Professional Services ProposalSeptember 6, 2017
Honorable Mayor and City Council
City ofShorewood
S755 Country Club Road
Shorewood, MINI SS331
477 Temperance Street |St, Paul, Mw55m1|(65/)286-845n
Re: Professional Services Proposal
Feasibility Report and Preliminary Design Services - Riviera Lane, Shorewood Lane, Maple Street
and Mann Lane Street and Utility Improvement Project
VVS8 Project 292S'24O
Dear Honorable Mayor and Council Members:
VVS8X\Associates, Inc. is pleased to provide you with our proposal for the preparation of a Feasibility
Report and Preliminary Design for the Maple Street and Mann Lane Street and Utility Improvement
Project and to update the Riviera Lane and Shorewood Lane Feasibility Report to exclude watermain
improvements. The proposed improvements are for the reconstruction of Maple Street from Lake
Linden Drive to the east Cul-de-sac and Mann Lane from Eureka Road to Seamans Drive in accordance
with the City's revised Capital improvement Plan and Pavement Management Plan.
The condition of the streets along Maple Street and Mann Lane have deteriorated tua point 1nwhich
the City has requested a review of reconstruction options for both the street pavements and utilities
along this corridor. Tn complete this task, the City has requested proposal to assist in reviewing the
condition of both the street and utility systems.
The Riviera Lane and Shorewood Lane Feasibility Report included watermain improvements. |t has since
been decided to exclude watermain improvements from these two streets. The Feasibility Report will
include the Maple Street and Mann Lane improvements and incorporate the updated language and
costs for the Riviera Lane and Shorewood Lane improvements excluding the watermain.
We anticipate the following scope items for the preliminary design and Feasibility Report preparation to
include the following items.
Proposed Services
Our proposed services include preparing a feasibility report, completing a topographic survey, and
providing the appropriate level of preliminary design services to consider street and utility
reconstruction options.
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.00rn
Riviera Lane, Shorewood Lane, Maple Street and Mann Lane Street endUU|hy|mpmvnmentPnojed-
FoouibUhyReport
September 8.2017
Page
Feasibility Report:
• Review the existing conditions of the street pavements, underlying soil conditions, utilities, and
drainage characteristics.
• Review opportunities to improve area drainage.
• Prepare adetailed preliminary opinion of potential construction and indirect project costs with
contingencies but excluding costs of acquisition of land due to the variability in land costs
• Identify potential for funding sources.
• Identify owners of parcels along the proposed improvement corridor that may be impacted by
construction.
• Identify potential need for the acquisition of permanent and temporary easements.
• Identify the necessary permitting agencies and requirements.
• Prepare preliminary project schedule.
• Prepare a Feasibility Report depicting the improvement corridor existing conditions, proposed
improvements, funding requirements and resources, figures depicting the improvements, and
feasibility statements regarding the improvements.
• Update the text and costs for the Riviera Lane and Shorewood Lane improvements based on no
vvatermalnnnd incorporate into this report.
• Review the determination of the necessity, feasibility, and cost-effectiveness of the project.
Preliminary Design: (Maple Street and Mann Lone)
• Complete a topographic survey to identify surficial information/landmarks, existing grades,
prupartyoornors/Unes, public/private utility locations. This information will not constitute an
official boundary survey.
• Provide a preliminary horizontal and vertical alignment for the street reconstruction including
preliminary earthwork calculations.
is Provide preliminary horizontal and vertical alignments for proposed sanitary sewer, watermain,
and storm sewer improvements only asneeded.
• Revise Riviera Lane and Shorewood Lane preliminary designs to exclude watermain
improvements.
• Coordinate location of private utility company facilities within the improvement corridor. This
coordination will include performing utility design locate request to provide quality level D
location for existing utilities.
• Prepare preliminary layout and design based upon public comments, City staff review and
engineering judgment for discussion with the Council. Preliminary layout will bea
representation ofhorizontal and vertical alignments with potential construction limits shown
and potential construction conflicts. Make minor revisions based upon Council direction.
• Conduct a feasibility level drainage design.
Preliminary Design: (Riviera Lane and Shorewood Lane)
=
Update Riviera Lane and Shorewood Lane preliminary designs to exclude watermain
improvements.
Public Involvement and Project Management:
• Project management and coordination/meetings with City staff and the City Council.
• Attendance of two public information meetings with residents to discuss the project and receive
comments regarding the design approach and proposed design. The goal isto have an
informational meeting before beginning preliminary design and one meeting prior to Feasibility
Report presentation to the Council.
• Attend one Public Hearing and provide a brief presentation on the Feasibility Report.
Riviera Lane, Shorewood Lane, Maple Street and Mann Lane Street and Utility Improvement Project —
Feasibility Report
September 0.2017
Page
Proposed Fee
We are proposing to complete the work on a cost-reimbursable basis in accordance with our current fee
schedule.
Estimated fees for:
Preliminary Design/Feasibility Report Preparation/Survey $25700
Geotechnica|Report $S,DDD
Sanitary Sewer Televising $ 2,000
Total Fee Amount $33,700
Thank you for this opportunity to provide professional consulting services to the City of Shorewood. If this
proposal is acceptable, please execute the signature block below and return ua our authorization tu
proceed.
Please do not hesitate to contact me at 651-286-8468 if you have any questions.
Sincerely,
WSB & Associates, Inc
Paul HonnbKP.E
Senior Associate
PKO9UGALFOR:
oj� -%44L
AlysnnFeuske P.E.
City Engineer
Feasibility Report and Preliminary Design Senvines — RivieroLone,JhorewoodLome,Mmple Street and
Mann Lone Street and Utility Improvement Project. - '
ACCEPTED BY:
Na
Title %
Date
A Estimate of Project Fees
WSA9 Ferisibffity Report - Rivient Low, Shorewood Lane, Maple Sh'"tand Mann Lowe Stroct and Utility Improverilent Project
City U Sh—"..d, MN
Estimated I No's
—pd
—J"
""w—,
—J-
OM
Pdnra D'—p—
"I
Tl'
KK
t. Nlfl. lff-Mvl h—'
17S
2,283.00
4
15
1
49
6,6fU.tl4
. ......... . —
— ----- —
............
f
. ..
4
MM
2
2s
t9
43
38
Re t AE'l
4. LOS W 1
47Q�
ITOTALPROJECf FEE AMOUNT
0'
�l