HomeMy WebLinkAbout01-31-18 CC Reg Mtg Agenda (rescheduled from 01-22-18)CITY OF SHOREWOOD
CITY COUNCIL REGULAR MEETING
WEDNESDAY, JANUARY 31, 2018
(Rescheduled from JANUARY 22, 2018)
AGENDA
1. CONVENE CITY COUNCIL MEETING
A. Roll Call
B. Review Agenda
5755 COUNTRY CLUB ROAD
COUNCIL CHAMBERS
6:00 P.M.
Mayor Zerby
Johnson
Labadie
Siakel
Sundberg
Attachments
2. CONSENT AGENDA — Motion to approve items on the Consent Agenda & Adopt
Resolutions Therein:
A. City Council Work Session Minutes of January 8, 2018 Minutes
B. City Council Regular Meeting Minutes of January 8, 2018 Minutes
C. Approval of the Verified Claims List Claims List
D. Appointment of Administrative Hearing Officers Clerk Memo
Resolution
E. Approval of Utility Assessment City Administrator Memo
3. MATTERS FROM THE FLOOR
(No Council Action will be taken)
4. PUBLIC HEARING
5. REPORTS AND PRESENTATIONS
A. Commission Service Recognition Awards:
Robert Bean, Planning Commission
Janet Sylvester, Planning Commission
6. PARKS
7. PLANNING
A. Report by Chair Maddy on January 16, 2018 Draft Minutes
Planning Commission Meeting
CITY COUNCIL REGULAR MEETING AGENDA — January 31, 2018
Page 2
B. Amendment of Zoning and Subdivision Application Requirements; Planning Director Memo
and Land Use Fee Ordinance Ordinance
Resolution for Summary Publication
8. ENGINEERING /PUBLIC WORKS
A. Receive Feasibility report for reconstruction on streets
B. Agreement for Jet -Vac purchase
C. Shorewood Lane Ravine Update
9. GENERAL /NEW BUSINESS
A. Amendments to City Code 104.03 Administrative Enforcement
B. Right of Way Ordinance
C. 2018 Updated Fee Schedule
D. Appointment of Planning and Parks Commission Members
10. STAFF AND COUNCIL REPORTS
A. Administration and Staff
B. Mayor and City Council
11. ADJOURN
Engineer Memo
Resolution
City Administrator Memo
Engineer Memo
Planning Director Memo
Ordinance
Resolution for Summary Publication
City Administrator Memo
Ordinance
Resolution for Summary Publication
Clerk Memo
Resolution
City Administrator Memo
Resolutions
CITY OF SHOREWOOD
CITY COUNCIL WORK SESSION
MONDAY, JANUARY 8, 2018
MINUTES
1. CONVENE CITY COUNCIL WORK SESSION
Mayor Zerby called the meeting to order at 6:00 P.M.
A. Roll Call
Present. Mayor Zerby; Councilmembers Johnson,
Administrator Lerud; Planning Director Dar!
Attorney Keane, and Engineer Fauske
Absent. Council member Sundberg
B. Review Agenda
Johnson moved, Labadie seconded, appr
2. RIGHT OF WAY ORDINANCE
Administrator Lerud said following approval of the sr
Legislative session, the city was going to be required t
statutory requirements; Upon reviewing the code, it b
review and updating. He said that Brown, Keane, Fa
June and the draft ordinance before vod is a result of th
Council member Sun4
Lerud said the update
1
2.
3.
a asp
2a
5755 COUNTRY CLUB ROAD
COUNCIL CHAMBERS
6:00 P.M.
iakel, and Sundberg; City
of Public Works Brown; City
ion passed 4/0.
[ll cell wireless legislation passed during the last
update its right of way ordinance to reflect those
,ame obvious that the entire code was in need of
;kc, "Darling and he met on a regular basis since
;e discussions.
primary principals:
Rights-of-way and other public ground owned by the City of Shorewood are an asset of the city
and must be proactively 'managed on that basis.
Controlling,access and establishing rules that can be enforced for the use of the rights -of -way by
utilities and other.users.'
3. Establishing regulations for the preservation and restoration of the rights -of -way by utility and
other uses is central to protecting the city's investment.
Lerud said that he would like to go through the ordinance page by page at this meeting, and answer
questions the council has as well as hearing suggested changes. He said staff would then go back and
make changes to the draft, and present it at the January 22 council meeting for consideration.
Through the discussion about the draft ordinance, the city council raised matters and questions that need
to be resolved in the final draft: Does the city have the authority to charge additional fees to right of way
users who regularly use the rights of way but do not have a franchise? Could solar panels be required to
power the small cell wireless equipment? Can the city require screening or other "disguising" of small
CITY OF SHOREWOOD WORK SESSION MEETING MINUTES
October 9, 2017
Page 2 of 2
cell wireless equipment? Is there a way that permit information can be made available to others or
publicly made available?
The discussion of Item 2 concluded at 6:50 P.M.
Mayor Zerby announced that Council was going to address Item 3 on the agenda in the large conference
room.
3.
PLANNING COMMISSION INTERVIEW
Council interviewed Todd Eggenberger, 6105 Chest
Planning Commission for a three -year term.
4. ADJOURN
Siakel moved, Labadie seconded, Adjourning th
7:00 P.M. Motion passed 510.
RESPECTFULLY SUBMITTED,
Greg Lerud, City Administrator
ATTEST:
Sandie Thone, City
it to the
ssion at
2B
CITY OF SHOREWOOD 5755 COUNTRY CLUB ROAD
CITY COUNCIL REGULAR MEETING COUNCIL CHAMBERS
MONDAY, JANUARY 8, 2018 7:00 P.M.
MINUTES
1. CONVENE CITY COUNCIL REGULAR MEETING
Mayor Zerby called the meeting to order at 7:03 P.M.
A. Roll Call
Present. Mayor Zerby; Councilmembers Johnson, Labadie, Siaket, and Sundberg; Attorney
Keane; City Administrator Lerud; Planning Director Darling; Director of Public Works
Brown; and, City Engineer Fauske
Absent: None.
B. Review Agenda
Labadie moved, Johnson seconded, approving the agenda. Motion passed 510.
2. CONSENT AGENDA
Mayor Zerby reviewed the items on the Consent Agenda.,
Siakel moved, Labadie seconded, Approving the Motions Contained on the Consent Agenda.
A. Approving the City Council Work Session Meeting Minutes of December 11, 2017
B. Approving the City Council Regular Meeting Minutes of December 11, 2017
C: Approval of the Verified Claims List
D. , - Setting the 2018 City Council Regular Meeting Schedule
E. Approval of the 2018 Pay Equity Report
F. Accepting Donations for Arctic Fever
G. Accepting organics Recycling Grant from Hennepin County
H. Approval of Seasonal Hires: Ice Rink Attendants
L Annual Review out of State Travel policy
J. Approval of Change Order 3 for Badger Park, Phase 2 Improvements, City Project
17 -09
Motion passed 510.
CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES
January 8, 2018
Page 2 of 5
3. MATTERS FROM THE FLOOR
No one was present.
4. PUBLIC HEARING
There were no public hearings.
5. REPORTS AND PRESENTATIONS
There were no reports or presentations.
6. PARKS
Parks Chairman Justin Mangold reported that the Planning 'Commission has beef
reviewing options for the Badger Park play ground area. He said the Commission
number of options and have coalesced around a pirate ship Chemed main structure.
7. PLANNING
There were no planning items on the
8. ENGINEERING /PUBLIC WORKS
A. Mill Street Speed Issue update
their time
ed a large
Public Works Director said there has been additional speed information collected along Mill Street. He
said the city had initial speed sampling done prior to the speed awareness displays that were installed on
Mill Street. The results of that sampling showed that the 85"' percentile was 36 miles per hour for both
north and south bound traffic. Following the installation of the speed awareness displays, pursuant to
council direction, additional speed sampling was done by SLMPD and Hennepin County. He said the
results ofthat study showed that the 85"'percentile for the northbound and southbound were 35 mph and
37 mph xespectively. Brown said that a review of the data indicates that the displays are having a very
limited imoact.on traffic.
Brown said that speed at this level, according to the city's speed management plan, indicates that physical
changes to the driving area are the most effective in reducing speed. One thing he said was not included
in his memo is that Hennepin County plans to stripe those lanes to 11 feet which will create a designated
bike area at grade. Brown said that even thought the data showed little impact from the speed awareness
displays in reducing speed, the city obtained an estimate of $4,000 to move the existing sign and
foundation an install it farther north. He said he wanted the council to have information for all options.
Mayor Zerby said he thought moving the southbound facing sign farther north along Mill Street would
lower speeds in that area.
Zerby moved, Sundberg seconded, approving relocating the southbound speed awareness display
farther north along Mill Street, motion passed 510.
CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES
January 8, 2018
Page 3 of 5
9. GENERAL /NEW BUSINESS
A. Annual Appointments and Designations for the City of Shorewood for 2018
Siakel suggested that the appointments and designations remain unchanged from 2017. After a brief
discussion,
Siakel moved, Labadie seconded, adopting RESOLUTION NO. 18 -005,
Certain Offices and Positions within the City of Shorewood for the Year
3
4
5
The following persons are appointed to the following
Council Representatives to:
Park Commission Liaison:
January — June 2018: Jennifer
July — December 2018: Debbie
Planning Commission Liaison:
January — June 2018: Kristine
July — December 24}18: Patrick
Metro Cities (AMM) and League
Alternate Metro Cities (AMM &
Lake Minnetonka Communicatio
Appointments to
(LMC): Kristine Sundberg
s Commission: Scott Zerby
tunications Commission: Patrick Johnson
Council: Jennifer Labadie
ke Minnetonka Police Department: Mayor
na Committee South Lake Minnetonka Police
ict Board Member: Kristine Sundberg
Fire District Board Member: Debbie Siakel
tee: None
,e: Debbie Siakel and Kristine Sundberg
eed Inspector: Joe Lu og wski
That the following other appointments are made:
a) City Attorney: Timothy J. Keane, Kutak Rock LLP
b) City Prosecutor: Ken Potts
C) Emergency Preparedness Director: per Police Board Decision
Official Depositories: Alerus Bank, US Bank, Wells Fargo, 4M Fund & other
Depositories as necessary
Official Newspaper: Sun Sailor. Notices may also be published in the Laker.
That the Blanket Bond (Official Bonds) is approved.
That such appointments shall take effect on the date hereof and shall continue for the remainder of the
year or until such time as a successor is appointed by the City Council.
CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES
January 8, 2018
Page 4 of 5
Motion passed 510.
10. STAFF AND COUNCIL REPORTS
A. Administrator and Staff
City Administrator Lerud said that the City received a certification from the GFOA for excellence in
financial reporting for 2017. He said the city has earned this certification for quite a few years
consecutively and Joe Rigdon and Michelle Nguyen deserve the credit for the recognition.
Lerud said that the community ribbon cutting ceremony for Shorewood Landings is this Wednesday from
3:30 to 4:30. For those who were not able to attend the tour last month, this is a good opportunity to see
this first class facility.
Engineer Fauske said that staff has started working with the Minnehaha Creek Watershed District
(MCWD) on a cooperative project to address surface and storm water issues in an area in roughly the
center third of Shorewood. She presented a map showing the area, She said this is consistent with the
areas discussed during a work session last year that identified needed improvements. Fauske said that
city staff has had initial discussions with MCWD staff about a cooperative project in this area.
Renae Clark, Planner and Project Manager for the MCWD said the watershed is looking forward to
working with the city on this project. To that end; she said she is working on a Memorandum of
Understanding between the City and MCWD that will outline the expectations of each group. Fauske
said that she will look forward to sharing additional information with the council in future meetings as
well as bringing back the MOU for council consideration.
Council member Lab,adi'
status and timeline of this
but she would keep the c
timeline, she said the city,,,
Fauske said, as the council
Whitley Mott's property at
the information she needed
historical data; the current i
Mr. Mott said he appr
receive the council's
forward to hearing the
d she thought it was important to let residents in this area know about the
aject. Fauske replied that it was very early in the process to set a schedule,
iciVinfornred as we go. When we get the point where we can publish a
ild'make sure residents are aware.
1 at the last meeting, she has been researching the surface water issue at
Yellowstone Trail. She said that she anticipated being able to have all
February 26 council meeting, and at that meeting she could present the
nd potential solutions for the council to consider.
d Ms Fauske's attention to this matter and wanted to make sure that this issue
on as well and that the process not bog down into inaction. He said he looks
mation on February 26.
Administrator Lerud presented the monthly financial report. There were no questions.
Director Brown said that Arctic Fever is this weekend, and even though the lack of snow has forced the
cancellation of the snow sculpture contest, there are many other activities going on the entire weekend.
B. Mayor and City Council
There were no comments.
CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES
January 8, 2018
Page 5 of 5
11. ADJOURN
Labadie moved, Johnson seconded, Adjourning the January 8, 2018 Regular City Council Meeting
at 7:44 P.M. Motion passed 510.
RESPECTFULLY SUBMITTED,
Greg Lerud, City Administrator
ATTEST:
Sandie Thone, City Clerk
® #2C
MEETING TYPE
City of Shorewood nib Meeting Item Regular Meeting
Title / Subject: Verified Claims
Meeting Date: January 22, 2018
Prepared by: Michelle Nguyen, Senior Accountant
Greg Lerud, City Administrator
Joe Rigdon, Interim Finance Director
Attachments: Claims lists
Policy Consideration:
Should the attached claims against the City of Shorewood be paid?
Background:
Claims for council authorization.
64238— 64262 & ACH 609,308.63
Total Claims $609,308.63
We have also included a payroll summary for the payroll period ending January 8, 2018.
Financial or Budget Considerations:
These expenditures are reasonable and necessary to provide services to our residents and funds are
budgeted and available for these purposes.
Options:
The City Council is may accept the staff recommendation to pay these claims or may reject any
expenditure it deems not in the best interest of the city.
Recommendation / Action Requested:
Staff recommends approval of the claims list as presented.
Next Steps and Timelines:
Checks will be distributed following approval.
Account Number Debit Amount Credit Amount Description
FUND 101
General Fund
101 -00- 1010 -0000
0.00
75,126.45
CASH AND INVESTMENTS
101 -13- 4101 -0000
10,891.31
0.00
FULL -TIME REGULAR
101 -13- 4103 -0000
121.12
0.00
PART -TIME
101 -13- 4121 -0000
825.93
0.00
PERA CONTRIB - CITY SHARE
101 -13 -4122 -0000
880.99
0.00
FICA CONTRIB - CITY SHARE
101 -13- 4131 -0000
8,261.85
0.00
EMPLOYEE INSURANCE - CITY
101 -13- 4151 -0000
74.83
0.00
WORKERS COMPENSATION
101 -15- 4101 -0000
1,851.94
0.00
FULL -TIME REGULAR
101 -15- 4121 -0000
138.91
0.00
PERA CONTRIB - CITY SHARE
101 -15 -4122 -0000
144.17
0.00
FICA CONTRIB - CITY SHARE
101 -15- 4131 -0000
1,915.84
0.00
EMPLOYEE INSURANCE - CITY
101 -15- 4151 -0000
7.48
0.00
WORKERS COMPENSATION
101 -18- 4101 -0000
5,837.36
0.00
FULL -TIME REGULAR
101 -18- 4121 -0000
437.82
0.00
PERA CONTRIB - CITY SHARE
101 -18 -4122 -0000
458.27
0.00
FICA CONTRIB - CITY SHARE
101 -18- 4131 -0000
5,693.28
0.00
EMPLOYEE INSURANCE - CITY
101 -18- 4151 -0000
15.49
0.00
WORKERS COMPENSATION
101 -24- 4101 -0000
4,120.16
0.00
FULL-TIME REGULAR
101 -24- 4121 -0000
309.01
0.00
PERA CONTRIB - CITY SHARE
101 -24 -4122 -0000
242.26
0.00
FICA CONTRIB - CITY SHARE
101 -24- 4131 -0000
540.00
0.00
EMPLOYEE INSURANCE - CITY
101 -24- 4151 -0000
21.51
0.00
WORKERS COMPENSATION
101 -32 -4101 -0000
9,981.95
0.00
FULL -TIME REGULAR
101 -32 -4105 -0000
737.88
0.00
STREET PAGER PAY
101 -32 -4121 -0000
803.97
0.00
PERA CONTRIB - CITY SHARE
101 -32 -4122 -0000
780.91
0.00
FICA CONTRIB - CITY SHARE
101 -32 -4131 -0000
2,658.08
0.00
EMPLOYEE INSURANCE - CITY
101 -32 -4151 -0000
453.98
0.00
WORKERS COMPENSATION
101 -33- 4101 -0000
3,429.74
0.00
FULL -TIME REGULAR
101 -33 -4102 -0000
134.27
0.00
OVERTIME
101 -33- 4121 -0000
267.30
0.00
PERA CONTRIB - CITY SHARE
101 -33 -4122 -0000
199.19
0.00
FICA CONTRIB - CITY SHARE
101 -33- 4151 -0000
107.92
0.00
WORKERS COMPENSATION
101 -52 -4101 -0000
5,140.39
0.00
FULL-TIME REGULAR
PR - G/L Distribution Report (01/08/2018 - 2:44 PM) Page 1
Account Number Debit Amount Credit Amount Description
101 -52 -4121 -0000
385.53
0.00
PERA CONTRIB - CITY SHARE
101 -52 -4122 -0000
463.59
0.00
FICA CONTRIB - CITY SHARE
101 -52 -4131 -0000
5,045.12
0.00
EMPLOYEE INSURANCE - CITY
101 -52 -4151 -0000
236.75
0.00
WORKERS COMPENSATION
101 -53- 4101 -0000
1,262.71
0.00
FULL -TIME REGULAR
101 -53- 4121 -0000
94.70
0.00
PERA CONTRIB - CITY SHARE
101 -53 -4122 -0000
97.83
0.00
FICA CONTRIB - CITY SHARE
101 -53- 4131 -0000
22.69
0.00
EMPLOYEE INSURANCE - CITY
101 -53- 4151 -0000
32.42
0.00
WORKERS COMPENSATION
FUND Total:
75,126.45
75,126.45
FUND 201
Southshore Center
201 -00- 1010 -0000
0.00
506.93
CASH AND INVESTMENTS
201 -00- 4101 -0000
430.95
0.00
FULL -TIME REGULAR
201 -00- 4121 -0000
32.32
0.00
PERA CONTRIB - CITY SHARE
201 -00 -4122 -0000
32.80
0.00
FICA CONTRIB - CITY SHARE
201 -00- 4151 -0000
10.86
0.00
WORKERS COMPENSATION
FUND Total:
506.93
506.93
FUND 601
Water Utility
601 -00- 1010 -0000
0.00
5,329.72
CASH AND INVESTMENTS
601 -00- 4101 -0000
3,278.52
0.00
FULL -TIME REGULAR
601 -00 -4102 -0000
141.66
0.00
OVERTIME
601 -00- 4105 -0000
368.94
0.00
WATER PAGER PAY
601 -00- 4121 -0000
284.17
0.00
PERA CONTRIB - CITY SHARE
601 -00 -4122 -0000
272.31
0.00
FICA CONTRIB - CITY SHARE
601 -00- 4131 -0000
867.69
0.00
EMPLOYEE INSURANCE - CITY
601 -00- 4151 -0000
116.43
0.00
WORKERS COMPENSATION
FUND Total:
5,329.72
5,329.72
FUND 611
Sanitary Sewer Utility
611 -00- 1010 -0000
0.00
4,424.12
CASH AND INVESTMENTS
611 -00- 4101 -0000
2,365.03
0.00
FULL -TIME REGULAR
611 -00 -4102 -0000
278.07
0.00
OVERTIME
611 -00- 4105 -0000
368.94
0.00
SEWER PAGER PAY
611 -00- 4121 -0000
225.93
0.00
PERA CONTRIB - CITY SHARE
611 -00 -4122 -0000
221.35
0.00
FICA CONTRIB - CITY SHARE
611 -00- 4131 -0000
867.69
0.00
EMPLOYEE INSURANCE - CITY
611 -00- 4151 -0000
97.11
0.00
WORKERS COMPENSATION
FUND Total:
4,424.12
4,424.12
PR - G/L Distribution Report (01/08/2018 - 2:44 PM) Page 2
Account Number Debit Amount Credit Amount Description
FUND 621
Recycling Utility
621 -00- 1010 -0000
0.00
374.39
CASH AND INVESTMENTS
621 -00- 4101 -0000
258.75
0.00
FULL -TIME REGULAR
621 -00- 4121 -0000
19.40
0.00
PERA CONTRIB - CITY SHARE
621 -00 -4122 -0000
19.67
0.00
FICA CONTRIB - CITY SHARE
621 -00- 4131 -0000
75.60
0.00
EMPLOYEE INSURANCE - CITY
621 -00- 4151 -0000
0.97
0.00
WORKERS COMPENSATION
FUND Total:
374.39
374.39
FUND 631
Storm Water Utility
631 -00- 1010 -0000
0.00
742.23
CASH AND INVESTMENTS
631 -00- 4101 -0000
378.20
0.00
FULL -TIME REGULAR
631 -00- 4121 -0000
28.35
0.00
PERA CONTRIB - CITY SHARE
631 -00 -4122 -0000
29.99
0.00
FICA CONTRIB - CITY SHARE
631 -00- 4131 -0000
300.70
0.00
EMPLOYEE INSURANCE - CITY
631 -00- 4151 -0000
4.99
0.00
WORKERS COMPENSATION
FUND Total:
742.23
742.23
FUND 700
Payroll Clearing Fund
700 -00- 1010 -0000
86,503.84
0.00
CASH AND INVESTMENTS
700 -00- 2170 -0000
0.00
33,538.79
GROSS PAYROLL CLEARING
700 -00- 2171 -0000
0.00
7,658.82
HEALTH INSURANCE PAYABLE
700 -00 -2172 -0000
0.00
5,247.38
FEDERAL WITHHOLDING PAYABLE
700 -00- 2173 -0000
0.00
2,217.11
STATE WITHHOLDING PAYABLE
700 -00- 2174 -0000
0.00
7,686.66
FICA/MEDICARE TAX PAYABLE
700 -00- 2175 -0000
0.00
7,192.89
PERA WITHHOLDING PAYABLE
700 -00- 2176 -0000
0.00
1,701.76
DEFERRED COMPENSATION
700 -00- 2177 -0000
0.00
1,180.74
WORKERS COMPENSATION
700 -00- 2180 -0000
0.00
567.84
LIFE INSURANCE
700 -00 -2182 -0000
0.00
335.44
UNION DUES
700 -00- 2183 -0000
0.00
19,176.41
HEALTH SAVINGS ACCOUNT
FUND Total:
86,503.84
86,503.84
Report Total: 173,007.68 173,007.68
PR - G/L Distribution Report (01/08/2018 - 2:44 PM) Page 3
Accounts Payable
To Be Paid Proof List
User: mnguyen
Printed: 01/08/2018 - 3:25PM
Batch: 00009.01.2018 - Dec -paid in Jan
Invoice Number Invoice Date Amount Quantity Payment Date Task Label
Account Number Description
CENTERPOINT ENERGY
136
12 -29 -2017 12/29/2017
601 -00- 4394 -0000 UTILITIES - AMESBURY WE
12 -29 -2017 12/29/2017
601 -00- 4396 -0000 UTILITIES - BOULDER BRID
12 -29 -2017 12/29/2017
101 -32- 4380 -0000 UTILITY SERVICES
12 -29 -2017 12/29/2017
101 -52- 4380 -0000 UTILITY SERVICES
12 -29 -2017 12/29/2017
101 -19- 4380 -0000 UTILITY SERVICES
12 -29 -2017 Total:
CENTERPOINT ENERGY
CITY OF TONKA BAY
149
4th Qtr- 2017 -WA 12/31/2017
601 -00- 4260 -0000 WATER PURCHASES - TONK
4th Qtr- 2017 -WA 12/31/2017
611 -00- 4400 -0000 CONTRACTUAL SERVICES
4th Qtr- 2017 -WA Total:
CITY OF TONKA BAY To
Close PO Line #
83.52
0.00
01/08/2018
False
20405 Knighsbridge Rd
184.10
0.00
01/08/2018
False
28125 Boulder Bridge
693.11
0.00
01/08/2018
False
24200 Smithtown Rd
152.72
0.00
01/08/2018
False
5745 Ctry Club & 25200 Hwy 7
246.71
0.00
01/08/2018
False
5755 Country Club Rd
1,360.16
1,360.16
835.84
0.00
01/08/2018
False
Quarterly Water Service
397.50
0.00
01/08/2018
False
Quarterly Sewer Service
1,233.34
1,233.34
AP -To Be Paid Proof List (01/08/2018 - 3:25 PM) Page 1
0
0
0
0
0
0
0
Invoice Number Invoice Date Amount Quantity Payment Date Task Label
Account Number Description
HAWKINS, INC.
211
4205591 -RI 12/29/2017 250.00
601 -00- 4245 -0000 GENERAL SUPPLIES
4205591 -RI Total: 250.00
HAWKINS, INC. Total: 250.00
HENNEPIN COUNTY INFORMATION TECHNOLOGY DEPARTMET
215
1000102877 12/31/2017 114.36
101 -32- 4321 -0000 COMMUNICATIONS - VOIC
1000102877 Total: 114.36
HENNEPIN COUNTY IN 114.36
INCLINE EXTERIORS
222
12 -12 -2017 12/12/2017 42,916.00
201 -00- 4223 -0000 MAINTENANCE OF BUILDI
12 -12 -2017 Total: 42,916.00
INCLINE EXTERIORS To 42,916.00
LEAGUE OF MINNESOTA CITIES INSURANCE TRUST (0049)
13
CMC39659 -2017 12/31/2017 2,500.00
601 -00- 4360 -0000 INSURANCE
CMC39659 -2017 Total: 2,500.00
LEAGUE OF MINNESOT 2,500.00
0.00 01/08/2018
Chlorine
0.00 01/08/2018
Monthly Radio MESB
0.00 01/08/2018
Roof & Gutter Replacement
0.00 01/08/2018
Flood Damage Claimant's Home -Nate Onken - Claim #3820
Type PO # Close PO Line #
Reference
False
False
False
False
AP -To Be Paid Proof List (01/08/2018 - 3:25 PM) Page 2
0
0
0
0
Invoice Number Invoice Date Amount Quantity Payment Date Task Label Type PO #
Account Number Description Reference
Close PO Line #
OPPIDAN
889
Escrow -2017 12/13/2017
1,000.00
0.00
01/08/2018
False 0
880 -00- 2200 -0000 ESCROW DEPOSITS PAYAB
Escrow Application Refund
Escrow -2017 12/13/2017
10,000.00
0.00
01/08/2018
False 0
880 -00- 2200 -0000 ESCROW DEPOSITS PAYAB
Escrow TIE Refund
Escrow -2017 12/13/2017
118,238.50
0.00
01/08/2018
False 0
880 -00- 2200 -0000 ESCROW DEPOSITS PAYAB
Escrow Landscaping Refund
Escrow -2017 12/13/2017
22,842.00
0.00
01/08/2018
False 0
450 -00- 4400 -0019 OPPIDAN SENIOR HOUSING
Water Feasiblility & Design Refund
Escrow -2017 Total:
152,080.50
OPPIDAN Total:
152,080.50
WSB AND ASSOCIATES INC
410
0- 001608 - 080 -21 11/30/2017
125.00
0.00
01/08/2018
False 0
631 -00- 4303 -0000 ENGINEERING FEES
Freeman Park Drainage Analysis
0- 001608 - 080 -21 Total:
125.00
0- 002092 - 710 -33 11/30/2017
88.00
0.00
01/08/2018
False 0
631 -00- 4302 -0009 MS4 SERVICES
MS4 Svcs
0- 002092 - 710 -33 Total:
88.00
0- 002925 - 052 -11 11/30/2017
4,000.00
0.00
01/08/2018
False 0
101 -31- 4400 -0000 CONTRACTUAL SERVICES
Gen Eng Svc
0- 002925 - 052 -11 Total:
4,000.00
0- 002925 - 150 -19 11/30/2017
152.00
0.00
01/08/2018
False 0
450 -00- 4400 -0019 OPPIDAN SENIOR HOUSING
Oppidan Senior Living Dvlmt
0- 002925 - 150 -19 Total:
152.00
0- 002925 - 160 -19 11/30/2017
3,798.50
0.00
01/08/2018
False 0
470 -00- 4303 -0000 ENGINEERING FEES
Water Main- TIF- Oppidan
AP -To Be Paid Proof List (01/08/2018 - 3:25 PM) Page 3
Invoice Number Invoice Date Amount Quantity Payment Date Task Label
Account Number Description
Type PO # Close PO Line #
Reference
0- 002925 - 160 -19 Total:
3,798.50
0- 002925 - 180 -15 11/30/2017
183.75
0.00
01/08/2018
False 0
631 -00- 4303 -0000 ENGINEERING FEES
Public Work Ravine Restoration
0-002925-180-15 Total:
183.75
0- 002925 - 240 -10 11/30/2017
9,615.75
0.00
01/08/2018
False 0
404 -00- 4680 -0020 RIVIERA LAND & SHOREW
Riviera Land & Shorewood Ln St
0- 002925 - 240 -10 Total:
9,615.75
0- 002925 - 260 -11 11/30/2017
202.25
0.00
01/08/2018
False 0
404 -00- 4620 -0007 PAVEMENT MARKING
Pavement Marking
0- 002925 - 260 -11 Total:
202.25
0- 002925 - 270 -11 11/30/2017
3,320.25
0.00
01/08/2018
False 0
101 -31- 4303 -0000 ENGINEERING FEES
Misc. Engineering Support
0- 002925 - 270 -11 Total:
3,320.25
0- 002925 - 290 -10 11/30/2017
268.25
0.00
01/08/2018
False 0
404 -00- 4620 -0006 SEALCOAT PROJECT
Sealcoat Project
0- 002925 - 290 -10 Total:
268.25
0- 002925 -300 -9 11/30/2017
33,345.00
0.00
01/08/2018
False 0
402 -00- 4680 -0000 OTHER IMPROVEMENTS
Badger Park Phase 2
0- 002925 -300 -9 Total:
33,345.00
0- 002925 -350 -7 11/30/2017
76.00
0.00
01/08/2018
False 0
101 -00- 3414 -0000 PASS -THRU CHARGES
Starbuck -TH 7 Vine Hill Rd
0- 002925 -350 -7 Total:
76.00
0- 002925 -360 -6 11/30/2017
1,751.75
0.00
01/08/2018
False 0
101 -31- 4303 -0000 ENGINEERING FEES
Comp Plan Eng. Support -2040
0- 002925 -360 -6 Total:
1,751.75
AP -To Be Paid Proof List (01/08/2018 - 3:25 PM) Page 4
Invoice Number Invoice Date Amount Quantity Payment Date Task Label Type PO #
Account Number Description Reference
Close PO Line #
0- 002925 -370 -8 11/30/2017
3,053.25
0.00
01/08/2018
False
450 -00- 4302 -0016 MINNETONKA COUNTRY C
Minnetonka Country Club 2nd Ad
0- 002925 -370 -8 Total:
3,053.25
0- 002925 -400 -7 11/30/2017
4,148.50
0.00
01/08/2018
False
404 -00- 4680 -0027 STREET RECLAMATION IM
Street Reclamation Improvement
0- 002925 -400 -7 Total:
4,148.50
0- 003539 -000 -8 11/30/2017
42.50
0.00
01/08/2018
False
601 -00- 4303 -0000 ENGINEERING FEES
Well No. 5 Rehab
0- 003539 -000 -8 Total:
42.50
R- 010868 -000 -3 11/30/2017
397.00
0.00
01/08/2018
False
101 -31- 4303 -0000 ENGINEERING FEES
LRIP Grant Ctry Club /Yellow /Lk
R- 010868 -000 -3 Total:
397.00
R- 010930 -000 -2 11/30/2017
10,224.00
0.00
01/08/2018
False
631 -00- 4303 -0000 ENGINEERING FEES
Shwd Ln Ravine Stabilization
R- 010930 -000 -2 Total:
10,224.00
R- 011017 -000 -2 11/30/2017
2,910.00
0.00
01/08/2018
False
611 -00- 4303 -0000 ENGINEERING FEES
Sanitary Sewer Lining
R- 011017 -000 -2 Total:
2,910.00
WSB AND ASSOCIATES
77,701.75
Report Total: 278,156.11
AP -To Be Paid Proof List (01/08/2018 - 3:25 PM) Page 5
0
0
0
0
0
0
Accounts Payable
Computer Check Proof List by Vendor
User: mnguyen
Printed: 01/08/2018 - 3:49PM
Batch: 00006.01.2018 - PR -01 -08 -2018
Invoice No
Description
Amount
Payment Date
Acct Number
Reference
Vendor: 12
AFSCME MN COUNCIL 5 - UNION DUES
Check Sequence: 1
ACH Enabled: True
January -2018
PR Batch 00001.01.2018 Union Dues
335.44
01/08/2018
700 -00- 2182 -0000
PR Batch 00001.01.2018 Union Dues
Check Total:
335.44
Vendor: 419
COMMUNITY BANK CHASKA
Check Sequence: 2
ACH Enabled: False
2018 -HSA- Bauman
2018 -HSA - Brett & Amanada Baumann
660.60
01/08/2018
700 -00- 2183 -0000
PR Batch 00001.01.2018 HSA - COMMUN
Check Total:
660.60
Vendor: 5
EFTPS - FEDERAL W/H
Check Sequence: 3
ACH Enabled: True
PR -01 -08 -2018
PR Batch 00001.01.2018 Federal Income Tax
5,247.38
01/08/2018
700 -00- 2172 -0000
PR Batch 00001.01.2018 Federal Income I
PR -01 -08 -2018
PR Batch 00001.01.2018 FICA Employee Portio
3,114.85
01/08/2018
700 -00- 2174 -0000
PR Batch 00001.01.2018 FICA Employee _
PR -01 -08 -2018
PR Batch 00001.01.2018 FICA Employer Portioj
3,114.85
01/08/2018
700 -00- 2174 -0000
PR Batch 00001.01.2018 FICA Employer ]
PR -01 -08 -2018
PR Batch 00001.01.2018 Medicare Employee Pc
728.48
01/08/2018
700 -00- 2174 -0000
PR Batch 00001.01.2018 Medicare Emplo,.
PR -01 -08 -2018
PR Batch 00001.01.2018 Medicare Employer Po
728.48
01/08/2018
700 -00- 2174 -0000
PR Batch 00001.01.2018 Medicare Emplo,.
Check Total:
12,934.04
Vendor: 2
ICMA RETIREMENT TRUST - 302131 -457
Check Sequence: 4
ACH Enabled: False
PR -01 -08 -2018
PR Batch 00001.01.2018 Deferred Comp Flat Ai
1,550.00
01/08/2018
700 -00- 2176 -0000
PR Batch 00001.01.2018 Deferred Comp I
PR -01 -08 -2018
PR Batch 00001.01.2018 Deferred Comp Percen
151.76
01/08/2018
700 -00- 2176 -0000
PR Batch 00001.01.2018 Deferred Comp I
Check Total:
1,701.76
Vendor: 11
MINNESOTA DEPARTMENT OF REVENUE
Check Sequence: 5
ACH Enabled: True
PR -01 -08 -2018
PR Batch 00001.01.2018 State Income Tax
2,217.11
01/08/2018
700 -00- 2173 -0000
PR Batch 00001.01.2018 State Income Tax
Check Total:
2,217.11
Vendor: 7
MINNESOTA LIFE
Check Sequence: 6
ACH Enabled: True
January -2018
PR Batch 00001.01.2018 Life Insurance
551.84
01/08/2018
700 -00- 2180 -0000
PR Batch 00001.01.2018 Life Insurance
Check Total: 551.84
AP- Computer Check Proof List by Vendor (01/08/2018 - 3:49 PM) Page 1
Invoice No Description Amount Payment Date Acct Number Reference
Vendor: 10
NCPERS MINNESOTA
Check Sequence: 7
January -2018
PR Batch 00001.01.2018 PERA Life
16.00
01/08/2018
700 -00- 2180 -0000
Check Total:
16.00
Vendor: 665
OPTUM BANK
Check Sequence: 8
PR -01 -08 -2018
PR Batch 00001.01.2018 HSA - OPTUM BANK
18,515.81
01/08/2018
700 -00- 2183 -0000
Check Total:
18, 515.81
Vendor: 9
PERA
Check Sequence: 9
PR -01 -08 -2018
PR Batch 00001.01.2018 MN -PERA Deduction
3,339.55
01/08/2018
700 -00- 2175 -0000
PR -01 -08 -2018
PR Batch 00001.01.2018 MN PERA Benefit Em
3,853.34
01/08/2018
700 -00- 2175 -0000
Check Total:
7,192.89
Total for Check Run:
44,125.49
Total of Number of Checks:
9
AP- Computer Check Proof List by Vendor (01/08/2018 - 3:49 PM)
ACH Enabled: False
PR Batch 00001.01.2018 PERA Life
ACH Enabled: True
PR Batch 00001.01.2018 HSA - OPTUM B.
ACH Enabled: True
PR Batch 00001.01.2018 MN -PERA Dedu
PR Batch 00001.01.2018 MN PERA Benei
Page 2
Accounts Payable
Computer Check Proof List by Vendor
User: mnguyen
Printed: 01/18/2018 - 9:14AM
Batch: 00007.01.2018 - CC- 01- 22- 18- Dec2017
Invoice No Description
Amount Payment Date Acct Number
Reference
Vendor: 868
BANK OF MONTREAL
Check Sequence: 1 ACH Enabled: True
Dec - 2017- AutoPD
Accela- Annual Maint
7,021.39
01/22/2018
101 -00- 1551 -0000
Dec - 2017- AutoPD
Accela- Annual Maint
7,021.39
01/22/2018
101 -15- 4221 -0000
Dec - 2017- AutoPD
Culligan Water
96.35
01/22/2018
101 -19- 4245 -0000
Dec - 2017- AutoPD
Winstream -City Hall
109.20
01/22/2018
101 -19- 4321 -0000
Dec - 2017- AutoPD
Winstream - Public Works
53.01
01/22/2018
101 -32- 4321 -0000
Dec - 2017- AutoPD
Waste Management
535.84
01/22/2018
101 -32- 4400 -0000
Dec - 2017- AutoPD
Waste Management
212.33
01/22/2018
101 -32- 4400 -0000
Dec - 2017- AutoPD
Winstream -3 Parks
164.23
01/22/2018
101 -52- 4321 -0000
Dec - 2017- AutoPD
City of Chanhassen
43.54
01/22/2018
101 -52- 4380 -0000
Dec - 2017- AutoPD
48 Barriers - CIP- Freeman Park Ice Rink
8,155.00
01/22/2018
402 -00- 4680 -0000
Dec - 2017- AutoPD
Winstream - Badger Well
55.61
01/22/2018
601 -00- 4395 -0000
Dec - 2017- AutoPD
Winstream - Boulder Bridge
55.61
01/22/2018
601 -00- 4396 -0000
Dec - 2017- AutoPD
Winstream -West Tower
110.72
01/22/2018
601 -00- 4321 -0000
Dec - 2017- AutoPD
Accela - Monthly Svc
793.50
01/22/2018
601 -00- 4450 -0000
Dec - 2017- AutoPD
Accela - Monthly Svc
793.50
01/22/2018
611 -00- 4450 -0000
Dec - 2017- AutoPD
Republic Services
9,854.80
01/22/2018
621 -00- 4400 -0000
Dec - 2017- AutoPD
Verizon - Lift Stations
433.62
01/22/2018
611 -00- 4321 -0000
Dec - 2017 - Bauman
UPS
6.90
01/22/2018
601 -00- 4208 -0000
Dec - 2017 - Bauman
Fedex
20.58
01/22/2018
601 -00- 4245 -0000
Dec - 2017 - Bauman
Cub Foods
1.98
01/22/2018
601 -00- 4245 -0000
Dec - 2017 - Bauman
Sand & Salt
1,788.20
01/22/2018
101 -33- 4245 -0000
Dec - 2017 - Bauman
Sand & Salt
1,000.00
01/22/2018
101 -33- 4245 -0000
Dec - 2017 - Bauman
Consolidated Container
358.20
01/22/2018
101 -52- 4245 -0000
Dec - 2017 - Bauman
KD & Co. Recycling
40.00
01/22/2018
101 -32- 4400 -0000
Dec - 2017 - Bauman
Gas
56.48
01/22/2018
101 -32- 4212 -0000
Dec - 2017 - Bauman
UFC Farm Supply
23.08
01/22/2018
101 -32- 4245 -0000
Dec - 2017 - Bauman
Shorewood True
11.99
01/22/2018
101 -32- 4245 -0000
Dec - 2017 - Bauman
Northern Safety Co.
68.28
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Brown
Avagate- Tiffedit.com
59.00
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Brown
Adobe
193.42
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Brown
Gas
59.42
01/22/2018
101 -32- 4212 -0000
Dec - 2017 -Brown
Professional Wireless
1,260.34
01/22/2018
403 -00- 4640 -0000
AP- Computer Check Proof List by Vendor (01/18/2018 - 9:14 AM) Page 1
Invoice No Description Amount Payment Date Acct Number Reference
Dec - 2017 -Faschi
Gas
935.73
01/22/2018
101 -32- 4212 -0000
Dec - 2017 -Faschi
Cub Foods
71.88
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Faschi
Shorewood True
7.99
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Grout
Oriental Trading
23.49
01/22/2018
101 -53- 4441 -0000
Dec - 2017 -Grout
Amazon- Backdrop
65.99
01/22/2018
101 -53- 4441 -0000
Dec - 2017 -Grout
Amazon- Monitor & Keyboard
149.44
01/22/2018
201 -00- 4245 -0000
Dec - 2017 -Hanson
Shorewood True
134.36
01/22/2018
101 -52- 4245 -0000
Dec - 2017 -Hanson
Gas
234.45
01/22/2018
101 -32- 4212 -0000
Dec - 2017 -Heitz
Gas
335.98
01/22/2018
101 -32- 4212 -0000
Dec - 2017 -Heitz
Red Wing Shoe
249.98
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Heitz
BP
24.69
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Heitz
Hamel Building Center
876.74
01/22/2018
101 -52- 4245 -0000
Dec - 2017 -Heitz
Shorewood True
60.97
01/22/2018
101 -52- 4245 -0000
Dec - 2017 -Heitz
Braodway Rental
295.70
01/22/2018
101 -32- 4410 -0000
Dec - 2017 - Lugows
Shorewood True
27.50
01/22/2018
101 -32- 4245 -0000
Dec - 2017 - Lugows
Shorewood True
32.32
01/22/2018
101 -32- 4245 -0000
Dec - 2017 - Lugows
Gas
286.01
01/22/2018
101 -32- 4212 -0000
Dec - 2017 - Lugows
Shorewood True
5.91
01/22/2018
101 -19- 4223 -0000
Dec - 2017 - Lugows
Pollution Control Agency
345.00
01/22/2018
601 -00- 4331 -0000
Dec - 2017 -Mason
Gas
202.64
01/22/2018
101 -32- 4212 -0000
Dec - 2017 -Mason
Applied MSS
114.52
01/22/2018
101 -32- 4212 -0000
Dec - 2017 -Mason
Shorewood True
74.21
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Mason
Lube Tech
587.25
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Mason
Northern Tool Equipment
74.16
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Mason
UFC Farm Supply
219.98
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Mason
Carquest
62.69
01/22/2018
101 -32- 4221 -0000
Dec - 2017 -Mason
Boyer Ford Trucks
79.07
01/22/2018
101 -32- 4221 -0000
Dec - 2017 -Mason
H & L Mesabi
1,240.16
01/22/2018
101 -33- 4245 -0000
Dec - 2017 -Moore
City Hall - Email - Constant Contact
500.00
01/22/2018
101 -19- 4433 -0000
Dec - 2017 -Moore
Online Courses
10.00
01/22/2018
101 -13- 4331 -0000
Dec - 2017 -Moore
SSCC - Facebook
10.00
01/22/2018
201 -00- 4433 -0000
Dec - 2017 -Moore
SSCC - Email - Constant Contact
273.08
01/22/2018
201 -00- 4433 -0000
Dec - 2017 - Pounde
Shorewood True
25.98
01/22/2018
101 -52- 4245 -0000
Dec - 2017 - Pounde
Red Wing Shoe
250.00
01/22/2018
101 -32- 4245 -0000
Dec - 2017 - Pounde
Gas
170.44
01/22/2018
101 -32- 4212 -0000
Dec - 2017 - Pricco
Office Depot
95.85
01/22/2018
101 -13- 4200 -0000
Dec - 2017 - Pricco
Office Depot
86.34
01/22/2018
101 -13- 4200 -0000
Dec - 2017 - Pricco
Office Depot
357.26
01/22/2018
101 -13- 4200 -0000
Dec - 2017 - Pricco
Ferguson - Water Meters
1,419.80
01/22/2018
601 -00- 4265 -0000
Dec - 2017 - Pricco
Ferguson - Water Meters
1,230.00
01/22/2018
601 -00- 4265 -0000
Dec - 2017 -Stark
Gas
222.91
01/22/2018
101 -32- 4212 -0000
Dec - 2017 -Stark
Red Wing Shoe
250.00
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Stark
Menards
26.52
01/22/2018
101 -32- 4245 -0000
AP- Computer Check Proof List by Vendor (01/18/2018 - 9:14 AM) Page 2
Invoice No Description Amount Payment Date Acct Number Reference
Dec - 2017 -Stark
The Home Depot
63.90
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Stark
Shorewood True
77.30
01/22/2018
101 -32- 4245 -0000
Dec - 2017 -Stark
Shorewood True
44.99
01/22/2018
101 -32- 4240 -0000
Dec - 2017 -Thone
Crown Trophy
290.00
01/22/2018
101 -11- 4245 -0000
Dec - 2017 -Thone
Kowalskis Coffee
14.98
01/22/2018
101 -19- 4245 -0000
Dec - 2017 -Thone
Cubs
11.28
01/22/2018
101 -19- 4245 -0000
Dec - 2017 -Thone
Dollar Tree
16.13
01/22/2018
101 -19- 4245 -0000
Dec - 2017 -Thone
Target
45.37
01/22/2018
101 -19- 4245 -0000
Dec - 2017 -Thone
Amazon
28.90
01/22/2018
101 -19- 4245 -0000
Check Total:
52,797.35
Vendor: 891
C. S. McCROSSAN CONSTRUCTION, INC.
Check Sequence: 2
ACH Enabled: False
PV #11- P02925 -40
P.V. #1 - Project 02925 -40 - Street Reclamation I
101,457.71
01/22/2018
404 -00- 4680 -0027
Check Total:
101,457.71
Vendor: 192
G & K SERVICES
Check Sequence: 3
ACH Enabled: False
December -2017
City Hall
144.94
01/22/2018
101 -19- 4400 -0000
December -2017
Public Works
1,216.56
01/22/2018
101 -32- 4400 -0000
December -2017
Southshore Center
53.38
01/22/2018
201 -00- 4400 -0000
Check Total:
1,414.88
Vendor: 869
MINNESOTA UNEMPLOYMENT INSURANC
Check Sequence: 4
ACH Enabled: False
DocID- 11778955
4th Qtr- 2017 - Unemployment -Bruce DeJong
8,851.57
01/22/2018
101 -15- 4141 -0000
Check Total:
8,851.57
Vendor: 421
VERIZON WIRELESS
Check Sequence: 5
ACH Enabled: False
9799093645
Sewer & Water - Acct842017386
48.78
01/22/2018
601 -00- 4321 -0000
Acct #842017386 -00001
9799093645
Sewer & Water - Acct842017386
48.79
01/22/2018
611 -00- 4321 -0000
Acct #842017386 -00001
9799093645
S & W Lines - Acct842017386
48.78
01/22/2018
631 -00- 4321 -0000
Acct #842017386 -00001
Credit -Brad -Cell
S & W Lines - Acct842017386
-6.64
01/22/2018
631 -00- 4321 -0000
Acct #842017386 -00001
Credit -Brad -Cell
Sewer & Water - Acct842017386
-6.64
01/22/2018
611 -00- 4321 -0000
Acct #842017386 -00001
Credit -Brad -Cell
Sewer & Water - Acct842017386
-6.64
01/22/2018
601 -00- 4321 -0000
Acct #842017386 -00001
Check Total:
126.43
Vendor: 411
XCEL ENERGY, INC.
