Loading...
HomeMy WebLinkAbout01-31-18 CC Reg Mtg Agenda (rescheduled from 01-22-18)CITY OF SHOREWOOD CITY COUNCIL REGULAR MEETING WEDNESDAY, JANUARY 31, 2018 (Rescheduled from JANUARY 22, 2018) AGENDA 1. CONVENE CITY COUNCIL MEETING A. Roll Call B. Review Agenda 5755 COUNTRY CLUB ROAD COUNCIL CHAMBERS 6:00 P.M. Mayor Zerby Johnson Labadie Siakel Sundberg Attachments 2. CONSENT AGENDA — Motion to approve items on the Consent Agenda & Adopt Resolutions Therein: A. City Council Work Session Minutes of January 8, 2018 Minutes B. City Council Regular Meeting Minutes of January 8, 2018 Minutes C. Approval of the Verified Claims List Claims List D. Appointment of Administrative Hearing Officers Clerk Memo Resolution E. Approval of Utility Assessment City Administrator Memo 3. MATTERS FROM THE FLOOR (No Council Action will be taken) 4. PUBLIC HEARING 5. REPORTS AND PRESENTATIONS A. Commission Service Recognition Awards: Robert Bean, Planning Commission Janet Sylvester, Planning Commission 6. PARKS 7. PLANNING A. Report by Chair Maddy on January 16, 2018 Draft Minutes Planning Commission Meeting CITY COUNCIL REGULAR MEETING AGENDA — January 31, 2018 Page 2 B. Amendment of Zoning and Subdivision Application Requirements; Planning Director Memo and Land Use Fee Ordinance Ordinance Resolution for Summary Publication 8. ENGINEERING /PUBLIC WORKS A. Receive Feasibility report for reconstruction on streets B. Agreement for Jet -Vac purchase C. Shorewood Lane Ravine Update 9. GENERAL /NEW BUSINESS A. Amendments to City Code 104.03 Administrative Enforcement B. Right of Way Ordinance C. 2018 Updated Fee Schedule D. Appointment of Planning and Parks Commission Members 10. STAFF AND COUNCIL REPORTS A. Administration and Staff B. Mayor and City Council 11. ADJOURN Engineer Memo Resolution City Administrator Memo Engineer Memo Planning Director Memo Ordinance Resolution for Summary Publication City Administrator Memo Ordinance Resolution for Summary Publication Clerk Memo Resolution City Administrator Memo Resolutions CITY OF SHOREWOOD CITY COUNCIL WORK SESSION MONDAY, JANUARY 8, 2018 MINUTES 1. CONVENE CITY COUNCIL WORK SESSION Mayor Zerby called the meeting to order at 6:00 P.M. A. Roll Call Present. Mayor Zerby; Councilmembers Johnson, Administrator Lerud; Planning Director Dar! Attorney Keane, and Engineer Fauske Absent. Council member Sundberg B. Review Agenda Johnson moved, Labadie seconded, appr 2. RIGHT OF WAY ORDINANCE Administrator Lerud said following approval of the sr Legislative session, the city was going to be required t statutory requirements; Upon reviewing the code, it b review and updating. He said that Brown, Keane, Fa June and the draft ordinance before vod is a result of th Council member Sun4 Lerud said the update 1 2. 3. a asp 2a 5755 COUNTRY CLUB ROAD COUNCIL CHAMBERS 6:00 P.M. iakel, and Sundberg; City of Public Works Brown; City ion passed 4/0. [ll cell wireless legislation passed during the last update its right of way ordinance to reflect those ,ame obvious that the entire code was in need of ;kc, "Darling and he met on a regular basis since ;e discussions. primary principals: Rights-of-way and other public ground owned by the City of Shorewood are an asset of the city and must be proactively 'managed on that basis. Controlling,access and establishing rules that can be enforced for the use of the rights -of -way by utilities and other.users.' 3. Establishing regulations for the preservation and restoration of the rights -of -way by utility and other uses is central to protecting the city's investment. Lerud said that he would like to go through the ordinance page by page at this meeting, and answer questions the council has as well as hearing suggested changes. He said staff would then go back and make changes to the draft, and present it at the January 22 council meeting for consideration. Through the discussion about the draft ordinance, the city council raised matters and questions that need to be resolved in the final draft: Does the city have the authority to charge additional fees to right of way users who regularly use the rights of way but do not have a franchise? Could solar panels be required to power the small cell wireless equipment? Can the city require screening or other "disguising" of small CITY OF SHOREWOOD WORK SESSION MEETING MINUTES October 9, 2017 Page 2 of 2 cell wireless