 $0.00 1 $305.00 VALVE & BOX IRRIGATION 54 2504.602 SYSTEM EACH $262.50 5 0 $0.00 0 $0.00 REPAIR 55 2505.601 UTILITY LS $5,000.00 1 0 $0.00 0.5 $2,500.00 COORDINATION CITY OF SHOREWOOD 5755 Country Club Road Shorewood, MN 55331-8926 Project No. 02925-16 Pay Voucher No. 7 02925-16 Project Material Status Quantity Amount Line Item Description Units Unit Price Contract This This Quantity Amount Quantity Pay Pay To Date To Date Voucher Voucher 56 2506.516 CASTING EACH $600.00 2 0 $0.00 1 $600.00 ASSEMBLY ADJUST FRAME 57 2506.602 & RING EACH $386.00 13 0 $0.00 11 $4,246.00 CASTING 58 2506.602 CHIMNEY EACH $177.50 13 0 $0.00 11 $1,952.50 SEALS 59 2521.501 4"CONCRETE WALK SF $10.00 20 0 $0.00 0 $0.00 CONCRETE 60 2531.501 CURB & L F $35.50 1440 0 $0.00 1018 $36,139.00 GUTTER DESIGN B618 6"CONCRETE 61 2531,507 DRIVEWAY S Y $76.25 30 0 $0.00 7.5 $571.88 PAVEMENT 62 2535.501 BITUMINOUS L F $9.65 200 0 $0.00 0 $0.00 CURB 63 2540.602 SUPPORT EACH $125.00 5 0 $0.00 1 $125.00 i 64 2540.602 MAIL BOX EACH $75.00 31 0 $0.00 12 $900.00 (TEMPORARY) 65 2557.602 REPAIR DOG EACH $100.00 5 0 $0.00 0 $0.00 FENCE 66 2563.601 TRAFFIC CONTROL LS $4,080.00 1 0 $0.00 0.5 $2,040.00 67 2564.531 SIGN PANELS SF $35.19 47 0 $0.00 0 $0.00 TYPE C 68 2571.501 CONIFEROUS TREE $647.00 5 0 $0.00 0 $0.00 TREE 8' HT B&B DECIDUOUS E 69 2571.502 TREE 2.5" CAL TREE $647.00 5 0 $0.00 0 $0.00 B&B 70 2573.502 SILT FENCE, L F $1.47 5000 0 $0.00 0 $0.00 TYPE MS STORM DRAIN 71 2573.530 INLET EACH $178.00 10 0 $0.00 0 $0.00 PROTECTION SEDIMENT 72 2573.533 CONTROL LOG L F $2.96 5000 0 $0.00 2668.6 $7,899.06 TYPE WOOD FIBER TEMPORARY 73 2573.535 ROCK EACH $650.00 11 0 $0.00 2 $1,300.00 CONSTRUCTION ENTRANCE COMMON 74 2574.525 TOPSOIL C Y $25.00 100 0 $0.00 0 $0.00 BORROW 75 2575.502 SEED MIXTURE LB $5.08 60 0 $0.00 30 $152.40 21-111 CITY OF SHOREWOOD 5755 Country Club Road Shorewood, MN 55331-8926 Project No. 02925-16 Pay Voucher No. 7 02925-16 Project Material Status Quantity Amount Line Item Description Units Unit Price Contract This This Quantity Amount Quantity Pay Pay To Date To Date Voucher Voucher 76 2575.502 SEED MIXTURE LB $5.08 60 0 $0.00 0 $0.00 21-112 77 2575.502 SEED MIXTURE LB $3.40 290 0 $0.00 350 $1,190.00 25-131 78 2575.502 SEED MIXTURE 25-141 LB $4.21 10 0 $0.00 0 $0.00 HYDRAULIC 79 2575.563 MATRIX TYPE S Y $0.73 11600 0 $0.00 4031 $2,942.63 MULCH SEEDING (INCL 80 2575.604 TOPSOIL & ACRE $1,015.00 1.7 0 $0.00 0 $0.00 FERT) 81 2575.604 SEEDING (INCL ACRE $1,015.00 1.1 0 $0.00 0 $0.00 FERT) 82 2575.608 SEED MIXTURE POUND $66.00 10 0 $0.00 0 $0.00 34-262 Totals For Section SCHEDULE B -SURFACE IMPROVEMENTS: $0.00 $366,777.59 SCHEDULE C -STORM SEWER IMPROVEMENTS 83 2021.501 MOBILIZATION LS $3,950.00 1 0 $0.00 0.5 $1,975.00 REMOVE 84 2104.501 SEWER PIPE L F $13.00 770 437 $5,681.00 637 $8,281.00 (STORM) REMOVE 85 2104.509 DRAINAGE EACH $250.00 4 0 $0.00 3 $750.00 STRUCTURE 86 2105.604 GEOTEXTILE S Y $1.75 100 0 $0.00 49.2 $86.10 FABRIC TYPE IV GRANULAR 87 2451.609 AND D TION TON $0.01 200 0 $0.00 40.78 $0.41 BEDDING 12" RC PIPE 88 2501.511 CULVERT L F $37.00 200 10.5 $388.50 167.5 $6,197.50 CLASS V 24" RC PIPE 89 2501.515 APRON WITH EACH $1,000.00 1 0 $0.00 0 $0.00 TRASH GUARD 36" RC SAFETY 