Check Sequence: 6
ACH Enabled: True
5102846200 -0118
5655 Merry Lane
25.23
01/22/2018
101 -52- 4380 -0000
5655 Merry Lane
5145317119 - 011218
Parks
148.35
01/22/2018
101 -52- 4380 -0000
Parks
5145317119 - 011218
P.W. Street Lights Svc
1,799.53
01/22/2018
101 -32- 4399 -0000
P.W. Street Lights Svc
5145317119 - 011218
C.H.Svcs
2.43
01/22/2018
101 -19- 4380 -0000
C.H.Svcs
AP- Computer Check Proof List by Vendor (01/18/2018 - 9:14 AM) Page 3
Invoice No Description Amount Payment Date Acct Number Reference
5145317119 - 011218
P.W. Bldg Svc
33.44
01/22/2018
101 -32- 4380 -0000
5145317119 - 011218
Boulder Bridge
1,271.21
01/22/2018
601 -00- 4396 -0000
5145317119 - 011218
S.E. Area Svc
2,154.38
01/22/2018
601 -00- 4398 -0000
5145317119 - 011218
Street Lights
522.42
01/22/2018
611 -00- 4380 -0000
5145368132122717
5700 County Rd 19
36.01
01/22/2018
101 -32- 4399 -0000
5145368132122717
5700 County Rd 19 - Unit Light
295.88
01/22/2018
101 -32- 4399 -0000
Check Total: 6.288.88
Total for Check Run: 170,936.82
Total of Number of Checks: 6
P.W. Bldg Svc
Boulder Bridge
S.E. Area Svc
Street Lights
5700 County Rd 19
5700 County Rd 19 - Unit Light
AP- Computer Check Proof List by Vendor (01/18/2018 - 9:14 AM) Page 4
Accounts Payable
Computer Check Proof List by Vendor
User: mnguyen
Printed: 01/18/2018 - 9:50AM
Batch: 00008.01.2018 - CC- 01 -22 -18
Invoice No Description
Amount Payment Date Acct Number
Reference
Vendor:
817
ARCPOINT LABS OF EDEN PRAIRIE
Check Sequence: 1
ACH Enabled: False
915
Annual Random Pool Mgmt Fee
480.00
01/22/2018
101 -32- 4305 -0000
Check Total:
480.00
Vendor:
137
CENTURY LINK
Check Sequence: 2
ACH Enabled: False
612E451785 -JA18
612 -E45- 1785 -Bldr Brdg
294.00
01/22/2018
601 -00- 4396 -0000
612E458019 -JA18
612 -E45- 8019 -SE Areas
220.50
01/22/2018
601 -00- 4398 -0000
Check Total:
514.50
Vendor:
150
CLASSIC CLEANING COMPANY
Check Sequence: 3
ACH Enabled: False
26121
City Hall Monthly Svc
525.00
01/22/2018
101 -19- 4400 -0000
26122
Public Works Monthly Svc
295.00
01/22/2018
101 -32- 4400 -0000
Check Total:
820.00
Vendor:
573
COMPASS MINERALS AMERICA
Check Sequence: 4
ACH Enabled: False
159631
Salt & Sand
2,135.45
01/22/2018
101 -33- 4245 -0000
Check Total:
2,135.45
Vendor:
167
ECM PUBLISHERS INC
Check Sequence: 5
ACH Enabled: True
562705
Zoning & Subd Teat Amendment
58.75
01/22/2018
101 -18- 4351 -0000
562822
Zoning & Subd Teat Amendment
38.55
01/22/2018
101 -18- 4351 -0000
Check Total:
97.30
Vendor:
200
GOPHER STATE ONE CALL
Check Sequence: 6
ACH Enabled: True
8000717
AnnualFee
16.67
01/22/2018
601 -00- 4433 -0000
8000717
AnnualFee
16.66
01/22/2018
611 -00- 4433 -0000
8000717
AnnualFee
16.67
01/22/2018
631 -00- 4433 -0000
Check Total:
50.00
AP- Computer Check Proof List by Vendor (01/18/2018 - 9:50 AM) Page 1
Invoice No Description Amount Payment Date Acct Number Reference
Vendor: 707
LAKE MINNETONKA COMMUNICATION G
Check Sequence: 7
ACH Enabled: False
1186
Install Shock Mount Plate
99.00
01/22/2018
101 -11- 4400 -0000
Check Total:
99.00
Vendor: 281
METRO CITIES
Check Sequence: 8
ACH Enabled: False
72
2018 Membership Dues
3,218.00
01/22/2018
101 -11- 4331 -0000
Check Total:
3,218.00
Vendor: 792
METROPOLITAN AREA MANAGEMENT AS
Check Sequence: 9
ACH Enabled: False
2734
Membership - Sandie Thone
45.00
01/22/2018
101 -13- 4433 -0000
Check Total:
45.00
Vendor: 456
MINNESOTA PIPE & EQUIP
Check Sequence: 10
ACH Enabled: False
394219
Retainer Nozzle Wrench Head
803.55
01/22/2018
601 -00- 4245 -0000
394248
Parts
56.08
01/22/2018
601 -00- 4245 -0000
Check Total:
859.63
Vendor: 890
EMMANELSON
Check Sequence: 11
ACH Enabled: False
2018- ArcticFev
2018 - Arctic Fever Princess Brunch
400.00
01/22/2018
101 -53- 4441 -0000
Check Total:
400.00
Vendor: 317
JEREMY NORMAN
Check Sequence: 12
ACH Enabled: False
2018- ArcticFev
2018 - Arctic Fever Expenses Reimbursement
245.65
01/22/2018
101 -53- 4441 -0000
Check Total:
245.65
Vendor: 240
KENNETH POTTS, PA
Check Sequence: 13
ACH Enabled: True
Campbell- 200513M
Forfeiture - Campbell - 2005 BMW
557.00
01/22/2018
101 -16- 4304 -0000
January -2018
Prosectution Monthly Services
2,500.00
01/22/2018
101 -16- 4304 -0000
Olson- 2014Lexus
Forfeiture - Olson -2004 Lexus
938.00
01/22/2018
101 -16- 4304 -0000
Check Total:
3,995.00
Vendor: 360
SOUTH LAKE MINNETONKA POLICE DEPA
Check Sequence: 14
ACH Enabled: False
January- 2018 -013
Monthly- Operating Budget Exp
102,886.08
01/22/2018
101 -21- 4400 -0000
Check Total:
102, 886.08
Vendor: 365
STAR TRIBUNE
Check Sequence: 15
ACH Enabled: False
2018 - Newspaper
2018 - Newspapers
171.60
01/22/2018
101 -19- 4433 -0000
AP- Computer Check Proof List by Vendor (01/18/2018 - 9:50 AM) Page 2
Invoice No Description Amount Payment Date Acct Number Reference
Check Total:
Vendor: 657 SUMMIT COMPANIES
1233271 Annual Fire Extinguisher Inspection
Check Total:
Total for Check Run:
Total of Number of Checks:
AP- Computer Check Proof List by Vendor (01/ 18/2018 - 9:50 AM)
Check Sequence: 16
73.00 01/22/2018 201 -00- 4400 -0000
73.00
116,090.21
16
ACH Enabled: False
Page 3
I M
M City of Shorewood Council Meeting Item
Title / Subject:
Resolution Appointing Hearing Officers
2 D :::]
Meeting Date:
Monday, January 22, 2018
MEETING TYPE
Prepared by:
Sandie Thone, City Clerk
Regular Meeting
Reviewed by:
Greg Lerud, City Administrator
Attachments:
Resolution
Policy Consideration: Pursuant to Shorewood City Code Chapter 104 allows for a process for
general penalty and enforcement for violation of any provision of the code. City Code, Chapter
104.03 ADMINISTRATIVE ENFORCEMENT OF CODE REGULATIONS, Subdivision 3, Appeal to
Hearing Officer. b. Hearing Officer. states that the Shorewood City Council shall by resolution
from time to time appoint a list of persons authorized to act as a Hearing Officer. The Hearing
Officer is authorized to conduct an informal hearing to determine if a code offense has
occurred. The Hearing Officer shall have the authority to uphold or dismiss the citation or
reduce, stay or waive the civil penalty imposed upon such terms and conditions as the Hearing
Officer shall determine. The Hearing Officer's decision is final, except for appeal in limited
cases to the City Council, as set forth in 104.03 Subdivision 4 in the Shorewood City Code.
Background: The following persons or entities are recommended for appointment as hearing
Officers for the City of Shorewood Code Enforcement:
1) Peter Beck
Beck Law Office
4746 Sheridan Avenue South
Minneapolis, MN 55410
612.991.1350
2) Karen E. Marty
Marty Law Firm, LLC
3800 American Boulevard West
Suite 1500
Bloomington, MN 55431
952.921.5859
Mission Statement: The City of Shorewood is committed to providing residents quality public services, a
healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial
management through effective, efficient, and visionary leadership. Page 1
If appointed Hearing Officers are unavailable, other hearing officers may be obtained.
Action Requested: Staff respectfully recommends the city council approve the Resolution
Appointing Hearing Officers for the administrative enforcement of code regulations.
Motion, second and simple majority vote required.
Connection to Vision /Mission: Consistency in providing residents quality public services, a
healthy environment, a variety of attractive amenities, a sustainable tax base, and sound
financial management through effective, efficient, and visionary leadership.
CITY OF SHOREWOOD
COUNTY OF HENNEPIN
STATE OF MINNESOTA
RESOLUTION 18 -XX
A RESOLUTION APPOINTING ADMINISTRATIVE HEARING OFFICERS
FOR THE CITY OF SHOREWOOD
WHEREAS, Shorewood City Code, Chapter 104 allows for a process of general penalty and
enforcement for violation of any provision of the City Code; and
WHEREAS, Shorewood City Code, Chapter 104.03 ADMINISTRATIVE ENFORCEMENT
OF CODE REGULATIONS, Subdivision 3, Appeal to Hearing Officer. b. Hearing Officer.
states that the Shorewood City Council shall by resolution from time to time appoint a list of
persons authorized to act as a Hearing Officer. The Hearing Officer is authorized to conduct an
informal hearing to determine if a code offense has occurred. The Hearing Officer shall have the
authority to uphold or dismiss the citation or reduce, stay or waive the civil penalty imposed
upon such terms and conditions as the Hearing Officer shall determine. The Hearing Officer's
decision is final, except for appeal in limited cases to the City Council, as set forth in 104.03
Subdivision 4 in the Shorewood City Code.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Shorewood that
the following are appointed as Hearing Officers for the City of Shorewood Administrative
Enforcement of Code Regulations:
1) Peter Beck
Beck Law Office
4746 Sheridan Avenue South
Minneapolis, MN 55410
612.991.1350
2) Karen E. Marty
Marty Law Firm, LLC
3800 American Boulevard West
Suite 1500
Bloomington, MN 55431
952.921.5859
3) If appointed Hearing Officers are unavailable, other hearing officers may be obtained.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 22nd day of
January 2018.
Scott Zerby, Mayor
Sandie Thone, City Clerk
#2E
MEETING TYPE
City of Shorewood Council Meeting Item REGULAR
Title / Subject: Assessment For Unpaid Utility charge
Meeting Date: January 22, 2018
Prepared by: Greg Lerud, City Administrator
Policy Consideration: Should the city council approve a utility assessment for 4405 Enchanted Point?
Background: Late last year Jack Molin, owner of 4405 Enchanted Point, contacted me about his utility
bill. Mr. Molin presented a history of correspondence dating back to 2008 regarding questions he raised
then about the charges to the property that is seasonal in nature and can only be occupied for part of
the year. The total charges amount to $4,283.76 for all utilities and recycling.
It appears from the correspondence and notes that Mr. Molin provided me, he and his wife contacted
the city many times to get a resolution to the matter — having been told that it was being worked on. I
was not able to find anything here regarding a response. I explained to Mr. Molin that the council
makes the final determination on appeals of charges but there are some charges that I explained simply
could not be waived — storm sewer and recycling.
Financial or Budget Considerations: No material financial consideration. However, as the city council
will be considering utility rates in February, the question of charges for seasonal residences should be
considered by the council.
Options: Assess the $4,283.76 or approve a lesser assessment.
Recommendation / Action Requested: Given these circumstances I recommend that the council accept
payment of $2,575.43 to settle the outstanding charges for this assessment, with credit for payment
received of $571.94. This amount represents the full payment of recycling ($457.00, full storm sewer,
$552.51, half of sanitary sewer charge, $1565.92, and waiving late fees, $129.56.) 1 further recommend
that the council examine utility rates that could be put in place for properties that are not usable for a
portion of the year. A Resolution is not included here because I believe the owner will immediately pay.
If he does not, this will be included with the year end comprehensive assessment.
Next Steps and Timeline: Staff will communicate the council's decision to the property owner.
Mission Statement: The City of Shorewood is committed to providing residents quality public services, a
healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial
management through effective, efficient, and visionary leadership. Page 1
CITY OF SHOREWOOD
PLANNING COMMISSION MEETING
TUESDAY, JANUARY 16, 2018
MINUTES
CALL TO ORDER
Chair Maddy called the meeting to order at 7:03 P.M.
ROLL CALL
Present
Absent:
Chair Maddy; Commissioners Davis, Bean, Riedel and
Councilmember Kristine Sundberg
APPROVAL OF AGENDA
Davis moved, Riedel seconded, approving the agenda
APPROVAL OF MINUTES
November 7, 2017
Reedel moved, Davis seconded, approving the Pl
as presented. Motion passed 4/0/1 with Commiss
PUBLIC HEARIN
The amendments
fees are listed.
COUNCIL CHAMBERS
5755 COUNTRY CLUB ROAD
7:00 P.M.
Planning Director Darling
passed 510.
Minutes of November 7, 2017,
his absence from the meeting.
AMENDMENTS REGARDING PROCEDURES
JCATIONS
noting that the amendments concern a few basic
cants furnish mailing labels
es are sent for rezonings, preliminary plats, and PUDs
een submission of applications and the date of the
public
e to fees identified in Chapter 1301, the city code chapter where land use
In reference to the proposed amendment regarding the amount of time between application submission and the date
of the public hearing /meeting, Commissioner Riedel asked if the applicants were protected by the 60 -day rule so
that staff couldn't arbitrarily take longer to review applications. He also asked if the language should be amended
to say that the public hearing should take place within 60 days. Director Darling replied that the city is able to
extend the review period by an additional 60 days and that the deadline is placed on the front page of each staff
report. If the applicant needs to revise plans multiple times, the hearing could be scheduled 70 days into the review
period and Director Darling asked for the flexibility. Commissioner Riedel stated he was satisfied because the
statutory review period protects the applicant.
CITY OF SHOREWOOD PLANNING COMMISSION MEETING
January 16, 2018
Page 2 of 5
The Planning Commission the reviewed the amendments line by line.
In reference to the amendments concerning distance requirements, Commissioner Bean raised a concern that
residents could be confused by having the mailing distance at 750 feet for some applications and 500 feet for others.
Chair Maddy asked if all applications would be noticed 750 feet or just some. Director Darling replied that the
proposal was to increase the notice distance for the most controversial applications (rezoning, subdivisions, and
PUDs) to 750 feet, the remainder would be 500 feet.
Commissioner Bean suggested that 750 feet may be appropriate for all applications. He asked if the
Councilmembers had a passion for the increased notice.
Director Darling replied that the Councilmembers were comfortable with the existing 500 feet, but were interested
in approving greater distances on a case by case basis. Staff was concerned that some applications would be
submitted and could be mailed a notice consistent with the code, but the Council right have preferred a wider
notice. Staff thought it was worth one more discussion to avoid a situation where the Council sends the request
back to staff to have a wider notice sent. Such a delay could also present an issue with the statutory review deadline.
Commissioner Riedel asked what the Council's motivation is for varying the notification distance on a case by case
basis.
Director Darling responded that it would reflect the controversial nature of an application, like another Minnetonka
Golf Course or Oppidan redevelopment application.
Commissioner Riedel asked if staff would follow the code or would they increase the distance on their own.
Director Darling replied that they would follow code unless directed otherwise.
Commissioner Bean said that what the proposal does is stipulate a larger, required distance.
Commissioner Riedel
Director Darling agreed, but
Commissioner Sylvester was c
difference was .confusing, stati
distance.
Commissioner Riedel said that
mailed a notice but weren't.
Commissioner Davis said
enough.
doesn't say it can't be sent to a wider notice area.
known ahead of time.
shouldn't be a problem.
d about the cost implications of the greater distance and disagreed that the
it is appropriate that the more impactful applications have a wider mailing
a set distance would avoid having people upset that they should have been
she agreed that having 750 was appropriate for all applications. The lots are big
Chair Maddy asked Director Darling if the additional distance was a hardship.
Director Darling indicated that it is a lot of notification for variances.
Commissioner Bean remembered that the Council thought that notices for variances didn't need to be enlarged.
Most variances don't impact the wider neighborhood.
Commissioner Riedel asked if the proposal would increase CUPS as most of those are smaller in nature.
CITY OF SHOREWOOD PLANNING COMMISSION MEETING
January 16, 2018
Page 3 of 5
Chair Maddy summarized that the distance requirements would be left as proposed.
Chair Maddy opened the Public Hearing at 7:25 P.M. noting the procedures used in a Public Hearing. As no one
was present to speak on the item, he closed the public testimony portion and the public hearing at 7:26 P.M.
Bean moved, Davis seconded, recommending approval of the amendment to City Code sections 1201.04,
1201.05, 1201.25, 1202.03 and 1202.09 of City Code as recommended by staff. Motion passed 510.
PUBLIC MEETING — SETBACK VARIANCE
Applicants: Robert and Joan Wright
Location: 6110 Club Valley Road
Chair Maddy introduced the item.
Director Darling summarized the staff report.
Director Darling added a letter received in support of the
Road into the minutes.
Commissioner Riedel asked if the request would
confirmed it would.
Chair Maddy recognized the applicant and his c
<<compromised audio>> Rob(
bought the home in 2001 infer
property file to show where the
room to accommodate a garage
and third stall garage additions,
much of their backyard and th
<<compromised a
the garage addition
Commissioner Riedel ask
<<compromised audio>>
150 Club Valley
Director Darling
Builders and Remodelers.
Road and Richard . Indicated that he and his wife
There was no survey or other documentation in the
e property, but staff thought there would be enough
fferent options, including detached storage buildings
space they need. The detached building takes up too
d a greater variance. They have elected to propose
)n must show practical difficulties and that the request is the
asked if the addition could be setback farther from the property
nt and his contractor responded that the curving was not an option and that
that reducing the width would not produce a workable space.
the addition would require modified trusses.
applicant.
Commissioner Riedel indicated that the floorplan was helpful to see what could be added without a variance.
<<compromised audio>> Mr. Olson stated that he felt that the rain garden/infiltration basin requirement was
onerous because the application was under the impervious surface amount allowed by code.
Commissioner Riedel asked about how large a rain garden that would be?
CITY OF SHOREWOOD PLANNING COMMISSION MEETING
January 16, 2018
Page 4 of 5
Mr. Olson indicated that they haven't calculated out the exact size at this point. The applicant indicated that he is
trying to preserve as much of the backyard as he can. His yard picks up the water from properties further south and
they all drain north through a culvert under Yellowstone Trail.
Commissioner Riedel stated that if the property already collects water and then drains to the west, there is a natural
area to place the rain garden. The concept is fairly simple. The watershed districts have grants for this type of
improvement. Their website has information on grants.
Commissioner Davis noted their web address and where the watershed district has then'.. offices. She also stated that
the Commission isn't recommending a retention pond, but a lovely natural area and he could add vegetation for
pollinators and be a local hero.
Commissioner Maddy asked who gives the final approval for the rain garden. Director Darling replied that the City
Engineer does.
Commissioner Davis gave examples of rain gardens at the
Commissioner Maddy indicated the discussion needs to
Commissioner Bean indicated that the applicant has shown°
nonconformity he meets practical difficulties and, the design is
neighborhood.
Commissioner Riedel noted that he found the
difficulties.
Commissioner Maddy asked if anyone had concerns
Commissioner Maddy
Commissioner Bean raised a'conc
the condition have to be deferred u
Commissioner Maddy asked if the
Director Darling indicated that the
heavier clay soils is about 25 perce
feet of additional impervious (assu
in sandier soils could be smaller as
have been requiring rain gardens /it
Riedel moved, Sylveste
to be 27.1 feet from the
conditions:
ition for the
didn't know
items,
minim
garden.
variance and
hough the addition increases the
with the rest of the house and the
ary to alleviate the practical
No concerns were noted.
large the rain garden would have to be and would
designed.
should be applied to the building permit.
edition should remain with the variance approval. A typical rule of thumb for
of the area to be treated. In that case, the addition would be about 800 square
ag clay soils), so the rain garden would be about 200 square feet. Rain gardens
ey infiltrate faster. They would need to be about 10 percent of the area. Staff
tration basins with redevelopment of residential lots and substantial additions.
d, recommending approval of the variance application to allow an addition
erty line abutting Yellowstone Trail where 35 feet is required subject to two
1. The applicants must submit a survey for the entire property including dimensions.
2. The applicants must submit plans to accommodate on -site storm -water infiltration for the increase
in impervious surface coverage using either a rain garden or infiltration basin, show the location of
the basin on the survey, and submit all necessary documentation indicating that the feature would
function as proposed.
Motion passed 510.
CITY OF SHOREWOOD PLANNING COMMISSION MEETING
January 16, 2018
Page 5 of 5
Director Darling indicated that this item would be on the February 12, 2018 City Council meeting.
5. MATTERS FROM THE FLOOR - None
6. REPORTS
• Council Meeting Report
Director Darling summarized the following items from the Council's January 8, 20
• Setting the 2018 City Council Regular Meeting Schedule. Dii
2018 Planning Commission meeting schedule at the February
• Update on the Mill Street Speed Issues.
• Annual Appointments and Designation for the Planning Cc
Darling would report the
Darling indicated that Councilmember Kristine Sundberg would be 1
the year and Councilmember Johnson for the second half of the year.
2018. Director
r the first half of
Additionally, two Commissioners (Sylvester and Bean) have indicated that they will not
request reappointment. The Council has interviewed replacement candidates and would likely
appoint persons to the open positions at their January 22,, 2018 meeting.
Commissioner Bean also indicated that he will be absent at next months' meeting.
o Director Darling also indicated that long -time Commission recording secretary Christine
Freeman has resigned. Her presence and accurate notes were valued and will be missed.
• Update on Projects
Director Darling noted that the developer for the Minnetonka Country Club has submitted the third and final phase
of the development for final plat approval. The proposed development is consistent with the preliminary plat and
PUD plans that were reviewed and approved by the Planning Commission and City Council.
• Draft Next Meeting Agenda
February 6, 2018 conflicts with caucuses scheduled for the state, consequently the next meeting would be February
20, 2018. Director Darling stated there are no applications slated for the February 20, 2018, Planning Commission
meeting. She noted she may have some housekeeping items for discussion.
7. ADJO
Riedel moved, Davis seconded, adjourning the Planning Commission Meeting of January 16, 2018 at 8:07
P.M. Motion passed 510.
RESPECTFULLY SUBMITTED,
Marie Darling, Planning Director.
#7B
MEETING TYPE
City of Shorewood Council Meeting Item Regular Meeting
Title / Subject: Fees, Procedures and Application Materials Amendment — Chapters 1301,
1201 and 1202 of the Shorewood City Code
Meeting Date: January 22, 2018
Prepared by: Marie Darling, Planning Director
Reviewed by: Patti Helgesen, Assistant Planner
Attachments: Planning Directors Memorandum for January 16, 2018 PC meeting
Ordinance
Resolution and Summary Publication Ordinance
Policy Consideration: Should the Shorewood Fees and Zoning and Subdivision Regulations be amended
to revise the Land Use Application fees, procedures and application requirements?
Background: See attached memorandum for background. At their January 16, 2018 meeting, the
Planning Commission held a public hearing and voted unanimously to recommend adoption of the
proposed amendments with no changes. Their discussion is summarized in the minutes. No one from
the public requested to speak.
Notice of the Planning Commission public hearing was published in both official newspapers. In
conformance with State Statute, notice of City Council consideration of the amendment was also posted
at City Hall and included in the email notification for general city information and notices. The proposed
ordinance was also posted on the city's website.
Financial or Budget Considerations: The fee increases are proposed to cover additional expenses
related to preparing mailing labels, recording documents with Hennepin County, and publishing legal
notices. The increase in the escrow amounts are proposed to cover the cost of having the consulting
engineers and attorneys review the initial application, although City Code allows the City to charge
additional consulting fees to the applicant.
Options: Adopt the draft code amendment; modify the amendments; or refer the amendments back to
staff.
Recommendation / Action Requested: Staff agrees with the Planning Commission's recommendation
and recommends approval. Staff provide the following draft motions:
Move to approve an ordinance amending City Code section 1301.03 related to land use fees;
sections 1201.04, 1201.05, and 1201.25 (zoning regulations), and sections 1202.03 and 1202.09
of the subdivision regulations.
Mission Statement: The City of Shorewood is committed to providing residents quality public services, a
healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial
management through effective, efficient, and visionary leadership.
S:�Plonning�Plonning Files �Applicotions�2017 CURRENT CASES�Fee Increase and procedures amendments�CAF January 22, 2019.d— Page 1
2. Move to approve a resolution adopting a summary publication ordinance and the text of the
summary pursuant to MN Statute 331A.01 which would inform the public of the intent and
effect of the ordinance without publishing the entire ordinance.
Next Steps and Timelines: Once adopted, the summary will be published in the official newspaper.
Once published, the ordinance becomes effective. All applications received prior to publication in the
official newspaper would be reviewed under the existing standards.
Connection to Vision / Mission: Provision of quality public services
MEMORANDUM
CITY OF
SHOREWOOD
5755 Country Club Road • Shorewood, Minnesota 55331 • 952- 960 -7900
Fax: 952- 474 -0128 • www.ci.shorewood.mmus • cityha11 @ci.shorewood.mn.us
TO: Planning Commission
FROM: Marie Darling, Planning Director
MEETING DATE: January 16, 2018
RE: City Code Text Amendments for Zoning and Subdivision Regulations
Concerning Administration and Procedures for Applications
FILE: 18.01 (Sections 1201.04, 1201.05, 1201.25, 1202.03 and 1202.09 of City Code)
Staff proposes "housekeeping amendments" to modify the procedures for zoning and subdivision
regulations to accomplish the following tasks:
Reflect changing practices regarding mailing labels practices at Hennepin County
Increase the distance mailed notices are sent for requests for rezoning, subdivision, and PUD
applications
Modify the time allowed between submission of applications and the date of the public hearing
The proposed language is attached. Staff are also proposing changes to the fees to make sure that
application review is self - sustaining and to cover the increased notification and recording costs associated
with development applications. The City Council reviews fee increases. Staff also propose to correct two
references in the subdivision regulations to the appropriate city code section where the fees for subdivision
applications are codified.
Mailing labels
Many cities' code (including Shorewood's) requires mailing labels to be provided and certified by
Hennepin County. Hennepin County has informed all their cities that they will no longer be certifying lists
of property owners or providing mailing labels, but has created a service on their website to allow users the
ability to create lists of property owners, maps of affected properties and mailing labels. Initially, staff had
begun to require that applicants use the website to provide the information. What staff has found in the
short time the data base has been available is that we are spending more time assisting and correcting
problems with the labels than if we initially created the labels ourselves. Consequently, staff propose to
amend the ordinance language to remove the requirement that applicants submit mailing labels and staff
will use Hennepin and Carver County mailing label services.
Page 2
Mailed notices
At a recent City Council worksession, the Council asked staff to research whether the mailing distance is
adequate for most applications. As a result of the discussion, the City Council decided to keep the mailing
distances the same and review changes on a case by case basis. To be able to provide as much direction as
possible for applicants and developers up front, staff proposes to increase the distance requirements for
rezoning, subdivision and PUD applications and avoid a situation where the Council needs to redirect staff
to widen the notice distance after an application is submitted. Setting the distance requirements ahead of
time also prevents conflicts with the land use application review deadlines imposed by State Statute.
Public hearing /meeting schedules
The current ordinance requirements are very inflexible concerning the time between submission of
application materials and the scheduling of public hearings. Staff has proposed allowing more flexibility in
the language to permit staff to work with an applicant to improve their application to better meet code
requirements prior to bringing the application before the Planning Commission and City Council as may be
needed.
ATTACHMENTS:
Draft Ordinance Amendments
Comparison of Cities notice requirements (from City Council worksession)
City Site Plan Variance Conditional Use Interim Use Rezoning Comp Plan Amendment Preliminary Plat Minor Subdivision Notice for hearing /meetings Comments on mailed notices
Statute 0 0 350 350 350 0 0 0 10 days NA
Shorewood 0 500 500 500 500 500 500 0 10 days NA
Plymouth 200 200 500 500 750 750 750 NA 10 days Two notices, one upon receipt of app for comp plan, rez, PUD
Chaska 350 400 400 NA 400 400 400 NA 10 days NA
Chanhassen 500 500 500 500 500 500 500 500 10 days NA
Minnetonka 400 400 400 400 400 400 400 400 10 days Both renters and owners are noticed.
Excelsior 350 350 350 350 350 350 350 0 10 days NA
Maple Grove 0 350 500 NA 500 500 500 500 10 days NA
St. Louis Park NA 350 350 NA 350 500 500 0 10 days Two notices, one notifying of PC meeting and one for CC meeting
Bloomington 500 200 500 500 500 500 500 0 10 days NA
0 350 350 NA 350 350 350 350 10 days 600 feet for PUDs
500 500 500 NA 500 500 500 500 10 days administrative lot splits have no notice
CITY OF SHOREWOOD
ORDINANCE NO. 550
AN ORDINANCE AMENDING THE SHOREWOOD
CITY CODE AS IT PERTAINS TO FEES, PROCEDURES AND APPLICATION
MATERIALS
Section 1. City Code Section 1301.03 is hereby amended as follows:
1301.03 LAND USE FEES.
LICENSE, PERMIT, SERVICE CHARGES AND MISCELLANEOUS FEES
Type of Charge /Fee City Code Charge /Fee
VI. Building, Zoning, Land Use
Site »�ia fe e :,iee ft;r;,..,
l i 2n�2
I $450
Comprehensive plan amendment
Pre - application
Formal Application
$200
$800 plus $1,000 escrow
Conditional use permit
Residential
Non - residential
Non residential (tel tien�
1201.04
$200$400
$400 plus $ 100 o
$500 plus $1,000 escrow
$ 1000 $ 1000
plus esefew
Fence permit
1 1201.03
I $20
Interim use permit
Residential
Non - residential
1201.04
$400
$500 plus $1,000 escrow
Planned unit development
Concept Stage
Development Stage
Final Stage
By Conditional Use Permit
1201.25
1201.25
1201.25
1201.06
$300 $100 o
plus
$500 plus $1,000 escrow
$300 pips $ 00 o
$700 plus $1,000 escrow
$300 $100 o
plus
$500 plus $1,000 escrow
$500 plus $1,000 escrow
Sign permits
TemporgU
Permanent
1201.03.1 if
$20
Per 1997 U.B.C. Table 1 -A
Site plan review
1201.03
$50$200 plus $1,000
escrow
Subdivision sketch plan review
1 1202.034
I $200
Subdivision (metes and bo „'^minor subdivision)
JJ
1 1202.03
I $35&500 plus $54-00
escrow (thfee lots e less
LICENSE, PERMIT, SERVICE CHARGES AND MISCELLANEOUS FEES
Type of Charge /Fee
City Code
Reference
Charge /Fee
Subdivision (preliminary plat)
5 or fewer lots
Over 5 lots
1202.034a(2)
$3-5-0600 plus $25 /lot plus
an escrow deposit, as
follows:
$1,000 esefe�v
$3,000
Subdivision (final plat)
5 or fewer lots
Over 5 lots
1202.03
$500 plus $25 /lot plus an
escrow deposit, as follows:
$1,000 esefe�v
$2,000
Traffic Studies when required as part of another
Multiple
Escrow for estimated cost
application
of study to be completed
by the City's consulting
engineers plus $500.
Variances
Residential
Non - residential
1201.05 and
1202.09
$250 plus WO °
$400
$300 $100 °
plus
$500
Zoning Amendment (Text or Mai)
1 1201.04
I $600 plus $1,000 escrow
Zoning Permits
1 1201.07
1$20
Park dedication (cash in lieu of land)
1202.07
$6,500 /dwelling unit or 8%
of raw land value
Extension of plat approval deadline f r fee,.,-ding
nesekAiens
1202.03
$200 501 of e figs -n
applieatien °
*Note: Base fees are non - refundable. Escrow deposits are to cover consulting engineer, and
attorney, and other consultant expenses. Applicants are informed that any city expenses not covered
by these fees will be billed to them. Unused escrow fees will be returned to applicant upon written
request. Applications with more than one required escrow account shall be required to submit the
escrow based on the highest required escrow amount.
Building permit
D ° t; .
v °s'al
Reefing pefmit
Sidi ° mi
1i n�
c
S.B.C.
S
1997 T T u C SECTION
T
4-07
1997 U.B.C. TABLE 1 A
A 'TE
AND STATE
vrrr>: 1300
.0160
$35
LICENSE, PERMIT, SERVICE CHARGES AND MISCELLANEOUS FEES
Type of Charge /Fee
City Code
Reference
Charge /Fee
Window pefmit
T\ eeh a1 pe mit
Plumbing permit
$7-5
$7-5
StateStuttAe
or-
value, $35 minimum
State Statt A° or- e 1 c /4;. ufe
$35 ,,,
Removal .,b.,,,,a,.,,ment ,,,1 °,,,,,,,,,,,,,1 tanks
U.F.C.
$35 fifst tank plus $20 ° 1,
additional
Demoliti exit
S.B.C.
$50—*
A,ppfoved sign pefmit 4°°
D 1997 T T T2 (` 'Table !-A
Fenee pe mit
11 ll�z
$-20
(_fading /4;11;, g ,-,efmit
S.B.C.
D 1997 U.B.C. 'Table A-
33 A and A 33 B
Homeoe 'HA
1 2n1 n� 1 2
z
e200 isp° ;
r -nde,-,.,-,.,,n ; gatio system pe
901��
R.O.W. Enefeaeliment
901.01.2b
$40
R.O.W. of easementva it
8
R.O.W. A fee
90i.09
$7-5
exe administration
Pef additional exeavatien tuVaved area
90i.09
$2-9
r -nde,,,,,,,,,,,,,1 utility /teleee ,.,
installation direetbefing of tumekng
90i.09
$45 pef 100 r Ft (plus-
° rlfmit fee)
r hide,- .,-,.,,,,,a tAility /teleex.,.,
installation open tFenehing
9
$60 r 100 r Ft (plus-
°
LICENSE, PERMIT, SERVICE CHARGES AND MISCELLANEOUS FEES
Type of Charge /Fee City Code Charge /Fee
Reference
Obstmaie 90i.09 $N
D fee 1901.09 I dies
Section 2. Zoning Regulations Section 1201.04 is hereby amended as follows:
1201.04 ADMINISTRATION, AMENDMENTS AND CONDITIONAL USE PERMITS.
Subd.1. Procedure.
a. Application. Requests for amendments or conditional use permits, as
provided within this chapter, shall be filed with the Zoning Administrator on an official
application form. The application shall be accompanied by a fee as provided for by City Council
ordinance. This fee shall not be refunded. The application shall also be accompanied by five
copies of detailed written and graphic materials fully explaining the proposed change,
development or use and list - v^ rprvpcM - owners zvcucr5vv- feet - v^rthe srvdccc
b. Staff review /technical assistance reports. Upon receipt of an application
for an amendment or conditional use permit, the Zoning Administrator shall, when deemed
necessary, refer the request to appropriate staff to insure that informational requirements are
complied with. When all informational requirements have been complied with, the request shall
be considered officially submitted. Also, when deemed necessary, the Zoning Administrator
shall instruct the appropriate staff persons to prepare technical reports and /or provide general
assistance in preparing a recommendation on the request to the Planning Commission and City
Council.
(1) Notwithstanding anything to the contrary in this chapter, all
applications for any site plan, conditional use permit, land use permit, variance, or for any other
city approval required by this chapter, or to amend this chapter, shall be made in writing on a
form provided by the city, if the city has a form, to the Zoning Administrator. The Zoning
Administrator is authorized to reject in writing any incomplete application within 15 business
days of receipt if the application is incomplete, stating the reasons or its rejection, including what
information is missing. This rejection shall be sent by first -class mail to the applicant. Every
application shall contain the legal description of the property and a statement of the specific
permit or action being sought. Nothing in this section shall be deemed to prevent the city from
requesting additional information from the applicant upon which to base a decision.
(2) If a dispute arises over a specific fee imposed by the city, the
amount of the fee must be deposited and held in escrow, and the person aggrieved by the fee may
appeal to district court, as provided by M.S. § 462.361, as it may be amended from time to time.
The application shall proceed as if the fee had been paid, pending a decision of the court.
C. Public hearing. Upon official submission of the request, the Zoning
Administrator shall set a public hearing on the request for the neM a regularly scheduled
Planning Commission meeting occurring at least ten working days from the date as a notice of
the hearing is published in the official newspaper. The notice shall contain a legal property
description and description of the request and shall be published no more than 30 days and no
less than ten days prior to the hearing. Written notification of the hearing shall also be mailed at
least ten working days prior to the date of the hearing to all owners of land within 500 feet of the
boundary of the property in uestienrelated to a conditional /interim use permit and 750 feet of
the boundary of the property related to an amendment. Failure of a property owner to receive the
notice shall not invalidate any proceedings as set forth within this chapter.
Section 3. Zoning Regulations Section 1201.05 Subd. 3 is hereby amended as follows:
1201.05 ADMINISTRATION, VARIANCES AND APPEAL
Subd. 3. Variances.
a. Criteria. In considering all requests for a variance and in taking subsequent
action, the city staff, the Planning Commission and the City Council, serving as the
Board of Adjustments and Appeals, may approve a variance application upon
finding that all of the following criteria, as applicable, are met:
(1) The variance, and its resulting construction and use, is consistent
with the intent of the comprehensive plan and in harmony with the
general purposes and intent of this Chapter.
(2) The applicant has established that there are practical difficulties in
complying with this Chapter. Practical difficulties mean:
(a) The property owner proposes to use the property in a
reasonable manner not permitted by this Chapter.
(b) The plight of the landowner is due to circumstances unique
to the property not created by the landowner.
(c) The variance, if approved, would not alter the essential
character of the locality.
(3) The variance would not be based exclusively on economic
considerations.
(4) The variance shall not impair an adequate supply of light and air to
adjacent property, unreasonably increase the congestion in the
public street, or increase the danger of fire or endanger the public
safety.
(5) The variance, and its resulting construction or project, would not be
detrimental to the public welfare, nor would it be injurious to other
land or improvements in the neighborhood.
(6) The variance is the minimum variance necessary to address or
alleviate the practical difficulties.
b. Procedure.
(1) Application. Requests for variances, as provided within this chapter,
shall be filed with the Zoning Administrator on an official
application form. The application shall be accompanied by a fee as
provided for by City Council resolution. The application shall also
be accompanied by three copies of a survey signed by a land
surveyor licensed in the State of Minnesota, and detailed written and
graphic materials fully explaining the proposed change,
development or use and ° mailing list ails label and ° map or
all efty o s leeated within 500 feet o f the subjeet
Hennevin Co-
Section 4. Zoning Regulations Section 1201.25 Subd. 6 is hereby amended as follows:
Subd. 6. Procedure for processing a P. U.D.
a. Application conference. Upon filing of an application for P.U.D., the
applicant of the proposed P.U.D. is encouraged to arrange for and attend a conference with the
Zoning Administrator. The primary purpose of the conference shall be to provide the applicant
with an opportunity to gather information and obtain guidance as to the general suitability of his
or her proposal for the area for which it is proposed and its conformity to the provisions of this
chapter before incurring substantial expense in the preparation of plans, surveys and other data.
b. General concept plan.
(1) Purpose. The general concept plan provides an opportunity for the
applicant to submit a plan to the city showing his or her basic intent and the general nature of the
entire development without incurring substantial cost. The following elements of the proposed
general concept plan represent the immediately significant elements for city review and
comment:
(a) Overall maximum P.U.D. density range;
(b) General location of major streets and pedestrian ways;
(c) General location and extent of public and common open
space;
(d) General location of residential and nonresidential land uses
with approximate type and intensities of development;
(e) Staging and time schedule of development;
(f) Other special criteria for development;
(2) Schedule:
(a) Developer meets with the Zoning Administrator to discuss
the proposed development;
(b) The applicant shall file the concept stage application,
together with all supporting data and filing fee as established by City Council resolution;
(c) Withi,, 30 days afte - v efifieatio by the staff that � o
requife d plan an s "pe .frog data is adequate, Me Planning Commission shall hold a public
hearing;
(d) The Zoning Administrator, upon verification of the
application, shall instruct the City Administrator /Clerk to set a public hearing f�e at a
regular meeting of the Planning Commission. The Planning Commission shall conduct the
hearing and report its findings and make recommendations to the City Council. Notice of the
hearing shall consist of a legal property description, description of request and be published in
the official newspaper at least ten days prior to the hearing. Written notification of the hearing
shall be mailed at least ten days prior to the hearing to all owners of land within X750 feet of
the boundary of the property in question;
(e) Failure of a property owner to receive the notice shall not
in validate any proceedings as set forth within this chapter;
(f) The Zoning Administrator shall instruct the appropriate
staff persons to prepare technical reports where appropriate and provide a general assistance in
preparing a recommendation on the action to the City Council. Additionally, the request shall be
referred to the Park Commission for their review and comment;
(g) Upon consent of the City Council, the Planning
Commission and city staff shall have the authority to request additional information from the
applicant concerning operational factors or to retain expert testimony with the consent and at the
expense of the applicant concerning operational factors, the information to be declared necessary
to establish performance conditions in relation to all pertinent sections of this chapter;
(h) The applicant or a representative thereof shall appear
before the Planning Commission at the public hearing in order to answer questions concerning
the proposed development;
(i) Within 60 days of the public hearing, or the further time as
may be agreed to by the applicant, the Planning Commission shall itself review the reports and
plans and submit its written report and recommendations to the Council and applicant. The report
shall contain the findings of the Planning Commission with respect to the general concept plan.
If the planning commission fails to act within the time specified herein, it shall be deemed to
have recommended the plan for approval;
0) The Zoning Administrator, upon receipt of the Planning
Commission recommendation, shall instruct the City Administrator /Clerk to set a public hearing
before the City Council. Notice of the hearing shall consist of a legal property description,
description of request and map detailing property location and be published in the official
newspaper at least ten days prior to the hearing. Written notification of the hearing shall be
mailed at least ten days prior to the hearing to all owners of land within X750 feet of the
boundary of the property in question;
(k) Council action:
(i) Following the required publishing and notification
procedure, the City Council shall hold a public hearing;
(ii) The applicant or a representative thereof shall
appear before the City Council in order to present the planned unit development and answer
questions concerning the proposed project;
(iii) The Council shall review the proposed
development, any reports and recommendations of advisory commissions and city staff and
testimony from the public hearing;
(iv) In evaluating the request, the Council shall
determine the relationship between the proposed development, the Comprehensive Plan and this
chapter. Where any question exists as to city policy, the Council may, at any time, refer the
project or any specific item within the project back to the Planning Commission for further study
and with clarification as to the policy;
(v) The City Council shall have the authority to request
additional information from the applicant concerning operational factors or to retain expert
testimony with the consent and at the expense of the applicant concerning operational factors, the
information to be declared necessary to establish performance conditions in relation to all
pertinent sections of this chapter;
(vi) The City Council may require revisions to or
modifications of the general concept plan where deemed necessary. Any revision or modification
shall be referred to the Planning Commission for informational purposes;
(vii) Within 60 days of their receipt of the concept plan
and any reports or recommendations from advisory commissions or city staff, the City Council
shall grant approval, resubmit the plan to the Planning Commission for further consideration of
specified items or deny approval of the concept plan;
(3) Optional submission of development stage plan. In cases of single
stage P.U.D.'s or where the applicant wishes to begin the first stage of a multiple stage P.U.D.,
immediately he or she may, at his or her option, initially submit development stage plans for the
proposed P.U.D. In this case, the Planning Commission and Council shall consider the plans,
grant or deny development stage plan approval in accordance with the provisions of Subd. 6c.
(4) Effect of concept plan approval. Unless the applicant shall fail to
meet time schedules for filing development stage and final plans or shall fail to proceed with
development in accordance with the plans as approved or shall in any other manner fail to
comply with any condition of this chapter or of any approval granted pursuant to it, a general
concept plan which has been approved shall not be modified, revoked or otherwise impaired
pending the application of development stage and final plans by any action of the city without
the consent of the applicant. Problems arising or found to exist during the development or final
plan stage of a project may provide cause for the city to require modification of the general
concept plan.
(5) Limitation ofgeneral concept plan approval. Unless a
development stage plan covering at least ten dwelling units or the area designated in the general
concept plan as the first stage of the P.U.D., whichever is greater, has been filed within six
months from the date Council grants general concept plan approval, or in any case where the
applicant fails to file development stage and final plans and to proceed with development in
accordance with the provisions of this chapter and of an approved general concept plan, the
approval may be revoked by Council action. In this case, the Council shall forthwith adopt a
resolution repealing the general concept plan approval for that portion of the P.U.D. that has not
received final approval and re- establishing the zoning and other ordinance provisions that would
otherwise be applicable. Upon application by the applicant, the Council, at its discretion, may
extend for additional periods not in excess of six months each, the filing deadline for any
development stage plan, when for good cause shown, the extension is necessary.