equipment? Is there a way that permit information can be made available to others or publicly made available? The discussion of Item 2 concluded at 6:50 P.M. Mayor Zerby announced that Council was going to address Item 3 on the agenda in the large conference room. 3. PLANNING COMMISSION INTERVIEW Council interviewed Todd Eggenberger, 6105 Chest Planning Commission for a three -year term. 4. ADJOURN Siakel moved, Labadie seconded, Adjourning th 7:00 P.M. Motion passed 510. RESPECTFULLY SUBMITTED, Greg Lerud, City Administrator ATTEST: Sandie Thone, City it to the ssion at 2B CITY OF SHOREWOOD 5755 COUNTRY CLUB ROAD CITY COUNCIL REGULAR MEETING COUNCIL CHAMBERS MONDAY, JANUARY 8, 2018 7:00 P.M. MINUTES 1. CONVENE CITY COUNCIL REGULAR MEETING Mayor Zerby called the meeting to order at 7:03 P.M. A. Roll Call Present. Mayor Zerby; Councilmembers Johnson, Labadie, Siaket, and Sundberg; Attorney Keane; City Administrator Lerud; Planning Director Darling; Director of Public Works Brown; and, City Engineer Fauske Absent: None. B. Review Agenda Labadie moved, Johnson seconded, approving the agenda. Motion passed 510. 2. CONSENT AGENDA Mayor Zerby reviewed the items on the Consent Agenda., Siakel moved, Labadie seconded, Approving the Motions Contained on the Consent Agenda. A. Approving the City Council Work Session Meeting Minutes of December 11, 2017 B. Approving the City Council Regular Meeting Minutes of December 11, 2017 C: Approval of the Verified Claims List D. , - Setting the 2018 City Council Regular Meeting Schedule E. Approval of the 2018 Pay Equity Report F. Accepting Donations for Arctic Fever G. Accepting organics Recycling Grant from Hennepin County H. Approval of Seasonal Hires: Ice Rink Attendants L Annual Review out of State Travel policy J. Approval of Change Order 3 for Badger Park, Phase 2 Improvements, City Project 17 -09 Motion passed 510. CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES January 8, 2018 Page 2 of 5 3. MATTERS FROM THE FLOOR No one was present. 4. PUBLIC HEARING There were no public hearings. 5. REPORTS AND PRESENTATIONS There were no reports or presentations. 6. PARKS Parks Chairman Justin Mangold reported that the Planning 'Commission has beef reviewing options for the Badger Park play ground area. He said the Commission number of options and have coalesced around a pirate ship Chemed main structure. 7. PLANNING There were no planning items on the 8. ENGINEERING /PUBLIC WORKS A. Mill Street Speed Issue update their time ed a large Public Works Director said there has been additional speed information collected along Mill Street. He said the city had initial speed sampling done prior to the speed awareness displays that were installed on Mill Street. The results of that sampling showed that the 85"' percentile was 36 miles per hour for both north and south bound traffic. Following the installation of the speed awareness displays, pursuant to council direction, additional speed sampling was done by SLMPD and Hennepin County. He said the results ofthat study showed that the 85"'percentile for the northbound and southbound were 35 mph and 37 mph xespectively. Brown said that a review of the data indicates that the displays are having a very limited imoact.on traffic. Brown said that speed at this level, according to the city's speed management plan, indicates that physical changes to the driving area are the most effective in reducing speed. One thing he said was not included in his memo is that Hennepin County plans to stripe those lanes to 11 feet which will create a designated bike area at grade. Brown said that even thought the data showed little impact from the speed awareness displays in reducing speed, the city obtained an estimate of $4,000 to move the existing sign and foundation an install it farther north. He said he wanted the council to have information for all options. Mayor Zerby said he thought moving the southbound facing sign farther north along Mill Street would lower speeds in that area. Zerby moved, Sundberg seconded, approving relocating the southbound speed awareness display farther north along Mill Street, motion passed 510. CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES January 8, 2018 Page 3 of 5 9. GENERAL /NEW BUSINESS A. Annual Appointments and Designations for the City of Shorewood for 2018 Siakel suggested that the appointments