90 2501.567 APRON & EACH $1,838.50 1 0 $0.00 0 $0.00 GRATE DES 3132 i 12" RC PIPE 91 2501.602 APRON W/ EACH $567.00 6 0 $0.00 6 $3,402.00 TRASH GUARD 8" PRECAST 92 2502.501 CONCRETE EACH $2,000.00 2 0 $0.00 2 $4,000.00 HEADWALL 93 2502.521 8" PVC PIPE L F $21.25 40 0 $0.00 48 $1,020.00 DRAIN 18" RC PIPE CITY OF SHOREWOOD 5755 Country Club Road Shorewood, MN 55331-8926 Project No. 02925-16 Pay Voucher No. 7 02925-16 Project Material Status Quantity Amount Line Item Description Units Unit Price Contract This This Quantity Amount Quantity Pay Pay To Date To Date Voucher Voucher 94 2503.541 SEWER DES L F $42.75 160 0 $0.00 0 $0.00 3006 CL III 24" RC PIPE 95 2503.541 SEWER DES L F $47.25 100 0 $0.00 0 $0.00 3006 CL III 36" RC PIPE 96 2503.541 SEWER DES L F $73.50 440 200 $14,700.00 200 $14,700.00 3006 CL III CONST 97 2506.501 DRAINAGE L F $146.25 24 0 $0.00 0 $0.00 STRUCTURE DES 48-4020 CONST 98 2506.501 DRAINAGE STRUCTURE L F $475.00 19 8.2 $3,895.00 8.2 $3,895.00 DES 84-4020 CONST 99 2506.502 DRAINAGE STRUCTURE EACH $499.50 3 0 $0.00 3 $1,498.50 DESIGN G CONST DRAINAGE 100 2506.502 STRUCTURE EACH $397.00 1 0.8 $317.60 0.8 $317.60 DESIGN SPECIAL CASTING 101 2506.516 ASSEMBLY EACH $625.00 5 0 $0.00 0 $0.00 RANDOM 102 2511.501 RIPRAP CLASS C Y $85.00 90 0 $0.00 29.7 $2,524.50 III Totals For Section SCHEDULE C -STORM SEWER $24,982.10 $48,647.61 IMPROVEMENTS: i Change Order 1 -Remove tree and dispose of contaminated material 103 2101.511 CLEARING G& LS $2,640.00 1 0 $0.00 1 $2,640.00 HAUL AND 104 2105.607 DISPOSE OF LS $18,653.25 1 0 $0.00 1 $18,653.25 CONTAMINATED MATERIAL I Totals For Change Order 1 -Remove tree and dispose of $0.00 $21,293.25 contaminated material: Change Order 2 -ADDITIONAL REQUIRED ITEMS STABILIZING j 105 2105.543 AGGREGATE TON $29.70 153.03 0 $0.00 153.03 $4,544.99 TEMPORARY 106 2360.501 BITUMINOUS TON $322.61 8 0 $0.00 8 $2,580.88 WEDGE 107 2564.602 SIGN PANELS SF $48.25 7.5 0 $0.00 0 $0.00 \99622 TYPE SPECIAL EROSION CONTROL CITY OF SHOREWOOD 5755 Country Club Road Shorewood, MN 55331-8926 Project No. 02925-16 Pay Voucher No. 7 02925-16 Project Material Status Quantity Amount Line Item Description Units Unit Price Contract This This Quantity Amount Quantity Pay Pay To Date To Date Voucher Voucher 108 2575.523 BLANKETS CATEGORY 3 S Y $1.38 222 0 $0.00 2142.17 $2,956.19 Totals For Change Order 2-ADDITIONAL REQUIRED ITEMS: $0.00 $10,082.06 Change Order 3 -CONSTRUCTION CHANGES 109 2105.505 MUCK C Y $86.05 115 0 $0.00 115 $9,895.75 EXCAVATION 110 2105.507 SUBGRADE C Y $31.13 136 0 $0.00 136 $4,233.68 EXCAVATION 111 2105.604 GEOTEXTILE S Y $2.63 1273 0 $0.00 1273 $3,347.99 FABRIC TYPE V 112 2563.601 TRAFFIC LS $5,453.69 1 0 $0.00 1 $5,453.69 CONTROL Totals For Change Order 3-CONSTRUCTION CHANGES: $0.00 $22,931.11 Project Totals: $26,119.45 $885,182.38 02925-16 Contract Changes j No. Type Date Explanation Estimated Amount Paid Amount To Date C01 Change Order 11/9/2016 Remove tree and dispose of contaminated material $21,293.25 $21,293.25 CO2 Change Order 1/4/2017 ADDITIONAL REQUIRED ITEMS $7,794.11 $10,082.06 CO3 Change Order 4/19/2017 CONSTRUCTION CHANGES $22,931.11 $22,931.11 Contract Change Totals: $52,018.47 $54,306.42 i I I I i I i I