C. Development stage.
(1) Purpose. The purpose of the development stage plan is to provide a
specific and particular plan upon which the Planning Commission will base its recommendation
to the Council and with which substantial compliance is necessary for the preparation of the final
plan.
(2) Submission of development stage. Upon approval of the general
concept plan and within the time established in Subd. 6b(5) above, the applicant shall file with
the Zoning Administrator a development stage plan consisting of the information and
submissions required by subdivision 5b for the entire P.U.D. or for one or more stages thereof in
accordance with a staging plan approved as part of the general concept plan. The Development
Stage Plan shall refine, implement and be in substantial conformity with the approved General
Concept Plan.
(3) Review and action by city staff and Planning Commission.
Immediately upon receipt of a completed Development Stage Plan, the Administrator shall refer
the plan to the following city staff and /or official bodies for the indicated action:
(a) The City Attorney for legal review of all documents;
(b) The City Engineer for review of all engineering data and
the City /Developer Agreement;
(c) The City Building Official for review of all building plans;
(d) The Zoning Administrator for review of all plans for
compliance with the intent, purpose and requirements of this chapter and conformity with the
General Concept Plan and Comprehensive Plan;
(e) The City Planning Commission for review and
recommendation to the Council;
(f) The Park Commission for review of public recreation
and /or open space provisions;
(g) When appropriate, as determined by the Zoning
Administrator to other special review agencies such as the Watershed Districts, Soil
Conservation Services, Highway Departments or other affected agencies. All staff or
commissions designated in paragraphs (a) through (d) hereof shall submit their reports in writing
to the Planning Commission and applicant at least five days prior to the date of the Planning
Commission meeting at which the request is to be heard.
(4) Schedule.
(a) Developer meets with the Zoning Administrator and city
staff to discuss specific development plans.
(b) The applicant shall file the Development Stage application
within six months after Concept Plan review, together with all supporting data and filing fee as
established by City Council resolution.
(c) Technical staff reports shall be prepared on the proposed
development and distributed to the Planning Commission and the applicant at least five days
prior to the date of the Planning Commission meeting at which the request is to be heard.
(d) The applicant or a representative thereof shall appear
before the Planning Commission in order to answer questions concerning the proposed
development.
(e) The Planning Commission will make a recommendation to
the City Council on the Development Stage Plan.
(f) Council action:
(i) The applicant or a representative thereof shall
appear before the City Council in order to present the Development Stage Plan and answer
questions concerning the Plan;
(ii) The Council shall review the Development Stage
Plan and any reports and recommendations of advisory commissions and city staff,
(iii) The Council shall determine the relationship
between the Development Stage Plan and the previously approved Concept Plan.
(iv) Where deemed necessary, an additional public
hearing may be required during the Development Stage of the P.U.D. The public hearing shall be
held at the discretion of the City Council and shall comply with the procedures set forth in
subdivisions 6b(2)(c) through 0) of this section.
(v) The City Council may require revisions to or
modifications of the Development Stage Plan where deemed necessary. Any revision or
modification shall be referred to the Planning Commission for informational purposes.
(vi) The Council shall approve or deny the Development
Stage Plan.
(vii) If approved, the Council shall instruct the City
Attorney to draw up a P.U.D. agreement which stipulates the specific terms and conditions
approved by the City Council and accepted by the applicant. This agreement shall be signed by
the Mayor of the City of Shorewood, City Administrator /Clerk and the applicant within 30 days
of Council approval of the Development Stage Plan. Where the Development Stage Plan is to be
resubmitted or denied approval, the Council action shall be by written report setting forth the
reasons for its action. In all cases, a certified copy of the document evidencing Council action
shall be promptly delivered to the applicant by the Zoning Administrator.
(5) Limitation on Development Stage Plan approval. Unless a Final
Plan covering the area designated in the Development Stage Plan as the first stage of the P.U.D.
has been filed within six months from the date Council grants Development Stage Plan approval,
or in any case where the applicant fails to file Final Plans and to proceed with development in
accordance with the provisions of this chapter and /or approved Development Stage Plan, the
approval shall expire. Upon application by the applicant, the Council, at its discretion, may
extend for not more than six months, the filing deadline for any Final Plan when, for good cause
shown, the extension is necessary. In any case where Development Plan approval expires, the
Council shall forthwith adopt a resolution repealing the General Concept Plan approval and the
Development Stage Plan approval for that portion of the P.U.D. that has not received Final Plan
approval and reestablishing the zoning and other ordinance provisions that would otherwise be
applicable.
(6) Site improvements. At any time following the approval of a
Development Stage Plan by the Council, the applicant may, pursuant to the applicable
ordinances of the city, apply for, and the City Engineer may issue, grading permits for the area
within the P.U.D. for which Development Stage Plan approval has been given.
d. Final Plan.
(1) Purpose. The Final Plan is to serve as a complete, thorough and
permanent public record of the P.U.D. and the manner in which it is to be developed. It shall
incorporate all prior approved plans and all approved modifications thereof resulting from the
P.U.D. process. It shall serve in conjunction with other city ordinances as the land use regulation
applicable to the P.U.D. The Final Plan is intended only to add detail to, and to put in final form,
the information contained in the Development Stage Plan and shall conform to the Development
Stage Plan in all respects.
(2) Schedule.
(a) Upon approval of the Development Stage Plan, and within
the time established by Subd. 6.c.(5) above, the applicant shall file with the Zoning
Administrator a Final Plan consisting of the information and submissions required by Subd. 5.c.
of this section for the entire P.U.D. or for one or more stages. This plan will be reviewed and
approved /denied by city staff, unless otherwise specified by the City Council.
(b) Within 30 days of its approval, the applicant shall cause the
Final Plan, or the portions thereof as are appropriate, to be recorded with the County Registrar of
Titles. The applicant shall provide the city with a signed copy verifying county recording within
40 days of the date of approval.
(3) Building and other permits. Except as otherwise expressly
provided herein, upon receiving notice from the Zoning Administrator that the approved Final
Plan has been recorded and upon application of the applicant pursuant to the applicable
ordinances of the city, all appropriate officials of the city may issue building and other permits to
the applicant for development, construction and other work in the area encompassed by the
approved Final Plan; provided, however, that no permit shall be issued unless the appropriate
official is first satisfied that the requirements of all codes and ordinances which are applicable to
the permit sought have been satisfied.
(4) Limitations on Final Plan approval. Within one year after the
approval of the Final Plan for P.U.D., or shorter time as may be established by the approved
development schedule, construction shall commence in accordance with the approved plan.
Failure to commence construction within the period shall, unless an extension shall have been
granted as hereinafter provided, automatically render void the P.U.D. permit and all approvals of
the P.U.D. plan and the area encompassed within the P.U.D. shall thereafter be subject to those
provisions of the zoning ordinance and other ordinances applicable in the district in which it is
located. In this case, the Council shall forthwith adopt an ordinance repealing the P.U.D. permit
and all P.U.D. approvals and re- establishing the zoning and other ordinance provisions that
would otherwise be applicable.
(5) Inspection during development.
(a) Compliance with overall plan. Following Final Plan
approval of a P.U.D., or a stage thereof, the Zoning Administrator shall, at least annually until
the completion of development, review all permits issued and construction undertaken and
compare actual development with the approval development schedule.
(b) Development not proceeding according to schedule. If the
Zoning Administrator finds that development is not proceeding in accordance with the approved
schedule, or that it fails in any other respect to comply with the P.U.D. plans as finally approved,
he or she shall immediately notify the Council. Within 30 days of the notice, the Council shall
either by ordinance revoke the P.U.D. permit and the land shall thereafter be governed by the
regulations applicable in the district in which it is located or shall take the steps as it shall deem
necessary to compel compliance with the Final Plans as approved or shall require the landowner
or applicant to seek an amendment of the Final Plan.
Section 5. Subdivision Regulations Section 1202.03 Subd. 2 is hereby amended as
follows:
1202.03 PROCEDURES FOR FILING AND REVIEW.
Subd. 2. Preliminary Plat.
a. Filing. Five copies of the preliminary plat
Hennepin County shall be submitted to the Zoning Administrator. The required filing fee as
established by City Code Section 1301.03 Couneil fesehi ien shall be paid and any necessary
applications for variances from the provisions of this chapter shall be submitted with the required
fee. The pfoposal must be submitted by the fif st Tuesday of any given men-th in efdef to be
plaeed on the Planning Commission agenda f6f the fifst Tuesday of the following men-th. The
plan shall be considered as being officially submitted when all the information requirements
have been complied with.
b. Public hearing. Upon receipt of the subdivision application, the Zoning
Administrator shall set a public hearing for public review of the preliminary plat. The hearing
shall be established once adequate time has been allowed for staff and advisory body review of
the plat. The Planning Commission shall conduct the hearing and report its findings and make
recommendations to the City Council. Notice of the hearing shall contain a legal property
description, description of request detailing property location and be published in the official
newspaper no more than 30 and no less than ten days prior to the hearing. Written notification of
the hearing shall be mailed no more than 30 and no less than ten days prior to the hearing to all
owners of land within X750 feet of the boundary of the property in question.
Section 6. Subdivision Regulations Section 1202.03 Subd. 2 a. 1. is hereby amended as
follows:
1202.09 VARIANCES AND APPEALS.
Subd. 1. Findings. The Planning Commission may recommend a variance from the
minimum standards of this chapter, but not procedural provisions, when in its opinion, undue
hardship may result from strict compliance. In recommending any variance, the Commission
shall prescribe any conditions that it deem necessary to or desirable for the public interest. In
making its recommendations, the Planning Commission shall take into account the nature of the
proposed use of land and the existing use of land in the vicinity, the number of persons to reside
or work in the proposed subdivision and the probable effect of the proposed subdivision upon
traffic conditions in the vicinity. A variance shall only be recommended when the Planning
Commission finds:
a. There are special and highly unique circumstances or conditions affecting
the property that are not common to other properties in the city and that the strict application of
the provisions of this chapter would deprive the applicant of the reasonable and minimum use of
its land;
b. That the granting of the variance will not be detrimental to the public
health or welfare or injurious to other property in the vicinity in which the property is situated;
C. That the variance is to correct inequities resulting from an extreme
hardship limited to topography, soils or other physical factors of the land.
d. After consideration of the Planning Commission recommendations, the
City Council may grant variances, subject to a, b, and c, above.
Subd. 2. Variance application procedures.
a. Procedure.
(1) Application. Appeals or requests for variances, as provided within
this chapter, shall be filed with the Zoning Administrator on an official application form. The
application shall be accompanied by a fee as p,-,.vide,a f r established by City Code Chapter
1301.03'�-� r'4-� r�,.,,nei fese Aie . This fee shall not be refunded. The application shall also be
accompanied by five copies of detailed written and graphic materials fully explaining the
proposed change, development or use and ° mailing list of pfope fty o ° s leeated .. it —hi,, 500
Section 7. This Ordinance shall be in full force and effect upon publication in the
Official Newspaper of the City of Shorewood.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this day
of 2018.
Scott Zerby, Mayor
ATTEST:
Sandie Thone, City Clerk
CITY OF SHOREWOOD
RESOLUTION NO.
A RESOLUTION APPROVING PUBLICATION OF
ORDINANCE NO. 550 BY TITLE AND SUMMARY
WHEREAS, at a duly called meeting on January 22, 2018, the City Council of the City
of Shorewood adopted Ordinance No. 550 entitled "AN ORDINANCE AMENDING
CHAPTERS 1301, 1201 AND 1202 OF THE SHOREWOOD CITY CODE RELATED TO
FEES, PROCEDURES AND APPLICATION MATERIALS "; and,
WHEREAS, The City Council has adopted a lengthy ordinance related to fees, procedures
and application procedures for land use applications. The purpose of this summary is to inform the
public of the intent and effect of the ordinance and to publish only a summary of the ordinance
with the full ordinance being on file in the office of the City Clerk during regular office hours;
NOW THEREFORE, IT IS HEREBY RESOLVED BY THE CITY COUNCIL OF THE
CITY OF SHOREWOOD:
The City Council finds that the above title and summary of Ordinance No. 550 clearly
informs the public of intent and effect of the Ordinance.
2. The City Clerk is directed to publish Ordinance No. 550 by title and summary, pursuant
to Minnesota Statutes, Section 412.191, subdivision 4. Such summary is to be
substantially the same as the attached form.
A full copy of the Ordinance is available at Shorewood City Hall and on the city's website.
ADOPTED by the Shorewood City Council on this 22"d day of January 2018.
ATTEST:
Sandie Thone, City Clerk
Scott Zerby, Mayor
(Official Publication)
CITY OF SHOREWOOD
COUNTY OF HENNEPIN
STATE OF MINNESOTA
ORDINANCE 550 (SUMMARY PUBLICATION)
AN ORDINANCE AMENDING CHAPTERS 1301, 1201 AND 1202 OF THE
SHOREWOOD CITY CODE RELATING TO FEES, PROCEDURES AND APPLICATION
MATERIALS
1301.03 LAND USE FEES
1201.04 ADMINISTRATION, AMENDMENTS AND CONDITIONAL USE PERMITS
1201.05 ADMINISTRATION, VARIANCE AND APPEAL
1201.25 P.U.D. PLANNED UNIT DEVELOPMENT DISTRICT
1202.03 PROCEDURES FOR FILING AND REVIEW
1202.09 VARIANCES AND APPEALS
Ordinance becomes effective upon publication. The amendments in their entirety are available for review
in the City Clerk's office. Adopted by the Shorewood City Council on January 22, 2018.
s/s Sandie Thone, City Clerk
y #8A
MEETING TYPE
City of Shorewood Council Meeting Item Regular Meeting
Title / Subject: Receive Updated Feasibility Report and Authorize Preparation of Plans and
Specifications for the 2018 Street and Utility Improvement Project, City Project 17 -04
Meeting Date: January 22, 2018
Prepared by: Alyson Fauske, PE, City Engineer
Reviewed by: Larry Brown, PE, Public Works Director
Attachments: Feasibility Report prepared by WSB, January 22, 2018
Resolution
Resident comments (2)
Background: On September 6, 2017, the Shorewood City Council authorized the preparation of a
revision to the Engineering Feasibility Report for the 2018 Street and Utility Improvement Project to
include Mann Lane and Maple Street; the original improvement project included the reconstruction of
Riviera Lane from Yellowstone Trail to the cul -de -sac and Shorewood Lane from Smithtown Road to the
cul -de -sac. Subsequent to the October 9, 2017 City Council Work Session, WSB was directed to analyze
the feasibility of installing a trail along Country Club Road (current terminus to Yellowstone Trail) and
Yellowstone Trail (Country Club Road to Lake Linden Drive) since Yellowstone Trail is contiguous to
Riviera Lane.
The project includes street, drainage and utility improvements generally consisting of reconstruction of
the street meeting City design standards with concrete curb and gutter, storm sewer, and minor sanitary
sewer improvements related to reduction in inflow and infiltration into the system.
Watermain extension was evaluated with the original feasibility study. The watermain work was
removed from the project scope due to the significant impact to the city's water fund to extend the
portion within Yellowstone Trail and the extended time anticipated to replenish the fund via water
connections. Staff has been contacted by two residents on Riviera Lane who want the watermain to be
included in the project and has explained why watermain extension is not proposed at this time. An
email from one of the residents is included in the packet. The other resident requested the City's
petition form in effort to provide staff and council proof of resident support for the watermain
extension, including residents along Yellowstone Trail. Staff indicated that the council would be
considering the project scope at the January 22nd meeting and has not heard back from the resident at
the time of writing this report.
Staff recommends that Maple Street be removed from the project since storm sewer improvements
outside of the project area are required. Improvements to Maple Street should be included with future
improvements to Lake Linden Drive.
Staff recommends not to proceed with the trail extension as it is typically more cost - effective to
construct trails in conjunction with a street improvement project, anticipated additional future costs
during street reconstruction as portions of the trail would likely need to be removed and replaced due
Mission Statement; The City of Shorewood is committed to providing residents quality public services, a
healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial
management through effective, efficient, and visionary leadership. Page 1
alignment changes, and watershed district permitting would be an issue without installing storm water
mitigation features within the right of way corridor.
The street improvements described in the Feasibility Report are necessary, cost effective, and feasible.
Financial or Budget Considerations: The total estimated project cost is summarized below.
Street
Improvement
Cost
Total Project Cost
Surface Improvements
$600,300.00
Riviera Lane
Sanitary Improvements
$19,300.00
$779,700.00
Drainage Improvements
$160,100.00
Surface Improvements
$411,000.00
Shorewood Lane
Sanitary Improvements
$54,300.00
$524,600.00
Drainage Improvements
$59,300.00
Surface Improvements
$280,400.00
Mann Lane
Sanitary Improvements
$12,200.00
$362,800.00
Drainage Improvements
$70,200.00
Surface Improvements
$366,900.00
Maple Street
Sanitary Improvements
$0.00
$466,600.00
Drainage Improvements
$99,700.00
Surface Improvements
$572,900.00
Country Club Road
Sanitary Improvements
$2,500.00
$588,400.00
Drainage Improvements
$41,100.00
Surface Improvements
$488,100.00
Yellowstone Trail
Sanitary Improvements
$4,900.00
$574,700.00
Drainage Improvements
$81,700.00
TOTAL
$3,324,900.00
Options: Staff recommends that the Council consider the following actions:
1. Approve the attached resolution Receiving the Feasibility Report and Authorize the
Preparation of Plans and Specifications for the Mann Lane, Riviera Lane and Shorewood
Lane Street and Utility Improvements.
2. Direct staff to modify plans.
3. Take no action at this time
Recommendation /Action Requested: Staff recommends the City Council approve the attached
resolution Receiving the Feasibility Report and Authorize the Preparation of Plans and Specifications for
the Mann Lane, Riviera Lane and Shorewood Lane Street and Utility Improvements, City Project 17 -04.
Next Steps and Timelines:
City Council approves final plans and specifications, authorizes advertisement for bids- March, 2018
City Council award construction contract- May, 2018
Begin construction- May /June, 2018
Construction substantially complete- September, 2018
Final completion — Spring, 2019
RIVIERA LANE, SHOREWOOD
LANE, MANN LANE, AND MAPLE
STREET IMPROVEMENTS AND
TRAIL EXTENSION ALONG
COUNTRY CLUB ROAD AND
YELLOWSTONE TRAIL
CITY OF SHOREWOOD I HENNEPIN COUNTY I MINNESOTA
JANUARY 22, 2018
Prepared for:
City of Shorewood
5755 Country Club Road
Shorewood, MN 55331
CITY OF SHOREWOOD PROJECT NO. 17 -04
WSB PROJECT NO. 2925 -24
FEASIBILITY REPORT
RIVIERA LANE, SHOREWOOD LANE, MANN LANE,
AND MAPLE STREET IMPROVEMENTS AND
TRAIL EXTENSION ALONG COUNTRY CLUB ROAD AND
YELLOWSTONE TRAIL
CITY PROJECT NO. 17 -04
CITY OF SHOREWOOD, MINNESOTA
January 22, 2018
Prepared By:
A
Feasibility Report
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
AP
178 East g`" Street, Suite 200 1 St. Paul, MN 55101 1 (651) 286 -8450
January 22, 2017
Honorable Mayor and City Council
City of Shorewood
5755 Country Club Road
Shorewood, MN 55331
Re: Feasibility Report
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
W SB Project No. 2925 -24
Dear Honorable Mayor and City Council:
Transmitted herewith for your review is a Feasibility Report for the above referenced project.
The report addresses the improvements along Riviera Lane south of Yellowstone Trail,
Shorewood Lane north of Smithtown Road, Mann Lane east of Eureka Road, and Maple Street
east of Lake Linden Drive. The proposed project includes road reconstruction complete with
bituminous paving and concrete curb and gutter.
Additional improvements included in this report include extension of trail along Country Club
Road from Mary Lake Trail to Yellowstone Trail and along Yellowstone Trail from Country
Club Road to Lake Linden Drive.
The report contained herein presents costs for the project as well as proposed funding.
We are available at your convenience to discuss this report. Please feel free to contact me at
(763) 512 -5244 if you have any questions regarding this proposed project.
Sincerely,
WSB & Associates, Inc.
Alyso Fauske, PE
City Engineer
Enclosure
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
CERTIFICATION
I hereby certify that this plan, specification, or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Professional Engineer under the laws of the State of
Minnesota.
Date: January 22, 2018 Lic. No. 23359
Quality Control Review Completed By:
on Fauske, PE
Date: Date: January 22, 2018 Lic. No. 42437
Feasibility Report
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
TABLE OF CONTENTS
TITLE SHEET
LETTER OF TRANSMITTAL
CERTIFICATION SHEET
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY ....................................................................... ..............................2
2. STREET AND UTILITY IMPROVEMENT PROJECT ...................... ..............................3
2.1 Introduction ........... ...............................
2. 1.1 Authorization ...........................
2.1.2 Scope ........ ...............................
2.1.3 Data Available .........................
2.1.4 Project Background .................
2.2 Existing Conditions ..............................
2.2.1 Roadway ... ...............................
2.2.2 Drainage ... ...............................
2.2.3 Sanitary Sewer .........................
2.2.4 Watermain ...............................
2.2.5 Private Utilities ........................
2.3 Proposed Improvements .......................
2.3.1 Roadway ... ...............................
2.3.2 Drainage ... ...............................
2.3.3 Sanitary Sewer .........................
2.3.4 Watermain ...............................
2.3.5 Trail Extension ........................
2.3.6 Street Sign Replacement..........
2.3.7 Mailbox Replacement ..............
2.3.8 Easements . ...............................
2.3.9 Permits /Approvals ...................
2.3.10 Detour Routes /Project Phasing
2.3.11 Public Involvement ..................
3. FINANCING
3.1 Opinion of Cost
3.2 Funding ............
4. PROJECT SCHEDULE
5. CONCLUSIONS AND RECOMMENDATIONS
Appendix A - Figures
Appendix B - Opinion of Probable Cost
Appendix C - Geotechnical Boring Logs
Appendix D - Sanitary Sewer Televising Summary
.3
.3
.3
.3
.4
.5
.5
.5
.6
.6
.6
.7
.7
.7
.8
.8
.8
.9
.9
10
10
10
10
11
11
11
12
13
Feasibility Report Page 1
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
1. EXECUTIVE SUMMARY
The Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail
Extension along Country Club Road and Yellowstone Trail, City Project No. 17 -04, was initiated
by the City Council at their September 11, 2017, regular City Council meeting. Improvements
proposed for construction in 2018 include the reconstruction of Riviera Lane south of
Yellowstone Trail, Shorewood Lane north of Smithtown Road, Mann Lane east of Eureka Road,
and Maple Street east of Lake Linden Drive, approximately 2,450 feet (0.47 miles). The
proposed improvements include removing the existing pavement, correcting the subgrade,
installing concrete curb and gutter, storm sewer, and installing new pavement.
Additional improvements for consideration include extension of bituminous trail along Country
Club Road from Mary Lake Trail to Yellowstone Trail and along Yellowstone Trail from
Country Club Road to Lake Linden Drive.
A map illustrating the project location can be found on Figure 1 of Appendix A.
The total estimated project cost for the Riviera Lane, Shorewood Lane, Mann Lane, and Maple
Street Improvements and Trail Extension along Country Club Road and Yellowstone Trail is
approximately $3,324,900. Funding for the project will be provided through the City's Street
Reconstruction Fund, Storm Water Fund, and Sanitary Sewer Fund.
The project reconstruction can be completed, including the first lift of bituminous paving and
restoration items, in 2018. The final lift of bituminous paving is proposed to be installed in June
of 2019.
This project is feasible, necessary, and cost effective from an engineering standpoint and should
be constructed as proposed herein. Financial feasibility will need to be considered by the City
Council.
Feasibility Report Page 2
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
2. STREET AND UTILITY IMPROVEMENT PROJECT
2.1 Introduction
2.1.1 Authorization
On September 11, 2017, the Shorewood City Council authorized the preparation of an
Engineering Feasibility Report for the Riviera Lane, Shorewood Lane, Mann Lane, and
Maple Street Improvements and Trail Extension along Country Club Road and
Yellowstone Trail. This project has been designated as City Project No. 17 -04.
2.1.2 Scope
Improvements outlined within this report include the reconstruction of Riviera Lane,
Shorewood Lane, Mann Lane, and Maple Street to an urban section with concrete curb
and gutter meeting the current City design standard, drainage improvements, and sanitary
sewer rehabilitation.
Additional improvements for consideration include extension of bituminous trail along
Country Club Road from Mary Lake Trail to Yellowstone Trail and along Yellowstone
Trail from Country Club Road to Lake Linden Drive.
The project area is shown in Figure 1 of Appendix A.
2.1.3 Data Available
Information and materials used in the preparation of this report include the following:
• City of Shorewood Pavement Management Plan
• City of Shorewood Record Plans
• City of Shorewood Base and Topography Maps
• Private Utility Maps
• Field Observations of the Area
• Field Topography Survey
• Geotechnical Evaluation Report prepared by American Engineering Testing dated
January 2017
• Televising Reports of the Sanitary Sewer System, Hydro -Klean dated December
2016
• City of Shorewood Assessment Policy
• Neighborhood Informational Meeting held December 7, 2017
Feasibility Report Page 3
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
2.1.4 Project Background
The feasibility report for the project was originally presented to City Council in 2017 and
included the reconstruction of Riviera Lane and Shorewood Lane only complete with
extension of watermain to serve properties currently being service by individual, onsite
wells. However, extension of watermain was determined not to be cost effective for the
budget at that time and the project was postponed. On August 14, 2017, the Council was
presented with a revised Capital Improvement Plan schedule that included the
reconstruction of Riviera Lane, Shorewood Lane, Mann Lane and Maple Street for the
2018 construction season, excluding extension of watermain.
This project was initiated through the continued development and implementation of the
City of Shorewood's Pavement Management Plan. The Pavement Management Plan
provides a schedule for the various roadway improvements that are necessary to maintain
the City streets in an effective and efficient manner. City streets are evaluated and the
pavement management plan schedule revised according to the pavement condition
ratings. Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street have been
evaluated with a Pavement Surface Evaluation and Rating (PASER) rating of 6, 5, 5, and
4 respectively, on a condition scale from 1 to 10 in 2016. Prior year's ratings ranged
from 3 to 4 but have increased mainly due to patching and sealcoat activities.
The following conditions have been identified within the project area:
• Existing streets do not meet City minimum roadway standards with concrete curb
and gutter.
• Deterioration of the existing streets including alligator cracking, edge cracking,
transverse cracking, and longitudinal cracking.
• The roadway exhibits drainage issues due to roadway deformation and inadequate
drainage systems (ditches or storm sewer).
• Sanitary sewer has been found to have minor deficiencies including leaking joints
and traces of mineral deposits.
Feasibility Report Page 4
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
2.2 Existing Conditions
2.2.1 Roadway
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street were originally
constructed in 1972 when the sanitary sewer was constructed and are experiencing
various severities of distresses including alligator, block, transverse, and longitudinal
cracking, along with localized drainage issues. The proposed reconstruction area consists
of 22 -32- foot -wide rural section (no curb and gutter) roadways.
Soil borings taken within Riviera Lane and Shorewood Lane indicate the existing asphalt
thickness ranges from 2.75 inches to 5.25 inches and the underlying soils in the area
consist of silty sand fill, clayey sand fill, and sandy lean clay. A copy of the soil boring
results is included in Appendix C of this report. Additional boring will be completed
along Mann Lane and Maple Street during final design.
The City right -of -way within the proposed reconstruction project consists of 50 feet along
Riviera Lane and Shorewood Lane, 33 feet — 41.5 feet along Mann Lane, and 60 feet
along Maple Street. The project area is surrounded primarily by residential properties
that contain landscaping, trees, and numerous other private improvements beyond the
edge of the roadway and within the City right -of -way.
2.2.2 Drainage
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street are currently graded as
rural section roads with and without ditches The existing drainage system does not
provide an adequate means for conveyance of storm water runoff Coupled with the lack
of curb, localized ponding occurs on and adjacent to the roadways, within the boulevards
and yard areas.
Runoff from Riviera Lane is conveyed to the south where surface water outlets to
existing ponds located on the east side of Riviera Lane midblock, and southwest of
Riviera Lane through side yards at the cul -de -sac.
Runoff from Shorewood Lane is conveyed to the north and collected at a catch basin
located on the east side of the cul -de -sac that outlets to a pond located east of Shorewood
Lane and west of Lawtonka Drive.
Runoff from Mann Lane is conveyed to an existing low point east of the driveway at
25350 Mann Lane. Surface water continues north to an existing wetland.
Runoff from Maple Street is conveyed to the north along the east side of Lake Linden
Drive where it eventually drains to Lake Linden. Lake Linden Drive consists of a
shallow ditch system along the west side of the roadway. The lack of ditches and storm
facilities along the east side of the roadway has created erosion issues along the existing
banks and contributed to the deterioration of the roadway edges.
Feasibility Report Page 5
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
2.2.3 Sanitary Sewer
The existing sanitary sewer system in the project area consists of 9- inch - diameter
polyvinyl chlorinated (PVC) pipe sewer constructed in 1972.
The existing sanitary sewer along Riviera Lane and Shorewood Lane was televised by
Hydro -Klean in 2016 and the mainline sewer was found to be in good condition with
minor deficiencies including traces of mineral deposits and manhole joints in need of re-
grouting. A summary of the sanitary sewer televising and manhole inspections can be
found in Appendix D of this report. The remaining sanitary sewer along Mann Lane and
Maple Street will be televised during final design.
2.2.4 Watermain
There is no existing watermain along Riviera Lane, Shorewood Lane, Mann Lane, and
Maple Street and properties are served by private wells for water supply.
2.2.5 Private Utilities
Private utilities within the project area include communications, gas, and electric
facilities. A meeting will be held with the utility companies during the final design stage
to coordinate utility conflicts and construction schedule. Private utility companies that
have been identified with facilities in the general project area include:
• CenturyLink (Telephone /Internet)
• CenterPoint Energy (Gas)
• Jaguar Communications (Telephone /Internet)
• Mediacom (Cable)
• Xcel Energy (Electric)
• Metropolitan Council Environmental Services (MCES) Commission
Feasibility Report Page 6
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
2.3 Proposed Improvements
2.3.1 Roadway
Riviera Lane, Shorewood Lane, and Maple Street are proposed to be reconstructed to the
City's Design Standard for a residential, urban roadway, consisting of a 28 -foot street
width, as measured to back -of -curb, with surmountable concrete curb and gutter.
Shorewood Lane was previous reconstructed from County Road 19 to the Fire Station
entrance. This segment is proposed to be milled with bituminous overlay.
Mann Lane is proposed to be constructed as a residential, urban roadway, consisting of a
reduced width of 26 feet, as measured to back -of -curb due to limited right -of -way.
Reconstruction of the roadways will include the following section: two - inches (2 ") of
bituminous wear course, two - inches (2 ") of bituminous base course, eight- inches (8 ") of
Class 5 aggregate base, twenty- four - inches (24 ") of select granular material, and
geotextile fabric over an acceptable and compacted subgrade. The geotextile fabric is
intended to separate the underlying in -situ clayey materials from the new granular
materials.
Improvements along Riviera Lane and Shorewood Lane include reconstructing the
existing cul -de -sac to meet the City's Design Standard of 90 feet in diameter. To
reconstruct the cul -de -sac on Riviera Lane, the work may impact adjacent property area
and may require temporary construction easements.
Improvements along Maple Street include constructing a 50 -foot diameter cul -de -sac at
the east side. In order to construct the cul -de -sac to the City standard of 90 feet, the work
would not only impact adjacent property area but would require additional permanent
right -of -way. Maple Street is a short street section of 200 feet with only three properties
with direct access to the roadway.
The proposed typical sections for Riviera Lane, Shorewood Lane, Mann Lane, and Maple
Street are shown on Figure 2, Figure 3, Figure 4, and Figure 5 in Appendix A.
Reconstruction of the existing streets is intended to improve the design strength of the
pavement system and provide a street surface with an extended life meeting current City
Design Standards.
2.3.2 Drainage
Reconstruction of the road provides the opportunity to improve drainage in the area with
the installation of storm sewer facilities. The drainage system will be improved with the
addition of catch basins along the roadway to better accommodate area drainage and the
extension of new storm sewer where facilities do not currently exist.
Feasibility Report Page 7
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
Additional drainage improvements proposed along Maple Street include expanding storm
sewer facilities along Lake Linden Drive and replacing the existing outlet to Lake
Linden. Expansion of the storm sewer along Lake Linden Drive will require the existing
bituminous trail to be removed and replaced, tree impacts, and portions of the roadway to
be patched to facilitate construction.
The proposed storm sewer for Riviera Lane, Shorewood Lane, Mann Lane, and Maple
Street are shown on Figure 2, Figure 3, Figure 4, and Figure 5 in Appendix A.
2.3.3 Sanitary Sewer
The proposed sanitary sewer improvements include adjusting existing manhole castings
to the new roadway surface with chimney seals to reduce inflow and infiltration of storm
water into the manholes. It is also proposed to repair damaged sanitary sewer identified
in the sewer televising tapes including minor point repairs, pipe sewer cleaning and
manhole grouting.
Public Works has identified sanitary sewer that is close to a house and will cause
problematic maintenance in the future. The project includes relocation of the sanitary
sewer in the Shorewood Lane right -of -way. The relocation of the sanitary sewer is
identified in Figure 3 of Appendix A.
2.3.4 Watermain
Extension of the watermain is not proposed with these improvements. The Water Fund is
not sufficient to fund watermain extension for these projects along with other projects
within the City's Capital Improvements.
2.3.5 Trail Extension
Trail extension improvements include a 10 -foot bituminous trail along Country Club
Road from Mary Lake Trail to Yellowstone Trail and along Yellowstone Trail from
Country Club Road to Lake Linden Drive. The design will consider the preservation of
neighborhood features such as trees, landscaping, driveways, and wetlands; however,
there will be impacts to these items throughout the corridor.
Trail extension along the west side of Country Club Road and south side of Yellowstone
Trail will provide an off - street access route for pedestrians between Minnetonka Country
Club and Lake Linden Drive. The proposed location of the trail provides a route for
pedestrians to avoid crossing higher volume roadways.
Proposed trail improvements along Country Club Road include reconstructing Country
Club Road between Mary Lake Trail and Yellowstone trail, installing new concrete curb
and gutter along the west side of Country Club Road to provide separation from the trail
and convey drainage of the street section. The proposed typical section for Country Club
Road is shown on Figure 6 in Appendix A.
Feasibility Report Page 8
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
Proposed trail improvements along Yellowstone Trail include installing new concrete
curb and gutter as necessary along the south side of the roadway to minimize impacts to
adjacent wetlands. The proposed trail would be constructed with a variable boulevard
(Yellowstone Trail is not centered on the existing road right -of -way) and a 2- foot -wide
grass buffer from the outside edge of the trail to the right -of -way line when possible. In
areas of limited right -of -way, topographic features, or that have potential for wetland
impacts, retaining walls are proposed to minimize impacts and reduce easement
requirements. Topographic survey will be completed during final design. The proposed
typical section for Yellowstone Trail is shown on Figure 7 in Appendix A.
The proposed pavement section for the trails will consist of 3 inches of bituminous
pavement and 6 inches of class 5 aggregate base over an acceptable, compacted subgrade.
Geotechnical evaluation will be completed during final design to determine if the existing
subgrade material is suitable for use.
The trail is proposed to be installed where pedestrian facilities currently do not exist, and
will impact adjacent properties. Typical impacts associated with the construction of a
new trail include tree removal, fence removal /replacement, grading within front lawn
areas, irrigation relocation, removal and replacement of driveway approaches, relocation
of existing private utilities, stormwater facilities, and modifications to existing driveway
grades. Work associated with these items will primarily occur within the public right -of-
way, but driveway removal and grading within the yard may extend further into adjacent
properties. Detailed impacts to properties are typically determined during the final
design process.
New trail construction will require additional water quality improvements as the
construction will result in an increase in impervious area. Perforated drain the will be
installed along the majority of the trail within the buffer area and sumped drainage
structures are proposed to collect sediment prior to stormwater discharge as a means to
improve water quality.
2.3.6 Street Sign Replacement
All existing street signs within the project will be replaced with new street signs that meet
the Federal Highway Administration's (FHWA) requirements for retro - reflectivity.
2.3.7 Mailbox Replacement
Mailboxes are proposed to be salvaged and relocated temporarily during construction,
then reinstalled near the end of construction activities. Mailboxes will be reinstalled to
meet the United States Postal Service (LISPS) requirements. In the event the condition of
the existing mailbox support warrants replacement prior to reinstallation, the City is
proposing to salvage the existing mailbox and install a new mailbox support that will
meet both City standards and USPS requirements.
Feasibility Report Page 9
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
2.3.8 Easements
It is anticipated that work will take place within the existing roadway right -of -way or
within existing drainage and utility easements. Additional permanent right -of -way or
easement acquisition may be required and will be determined during final design.
2.3.9 Permits /Approvals
The anticipated permits and the respective regulatory agencies are listed below:
Minnesota Pollution Control Agency (MPCA) (NPDES) ...Erosion /Stormwater Permit
Minnehaha Creek Watershed District (MCWD) .... .............Erosion /Stormwater Permit
Hennepin County (HC) ........ ............................... Work in County Right of way
2.3.10 Detour Routes/Project Phasing
Construction of the proposed improvements will require limited resident access during
the work day when construction activities are in progress. However, the contractor will
be required to provide access to properties to the extent possible. City staff will work
with the contractor to provide notice to residents for activities that may affect access.
Traffic control devices meeting the Minnesota Manual on Uniform Traffic Control
Devices will be required for posting roadway closures. In order to accommodate the
property owners along the excavated roads, temporary parking on the adjacent streets
may be necessary when vehicle access is not possible, such as when excavation is within
the roadway during daytime hours. The contractor will be responsible for providing
access to properties throughout the duration of the project.
Access to the Fire Station will be maintained during construction with minor coordinated
interruptions.
2.3.11 Public Involvement
A public informational open house meeting for the proposed project was conducted
December 7, 2017. Preliminary information was presented to attendees regarding the
proposed improvements, schedule, impacts associated with the project and what to expect
during construction. Residents were encouraged to share their knowledge of the project
area, specifically any known areas of concern.
Feasibility Report Page 10
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
3. FINANCING
3.1 Opinion of Cost
A detailed engineer's opinion of probable costs for the proposed improvements can be found in
Appendix B of this report. The opinion of probable cost incorporates bid prices from the 2017
construction season projected to a 2018 cost basis including a 10% construction contingency
(20% for trail extension improvements along Country Club Road and Yellowstone Trail).
Indirect costs are typically 27% of the construction cost and include engineering, legal,
financing, and administrative costs for budgetary purposes.
Table 1 below provides a summary of the opinion of probable costs for the Riviera Lane,
Shorewood Lane, Mann Lane, and Maple Street Improvement Project:
Table 1
Opinion of Probable Costs
Street
Improvement
Cost
Total Project Cost
Riviera Lane
Surface Improvements
$600,300.00
$779,700.00
Sanitary Improvements
$19,300.00
Drainage Improvements
$160,100.00
Shorewood Lane
Surface Improvements
$411,000.00
$524,600.00
Sanitary Improvements
$54,300.00
Drainage Improvements
$59,300.00
Mann Lane
Surface Improvements
$280,400.00
$362,800.00
Sanitary Improvements
$12,200.00
Drainage Improvements
$70,200.00
Maple Street
Surface Improvements
$366,900.00
$466,600.00
Sanitary Improvements
$0.00
Drainage Improvements
$99,700.00
Country Club Road
Surface Improvements
$572,900.00
$616,500.00
Sanitary Improvements
$2,500.00
Drainage Improvements
$41,100.00
Yellowstone Trail
Surface Improvements
$488,100.00
$574,700.00
Sanitary Improvements
$4,900.00
Drainage Improvements
$81,700.00
TOTAL
$3,324,900.00
3.2 Funding
Funding for the project will be provided through the City's Street Reconstruction Fund, Storm
Water Fund, and Sanitary Sewer Fund.
Feasibility Report Page 11
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
4. PROJECT SCHEDULE
The proposed project schedule for the Riviera Lane, Shorewood Lane, Mann Lane, and Maple
Street Improvement Project is as follows:
Neighborhood Informational Meeting ..................... ............................... December 7, 2017
Accept Feasibility Report /Order Project ..................... ............................... January 22, 2018
Approve Plans and Specifications /Authorize Ad for Bid ..... ............................... April 2018
OpenBids ............................................................................... ............................... May 2018
Award Construction Contract ................................................ ............................... June 2018
Begin Construction ................................................................ ............................... June 2018
Construction Substantially Complete .......................... ............................... September 2018
Final Completion (Final Lift of Bituminous Wear Course) .............................. Spring 2019
* Schedule assumes all private utility and gas main relocation work is completed prior to start of
construction.
Feasibility Report Page 12
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
5. CONCLUSIONS AND RECOMMENDATIONS
The Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail
Extension along Country Club Road and Yellowstone Trail project consists of roadway, trail,
drainage, and minor sanitary sewer improvements.
The total estimated project cost for the Riviera Lane, Shorewood Lane, Mann Lane, and Maple
Street Improvements and Trail Extension along Country Club Road and Yellowstone Trail
project is approximately $3,324,900. Funding for the project will be provided through City's
Street Reconstruction Fund, Storm Water Fund, and Sanitary Sewer Fund.
This project is feasible, necessary, and cost - effective from an engineering standpoint. The
project funding feasibility is subject to financial review by the City. Based on the information
contained in this report, it is recommended to proceed with the improvements as outlined herein.
Council will determine the financial feasibility of the improvements. Council may want to
consider reconstructing Maple Street at the time Lake Linden Drive is improved due to the
necessary construction of storm sewer along Lake Linden Drive.
Council may also want to consider financial feasibility of the trail improvements. Trail
extension may require removal and replacement of some of the proposed trail and associated
drainage improvements at the time Yellowstone Trail is reconstructed. Previous studies have
shown it is more cost effective to construct trails along roadways when the road is reconstructed
to reduce costs to reconstruct portions of the trail improvements with the future roadway.
Feasibility Report Page 13
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
APPENDIX A
Figures
Feasibility Report
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
AV
r
R/W
��wre�
v reisxr o�r n..v
� eaPeo�or�e EEgo aere
RIVIERA LANE
R/W
u uenrarn..v
AL RIVIERA LANE LEGEND
WSB 5
FIGURE 2 STREET AND UTILITY IMPROVEMENT PROJECT STREET RECONSTRUCTION TURF RESTORATION
EIT w oesza.zaa a„ FOR THE CITY OF SHOREWOOD, MN ❑ — _ x E N FEET
PROPOSED TRAIL — PROPOSED STORM
CONTINUE STORI I EXTENSION TO LAKE LINDEN
\\._�. mm
so,
\ \` �:
6070
6090
R/ W
I
I
6" SELECT TOPSOIL
BORROW AND SOD
\\
�7 \
6067 -
\�p\
--606
\
\\
o �a\ Mil
ep
.�� SURAIOUNTABLE CURB
a
23800
Al A
CUB FOODS
R/W
I I
WRIGHT OF WAY 30 RIGHT OF VJAY
14' TO BACK 14' TO BACK
OF CURB OF CURB
VARIES SURMOUNTABLECONCRETE SURHOUNTASLE CONCRETE VAS RIES
CURB AND GUTTER 2.50% 2.50% CURSANDGUTTER
6" SELECT TOPSOIL
________ _______________________________ / BORROW AND SOD
2" TYPE SP 9.5 BITUMINOUS WEARING COURSE
2357 BITUMINOUS TACK COAT
2" TYPE SP 12.5 BITUMINOUS WEARING COURSE
8" AGGGREGATE BASE. CLASS 5
24" SELECT GRANULAR BORROW
GEOTEXTILE FABRIC (TYPE V)
FOR THE CITY OF SHOREWOOD, MN
LEGEND N
MAPLE STREET
WSB FIGURE 5 STREET AND UTILITY IMPROVEMENT PROJECT STREET RECONSTRUCTION —>—>— PROPOSED STORM
w
WSB PROJECT NO.: H.6® CITY OF
02925 -240 12/28117 SCALE IN FEET SHORE RIiWOOD
�\� \
s 90
IR
— \
OF
�„ \ �\\ \;,� \\ \ „ \.<' ,. \��\ �� � : \\ �•\ v., ��\��,, � \\ � \ \\ \.�. �``�' _ 5955 �
RIW RIW
14 TO BACK
zs reioH, of w.sv zs relou, of v:FV
V� ,o TreF.a curesnu scures za TO EDGE
ETI
UTTER 2 501, C IS,
0ss�scT TOasou esE1ECT TOasoii
SORROI AND SOD z vas aa.s sl,uzniuouswsF.rewc couress
,vas E s IUDUIuouswso.aiuc couuss si BITURIMOUS TACK COAT
I A-.EC..TE e..sE, a „ss s l,00%CRUSREO aocrcl „ GGGREGATE BASE s s (1010 %CRUSHED ROCK)
_TErnLE EHERIC wP a
rere,
LEGEND
COUNTRY CLUB ROAD
WS�+ R FIGURE 7 STREET AND UTILITY IMPROVEMENT PROJECT STREET RECONSTRUCTION PROPOSED TRAIL
® FOR THE CITY OF SHOREWOOD, MN
ME PROJECT NO.: IT El I V ol:
02925-240 121 2817 ACALE IN FEET S110M1';W000
APPENDIX B
Opinion of Probable Cost
Feasibility Report
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
Opinion of Probable Cost
WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: WE
and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK
Project Location: City of Shorewood
City Project No.: 17 -04
WSB Project No: 02925 -24 Date: 1/4/2018
No.
L
NIN/DOT
Specification
No.