and designations remain unchanged from 2017. After a brief discussion, Siakel moved, Labadie seconded, adopting RESOLUTION NO. 18 -005, Certain Offices and Positions within the City of Shorewood for the Year 3 4 5 The following persons are appointed to the following Council Representatives to: Park Commission Liaison: January — June 2018: Jennifer July — December 2018: Debbie Planning Commission Liaison: January — June 2018: Kristine July — December 24}18: Patrick Metro Cities (AMM) and League Alternate Metro Cities (AMM & Lake Minnetonka Communicatio Appointments to (LMC): Kristine Sundberg s Commission: Scott Zerby tunications Commission: Patrick Johnson Council: Jennifer Labadie ke Minnetonka Police Department: Mayor na Committee South Lake Minnetonka Police ict Board Member: Kristine Sundberg Fire District Board Member: Debbie Siakel tee: None ,e: Debbie Siakel and Kristine Sundberg eed Inspector: Joe Lu og wski That the following other appointments are made: a) City Attorney: Timothy J. Keane, Kutak Rock LLP b) City Prosecutor: Ken Potts C) Emergency Preparedness Director: per Police Board Decision Official Depositories: Alerus Bank, US Bank, Wells Fargo, 4M Fund & other Depositories as necessary Official Newspaper: Sun Sailor. Notices may also be published in the Laker. That the Blanket Bond (Official Bonds) is approved. That such appointments shall take effect on the date hereof and shall continue for the remainder of the year or until such time as a successor is appointed by the City Council. CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES January 8, 2018 Page 4 of 5 Motion passed 510. 10. STAFF AND COUNCIL REPORTS A. Administrator and Staff City Administrator Lerud said that the City received a certification from the GFOA for excellence in financial reporting for 2017. He said the city has earned this certification for quite a few years consecutively and Joe Rigdon and Michelle Nguyen deserve the credit for the recognition. Lerud said that the community ribbon cutting ceremony for Shorewood Landings is this Wednesday from 3:30 to 4:30. For those who were not able to attend the tour last month, this is a good opportunity to see this first class facility. Engineer Fauske said that staff has started working with the Minnehaha Creek Watershed District (MCWD) on a cooperative project to address surface and storm water issues in an area in roughly the center third of Shorewood. She presented a map showing the area, She said this is consistent with the areas discussed during a work session last year that identified needed improvements. Fauske said that city staff has had initial discussions with MCWD staff about a cooperative project in this area. Renae Clark, Planner and Project Manager for the MCWD said the watershed is looking forward to working with the city on this project. To that end; she said she is working on a Memorandum of Understanding between the City and MCWD that will outline the expectations of each group. Fauske said that she will look forward to sharing additional information with the council in future meetings as well as bringing back the MOU for council consideration. Council member Lab,adi' status and timeline of this but she would keep the c timeline, she said the city,,, Fauske said, as the council Whitley Mott's property at the information she needed historical data; the current i Mr. Mott said he appr receive the council's forward to hearing the d she thought it was important to let residents in this area know about the aject. Fauske replied that it was very early in the process to set a schedule, iciVinfornred as we go. When we get the point where we can publish a ild'make sure residents are aware. 1 at the last meeting, she has been researching the surface water issue at Yellowstone Trail. She said that she anticipated being able to have all February 26 council meeting, and at that meeting she could present the nd potential solutions for the council to consider. d Ms Fauske's attention to this matter and wanted to make sure that this issue on as well and that the process not bog down into inaction. He said he looks mation on February 26. Administrator Lerud presented the monthly financial report. There were no questions. Director Brown said that Arctic Fever is this weekend, and even though the lack of snow has forced the cancellation of the snow sculpture