Description
Unit
Estimated
Total
Quantity
Estimated
Unit Price
Estimated
Total Cost
A. Riviera Lane Surface Improvements
1
2021.501
MOBILIZATION
LUMP SUM
1
$20,500.00
$20,500.00
2
2101.524
CLEARING
TREE
42
$250.00
$10,500.00
3
2101.524
GRUBBING
TREE
42
$250.00
$10,500.00
4
2104.502
REMOVE MAIL BOX SUPPORT
EACH
3
$25.00
$75.00
5
2104.503
SAWING CONCRETE PAVEMENT (FULL DEPTH)
LIN FT
20
$5.00
$100.00
6
2104.503
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
80
$3.001
$240.00
7
2104.503
SALVAGE FENCE
LIN FT
130
$10.00
$1,300.00
8
2104.504
REMOVE BITUMINOUS PAVEMENT
SO YD
2400
$3.50
$8,400.00
9
2104.504
REMOVE BITUMINOUS DRIVEWAY PAVEMENT
SO YD
400
$3.50
$1,400.00
10
2104.504
REMOVE CONCRETE DRIVEWAY PAVEMENT
SO YD
20
$6.50
$130.00
11
2104.509
REMOVE SIGN
EACH
2
1 $50.00
$100.00
12
2104.601
RELOCATE MISCELLANEOUS STRUCTURES
LUMP SUM
1
$1,000.00
$1,000.00
13
2104.602
SALVAGE & REINSTALL MAILBOX
EACH
20
$100.00
$2,000.00
14
2105.504
GEOTEXTILE FABRIC TYPE V
SO YD
4300
$3.50
$15,050.00
15
2105.507
COMMON EXCAVATION (EV) (P)
CU YD
1900
$18.00
$34,200.00
16
2105.507
MUCK EXCAVATION
CU YD
300
$18.00
$5,400.00
17
2105.507
SUBGRADE EXCAVATION (EV) (P)
CU YD
3000
$18.00
$54,000.00
18
2105.507
SELECT GRANULAR BORROW (P)
CU YD
3000
$20.00
$60,000.00
19
2105.507
SELECT GRANULAR BORROW
CU YD
300
$20.00
$6,000.00
20
2105.604
MINOR GRADING
LUMP SUM
1
$1,000.00
$1,000.00
21
2112.501
SUBGRADE PREPARATION
ROAD STA
9
$200.00
$1,800.00
22
2123.610
STREET SWEEPER (WITH PICKUP BROOM)
HOUR
20
$150.00
$3,000.00
23
2130.523
WATER (DUST CONTROL)
MGAL
35
$50.00
$1,750.00
24
2211.507
AGGREGATE BASE CLASS (100% CRUSHED) (P)
CU YD
1900
$28.00
$53,200.00
25
2331.501
-5
JOINT ADHESIVE - MASTIC
LIN FT
2000
$1.00
$2,000.00
26
2357.506
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
200
$3.50
$700.00
27
2360.503
TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY
SO YD
240
$35.00
$8,400.00
28
2360.509
TYPE SP 9.5 WEARING COURSE MIX (2,C)
TON
360
$64.00
$23,040.00
29
2360.509
TYPE SP 12.5 WEARING COURSE MIX (2,C)
TON
360
$64.00
$23,040.00
30
2504.602
IRRIGATION SYSTEM REPAIR
EACH
4
$200.00
$800.00
31
2505.601
UTILITY COORDINATION
LUMP SUM
1
$1,000.00
$1,000.00
32
2531.501
CONCRETE CURB AND GUTTER (SURMOUNTABLE)
LIN FT
2000
$18.00
$36,000.00
33
2531.504
6" CONCRETE DRIVEWAY PAVEMENT
SO YD
70
$65.00
$4,550.00
34
2540.602
MAIL BOX (TEMPORARY)
EACH
20
$50.00
$1,000.00
35
2540.602
MAIL BOX SUPPORT
EACH
3
$75.00
$225.00
36
2551.603
INSTALL FENCE
LIN FT
130
$15.00
$1,950.00
37
2557.602
REPAIR DOG FENCE
EACH
4
$250.00
$1,000.00
38
2563.601
TRAFFIC CONTROL
LUMP SUM
1
$1,500.00
$1,500.00
39
2564.518
SIGN PANELS TYPE C
SO FT
7
$65.00
$455.00
40
2564.602
SIGN PANELS TYPE SPECIAL
EACH
1
$250.00
$250.00
41
2571.524
CONIFEROUS TREE 8' HT B &B
EACH
10
$550.00
$5,500.00
42
2571.524
DECIDUOUS TREE 2.5" CAL B &B
EACH
10
$550.00
$5,500.00
43
2572.510
PRUNE TREES
EACH
10
$100.00
$1,000.00
44
2573.502
STORM DRAIN INLET PROTECTION
EACH
4
$200.00
$800.00
45
2573.503
SILT FENCE, TYPE MACHINE SLICED
LIN FT
2000
$2.50
$5,000.00
46
2573.503
SEDIMENT CONTROL LOG TYPE WOOD FIBER
LIN FT
2000
$3.50
$7,000.00
47
2573.604
STABILIZED CONSTRUCTION ENTRANCE
EACH
1
$1,000.00
$1,000.00
48
2575.502
SEED MIXTURE 25 -151
LB
50
$20.00
$1,000.00
49
2575.523
EROSION CONTROL BLANKET CATEGORY 3
S Y
1 100
1 $5.00
$500.00
B. Riviera Lane Sanitary Improvements
Opinion of Probable Cost
2105.504
52
2104.502
REMOVE CASTING
WSB Project:
Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By:
DJE
$500.00
and Trail Extension along Country Club Road and Yellowstone Trail Checked By:
KAK
Project Location:
City of Shorewood
$300.00
City Project No.:
17 -04
$3,500.00
WSB Project No:
02925 -24 Date:
1/4/2018
CASTING ASSEMBLY
NIN/DOT
EACH
3
Estimated
$2,250.00
55
2506.602
CHEMICAL GROUT MANHOLE
2502.541
EACH
1
Estimated
Estimated
Item No.
Specification
Description
Unit
Total
3
$350.00
$1,050.00
63
2503.503
15' RC PIPE SEWER DESIGN 3006 CL V
Subtotal - B Riviera Lane Sanitary Improvements
+10% Contingency
Subtotal - B Riviera Lane Sanitary Improvements
+ 27% Indirect Costs
Total - B Riviera Lane Sanitary Improvements
Unit Price
Total Cost
$26,000.00
No.
2503.503
18" RC PIPE SEWER DESIGN 3006 CL V
Quantity
70
$55.00
50
2575.604
SEEDING (INCL TOPSOIL AND FERT)
ACRE
0.3
$10,000.00
$3,000.00
51
2575.605
HYDRAULIC MULCH MATRIX
LB
900
$2.00
$1,800.00
$2,000.00
Subtotal - A Riviera Lane Surface Improvements
$429,655.00
CONST DRAINAGE STRUCTURE DES SPECIAL 2
+10% Contingency
$42,965.50
$15,000.00
Subtotal - A Riviera Lane Surface Improvements
$472,620.50
2506.502
+ 27% Indirect Costs
$127,607.54
1 5
Total -A Riviera Lane Surface Improvements
$600,228.04
B. Riviera Lane Sanitary Improvements
57
2105.504
52
2104.502
REMOVE CASTING
$5.00
EACH
3
$500.00
$1,500.00
53
2503.603
SEWER LINER SPOT REPAIR
$300.00
EACH
2
$3,500.00
$7,000.00
54
2506.502
CASTING ASSEMBLY
60
EACH
3
$750.00
$2,250.00
55
2506.602
CHEMICAL GROUT MANHOLE
2502.541
EACH
1
$2,000.00
$2,000.00
56
2506.602
CHIMNEY SEALS
4" PVC PIPE DRAIN CLEANOUT
EACH
3
$350.00
$1,050.00
63
2503.503
15' RC PIPE SEWER DESIGN 3006 CL V
Subtotal - B Riviera Lane Sanitary Improvements
+10% Contingency
Subtotal - B Riviera Lane Sanitary Improvements
+ 27% Indirect Costs
Total - B Riviera Lane Sanitary Improvements
$13,800.00
$1,380.00
$15,180.00
$4,098.60
$19,278.60
C. Riviera Lane Drainage Improvements Improvements
57
2105.504
GEOTEXTILE FABRIC TYPE IV
SO YD
40
$5.00
$200.00
58
2451.507
COURSE AGGREGATE BEDDING (CV)
CU YD
10
$30.00
$300.00
59
2501.502
15' RC PIPE APRON
EACH
2
$1,000.00
$2,000.00
60
2501.502
18" RC PIPE APRON
EACH
1
$1,000.00
$1,000.00
61
2502.541
4" PERF PVC PIPE DRAIN
LIN FT
2000
$22.00
$44,000.00
62
2502.602
4" PVC PIPE DRAIN CLEANOUT
EACH
10
$350.00
$3,500.00
63
2503.503
15' RC PIPE SEWER DESIGN 3006 CL V
LIN FT
500
$52.00
$26,000.00
64
2503.503
18" RC PIPE SEWER DESIGN 3006 CL V
LIN FT
70
$55.00
$3,850.00
65
2506.501
CONST DRAINAGE STRUCTURE DES 48 -4020
LIN FT
30
$350.00
$10,500.00
66
2506.502
CONST DRAINAGE STRUCTURE DES SPECIAL
EACH
1
$2,000.00
$2,000.00
67
2506.502
CONST DRAINAGE STRUCTURE DES SPECIAL 2
EACH
1
$15,000.00
$15,000.00
68
2506.502
CASTING ASSEMBLY
I EACH
1 5
$750.001
$3,750.00
61
2511.507
RANDOM RIPRAP CLASS III
I CU YD
1 25
1 $100.001
$2,500.00
Subtotal - C Riviera Lane Drainage Improvements $114,600.00
+10% Contingency $11,460.00
Subtotal - C Riviera Lane Drainage Improvements $126,060.00
+ 27% Indirect Costs $34,036.20
Total - C Riviera Lane Drainage Improvements $160,096.20
Opinion of Probable Cost
WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: WE
and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK
Project Location: City of Shorewood
City Project No.: 17 -04
WSB Project No: 02925 -24 Date: 1/4/2018
Item No.
NIN/DOT
Specificatio
n No.
Description
Unit
Estimated
Total
Quantity
Estimated
Unit Price
Estimated
Total Cost
D. Shorewood Lane Surface Improvements
62
2021.501
MOBILIZATION
LUMP SUM
1
$14,100.00
$14,100.00
63
2101.505
CLEARING
ACRE
0.01
$10,000.00
$100.00
64
2101.505
GRUBBING
ACRE
0.01
$10,000.00
$100.00
65
2101.524
CLEARING
TREE
4
$350.00
$1,400.00
66
2101.524
GRUBBING
TREE
4
$350.00
$1,400.00
67
2104.502
REMOVE MAIL BOX SUPPORT
EACH
2
$25.00
$50.00
68
2104.503
SAWING CONCRETE PAVEMENT (FULL DEPTH)
LIN FT
40
$5.00
$200.00
69
2104.503
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
200
$3.00
$600.00
70
2104.504
REMOVE BITUMINOUS PAVEMENT
SO YD
2930
$3.50
$10,255.00
71
2104.504
REMOVE BITUMINOUS DRIVEWAY PAVEMENT
SO YD
100
$3.50
$350.00
72
2104.504
REMOVE CONCRETE DRIVEWAY PAVEMENT
SO YD
40
$6.50
$260.00
73
2104.509
REMOVE SIGN
EACH
1
$50.00
$50.00
74
2104.518
REMOVE CONCRETE WALK
SO FT
200
$3.00
$600.00
75
2104.601
RELOCATE MISCELLANEOUS STRUCTURES
LUMP SUM
1
$1,000.00
$1,000.00
76
2104.602
SALVAGE & REINSTALL MAILBOX
EACH
10
$100.00
$1,000.00
77
2105.504
GEOTEXTILE FABRIC TYPE V
SO YD
3400
$3.50
$11,900.00
78
2105.507
COMMON EXCAVATION (EV) (P)
CU YD
700
$18.00
$12,600.00
79
2105.507
MUCK EXCAVATION
CU YD
230
$18.00
$4,140.00
80
2105.507
SUBGRADE EXCAVATION (EV) (P)
CU YD
2300
$18.00
$41,400.00
81
2105.507
SELECT GRANULAR BORROW (P)
CU YD
2300
$20.00
$46,000.00
82
2105.507
SELECT GRANULAR BORROW
CU YD
230
$20.00
$4,600.00
83
2105.604
MINOR GRADING
LUMP SUM
1
$1,000.00
$1,000.00
84
2112.501
SUBGRADE PREPARATION
ROAD STA
7
$200.00
$1,400.00
85
2123.610
STREET SWEEPER (WITH PICKUP BROOM)
HOUR
20
$150.00
$3,000.00
86
2130.523
WATER (DUST CONTROL)
MGAL
50
$50.00
$2,500.00
87
2211.507
AGGREGATE BASE CLASS 5 (100% CRUSHED) (P)
CU YD
700
$20.00
$14,000.00
88
2232.504
MILL BITUMINOUS SURFACE
SO YD
850
$5.00
$4,250.00
89
2331.501
JOINT ADHESIVE - MASTIC
LIN FT
1500
$1.00
$1,500.00
90
2357.506
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
220
$3.50
$770.00
91
2360.503
TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY
SO YD
170
$35.00
$5,950.00
92
2360.509
TYPE SP 9.5 WEARING COURSE MIX (2,C)
TON
400
$64.00
$25,600.00
93
2360.509
TYPE SP 12.5 WEARING COURSE MIX (2,C)
TON
400
$64.00
$25,600.00
94
2504.602
IRRIGATION SYSTEM REPAIR
EACH
3
$200.00
$600.00
95
2505.601
UTILITY COORDINATION
LUMP SUM
1
$1,000.00
$1,000.00
96
2521.518
6" CONCRETE WALK
SO FT
200
$8.00
$1,600.00
97
2531.501
CONCRETE CURB AND GUTTER (SURMOUNTABLE)
LIN FT
1500
$18.00
$27,000.00
98
2531.504
6" CONCRETE DRIVEWAY PAVEMENT
SO YD
60
$65.00
$3,900.00
99
2531.618
TRUNCATED DOMES
SO FT
32
$50.00
$1,600.00
100
2540.602
MAIL BOX (TEMPORARY)
EACH
10
$50.00
$500.00
101
2540.602
MAIL BOX SUPPORT
EACH
2
$75.00
$150.00
102
2557.602
REPAIR DOG FENCE
EACH
3
$250.00
$750.00
103
2563.601
TRAFFIC CONTROL
LUMP SUM
1
$2,500.00
$2,500.00
104
2564.518
SIGN PANELS TYPE C
SO FT
4
$65.00
$260.00
105
2564.602
SIGN PANELS TYPE SPECIAL
EACH
2
$250.00
$500.00
106
2571.524
CONIFEROUS TREE 8' HT B &B
EACH
2
$550.00
$1,100.00
107
2571.524
1 DECIDUOUS TREE 2.5" CAL B &B
EACH
2
1 $550.001
$1,100.00
108
2573.502
STORM DRAIN INLET PROTECTION
EACH
6
$200.00
$1,200.00
109
2573.503
SILT FENCE, TYPE MACHINE SLICED
LIN FT
1500
$2.50
$3,750.00
110
2573.503
SEDIMENT CONTROL LOG TYPE WOOD FIBER
LIN FT
1500
$3.50
$5,250.00
E. Shorewood
Opinion of Probable Cost
116
2104.501
REMOVE SANITARY SEWER
LIN FT
WSB Project:
Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By:
DJE
117
and Trail Extension along Country Club Road and Yellowstone Trail Checked By:
KAK
Project Location:
City of Shorewood
$500.00
City Project No.:
17 -04
2104.525
WSB Project No:
02925 -24 Date:
1/4/2018
$500.00
NIN/DOT
119
2104.603
Estimated
LIN FT
238
$25.00
$5,950.00
120
2503.602
CONNECT TO EXISITING SANITARY SEWER
Estimated
Estimated
Item No.
Specificatio
Description
Unit
Total
LIN FT
230
$45.00
$10,350.00
122
2503.603
SEWER LINER SPOT REPAIR
Unit Price
Total Cost
$3,500.00
n No.
123
2506.502
Quantity
EACH
3
111
2573.604
STABILIZED CONSTRUCTION ENTRANCE
EACH
1
$1,000.00
$1,000.00
112
2575.502
SEED MIXTURE 25 -151
LB
20
$20.00
$400.00
113
2575.523
EROSION CONTROL BLANKET CATEGORY 3
S Y
1 150
j $5.00
j $750.00
114
2575.604
SEEDING (INCL TOPSOIL AND FERT)
ACRE
0.1
$10,000.00
$1,000.00
115
2575.605
HYDRAULIC MULCH MATRIX
LB
300
$2.00
$600.00
$1,000.00
Subtotal - D Shorewood Lane Surface Improvements
$294,185.00
+10% Contingency
$29,418.50
Subtotal - D Shorewood Lane Surface Improvements
$323,603.50
+ 27% Indirect Costs
$87,372.95
Total - D Shorewood Lane Surface Improvements
$410,976.45
E. Shorewood
Lane Sanitary Improvements
116
2104.501
REMOVE SANITARY SEWER
LIN FT
20
$10.00
$200.00
117
2104.502
REMOVE CASTING
EACH
1
$500.00
$500.00
118
2104.525
ABANDON SANITARY MANHOLE
EACH
2
$500.00
$1,000.00
119
2104.603
ABANDON SANITARY SEWER
LIN FT
238
$25.00
$5,950.00
120
2503.602
CONNECT TO EXISITING SANITARY SEWER
EACH
2
$2,000.00
$4,000.00
121
1 2503.603
8" PVC SANITARY SEWER - SDR 35
LIN FT
230
$45.00
$10,350.00
122
2503.603
SEWER LINER SPOT REPAIR
EACH
1
$3,500.00
$3,500.00
123
2506.502
CASTING ASSEMBLY
EACH
3
$750.00
$2,250.00
124
2506.602
CHEMICAL GROUT MANHOLE
EACH
1
$2,000.00
$2,000.00
125
2506.602
CHIMNEY SEALS
EACH
3
$350.00
$1,050.00
126
2506.603
1 CONST 48" DIA SAN SEWER MANHOLE
LIN FT
40.0
1 $200.001
$8,000.00
Subtotal - E Shorewood Lane Sanitary Improvements $38,800.00
+10% Contingency $3,880.00
Subtotal - E Shorewood Lane Sanitary Improvements $42,680.00
+ 27% Indirect Costs $11,523.60
Total - E Shorewood Lane Sanitary Improvements $54,203.60
F. Shorewood Lane Drainage Improvements
127
2104.502
REMOVE DRAINAGE STRUCTURE
EACH
1
$500.00
$500.00
128
2104.503
REMOVE SEWER PIPE (STORM)
LIN FT
40
$10.00
$400.00
129
2105.504
GEOTEXTILE FABRIC TYPE IV
SO YD
20
$5.00
$100.00
130
2451.507
COURSE AGGREGATE BEDDING (CV)
CU YD
10
$30.00
$300.00
131
2501.502
18" RC PIPE APRON
EACH
1
$1,000.00
$1,000.00
132
2502.541
4" PERF PVC PIPE DRAIN
LIN FT
100
$22.00
$2,200.00
133
2502.602
4" PVC PIPE DRAIN CLEANOUT
EACH
2
$350.00
$700.00
134
2503.503
15' RC PIPE SEWER DESIGN 3006 CL V
LIN FT
369
$52.00
$19,188.00
135
2503.503
18" RC PIPE SEWER DESIGN 3006 CL V
LIN FT
100
$55.00
$5,500.00
136
2506.501
CONST DRAINAGE STRUCTURE DES 48 -4020
LIN FT
15
$350.00
$5,250.00
137
2506.502
CONST DRAINAGE STRUCTURE DES SPECIAL
EACH
2
$2,000.00
1 $4,000.00
138
2506.502
CASTING ASSEMBLY
I EACH
1 3
1 $750.001
$2,250.00
139
2511.507
RANDOM RIPRAP CLASS III
I CU YD
1 10
1 $100.001
$1,000.00
Subtotal - F Shorewood Lane Drainage Improvements $42,388.00
+10% Contingency $4,238.80
Subtotal - F Shorewood Lane Drainage Improvements $46,626.80
+ 27% Indirect Costs $12,589.24
Total - F Shorewood Lane Drainage Improvements $59,216.04
Opinion of Probable Cost
WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: WE
and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK
Project Location: City of Shorewood
City Project No.: 17 -04
WSB Project No: 02925 -24 Date: 1/4/2018
Item No.
NIN/DOT
Specificatio
n No.
Description
Unit
Estimated
Total
Quantity
Estimated
Unit Price
Estimated
Total Cost
G. Mann
Lane Surface Improvements
140
2021.501
MOBILIZATION
LUMP SUM
1
$9,600.00
$9,600.00
141
2101.524
CLEARING
TREE
4
$250.00
$1,000.00
142
2101.524
GRUBBING
TREE
4
$250.00
$1,000.00
143
2104.502
REMOVE MAIL BOX SUPPORT
EACH
1
$25.00
$25.00
144
2104.503
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
120
$3.00
$360.00
145
2104.504
REMOVE BITUMINOUS PAVEMENT
SO YD
1650
$3.50
$5,775.00
146
2104.504
REMOVE BITUMINOUS DRIVEWAY PAVEMENT
SO YD
100
$3.50
$350.00
147
2104.509
REMOVE SIGN
EACH
4
$50.00
$200.00
148
2104.601
RELOCATE MISCELLANEOUS STRUCTURES
LUMP SUM
1
$500.00
$500.00
149
2104.602
SALVAGE & REINSTALL MAILBOX
EACH
10
$100.00
$1,000.00
150
2105.504
GEOTEXTILE FABRIC TYPE V
SO YD
1900
$3.50
$6,650.00
151
2105.507
COMMON EXCAVATION (EV) (P)
CU YD
500
$18.00
$9,000.00
152
2105.507
MUCK EXCAVATION
CU YD
160
$18.00
$2,880.00
153
2105.507
SUBGRADE EXCAVATION (EV) (P)
CU YD
1600
$18.00
$28,800.00
154
2105.507
SELECT GRANULAR BORROW (P)
CU YD
1600
$20.00
$32,000.00
155
2105.507
SELECT GRANULAR BORROW
CU YD
160
$20.00
$3,200.00
156
2105.604
MINOR GRADING
LUMP SUM
1
$1,000.00
$1,000.00
157
2112.501
SUBGRADE PREPARATION
ROAD STA
10
$200.00
$2,000.00
158
2123.610
STREET SWEEPER (WITH PICKUP BROOM)
HOUR
15
$150.00
$2,250.00
159
2130.523
WATER (DUST CONTROL)
MGAL
30
$50.00
$1,500.00
160
2211.507
AGGREGATE BASE CLASS 5 (100% CRUSHED) (P)
CU YD
500
$20.00
$10,000.00
161
2331.501
JOINT ADHESIVE - MASTIC
LIN FT
1400
$1.00
$1,400.00
162
2357.506
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
90
$3.50
$315.00
163
2360.503
TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY
SO YD
80
$35.00
$2,800.00
164
2360.509
TYPE SP 9.5 WEARING COURSE MIX (2,C)
TON
210
$64.00
$13,440.00
165
2360.509
TYPE SP 12.5 WEARING COURSE MIX (2,C)
TON
210
$64.00
$13,440.00
166
2504.602
IRRIGATION SYSTEM REPAIR
EACH
1
$200.00
$200.00
167
2505.601
UTILITY COORDINATION
LUMP SUM
1
$1,000.00
$1,000.00
168
2531.501
CONCRETE CURB AND GUTTER (SURMOUNTABLE)
LIN FT
1400
$18.00
$25,200.00
169
2540.602
MAIL BOX (TEMPORARY)
EACH
10
$50.00
$500.00
170
2540.602
MAIL BOX SUPPORT
EACH
1
$75.00
$75.00
171
2557.602
REPAIR DOG FENCE
EACH
1
$250.00
$250.00
172
2563.601
TRAFFIC CONTROL
LUMP SUM
1
$500.00
$500.00
173
2564.518
SIGN PANELS TYPE C
SO FT
18
$65.00
$1,170.00
174
2564.602
SIGN PANELS TYPE SPECIAL
EACH
2
$250.00
$500.00
175
2571.502
DECIDUOUS TREE 2.5' CAL B &B
EACH
4
$550.00
$2,200.00
176
2573.502
STORM DRAIN INLET PROTECTION
EACH
7
$200.00
$1,400.00
177
2573.503
SILT FENCE, TYPE MACHINE SLICED
LIN FT
1400
$2.50
$3,500.00
178
2573.503
SEDIMENT CONTROL LOG TYPE WOOD FIBER
LIN FT
1400
$3.50
$4,900.00
179
2573.604
STABILIZED CONSTRUCTION ENTRANCE
EACH
1
$1,000.00
$1,000.00
180
2575.502
SEED MIXTURE 25 -151
LB
30
1 $20.00
$600.00
181
2575.523
EROSION CONTROL BLANKET CATEGORY 3
S Y
800
$5.00
$4,000.00
182
2575.604
SEEDING (INCL TOPSOIL AND FERT)
ACRE
0.2
$10,000.00
$2,000.00
183
2575.605
HYDRAULIC MULCH MATRIX
LB
600
$2.00
$1,200.00
Subtotal - G Mann Lane Surface Improvements $200,680.00
+10% Contingency $20,068.00
Subtotal - G Mann Lane Surface Improvements $220,748.00
+ 27% Indirect Costs $59,601.96
Total - G Mann Lane Surface Improvements $280,349.96
H. Mann Lane Sanitary Improvements
Opinion of Probable Cost
2104.503
184
2104.502
REMOVE CASTING
$10.00
EACH
WSB Project:
Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements
Design By:
DJE
2503.603
and Trail Extension along Country Club Road and Yellowstone Trail
Checked By:
KAK
Project Location:
City of Shorewood
$3,500.00
186
City Project No.:
17 -04
192
EACH
WSB Project No:
02925 -24
Date:
1/4/2018
2506.602
NIN/DOT
2502.541
EACH
Estimated
Estimated
Estimated
Item No.
Specificatio
Description
Unit
Total
Unit Price
Total Cost
$700.00
n No.
2502.602
4" PVC PIPE DRAIN CLEANOUT
Quantity
$8,700.00
$870.00
$9,570.00
$2,583.90
$12,153.90
$350.00
H. Mann Lane Sanitary Improvements
189
2104.503
184
2104.502
REMOVE CASTING
$10.00
EACH
2
$500.00
$1,000.00
185
2503.603
SEWER LINER SPOT REPAIR
$100.00
EACH
1
$3,500.00
$3,500.00
186
2506.502
CASTING ASSEMBLY
192
EACH
2
$750.00
$1,500.00
187
2506.602
CHEMICAL GROUT MANHOLE
2502.541
EACH
1
$2,000.00
$2,000.00
188
2506.602
CHIMNEY SEALS
8" PERF PVC PIPE DRAIN
EACH
2
$350.00
$700.00
195
2502.602
4" PVC PIPE DRAIN CLEANOUT
Subtotal - H Mann Lane Sanitary Improvements
+10% Contingency
Subtotal - H Mann Lane Sanitary Improvements
+ 27% Indirect Costs
Total - H Mann Lane Sanitary Improvements
$8,700.00
$870.00
$9,570.00
$2,583.90
$12,153.90
I. Mann Lane Drainage Improvements
189
2104.503
REMOVE SEWER PIPE (STORM)
LIN FT
35
$10.00
$350.00
190
2105.504
GEOTEXTILE FABRIC TYPE IV
SO YD
20
$5.00
$100.00
191
2451.507
COURSE AGGREGATE BEDDING (CV)
CU YD
10
$30.00
$300.00
192
2501.502
15' RC PIPE APRON
EACH
3
$1,000.00
$3,000.00
193
2502.541
4" PERF PVC PIPE DRAIN
LIN FT
200
$22.00
$4,400.00
194
2502.541
8" PERF PVC PIPE DRAIN
LIN FT
200
$26.00
$5,200.00
195
2502.602
4" PVC PIPE DRAIN CLEANOUT
EACH
4
$350.00
$1,400.00
196
2502.602
8" PVC PIPE DRAIN CLEANOUT
EACH
2
$400.00
$800.00
197
2503.503
15' RC PIPE SEWER DESIGN 3006 CL V
LIN FT
378
$52.00
$19,656.00
198
2506.501
CONST DRAINAGE STRUCTURE DES 48 -4020
LIN FT
20
$350.00
$7,000.00
199
2506.502
CONST DRAINAGE STRUCTURE DES SPECIAL
EACH
2
$2,000.00
1 $4,000.00
200
2506.502
CASTING ASSEMBLY
EACH
4
$750.001
$3,000.00
201
2511.507
RANDOM RIPRAP CLASS III
CU YD
10
1 $100.001
$1,000.00
Subtotal - I Mann Lane Drainage Improvements $50,206.00
+10% Contingency $5,020.60
Subtotal - I Mann Lane Drainage Improvements $55,226.60
+ 27% Indirect Costs $14,911.18
Total - I Mann Lane Drainage Improvements $70,137.78
Opinion of Probable Cost
WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: WE
and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK
Project Location: City of Shorewood
City Project No.: 17 -04
WSB Project No: 02925 -24 Date: 1/4/2018
Item No.
MN /DOT
Specificatio
n No.
Description
Unit
Estimated
Total
Quantity
Estimated
Unit Price
Estimated
Total Cost
J. Maple Street Surface Improvements
202
2021.501
MOBILIZATION
LUMPSUM
1
$12,600.00
$12,600.00
203
2101.505
CLEARING
ACRE
0.04
$10,000.00
$400.00
204
2101.505
GRUBBING
ACRE
0.04
$10,000.00
$400.00
205
2101.524
CLEARING
TREE
5
$250.00
$1,250.00
206
2101.524
GRUBBING
TREE
5
$250.00
$1,250.00
207
2104.503
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
1000
$3.00
$3,000.00
208
2104.504
REMOVE BITUMINOUS PAVEMENT
SQ YD
2300
$3.50
$8,050.00
209
2104.504
REMOVE BITUMINOUS DRIVEWAY PAVEMENT
SQ YD
100
$3.50
$350.00
210
2104.509
REMOVE SIGN
EACH
1
$50.00
$50.00
211
2104.518
REMOVE BITUMINOUS TRAIL
SO FT
7200
$5.00
$36,000.00
212
2104.601
RELOCATE MISCELLANEOUS STRUCTURES
LUMPSUM-
1
$500.00
$500.00
213
2104.602
SALVAGE & REINSTALL MAILBOX
EACH
1
$100.00
$100.00
214
2105.504
GEOTEXTILE FABRIC TYPE V
SQ YD
1200
$3.50
$4,200.00
215
2105.507
COMMON EXCAVATION (EV) (P)
CU YD
500
$18.00
$9,000.00
216
2105.507
MUCK EXCAVATION
CU YD
80
$18.00
$1,440.00
217
2105.507
SUBGRADE EXCAVATION (EV) (P)
CU YD
800
$18.00
$14,400.00
218
2105.507
SELECT GRANULAR BORROW (P)
CU YD
680
$20.00
$13,600.00
219
2105.507
SELECT GRANULAR BORROW
CU YD
80
$20.00
$1,600.00
220
2105.604
MINOR GRADING
LUMPSUM
1
$1,000.00
$1,000.00
221
2112.501
SUBGRADE PREPARATION
ROAD STA
2
$200.00
$400.00
222
2123.610
STREET SWEEPER (WITH PICKUP BROOM)
HOUR
10
$150.00
$1,500.00
223
2130.523
WATER (DUST CONTROL)
MGAL
10
$50.00
$500.00
224
2211.507
AGGREGATE BASE CLASS 5 (100% CRUSHED) (P)
CU YD
500
$20.00
$10,000.00
225
2231.501
BITUMINOUS PATCHING MIXTURE
TON
300
$200.00
$60,000.00
226
2331.501
JOINT ADHESIVE - MASTIC
LIN FT
500
$1.00
$500.00
227
2357.506
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
40
$3.50
$140.00
228
2360.503
TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY
SQ YD
80
$35.00
$2,800.00
229
2360.509
TYPE SP 9.5 WEARING COURSE MIX (2,C)
TON
90
$64.00
$5,760.00
230
2360.509
TYPE SP 12.5 WEARING COURSE MIX (2,C)
TON
90
$64.00
$5,760.00
231
2504.602
IRRIGATION SYSTEM REPAIR
EACH
1
$200.00
$200.00
232
2505.601
UTILITY COORDINATION
LUMPSUM
1
$1,000.00
$1,000.00
233
2521.511
3" BITUMINOUS WALK
SO FT
7200
$5.00
$36,000.00
234
2531.501
CONCRETE CURB AND GUTTER (SURMOUNTABLE)
LIN FT
500
$18.00
$9,000.00
235
2540.602
MAIL BOX (TEMPORARY)
EACH
1
$50.00
$50.00
236
2563.601
TRAFFIC CONTROL
LUMPSUM-
1
$10,000.00
$10,000.00
237
2564.518
SIGN PANELS TYPE C
SO FT
7
$65.00
$455.00
238
2564.602
SIGN PANELS TYPE SPECIAL
EACH
1
$250.00
$250.00
239
2571.524
CONIFEROUS TREE 8' HT B &B
EACH
2
$550.00
$1,100.00
240
2571.524
DECIDUOUS TREE 2.5" CAL B &B
EACH
2
$550.00
$1,100.00
241
2573.502
STORM DRAIN INLET PROTECTION
EACH
2
$200.00
$400.00
242
2573.503
SILT FENCE, TYPE MACHINE SLICED
LIN FT
100
$2.50
$250.00
243
2573.503
SEDIMENT CONTROL LOG TYPE WOOD FIBER
LIN FT
500
$3.50
$1,750.00
244
2573.604
STABILIZED CONSTRUCTION ENTRANCE
EACH
1
$1,000.00
$1,000.00
245
2575.502
SEED MIXTURE 25 -151
LB
20
$20.00
$400.00
246
2575.523
EROSION CONTROL BLANKET CATEGORY 3
S Y
300
$5.00
$1,500.00
247
2575.604
SEEDING (INCL TOPSOIL AND FERT)
ACRE
0.1
$10,000.00
$1,000.00
248
2575.605
HYDRAULIC MULCH MATRIX
LB
300
$2.00
$600.00
Subtotal - G Mann Lane Surface Improvements $262,605.00
+10% Contingency $26,260.50
K. Maple Street
Opinion of Probable Cost
249
2105.504
GEOTEXTILE FABRIC TYPE IV
WSB Project:
Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By:
DJE
$5.00
and Trail Extension along Country Club Road and Yellowstone Trail
Checked By:
KAK
Project Location:
City of Shorewood
CU YD
10
City Project No.:
17 -04
251
2501.502
WSB Project No:
02925 -24
Date:
1/4/2018
$1,000.00
MN /DOT
252
2503.503
Estimated
Estimated
Estimated
Item No.
Specificatio
Description
Unit
Total
Unit Price
Total Cost
LIN FT
n No.
$55.00
$38,500.00
Quantity
2506.501
CONST DRAINAGE STRUCTURE DES 48 -4020
Subtotal -G Mann Lane Surface Improvements
$288,865.50
$350.00
$17,150.00
+ 27% Indirect Costs
$77,993.69
CONST DRAINAGE STRUCTURE DES SPECIAL
Total - G Mann Lane Surface Improvements
$366,859.19
K. Maple Street
Drainage Improvements
249
2105.504
GEOTEXTILE FABRIC TYPE IV
SO YD
30
$5.00
$150.00
250
2451.507
COURSE AGGREGATE BEDDING (CV)
CU YD
10
$30.00
$300.00
251
2501.502
18" RC PIPE APRON
EACH
1
$1,000.00
$1,000.00
252
2503.503
15' RC PIPE SEWER DESIGN 3006 CL V
LIN FT
120
$52.00
$6,240.00
253
2503.503
18" RC PIPE SEWER DESIGN 3006 CL V
LIN FT
700
$55.00
$38,500.00
254
2506.501
CONST DRAINAGE STRUCTURE DES 48 -4020
LIN FT
49.0
$350.00
$17,150.00
255
2506.502
CONST DRAINAGE STRUCTURE DES SPECIAL
EACH
1
$2,000.00
$2,000.00
256
2506.502
CASTING ASSEMBLY
EACH
6
$750.00
$4,500.00
257
2511.507
RANDOM RIPRAP CLASS III
CU YD
15
$100.00
$1,500.00
Subtotal - K Maple Street Drainage Improvements
+10% Contingency
Subtotal -K Maple Street Drainage Improvements
+27 %Indirect Costs
Total - K Maple Street Drainage Improvements
$71,340.00
$7,134.00
$78,474.00
$21,187.98
$99,661.98
Opinion of Probable Cost
WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: WE
and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK
Project Location: City of Shorewood
City Project No.: 17 -04
WSB Project No: 02925 -24 Date: 1/4/2018
Item No.
MN /DOT
Specificatio
n No.
Description
Unit
Estimated
Total
Quantity
Estimated
Unit Price
Estimated
Total Cost
L. Country
Club
Road Surface Improvements
258
2021.501
MOBILIZATION
LUMP SUM
1
$17,900.00
$17,900.00
259
2101.505
CLEARING
ACRE
0.12
$10,000.00
$1,200.00
260
2101.505
GRUBBING
ACRE
0.12
$10,000.00
$1,200.00
261
2101.524
CLEARING
TREE
6
$350.00
$2,100.00
262
2101.524
GRUBBING
TREE
6
$350.00
$2,100.00
263
2104.502
REMOVE MAIL BOX SUPPORT
EACH
1 1
$25.00
$25.00
264
2104.503
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
180
$3.00
$540.00
265
2104.504
REMOVE BITUMINOUS PAVEMENT
SQ YD
1900
$3.50
$6,650.00
266
2104.504
REMOVE BITUMINOUS DRIVEWAY PAVEMENT
SQ YD
10
$3.50
$35.00
267
2104.509
REMOVE SIGN
EACH
4
$50.00
$200.00
268
2104.601
RELOCATE MISCELLANEOUS STRUCTURES
LUMP SUM
1
$500.00
$500.00
269
2104.602
SALVAGE & REINSTALL MAILBOX
EACH
10
$100.00
$1,000.00
270
2105.504
GEOTEXTILE FABRIC TYPE V
SQ YD
28300
$3.50
$99,050.00
271
2105.507
COMMON EXCAVATION (EV) (P)
CU YD
700
$18.00
$12,600.00
272
2105.507
MUCK EXCAVATION
CU YD
160
$18.00
$2,880.00
273
2105.507
SUBGRADE EXCAVATION (EV) (P)
CU YD
1600
$18.00
$28,800.00
274
2105.507
SELECT GRANULAR BORROW (P)
CU YD
1600
$20.00
$32,000.00
275
2105.507
SELECT GRANULAR BORROW
CU YD
160
$20.00
$3,200.00
276
2105.604
MINOR GRADING
LUMPSUM
1
$1,000.00
$1,000.00
277
2112.501
SUBGRADE PREPARATION
ROAD STA
10
$200.00
$2,000.00
278
2123.610
STREET SWEEPER (WITH PICKUP BROOM)
HOUR
20
$150.00
$3,000.00
279
2130.523
WATER (DUST CONTROL)
MGAL
35
$50.00
$1,750.00
280
2211.507
AGGREGATE BASE CLASS 5 (100% CRUSHED) (P)
CU YD
700
$20.00
$14,000.00
281
2331.501
JOINT ADHESIVE - MASTIC
LIN FT
1500
$1.00
$1,500.00
282
2357.506
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
120
$3.50
$420.00
283
2360.503
TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY
SQ YD
10
$35.00
$350.00
284
2360.509
TYPE SP 9.5 WEARING COURSE MIX (2,C)
TON
300
$64.00
$19,200.00
285
2360.509
TYPE SP 12.5 WEARING COURSE MIX (2,C)
TON
300
$64.00
$19,200.00
286
2504.602
IRRIGATION SYSTEM REPAIR
EACH
1
$200.00
$200.00
287
2505.601
UTILITY COORDINATION
LUMPSUMI
1
$1,000.00
$1,000.00
288
2521.511
3" BITUMINOUS WALK
SO FT
7200
$5.00
$36,000.00
289
2521.518
6" CONCRETE WALK
SO FT
200
$8.00
$1,600.00
290
2531.501
CONCRETE CURB AND GUTTER (SURMOUNTABLE)
LIN FT
1500
$18.00
$27,000.00
291
2531.618
TRUNCATED DOMES
SO FT
32
$50.00
$1,600.00
292
2540.602
MAIL BOX (TEMPORARY)
EACH
10
$50.00
$500.00
293
2540.602
MAIL BOX SUPPORT
EACH
1
$75.00
$75.00
294
2557.602
REPAIR DOG FENCE
EACH
1
$250.00
$250.00
295
2563.601
TRAFFIC CONTROL
LUMP SUM
1
$10,000.00
$10,000.00
296
2564.518
SIGN PANELS TYPE C
SO FT
13
$65.00
$845.00
297
2564.602
SIGN PANELS TYPE SPECIAL
EACH
2
$250.00
$500.00
298
2571.524
CONIFEROUS TREE 8' HT B &B
EACH
2
$550.00
$1,100.00
299
2571.524
DECIDUOUS TREE 2.5" CAL B &B
EACH
2
$550.00
$1,100.00
300
2573.502
STORM DRAIN INLET PROTECTION
EACH
2
$200.00
$400.00
301
2573.503
SILT FENCE, TYPE MACHINE SLICED
LIN FT
1500
$2.50
$3,750.00
302
2573.503
SEDIMENT CONTROL LOG TYPE WOOD FIBER
LIN FT
1500
$3.50
$5,250.00
303
2573.604
STABILIZED CONSTRUCTION ENTRANCE
EACH
2
$1,000.00
$2,000.00
304
2575.502
SEED MIXTURE 25 -151
LB
30
1 $20.00
$600.00
305
2575.523
EROSION CONTROL BLANKET CATEGORY 3
S Y
900
$5.00
$4,500.00
306
2575.604
SEEDING (INCL TOPSOIL AND FERT)
ACRE
0.2
$10,000.00
$2,000.00
M. Country Club Road Sanitary Improvements
Opinion of Probable Cost
2104.503
308
2104.502
REMOVE CASTING
WSB Project:
Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By:
DJE
1 $500.00
and Trail Extension along Country Club Road and Yellowstone Trail Checked By:
KAK
Project Location:
City of Shorewood
$100.00
City Project No.:
17 -04
$750.00
WSB Project No:
02925 -24 Date:
1/4/2018
CHIMNEY SEALS
MN /DOT
EACH
1
Estimated
$350.00
$1,000.00
Subtotal - H Mann Lane Sanitary Improvements
$1,600.00
2502.503
+20% Contingency
$320.00
Estimated
Estimated
Item No.
Specificatio
Description
Unit
Total
Total - H Mann Lane Sanitary Improvements
$2,438.40
$1,000.00
317
2503.503
15' RC PIPE SEWER DESIGN 3006 CL V
LIN FT
Unit Price
Total Cost
$4,160.00
n No.
2506.501
CONST DRAINAGE STRUCTURE DES 48 -4020
Quantity
4
$350.00
307
2575.605
HYDRAULIC MULCH MATRIX
LB
600
$2.00
$1,200.00
$2,000.00
Subtotal - L Country Club Road Surface Improvements
$375,870.00
CASTING ASSEMBLY
+20% Contingency
$75,174.00
$750.00
Subtotal - L Country Club Road Surface Improvements
$451,044.00
2511.507
+ 27% Indirect Costs
$121,781.88
1 15
Total - L Country Club Road Surface Improvements
$572,825.88
M. Country Club Road Sanitary Improvements
311
2104.503
308
2104.502
REMOVE CASTING
$10.00
EACH
1 1
1 $500.00
1 $500.00
309
2506.502
CASTING ASSEMBLY
$100.00
EACH
1
$750.00
$750.00
310
2506.602
CHIMNEY SEALS
314
EACH
1
1 $350.00
$350.00
$1,000.00
Subtotal - H Mann Lane Sanitary Improvements
$1,600.00
2502.503
+20% Contingency
$320.00
1000
Subtotal - H Mann Lane Sanitary Improvements
$1,920.00
316
+ 27% Indirect Costs
$518.40
EACH
Total - H Mann Lane Sanitary Improvements
$2,438.40
N. Country Club Road Drainage Improvements
311
2104.503
REMOVE SEWER PIPE (STORM)
LIN FT
70
$10.00
$700.00
312
2105.504
GEOTEXTILE FABRIC TYPE IV
SO YD
20
$5.00
$100.00
313
2451.507
COURSE AGGREGATE BEDDING (CV)
CU YD
10
$30.00
$300.00
314
2501.502
15' RC PIPE APRON
EACH
1
$1,000.00
$1,000.00
315
2502.503
4" PERF PVC PIPE DRAIN
LIN FT
1000
$14.00
$14,000.00
316
2502.602
4" PVC PIPE DRAIN CLEAN OUT
EACH
4
$250.00
$1,000.00
317
2503.503
15' RC PIPE SEWER DESIGN 3006 CL V
LIN FT
80
$52.00
$4,160.00
318
2506.501
CONST DRAINAGE STRUCTURE DES 48 -4020
LIN FT
4
$350.00
$1,400.00
319
2506.502
CONST DRAINAGE STRUCTURE DES SPECIAL
EACH
1
$2,000.00
$2,000.00
320
2506.502
CASTING ASSEMBLY
EACH
1
$750.00
$750.00
321
2511.507
RANDOM RIPRAP CLASS III
CU YD
1 15
1 $100.00
1 $1,500.00
Subtotal - N Country Club Road Drainage Improvements $26,910.00
+20% Contingency $5,382.00
Subtotal - N Country Club Road Drainage Improvements $32,292.00
+ 27% Indirect Costs $8,718.84
Total - N Country Club Road Drainage Improvements $41,010.84
Opinion of Probable Cost
WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: WE
and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK
Project Location: City of Shorewood
City Project No.: 17 -04
WSB Project No: 02925 -24 Date: 1/4/2018
Item No.
MN /DOT
Specificatio
n No.
Description
Unit
Estimated
Total
Quantity
Estimated
Unit Price
Estimated
Total Cost
O. Yellowstone Trail Surface Improvement
322
2021.501
MOBILIZATION
LUMP SUM
1
$15,300.00
$15,300.00
323
2101.505
CLEARING
ACRE
0.14
$10,000.00
$1,400.00
324
2101.505
GRUBBING
ACRE
0.14
$10,000.00
$1,400.00
325
2101.524
CLEARING
TREE
80
$350.00
$28,000.00
326
2101.524
GRUBBING
TREE
80
$350.00
$28,000.00
327
2104.502
REMOVE MAIL BOX SUPPORT
EACH
2
$25.00
$50.00
328
2104.503
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
340
$3.00
$1,020.00
329
2104.503
SAWING CONCRETE PAVEMENT (FULL DEPTH)
LIN FT
20
$5.00
$100.00
330
2104.504
REMOVE BITUMINOUS PAVEMENT
SQ YD
380
$3.50
$1,330.00
331
2104.504
REMOVE BITUMINOUS DRIVEWAY PAVEMENT
SQ YD
170
$3.50
$595.00
332
2104.504
REMOVE CONCRETE DRIVEWAY PAVEMENT
SQ YD
40
1 $6.50
$260.00
333
2104.509
REMOVE SIGN
EACH
6
$50.00
$300.00
334
2104.601
RELOCATE MISCELLANEOUS STRUCTURES
LUMP SUM
1
$2,500.00
$2,500.00
335
2104.602
SALVAGE & REINSTALL MAILBOX
EACH
10
$100.00
$1,000.00
336
2105.507
COMMON EXCAVATION (EV) (P)
CU YD
100
$18.00
$1,800.00
337
2105.604
MINOR GRADING
LUMPSUMI
1
$1,000.00
$1,000.00
338
2123.610
STREET SWEEPER (WITH PICKUP BROOM)
HOUR
20
$150.00
$3,000.00
339
2211.507
AGGREGATE BASE CLASS 5 (100% CRUSHED)
TON
200
$20.00
$4,000.00
340
2231.501
BITUMINOUS PATCHING MIXTURE
TON
100
$200.00
$20,000.00
341
2331.501
JOINT ADHESIVE - MASTIC
LIN FT
300
$1.00
$300.00
342
2360.503
TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY
SQ YD
100
$35.00
$3,500.00
343
2411.618
MODULAR BLOCK RETAINING WALL
SO FT
1800
$25.00
$45,000.00
344
2504.602
IRRIGATION SYSTEM REPAIR
EACH
1
$200.00
$200.00
345
2505.601
UTILITY COORDINATION
LUMPSUM
1
$1,000.00
$1,000.00
346
2521.511
3" BITUMINOUS WALK
SO FT
18500
$5.00
$92,500.00
347
2521.518
6" CONCRETE WALK
SO FT
400
$8.00
$3,200.00
348
2531.501
CONCRETE CURB AND GUTTER B618
LIN FT
300
$22.00
$6,600.00
349
2531.504
6" CONCRETE DRIVEWAY PAVEMENT
SQ YD
40
$65.00
$2,600.00
350
2531.618
TRUNCATED DOMES
SO FT
64
$50.00
$3,200.00
351
2540.602
MAIL BOX (TEMPORARY)
EACH
10
$50.00
$500.00
352
2540.602
MAIL BOX SUPPORT
EACH
2
$75.00
$150.00
353
2557.602
REPAIR DOG FENCE
EACH
2
$250.00
$500.00
354
2563.601
TRAFFIC CONTROL
LUMPSUMI
1
$10,000.00
$10,000.00
355
2564.518
SIGN PANELS TYPE C
SO FT
22
$65.00
$1,430.00
356
2564.602
SIGN PANELS TYPE SPECIAL
EACH
2
$250.00
$500.00
357
2571.524
CONIFEROUS TREE 8' HT B &B
EACH
10
$550.00
$5,500.00
358
2571.524
DECIDUOUS TREE 2.5" CAL B &B
EACH
10
$550.00
$5,500.00
359
2573.502
STORM DRAIN INLET PROTECTION
EACH
4
$200.00
$800.00
360
2573.503
SILT FENCE, TYPE MACHINE SLICED
LIN FT
1800
$2.50
$4,500.00
361
2573.503
SEDIMENT CONTROL LOG TYPE WOOD FIBER
LIN FT
1800
$3.50
$6,300.00
362
2575.502
SEED MIXTURE 25 -151
LB
50
$20.00
$1,000.00
363
2575.523
EROSION CONTROL BLANKET CATEGORY 3
S Y
2,000
$5.00
$10,000.00
364
2575.604
SEEDING (INCL TOPSOIL AND FERT)
ACRE
0.4
$10,000.00
$4,000.00
365
2575.605
HYDRAULIC MULCH MATRIX
LB
200
$2.00
$400.00
Subtotal - O Yellowstone Trail Surface Improvements $320,235.00
+20% Contingency $64,047.00
Subtotal - O Yellowstone Trail Surface Improvements $384,282.00
+ 27% Indirect Costs $103,756.14
Total -O Yellowstone Trail Surface Improvements $488,038.14
Q. Yellowstone Trail Drainage Improvements
Opinion of Probable Cost
369
2105.504
GEOTEXTILE FABRIC TYPE IV
WSB Project:
Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By:
DJE
$300.00
and Trail Extension along Country Club Road and Yellowstone Trail
Checked By:
KAK
Project Location:
City of Shorewood
10
$30.00
City Project No.:
17 -04
2501.502
15' RC PIPE APRON
WSB Project No:
02925 -24
Date:
1/4/2018
$3,000.00
MN /DOT
2502.503
4" PERF PVC PIPE DRAIN
Estimated
LIN FT
1850
$14.00
$25,900.00
373
2502.602
4" PVC PIPE DRAIN CLEAN OUT
Estimated
Estimated
Item No.
Specificatio
Description
Unit
Total
15' RC PIPE SEWER DESIGN 3006 CL V
LIN FT
195
$52.00
$10,140.00
375
Unit Price
Total Cost
n No.
12
$350.00
Quantity
376
2506.502
P. Yellowstone Trail Sanitary Improvements
EACH
366
2104.502
REMOVE CASTING
EACH
2
$500.00
$1,000.00
367
2506.502
CASTING ASSEMBLY
EACH
2
$750.00
$1,500.00
368
2506.602
CHIMNEY SEALS
EACH
2
$350.00
$700.00
Subtotal - P Yellowstone Trail Sanitary Improvements
$3,200.00
+20% Contingency
$640.00
Subtotal - P Yellowstone Trail Sanitary Improvements
$3,840.00
+ 27% Indirect Costs
$1,036.80
Total - P Yellowstone Trail Sanitary Improvements
$4,876.80
Q. Yellowstone Trail Drainage Improvements
369
2105.504
GEOTEXTILE FABRIC TYPE IV
SO YD
60
$5.00
$300.00
370
2451.507
COURSE AGGREGATE BEDDING (CV)
CU YD
10
$30.00
$300.00
371
2501.502
15' RC PIPE APRON
EACH
3
$1,000.00
$3,000.00
372
2502.503
4" PERF PVC PIPE DRAIN
LIN FT
1850
$14.00
$25,900.00
373
2502.602
4" PVC PIPE DRAIN CLEAN OUT
EACH
6
$250.00
$1,500.00
374
2503.503
15' RC PIPE SEWER DESIGN 3006 CL V
LIN FT
195
$52.00
$10,140.00
375
2506.501
CONST DRAINAGE STRUCTURE DES 48 -4020
LIN FT
12
$350.00
$4,200.00
376
2506.502
CONST DRAINAGE STRUCTURE DES SPECIAL
EACH
1
$2,000.00
$2,000.00
377
2506.502
CASTING ASSEMBLY
EACH
3
$750.00
$2,250.00
378
2511.507
RANDOM RIPRAP CLASS III
CU YD
40
$100.00
$4,000.00
Subtotal - Q Yellowstone Trail Drainage Improvements
+20% Contingency
Subtotal - Q Yellowstone Trail Drainage Improvements
+ 27% Indirect Costs
Total - Q Yellowstone Trail Drainage Improvements
$53,590.00
$10,718.00
$64,308.00
$17,363.16
$81,671.16
APPENDIX C
Geotechnical Boring Logs
Feasibility Report
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
PROJECT
SUBJECT
Scale
As shown
Shorewood Lane Reconstruction
Shorewood, Minnesota
Soil Boring Locations
Drawn By I Checked By
Him),
i
AET NO,
01-07092
DATE
January 2017
AMERICAN
ENGINEERING
TESTING, INC.
SUBSURFACE BORING LOG
AET JOB NO: 01 -07092 LOG OF BORING NO. B-1 (p. 1 Of 1)
PROJECT: Riviera and Shorewood Lane Reconstruction; Shorewood, MN
DEPTH
FEET
ELEVATION:
MATERIAL DESCRIPTION
GEOLOGY
N
MC
SAMPLE
TYPE
REC
IN'
FIELD & LABORATORY TESTS
WC
DEN
LL
PL
,H20
5.25" Bituminous pavement
FILL
8.25" FILL, silty sand with gravel, brown, frozen
(A -1 -b)
1
M
FILL, mostly silty sand, a little gravel, brown,
frozen to 2'(A-2-4)
2
FILL, mostly sandy lean clay, slightly organic, a
little gravel and silty sand, trace roots, dark
3
8
M
x
SS
10
13
4
brown and brown (A -6)
FILL, mostly sandy lean clay, a little gravel,
TILL
5
brown, gray and dark brown (A -6)
9
M
SS
12
19
48
LEAN CLAY WITH SAND, slightly organic,
6
trace roots, black, firm to stiff (CL) (A -6)
7
8
8
M
SS
16
25
9
10
9
M
SS
14
27
11
12
27
LEAN CLAY, trace roots, gray, firm (CL)
(A -7 -6)
13
5
M
SS
18
20
SANDY LEAN CLAY, a little gravel, gray, a
14
little brown, firm, laminations of silty sand (CL)
(A -6)
FINE
LEAN CLAY WITH SAND, a little gravel,
ALLUVIUM
24
15
gray, a little brown, stiff, laminations of sandy
silt and silty sand (CL) (A -6) j
13
M
x
SS
14
18
TILL
16
CLAYEY SAND, a little gravel, gray, a little
brown, stiff, laminations of silty sand (SC) (A -6)
END OF BORING
DEPTH: DRILLING METHOD
WATER LEVEL MEASUREMENTS
NOTE: REFER TO
I n
0 -14 /Z 3.25 HSA
TIME
SAMPLED DTH
DEPTH
DEPTH
FLUIID LEVEL
LEVEL
THE ATTACHED
F12/28/16
12:00
16.0
14.5
15.5
None
SHEETS FOR AN
EXPLANATION OF
BORING
COMPLETED: 12/28/16
TERMINOLOGY ON
DR: DTS LG: DO Rig: 1C
THIS LOG
06/04
AMERICAN
ENGINEERING SUBSURFACE BORING LOG
TESTING, INC.
AFT JOB NO: 01 -07092 LOG OF BORING NO. B-2 (p. I of 1)
PROJECT: Riviera and Shorewood Lane Reconstruction; Shorewood, MN
D
DEPTH
IN
SURFACE ELEVATION:
GEOLOGY
N
MC
SAMPLE
REC
FIELD &LABORATORY TESTS
WC
DEN
LL
PL
o- #20
FEET
MATERIAL DESCRIPTION
TYPE
IN.
3" Bituminous pavement
FILL
1
M
FILL, mostly silty sand with gravel, dark brown,
frozen (A -1 -b)
FILL, mostly silty sand, a little gravel and clayey
2
sand, frozen to 20 (A -2 -4)
FINE
ALLUVIUM
8
M
SS
14
25
78
LEAN CLAY, a little gravel, brown, a little gray,
3
firm, laminations of silty sand and clayey sand
(CL) (A -6)
4
SANDY LEAN CLAY, a little gravel, brown, a
TILL
5
little gray and dark brown, stiff, laminations of
11
M
SS
14
19
silty sand and sandy silt (CL) (A -6)
6-
CLAYEY SAND, a little gravel, brown, very
stiff (SC) (A -6)
16
M
SS
16
19
8
9
10
16
M
SS
16
19
I1
SANDY LEAN CLAY, a little gravel, brownish
12
gray, a little brown, very stiff, laminations of
sandy silt (CL) (A -6)
17
M
SS
18
19
13
14
SANDY LEAN CLAY, a little gravel, brown,
very stiff (CL) (A -6)
15
16
M
SS
14
19
16
END OF BORING
DEPTH: DRILLING METHOD
WATER LEVEL MEASUREMENTS
NOTE: REFER TO
1 "
0 -14/2 3.25 HSA
DATE
TIME
SAMPLED
DEPTIH
DEPTH
FLUIID LEVEL
LEVEL
THE ATTACHED
12/28/16
11:10
16.0
14.5
16.0
None
SHEETS FOR AN
EXPLANATION OF
BORING
TERMINOLOGY ON
COMPLETED: 12/28/16
THIS LOG
DR: DTS LG: DO Rig: 1C
06/04
AMERICAN
ENGINEERING SUBSURFACE BORING LOG
TESTING, INC.
AET JOB NO: 01 -07092 LOG OF BORING NO. B-3 (p. 1 of 1)
PROJECT: Riviera and Shorewood Lane Reconstruction; Shorewood, MN
DIN
SURFACE ELEVATION:
GEOLOGY
N
MC
SAMPLE
REC
FIELD & LABORATORY TESTS
WC
DEN
LL
PL
o - #20
FEET
MATERIAL DESCRIPTION
TYPE
IN.
3.75" Bituminous pavement
FILL
1
9.5" Crushed limestone base, light brown, frozen
(A -1 -b)
M
12
FILL, mixture of clayey sand and silty sand, a
2
little gravel, dark brown and brown, frozen
(A -2 -6)
14
D
SS
14
9
3
FILL, mostly clayey sand, a little gravel and silty
sand, brown, frozen to 20" (A -6)
4
SANDY LEAN CLAY, a little gravel, brown, a
TILL
little gray, stiff, laminations of silty sand (CL)
5—
(A -6)
11
M
SS
16
19
61
6
7
16
M
SS
14
17
8
9
10
14
M
SS
12
16
11
LEAN CLAY, a little gravel, brown and gray,
FINE
12
stiff, laminations of silty sand (CL) (A -6)
ALLUVIUM
25
10
M
SS
18
CLAYEY SAND, a little gravel, brown, a little
TILL
13
gray and dark brown,s tiff, laminations of silty
18
san Band sandy silt (SC) (A -6)
14
15
14
M
SS
18
19
16
END OF BORING
DEPTH: DRILLING METHOD
WATER LEVEL MEASUREMENTS
NOTE: REFER TO
1 , „
0 -14/2 3.25 HSA
DATE
TIME
SAMPLED PTH
DEPTH
CAVE-IN E H
FLUID LEVEL
LEVEL
THE ATTACHED
12/28/16
1:40
16.0
14.5
15.8
None
SHEETS FOR AN
EXPLANATION OF
BORING
COMPLETED: 12/28/16
TERMINOLOGY ON
DR: DTS LG: DO Rig: 1C
TIES LOG
06/04
AMERICAN
ENGINEERING SUBSURFACE BORING LOG
TESTING, INC.
AET JOB NO: 01 -07092 LOG OF BORING NO. B-4 (p. I of 1)
PROJECT: Riviera and Shorewood Lane Reconstruction; Shorewood, MN
DEPTH
SURFACE ELEVATION:
GEOLOGY
N
MC
SAMPLE
REC
FIELD & LABORATORY TESTS
WC
DEN
LL
PL
a #20
FEET
MATERIAL DESCRIPTION
TYPE
'
2.75" Bituminous pavement
FILL
1
M
16
14" Crushed limestone base, light brown, frozen
SANDY LEAN CLAY, a little gravel, brown,
TILL OR
2
frozen to 24" then very stiff, laminations of silty
FILL
sand (CL) (A -6) (possible fill)
18
M
SS
14
18
55
3
4
CLAYEY SAND, a little gravel, brown mottled,
TILL
very stiff, laminations of silty sand (SC) (A -6)
5
15
M
SS
16
18
39
6
SANDY LEAN CLAY, a little gravel, brown,
firm, laminations of silty sand (CL) (A -6)
5
M
SS
8
20
8
9
10
6
M
SS
10
21
11
LEAN CLAY WITH SAND, brown, a little dark
FINE
12
brown and gray, firm, laminations of silty san
ALLUVIUM
19
dand sandy silt (CL) (A -6)
5
M
SS
10
13
26
14
15
7
M
SS
10
23
16
END OF BORING
DEPTH: DRILLING METHOD
WATER LEVEL MEASUREMENTS
NOTE: REFER TO
0- 141/2' 3.25" HSA
DATE
TIME
SAMPLED
DEPTH
CASING
DEPTH
CAVE -IN
DEPTH
DRILLING
FLUID LEVEL
WATER
LEVEL
THE ATTACHED
12/28/16
1:30
16.0
14.5
15.7
None
SHEETS FOR AN
EXPLANATION OF
BORING
COMPLETED: 12/28/16
TERMINOLOGY ON
DR: DTS LG: DO Rig: 1C
I
I
THIS LOG
06/04
APPENDIX D
Sanitary Sewer Televising Summary
Feasibility Report
Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and
Trail Extension Along Country Club Road and Yellowstone Trail
City of Shorewood Project No. 17 -04
WSB Project No. 2925 -24
CHYDRIO
KLEAM
www.hydro - klean.com
toll free 855.845.5326
Des Moines, IA Mankato, MN Rogers, MN Sioux Falls, SD Watertown, SD
January 6, 2017
Paul Hornby
City of Shorewood
5755 Country Club Road
Shorewood, Minnesota 55331
Dear Paul;
Thank you for the opportunity to provide the televising of your sanitary sewer in 2016.
Based upon NASSCO PACP Condition Grades 1 -5, only one line had minor attached
deposits /encrustation. NASSCO condition grade for this defect is a 2 which is very minor. Please see
the PACP Codes and Grading information in your bound report for additional information.
............................................................... ...............................
Fourteen manholes were identified throughout the project area. Two of the manholes were buried.
Three of these manholes can benefit from rehabilitation.
Manhole #
Rehabilitation Required
Video
35 -1
No rehab
Video
35 -1A
No rehab
Video
35 -2
No rehab
Buried, no video
35 -3
No rehab
Video
35 -4
No rehab
Video
35 -5
No rehab
Video
35 -6
Grout 2 pipe connections and
bottom barrel joint
Video
35 -7
No rehab
Video
37 -7
No rehab
Video
38 -16
No rehab
Buried, no video
38 -17
No rehab
Video
38 -18
Grout lift hole, 3 pipe
connection and 3 barrel joints
Video
38 -19
Remove casting, install new
adjustment rings, reset casting
and new asphalt surface
Video
75 -7
No rehab
Video
Expalrience the difference.
One cWIL One service previder. One experience.
The hand - written manhole reports are printed in the bound copy of your report. The videos are
located on your flash drive in a folder labelled Manholes. A proposal to address the rehabilitation on
these structures is included in the package.
Maintenance
Your collection system will benefit from a yearly cleaning, televising and manhole inspection schedule
to locate deficiencies before they pose a problem. Hydro - Klean's P.I.P.E. program will allow you to
schedule maintenance items now at today's costs can save money while offering you the additional
benefit of prioritized recommendations as well as no cost manhole inspections. Please contact us for a
maintenance proposal suitable to your needs.
Please call with any questions. Paul, we look forward to working with the City again.
Sincerely,
Michele McGreal
Hydro - Klean, LLC
Cell 612.845.4394
Hydro -Klean LLC
333 NW 49th Place
Des Moines, IA 50313
Phone: (515) 283 -0500
Fax: (515) 283 -0505
Main
Inspections
Pipe Run and
Scoring
:)roject qairn
i lli :II:ID
ft
treeU
Shorewood MN 123016
38 -17 A
SHOREWOOD
RIVIERA LN.
Start dateffiirne'
)'irec 'iioim�
Wealgeru"
ocadoin cock'
12/30/2016 7:57 AM
D
Grade
Rating Rating Index
q Il e'
" ter II'..
eki IhU
\NNNii 'dglq
C
PVC
9 in.
Scores
Calculated at: 1/6/2017 5:03:24 PM
Started at 0.0 ft. with flow
on 12/3012,0116 7:57:00 A
D
�,f parr
N
Nt
Stopped at 1110.5 ft with flow
an 12130/20,16, 7:57:00, A
, MH '3.8 -17
�abr:°ic
H - IManhole
01.0 ft.,
V1- Water Level
110.,5 ft„
HI - Manholle;
Main Inspections Pipe Run and Scoring Page 1 of 11
Structural:
O &M:
Overall:
Grade
Segment
Pipe Quick
Pipe Rating
Segment
Pipe Quick Pipe Rating
Pipe Rating Pipe Rating
Grade
Rating Rating
Index
Grade
Rating Rating Index
Index
1
0
0
2
0
E
0
3
0
0
0000
0
0
0000
0
Started at 0.0 ft. with flow
on 12/3012,0116 7:57:00 A
D
�,f parr
N
Nt
Stopped at 1110.5 ft with flow
an 12130/20,16, 7:57:00, A
, MH '3.8 -17
�abr:°ic
H - IManhole
01.0 ft.,
V1- Water Level
110.,5 ft„
HI - Manholle;
Main Inspections Pipe Run and Scoring Page 1 of 11
Main Inspections Pipe Run and Scoring
:)Iroject qairn
i lli :II:ID
ft
treeU
Shorewood MN 123016
38 -18
A SHOREWOOD
RIVIERA LN.
Start dateffiirne'
)'irec 'iioim�
Weadgeru"
doini cock'
12/30/2016 8:13 AM
U
Grade
Sq Il e'
ter'i II'..
c'ki IhU
1 N'ii 'dglq
C
PVC
9 in.
Index
Scores
0
Calculated at: 1/6/2017 5:03:24 PM
Stopped at 1.82.1 ft. against how . ° t 1821111 ft- �.
own 12,/30 2016 &13: 00 A 41H - M4ainhol
44 vw °.F
CPA 77C
a.
Started at 110 ft. against flow „ �, + 2� „31 fL 1 .
one 12/30/20168:11.010 AM I'F - -'Tap Factory
t d 3, ft.,
AMH - Manhole
MH "38 -17' m
At. tk � iii fly.,
MWL. - Water Lovel
Main Inspections Pipe Run and Scoring Page 2 of 11
Structural:
O &M:
Overall:
Grade
Segment
Pipe Quick
Pipe Rating
Segment
Pipe Quick Pipe Rating
Pipe Rating Pipe Rating
Grade
Rating Rating
Index
Grade
Rating Rating
Index
Index
1
0
0
2
0
0
3
0
0
0000
0
0
0000
0
Stopped at 1.82.1 ft. against how . ° t 1821111 ft- �.
own 12,/30 2016 &13: 00 A 41H - M4ainhol
44 vw °.F
CPA 77C
a.
Started at 110 ft. against flow „ �, + 2� „31 fL 1 .
one 12/30/20168:11.010 AM I'F - -'Tap Factory
t d 3, ft.,
AMH - Manhole
MH "38 -17' m
At. tk � iii fly.,
MWL. - Water Lovel
Main Inspections Pipe Run and Scoring Page 2 of 11
Main Inspections Pipe Run and Scoring
:)Iroject qairn
i lli :II:ID
ft
treeU
Shorewood MN 123016
38 -19
A SHOREWOOD
RIVIERA LN.
Start dateffiirne'
)'irec 'iioim�
Weadgeru"
lion cock'
12/30/2016 8:30 AM
U
2
2100
Sq Il e'
ter'i II'..
c'ki Il iU
1 N ddglq
C
PVC
9 in.
0
4
0
Scores
0
Calculated at: 1/6/2017 5:03:23 PM
Grade
Structural:
Segment Pipe Quick Pipe Rating
Grade Rating Rating Index
O &M:
Segment Pipe Quick Pipe Rating
Grade Rating Rating Index
Overall:
Pipe Rating Pipe Rating
Index
1
0
0
0000
0
2
2100
2.00
2
2.00
2
0
2
0
0
0
3
0
4
0
5
0
Stopped at 3093 ft. against floe
awn 12130 2016 8:30:00 A
At 246 6 fl::IO3 ,
T - Tap Factory
oM
ry
Ifl
UN L79
At 1.32. fli,� 9/.
a� TFA, - Tap Factory Active
(.w,
ulN' A
Started ,at OX ft. .against flow
on 12/3,012016 8:30 :00 AGE .
3,09 .7 ft°
H - r4ainh of
At 241.E fit. 2/°
TF - Tai Factory
At 240.8 ft °,12
paw - Deposits Attached
Encrustation
Sating: 3
Category: O &M
0 0 fl:o,
H - Manhole
GA) ft '
K _ Water Level
Main Inspections Pipe Run and Scoring Page 3 of 11
Main Inspections Pipe Run and Scoring
:)Iroject qairn
i lli :II:ID
ft
treeU
Shorewood MN 123016
38 -7
A SHOREWOOD
RIVIERA LN.
Start to iiir nc'
)'irec 'iioim�
Weadgeru"
Lion cock'
12/30/2016 9:43 AM
D
Grade
Ilgi Il e'
ter Ikk
c'ki IhU
1 N'ii 'tllgi'
C
PVC
9 in.
Index
Scores
0
Calculated at: 1/6/2017 5:03:23 PM
Started at 0.0 ft. with flow
on 12/3012,01 9,410 A
Lry Ln
�, . C
"T ,
b I'
At 236.5 ft,. 3',j. 91 �
(.7 TFA Tap. Factory Active
g
a
i LrA
At 326.9 ft. 3/. I �
TF - Tap Factory
Stopped at 410.5 ft. with Flo
on 12/3617316 0:41010, A,
MN '38-7'
H - IMan�hole
0.0 ft.,
Vt - Water Level
At 64,3 ft.. 1.0/.
TF - Tap Factory
At 278.0 ft, 101.
TF - Tap Factory Active
At 382.2 ft, 10/.,
TiFA - Tap, Factory Active
410.5 ft.'
H - Manhole
Main Inspections Pipe Run and Scoring Page 4 of 11
Structural:
O &M:
Overall:
Grade
Segment
Pipe Quick
Pipe Rating
Segment
Pipe Quick Pipe Rating
Pipe Rating Pipe Rating
Grade
Rating Rating
Index
Grade
Rating Rating
Index
Index
1
0
0
2
0
0
3
0
0
0000
0
0
0000
0
Started at 0.0 ft. with flow
on 12/3012,01 9,410 A
Lry Ln
�, . C
"T ,
b I'
At 236.5 ft,. 3',j. 91 �
(.7 TFA Tap. Factory Active
g
a
i LrA
At 326.9 ft. 3/. I �
TF - Tap Factory
Stopped at 410.5 ft. with Flo
on 12/3617316 0:41010, A,
MN '38-7'
H - IMan�hole
0.0 ft.,
Vt - Water Level
At 64,3 ft.. 1.0/.
TF - Tap Factory
At 278.0 ft, 101.
TF - Tap Factory Active
At 382.2 ft, 10/.,
TiFA - Tap, Factory Active
410.5 ft.'
H - Manhole
Main Inspections Pipe Run and Scoring Page 4 of 11
Main Inspections Pipe Run and Scoring
:)Iroject qairn
i lli :II:ID
ft
treeU
Shorewood MN 123016
35 -4
A SHOREWOOD
SHOREWOOD LN.
Start ate iiir nc'
)'irec 'iioim�
Weadgeru"
lion cock'
12/30/2016 10:32 AM
D
Grade
q Il e'
ter'i Ikk
c'ki Il iU
1 N ddglq
C
PVC
9 in.
Scores
Calculated at: 1/6/2017 5:03:22 PM
r�
Key �;b
,7.
p
Started at 0,0 ft. rith tlo
on 12/301/2016 10:32:00 AM
Stopped at: 99.9 ft„ with flow
on 12/30,12016 1022 :00 AMI
9IIHI "35,3®
N " 3'S - -4'
0.0 ft.,
Vt - Water Level
At 14.9 ft. 1.0/.
TFA - Tap Factory Active
At 41.3 . 9/,
TFC - Tap Factory Capped
99.9 ft.
H - Manhole
Main Inspections Pipe Run and Scoring Page 5 of 11
Structural:
O &M:
Overall:
Grade
Segment
Pipe Quick
Pipe Rating
Segment
Pipe Quick Pipe Rating
Pipe Rating Pipe Rating
Grade
Rating Rating
Index
Grade
Rating Rating Index
Index
1
0
0
2
0
0
3
0
0
0000
0
0
0000
0
r�
Key �;b
,7.
p
Started at 0,0 ft. rith tlo
on 12/301/2016 10:32:00 AM
Stopped at: 99.9 ft„ with flow
on 12/30,12016 1022 :00 AMI
9IIHI "35,3®
N " 3'S - -4'
0.0 ft.,
Vt - Water Level
At 14.9 ft. 1.0/.
TFA - Tap Factory Active
At 41.3 . 9/,
TFC - Tap Factory Capped
99.9 ft.
H - Manhole
Main Inspections Pipe Run and Scoring Page 5 of 11
Main Inspections Pipe Run and Scoring
:)Iroject qairn
i lli :II:ID
ft
treeU
Shorewood MN 123016
35 -3
A SHOREWOOD
SHOREWOOD LN.
Start ate iiir nc'
)'irec 'iioim�
Weadgeru"
lion cock'
12/30/2016 10:45 AM
D
Grade
q Il e'
ter'i Ikk
c'ki Il iU
1 N ddglq
C
PVC
9 in.
Scores
Calculated at: 1/6/2017 5:03:25 PM
��ti and f,
�t• �M
N
r�
Key �;b
,7.
p
Started at 6,0 ft. rith flow
on 12/301/2016 10.45.00 AM
At 9..4 . 31.,
TF - Taup Factory
Stopped ate 41.5 tt„ with Flo
on 12/30,12016 10;45.00 AMl ,
UHi °35 -210
0.0 ft.,
Vt - Water Level
41.5 ft.
H - Manhole
Main Inspections Pipe Run and Scoring Page 6 of 11
Structural:
O &M:
Overall:
Grade
Segment
Pipe Quick
Pipe Rating
Segment
Pipe Quick Pipe Rating
Pipe Rating Pipe Rating
Grade
Rating Rating
Index
Grade
Rating Rating Index
Index
1
0
0
2
0
0
3
0
0
0000
0
0
0000
0
��ti and f,
�t• �M
N
r�
Key �;b
,7.
p
Started at 6,0 ft. rith flow
on 12/301/2016 10.45.00 AM
At 9..4 . 31.,
TF - Taup Factory
Stopped ate 41.5 tt„ with Flo
on 12/30,12016 10;45.00 AMl ,
UHi °35 -210
0.0 ft.,
Vt - Water Level
41.5 ft.
H - Manhole
Main Inspections Pipe Run and Scoring Page 6 of 11
Main Inspections Pipe Run and Scoring
:)Iroject qairn
i lli :II:ID
ft
treeU
Shorewood MN 123016
35 -2
A SHOREWOOD
SHOREWOOD LN.
Start ate iiir nc'
)'irec 'iioim�
Weadgeru"
lion cock'
12/30/2016 10:56 AM
D
Grade
q Il e'
ter'i Ikk
c'ki Il iU
1 N ddglq
C
PVC
9 in.
Scores
Calculated at: 1/6/2017 5:03:24 PM
q �7
L � B. i
F, F,,
r�
0
,7.
p
Started at 0.0 ft. Frith flow
on 12/301/2516 10.56:00 AM
Stoppedat 75.0 ft, with Flo
on 12/30,12016 10:56:00 AMl ,
H "F'5 -1®
H - Manhole
0.0 ft.,
Vt - Water Level
At 3T9 ft. /:w
TF - Tap Factory
y
75.0 ft.
H - Manhole
Main Inspections Pipe Run and Scoring Page 7 of 11
Structural:
O &M:
Overall:
Grade
Segment
Pipe Quick
Pipe Rating
Segment
Pipe Quick Pipe Rating
Pipe Rating Pipe Rating
Grade
Rating Rating
Index
Grade
Rating Rating Index
Index
1
0
0
2
0
0
3
0
0
0000
0
0
0000
0
q �7
L � B. i
F, F,,
r�
0
,7.
p
Started at 0.0 ft. Frith flow
on 12/301/2516 10.56:00 AM
Stoppedat 75.0 ft, with Flo
on 12/30,12016 10:56:00 AMl ,
H "F'5 -1®
H - Manhole
0.0 ft.,
Vt - Water Level
At 3T9 ft. /:w
TF - Tap Factory
y
75.0 ft.
H - Manhole
Main Inspections Pipe Run and Scoring Page 7 of 11
Main Inspections Pipe Run and Scoring
:)Iroject qairn
i lli :II:ID
ft
treeU
Shorewood MN 123016
35 -1
A SHOREWOOD
SHOREWOOD LN.
Start ate iiir nc'
)'irec 'iioim�
Weadgeru"
lion cock'
12/30/2016 11:03 AM
D
Grade
q Il e'
ter'i Ikk
c'ki Il iU
1 N ddglq
C
PVC
9 in.
Index
Scores
0
Calculated at: 1/6/2017 5:03:24 PM
q
b I'
(.7 w,
Started at 0.0 ft. rith flow
on 12/301/2016 11:03:00 AM
Stopped at 144.8 ft. with Flo
on 12/301,20,16 11:810,0 A
0.0 ft.,
Vt - Water Level
144.8 ft.
H - Manhole
Main Inspections Pipe Run and Scoring Page 8 of 11
Structural:
O &M:
Overall:
Grade
Segment
Pipe Quick
Pipe Rating
Segment
Pipe Quick Pipe Rating
Pipe Rating Pipe Rating
Grade
Rating Rating
Index
Grade
Rating Rating
Index
Index
1
0
0
2
0
0
3
0
0
0000
0
0
0000
0
q
b I'
(.7 w,
Started at 0.0 ft. rith flow
on 12/301/2016 11:03:00 AM
Stopped at 144.8 ft. with Flo
on 12/301,20,16 11:810,0 A
0.0 ft.,
Vt - Water Level
144.8 ft.
H - Manhole
Main Inspections Pipe Run and Scoring Page 8 of 11
Main Inspections Pipe Run and Scoring
:)Iroject qairn
i lli :II:ID
ft
treeU
Shorewood MN 123016
35 -5
A SHOREWOOD
SHOREWOOD LN.
Start ate iiir nc'
)'irec 'iioim�
Weadgeru"
lion cock'
12/30/2016 11:33 AM
U
Grade
IIqapc
ter akk
ck;plhU
1 N'ii 'dq'
C
PVC
9 in.
Index
Scores
0
Calculated at: 1/6/2017 5:03:24 PM
oM
d,
Stopped at 319.9 ft. against hove
on 12130 2016 11,33;00 All
At ' 271.9 ft. 10/
3T _ 'T a-p Factory
Im'l
b I'
t 1.'11.4 ft. 9
iF _. -FDp Factory Ac re
u1:li A
Started ,at OX ft. ,against flow
on 12/3,012016 11:33:00 AM I
�rlthll1YC9�'�yi
311.9 °
H - planh of
At 242. fit °, 21,
TF - Tap Factor
At 1016 9 ft, /
TF - Tap Factor :ctiv +e
0 0 ft o,
H - Manhole
GA) 'ft"
K _ Water Level
Main Inspections Pipe Run and Scoring Page 9 of 11
Structural:
O &M:
Overall:
Grade
Segment
Pipe Quick
Pipe Rating
Segment
Pipe Quick Pipe Rating
Pipe Rating Pipe Rating
Grade
Rating Rating
Index
Grade
Rating Rating
Index
Index
1
0
0
2
0
0
3
0
0
0000
0
0
0000
0
oM
d,
Stopped at 319.9 ft. against hove
on 12130 2016 11,33;00 All
At ' 271.9 ft. 10/
3T _ 'T a-p Factory
Im'l
b I'
t 1.'11.4 ft. 9
iF _. -FDp Factory Ac re
u1:li A
Started ,at OX ft. ,against flow
on 12/3,012016 11:33:00 AM I
�rlthll1YC9�'�yi
311.9 °
H - planh of
At 242. fit °, 21,
TF - Tap Factor
At 1016 9 ft, /
TF - Tap Factor :ctiv +e
0 0 ft o,
H - Manhole
GA) 'ft"
K _ Water Level
Main Inspections Pipe Run and Scoring Page 9 of 11
Main Inspections Pipe Run and Scoring
:)Iroject qairn
i lli :II:ID
ft
treeU
Shorewood MN 123016
35 -7
A SHOREWOOD
SHOREWOOD LN.
Start ate iiir nc'
)'irec 'iioim�
Weadgeru"
lion cock'
12/30/2016 12:16 PM
D
Grade
q Il e'
ter'i Ikk
c'ki Il iU
1 N ddglq
C
PVC
9 in.
Scores
Calculated at: 1/6/2017 5:03:24 PM
Started at 0.0 ft. with 6a
on 12/3012016 12:16:00 PAN
CywV R °y�"1
At 49.0 'ft. 2,1.
TF - Tap IFa;ctor
b I'
(. w,
"" g
A
Stopped at 1113 ft. with flow
on 12/301,20,16 1.2:16:0,0 pM
UHi 135-610
H - Mianh ole
01.0 ft,,
Vt - Water Level
At 43.6 ft. 10/,.
TF - Tap P'atto:ry
111.3 ft.
Main Inspections Pipe Run and Scoring Page 10 of 11
Structural:
O &M:
Overall:
Grade
Segment
Pipe Quick
Pipe Rating
Segment
Pipe Quick Pipe Rating
Pipe Rating Pipe Rating
Grade
Rating Rating
Index
Grade
Rating Rating Index
Index
1
0
0
2
0
0
3
0
0
0000
0
0
0000
0
Started at 0.0 ft. with 6a
on 12/3012016 12:16:00 PAN
CywV R °y�"1
At 49.0 'ft. 2,1.
TF - Tap IFa;ctor
b I'
(. w,
"" g
A
Stopped at 1113 ft. with flow
on 12/301,20,16 1.2:16:0,0 pM
UHi 135-610
H - Mianh ole
01.0 ft,,
Vt - Water Level
At 43.6 ft. 10/,.
TF - Tap P'atto:ry
111.3 ft.
Main Inspections Pipe Run and Scoring Page 10 of 11
Main Inspections Pipe Run and Scoring
:)Iroject qairn
i lli :II:ID
ft
treeU
Shorewood MN 123016
35 -5
B SHOREWOOD
SHOREWOOD LN.
Start dateffiirne'
)'irec 'iioim�
Weadgeru"
lion cock'
12/30/2016 12:50 PM
U
Grade
Sq Il e'
ter'i II'..
c'ki Il iU
1 N ddglq
C
PVC
9 in.
Index
Scores
0
Calculated at: 1/6/2017 5:03:24 PM
t::a gym;
C
F m"
�^v�
b I'
a�
(. w,
N' LrA
Stopped at 218.0 ft. against drove —
awn 12,/30 2016 12:50,00 P
,At 1.t65 ft, R,u 01 f
1i= - Tap Factory
Started ,at OX ft„ ,against flow
on 12/3,012010 12:50:,00 pH
�r1r4*tnlllYC9�'�bli
LS 0 ft-
4H - Mleinhol'e
dH - Manhole
GA) ft"
x"L _ Water Level
Main Inspections Pipe Run and Scoring Page 11 of 11
Structural:
O &M:
Overall:
Grade
Segment
Pipe Quick
Pipe Rating
Segment
Pipe Quick Pipe Rating
Pipe Rating Pipe Rating
Grade
Rating Rating
Index
Grade
Rating Rating
Index
Index
1
0
0
2
0
0
3
0
0
0000
0
0
0000
0
t::a gym;
C
F m"
�^v�
b I'
a�
(. w,
N' LrA
Stopped at 218.0 ft. against drove —
awn 12,/30 2016 12:50,00 P
,At 1.t65 ft, R,u 01 f
1i= - Tap Factory
Started ,at OX ft„ ,against flow
on 12/3,012010 12:50:,00 pH
�r1r4*tnlllYC9�'�bli
LS 0 ft-
4H - Mleinhol'e
dH - Manhole
GA) ft"
x"L _ Water Level
Main Inspections Pipe Run and Scoring Page 11 of 11
CITY OF
SHOREWOOD
Preliminary Layout
Riviera Lane and Shorewood Lane Street
and Utility Improvements
SHOREWOOD, MINNESOTA
0 100 200
SCALE IN FEET
WSB PROJECT NO.
2925 -24
DATE: DECEMBER 2016
FIGURE 1
CITY OF
SHOREWOOD
Preliminary Layout
Riviera Lane and Shorewood Lane Street
and Utility Improvements
SHOREWOOD, MINNESOTA
0 100 200
SCALE IN FEET
WSB PROJECT NO.
2925 -24
DATE: DECEMBER 2016
FIGURE 2
CITY OF SHOREWOOD
RESOLUTION NO. 18-
A RESOLUTION RECEIVING FEASIBILITY REPORT
AND AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS
FOR
MANN LANE, RIVIERA LANE AND SHOREWOOD LANE
STREET AND UTILITY IMPROVEMENT PROJECT, CITY PROJECT 17 -04
WHEREAS, the City Council authorized preparation of a revision to the Feasibility
Report for the Riviera Lane and Shorewood Lane Street and Utility Improvement Project,
City Project 17 -04, to include Mann Lane and Maple Street on September 6, 2017; and
WHEREAS, subsequent to the October 9, 2017 City Council work session
discussion regarding trail improvements within the City, the trail extension next to Country
Club Road from the current terminus to Yellowstone Trail, and the trail extension next to
Yellowstone Trail from Country Club Road to Lake Linden Drive was to be included the
feasibility report; and
WHEREAS, the report provides information regarding whether the proposed
improvements are necessary, cost - effective, and feasible; whether it should best be made as
proposed or in connection with some other improvement; and the estimated cost of the
improvement as recommended.
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of
Shorewood, Minnesota:
1. The Council receives the Feasibility Report prepared by WSB; and
2. The Council will consider the improvement of Mann Lane, Riviera Lane and
Shorewood Lane Street and Utility Improvement Project, City Project 17 -04, in
accordance with the report at an estimated cost of $1,578,300; and
3. Authorizes the preparation of plans and specifications for the improvements on
Mann Lane, Riviera Lane and Shorewood Lane.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD
this 221 day of January, 2018.
Scott Zerby, Mayor
ATTEST:
Sandie Thone, City Clerk
PLEASE COMMENT ON ANY ISSUES 'SHE CITY SHOULD CONSIDER WHEN
ES 16,
'KING OR CONSTRUCTING THIS PROJECT.
D
t"e'f'5 'vq -I
L 14,
7Z)
/75
j 7vi,
n 4-t
Your Name °l Phone
Address
CITYOF
SHOREWOOD
Engineer
From: Sandra Ahlstrom
Sent: Tuesday, December 12, 2017 10:12 PM
To: Engineer
Subject: Re: Remarks Re: 2018 Street Improvements for Riviera Lane (City Project No. 17 -04)
Good evening, Alyson,
"Yes, the cost - sharing is for the water main.`We already have the sewer connection. I reread what I composed for you
and missed that as you've noted. Is there a way to add the water main to my letter so it does make sense? What would
you suggest? I could just rewrite my letter and make the correction... And then, we do want to include our email in the
council packet.
Sincerely,
Tom and Sandy Ahlstrom
> On Dec 12, 2017, at 3:32 PM, Engineer < CityEngineer @ci.shorewood.mn.us> wrote:
> Hello Tom and Sandy,
> Thank you for the email. The cost -share scenario you present is for the water main, correct? That is my recollection
from our telephone conversation last week.
> Would you like me to include your email in the council packet for the public hearing? If so, I will block out your email
address.
> Regards,
> Alyson Fauske, PE (MN)
> City Engineer
> Shorewood MN
> 952.960.7910
> - - - -= Original Message---- -
> From: Sandra Ahlstrom [mailto
> Sent: Monday, December 11, 2017 8:27 PM
> To: Sandra Ahlstrom <sandy.earth350 @gmail.com>
> Subject: Remarks Re: 2018 Street Improvements for Riviera Lane (City Project No. 17 -04)
> Good morning, Alyson Sauske, City Engineer with the City of Shorewood,
> I appreciated being able to talk with you about the above mentioned street improvement project that includes Riviera
Lane. We live at 6085 Riviera Lane and have previously attended two informational City Council mtgs. concerning the
improvement plans but we were then told that the project was on hold till a future date. We were not able to attend
the Neighborhood Mtg. - Open House the evening of November 22 but want to reiterate our understanding of the cost -
sharing of this project on the homeowners affected. We stated at the earlier council mtgs. that we believe the 4 homes
on the south side of Yellowstone Trail leading east to Riviera Lane should share in the cost of the road improvement to
be done. If those 4 homes plus the 14 on Riviera share the costs, all of our costs will be lessened. That is the fairest plan
for all concerned, in our estimation.
> Many thanks for understanding and we hope to be able to speak with the city again at another date
> Sincerely,
> Tom and Sandy Ahlstrom
> 6085 Riviera Lane
> Shorewood, MN 55331
Sandra Ahlstrom
#8B
MEETING TYPE
City of Shorewood Council Meeting Item REGULAR
Title / Subject: Sewer Jet Vac Joint Purchase Agreement
Meeting Date: January 22, 2018
Prepared by: Greg Lerud, City Administrator
Reviewed by: Larry Brown, Public Works Director
Attachments: Redline contract
Policy Consideration: Should the City Council consider approving a revised agreement to purchase
and operate a sewer jet vac truck?
Background: At the November 27, 2017 regular council meeting, the Council approved an agreement
with the cities of Excelsior and Tonka Bay for the purchase and operation of a sewer jet vac truck. The
agreement was prepared by Tonka Bay and the council unanimously approved the agreement, as did the
City of Excelsior. When the agreement went back to the Tonka Bay Council, they made revisions to the
agreement and sent it back to Shorewood and Excelsior for re- approval.
Staff has been reluctant to bring this bak to Council because we cannot recommend approval of the
Tonka Bay modifications and suggested to our counterparts in the other cities that staff try to work out
the issues before bringing the agreement back for council consideration. At their meeting on January 9,
the Tonka Bay council formally requested the agreement be presented to both Excelsior and Shorewood
councils for consideration. That is the reason it is coming back to you.
Financial or Budget Considerations: Some of the Tonka Bay changes could have an impact on
Shorewood's share of the operating cost. The proposed language does not allow for any future analysis
for sharing the cost except for the one -time determination four years from now. Additionally, the "take
it or leave it" terms in Section 4 G d are unacceptable, and there are potential issues with the
recordkeeping requirements in Section 5d that do not exist with the approved 33 -33 -33 split.
Options: The council has the following options:
1. Take no action on the revised agreement and reiterate support only for the approved
agreement.
2. Approve the changes to the agreement as proposed by Tonka Bay.
3. Decline approval of the revised agreement but direct staff to see if there are changes that could
be made to make the agreement acceptable.
Recommendation / Action Requested: Staff cannot recommend approval of the revised agreement.
These changes were done by the Tonka Bay Council after Shorewood and Exceslior approval without any
input from our staff. In addition, if there are revisions to be made to the agreement, staff has a few
changes that it would like to include in any new agreement. Because staff believes that ownership of
this piece of equipment is important, we recommend the council decline to approve the revised
agreement and direct staff to negotiate changes. Staff further recommends that the period of
Mission Statement: The City of Shorewood is committed to providing residents quality public services, a
healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial
management through effective, efficient, and visionary leadership. Page 1
negotiations be no longer than 45 days. Staff will then present a revised agreement that it can support,
or recommend other action, including looking at a different purchase and use arrangement with a single
city.
Next Steps and Timeline: Staff will communicate the council's decision to Tonka Bay and Excelsior. The
city of Excelsior will consider this revised agreement at their first meeting in February.
JOINT PURCHASE AGREEMENT BETWEEN THE CITY OF TONKA BAY, THE
CITY OF EXCELSIOR, AND THE CITY OF SHOREWOOD FOR THE
COOPERATIVE
PURCHASE AND USE OF PUBLIC WORKS EQUIPMENT
This Joint Purchase Agreement ( "Agreement ") is made and entered into this day of
, 2017 by and between the City of Tonka Bay ( "Tonka Bay "), the City of
Excelsior ( "Excelsior "), and the City of Shorewood ( "Shorewood "), each a municipal
corporation under the law of the State of Minnesota, collectively referred to herein as the
"Parties" or individually as a "Party."