contest, there are many other activities going on the entire weekend. B. Mayor and City Council There were no comments. CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES January 8, 2018 Page 5 of 5 11. ADJOURN Labadie moved, Johnson seconded, Adjourning the January 8, 2018 Regular City Council Meeting at 7:44 P.M. Motion passed 510. RESPECTFULLY SUBMITTED, Greg Lerud, City Administrator ATTEST: Sandie Thone, City Clerk ® #2C MEETING TYPE City of Shorewood nib Meeting Item Regular Meeting Title / Subject: Verified Claims Meeting Date: January 22, 2018 Prepared by: Michelle Nguyen, Senior Accountant Greg Lerud, City Administrator Joe Rigdon, Interim Finance Director Attachments: Claims lists Policy Consideration: Should the attached claims against the City of Shorewood be paid? Background: Claims for council authorization. 64238— 64262 & ACH 609,308.63 Total Claims $609,308.63 We have also included a payroll summary for the payroll period ending January 8, 2018. Financial or Budget Considerations: These expenditures are reasonable and necessary to provide services to our residents and funds are budgeted and available for these purposes. Options: The City Council is may accept the staff recommendation to pay these claims or may reject any expenditure it deems not in the best interest of the city. Recommendation / Action Requested: Staff recommends approval of the claims list as presented. Next Steps and Timelines: Checks will be distributed following approval. Account Number Debit Amount Credit Amount Description FUND 101 General Fund 101 -00- 1010 -0000 0.00 75,126.45 CASH AND INVESTMENTS 101 -13- 4101 -0000 10,891.31 0.00 FULL -TIME REGULAR 101 -13- 4103 -0000 121.12 0.00 PART -TIME 101 -13- 4121 -0000 825.93 0.00 PERA CONTRIB - CITY SHARE 101 -13 -4122 -0000 880.99 0.00 FICA CONTRIB - CITY SHARE 101 -13- 4131 -0000 8,261.85 0.00 EMPLOYEE INSURANCE - CITY 101 -13- 4151 -0000 74.83 0.00 WORKERS COMPENSATION 101 -15- 4101 -0000 1,851.94 0.00 FULL -TIME REGULAR 101 -15- 4121 -0000 138.91 0.00 PERA CONTRIB - CITY SHARE 101 -15 -4122 -0000 144.17 0.00 FICA CONTRIB - CITY SHARE 101 -15- 4131 -0000 1,915.84 0.00 EMPLOYEE INSURANCE - CITY 101 -15- 4151 -0000 7.48 0.00 WORKERS COMPENSATION 101 -18- 4101 -0000 5,837.36 0.00 FULL -TIME REGULAR 101 -18- 4121 -0000 437.82 0.00 PERA CONTRIB - CITY SHARE 101 -18 -4122 -0000 458.27 0.00 FICA CONTRIB - CITY SHARE 101 -18- 4131 -0000 5,693.28 0.00 EMPLOYEE INSURANCE - CITY 101 -18- 4151 -0000 15.49 0.00 WORKERS COMPENSATION 101 -24- 4101 -0000 4,120.16 0.00 FULL-TIME REGULAR 101 -24- 4121 -0000 309.01 0.00 PERA CONTRIB - CITY SHARE 101 -24 -4122 -0000 242.26 0.00 FICA CONTRIB - CITY SHARE 101 -24- 4131 -0000 540.00 0.00 EMPLOYEE INSURANCE - CITY 101 -24- 4151 -0000 21.51 0.00 WORKERS COMPENSATION 101 -32 -4101 -0000 9,981.95 0.00 FULL -TIME REGULAR 101 -32 -4105 -0000 737.88 0.00 STREET PAGER PAY 101 -32 -4121 -0000 803.97 0.00 PERA CONTRIB - CITY SHARE 101 -32 -4122 -0000 780.91 0.00 FICA CONTRIB - CITY SHARE 101 -32 -4131 -0000 2,658.08 0.00 EMPLOYEE INSURANCE - CITY 101 -32 -4151 -0000 453.98 0.00 WORKERS COMPENSATION 101 -33- 4101 -0000 3,429.74 0.00 FULL -TIME REGULAR 101 -33 -4102 -0000 134.27 0.00 OVERTIME 101 -33- 4121 -0000 267.30 0.00 PERA CONTRIB - CITY SHARE 101 -33 -4122 -0000 199.19 0.00 FICA CONTRIB - CITY SHARE 101 -33- 4151 -0000 107.92 0.00 WORKERS COMPENSATION 101 -52 -4101 -0000 5,140.39 0.00 FULL-TIME REGULAR PR - G/L Distribution Report (01/08/2018 - 2:44 PM) Page 1 Account Number Debit Amount Credit Amount Description 101 -52 -4121 -0000 385.53 0.00 PERA CONTRIB - CITY SHARE 101 -52 -4122 -0000 463.59 0.00 FICA CONTRIB - CITY SHARE 101 -52 -4131 -0000 5,045.12 0.00 EMPLOYEE INSURANCE - CITY 101 -52 -4151 -0000 236.75 0.00 WORKERS COMPENSATION 101 -53- 4101 -0000 1,262.71 0.00 FULL -TIME REGULAR 101 -53- 4121 -0000 94.70 0.00 PERA CONTRIB - CITY SHARE 101 -53 -4122 -0000 97.83 0.00 FICA CONTRIB - CITY SHARE 101 -53- 4131 -0000 22.69 0.00 EMPLOYEE INSURANCE - CITY 101 -53- 4151 -0000 32.42 0.00 WORKERS COMPENSATION FUND Total: 75,126.45 75,126.45 FUND 201 Southshore Center 201 -00- 1010 -0000 0.00 506.93 CASH AND INVESTMENTS 201 -00- 4101 -0000 430.95 0.00 FULL -TIME REGULAR 201 -00- 4121 -0000 32.32 0.00 PERA CONTRIB - CITY SHARE 201 -00 -4122 -0000 32.80 0.00 FICA CONTRIB - CITY SHARE 201 -00- 4151 -0000 10.86 0.00 WORKERS COMPENSATION FUND Total: 