RECITALS
A. Each of the Parties hfl-vehas a limited need for a JetterNactor truck (generally, the
"Equipment ").
B. The estimated cost of the Equipment is approximately $ , exclusive of any costs
(e.g., tax, title, license, etc.).
C. Rather than each Party incurring the costs to purchase, maintain, and store such Equipment,
the Parties agree it is in their mutual best interests to establish a cooperative agreement
whereby they share in the acquisition and use of such new Equipment.
D. The Parties are authorized pursuant to Minnesota Statutes, section 471.59 to exercise their
shared powers cooperatively and jointly in the purchase and use of such Equipment.
AGREEMENT
In consideration of the mutual undertakings and understandings expressed herein, the Parties
hereby agree as follows:
Purpose. The purpose of this Agreement is to establish a process for the Parties to agree to
cooperatively purchase, use, maintain, and store the Equipment as outlined herein.
2. Responsible Party. Tonka Bay shall serve as the responsible Party ( "Responsible Party ")
for purchasing and insuring the Equipment cooperatively purchased under this Agreement.
3. Storage. The City of Excelsior shall primarily store the Equipment when it is not being used
by another Party. Each Party shall be responsible for short -term storage while the Equipment
is being used by that Party, as well as returning the Equipment to Excelsior following such
use. The Excelsior Public Works Superintendent ( "Excelsior Superintendent ") shall notify
the Tonka Bay Public Works Superintendent ( "Tonka Bay Superintendent ") and the
Shorewood Public Works Director ( "Shorewood Director ") of the process for removal and
return of the Equipment from its storage location. Each Party hereto shall have the right to
remove and return the Equipment in accordance with the use schedule required under this
5091300 AMB TN115 -1
Agreement. In return for Excelsior storing the Equipment, each Party agrees to pay Excelsior
an annualized rate of $1200.00--,l .2 00.00. or $100.00 per month per Party. Such payment
shall be made in full by each Party to Excelsior, without demand, no later than January 31St
of each year.
4. Cooperative Purchase of Equipment. The Parties agree that the cooperative purchase of
the Equipment shall be accomplished in accordance with this section.
(a) Proposal to Purchase. Each Party, through its Director or Superintendent, may propose to
the other Directors or Superintendents the cooperative purchase of a new or
replacement item of Equipment that would be beneficial to the Parties in providing
public works services within their respective cities. If the Directors and
Superintendents agree to proceed with the proposed purchase, each shall seek such
approvals as may be required to authorize the cooperative purchase of the identified
item of Equipment.
(b) Purchase. Upon the authorization by all Parties, the Responsible Party agrees to
undertake the necessary process to purchase the item of Equipment in accordance with
all applicable public contracting laws. The Director or Superintendent for each Party
shall agree on the specifications for the item of Equipment before the Responsible Party
formally undertakes the purchasing process.
(c) Cost Share. Each Party shall be responsible for one -third of the purchase price of the
Equipment, inclusive of all costs associated therewith. The respective cost - sharing
responsibilities of each Party are identified in Exhibit A, attached hereto.
(d) Payment. The Responsible Party shall notify each Party in writing of the required
payment for its equal 1/3 share of the Equipment prior to the Responsible Party
purchasing such Equipment. Each Party shall remit payment for their invoiced amount
within 30 days of receiving such invoice. Upon receipt of each Party's payment
hereunder, the Responsible Party shall purchase and pay for the Equipment in full.
(e) Ownership. The Equipment shall be owned in equal undivided shares by the Parties
hereto. Upon disposition of the Equipment cooperatively purchased under this
Agreement, each Party shall be entitled to one -third of the proceeds of the sale as
provided in the following paragraph.
(f) Disposition. The Director or Superintendent for each Party must agree, in writing, to
dispose of the Equipment cooperatively purchased under this Agreement. The Party
who served as the Responsible Party to purchase the item of Equipment shall be
responsible for disposing of it and promptly paying theeach other Party its one -third
share of the proceeds from the sale. If an item of Equipment is being traded in on a
new item of Equipment, the trade -in value shall reduce the purchase price of the new
item of Equipment in equal shares for each Peftie-sParty. The item of Equipment
acquired through the trade -in shall be subject to the approval process outlined in
paragraphs 4(a) and (b) above and owned, used, and maintained in accordance with the
2
509130v69 AM B T N 115 -1
terms of this Agreement. Before the item of Equipment is made available for purchase
by the general public, a Party hereto may elect to purchase the other Parties' interests in
the item of Equipment by paying one -third of the agreed upon value of the item of
Equipment. Notice of an election to purchase must be provided in writing to the other
Parties within €iftee thirty (4-530) days of the determination of the weed
upenaapnraised value of the item of Equipment. NE) Prafft , may elect to ptff .hale
Should one Party purchase the equitable share in the Equipment of another party, such
purchase shall not confer on the purchasing Party any greater or additional rights to use
the Equipment over the remaining Party holding an interest in the Property. The sale of
a Party's interest in the Property shall dispose of that Party's right to use the Equipment
under the terms of this Agreement.
(g) Costs. Costs incurred in the purchase, maintenance and operation, administration, and
disposition of the Equipment shall be allocated as provided herein. All ongoing
payment obligations shall follow the process provided in paragraph a, below.
a. Administrative Costs. Each Party agrees to reimburse the Responsible Party for
the administrative costs incurred pursuant to the administration of this Agreement,
including but not limited to the costs associated with the preparation of this
Agreement, securing bids for the purchase of the Equipment, executing the
purchase of the Equipment, and any other administrative costs incurred. The
Responsible Party shall provide each Party with a written invoice outlining its
share of the costs incurred hereunder, and each Party shall remit payment to the
Responsible Party within 30 days of receiving such invoice. The Parties agree
that the Responsible Party shall invoice each Party semi - annually on March 31St
and September 30th of each calendar year, except that if at any time the balance
due to the Responsible Party exceeds $500.00 per Party, the Responsible Party
may immediately invoice each Party in addition to the semi - annual invoices
allowed hereunder. In the event that the administrative costs incurred under this
Agreement are reasonably expected to exceed $1,000.00, the Responsible Party
shall obtain prior written permission from each Party prior to incurring such costs.
All initial costs incurred by the Responsible Party up to the date of delivery of the
Equipment shall be invoiced to each Party within 30 days of delivery of such
Equipment, and future costs shall be invoiced according to the provisions of this
section.
b. Maintenance and Minor Repairs. The Responsible Party agrees to perform
routine maintenance on the Equipment cooperatively purchased under this
Agreement. Routine maintenance includes lubricants (grease, oil, or other fluids),
repair of flat tire, replacement or repair of any minor damage reasonably caused
during normal use, etc. The other Parties agree to reimburse the Responsible
Party for one -third of the costs of routine maintenance, including a reasonable
charge for labor to conduct such maintenance. Each Party agrees to ensure that
the Equipment is cleaned and all fuel and fluids are full after use. In the event a
3
509130v69 AM B T N 115 -1
shared maintenance cost is estimated to exceed $10,000.00, the Responsible Party
agrees to obtain the prior written consent and /or prepayment of the other Parties
prior to undertaking such maintenance.
c. Insurance. The Responsible Party shall insure the Equipment purchased under
this Agreement and agrees to name the other Parties as an additional insured on
the policy. Each Party shall be responsible for one -third of the annual insurance
premium to insure the Equipment. The non - responsible Parties agree to
reimburse the Responsible Party for their one -third share of the costs of such
insurance. Each Party shall be responsible for maintaining its own general
liability insurance and workers' compensation insurance covering its own
employees while they are operating, maintaining, or otherwise utilizing the
Equipment pursuant to this Agreement.
d. Re- allocation of Costs. The Parties acknowledge that, upon the conclusion of the
initial term of this Agreement. the Parties will re- allocate the on-going costs
associated with the Equipment based on the actual proportional usage of the
Equipment between the Parties. Following the completion of the fourth ey ar of
the initial term. the Responsible Party shall review the records related to usage
which are required herein, and shall determine the proportionate percentage use of
each party over the initial term of this Agreement. If any Party does not agree
such re- allocation of the costs in subsequent terms as provided above, they may
withdraw from the Agreement pursuant to the terms contained herein.
5. Cooperative Use of Equipment. The Parties agree that the Equipment cooperatively
purchased under this Agreement shall be available for use by the Parties in accordance with
this section.
(a) Schedule. The Parties shall establish a schedule for the use of the Equipment to allow all
Parties a reasonable period of time to utilize the Equipment. Such schedule shall be
reduced to writing and signed by all Directors and Superintendents annually. All
changes to the schedule must be made in writing, signed by each of the Directors and
Superintendents.
(b) Use. Equipment shall only be used for its intended purpose. No Party shall lease, rent,
loan, or otherwise permit Equipment cooperatively purchased pursuant to this
Agreement to be used by anyone who is not a party to this Agreement without the
written consent of each of the other Parties.
(c) Liability. If the Equipment is damaged while it is being used by one of the Parties, that
Party shall be responsible for paying 100% of any deductible on the insurance claim.
Notwithstanding this provision, to the extent that such damage can reasonably be
repaired pursuant to the maintenance responsibilities under paragraph (c) above, the
Responsible Party shall make stffesuch repairs and invoice each Party for their
respective share pursuant to the payment terms herein. Any repair which is required
due to the negligence of any Party shall be the sole responsibility of that Party to repair.
4
509130v69 AM B T N 115 -1
Failure by any Party to repair any such damage within a reasonable time shall result in
the suspension of that Party's right to use the Equipment under this Agreement until
such time as the repairs are made to the reasonable satisfaction of the other Parties. If
such party fails to make such repairs, the Responsible Party may elect, at its discretion,
to make such repairs and invoice the negligent Party for the full costs of such repairs.
The negligent Party shall not regain its right to use the Equipment until such time as it
repays the Responsible Party for those repairs. Failure to repay for such repairs after
180 days' written notice shall result in the negligent Party abandoning its equitable
interest in the Equipment, and such interest shall transfer in equal shares to the non -
negligent Parties.
(d) Record - keeping. Each Party shall be responsible for keeping records, in a format
approved by the Responsible Party' Superintendent, outlining its use of the
Equipment, any maintenance or repairs that are completed, any issues that may be
experienced with the Equipment, and any other information which the Responsible
Party's Superintendent may request. Such records shall be maintained during the full
term of this Agreement, and shall be made available to the other parties. Further. each
party shall annually provide the Responsible Party's Superintendent with a coR f
such records.
(e) Truck Labeling, The Parties hereto agree that fetter /vactor truck to be j intly=purchased
by the Parties shall display the name of each City which is a party to his Agreement.
Such truck shall read "Cities of Excelsior, Shorewood, Tonka Bay". Any further
displayed names or images y be agreed upon by all of the Directors and
Superintendents.
6. Hold Harmless. Each Party shall be liable for its own acts to the extent provided by law and
hereby agrees to indemnify, hold harmless and defend the other Parties, their officers and
employees against any and all liability, loss, costs, damages, expenses, claims or actions,
including attorneys' fees, which any other Party, its officers and employees, may hereafter
sustain, incur or be required to pay, arising out of or by reason of any act or omission of the
indemnifying Party, its agents, servants or employees, in the execution or performance or
failure to adequately perform its obligations pursuant to this Agreement. Nothing in this
Agreement shall require a Party to indemnify, hold harmless, or defend any other Party for
the other Party's own acts or omissions.
7. Liability Limits. It is understood and agreed that the Parties' liabilities shall be limited by
the provisions of Minnesota Statutes, chapter 466, and /or other applicable law. The hold
harmless provision of this Agreement does not constitute a waiver by any Party of limitations
on liability provided under Minnesota Statutes, section 466.04, as amended. To the fullest
extent permitted by law, actions by the Parties pursuant to this Agreement are intended to be
and shall be construed as a "cooperative activity" and it is the intent of the Parties that they
shall be deemed a "single governmental unit" for the purposes of liability, all as set forth in
Minnesota Statutes, section 471.59, subdivision I a(a), as amended. Each Party to this
Agreement expressly declines responsibility for the acts or omissions of any other Party.
Each Party agrees to promptly notify the other if it knows or becomes aware of any facts or
5
509130v69 AM B T N 115 -1
allegations reasonably giving rise to actual or potential liability, claims, causes of action,
judgments, damages, losses, costs or expenses, involving or reasonably likely to involve the
other Party, and arising out of acts or omissions related to this Agreement.
8. Workers Compensation. It is hereby understood and agreed that any and all employees of a
Party, the Party's contractors and subcontractors, and all other persons employed, retained,
contracted with or otherwise engaged and all other persons employed by the Party related to
this Agreement shall not be considered employees of the other Party and that any and all
claims that may or might arise under the Workers' Compensation Act of the State of
Minnesota on behalf of said employees shall in no way be the obligation or responsibility of
the other Party.
9. Records. Pursuant to Minnesota Statutes, section 16C.05, Subd. 5, the Parties agree that
each other Party, the State Auditor, the Legislative Auditor, and any of their duly authorized
representatives at any time during normal business hours and as often as they may reasonably
deem necessary, shall have access to and the right to examine, audit, excerpt, and transcribe
any books, documents, papers, records, etc., which are pertinent to the accounting practices
and procedures of the Parties and involve transactions relating to this Agreement.
10. Data Privacy. Each Party, its employees, agents, owners, partners, and subcontractors, agree
to abide by the provisions of the Minnesota Government Data Practices Act, Minnesota
Statutes, chapter 13 and implementing regulations, if applicable, and all other applicable state
and federal laws, rules, regulations and orders relating to data privacy or confidentiality, and
as any of the same may be amended.
11. Default. Default in this Agreement may occur when a Party fails to perform any of the
provisions of this Agreement or so fails to administer the work as to endanger the
performance of this Agreement.
12. Withdrawal. ArryExce t durin the initial term. anv Party may terminate this Agreement
upon 180 days' written notice given to the other Parties. No Party may withdraw from this
Agreement during the initial term. Only the governing bodies of the Parties have the
authority to act pursuant to this provision of this Agreement. Upon a notice to withdraw
from this Agreement by any Party, the Equipment shall be sold at a fair market value in a
manner consistent with state law. The proceeds from such a sale shall be divided in equal
shares and distributed among the Parties. In the alternative, the non - withdrawing Parties
may, in equal portions, pay to the withdrawing Party an amount equal to one -third of the fair
market value of the Equipment. In such event, the non - withdrawing Parties shall acquire
equal 50% shares in the Equipment, including equal responsibility for the ongoing costs
thereof.
13. Term. The Parties agree the duration of this Agreement shall be governed by this section.
(a) Duration. This Agreement will be in force for a period of five years from the date of
execution. Any Party may withdraw from this Agreement as outlined herein. This
Agreement will automatically renew for subsequent five -year terms unless any Party
6
509130v69 AM B T N 115 -1
provides the other Parties written notice at least ninety (90) days before the end of the
then current term of its intent to not renew this Agreement.
(b) Equipment Division. On or before the expiration of this Agreement the Parties will
determine whether to retain or dispose of the cooperatively purchased Equipment. The
Parties agree to work in good faith to reach agreement on an equitable division of the
retained Equipment. The disposal of any Equipment shall be accomplished in
accordance with the disposition of cooperatively purchased Equipment as stated in
paragraph 4(f) of this Agreement (based on its useful life remaining as determined by
industry standards, or by a dealer appraisal if requested by a Party. if inere than one
Pafty wants to Fetain one the Equipment, the Par-ties shall determine W-he will fetain th
Equipment by fandem a,..,w ing Value will be determined by dealer appraisal selected
by mutual agreement of the Parties. This disposition of the Equipment shall be
completed as soon as is reasonably possible after the termination of the Agreement. If
more than one Party desires to retain the Equipment. the Responsible Party shall
arrange for the Equipment to be sold at auction, which auction shall be administered by
an independent third - party. The Parties hereto may participate in the auction pursuant
to any pplicable laws.
14. Entire Agreement. It is understood and agreed that the entire agreement between the Parties
is contained herein and that this Agreement supersedes all oral agreements and negotiations
between the Parties relating to the subject matter hereof. Any alterations, variations,
modifications, or waivers of provisions of this Agreement shall only be valid when they have
been reduced to writing as an amendment to this Agreement and signed by all Parties.
15. Severability. If any part of this Agreement is rendered void, invalid or unenforceable by a
court of competent jurisdiction, such rendering shall not affect the remainder of this
Agreement unless it shall substantially impair the value of the entire Agreement with respect
to any Party. The Parties agree to substitute for the invalid provision a valid provision that
most closely approximates the intent of the invalid provision.
16. Applicable Laws. The laws of the State of Minnesota shall apply to this Agreement.
17. Third Parties. This Agreement does not create any rights, claims or benefits inuring to any
person that is not a party hereto nor create or establish any third party beneficiary.
[SIGNATURE PAGE FOLLOWS]
7
509130v69 AM B T N 115 -1
IN WITNESS WHEREOF, the Parties hereto have executed and entered into this
Agreement effective as of the date first written above.
City of Tonka Bay
By:
Mayor
Attest:
By:
City Administrator
Date:
City of Shorewood
By:
Mayor
Attest:
By:
City Administrator
Date:
8
509130v69 AM B T N 115 -1
City of Excelsior
By:
Mayor
Attest:
By:
City Manager
Date:
EXHIBIT A
Cost Sharing Payments
Total Purchase Cost of the Equipment: $357,620.00
City of Tonka Bay $119,206.67
City of Excelsior $119,206.67
City of Shorewood $119,206.67
Trade -in Credits. Each party shall be entitled to the following deductions from the cost sharing
payments specified herein, should they choose to trade in their currently -owned equipment and
apply the monies received from those trade -ins to the Total Purchase Cost of the Equipment:
City of Tonka Bay $4,000.00
City of Excelsior $4,000.00
City of Shorewood $25,000.00
These trade -in credits are based on reasonably anticipated trade -in values for the existing
equipment owned by each city. If the actual trade -in values differ, the actual trade -in values
shall be used to calculate the appropriate credits. Because the Cities of Excelsior and Tonka Bay
currently jointly own similar equipment, each City shall be entitled a trade -in credit equal to 50%
of the trade in value, should they option to make such trade. Nothing herein shall require any
Party to trade in its currently -owned equipment.
5091300 AMB TN115 -1
Document comparison by Workshare Compare on Thursday, December 07,
2017 9:45:17 AM
Input:
Document 1 ID
Powerpocs: / /DOCSOPEN /509130/6
Description
DOCSOPEN- #509130 -v6 -Joint Purchase_ Agreement
Document 2 ID
Powerpocs: / /DOCSOPEN /509130/9
Description
DOCSOPEN- #509130 -v9 -Joint Purchase_ Agreement
Rendering set
Standard
Legend:
Style change
Format change
Inserted cell
Deleted cell
Moved cell
Split /Merged cell
Padding cell
Statistics:
Count
Insertions
23
Deletions
13
Moved from
0
Moved to
0
Style change
0
Format changed
0
Total changes
36
#8C
MEETING TYPE
City of Shorewood Council Meeting Item Regular Meeting
Title / Subject: Shorewood Lane Ravine
Meeting Date: January 22, 2018
Prepared by: Alyson Fauske, PE, City Engineer
Reviewed by: Larry Brown, PE, Public Works Director
Attachments: WSB Memo
Policy Consideration: Given the information gathered thus far, which option should be pursued for final
design?
Background: At the October 9, 2017 meeting the City Council authorized WSB to perform preliminary
design work to address erosion issues within the ravine that lies east of Shorewood Lane. Storm sewer
conveying drainage from a portion of County Road 19, City Hall /Badger Park and portions of Echo Road
discharges at the northeast corner of County Road 19 and Shorewood lane. The grade in the ravine
drops 30 feet over approximately 500 feet, with steep sideslopes.
WSB performed a hydrologic /hydraulic analysis and presents two options for consideration:
OPTION 1. Extend the storm sewer approximately 400' through the areas where the worst
erosion has occurred. This work would require significant tree removal and import of a large
amount of fill. The estimated cost for this option is $183,500.
OPTION 2. Install rock weirs to direct flow away from the banks, thereby reducing the erosive
forces of the banks of the ravine. Tree removal and import of fill is required for this option,
though not as extensive what would be required with Option 1. The estimated cost for this
option is $46,200.
Both options would mitigate the erosion issue. The first option would address the aesthetics of the
ravine in that the eroded channel would be backfilled over the storm sewer and revegetated. The
watershed district may have concerns with Option 1 as it involved extending storm sewer. With Option
2 the banks will essentially remain as is, with some fill and rock installed to decrease velocities.
Recommendation /Action Requested: Staff recommends proceeding with Option 2.
Next Steps and Timelines:
Early February- Meet with Minnehaha Creek Watershed District
Mid - March- Solicit bids or quotes for the project
Late April- Award the contract
Construction- May to July
Mission Statement: The City of Shorewood is committed to providing residents quality public services, a
healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial
management through effective, efficient, and visionary leadership. Page 1
A
WS
701 Xenia Avenue South I Suite 300 1 Minneapolis, MN 55416 1 (763) 541 -4800
Memorandum
To: Alyson Fauske, PE, City Engineer, City of Shorewood
Bill Alms, PE, Project Engineer, WSB & Associates
From: Amy Anderson, PE, Project Engineer, WSB & Associates
Date: January 17, 2018
Re: Shorewood Lane Ravine Stabilization
WSB Project No. 010930 -000
Executive Summary
WSB recommends proceeding with permitting and design of rock weirs in Shorewood Lane Ravine to
provide grade control and reduce erosive pressures on the ravine banks.
Project Background and Objectives
The City wishes to stabilize the existing ravine east of Shorewood Lane and north of Smithtown Road.
The ravine centerline is shown with a blue line on Figure 1. The existing ravine is forested with largely
mature trees and very little undergrowth. The sides of the ravine are very steep and in some cases nearly
vertical. Some areas are also exhibiting undercutting, which may lead to large escarpments and bank
failures during or after future storm events. Finally, the erosion in the ravine has undermined at least one
utility pole supporting existing overhead power lines.
The City has the following objectives for stabilization of the Shorewood Lane Ravine:
• Protect existing utility poles from future undermining and erosion
• Stabilize existing banks to reduce sediment loading to the downstream stormwater pond and
minimize likelihood of bank failures
• Preserve and enhance ravine aesthetics for the benefit of surrounding homeowners
Survey
WSB conducted an existing conditions survey of the ravine on November 6, 2017. The survey collected
information on the surrounding roads and utilities and cross sections of the ravine and its banks. The
survey also marked the locations of the wetland delineation boundary and the water elevation of the
existing stormwater pond.
WSB also took aerial photos of the ravine using an Unmanned Aerial Vehicle (UAV) to document the
existing conditions of the ravine banks on October 31, 2017.
Modeling
WSB used the existing conditions survey data to build a HEC -RAS model of the existing ravine. The
HEC -RAS model used cross sections collected by the survey and flow information from a HydroCAD
model of the Badger Park pond and Smithtown Road area upstream of the Shorewood Lane Ravine.
Figure 1 shows the ravine location and the subwatersheds used in the HydroCAD model. The flow rates
used in the HEC -RAS model are shown in Table 1.
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
K: \010930- 00MAdmin\Docs \Council Memo 20180117\Feasibility Memo 20180117.docx
Shorewood Lane Ravine Stabilization
January 17, 2018
Page 2
Table 1 — Flow rates used in modeling software
Modeling Results
A typical ravine cross section with modeled water surface elevations is shown in Figure 2.
Figure 2 shows that the ravine is not flowing full, even in large storm events. The maximum modeled
depth in the ravine channel is 3.1 feet in the 100 -year event.
The maximum modeled velocity in the Shorewood Lane ravine is 7.1 feet per second in the 100 -year
event. Higher frequency events such as the 25 -year storm have lower maximum velocities, usually
ranging from 5 to 6 feet per second at cross sections throughout the ravine. Velocities in this range are
enough to cause erosion at the toe of the ravine banks, especially since there is very little vegetation on
the banks due to the presence of mature trees which shade out undergrowth.
Stabilization Options Considered
WSB considered two primary options for stabilizing Shorewood Lane ravine. The first is extending the
existing stormwater pipe and filling the existing ravine to accommodate a bedded and backfilled pipe
trench for a 30" Reinforced Concrete Pipe (RCP). Option 2 is to reduce the slope of the existing ravine
and channel the flow towards the center and away from the sides of the ravine by constructing four rock
weirs. These options will be discussed as Options 1 and 2.
Option 1 — Extending the Existing Stormwater Pipe
Figure 3 shows the approximate extent of Option 1, which consists of extending the existing stormwater
pipe that currently outlets at the top of the ravine from Smithtown Road. Option 1 would extend the
existing 30" stormwater pipe approximately 400 feet down the centerline of Shorewood Lane Ravine. The
trench would need to be backfilled to properly bed the stormwater pipe, and this backfill would serve to fill
in the bottom few feet of the ravine as well as the undercut areas which have developed along the sides
of the ravine. The length of the pipe extension has been set at 400 feet to bring the pipe outlet past the
worst area of erosion while allowing construction work to remain outside of the delineated wetland
boundary, shown on Figure 3.
Option 1 includes major construction within Shorewood Lane Ravine. There would be some tree loss and
large quantities of soil and rock would need to be brought on -site in order to properly bed and backfill the
pipe. The estimated cost of Option 1 is $183,500. Further detail on the construction quantities and cost
breakdown of Option 1 is provided in Table 2.
The proposed condition for Option 1 has not been modeled to determine the effect on velocities in the
reach, but velocities in the pipe are expected to remain approximately the same as those in the existing
ravine. Modeling the proposed condition will be part of the next step in the design process.
Option 2 — Slope Reduction using Rock Weirs
The second option for addressing erosion in Shorewood Lane Ravine is to reduce the slope of the
channel by constructing a series of rock weirs. Figure 4 shows the approximate location of four rock weirs
within the ravine. These rock weirs would cross the entire channel and would be lower in the middle of the
channel and higher near the channel banks. This will direct flow away from the banks and toward the
center of the channel, reducing the erosive pressure on the banks. Multiple weirs would also create a
step -pool system in the channel, where high velocities would occur over the face of the weirs and then
water would pool behind them, creating areas of low velocities. Multiple weirs would also prevent further
downcutting of the channel through the ravine, since each weir will serve as an anchor point for the
channel grade.
K: \010930- 000 \Admin \DOGS \Council Memo 20180117 \Fea sibl llry Memo 20180117.docx
1YR
2YR
5YR
10YR
25YR
50YR
100YR
Flow to Ravine (cfs)
16.34
19.90
26.97
34.15
44.98
54.28
63.70
Modeling Results
A typical ravine cross section with modeled water surface elevations is shown in Figure 2.
Figure 2 shows that the ravine is not flowing full, even in large storm events. The maximum modeled
depth in the ravine channel is 3.1 feet in the 100 -year event.
The maximum modeled velocity in the Shorewood Lane ravine is 7.1 feet per second in the 100 -year
event. Higher frequency events such as the 25 -year storm have lower maximum velocities, usually
ranging from 5 to 6 feet per second at cross sections throughout the ravine. Velocities in this range are
enough to cause erosion at the toe of the ravine banks, especially since there is very little vegetation on
the banks due to the presence of mature trees which shade out undergrowth.
Stabilization Options Considered
WSB considered two primary options for stabilizing Shorewood Lane ravine. The first is extending the
existing stormwater pipe and filling the existing ravine to accommodate a bedded and backfilled pipe
trench for a 30" Reinforced Concrete Pipe (RCP). Option 2 is to reduce the slope of the existing ravine
and channel the flow towards the center and away from the sides of the ravine by constructing four rock
weirs. These options will be discussed as Options 1 and 2.
Option 1 — Extending the Existing Stormwater Pipe
Figure 3 shows the approximate extent of Option 1, which consists of extending the existing stormwater
pipe that currently outlets at the top of the ravine from Smithtown Road. Option 1 would extend the
existing 30" stormwater pipe approximately 400 feet down the centerline of Shorewood Lane Ravine. The
trench would need to be backfilled to properly bed the stormwater pipe, and this backfill would serve to fill
in the bottom few feet of the ravine as well as the undercut areas which have developed along the sides
of the ravine. The length of the pipe extension has been set at 400 feet to bring the pipe outlet past the
worst area of erosion while allowing construction work to remain outside of the delineated wetland
boundary, shown on Figure 3.
Option 1 includes major construction within Shorewood Lane Ravine. There would be some tree loss and
large quantities of soil and rock would need to be brought on -site in order to properly bed and backfill the
pipe. The estimated cost of Option 1 is $183,500. Further detail on the construction quantities and cost
breakdown of Option 1 is provided in Table 2.
The proposed condition for Option 1 has not been modeled to determine the effect on velocities in the
reach, but velocities in the pipe are expected to remain approximately the same as those in the existing
ravine. Modeling the proposed condition will be part of the next step in the design process.
Option 2 — Slope Reduction using Rock Weirs
The second option for addressing erosion in Shorewood Lane Ravine is to reduce the slope of the
channel by constructing a series of rock weirs. Figure 4 shows the approximate location of four rock weirs
within the ravine. These rock weirs would cross the entire channel and would be lower in the middle of the
channel and higher near the channel banks. This will direct flow away from the banks and toward the
center of the channel, reducing the erosive pressure on the banks. Multiple weirs would also create a
step -pool system in the channel, where high velocities would occur over the face of the weirs and then
water would pool behind them, creating areas of low velocities. Multiple weirs would also prevent further
downcutting of the channel through the ravine, since each weir will serve as an anchor point for the
channel grade.
K: \010930- 000 \Admin \DOGS \Council Memo 20180117 \Fea sibl llry Memo 20180117.docx
Shorewood Lane Ravine Stabilization
January 17, 2018
Page 3
Rock weirs do not directly address the undercutting of existing banks; however some additional rock and
borrow material could be used to fill in undercut areas to increase roughness and decrease velocities.
Rock could be used to protect existing utility poles, possibly with grout to keep the rocks in place and
prevent damage to the poles during large storm events. Installation of rock weirs would still include
access issues during construction but would not require large amounts of grading, nor would it cause
extensive tree loss, except what is necessary to provide access for construction vehicles.
Option 2 involves less construction work within and around Shorewood Lane Ravine than Option 1,
including significantly smaller quantities of rock and backfill. There would be some tree loss, but it is
expected to be less than in Option 1. The estimated cost of Option 2 is $46,200. Further detail on the
construction quantities and cost breakdown of Option 2 is provided in Table 3.
The proposed condition for Option 2 has not been modeled to determine the effect on velocities in the
reach, but velocities in the ravine are expected to decrease due to increased roughness and decreased
slope in the ravine. Modeling the proposed condition will be part of the next step in the design process.
Revised Project Schedule
WSB has revised the project schedule as provided to the City in November 2017.
Coordinate Meeting with Minnehaha Creek Watershed District to discuss construction and permitting —
Early February
Provide detailed design for public comment by city residents and staff — Late February
Finalize selected design and permit acquisition — February and March
Advertise Project for Public Bids — by March 15
Bid opening — early April
Contract award — late April
Construction — May - July
Recommendations
Pursue additional design of Option 2, including building a HEC -RAS model including rock weir structures
to quantify slope and velocity reductions provided by this option.
Attachments
Figure 1 — Existing Drainage Map
Figure 2 — Representative Cross Section with Modeled Water Surface Elevations
Figure 3 — Approximate Stormwater Pipe Extension Extent
Figure 4 — Approximate Rock Weir Locations
Table 2 - Cost Estimate for Option 1
Table 3 - Cost Estimate for Option 2
K: \010930- 000 \Admin \DOGS \Council Memo 20180117 \Feasibility Memo 20180117.docx
C
O LL
�
N ` Q N N Tw
n a Q
t
10 z<
aue�
�1..A
._
N
Q
ma
W J O
L
ai in
F.6�. �HI � �i F.,E �❑ � � ] FF
Eli
�
LL
Elk
°``fir- "'oJ,�„�,,.
f-
- -
El
A
A
6G
}O
sm }�
O
O
00
v
v
M
V
In
In
z
N
O
Q
(6
N
C
C
O
O
M
N
.9
M
t
7
O
M
N
7
C
N
Q
(6
N
X
O
r
[Sj UOiaenel3
E
U
T m
U O
(6 s
N
T
O
Q
U E
m W
O A
M j
0
Q
6 Q
O
m �
D
s
W
Table 2, Opinion of Probable Cost - Option 1, Pipe Extension
WSB Project: Shorewood Lane Ravine Design By: KAK
Project Location: City of Shorewood Checked By:
City Project No.:
WSB Pro ject No: 010930 -000 Date: 1/12/2018
Item No.
MN /DOT
Specification
No.
Description
Unit
Estimated
Total Quantity
Estimated Unit
Price
Estimated Total
Cost
SCHEDULE A - DRAINAGE IMPROVEMENTS (30" RCP EXTENSION)
1
2021.501
MOBILIZATION
LUMP SUM
1
$6,200.00
$6,200.00
2
2101.501
CLEARING
ACRE
0.4
$10,000.00
$4,000.00
3
2101.506
GRUBBING
ACRE
0.4
$10,000.00
$4,000.00
4
2104.501
REMOVE SEWER PIPE (STORM)
LIN FT
10
$20.00
$200.00
5
2105.603
SITE GRADING
LUMP SUM
1
$9,500.00
$9,500.00
6
2105.604
GEOTEXTILE FABRIC TYPE IV
SQ YD
1 30
$3.50
$105.00
7
2123.610
STREET SWEEPER (WITH PICKUP BROOM)
HOUR
10
$150.00
$1,500.00
8
2451.602
GRANULAR FOUNDATION AND /OR BEDDING
CU YD
60
$25.00
$1,500.00
9
2501.515
30" RC PIPE APRON
EACH
1
$4,000.00
$4,000.00
10
2501.561
30" RC PIPE SEWER DES 3006 CL III
LIN FT
400
$75.00
$30,000.00
11
2505.601
UTILITY COORDINATION
LUMP SUM
1
$2,500.00
$2,500.00
12
2506.501
CONST DRAINAGE STRUCTURE DES 72 -4020
LIN FT
6
$550.00
$3,300.00
13
2506.516
CASTING ASSEMBLY
EACH
1
$750.00
$750.00
14
2511.501
RANDOM RIPRAP CL III
TON
10
$200.00
$2,000.00
15
2563.601
TRAFFIC CONTROL
LUMP SUM
1
$500.00
$500.00
16
2573.502
SILT FENCE, TYPE MACHINE SLICED
LIN FT
900
$2.50
$2,250.00
17
2573.533
SEDIMENT CONTROL LOG TYPE WOOD FIBER
LIN FT
900
$3.50
$3,150.00
18
2573.535
TEMPORARY ROCK CONSTRUCTION ENTRANCE
EACH
1
$1,500.00
$1,500.00
19
2574.525
COMMON BORROW
CU YD
1780
$22.00
$39,160.00
20
2574.525
TOPSOIL BORROW
CU YD
300
$22.00
$6,600.00
21
2575.502
SEED MIX TYPE 34 -261
POUND
20
$5.00
$100.00
22
2575.523
EROSION CONTROL BLANKET CATEGORY 3N
SQ YD
2230
$2.00
$4,460.00
23
2575.604
SEEDING (INCL FERT)
ACRE
0.5
$2,000.00
$1,000.00
Total Schedule A - Drainage Improvements (30" RCP Extension) $128,275.00
+10% Contingency $12,827.50
Subtotal Schedule A - Drainage Improvements (30" RCP Extension) $141,102.50
+ 30% Indirect Costs $42,330.75
Total Schedule A - Drainage Improvements (30" RCP Extension) $183,433.25
K:\ 010930 - 000 \Quantity \Preliminary\010930 -000 OPC KAK 011218 1 of 1
Table 3, Opinion of Probable Cost - Option 2, Weir Installation
WSB Project: Shorewood Lane Ravine Design By: ARA
Project Location: City of Shorewood Checked By:
City Project No.:
WSB Pro ject No: 010930 -000 Date: 1/12/2018
Item No.
MN /DOT
Specification
No.
Description
Unit
Estimated
Total Quantity
Estimated Unit
Price
Estimated Total
Cost
SCHEDULE A - DRAINAGE IMPROVEMENTS (INSTALLATION OF FOUR ROCK WEIRS)
1
2021.501
MOBILIZATION
LUMP SUM
1
$6,200.00
$6,200.00
2
2101.501
CLEARING
ACRE
0.1
$10,000.00
$1,000.00
3
2101.506
GRUBBING
ACRE
0.1
$10,000.00
$1,000.00
4
2105.603
SITE GRADING
LUMP SUM
1
$9,500.00
$9,500.00
5
2105.604
GEOTEXTILE FABRIC TYPE IV
SQ YD
30
$3.50
$105.00
6
2123.610
STREET SWEEPER (WITH PICKUP BROOM)
HOUR
10
$150.00
$1,500.00
7
2451.602
GRANULAR FOUNDATION AND /OR BEDDING
CU YD
10
$25.00
$250.00
8
2505.601
UTILITY COORDINATION
LUMP SUM
1
$2,500.00
$2,500.00
9
2511.501
RANDOM RIPRAP CL III
TON
10
$200.00
$2,000.00
10
2563.601
TRAFFIC CONTROL
LUMP SUM
1
$500.00
$500.00
11
2573.502
SILT FENCE, TYPE MACHINE SLICED
LIN FT
900
$2.50
$2,250.00
12
2573.533
SEDIMENT CONTROL LOG TYPE WOOD FIBER
LIN FT
900
$3.50
$3,150.00
13
2573.535
TEMPORARY ROCK CONSTRUCTION ENTRANCE
EACH
1
$1,500.00
$1,500.00
14
2574.525
COMMON BORROW
CU YD
10
$22.00
$220.00
15
2574.525
TOPSOIL BORROW
CU YD
10
$22.00
$220.00
16
2575.502
SEED MIX TYPE 34 -261
POUND
10
$5.00
$50.00
17
2575.523
EROSION CONTROL BLANKET CATEGORY 3N
SQ YD
60
$2.00
$120.00
18
2575.604
SEEDING (INCL FERT)
ACRE
0.1
$2,000.00
$200.00
Total Schedule A - Drainage Improvements (Installation of 4 Rock Weirs) $32,265.00
+10% Contingency $3,226.50
Subtotal Schedule A - Drainage Improvements (Installation of 4 Rock Weirs) $35,491.50
+30% Indirect Costs $10,647.45
Total Schedule A - Drainage Improvements (Installation of 4 Rock Weirs) $46,138.95
K:\ 010930 - 000 \Quantity \Preliminary\010930 -000 OPC KAK 011218 1 of 1
#9A
MEETING TYPE
City of Shorewood Council Meeting Item Regular Meeting
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Title / Subject: Amendments to City Code section 104.03 Administrative Enforcement
Meeting Date: January 22, 2018
Prepared by: Marie Darling, Planning Director
Reviewed by: Patti Helgesen, Assistant Planner
Attachments: Ordinance
Resolution and Summary Publication Ordinance
Policy Consideration: Should the City of Shorewood charge a fee for a request to appeal an
administrative citation and should the fees for the hearing officer be borne by the city or the appellant?
Background /Financial or Budget Considerations: Staff noticed that the cost of hiring hearing officers is
rarely covered by the cost of fines that are collected. That trend was especially apparent this year when
staff fined a property owner $3,300 and they appealed. The final agreement reduced the fines in that
case by 50 percent to $1,750 with the understanding that the property owners were in the process of
selling their home. However, the hearing officer's charges were $2,943. That charge doesn't include the
costs for staff time to provide countless inspections, write and send violation notices and citations,
organize evidence, contact and schedule the hearing, prepare affidavits and assemble witnesses,
prepare testimony, etc.
No matter the outcome of the hearing officer's decision, the city currently bears the entire cost of all
appeals.
To counter that problem, staff propose amendments to two subdivisions of City Code Chapter 104.03:
• Section 104.03 Subd. 3. a. Appeal to Hearing Officer
To decrease the tax burden on the residents, staff propose to modify the language in Section 104.03 to
require an application fee for appeals to cover a portion of staff time needed to schedule and prepare
an appeal (noted as $200 in the revised master fee schedule — item 9C).
• New Section 104.03 Subd. 3. d. Outcome of hearing.
This amendment would put the burden of paying the cost of the hearing officer on the appellant if they
should lose their appeal or on the city if the citation(s) is (are) overturned. Should a citation be
overturned by the hearing officer, the cost of the appeal would also be refunded.
Options: Adopt the draft code amendments; modify the amendments; or refer the amendments back
to staff.
Mission Statement: The City of Shorewood is committed to providing residents quality public services, a
healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial
management through effective, efficient, and visionary leadership.
S:�Plonning�Plonning Files �Applicotions�2017 CURRENT CASES �Administrotiv Enforcement Amendmenr�CAF January 22, 2019.d— Page 1
Recommendation / Action Requested: Staff provide the following draft motions for approval:
1. Move to approve an ordinance amending City Code section 104.03 Administrative Enforcement
of Code Regulations.
2. Move to approve a resolution adopting a summary publication ordinance and the text of the
summary pursuant to MN Statute 331A.01 which would inform the public of the intent and
effect of the ordinance without publishing the entire ordinance.
Next Steps and Timelines: Once adopted, the summary will be published in the official newspaper.
Once published, the ordinance becomes effective.
Connection to Vision / Mission: Providing quality public services, a sustainable tax base and sound
financial management.
CITY OF SHOREWOOD
ORDINANCE NO. 551
AN ORDINANCE AMENDING CHAPTER 104°03 OF THE SHORE WOOD CITY CODE
AS IT PERTAINING TO ADMINISTRATIVE ENFORCEMENT
Section 1. City Code Section 1 04.03 Subd. 3 is hereby amended as follows:
104.03. ADMINISTRATIVE ENFORCEMENT OF CODE REGULATIONS,
Subd. 3. 14ppecil to Hecrr•ing- off icer.
a. Requesting cr hecrr ing. Any person contesting a citation issued pursuant to
this section nay, within ten days of the issuance of the citation, request a hearing before a
Hearing officer. Any request for a hearing shall be made in writing on a form provided by the
city, shall be accompanied by the fee required in the City of Shorewood Master Fee Schedule,
and either delivered personally to the city at City Hall or mailed to the city by United States first
class mail, postage prepaid and postmarked within the prescribed ten days. The hearing shall be
held at City Hall within 30 days of the date the city receives a timely hearing request. Failure to
attend the hearing constitutes a waiver of the violator's rights to an administrative hearing and an
admission of the violation. A. Hearing Officer may waive this result upon good cause shown.
The Hearing officer shall determine good cause, which shall not include forgetfulness or
intentional delay.
b. Hecrring Officer. The City Council shall by resolution from time to time
appoint a list of persons authorized to act as a Hearing officer. The Hearing Officer is
authorized to conduct an informal hearing to determine if a code offense has occur -ed. The
Hearing officer shall have the authority to uphold or dismiss the citation or reduce, stay or waive
the civil penalty imposed upon such terms and conditions as the Hearing Officer shall determine.
The Hearing officer's decision shall be made in writing on a form provided by the city for such
purpose. A copy of the Hearing officer's decision shall be served either in person or by United
States first class mail upon the person requesting the hearing. The Hearing officer's decision is
final, except for appeal in limited cases to the City Council, as set forth below, or as allowed
under state law.
C. Conduct of hecrring. At the hearing, the parties will have the opportunity
to present testimony, documents and exhibits and question witnesses. The Hearing officer shall
tape record the proceedings and receive testimony and exhibits. Strict rules of evidence will not
apply. The Hearing officer must receive and give weight to evidence, including hearsay
evidence that possesses probative value commonly accepted by reasonable and prudent persons
in the conduct of their affairs.
d. Outcorrre of hearing. If the Hearing Officer upholds the citation, the
appellant shall pay the cost of the Hearing Officer plus any civil penalties that result from the
citation. If the Hearing Officer dismisses the citation and waives the penalty, the City shall pay
the costs for the Hearing 0fflcer and refund the application fee for the appeal request.
Section Z. This ordinance shall be in full force and effect upon publication in the
Official Newspaper of the City of Shorewood.
CITY OF SHOREWOOD
ORDINANCE NO. 551
AN ORDINANCE AMENDING CHAPTER 104.03 OF THE SHOREWOOD CITY CODE
AS IT PERTAINING TO ADMINISTRATIVE ENFORCEMENT
Section 1. City Code Section 104.03 Subd. 3 is hereby amended as follows:
104.03. ADMINISTRATIVE ENFORCEMENT OF CODE REGULATIONS.
Subd. 3. Appeal to Hearing Officer.
a. Requesting a hearing. Any person contesting a citation issued pursuant to
this section may, within ten days of the issuance of the citation, request a hearing before a
Hearing Officer. Any request for a hearing shall be made in writing on a form provided by the
city„ sh ffl .be ac;c;onij,,)a ied by the fled; required in the City ofShoreivood Master Fee Sched use,,.
and either delivered personally to the city at City Hall or mailed to the city by United States first
class mail, postage prepaid and postmarked within the prescribed ten days. The hearing shall be
held at City Hall within 30 days of the date the city receives a timely hearing request. Failure to
attend the hearing constitutes a waiver of the violator's rights to an administrative hearing and an
admission of the violation. A Hearing Officer may waive this result upon good cause shown.
The Hearing Officer shall determine good cause, which shall not include forgetfulness or
intentional delay.
b. Hearing Officer. The City Council shall by resolution from time to time
appoint a list of persons authorized to act as a Hearing Officer. The Hearing Officer is
authorized to conduct an informal hearing to determine if a code offense has occurred. The
Hearing Officer shall have the authority to uphold or dismiss the citation or reduce, stay or waive
the civil penalty imposed upon such terms and conditions as the Hearing Officer shall determine.
The Hearing Officer's decision shall be made in writing on a form provided by the city for such
purpose. A copy of the Hearing Officer's decision shall be served either in person or by United
States first class mail upon the person requesting the hearing. The Hearing Officer's decision is
final, except for appeal in limited cases to the City Council, as set forth below, or as allowed
under state law.
C. Conduct of hearing. At the hearing, the parties will have the opportunity
to present testimony, documents and exhibits and question witnesses. The Hearing Officer shall
tape record the proceedings and receive testimony and exhibits. Strict rules of evidence will not
apply. The Hearing Officer must receive and give weight to evidence, including hearsay
evidence that possesses probative value commonly accepted by reasonable and prudent persons
in the conduct of their affairs.
cfl.cfl.ca �� c � li d� fl.caaY the .cost of the Ileal•ing.a ilic er 1 "flu any c ivi� 1,wi uddc;a. that res u�t fli•oni the
Citation Ifthe f l cc•uiug (-)ifluc ei; dismisses the c;it tioii sand ivai,ves the fl. eiu dty, the City flu cfl fl)aa .
the assts 6or the I learn g Oili er and r flu d the afl.)fl.flie ation bee 6or the �cfl.cfl.a� ��� request
Section 2. This Ordinance shall be in full force and effect upon publication in the
Official Newspaper of the City of Shorewood.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this day
of 2018.