506.93 506.93 FUND 601 Water Utility 601 -00- 1010 -0000 0.00 5,329.72 CASH AND INVESTMENTS 601 -00- 4101 -0000 3,278.52 0.00 FULL -TIME REGULAR 601 -00 -4102 -0000 141.66 0.00 OVERTIME 601 -00- 4105 -0000 368.94 0.00 WATER PAGER PAY 601 -00- 4121 -0000 284.17 0.00 PERA CONTRIB - CITY SHARE 601 -00 -4122 -0000 272.31 0.00 FICA CONTRIB - CITY SHARE 601 -00- 4131 -0000 867.69 0.00 EMPLOYEE INSURANCE - CITY 601 -00- 4151 -0000 116.43 0.00 WORKERS COMPENSATION FUND Total: 5,329.72 5,329.72 FUND 611 Sanitary Sewer Utility 611 -00- 1010 -0000 0.00 4,424.12 CASH AND INVESTMENTS 611 -00- 4101 -0000 2,365.03 0.00 FULL -TIME REGULAR 611 -00 -4102 -0000 278.07 0.00 OVERTIME 611 -00- 4105 -0000 368.94 0.00 SEWER PAGER PAY 611 -00- 4121 -0000 225.93 0.00 PERA CONTRIB - CITY SHARE 611 -00 -4122 -0000 221.35 0.00 FICA CONTRIB - CITY SHARE 611 -00- 4131 -0000 867.69 0.00 EMPLOYEE INSURANCE - CITY 611 -00- 4151 -0000 97.11 0.00 WORKERS COMPENSATION FUND Total: 4,424.12 4,424.12 PR - G/L Distribution Report (01/08/2018 - 2:44 PM) Page 2 Account Number Debit Amount Credit Amount Description FUND 621 Recycling Utility 621 -00- 1010 -0000 0.00 374.39 CASH AND INVESTMENTS 621 -00- 4101 -0000 258.75 0.00 FULL -TIME REGULAR 621 -00- 4121 -0000 19.40 0.00 PERA CONTRIB - CITY SHARE 621 -00 -4122 -0000 19.67 0.00 FICA CONTRIB - CITY SHARE 621 -00- 4131 -0000 75.60 0.00 EMPLOYEE INSURANCE - CITY 621 -00- 4151 -0000 0.97 0.00 WORKERS COMPENSATION FUND Total: 374.39 374.39 FUND 631 Storm Water Utility 631 -00- 1010 -0000 0.00 742.23 CASH AND INVESTMENTS 631 -00- 4101 -0000 378.20 0.00 FULL -TIME REGULAR 631 -00- 4121 -0000 28.35 0.00 PERA CONTRIB - CITY SHARE 631 -00 -4122 -0000 29.99 0.00 FICA CONTRIB - CITY SHARE 631 -00- 4131 -0000 300.70 0.00 EMPLOYEE INSURANCE - CITY 631 -00- 4151 -0000 4.99 0.00 WORKERS COMPENSATION FUND Total: 742.23 742.23 FUND 700 Payroll Clearing Fund 700 -00- 1010 -0000 86,503.84 0.00 CASH AND INVESTMENTS 700 -00- 2170 -0000 0.00 33,538.79 GROSS PAYROLL CLEARING 700 -00- 2171 -0000 0.00 7,658.82 HEALTH INSURANCE PAYABLE 700 -00 -2172 -0000 0.00 5,247.38 FEDERAL WITHHOLDING PAYABLE 700 -00- 2173 -0000 0.00 2,217.11 STATE WITHHOLDING PAYABLE 700 -00- 2174 -0000 0.00 7,686.66 FICA/MEDICARE TAX PAYABLE 700 -00- 2175 -0000 0.00 7,192.89 PERA WITHHOLDING PAYABLE 700 -00- 2176 -0000 0.00 1,701.76 DEFERRED COMPENSATION 700 -00- 2177 -0000 0.00 1,180.74 WORKERS COMPENSATION 700 -00- 2180 -0000 0.00 567.84 LIFE INSURANCE 700 -00 -2182 -0000 0.00 335.44 UNION DUES 700 -00- 2183 -0000 0.00 19,176.41 HEALTH SAVINGS ACCOUNT FUND Total: 86,503.84 86,503.84 Report Total: 173,007.68 173,007.68 PR - G/L Distribution Report (01/08/2018 - 2:44 PM) Page 3 Accounts Payable To Be Paid Proof List User: mnguyen Printed: 01/08/2018 - 3:25PM Batch: 00009.01.2018 - Dec -paid in Jan Invoice Number Invoice Date Amount Quantity Payment Date Task Label Account Number Description CENTERPOINT ENERGY 136 12 -29 -2017 12/29/2017 601 -00- 4394 -0000 UTILITIES - AMESBURY WE 12 -29 -2017 12/29/2017 601 -00- 4396 -0000 UTILITIES - BOULDER BRID 12 -29 -2017 12/29/2017 101 -32- 4380 -0000 UTILITY SERVICES 12 -29 -2017 12/29/2017 101 -52- 4380 -0000 UTILITY SERVICES 12 -29 -2017 12/29/2017 101 -19- 4380 -0000 UTILITY SERVICES 12 -29 -2017 Total: CENTERPOINT ENERGY CITY OF TONKA BAY 149 4th Qtr- 2017 -WA 12/31/2017 601 -00- 4260 -0000 WATER PURCHASES - TONK 4th Qtr- 2017 -WA 12/31/2017 611 -00- 4400 -0000 CONTRACTUAL SERVICES 4th Qtr- 2017 -WA Total: CITY OF TONKA BAY To Close PO Line # 83.52 0.00 01/08/2018 False 20405 Knighsbridge Rd 184.10 0.00 01/08/2018 False 28125 Boulder Bridge 693.11 0.00 01/08/2018 False 24200 Smithtown Rd 152.72 0.00 01/08/2018 False 5745 Ctry Club & 25200 Hwy 7 246.71 0.00 01/08/2018 False 5755 Country Club Rd 1,360.16 1,360.16 835.84 0.00 01/08/2018 False Quarterly Water Service 397.50 0.00 01/08/2018 False Quarterly Sewer Service 1,233.34 1,233.34 AP -To Be Paid Proof List (01/08/2018 - 3:25 PM) Page 1 0 0 0 0 0 0 0 Invoice Number Invoice Date Amount Quantity Payment Date Task Label Account Number Description HAWKINS, INC. 211 4205591 -RI 12/29/2017 250.00 601 -00- 4245 -0000 GENERAL SUPPLIES 4205591 -RI Total: 250.00 HAWKINS, INC. Total: 250.00 HENNEPIN COUNTY INFORMATION TECHNOLOGY DEPARTMET 215 1000102877 12/31/2017 114.36 101 -32- 4321 -0000 COMMUNICATIONS - VOIC 1000102877 Total: 114.36 HENNEPIN COUNTY IN 114.36 INCLINE EXTERIORS 222 12 -12 -2017 12/12/2017 42,916.00 201 -00- 4223 -0000 MAINTENANCE OF BUILDI 12 -12 -2017 Total: 42,916.00 INCLINE EXTERIORS To 42,916.00 LEAGUE OF MINNESOTA CITIES INSURANCE TRUST (0049) 13 CMC39659 -2017 12/31/2017 2,500.00 601 -00- 4360 -0000 INSURANCE CMC39659 -2017 Total: 2,500.00 LEAGUE OF MINNESOT 2,500.00 0.00 01/08/2018 Chlorine 0.00 01/08/2018 Monthly Radio MESB 0.00 01/08/2018 Roof & Gutter Replacement 0.00 01/08/2018 Flood Damage Claimant's Home -Nate Onken - Claim #3820 Type PO # Close PO Line # Reference False False False False AP -To Be Paid Proof List (01/08/2018 - 3:25 PM) Page 2 0 0 0 0 Invoice Number Invoice Date Amount Quantity Payment Date Task Label Type PO # Account Number Description Reference Close PO Line # OPPIDAN 889 Escrow -2017 12/13/2017 1,000.00 0.00 01/08/2018 False 0 880 -00- 2200 -0000 ESCROW DEPOSITS PAYAB Escrow Application Refund Escrow -2017 12/13/2017 10,000.00 0.00 01/08/2018 False 0 880 -00- 2200 -0000 ESCROW DEPOSITS PAYAB Escrow TIE Refund Escrow -2017 12/13/2017 118,238.50 0.00 01/08/2018 False 0 880 -00- 2200 -0000 ESCROW DEPOSITS PAYAB Escrow Landscaping Refund Escrow -2017 12/13/2017 22,842.00 0.00 01/08/2018 False 0 450 -00- 4400 -0019 OPPIDAN SENIOR HOUSING Water Feasiblility & Design Refund Escrow -2017 Total: 152,080.50 OPPIDAN Total: 152,080.50 WSB AND ASSOCIATES INC 410 0- 001608 - 080 -21 11/30/2017 125.00 0.00 01/08/2018 False 0 631 -00- 4303 -0000 ENGINEERING FEES Freeman Park Drainage Analysis 0- 001608 - 080 -21 Total: 125.00 0- 002092 - 710 -33 11/30/2017 88.00 0.00 01/08/2018 False 0 631 -00- 4302 -0009 MS4 SERVICES MS4 Svcs 0- 002092 - 710 -33 Total: 88.00 0- 002925 - 052 -11 11/30/2017 4,000.00 0.00 01/08/2018 False 0 101 -31- 4400 -0000 CONTRACTUAL SERVICES Gen Eng Svc 0- 002925 - 052 -11 Total: 4,000.00 0- 002925 - 150 -19 11/30/2017 152.00 0.00 01/08/2018 False 0 450 -00- 4400 -0019 OPPIDAN SENIOR HOUSING Oppidan Senior Living Dvlmt 0- 002925 - 150 -19 Total: 152.00 0- 002925 - 160 -19 11/30/2017 3,798.50 0.00 01/08/2018 False 0 470 -00- 4303 -0000 ENGINEERING FEES Water Main- TIF- Oppidan AP -To Be Paid Proof List (01/08/2018 - 3:25 PM) Page 3 Invoice Number Invoice Date Amount Quantity Payment Date Task Label Account Number Description Type PO # Close PO Line # Reference 0- 002925 - 160 -19 Total: 3,798.50 0- 002925 - 180 -15 11/30/2017 183.75 0.00 01/08/2018 False 0 631 -00- 4303 -0000 ENGINEERING FEES Public Work Ravine Restoration 0-002925-180-15 Total: 183.75 0- 002925 - 240 -10 11/30/2017 9,615.75 0.00 01/08/2018 False 0 404 -00- 4680 -0020 RIVIERA LAND & SHOREW Riviera Land & Shorewood Ln St 0- 002925 - 240 -10 Total: 9,615.75 0- 002925 - 260 -11 11/30/2017 202.25 0.00 01/08/2018 False 0 404 -00- 4620 -0007 PAVEMENT MARKING Pavement Marking 0- 002925 - 260 -11 Total: 202.25 0- 002925 - 270 -11 11/30/2017 3,320.25 0.00 01/08/2018 False 0 101 -31- 4303 -0000 ENGINEERING FEES Misc. Engineering Support 0- 002925 - 270 -11 Total: 3,320.25 0- 002925 - 290 -10 11/30/2017 268.25 0.00 01/08/2018 False 0 404 -00- 4620 -0006 SEALCOAT PROJECT Sealcoat Project 0- 002925 - 290 -10 Total: 268.25 0- 002925 -300 -9 11/30/2017 33,345.00 0.00 01/08/2018 False 0 402 -00- 4680 -0000 OTHER IMPROVEMENTS Badger Park Phase 2 0- 002925 -300 -9 Total: 33,345.00 0- 002925 -350 -7 11/30/2017 76.00 0.00 01/08/2018 False 0 101 -00- 3414 -0000 PASS -THRU CHARGES Starbuck -TH 7 Vine Hill Rd 0- 002925 -350 -7 Total: 76.00 0- 002925 -360 -6 11/30/2017 1,751.75 0.00 01/08/2018 False 0 101 -31- 4303 -0000 ENGINEERING FEES Comp Plan Eng. Support -2040 0- 002925 -360 -6 Total: 1,751.75 AP -To Be Paid Proof List (01/08/2018 - 3:25 PM) Page 4 Invoice Number Invoice Date Amount Quantity Payment Date Task Label Type PO # Account Number Description Reference Close PO Line # 0- 002925 -370 -8 11/30/2017 3,053.25 0.00 01/08/2018 False 450 -00- 4302 -0016 MINNETONKA COUNTRY C Minnetonka Country Club 2nd Ad 0- 002925 -370 -8 Total: 3,053.25 0- 002925 -400 -7 11/30/2017 4,148.50 0.00 01/08/2018 False 404 -00- 4680 -0027 STREET RECLAMATION IM Street Reclamation Improvement 0- 002925 -400 -7 Total: 4,148.50 0- 003539 -000 -8 11/30/2017 42.50 0.00 01/08/2018 False 601 -00- 4303 -0000 ENGINEERING FEES Well No. 5 Rehab 0- 003539 -000 -8 Total: 42.50 R- 010868 -000 -3 11/30/2017 397.00 0.00 01/08/2018 False 101 -31- 4303 -0000 ENGINEERING FEES LRIP Grant Ctry