Scott Zerby, Mayor
ATTEST:
Sandie Thone, City Clerk
CITY OF SHOREWOOD
RESOLUTION NO.
A RESOLUTION APPROVING PUBLICATION OF
ORDINANCE NO. 551 BY TITLE AND SUMMARY
WHEREAS, at a duly called meeting on January 22, 2018, the City Council of the City
of Shorewood adopted Ordinance No. 551 entitled "AN ORDINANCE AMENDING CHAPTER
104.03 OF THE SHOREWOOD CITY CODE PERTAINING TO ADMINISTRATIVE
ENFORCEMENT "; and,
WHEREAS, The City Council has adopted a lengthy ordinance amending City Code
section 104.03 to require an application fee for appeals and adding procedures for determining
who pays for the cost of the administrative hearing officer. The purpose of this summary is to
inform the public of the intent and effect of the ordinance and to publish only a summary of the
ordinance with the full ordinance being on file in the office of the City Clerk during regular office
hours;
NOW THEREFORE, IT IS HEREBY RESOLVED BY THE CITY COUNCIL OF THE
CITY OF SHOREWOOD:
The City Council finds that the above title and summary of Ordinance No. 551 clearly
informs the public of intent and effect of the Ordinance.
2. The City Clerk is directed to publish Ordinance No. 551 by title and summary, pursuant
to Minnesota Statutes, Section 412.191, subdivision 4. Such summary is to be
substantially the same as the attached form.
A full copy of the Ordinance is available at Shorewood City Hall and on the city's website.
ADOPTED by the Shorewood City Council on this 22"d day of January 2018.
ATTEST:
Sandie Thone, City Clerk
Scott Zerby, Mayor
(Official Publication)
CITY OF SHOREWOOD
COUNTY OF HENNEPIN
STATE OF MINNESOTA
ORDINANCE 551 (SUMMARY PUBLICATION)
AN ORDINANCE AMENDING CHAPTER 104.03 OF THE SHOREWOOD CITY CODE AS
IT PERTAINS TO ADMINISTRATIVE ENFORCEMENT
104.03 ADMINISTATIVE ENFORCEMENT OF CODE REGULATIONS
Subd. 3. a. Appeal to Hearing Officer — Adding a fee for appeals
New Subd. 3. d. Outcome of Hearing — Assigning the cost of the hearing officer based on the outcome of
the decision.
Ordinance becomes effective upon publication. The amendments in their entirety are available for review
in the City Clerk's office. Adopted by the Shorewood City Council on January 22, 2018.
s/s Sandie Thone, City Clerk
#9B
MEETING TYPE
City of Shorewood Council Meeting Item REGULAR
Title / Subject: Right -of -Way Ordinance
Meeting Date: January 22, 2018
Prepared by: Greg Lerud, City Administrator
Reviewed by: Larry Brown, Public Works Director; Alyson Fauske, City Engineer; Tim Keane, City
Attorney
Attachments: Right -of -Way Ordinance
Background: City staff presented a draft revision of the city's right of way ordinance at the January 8
work session. During that meeting there were some questions the council asked, and staff pledged to
have answers prepared for this presentation. The changes to the ordinance text since the last meeting
follow after this memo.
Does the city have the authority to charge non - franchise utilities "rent" for right of way usage or charge
more for their annual registration? The answer is that authority does not exist in statute. However,
alternatively, staff proposes additional language found in Section 901.18 that requires utility right of way
users to provide service drops to properties adjacent to where they have a permit for work, even if the
work was not part of the permit. In addition, staff required a higher security fee for non - franchise right
of way utility users and that language is found in Section 901.08.
Could solar panels be used to provide power for small cell wireless equipment? The solar equipment
today is not sufficient to provide the power needed to run the small cell facilities.
Can the small cell wireless equipment be screened or disguised? This is still an open question. Staff
added language in Section 901.08 of this ordinance that references the zoning code. Once developed,
that is where screening requirements will be added.
The other question did not relate to the ordinance per se, and that has to do with making permit
information available, so residents can know what is happening on their street. Staff is working with a
GIS software to manage our infrastructure.
Financial or Budget Considerations: Determining an exact budget impact of an effective right -of -way
ordinance is difficult. Maintaining streets and public grounds is a significant annual expense to the city
and the taxpayers. It is important that the city require users of the city rights -of -way to operate within
these corridors in a way that is as minimally invasive as possible, and that any improvements they do are
for the betterment of the community and not for the sole benefit of the utility. In addition, when a user
is given permission by the city to work on the city's property it is critical that the restoration be done as
efficiently as possible and that the city has established a process that ensures the restoration is as good,
or better than it was before the utility started their work. The proposed fee schedule for the right of
way fees is attached to this memo as well, and these amounts are in the master fee schedule that the
council will consider tonight. The council can modify any of the fees contained in the Resolution.
Mission Statement: The City of Shorewood is committed to providing residents quality public services, a
healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial
management through effective, efficient, and visionary leadership. Page 1
Options: The council can approve the ordinance as submitted, direct staff to make additional changes
and either approve them tonight or at a future meeting, or not approve the ordinance.
Recommendation /Actions: Staff recommends adopting the ordinance as submitted, along with any
changes that are made at the meeting.
Timeline: The ordinance will be published. Staff will start the registration process immediately.
Text changes since work session:
901.08 PERMIT APPLICATIONS; FEES; SECURITY; OTHER.
Subd.6. Security. Unless specifically stated in a franchise agreement with the city, companies shall
provide a surety bond, letter of credit or cash deposit_ in the amount determined by the City Engineer but
not less than $2,000 shall be required from each applicant. A surety bond shall be from a corporate surety
authorized to do business in the State. Security required pursuant to this Subd. 2 shall be conditioned that
the holder will perform the work in accordance with this Section and applicable regulations, will pay to
the City any costs incurred by the City in performing work pursuant to this Section; and will indemnify
and save the City and its officers, agents and employees harmless against any and all claims, judgment or
other costs arising from any excavation and other work covered by the permit or for which the City,
Council or any City officer may be liable by reason of any accident or injury to persons or property
through the fault of the permit holder, either in improperly guarding the excavation or for any other injury
resulting from the negligence of the permit holder. In addition to the above - referenced security, non -
franchise utility right of way users shall provide an irrevocable letter of credit, or cash deposit that shall
remain in force as long as the non - franchise utility user has facilities in the city's right of way. The
amount of this security shall be determined from time to time by the City Council. This security shall be
in addition to the security required from any subcontractor doing work on behalf of the non - franchise
right of way utility. The bond, letter of credit or cash deposit shall be released by the City upon
completion of the work and compliance with all conditions imposed by the permit. For permits allowing
excavations within public streets, such bond, letter of credit or cash deposit shall be held for a period of
24 months to guaranty the adequacy of all restoration work.
901.08 PERMIT APPLICATIONS; FEES; SECURITY; OTHER.
Subd. 8. Small Wireless Facility Conditions. In addition to subdivision 3, the erection or installation of
a wireless support structure, the collocation of a small wireless facility, or other installation of a small
wireless facility in the right -of -way, shall be subject to the following conditions:
g) Screening, disguising, or other zoning requirements shall be found in the City Code, Section
1201.03, Subdivision 21.
901.18 LOCATION OF FACILITIES AND EQUIPMENT.
Subd. 1. Undergrounding by Telecommunications Right -of -Way Users.
Any new construction and the installation of new equipment and replacement of old equipment of
telecommunication right -of -way users shall be underground or contained within buildings or other
structures in conformity with applicable codes. Provided, telecommunications right -of -way users may
attach equipment and facilities to existing poles and structures maintained by a service or utility service.
New and improved telecommunications facilities shall be made available for service to abutting parcels
on the same terms and conditions available to others in the same service area.
RIGHT OF WAY FEE SCHEDULE
CODE SECTION
901.08 Subd 2
901.03 Subd 2 (a)
901.03 Subd 2 (d)
901.06 Subd 1
901.11 Subd 5
901.08 Subd 6
901.07 Subd 3
901.19 Subd 1
TITLE CURRENT $ NEW $
ROW PERMITS
Excavation 150 200
Directional drilling or boring 40 per 100 LF1 40 per 100 LF1
Open trenching 60 per 100 LF1 60 per 100 LF1
Obstruction 20
Small Wireless Facility (per site) -
Pole /Pole Attachment -
ROW ENCROACHMENT
UNDERGROUND SPRINKLER
ANNUAL REGISTRATION FEE (non - utility)
ANNUAL REGISTRATION FEE (non- franchise right of
right of way user
ADMINISTRATION CHARGE
SECURITY /DAMAGE DEPOSIT (non - utility) VARIES
D E LAY
D E LAY
1- in addition to permit fee
2 - in addition to actual costs
150 2
20
40 40
20 20
200 300
2000
200 2
VARIES
250 PER DAY
250 PER DAY
CITY OF SHOREWOOD
ORDINANCE NO. 552
AN ORDINANCE AMENDING TITLE 900, CHAPTER 901 OF THE SHOREWOOD CITY
CODE RELATING TO STREETS AND PUBLIC RIGHT -OF -WAY
THE CITY COUNCIL OF THE CITY OF SHOREWOOD, MINNESOTA ORDAINS AS FOLLOWS:
Section 1. Title 900, Chapter 901 of the Shorewood City Code are hereby repealed and replaced with the
following:
TITLE 900
CHAPTER 901
STREETS AND PUBLIC RIGHT -OF -WAY
Section
901.01 Right of Way Management
901.02 Administration
901.03 Encroachments
901.04 House numbering
901.05 Underground utilities
901.06 Registration
901.07 Permit Required
901.08 Permit Applications; Fees; Security; Other
901.09 Diligence in Performing Work
901.10 Standards During Construction or Installation
901.11 Repair and Restoration
901.12 Permit Limitations
901.13 Denial of Permit
901.14 Emergency Work
901.15 Revocation of Permits
901.16 Appeal
901.17 Mapping
901.18 Location of Facilities and Equipment
901.19 Undergrounding and Relocation of Facilities
901.20 Pre - excavation Facilities Location
901.21 Inspection
901.22 Authority of Director or City Engineer
901.23 Right -of -Way Vacation
901.24 Abandoned and Unusable Equipment
901.25 Indemnification and Liability
901.26 Franchise Holders
901.27 Supplementary Applications
901.28 Other Obligations
901.29 Severability
901.30 Violation
901.01 RIGHT OF WAY MANAGEMENT.
Subd. 1. Findings and Purpose. To provide for the health, safety and welfare of its citizens, and to
ensure the integrity of its streets and the appropriate use of the rights -of -way, the City strives to keep its
rights -of -way in a state of good repair and free from unnecessary encumbrances. Accordingly, the City
hereby enacts this new chapter of this code relating to right -of -way permits and administration. This
chapter imposes reasonable regulation on the placement and maintenance of facilities and equipment
currently within its rights -of -way or to be placed therein at some future time. It is intended to
complement the regulatory roles of state and federal agencies. Under this chapter, persons excavating and
obstructing the rights -of -way will bear financial responsibility for their work. Finally, this chapter
provides for recovery of out -of- pocket and projected costs from persons using the public rights -of -way.
This chapter shall be interpreted consistently with 1997 Session Laws, Chapter 123, substantially codified
in Minnesota Statutes Sections 237.16, 237.162, 237.163, 237.79, 237.81, and 238.086 (the "Act ") and
2017 Session laws, Chapter 94 amending the Act, and the other laws governing applicable rights of the
City and users of the right -of -way. This chapter shall also be interpreted consistent with Minnesota Rules
7819.0050 — 7819.9950 where possible. To the extent any provision of this chapter cannot be interpreted
consistently with the Minnesota Rules, Minnesota Rules, that interpretation most consistent with the Act
and other applicable statutory and case law is intended. It is the purpose of this section to provide for
lawful incidental private use of publicly -owned rights -of -way not inconsistent with public use. This
chapter shall not be interpreted to limit the regulatory and police powers of the City to adopt and enforce
general ordinances necessary to protect the health, safety and welfare of the public.
Subd. 2. Election to Manage the Public Rights -of -Way. Pursuant to the authority granted to the City
under state and federal statutory, administrative and common law, the City hereby elects, pursuant Minn.
Stat. 237.163 subd. 2(b), to manage rights -of -way within its jurisdiction.
Subd. 3. Definitions. The following words, terms and phrases, as used herein, have the following
meanings:
The following definitions apply in this chapter of this code. References hereafter to "sections" are, unless
otherwise specified, references to sections in this chapter. Defined terms remain defined terms, whether or
not capitalized.
"Abandoned Facility" means a facility no longer in service or physically disconnected from a portion of
the operating facility, or from any other facility, that is in use or still carries service as determined by the
City Engineer.
"Applicant" means any person requesting permission to excavate or obstruct a right -of -way.
"City" means the City of Shorewood, Minnesota. For purposes of section 901, "City" means its elected
officials, officers, employees and agents.
"City Costs" means the actual costs the City incurs in managing its rights -of -way, including such costs, if
incurred, as those associated with registering applicants; issuing, processing, and verifying right -of -way
permit or small wireless facility permit applications; inspecting job sites and restoration projects;
maintaining, supporting, protecting, or moving user facilities during right -of -way work; determining the
adequacy of right -of -way restoration; restoring work inadequately performed after providing notice and
the opportunity to correct the work; and revoking right -of -way or small wireless facility permits. City
costs do not include payment by a telecommunications right -of -way user for the use of the right -of -way,
unreasonable fees of a third -party contractor used by the city including fees tied to or based on customer
counts, access lines, or revenues generated by the right -of -way or for the city, the fees and cost of
litigation relating to the interpretation of Minnesota Session Laws 1997, Chapter 123; Minnesota Statutes
Sections 237.162 or 237.163; or any ordinance enacted under those sections, or the City fees and costs
related to appeals taken pursuant to Section 901.16 of this chapter.
"Collocate or Collocation. To install, mount, maintain, modify, operate, or replace any piece of
equipment, including small wireless facility on, under, within, or adjacent to an existing wireless support
structure or utility pole that is owned privately, or by the city or other governmental unit.
"Commission" means the State Public Utilities Commission.
"Congested Right -of -Way" means a crowded condition in the subsurface of the public right -of -way that
occurs when the maximum lateral spacing between existing underground facilities does not allow for
construction of new underground facilities without using hand digging to expose the existing lateral
facilities in conformance with Minnesota Statutes, section 216D.04. subdivision 3, over a continuous
length in excess of 500 feet.
"Construction Performance Bond " means any of the following forms of security provided at permittee's
option:
a. Cash deposit;
b. Security of a form listed or approved under Minn. Stat. Sec. 15.73, subd. 3;
C. Letter of Credit, in a form acceptable to the City;
"Department" means the City.
"Department Inspector" means any person authorized by the City to carry out inspections related to the
provisions of this chapter.
"Director" means the City.
"Delay Penalty" is the penalty imposed as a result of unreasonable delays in right -of -way excavation,
obstruction, patching, or restoration as established by permit.
"Emergency" means a condition that (1) poses a danger to life or health, or of a significant loss of
property; or (2) requires immediate repair or replacement of facilities in order to restore service to a
customer.
"Equipment" means any tangible asset used to install, repair, or maintain facilities in any right -of -way.
"Excavate" means to dig into or in any way remove or physically disturb or penetrate any part of a right -
of -way.
"Excavation permit" means the permit which, pursuant to this chapter, must be obtained before a person
may excavate in a right -of -way. An Excavation permit allows the holder to excavate that part of the
right -of -way described in such permit.
"Excavation permit fee" means money paid to the City by an applicant to cover the costs as provided in
Section 901.08.
"Facility" or "Facilities" means any tangible asset in the right -of -way required to provide Utility Service.
"High Density Corridor" means a designated portion of the public right -of -way within which
telecommunications right -of -way users having multiple and competing facilities may be required to build
and install facilities in a common conduit system or other common structure.
"Hole" means an excavation in the pavement, with the excavation having a length less than the width of
the pavement.
"Landscaping" means the use of living plants to modify an area of land, including ornamental shrubs,
plants and flowers. For purposes of this chapter, the definition excludes trees, boulders, other natural
obstructions, and manmade features such as fences, structures, patios, parking pad, and the like.
"Local Representative" means a local person or persons, or designee of such person or persons,
authorized by a registrant to accept service and to make decisions for that registrant regarding all matters
within the scope of this chapter.
"Obstruct" means to place any tangible object in a right -of -way so as to hinder free and open passage
over that or any part of the right -of -way.
"Obstruction Permit" means the permit which, pursuant to this chapter, must be obtained before a person
may obstruct a right -of -way, allowing the holder to hinder free and open passage over the specified
portion of that right -of -way, for the duration specified therein.
"Obstruction Permit Fee" means money paid to the City by a permittee to cover the costs as provided in
Section 901.08
"Patch" or "Patching" means a method of pavement replacement that is temporary in nature. A patch
consists of (1) the compaction of the sub base and aggregate base, and (2) the replacement, in kind, of the
existing pavement for a minimum of two feet beyond the edges of the excavation in all directions. A
patch is considered full restoration only when the pavement is included in the City's five -year project
plan.
"Pavement" means any type of improved surface that is within the public right -of -way and that is paved
or otherwise constructed with bituminous, concrete, aggregate, or gravel.
"Permit" has the meaning given "right -of -way permit" in Minnesota Statutes, section 237.162.
"Permittee" means any person to whom a permit to excavate or obstruct a right -of -way has been granted
by the City under this chapter.
"Person" means an individual or entity subject to the laws and rules of this state, however organized,
whether public or private, whether domestic or foreign, whether for profit or nonprofit, and whether
natural, corporate, or political.
"Public Ground" means land owned or otherwise controlled by the City for park, open space, fire lanes, or
similar public purpose which are held for public use which land is not a Public Right -of -Way.
"Public Right -of -Way" or "Right -of -Way" means the area on, below, or above a public roadway,
highway, street, cartway, bicycle lane or public sidewalk in which the City has an interest, including other
dedicated rights -of -way for travel purposes and utility easements of the City. A right -of -way does not
include the airwaves above a right -of -way with regard to cellular or other non -wire telecommunications
or broadcast service.
"Pole Attachment Permit" A City required permit for any equipment or appurtenance attached to any
pole located in the Public Way or Public Ground, whether owned by the City or not.
"Public Street" The improved, traveled or surfaced portion of any public right -of -way or roadway.
"Registrant" means any person who (1) has or seeks to have its equipment or facilities located in any
right -of -way, or (2) in any way occupy or uses, or seeks to occupy or use, the right -of -way or place its
facilities or equipment in the right -of -way.
"Restore" or "Restoration" means the process by which an excavated right -of -way and surrounding area,
including pavement and foundation, is returned to the same condition and life expectancy that existed
before excavation.
"Restoration Cost" means the amount of money paid to the City by a permittee to achieve the level of
restoration according to plates 1 to 13 of Minnesota Public Utilities Commission rules.
"Right -of -Way Permit" means either the excavation permit or the obstruction permit, or both, depending
on the context, required by this chapter.
"Right -of -Way User" means (1) a telecommunications right -of -way user as defined by Minnesota
Statutes, section 237.162, subd. 4; or (2) a person owning or controlling a facility in the right -of -way that
is used or intended to be used for providing utility service, and who has a right under law, franchise, or
ordinance to use the public right -of -way.
"Service" or "Utility Service" includes (1) those services provided by a public utility as defined in Minn.
Stat. 216B.02, subds. 4 and 6; (2) services of a telecommunications right -of -way user, including
transporting of voice or data information; (3) services of a cable communications systems as defined in
Minn. Stat. Chapter. 238; (4) natural gas or electric energy or telecommunications services provided by
the City; (5) services provided by a cooperative electric association organized under Minn. Stat., Chapter
308A; and (6) water, and sewer, including service laterals, steam, cooling or heating services.
"Service Lateral" means an underground facility that is used to transmit, distribute, or furnish a common
source to an end -use customer. A service lateral is also an underground facility that is used in the
removal of wastewater, storm water, or sump pump discharge from a customer's premises.
"Small Wireless Facility" means a wireless facility that meets both of the following qualifications:
a) Each antenna is located inside an enclosure of no more than six cubic feet in volume or could
fit within such an enclosure; and
b) All other wireless equipment associated with the small wireless facility provided such
equipment is, in aggregate, no more than 28 cubic feet in volume, not including electric
meters, concealment elements, telecommunications demarcation boxes, battery backup power
systems, grounding equipment, power transfer switches, cutoff switches, cable, conduit,
vertical cable runs for the connection of power and other services, and any equipment
concealed from public view within or behind an existing structure or concealment.
"Storm Water" means water that originates during precipitation events and snow /ice melt.
"Supplementary Application" means an application made to excavate or obstruct more of the right -of -way
than allowed in, or to extend, a permit that had already been issued.
"Temporary Surface" means the compaction of sub base and aggregate base and replacement, in kind, of
the existing pavement only to the edges of the excavation. It is temporary in nature except when the
replacement is of pavement included in the City's two -year plan, in which case it is considered full
restoration.
"Trench" means an excavation in the pavement, with the excavation having a length equal to or greater
than the width of the pavement.
"Telecommunication right -of -way user" means a person or company installing or owning or controlling a
facility in the right -of -way, or seeking to own or control a Facility in the right -of -way that is used or is
intended to be used for providing wireless service, or transporting telecommunication or other voice or
data information. For purposes of this chapter, a cable communication system defined and regulated under
Minn. Stat. Chap. 238, and telecommunication activities related to providing natural gas or electric energy
services, a public utility as defined in Minn. Stat. Sec. 21613.02, a municipality, a municipal gas or power
agency organized under Minn. Stat. Chaps. 453 and 453A, or a cooperative electric association organized
under Minn. Stat. Chap. 308A, are not telecommunications right -of -way users for purposes of this
chapter, except to the extent such entity is offering wireless services.
"Utility Pole" means a pole that is used in whole or in part to facilitate telecommunications or electric
service.
"Wireless Facility" means equipment at a fixed location that enables the provision of wireless services
between user equipment and a wireless service network, including equipment associated with wireless
service, a radio transreceiver, antenna, coaxial or fiber -optic cable, regular and backup power supplies,
and a small wireless facility, but not including wireless support structures, wireline backhaul facilities, or
cables between utility poles or wireless support structures, or not otherwise immediately adjacent to and
directly associated with a specific antenna.
"Wireless Service" means any service using licensed or unlicensed wireless spectrum, including the use of
Wi -Fi, whether at a fixed location or by means of a mobile device, that is provided using wireless
facilities. Wireless service does not include services regulated under Title VI of the Communications Act
of 1934, as amended, including cable service
901.02 ADMINISTRATION.
The City Engineer is the principal City official responsible for the administration of the rights -of -way,
right -of -way permits, and the ordinances related thereto. The City Engineer may delegate any or all of
the duties hereunder.
901.03 ENCROACHMENTS.
Subd. 1. Purpose. The public welfare requires that the public rights -of -way within the City, including
highways, roads, streets and alleys, be reserved for public purposes. Public use of the full width of the
rights -of -way is necessary to public safety and the proper and efficient maintenance of the rights -of -way.
However, it is recognized that limited private use or encroachment onto the rights -of -way is not
necessarily inconsistent with public use. It is the purpose of this section to provide for lawful incidental
private use of publicly -owned rights -of -way not inconsistent with public use.
Subd. 2. Permit to encroach.
a) Permit required. The right to use publicly -owned rights -of -way within the City for any private
use or purpose other than the primary purpose of public travel, whether the use constitutes a
substantial or incidental use, may be acquired only through permit granted pursuant to this
section.
b) Application for permit. Any person may apply to the City Council for a permit to keep or
maintain private property within a publicly -owned right -of -way. The application shall be in
writing and must describe with specificity the private property and right -of -way involved and the
nature and extent of the requested encroachment.
c) Issuance of permit, conditions. The City Council may grant the permit if it is determined that the
use applied for is incidental and not inconsistent with safe and efficient public use. However, no
permit will be issued until the applicant has agreed in writing to waive any right to recover from
the City for damage occurring to the property located within the right -of -way which may result
from the performance of the City or its agents of its public duties as required by law.
d) Special permit for underground sprinkler systems. The City Engineer may approve an
application for a special permit for the installation of an underground sprinkler system within the
public right -of -way, providing the installation is not inconsistent with the public use of the right -
of -way. In the application, in addition to the information required by subsection b above, the
applicant shall provide a legal description of the private property served by the sprinkler system
and agree in writing to waive all rights to recover from the City for damage occurring to the
sprinkler system as a result of the City's performance of its public duties within the right -of -way.
The applicant shall further provide a survey or plat drawing showing the location of the
sprinkling system within the right -of -way and pay the special permit fee as may be prescribed by
ordinance passed by the City Council from time to time. The special permit shall become
effective upon its being duly recorded at the offices of the County Recorder or Registrar of Titles
and the applicant's providing to the City satisfactory proof thereof.
e) Revocation of permit. The City reserves the right to revoke any permit granted under this section
as may be required by the public interest.
Subd. 3. Unlawful encroachments. Any privately -owned property located within or encroaching upon
public -owned rights -of -way which has not been authorized in accordance with this section shall be
unlawful and be subject to removal by the City at the owner's expense.
Subd. 4. Exemption from provisions. The following uses of the public right -of -way shall be exempt
from the permit requirements of this section providing the following conditions are met:
a) Mailbox
1. The mailbox shall be on a single post located on the side of the right -of -way
contiguous with the mailbox owner's property or is positioned or clustered
according to specific directions of the United States Postal Service;
2. Mailboxes servicing a planned unit development (PUD) are positioned or
clustered with the platted portion of the PUD or on the side of the right -of -way
contiguous with the PUD;
3. The location of the mail box or mailboxes does not interfere with the City's
maintenance of the right -of -way.
b) Landscaping
1. All landscaping must be vegetative and remain under three feet in height.
(1987 Code, § 901.02) (Ord. 121, passed 5 -28 -1980; Ord. 204, passed 2 -8 -1988; Ord. 239, passed 6 -24-
1991)
901.04 HOUSE NUMBERING.
Subd. 1. Numbering system. To assist in providing immediate access to all lots, buildings and structures
in the City, the same shall be numbered in accordance with the following plan:
a) North -south numbers shall commence at the south border of the City and north -south streets shall
begin at the number 4600 and run to 6200;
b) East -west numbers shall commence at the east border of the City and east -west streets shall begin
at the number 19200 and run to 28400;
c) Odd numbers shall be on the south and east sides of the streets; even numbers shall be on the
north and west sides of the streets. There shall be 100 numbers to each block, as assigned on a
grid of 330 feet for east -west numbers; and 100 numbers to each block as assigned on a grid of
660 feet for north -south numbers.
d) On Enchanted and Shady Islands, numbers shall be assigned on a west to east basis only.
Commencing at the west border of Enchanted Island and running to the tip of Shady Island,
numbers shall begin at the number 4200 and run to 5400. There shall be 100 numbers to each
block assigned on a grid of 330 feet for each block west to east.
Subd. 2. House numbers assigned, chart kept. The City shall assign a street number to each house
and /or structure in the City, and shall maintain records showing the proper street number of every lot,
parcel and building in the City which shall be open to inspection by any interested person.
Subd. 3. Placement and size of numbers. It shall be the duty of the owners and occupants of every
house and structure in the city to display in a place visible from the street, figures at least six inches high
showing the number of the house or other residential structure. The size of figures on all other
occupancies shall be governed by the fire code regulations and shall conform to Minnesota Statutes
299F.011.
Subd. 4. Violation. Any person violating the terms of this section shall be guilty of a petty misdemeanor.
(1987 Code, § 901.03) (Ord. 76, passed 10 -8 -1973; Ord. 105, passed 9 -11 -1978) Penalty, see § 104.01
901.05 UNDERGROUND UTILITIES.
Subd. 1. All utilities installed after the effective date of these regulations, including, but not limited to
electrical, telephone and cable television lines, shall be buried unless otherwise approved by the City
Council.
Subd. 2. Existing overhead utilities within road rights -of -way in this section and of a capacity less than
115 kilovolts are declared to be nonconforming and must be buried at the time they are replaced due to
aging or capacity limitations or relocated due to road construction or reconstruction within the rights -of-
way in which they share space, unless otherwise approved by the City Council. Any modification to an
existing facility or new facility with a capacity of 115 kilovolts or greater shall be subject to the
conditional use permit requirements provided in Section 1201.04. This provision shall not apply to
existing overhead utilities located on rear or side lot line easements which directly serve adjacent
properties.
Subd. 3. Existing overhead utilities which are to be buried in conformance with Subd. 2 shall be done so
under the terms and requirements as provided in the applicable franchise agreement for the affected
utility, if so stipulated. In the absence of franchise agreement stipulations for the affected utility, the
burial shall occur under the terms, expense and scheduling requirements as required by the City at the
time the overhead utility is replaced or relocated. Substitute stipulations may be provided between the
affected utility and the City.
(Am. Ord. 378, passed 1 -14 -2002)
901.06 REGISTRATION.
Subd. 1. Annual Registration Required. Each person who occupies or uses, or seeks to occupy or use,
the right -of -way or place any equipment or facilities in or on the right -of -way, including persons with
installation and maintenance responsibilities by lease, sublease or assignment, must register with the City.
Such registration shall be made on an application form provided by the City Engineer and shall be
accompanied by the registration fee provided in Section 1301.02 of this Code.
Subd. 2. Registration Prior to Work. No person may construct, install, repair, remove, relocate, or
perform any other work on, or use any facilities or any part thereof, in any right -of -way without first
being registered with the City.
Subd. 3. Registration Information.
The registrant shall provide the following at the time of registration:
a) Registrant's name, address, telephone number, facsimile number, email address and Gopher One -
Call registration certificate number if required by State law.
b) Name, address, telephone number, email address and facsimile number of the person responsible
for fulfilling the obligations of the registrant.
c) A Certificate of Insurance from a company licensed to do business in the State of Minnesota.
Such certificate shall verify that the registrant is insured against claims for personal injury,
including death, as well as claims for property damage arising out of the (1.) use and occupancy
of the right -of -way by the registrant, its officers, agents, employees and permittees, and (2.)
placement and use of equipment or facilities in the right -of -way by the registrant, its officers,
agents, employees and permittees, including but not limited to; protection against liability arising
from completed operations, damage of underground equipment and collapse of property. Such
certificate shall also name the City as an additional insured as to whom the coverage's required
herein are in force and applicable and for whom defense will be provided as to all such coverages.
Such certificate shall require that the City be notified 30 days prior to cancellation of the policy.
Such insurance shall provide coverage in accordance with MN Statute 466.04 and provide
minimum coverage in the following amounts, as Council may amend from time to time:
General liability:
a. Public Liability, including premises, products and complete operations; Bodily
injury liability: $1,000,000 each person, $3,000,000 each occurrence and
Property damage liability: $3,000,000 each occurrence
b. In lieu of above requirements, bodily injury and property damage combined:
$3,000,000 single limit.
2. Comprehensive:
a. Automobile liability insurance, including owned, non -owned and hired vehicles:
b. Bodily injury liability: $1,000,000 each person, $3,000,000 each occurrence and
Property damage; $3,000,000 each occurrence.
c. In lieu of above Comprehensive insurance coverage, bodily injury and property
damage combined $3,000,000 single limit.
d) 24 hour emergency number.
e) An acknowledgment by the registrant of the indemnification pursuant to Subd. 2 of Subsection
901.25.
f) If the person is a corporation, a copy of the certificate is required to be filed under Minn. Stat.
300.06 as recorded and certified to by the Secretary of State.
g) When applicable, a copy of the person's order granting a certificate of authority from the
Minnesota Public Utilities Commission or other authorization or approval from the applicable
state or federal agency to lawfully operate, where the person is lawfully required to have such
authorization or approval from said commission or other state or federal agency.
h) The registrant shall keep all of the information listed above current at all times by providing to
the City information as to changes within fifteen (15) days following the date on which the
registrant has knowledge of any change.
i) Such other information the City may require.
Subd. 4. Exceptions.
The following are not subject to the requirements of this Subsection.
a) Persons engaged in snow removal activities.
b) Federal, State, County, and City agencies.
c) Persons acting as agents, contractors or subcontractors for a registrant who has properly
registered in accordance with this Subsection 901.06.
Subd. 5. Term.
Registrations issued pursuant to this Section shall expire on December 31 of each calendar year.
Subd. 6. Registrant obligations. All registrants are obligated to:
a) Respond, in a timely manner, and in all cases no longer than 30 (thirty) days, to all requests,
inquiries, and correspondence from the City.
b) Attend any pre - construction, progress meetings upon notification from the City of their required
attendance. Failure to attend such meetings shall be considered a default on the registration
conditions, and result in the Registrant being removed from the city's registration without refund
of any fees. Re- registration cannot occur for the remainder of that calendar year.
901.07 PERMIT REQUIRED.
Subd. 1. Permit Required. Except as otherwise provided in this code, no person may obstruct or
excavate any right -of -way, or install or place facilities in the right -of -way without first having obtained
the appropriate right -of -way permit from the City to do so.
a) Excavation Permit. An excavation permit is required by a registrant to excavate that part of
the right -of -way described in such permit and to hinder free and open passage over the
specified portion of the right -of -way by placing facilities described therein, to the extent and for
the duration specified therein.
b) Obstruction Permit. An obstruction permit is required by a registrant to hinder free and open
passage over the specified portion of right -of -way by placing equipment described therein on
the right -of -way, to the extent and for the duration specified therein. An obstruction permit is
not required if a person already possesses a valid excavation permit for the same project.
c) Small Wireless Facility Permit. A small wireless facility permit is required by registrant to
erect or install a wireless support structure, to collocate a small wireless facility, or to otherwise
install a small wireless facility in the specified portion of the right -of -way, to the extent
specified therein, provided that such permit shall remain in effect for the length of time the
facility is in use, unless lawfully revoked.
d) Pole/ Pole Attachment Permit. A pole permit shall be required for the placement of new
utility poles as well as anytime a new attachment is made to any pole, new or existing, privately
or publicly owned.
Subd. 2. Permit Extensions. No person may excavate or obstruct the right -of -way beyond the date or
dates specified in the permit unless (i) such person makes a supplementary application for another right-
of -way permit before the expiration of the initial permit, and (ii) a new permit or permit extension is
granted.
Subd. 3. Delay Penalty. In accordance with Minnesota Rule 7819.1000 subd. 3 and notwithstanding
subd. 2 of this Section, the City shall establish and impose a delay penalty for unreasonable delays in
right -of -way excavation, obstruction, patching, or restoration. The delay penalty shall be established
from time to time by City council resolution.
Subd. 4. Permit Display. Permits issued under this chapter shall be conspicuously displayed or
otherwise available at all times at the indicated work site and shall be available for inspection by the City.
901.08 PERMIT APPLICATIONS; FEES; SECURITY; OTHER.
Application for a permit is made to the City. An application for a permit shall be made on forms provided
by the City Engineer and shall be accompanied by the fees as determined by the City Council from time
to time, which are established to reimburse the City for City costs. Permit applications shall contain, and
will be considered complete only upon compliance with the requirements of the following provisions:
Subd. 1. Application.
a) Scaled drawings showing the location of all facilities and improvements existing and proposed by
the applicant.
b) A description of the methods that will be used for installation.
c) A proposed schedule for all work.
d) The location of any public streets, sidewalks or alleys that will be temporarily closed to traffic
during the work.
e) The location of any public streets, sidewalks or alleys that will be disrupted by the work.
f) A description of methods for restoring any public improvements disrupted by the work.
g) Any other information reasonably required by the City Engineer.
h) Traffic control plan referencing the Minnesota Manual on Uniform Traffic Control Devices.
i) Registration with the City pursuant to this chapter
j) Permit fees, estimated restoration costs and other management costs
k) Prior obstructions or excavations, any undisputed loss, damage, or expense suffered by the City
because of applicant's prior excavations or obstructions of the rights -of -way or any emergency
actions taken by the City;
1) Franchise fees or other charges, if applicable.
m) If the work is to be performed by an agent, contractor or subcontractor on behalf of a registrant,
such application shall be signed by the registrant.
Subd. 2. Permit Fee.
a) The City shall impose permit fees in an amount sufficient to recover the City's costs.
b) Payment of disputed amounts due the City by posting letter of credit or depositing in an escrow
account an amount equal to at least 110% of the amount owing.
c) Posting an additional or larger construction cash deposit or letter of credit for additional facilities
when applicant requests an excavation permit to install additional facilities and the City deems
the existing construction performance bond inadequate under applicable standards.
Subd. 3. Payment of Permit Fees. No excavation permit or obstruction permit shall be issued without
payment of excavation or obstruction permit fees. The City may allow applicant to pay such fees within
thirty (30) days of billing.
Subd. 4. Non Refundable. Permit fees that were paid for a permit that the City has revoked for a breach
as stated in Section 901.15 are not refundable.
Subd. 5. To Franchises. Unless otherwise agreed to in a franchise, City costs may be charged separately
from and in addition to the franchise fees imposed on a right -of -way user in the franchise.
Subd.6. Security. Unless specifically stated in a franchise agreement with the city, companies shall
provide a surety bond, letter of credit or cash deposit_ in the amount determined by the City Engineer but
not less than $2,000 shall be required from each applicant. A surety bond shall be from a corporate surety
authorized to do business in the State. Security required pursuant to this Subd. 2 shall be conditioned that
the holder will perform the work in accordance with this Section and applicable regulations, will pay to
the City any costs incurred by the City in performing work pursuant to this Section; and will indemnify
and save the City and its officers, agents and employees harmless against any and all claims, judgment or
other costs arising from any excavation and other work covered by the permit or for which the City,
Council or any City officer may be liable by reason of any accident or injury to persons or property
through the fault of the permit holder, either in improperly guarding the excavation or for any other injury
resulting from the negligence of the permit holder. In addition to the above - referenced security, non -
franchise utility right of way users shall provide an irrevocable letter of credit, or cash deposit that shall
remain in force as long as the non - franchise utility user has facilities in the city's right of way. The
amount of this security shall be determined from time to time by the City Council. This security shall be
in addition to the security required from any subcontractor doing work on behalf of the non - franchise
right of way utility. The bond, letter of credit or cash deposit shall be released by the City upon
completion of the work and compliance with all conditions imposed by the permit. For permits allowing
excavations within public streets, such bond, letter of credit or cash deposit shall be held for a period of
24 months to guaranty the adequacy of all restoration work.
Subd. 7. Permit Issuance; Conditions. The City may impose reasonable conditions upon the issuance
of the permit and the performance of the applicant thereunder to protect the health, safety and welfare or
when necessary to protect the right -of -way and its current use. In addition, a permittee shall comply with
all requirements of local, state and federal laws, including but not limited to Minnesota Statutes§
216D.01 -.09 (Gopher One Call Excavation Notice System) and Minnesota Rules Chapter 7560.No permit
shall be issued to anyone who has failed to register in accordance with Subsection 901.06.
Subd. 8. Small Wireless Facility Conditions. In addition to subdivision 3, the erection or installation of
a wireless support structure, the collocation of a small wireless facility, or other installation of a small
wireless facility in the right -of -way, shall be subject to the following conditions:
a) A small wireless facility shall only be collocated on the particular wireless support structure,
under those attachment specifications, and at the height indicated in the applicable permit
application.
b) No new wireless support structure installed within the right -of -way shall exceed 50 feet in height
without the city's written authorization, provided that the city may impose a lower height limit in
the applicable permit to protect the public health, safety, and welfare or to protect the right -of-
way and its current use, and further provided that the registrant may replace an existing wireless
support structure exceeding 50 feet in height with a structure of the same height subject to such
conditions or requirements as may be imposed in the applicable permit.
c) No wireless facility may extend more than 10 feet above its wireless support structure.
d) Where an applicant proposes to install a new wireless support structure in the right -of -way, the
city may impose separation requirements between such structure and any existing wireless
support structure or other facilities in and around the right -of -way.
e) Where an applicant proposes collocation on a decorative wireless support structure, sign or other
structure not intended to support small wireless facilities, the city may impose reasonable
requirements to accommodate the particular design, appearance or intended purpose of such
structure.
f) Where an applicant proposes to replace a wireless support structure, the city may impose
reasonable restocking, replacement, or relocation requirements on the replacement of such
structure.
g) Screening, disguising, or other zoning requirements shall be found in the City Code, Section
1201.03, Subdivision 21.
Subd. 9. Small Wireless Facility Agreement. A small wireless facility shall only be collocated on a
small wireless support structure owned by or controlled by the city, or any other city asset in the right -of-
way, after the applicant has executed a standard small wireless facility collocation agreement with the
city. The standard collocation agreement shall require payment of the following fees:
• S150 per year for rent to collocate on the city structure.
• $25 per year for maintenance associated with the collocation.
• A monthly fee for electrical service as follows:
i. $73 per radio node less than or equal to 100 maximum watts;
ii. $182 per radio node over 100 maximum watts; or
iii. The actual costs of electricity, if the actual cost exceeded the foregoing.
The standard collocation agreement shall be in addition to, and not in lieu of, the required small wireless
facility permit, provided, however, that the applicant shall not be additionally required to obtain a license
or franchise in order to collocate. Issuance of a small wireless facility permit does not supersede, alter or
affect any then - existing agreement between the city and applicant.
Subd. 10. Action on Small Wireless Facility Permit Applications.
a) Deadline for Action. The City shall approve or deny a small wireless facility permit within 90
days after filing of such application, except as provided for in paragraph 3 of this section. The
small wireless facility permit and any associated building permit application, shall be deemed
approved if the city fails to approve or deny the application within the review period established
in this paragraph.
b) Consolidated Applications. An applicant may file a consolidated small wireless facility permit
application addressing the proposed collocation of up to 15 small wireless facilities, or a greater
number if agreed to by a local government unit, provided that all small wireless facilities in the
application:
1. Are located within a two -mile radius;
2. Consist of substantially similar equipment; and
3. Are to be placed on similar types of wireless support structures.
In rendering a decision on a consolidated permit application, the city may approve some small
wireless facilities and deny others, but may not use denial of one or more permits as a basis to
deny all small wireless facilities in an application
c) Tolling of Deadline. The 90 -day deadline for action on a small wireless facility permit
application may be tolled if:
1. The City receives applications from one or more applicants seeking approval of permits
for more than 30 small wireless facilities within a seven -day period. In such case, the
City may extend the deadline for all such applications by 30 days by informing the
affected applicants in writing of such extension.
2. The applicant fails to submit all required documents or information and the city provides
written notice of incompleteness to the applicant within 30 days of receipt of the
application. Upon submission of additional documents or information the city shall have
ten days to notify the applicant in writing of any still - missing information. Once the
complete application has been submitted, the 90 day deadline for action will begin.
Subd. 11. Exceptions.
No permit shall be required for the following:
• Snow removal activities;
• Activities of the City; or,
• Installation and maintenance of sewer or water services provided that no excavation or
other work is done within a street, sidewalk or alley and all work is confined to
unimproved portions of rights -of -way or easements.
901.09 DILIGENCE IN PERFORMING WORK.
Work shall progress in an expeditious manner as reasonably permitted by weather conditions until
completion in order to avoid unnecessary inconvenience to traffic. In the event that the work is not
performed in accordance with applicable regulations pertaining to excavations and utility connections, or
the work is not done in an expeditious manner, or shall cease or be abandoned without due cause, the City
may, after 72 hour notice to the permit holder, correct the work and fill the excavation or repair the street.
The entire cost of such work shall be paid by the permit holder upon demand made by the City. If permit
holder fails to pay, the City will exercise a claim on the security.
901.10 STANDARDS DURING CONSTRUCTION OR INSTALLATION.
The permit holder shall comply with the following standards when engaging in the work:
a) Conduct the operations and perform the work in a manner as to ensure the least obstruction and
interference to traffic.
b) Take adequate precautions to ensure the safety of the general public and those who require access
to abutting property.
c) If required by the City Engineer, notify adjoining property owners prior to the commencement of
work which may disrupt the use of and access to such adjoining properties.
d) In all cases where construction work interferes with the normal use of the construction area,
provide for closing the construction area to traffic or to afford it restricted use of the area and
comply with the Minnesota Manual On Uniform Traffic Control Devices traffic safety signing
requirements.
e) Exercise precaution at all times for the protection of persons, including employees and property.
f) Protect and identify excavations and work operations with barricade flags, and if required, by
flagmen in the daytime, and by warning lights at night.
g) Provide proper trench protection as required by O.S.H.A. when necessary and depending upon
the type of soil, in order to prevent cave -ins endangering life or tending to enlarge the excavation.
h) Protect the root growth of trees and shrubbery.
i) Installation of pipe (utility conductors) under Portland Cement Concrete, asphalt concrete, or
other high -type bituminous pavements shall be done by jacking, auguring or tunneling as directed
by the City Engineer unless otherwise authorized. HDPE sleeving shall be an acceptable casing or
sleeving material for telecommunications installations.
j) When removing pavement of Portland Cement Concrete, asphalt concrete or high -type built -up
bituminous surfacing, the pavement shall be removed on each side of the trench or excavation a
distance of nine inches beyond the trench width and length, in order to provide a shoulder and
solid foundation for the surface restoration.
k) To obtain a straight edge and neat - appearing opening in pavement surfaces, the following
procedure is required:
1. Portland Cement Concrete Pavement - The surface shall be saw -cut scored two inches
deep and the concrete broken out by sledge or pneumatic hammer chisel.
2. Asphalt Concrete — The surface shall be cut full depth by pneumatic hammer chisel.
1) Excavations, trenches and jacking pits off the roadway or adjacent to the roadway or curbing shall
be sheathed and braced depending upon location and soil stability, and as directed by the City.
m) Excavations, trenches, directional borings, and jacking pits shall be protected when unattended to
prevent entrance of surface drainage.
n) All backfilling must be placed in six inch lifts at optimum moisture and compacted 100 percent of
AASHTO density. Compaction shall be accomplished with hand, pneumatic or vibrating
compactors as appropriate. Backfill material shall be Class 5, or better in the judgment of the City
Engineer. The City Engineer may permit backfilling with the material from the excavation
provided such material is granular in nature and acceptable to the City Engineer.
o) Compacted backfill shall be brought to street grade and crowned to match the existing driving
surface.
p) Street and pedestrian traffic shall be maintained throughout construction unless provided
otherwise by the permit.
q) No lugs damaging to roadway surfaces may be used.
r) Dirt or debris must be promptly removed during construction.
s) Other reasonable standards and requirements of the City Engineer.
901.11 REPAIR AND RESTORATION.
Subd. 1. Timing. The work to be done under the excavation permit, and the patching and restoration of
the right -of -way as required herein, must be completed within the dates specified in the permit, increased
by as many days as work could not be done because of circumstances beyond the control of the permittee.
Permanent restoration of the driving surface shall be completed within three working days of completion
of the backfilling. Permanent restoration of all other work shall be completed within ten days following
backfilling or completion of the excavation work.
Subd. 2. Patch and Restoration. Permittee shall patch its own work. The City may choose either to
have the permittee restore the right -of -way or to restore the right -of -way itself.
a) City Restoration. If the City restores the right -of -way, permittee shall pay the costs thereof
within thirty (30) days of billing. If, following such restoration, the pavement settles due to
permittee's improper backfilling, the permittee shall pay to the City, within thirty (30) days of
billing, all costs associated with correcting the defective work. The permit holder may request
that the City restore the right -of -way. The permit holder shall pay to the City, in advance, a cash
deposit equaling 150% of the estimated restoration cost. The restoration cost shall be estimated
by the City Engineer. Following completion of the restoration, any funds in excess of the actual
restoration cost shall be returned to the permit holder.
b) Permittee Restoration. If the permittee restores the right -of -way itself, it shall at the time of
application for an excavation permit post security as required by this ordinance.
Subd. 3. Standards. The permittee shall perform excavation, backfilling, patching and restoration
according to the standards and with the materials specified by the City and shall comply with Minnesota
Rule 7819.1100. The permit holder shall perform repairs and restoration according to the standards and
with the materials specified by the City. The City shall have the authority to prescribe the manner and
extent of the restoration, and may do so in written procedures of general application or on a case -by -case
basis. The City in exercising this authority shall be guided by the following standards and consideration:
a) The number, size, depth and duration of the excavations, disruptions or damage to the right -of-
way.
b) The traffic volume carried by the right -of -way; the character of the neighborhood surrounding the
right -of -way;
c) The pre- excavation condition of the right -of -way; the remaining life - expectancy of the right -of-
way affected by the excavation;
d) Whether the relative cost of the method of restoration to the permit holder is in reasonable
balance with the prevention of an accelerated depreciation of the right -of -way that would
otherwise result from the excavation, disturbance or damage to the right -of -way; and
e) The likelihood that the particular method of restoration would be effective in slowing the
depreciation of the right -of -way that would otherwise take place.
f) The excavation, backfilling, patching and restoration, and all other work performed in the right -
of -way shall be done in conformance with Minnesota Rules 7819.1100 and 7819.5000 and other
applicable local requirements, in so far as they are not inconsistent with the Minnesota Statutes,
Sections 237.162 and 237.163. Installation of service laterals shall be performed in accordance
with Minnesota Rules Chapter 7560 and these ordinances. Service lateral installation is further
subject to those requirements and conditions set forth by the City in the applicable permits and /or
agreements referenced in Section 901.18 subd. 2 of this ordinance.
Subd. 4. Duty to Correct Defects. The permittee shall correct defects in patching or restoration
performed by permittee or its agents. The permittee , shall correct all restoration work to the extent
necessary, using the method required by the City. Said work shall be completed within seven (7) calendar
days of the notice being sent by the City, not including days during which work cannot be done because
of circumstances constituting force majeure or days when work is prohibited as unseasonable or
unreasonable.
Subd. 5. Failure to Restore. If the permittee fails to restore the right -of -way in the manner and to the
condition required by the City, or fails to satisfactorily complete all restoration required by the City, the
City, at its option may do such work or hire a contractor to complete the work. Any restoration done in
this manner will include an administrative charge to cover the City's cost, but said charge will in no event
be less than $100.00 and the City will withhold permits for future work until reimbursement is made by
the permittee. In that event the permittee shall pay to the City, within thirty (30) days of billing, the cost
of restoring the right -of -way. If permittee fails to pay as required, the City may exercise its rights under
the letter of credit, cash deposit, or other financial guarantee. Failure to restore shall also be considered a
violation of the registration requirements and may subject permittee to removal from city registration.
Subd. 6. Guarantees. The permit holder shall guarantee its work and shall maintain it for twenty -four
(24) months following its completion. During this twenty -four month period it shall, upon notification
from the City Engineer, promptly correct all restoration work to the extent necessary, using the method
required by the City Engineer.
901.12 PERMIT LIMITATIONS.
Permits issued pursuant to this Section are valid only for the area of the right -of -way specified in the
application and the permit and only for the dates so specified. No work shall be extended beyond the
permitted area or dates without a new permit being procured therefore, provided the City Engineer may
extend the completion date of the work in accordance with Subd. 1 of Subsection 901.11.
901.13 DENIAL OF PERMIT.
Subd. 1. Reasons for Denial. The City may deny a permit for failure to meet the requirements and
conditions of this chapter or if the city determines that the denial is necessary to protect the health, safety,
and welfare or when necessary to protect the right -of -way and its current use.
Subd. 2. Procedural Requirements. The denial or revocation of a permit must be made in writing and
must document the basis for the denial. The City must notify the applicant or right -of -way user in writing
within three business days of the decision to deny or revoke a permit. If an application is denied, the
applicant may address the reasons for denial identified by the City and resubmit its application. If the
application is resubmitted within 30 days of receipt of the notice of denial, no additional application fee
shall be imposed. The City must approve or deny the resubmitted application within 30 days after
submission.
901.14 EMERGENCY WORK.
Subd. 1. Emergency Situations. Each registrant shall immediately notify the director of any event
regarding its facilities that it considers to be an emergency. Excavators' notification to Gopher State
One Call regarding an emergency situation does not fulfill this requirement. Within two (2) business days
after the occurrence of the emergency, the registrant shall apply for the necessary permits, pay the fees
associated Therewith, and fulfill the rest of the requirements necessary to bring itself into compliance
with this chapter for the actions it took in response to the emergency. If the City Engineer becomes aware
of an emergency, the City Engineer shall attempt to contact the local representative of each registrant
affected, or potentially affected, by the emergency. In any event, the City Engineer may take whatever
action deemed necessary to respond to the emergency, the cost of which shall be borne by the registrant
whose facilities or equipment occasioned the emergency.
Subd. 2. Non - Emergency Situations. Except in an emergency, any person who, without first having
obtained the necessary permit, obstructs or excavates a right -of -way must subsequently obtain a permit
and, as a penalty, pay double the normal fee for said permit, pay double all the other fees required by the
City code, deposit with the City the fees necessary to correct any damage to the right -of -way, and comply
with all of the requirements of this chapter.
901.15 REVOCATION OF PERMITS.
Subd. 1. Substantial Breach. The City reserves its right, as provided herein, to revoke any right -of -way
permit without a fee refund, if there is a substantial breach of the terms and conditions of any statute,
ordinance, rule or regulation, or any material condition of the permit. A substantial breach by permittee
shall include, but shall not be limited to, the following:
a) The violation of any material provision of the right -of -way permit;
b) An evasion or attempt to evade any material provision of the right -of -way permit, or the
perpetration or attempt to perpetrate any fraud or deceit upon the City or its citizens; Any material
misrepresentation of fact in the application for a right -of -way permit;
c) The failure to complete the work in a timely manner, unless a permit extension is obtained or
unless the failure to complete work is due to reasons beyond the permittee's control; or
d) The failure to correct, in a timely manner, work that does not conform to a condition indicated on
an order issued pursuant to Sec. 901.21.
Subd.2. Written Notice of Breach. If the city determines that the permittee has committed a substantial
breach of a term or condition of any statute, ordinance, rule, regulation, or any condition of the permit, the
city shall make a written demand upon the permittee to remedy such violation. The demand shall state
that continued violations may be cause for revocation of the permit. A substantial breach, as stated above,
will allow the city, at its discretion, to place additional or revised conditions on the permit to mitigate or
remedy the breach.
Subd. 3. Response to Notice of Breach. Within forty -eight (48) hours of the city sending notification of
the breach, permittee shall provide the city with a plan, acceptable to the city, which will cure the breach.
Permittee's failure to so contact the city, or permittee's failure to timely submit an acceptable plan, or
permittee's failure to reasonably implement the approved plan, shall be cause for immediate revocation of
the permit.
Subd. 4. Reimbursement of City Costs. If a permit is revoked, the permittee shall also reimburse the
city for the city's reasonable costs, including, but not limited to, restoration costs and the costs of
collection and reasonable attorneys' fees incurred in connection with such revocation.
901.16 APPEAL.
Subd. 1. Filing of Appeal.
Any person aggrieved by, 1) the denial of a permit application, 2) the denial of a registration, 3) the
revocation of a permit or, 4) the application of the fee imposed by the City of Shorewood's master fee
schedule, may appeal to the Council by filing a written notice of appeal with the Clerk. Said notice must
be filed with 20 days of the action causing the appeal.
Subd. 2. Notice of Hearing.
The Council shall hear the appeal not later than 30 days after the date the appeal is filed. Notice of the
date, time, place, and purpose of the hearing shall be mailed to the appellant not less than 10 days before
the date of the hearing.
Subd. 3. Hearing and Decision.
The Council shall, at such hearing, hear and consider any evidence offered by the appellant, the City
Engineer, and anyone else wishing to be heard. After hearing the oral and written views of all interested
persons, the Council shall make its decision at the same meeting or at a specified future meeting.
901.17 MAPPING.
Subd. 1. Information Required. Each registrant and permittee, upon request by the City, shall provide
mapping information required by the City in accordance with Minnesota Rules 7819.4000 and 7819.4100.
Following completion of any work pursuant to a permit, and upon City request, the permittee shall
provide the City Engineer accurate maps and drawings certifying the "as- built" location of all equipment
installed, owned and maintained by the permittee. Such maps and drawings shall include the horizontal
and vertical location of all facilities and equipment and shall be provided consistent with the City's
mapping system. Failure to provide maps and drawings pursuant to this subsection shall be grounds for
revoking the permit holder's registration.
Subd. 2. Service Laterals. All permits issued for the installation or repair of service laterals, other than
minor repairs as defined in Minnesota Rules 7560.0150 subpart 2, shall require the permittee's use of
appropriate means of establishing the horizontal locations of installed service laterals. Permittees or their
subcontractors shall submit to the director evidence satisfactory to the director of the installed service
lateral locations. Compliance with this subdivision 2 and with applicable Gopher State One Call law and
Minnesota Rules governing service laterals install after December 31, 2005, shall be a condition of any
City approval necessary for 1) payments to contractors working on a public improvement project
including those under Minnesota Statutes, Chapter 429, and 2) City approval of performance under
development agreements, or other subdivision or site plan approval under Minnesota Statutes, Chapter
462. The director shall reasonably determine the appropriate method of providing such information to the
City. Failure to provide prompt and accurate information on the service laterals installed may result in the
revocation of the permit issued for the work or for future permits to the offending permittee or its
subcontractors.
901.18 LOCATION OF FACILITIES AND EQUIPMENT.
Subd. 1. Undergrounding by Telecommunications Right -of -Way Users.
Any new construction and the installation of new equipment and replacement of old equipment of
telecommunication right -of -way users shall be underground or contained within buildings or other
structures in conformity with applicable codes. Provided, telecommunications right -of -way users may
attach equipment and facilities to existing poles and structures maintained by a service or utility service.
New and improved telecommunications facilities shall be made available for service to abutting parcels
on the same terms and conditions available to others in the same service area.
Subd. 2. Corridors.
The City Engineer may assign specific corridors within the right -of -way, or any particular segment
thereof as may be necessary, for each type of equipment that is or, pursuant to current technology, the
City Engineer expects will someday be located within the right -of -way. All permits issued by the City
Engineer involving the installation or replacement of equipment shall designate the proper corridor for the
equipment at issue.
Subd. 3. Limitation of Space.
To protect health and safety, the City Engineer shall have the power to prohibit or limit the placement of
new or additional equipment within the right -of -way if there is insufficient space to accommodate all of
the requests of registrants or persons to occupy and use the right -of -way. In making such decisions, the
City Engineer shall strive to the extent possible to accommodate all existing and potential users of the
right -of -way, but shall be guided primarily by considerations of the public interest, the public's needs for
the particular utility service, the condition of the right -of -way, the time of year with respect to essential
utilities, the protection of existing equipment in the right -of -way, and future City plans for public
improvements and development projects which have been determined to be in the public interest.
901.19 RELOCATION OF FACILITIES.
Subd.l. Placement, location, and relocation of facilities must comply with the Act, with other
applicable law, and with Minnesota Rules 7819.3100, 7819.5000, 7819.5100, to the extent the rules do
not limit authority otherwise available to cities.
a) Relocation notification procedure. The City shall notify the utility owner at least 90 days in
advance of the need to relocate existing facilities so the owner can determine if relocation or
replacement is required and plan for any required work. The City shall provide a second
notification to the owner one (1) month before the owner needs to begin the relocation. The
utility owner shall begin relocation of the facilities within one (1) month of the second
notification. To the extent technically feasible, all utilities shall be relocated within one (1)
month or in a time frame determined by the City. The City may allow a different schedule if it
does not interfere with the City's project. The utility owner shall diligently work to relocate the
facilities within the above schedule. The registrant shall restore any rights -of -way to the condition
it was prior to removal and relocation.
b) Delay to City Project. The City shall notify the utility owner if the owner's progress will not
meet the relocation schedule. If the owner fails to meet the relocation schedule due to
circumstances within its control, the City may charge the utility owner for all costs incurred and
requested by a contractor working for the City who is delayed because the relocation is not
completed in the scheduled timeframe and for all costs incurred by the City due to the delay.
c) Delay Penalties. Delay penalties under this section shall be set time to time by the City Council.
d) For relocations or requests made by the City that are matters of convenience, and where the city
shall be charged for such costs, the utility owner shall provide the city a detailed estimate of all
relocation costs, including, but not limited to: quantities of all materials and supplies, cost for
each quantity, labor costs, other. The City shall have the right to independently verify the cost to
determine reasonableness.
Subd. 2. Undergrounding of Relocated Telecommunications Facilities.
A telecommunications right -of -way user shall relocate all above ground facilities and equipment to
underground locations at its own cost and expense at the City's request when, i) the City requires the
relocation of all telecommunications facilities and equipment to underground locations or ii) structures or
poles to which the registrant's facilities or equipment is attached are abandoned or removed by the owner
of such structures or poles, or as ordered removed by the City.
Subd. 3. Nuisance. One year after the passage of this chapter, any facilities found in a right -of -way that
have not been registered shall be deemed to be a nuisance. The City may exercise any remedies or rights
it has at law or in equity, including, but not limited to, abating the nuisance or taking possession of the
facilities and restoring the right -of -way to a useable condition.
Subd. 4. Limitation of Space. To protect health, safety, and welfare, or when necessary to protect the
right -of -way and its current use, the City shall have the power to prohibit or limit the placement of new or
additional facilities within the right -of -way. In making such decisions, the City shall strive to the extent
possible to accommodate all existing and potential users of the right -of -way, but shall be guided primarily
by considerations of the public interest, the public's needs for the particular utility service, the condition
of the right -of -way, the time of year with respect to essential utilities, the protection of existing facilities
in the right -of -way, and future City plans for public improvements and development projects which have
been determined to be in the public interest.
Subd. 5. Fee Waiver. When relocation occurs in conjunction with a public improvement project, the
City Engineer shall have discretion to waive all or a portion of the fees associated with the work that is
occurring within the boundaries of the public improvement project.
901.20 PRE - EXCAVATION FACILITIES LOCATION.
In addition to complying with the requirements of Minn. Stat. 216D.01 -.09 ( "One Call Excavation Notice
System ") before the start date of any right -of -way excavation, each registrant who has facilities or
equipment in the area to be excavated shall mark the horizontal and vertical placement of all said
facilities. Any registrant whose facilities are less than twenty (20) inches below a concrete or asphalt
surface shall notify and work closely with the excavation contractor to establish the exact location of its
facilities and the best procedure for excavation.
901.21 INSPECTION.
Subd. 1. Notice of Completion. When the work under any permit hereunder is completed, the permittee
shall furnish a completion certificate in accordance Minnesota Rule 7819.1300.
Subd. 2. Site Inspection. Permittee shall make the work -site available to the City and to all others as
authorized by law for inspection at all reasonable times during the execution of and upon completion of
the work.
901.22 AUTHORITY OF DIRECTOR OR CITY ENGINEER.
a) At the time of inspection, the director or City Engineer may order the immediate cessation of any
work which poses a serious threat to the life, health, safety or well -being of the public.
b) The director or City Engineer may issue an order to the permittee for any work that does not
conform to the terms of the permit or other applicable standards, conditions, or codes. The order
shall state that failure to correct the violation will be cause for revocation of the permit. Within
ten (10) days after issuance of the order, the permittee shall present proof to the director that the
violation has been corrected. If such proof has not been presented within the required time, the
director may revoke the permit pursuant to Sec. 901.15.
901.23 RIGHT -OF -WAY VACATION.
Subd. 1. Reservation of right. If the City vacates a right -of -way that contains the facilities of a
registrant, the registrant's rights in the vacated right -of -way are governed by Minnesota Rules 7819.3200.
Subd. 2. Relocation of Equipment. If the vacation requires the relocation of registrant facilities and
equipment; and (a) if the vacation proceedings are initiated by the registrant, the registrant must pay the
relocation costs; or (b) if the vacation proceedings are initiated by the City, the registrant must pay the
relocation costs unless otherwise agreed to by the City and the registrant; or (c) if the vacation
proceedings are initiated by a person or persons other than the registrant or permit holder, such other
person or persons must pay the relocation costs.
Subd. 3. Notice. Required notification of request to vacate shall be done pursuant to MN Statutes
645.11.
901.24 ABANDONED AND UNUSABLE EQUIPMENT.
Subd. 1. Discontinued Operations. A registrant who has determined to discontinue its operations in the
City must either:
a) Provide information satisfactory to the City Engineer that the registrant's obligations for its
equipment in the right -of -way under this Section have been lawfully assumed by another
registrant; or
b) Submit to the City Engineer an action plan for the removal or abandonment of equipment and
facilities. The City Engineer shall require removal of such facilities and equipment if the City
Engineer determines such removal is necessary to protect the public health, safety and welfare.
The City Engineer may require the registrant to post a bond in an amount sufficient to reimburse
the City for reasonably anticipated costs to be incurred in removing the facilities and equipment.
Subd. 2. Abandoned Facilities and Equipment. Facilities and equipment of a registrant located on the
surface of or above a right -of -way or on public grounds which remains unused shall be deemed to be
abandoned. Such abandoned equipment is deemed to be a nuisance. The City may exercise any remedies
or rights it has at law or in equity, including, but not limited to;
a) Abating the nuisance; or
b) Requiring removal of the equipment or facilities by the registrant, or the registrant's successor in
interest. Appeals under this section shall follow the procedures in Section 901.16.
Subd. 3. Removal of Underground Equipment. Any registrant who has unusable and abandoned
underground facilities or equipment in any right -of -way shall promptly remove it from that right -of -way.
901.25 INDEMNIFICATION AND LIABILITY.
By registering with the City, or by accepting a permit under this chapter, a registrant or permittee agrees
to defend and indemnify the City in accordance with the provisions of Minnesota Rule 7819.1250.
Subd. 1. Limitation of Liability. By reason of the acceptance of a registration or the grant of a right -of-
way permit, the City does not assume any liability (a) for injuries to persons, damage to property, or loss
of service claims by parties other than the registrant or the City, or (b) for claims or penalties of any sort
resulting from the installation, presence, maintenance, or operation of equipment by registrants or
activities of registrants.
Subd. 2. Indemnification. By registering with the City Engineer, a registrant agrees, or by accepting a
permit under this Section, a permit- holder is required, to defend, indemnify, and hold the City whole and
harmless from all costs, liabilities, and claims for damages of any kind arising out of the construction,
presence, installation, maintenance, repair or operation of its equipment, or out of any activity undertaken
in or near a right -of -way , whether or not any act or omission complained of is authorized, allowed, or
prohibited by a right -of -way permit. It further agrees that it will not bring, nor cause to be brought, any
action, suit or other proceeding claiming damages, or seeking any other relief against the City for any
claim nor for any award arising out of the presence, installation, maintenance or operation of its
equipment, or any activity undertaken in or near a right -of -way, whether or not the act or omission
complained of is authorized, allowed or prohibited by a right -of -way permit. The foregoing does not
indemnify the City for its own negligence except for claims arising out of or alleging the City's
negligence where such negligence arises out of or is primarily related to the presence, installation,
construction, operation, maintenance or repair of said equipment by the registrant or on the registrant's
behalf, including but not limited to, the issuance of permits and inspection of plans or work. This section
is not, as to third parties, a waiver of any defense or immunity otherwise available to the registrant or to
the City; and the registrant, in defending any action on behalf of the City, shall be entitled to assert in any
action every defense or immunity that the City could assert in its own behalf.
901.26 FRANCHISE HOLDERS.
If there is a conflict in terms between the franchise of an entity holding a valid franchise agreement with
the City and this Section, the terms of the franchise shall prevail. For definitions and timelines contained
within both this ordinance and the franchise agreement, the more restrictive provision shall govern.
901.27 SUPPLEMENTARY APPLICATIONS.
Subd. 1. Limitation on Area. A right -of -way permit is valid only for the area of the right -of -way
specified in the permit. No permittee may do any work outside the area specified in the permit, except as
provided herein. Any permittee which determines that an area greater than that specified in the permit
must be obstructed or excavated must before working in that greater area (i) make application for a permit
extension and pay any additional fees required thereby, and (ii) be granted a new permit or permit
extension.
Subd. 2. Limitation on Dates. A right -of -way permit is valid only for the dates specified in the permit.
No permittee may begin its work before the permit start date or, except as provided herein, continue
working after the end date. If a permittee does not finish the work by the permit end date, it must apply
for a new permit for the additional time it needs, and receive the new permit or an extension of the old
permit before working after the end date of the previous permit. This supplementary application must be
submitted before the permit end date.
901.28 OTHER OBLIGATIONS.
Subd. 1. Compliance With Other Laws. Obtaining a right -of -way permit does not relieve permittee of
its duty to obtain all other necessary permits, licenses, and authority and to pay all fees required by the
City or other applicable rule, law or regulation. A permittee shall comply with all requirements of local,
state and federal laws, including but not limited to Minnesota Statutes, Section 216D.01 -.09 (Gopher One
Call Excavation Notice System) and Minnesota Rules Chapters 7560 and 7819. A permittee shall perform
all work in conformance with all applicable codes and established rules and regulations, and is
responsible for all work done in the right -of -way pursuant to its permit, regardless of who does the work.
Subd. 2. Prohibited Work. Except in an emergency, and with the approval of the City, no right -of -way
obstruction or excavation may be done when the City determines it is seasonally prohibited or when the
City determines that the conditions are unreasonable for such work.
Subd. 3. Interference with Right -of -Way. A permittee shall not so obstruct a right -of -way that the
natural free and clear passage of water through the gutters or other waterways shall be interfered with.
Private vehicles of those doing work in the right -of -way may not be parked within or next to a permit
area, unless parked in conformance with City parking regulations. The loading or unloading of trucks
must be done solely within the defined permit area unless specifically authorized by the permit.
Subd. 4. Trenchless Excavation. As a condition of all applicable permits, permittees employing
trenchless excavation methods, including but not limited to Horizontal Directional Drilling, shall follow
all requirements set forth in Minnesota Statutes, Chapter 216D and Minnesota Rules Chapter 7560, and
shall require potholing or open cutting over existing underground utilities before excavating. If any
trenchless excavation crosses or intersects with a city sanitary sewer main or lateral, storm sewer main or
lateral, catch basin, manhole or any associated structure, a post excavation televised inspection in
accordance with the City's current standard specifications shall be made of all such crossings within 30
days of said work to ensure that the city utilities were not damaged or impacted by the trenchless
excavation. Televised results shall be provided in a format acceptable to the city, and sent to the city
within 30 days of the televising.
901.29 SEVERABILITY.
If any portion of this chapter is for any reason held invalid by any court of competent jurisdiction, such
portion shall be deemed a separate, distinct, and independent provision and such holding shall not affect
the validity of the remaining portions thereof. Nothing in this chapter precludes the City from requiring a
franchise agreement with the applicant, as allowed by law, in addition to requirements set forth herein.
901.30 VIOLATION.
Any person who shall violate any of the provisions of this chapter shall be guilty of a misdemeanor,
unless otherwise specified.
(1987 Code, § 901.04) (Ord. 121, passed 5 -28 -1980) Penalty, see § 104.01
PASSEDBY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this day of
, 2018.
ATTEST:
Sandie Thone, City Clerk
Scott Zerby, Mayor
M City of Shorewood Council Meeting Item
Title / Subject: Approving 2018 Master Fee Schedule Update
Meeting Date: Monday, January 22, 2018
Prepared by: Sandie Thone, City Clerk
Reviewed by: Greg Lerud, City Administrator
Attachments: Resolution
9C
MEETING TYPE
Regular Meeting
Policy Consideration: Pursuant to MN State Law municipalities shall set forth fees to be reimbursed for
administrative costs and expenses associated with issuing permits, licenses and providing other city
services.
Background: The City of Shorewood is required to set forth fees and charges to reimburse the city for
administrative and other expenses related to the issuing of permits, licenses and other services. The city
is required to maintain the relevant schedule of fees and regularly audit their effectiveness and ensure
the cost to issue permits or provide services are covered but that costs do not exceed the cost to issue
the permit or provide the service as municipalities are not to profit from the fees and charges. In May of
2017 the City of Shorewood adopted Ordinance 541 repealing and replacing Chapter 1301 of the
Shorewood Municipal Code to allow for reference of a Master Fee Schedule to allow the establishment
and amendment of fees by resolution, with the exception of land use fees that will remain in the
ordinance and adopted by ordinance. This change ensured a more efficient and economical process
while still keeping council control of the fees charged by the city. At that time, staff made plans to
review the fees for relevance and has since completed their review and the following document: 2018
Master Fee Schedule is the proposed city fee schedule proposed resulting from this analysis. It
incorporates the changes, deletions and /or additions that have come before you tonight. The proposed
changes are delineated in the items presented at the meeting and incorporated into the 2018 Master
Fee Schedule.
Financial or Budget Considerations: The city fees proposed should adequately cover the cost of issuing
permits and providing the services as described.
Recommendation /Action Requested:
1) Staff respectfully recommends the city council approve the resolution approving the 2018
Master Fee Schedule as proposed or make the appropriate changes as deemed necessary.
Motion, second and simple majority vote required.
Connection to Vision / Mission: Consistency in providing residents quality public service, a sustainable
tax base, and sound financial management through effective, efficient, and visionary leadership.
Mission Statement: The City of Shorewood is committed to providing residents quality public services, a
healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial
management through effective, efficient, and visionary leadership. Page 1
CITY OF SHOREWOOD
COUNTY OF HENNEPIN
STATE OF MINNESOTA
RESOLUTION 18 -XX
APPROVING 2018 UPDATED MASTER FEE SCHEDULE
WHEREAS, the City of Shorewood and its activities as a municipality requires setting forth fees
and charges to reimburse the city for administrative and other expenses related to the issuing of
permits, licenses and other services; and
WHEREAS, the City of Shorewood must maintain a relevant schedule of fees and regularly
audit their effectiveness; and
WHEREAS, the City of Shorewood has established fees for licensing, permits, programs, and
services that include but are not limited to building, zoning, planning, business, animal, park and
recreation, rentals, solicitors, fire prevention, utility, franchise, administrative citations, and other
miscellaneous fees that further the health, safety and welfare of the community at large; and
WHEREAS, all fees and charges shall be fixed and determined by the council and set forth in the
master fee schedule which will be adopted by resolution and uniformly enforced; and
WHEREAS, the Shorewood Master Fee Schedule has been audited and the following changes
have been recommended for the 2018 Master Fee Schedule as described for the city council at
the regular city council meeting held on January 22, 2018 and as delineated in the Proposed
Master Fee Schedule for 2018 attached as Appendix A.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Shorewood, the
updated 2018 Master Fee Schedule for the City of Shorewood is adopted.
ADOPTED BY THE CITY COUNCIL of the City of Shorewood this 22nd day of January
2018.
ATTEST: Scott Zerby, Mayor
Sandie Thone, City Clerk
5755 Country Club Road * Shorewood, MN * 55331 2 0 18
952. 960.7900 /www.ci.shorewood.mn.us
City of
Shorewood
MASTER FEE SCHEDULE
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
Introduction
In May of 2017 the Shorewood City Council approved an amendment to Chapter 1300:
Municipal Fees of the Shorewood City Code removing the actual fees from the Code,
with the exception of Land Use Fees, and replacing it with referencing the Master Fee
Schedule which will establish fees by Council resolution. Land Use Fees are required
pursuant to MN State statutes to be amended and established by ordinance in
communities that collect in excess of $5,000 in said fees on an annual basis. Previous
and future resolutions and ordinances amending or establishing new fees will be
collated into the Master Fee Schedule as necessary and prudent. These updates are set
forth by Council resolution (and ordinance in the case of land use fees) and
incorporated into the Master Fee Schedule upon adoption of the proposed established
fees. This provides a cost - effective and expedient process for reviewing fees for
relevance and providing annual updates to the schedule of city fees and a user - friendly
document for public use.
A copy of the Master Fee Schedule is available on the city website at
www.ci.shorewood.mn.us or at city offices located at 5755 Country Club Road in
Shorewood, MN 55331. To obtain an electronic copy please email
cityofshorewood @gmail.com.
z
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
TABLE OF CONTENTS
SECTION I: License and Permit Service Fees 4 -6
SECTION II: Liquor License Fees and Charges 7
SECTION III: Utility Rates; Sewer, Water, Stormwater, Recycling 8 -9
SECTION IV: Miscellaneous Fees and Charges 10 -12
SECTION V: Park and Recreation Fees 13
SECTION VI: Building and Right of Way Fees 14 -15
SECTION VII: Zoning and Land Use Fees (Ordinance) 16 -17
3
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
LICENSE, PERMIT, SERVICE CHARGES AND MISCELLANEOUS FEES
Type of Charge /Fee
City Code Reference
Charge /Fee
I. License and Permit Service Fees
Administrative enforcement
104.03
Class A Offenses: $100
Violations of Public Health
Regulations
(Chapters 501 -503, except those violations
which are also Zoning Code Violations)
Class B Offenses: $300
Violations of Rental Housing
Regulations (Chapter 1004)
Subsequent Class B Violations $1,000
Class C Offenses: $300
Violations of Building Regulations
(Chapters 1001 -1003 and 1005)
Violations of Wetland Regulations
(Chapter 1102)
Violations of Tree Preservation
Regulations (Chapter 1103)
Violations of Zoning Regulations
(Chapter 1201)
Subsequent Class C Violations:
2nd citation within 24 months of issuance
of previous citation: 25% increase over
scheduled civil penalty
3rd citation within 24 months of issuance of
previous citation: 50% increase over
scheduled civil penalty
4th citation within 24 months of previous
citation: 100% increase over scheduled civil
penalty
Administrative Enforcement Appeal
104.03
$200
4
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
LICENSE, PERMIT, SERVICE CHARGES AND MISCELLANEOUS FEES
Type of Charge /Fee
City Code Reference
I. License and Permit Service Fees
Adult use license 1 309
Investigative fee
Adult use facility license
Animal impound fees
Daily boarding fee
Additional services when
required
Commercial lawn fertilizer
application license (annual)
Dock - Boat docks and boat storage
facility license
Dock - Multiple dock facility license
Dog licenses, per animal
Domestic partnership registry
Registration
Amendment
Termination certificate,
certified
Farm and other animals
Charge /Fee
$500
$1,675 + $50 /video booth or stall
701.08.4 $25 first offense of year, $50 thereafter
$25
$95 inoculation
$35 bath
310.03.2d $30
304.05 1 $35
1201.24, Subd. 10 $2 per slip /per year
701.03.2 $101$5 license late fee
110.06 $25
$25
$25
$2
704.09 1 $50
Fire alarm permits 601.06.1 $200 2nd false alarm and thereafter
Fire (recreational fire permit) 501.03 No charge
Fireworks dealer license /permit $100 per site /per year
Gambling permit - exempt
Gambling premises permit - new
investigation fee
301.09.3 1 $25
301.08.4 1 $100
Horse permit 702.04 $25
Kennel license 701.04.2 $25 /initial license
$10 /renewal license
Police alarm permits
System contractor license
601.06.1 $100 3rd false alarm and thereafter
$1,000 bond
Therapeutic massage annual I 1 $100 1
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
business license fee
Tobacco retailer license
302
$250/ remise
Tobacco administrative fines:
Tobacco licensees in violation
$75 /first offense
$200 /second offense in 24 -month period
$250 /thereafter within 24 -month period
Individuals in tobacco violation
$50 per offense
6
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
II. Liquor License Fees and Liquor Violation Fines
Type of Charge /Fee
City Code Reference
Charge /Fee
Intoxicating liquor license - on -sale
401.06.1
$7,500
Wine license - on -sale
401.06.1
$1,000
Intoxication malt liquor/wine license - on -sale
401.06.1
$2,000
Intoxicating liquor - off -sale
401.06.1
$310
special club license
401.06.1
$250
-Liquor
Sunday license
401.06.1
$200
-Special
3.2% malt/liquor license - on -sale
401.06.2
$300
3.2% malt liquor license - off -sale
401.06.2
$50
3.2% malt liquor or intoxicating liquor
license
401.06.2
$25
-Temporary
license investigation fee -New license
401.06.1
$500
-Liquor
Liquor license investigation fee - Renewal
with change in managers/owners/like
401.06.1
$250
Liquor licensees' in violation
40121
$500 /first offense
$1,000 /second offense in 24- months
$1,500 /third offense in 24- months
$2,000 /fourth offense in 24- months
7
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
III. Utility Rates
Sewer
Type of Charge /Fee
City Code
Charge /Fee
Reference
Sewer connection permit
904.07.1
$150
Residential:
Sanitary Sewer Service
904.15.1a
$77.29/qtr/sewer only
$51.53 /qtr /low income sewer only
Commercial:
$8.75 Base $2.02/1,000 gallons
Sanitary sewer surcharge
904.09.5
$100 /month
Local sewer availability charge
904.18.3
$1,200
Water
Type of Charge /Fee
City Code
Charge /Fee
Reference
Water connection permit
903.03.1a
Inside
$50
Outside
$60
Watering restriction violation
903.12
$50 first violation
$25 increase each succeeding
violation
(e.g. 2nd violation $75, 3rd violation
$100, and the like)
$17.50 /quarter first 5,000 gallons,
plus $2.95 per 1,000 gallons in
excess of 5,000 gallons up to 50,000
gallons, and $4.25 per 1,000 gal in
Water service
903.09.1a
excess of 50,000 gal/qtr
Water service - low income
903.09.la(1)
$15 /quarter minimum
Water turn -on and shut -off fee
903.04
$50
Water connection fee
903.03.3
$10,000
Single - family residential
See chart and formula in 903.04
Multi- family residential, Commercial
Subd. 3.
Schools, churches, government and other non-
residential
See chart and formula in 903.04
Subd. 3.a.
8
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
Stormwater Management
Type of Charge /Fee
City Code
Charge /Fee
Reference
Stormwater Management Utility
$18.30 /qtr: lots less than 10,000 sq.
ft.
Residential equivalent factor
$26.13 /qtr: lots 10,000 - 50,000 sq. ft.
Basic system rate
905.03
$34.01 /qtr: lots 50,000 plus sq. ft.
Recycling
Type of Charge /Fee
City Code
Charge /Fee
Reference
Residential recycling fee
$14 /quarter/household
9
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
IV. Miscellaneous Fees and Charges
Type of Charge /Fee
City Code
Charge /Fee
Reference
Special assessment search
$25
Mailed minutes (nonresident)
$75.00 annual
$.25 /page /individual
Mailed agendas
$35 annual
$.25 /page /individual
Copies
$.25 /page /single side 8.5 x 11 @
$.50 /page /single side anything larger
Color copies
$1 /page /single side
Mailing labels (all city residents)
$35 all residents on printed mailing
Labels
Aerial topography:
Mylar copy
$16 /acre plus $5 /mylar
Electronic
$50 /megabyte of data
City Code book
$75
CD Rom
$25
Updates
$25 /year
City Zoning Code
$25 per page plus binding costs
Assessment Certification Fee
903.10.3(e)
$50
Comprehensive Plan (softbound color copy)
Cost of production
10
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
City Subdivision Ordinance (softbound copy)
$25 per page plus binding costs
Election filing fee
$2
Spring clean -up fees
507.09.1
Up to $10
507.09.2
$20 air conditioners*
$20 water softeners*
$12 appliances, including water
heaters*
$10 mattresses and rolled
carpets /padding *
$15 large furniture*
$5 tires with or without rims*
$13 truck tires without rims*
$0 auto batteries*
* Or as determined based upon
actual cost of disposal
Transient business,
308.08
peddling/soliciting
$50/appl icant
Sand barrel/sand charge
$40 barrel and sand/$30 sand only
*Rental Housing Licenses are effective for a
period of three (3) years.
Appeal filing fee
$100
*License application fee, per rental dwelling in
1004.06.6
$75
building with one to five rental units (includes
up to two inspections per unit)
*License application fee, per rental dwelling in
1004.03(3)
$400 plus $10 per rental unit up to
building with six or more rental units (includes
(Res.
$750 maximum
up to two inspections per unit)
Additional inspections as necessary
1004.03(3)
$35 /inspection
(Res. 17-089)
Rental license application fee for buildings
with six (6) or more units constructed within
1004.03(3)
one year from date of application shall be base
(Res. 17-089)
license fee excluding $10 per rental unit fee.
11
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
Return check fee
$25
Plans and specifications, paper copy
$35
Plans and specifications, CD copy
$25
12
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
V. Park and Recreation
Type of Charge /Fee
City Code
Charge /Fee
Reference
Park and recreation use fees
902.06.3
Organized sports participant
$10 /per participant, per sport, per
Skating rinks (per rink)
season
Lights
$15/hour
Tournaments, per rink
$30 /day plus attendant salary
505.02.4
Special Event Registration and Permit
$50 /day for events on public
property with 75 or more
attendees /participants.
Soccer /Football/Baseball/Softball Fields (per
field)
Damage deposit, all fields
$125 /flat fee
Football Field, unlighted
$50/hour or $210 /day
Lights
$30/hour
Diamond field (baseball)
$50 /day
Entire soccer area, unlighted
$150 /day
Tennis Courts
$5 /court/hour
Multi -use buildings
Resident Base Fee
Damage deposit, all buildings
$50
Manor /Badger
$25
Eddy Station
$100
Picnic Pavilions
Resident Base Fee
Manor /Freeman
$25
Eddy Station Pavilions
$50
13
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
VI. Building and Right of Way Fees
Note: Base fees are non - refundable. Escrow deposits are to cover consulting engineer and attorney expenses.
Applicants are informed that any city expenses not covered by these fees will be billed to them. Unused escrow
fees will be returned to applicant upon written request.
Building permit
1001.03
1997 U.B.C. SECTION 107
1997 U.B.C. TABLE I -A AND
STATE RULE 1300.0160
Reinspection fee
$35
Residential
$75
Roofing permit
$75
Siding permit
S.B.C.
$75
Window permit
S.B.C.
Mechanical permit
State Statute or 2.5% of value, $35
S.B.C.
minimum
Plumbing permit
State Statute or $15 /fixture, $35
minimum
Removal or abandonment,
U.F.C.
$35 first tank plus $20 each
underground tanks
additional
Demolition permit
S.B.C.
$50 (Fee waived when done in
conjunction with a building
permit or burned by the fire
department)
Sign permit application fee
1201.03.11 f
$20 (Temporary)
Per 1997 U.B.C. Table I -A for
permanent
Fence permit
1201.03.2f
$20
Grading /filling permit
S.B.C.
Per 1997 U.B.C. Table A -33 -A
and A -33 -B
14
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
R.O.W Administrative Charge
901.11 Subd. 5
$200 (in addition to actual costs)
R.O.W. Annual
901.06 Subd.1
$300
Registration Fee (non - utility)
R.O.W. Annual
901.06 Subd.1
$2,000
Registration Fee (non- franchise
right -of -way user)
R.O.W. Encroachment
901.01.2a
$40
Permit
R.O.W. or Public Ground Excavation
901.08 Subd. 2
$200
Permit
Directional Drilling or Boring
901.08 Subd. 2
$45 per 100 L. Ft. (in addition to
permit fee)
901.08 Subd. 2
Open Trenching
$60 per 100 L. Ft. (in addition to
permit fee)
901.08 Subd. 2
Obstruction Permit
$20
Small Wireless Facility (per site)
901.08 Subd. 2
$150 (in addition to actual costs)
Security /Damage Deposit (non - utility)
901.08 Subd. 6
Varies
Street Excavation Permit
Pole /Pole Attachment
901.08 Subd. 2
$20
Underground Sprinkler /Irrigation
901.01.2d
$20
System Permit
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
VII. Zoning and Land Use Fees (Ordinance)
LICENSE, PERMIT, SER VICE CHARGES AND MISCELLANEOUS FEES
Type of Charge /Fee
City Code
Charge /Fee
Reference
Comprehensive plan amendment
Pre - application
$200
Formal Application
$800 plus $1,000 escrow
1201.04
Conditional use permit
$400
Residential
$500 plus $1,000 escrow
Non - residential
Fence permit
1201.03
$20
Interim use permit
1201.04
Residential
$400
Non - residential
$500 plus $1,000 escrow
Planned unit development
Concept Stage
1201.25
$500 plus $1,000 escrow
Development Stage
1201.25
$700 plus $1,000 escrow
Final Stage
1201.25
$500 plus $1,000 escrow
By Conditional Use Permit
1201.06
$500 plus $1,000 escrow
Sign permits
1201.03.1 If
Temporary
$20
Permanent
Per 1997 U.B.C. Table I -A
Site plan review
1201.03
$200 plus $1,000 escrow
Subdivision sketch plan review
1202.03
$200
Subdivision (minor subdivision)
1202.03
$500 plus $500 escrow
Subdivision (preliminary plat)
1202.03
$600 plus $25 /lot plus an
escrow deposit, as follows:
5 or fewer lots
$1,000
Over 5 lots
$3,000
Subdivision (final plat)
1202.03
$500 plus $25 /lot plus an
escrow deposit, as follows:
16
City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2
10/25 /2017 /Updated 1/22/2018
VII. Zoning and Land Use Fees (Ordinance)
LICENSE, PERMIT, SER VICE CHARGES AND MISCELLANEOUS FEES
Type of Charge /Fee
City Code
Charge /Fee
Reference
5 or fewer lots
$1,000
Over 5 lots
$2,000
Traffic Studies when required as part of another
Multiple
Escrow for estimated cost of
application
study to be completed by the
City's consulting engineers
plus $500.
Vacation or Easement
$300
Variances
1201.05 and
$400
Residential
1202.09
Non - residential
$500
Zoning Amendment (Text or Map)
j 1201.04
j $600 plus $1,000 escrow
Zoning Permits
1201.07
$20
Park dedication (cash in lieu of land)
1202.07
$6,500 /dwelling unit or 8% of
raw land value
Extension of deadline for recording resolutions
1202.03
$200
Extension of plat approval
1202.03
$200
*Note: Base fees are non - refundable. Escrow deposits are to cover consulting engineer, attorney, and other
consultant expenses. Applicants are informed that any city expenses not covered by these fees will be billed to
them. Unused escrow fees will be returned to applicant upon written request. Applications with more than one
required escrow account shall be required to submit the escrow based on the highest required escrow amount.
17
#9D
MEETING TYPE
City of Shorewood Council Meeting Item REGULAR
Title / Subject: Appointments and Reappointments to Planning Commission and Parks Commission
Meeting Date: January 22, 018
Prepared by: Greg Lerud
Reviewed by: Sandie Thone and Marie Darling
Attachments: Resolutions
Policy Consideration: Appointing City residents to serve on the Planning and Parks Commissions.
Background: Robert Bean and Janet Sylvester have submitted their resignations from the city's Planning
Commission creating two vacancies effective March 1, 2018. Todd Eggenberger recently submitted an
application to serve on the city's planning commission, and on January 8, the City Council interviewed
Mr. Eggenberger. Previously, the city interviewed Nathaniel Gorham and Holly Ashmore for a
Commission appointment, subsequently appointing Gorham to the Parks Commission June 12, 2017.
Mr. Gorham notified staff that he prefers serving on the Planning Commission and requested that the
council consider him for one of the Planning Commission vacancies. Should the council appoint Mr.
Gorham to the planning commission it will create a vacancy on the Parks Commission. Holly Ashmore
also recently spoke with staff and she stated she wishes to be considered again for a parks commission
appointment should there be a vacancy.
Financial or Budget Considerations: None
Next Steps and Timeline: There are two Resolutions attached to this memo. The first Resolution is for
reappointments and appointment to the Planning Commission. Depending on the council's decision
regarding appointments to the Planning Commission vacancies, the appointment section in the second
Resolution may not be needed.
Options: The Council can make appointments to fill up to three commission vacancies. If the Council
chooses to not fill any number of the openings, staff requests that you provide direction on how to
proceed in filling the remaining vacancies.
Recommendations: Staff recommends appointing these three candidates to open commission
positions.
Timeline /Further Action: Staff will notify the candidates of the City Council's decision.
Mission Statement: The City of Shorewood is committed to providing residents quality public services, a
healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial
management through effective, efficient, and visionary leadership. Page 1
CITY OF SHOREWOOD
RESOLUTION NO. 18 - xxx
A RESOLUTION MAKING PLANNING COMMISSION APPOINTMENTS
WHEREAS, the City of Shorewood has received resignation from two commission
members, Robert Bean and Janet Sylvester; and,
WHEREAS, the City of Shorewood has advertised for Shorewood residents to apply to
serve on the Planning Commission; and,
WHEREAS, the City Council has completed interviews and selection procedure for
appointment to said Commission;
NOW, THEREFORE BE IT RESOLVED that the City Council of the City of
Shorewood hereby makes the following appointments to the Planning Commission effective
March 1, 2017, with the term expiration as indicated:
Planning Commission:
Member Term
1.
February 28, 2021
February 28, 2021
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 22nd
day of January, 2018.
ATTEST:
Sandie Thone, City Clerk
Scott Zerby, Mayor
CITY OF SHOREWOOD
RESOLUTION NO. 18 - xxx
A RESOLUTION MAKING APPOINTMENT TO THE SHOREWOOD PARKS
COMMISSION
WHEREAS, the City of Shorewood City Council has an opening on the City's Park
Commission; and
NOW, THEREFORE BE IT RESOLVED that the City Council of the City of
Shorewood hereby makes the following reappointments and appointment to the Shorewood Park
Commission effective March 1, 2018, with the term expiration as indicated:
Park Commission Member Term Expiring
1. Justin Mangold February 28, 2021
2. Molly Barr February 28, 2021
Park Commission Member Term Expiring
1.
February 28, 2019
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 22nd
day of January, 2018.
ATTEST:
Sandie Thone, City Clerk
Scott Zerby, Mayor