Club /Yellow /Lk R- 010868 -000 -3 Total: 397.00 R- 010930 -000 -2 11/30/2017 10,224.00 0.00 01/08/2018 False 631 -00- 4303 -0000 ENGINEERING FEES Shwd Ln Ravine Stabilization R- 010930 -000 -2 Total: 10,224.00 R- 011017 -000 -2 11/30/2017 2,910.00 0.00 01/08/2018 False 611 -00- 4303 -0000 ENGINEERING FEES Sanitary Sewer Lining R- 011017 -000 -2 Total: 2,910.00 WSB AND ASSOCIATES 77,701.75 Report Total: 278,156.11 AP -To Be Paid Proof List (01/08/2018 - 3:25 PM) Page 5 0 0 0 0 0 0 Accounts Payable Computer Check Proof List by Vendor User: mnguyen Printed: 01/08/2018 - 3:49PM Batch: 00006.01.2018 - PR -01 -08 -2018 Invoice No Description Amount Payment Date Acct Number Reference Vendor: 12 AFSCME MN COUNCIL 5 - UNION DUES Check Sequence: 1 ACH Enabled: True January -2018 PR Batch 00001.01.2018 Union Dues 335.44 01/08/2018 700 -00- 2182 -0000 PR Batch 00001.01.2018 Union Dues Check Total: 335.44 Vendor: 419 COMMUNITY BANK CHASKA Check Sequence: 2 ACH Enabled: False 2018 -HSA- Bauman 2018 -HSA - Brett & Amanada Baumann 660.60 01/08/2018 700 -00- 2183 -0000 PR Batch 00001.01.2018 HSA - COMMUN Check Total: 660.60 Vendor: 5 EFTPS - FEDERAL W/H Check Sequence: 3 ACH Enabled: True PR -01 -08 -2018 PR Batch 00001.01.2018 Federal Income Tax 5,247.38 01/08/2018 700 -00- 2172 -0000 PR Batch 00001.01.2018 Federal Income I PR -01 -08 -2018 PR Batch 00001.01.2018 FICA Employee Portio 3,114.85 01/08/2018 700 -00- 2174 -0000 PR Batch 00001.01.2018 FICA Employee _ PR -01 -08 -2018 PR Batch 00001.01.2018 FICA Employer Portioj 3,114.85 01/08/2018 700 -00- 2174 -0000 PR Batch 00001.01.2018 FICA Employer ] PR -01 -08 -2018 PR Batch 00001.01.2018 Medicare Employee Pc 728.48 01/08/2018 700 -00- 2174 -0000 PR Batch 00001.01.2018 Medicare Emplo,. PR -01 -08 -2018 PR Batch 00001.01.2018 Medicare Employer Po 728.48 01/08/2018 700 -00- 2174 -0000 PR Batch 00001.01.2018 Medicare Emplo,. Check Total: 12,934.04 Vendor: 2 ICMA RETIREMENT TRUST - 302131 -457 Check Sequence: 4 ACH Enabled: False PR -01 -08 -2018 PR Batch 00001.01.2018 Deferred Comp Flat Ai 1,550.00 01/08/2018 700 -00- 2176 -0000 PR Batch 00001.01.2018 Deferred Comp I PR -01 -08 -2018 PR Batch 00001.01.2018 Deferred Comp Percen 151.76 01/08/2018 700 -00- 2176 -0000 PR Batch 00001.01.2018 Deferred Comp I Check Total: 1,701.76 Vendor: 11 MINNESOTA DEPARTMENT OF REVENUE Check Sequence: 5 ACH Enabled: True PR -01 -08 -2018 PR Batch 00001.01.2018 State Income Tax 2,217.11 01/08/2018 700 -00- 2173 -0000 PR Batch 00001.01.2018 State Income Tax Check Total: 2,217.11 Vendor: 7 MINNESOTA LIFE Check Sequence: 6 ACH Enabled: True January -2018 PR Batch 00001.01.2018 Life Insurance 551.84 01/08/2018 700 -00- 2180 -0000 PR Batch 00001.01.2018 Life Insurance Check Total: 551.84 AP- Computer Check Proof List by Vendor (01/08/2018 - 3:49 PM) Page 1 Invoice No Description Amount Payment Date Acct Number Reference Vendor: 10 NCPERS MINNESOTA Check Sequence: 7 January -2018 PR Batch 00001.01.2018 PERA Life 16.00 01/08/2018 700 -00- 2180 -0000 Check Total: 16.00 Vendor: 665 OPTUM BANK Check Sequence: 8 PR -01 -08 -2018 PR Batch 00001.01.2018 HSA - OPTUM BANK 18,515.81 01/08/2018 700 -00- 2183 -0000 Check Total: 18, 515.81 Vendor: 9 PERA Check Sequence: 9 PR -01 -08 -2018 PR Batch 00001.01.2018 MN -PERA Deduction 3,339.55 01/08/2018 700 -00- 2175 -0000 PR -01 -08 -2018 PR Batch 00001.01.2018 MN PERA Benefit Em 3,853.34 01/08/2018 700 -00- 2175 -0000 Check Total: 7,192.89 Total for Check Run: 44,125.49 Total of Number of Checks: 9 AP- Computer Check Proof List by Vendor (01/08/2018 - 3:49 PM) ACH Enabled: False PR Batch 00001.01.2018 PERA Life ACH Enabled: True PR Batch 00001.01.2018 HSA - OPTUM B. ACH Enabled: True PR Batch 00001.01.2018 MN -PERA Dedu PR Batch 00001.01.2018 MN PERA Benei Page 2 Accounts Payable Computer Check Proof List by Vendor User: mnguyen Printed: 01/18/2018 - 9:14AM Batch: 00007.01.2018 - CC- 01- 22- 18- Dec2017 Invoice No Description Amount Payment Date Acct Number Reference Vendor: 868 BANK OF MONTREAL Check Sequence: 1 ACH Enabled: True Dec - 2017- AutoPD Accela- Annual Maint 7,021.39 01/22/2018 101 -00- 1551 -0000 Dec - 2017- AutoPD Accela- Annual Maint 7,021.39 01/22/2018 101 -15- 4221 -0000 Dec - 2017- AutoPD Culligan Water 96.35 01/22/2018 101 -19- 4245 -0000 Dec - 2017- AutoPD Winstream -City Hall 109.20 01/22/2018 101 -19- 4321 -0000 Dec - 2017- AutoPD Winstream - Public Works 53.01 01/22/2018 101 -32- 4321 -0000 Dec - 2017- AutoPD Waste Management 535.84 01/22/2018 101 -32- 4400 -0000 Dec - 2017- AutoPD Waste Management 212.33 01/22/2018 101 -32- 4400 -0000 Dec - 2017- AutoPD Winstream -3 Parks 164.23 01/22/2018 101 -52- 4321 -0000 Dec - 2017- AutoPD City of Chanhassen 43.54 01/22/2018 101 -52- 4380 -0000 Dec - 2017- AutoPD 48 Barriers - CIP- Freeman Park Ice Rink 8,155.00 01/22/2018 402 -00- 4680 -0000 Dec - 2017- AutoPD Winstream - Badger Well 55.61 01/22/2018 601 -00- 4395 -0000 Dec - 2017- AutoPD Winstream - Boulder Bridge 55.61 01/22/2018 601 -00- 4396 -0000 Dec - 2017- AutoPD Winstream -West Tower 110.72 01/22/2018 601 -00- 4321 -0000 Dec - 2017- AutoPD Accela - Monthly Svc 793.50 01/22/2018 601 -00- 4450 -0000 Dec - 2017- AutoPD Accela - Monthly Svc 793.50 01/22/2018 611 -00- 4450 -0000 Dec - 2017- AutoPD Republic Services 9,854.80 01/22/2018 621 -00- 4400 -0000 Dec - 2017- AutoPD Verizon - Lift Stations 433.62 01/22/2018 611 -00- 4321 -0000 Dec - 2017 - Bauman UPS 6.90 01/22/2018 601 -00- 4208 -0000 Dec - 2017 - Bauman Fedex 20.58 01/22/2018 601 -00- 4245 -0000 Dec - 2017 - Bauman Cub Foods 1.98 01/22/2018 601 -00- 4245 -0000 Dec - 2017 - Bauman Sand & Salt 1,788.20 01/22/2018 101 -33- 4245 -0000 Dec - 2017 - Bauman Sand & Salt 1,000.00 01/22/2018 101 -33- 4245 -0000 Dec - 2017 - Bauman Consolidated Container 358.20 01/22/2018 101 -52- 4245 -0000 Dec - 2017 - Bauman KD & Co. Recycling 40.00 01/22/2018 101 -32- 4400 -0000 Dec - 2017 - Bauman Gas 56.48 01/22/2018 101 -32- 4212 -0000 Dec - 2017 - Bauman UFC Farm Supply 23.08 01/22/2018 101 -32- 4245 -0000 Dec - 2017 - Bauman Shorewood True 11.99 01/22/2018 101 -32- 4245 -0000 Dec - 2017 - Bauman Northern Safety Co. 68.28 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Brown Avagate- Tiffedit.com 59.00 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Brown Adobe 193.42 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Brown Gas 59.42 01/22/2018 101 -32- 4212 -0000 Dec - 2017 -Brown Professional Wireless 1,260.34 01/22/2018 403 -00- 4640 -0000 AP- Computer Check Proof List by Vendor (01/18/2018 - 9:14 AM) Page 1 Invoice No Description Amount Payment Date Acct Number Reference Dec - 2017 -Faschi Gas 935.73 01/22/2018 101 -32- 4212 -0000 Dec - 2017 -Faschi Cub Foods 71.88 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Faschi Shorewood True 7.99 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Grout Oriental Trading 23.49 01/22/2018 101 -53- 4441 -0000 Dec - 2017 -Grout Amazon- Backdrop 65.99 01/22/2018 101 -53- 4441 -0000 Dec - 2017 -Grout Amazon- Monitor & Keyboard 149.44 01/22/2018 201 -00- 4245 -0000 Dec - 2017 -Hanson Shorewood True 134.36 01/22/2018 101 -52- 4245 -0000 Dec - 2017 -Hanson Gas 234.45 01/22/2018 101 -32- 4212 -0000 Dec - 2017 -Heitz Gas 335.98 01/22/2018 101 -32- 4212 -0000 Dec - 2017 -Heitz Red Wing Shoe 249.98 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Heitz BP 24.69 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Heitz Hamel Building Center 876.74 01/22/2018 101 -52- 4245 -0000 Dec - 2017 -Heitz Shorewood True 60.97 01/22/2018 101 -52- 4245 -0000 Dec - 2017 -Heitz Braodway Rental 295.70 01/22/2018 101 -32- 4410 -0000 Dec - 2017 - Lugows Shorewood True 27.50 01/22/2018 101 -32- 4245 -0000 Dec - 2017 - Lugows Shorewood True 32.32 01/22/2018 101 -32- 4245 -0000 Dec - 2017 - Lugows Gas 286.01 01/22/2018 101 -32- 4212 -0000 Dec - 2017 - Lugows Shorewood True 5.91 01/22/2018 101 -19- 4223 -0000 Dec - 2017 - Lugows Pollution Control Agency 345.00 01/22/2018 601 -00- 4331 -0000 Dec - 2017 -Mason Gas 202.64 01/22/2018 101 -32- 4212 -0000 Dec - 2017 -Mason Applied MSS 114.52 01/22/2018 101 -32- 4212 -0000 Dec - 2017 -Mason Shorewood True 74.21 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Mason Lube Tech 587.25 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Mason Northern Tool Equipment 74.16 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Mason UFC Farm Supply 219.98 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Mason Carquest 62.69 01/22/2018 101 -32- 4221 -0000 Dec - 2017 -Mason Boyer Ford Trucks 79.07 01/22/2018 101 -32- 4221 -0000 Dec - 2017 -Mason H & L Mesabi 1,240.16 01/22/2018 101 -33- 4245 -0000 Dec - 2017 -Moore City Hall - Email - Constant Contact 500.00 01/22/2018 101 -19- 4433 -0000 Dec - 2017 -Moore Online Courses 10.00 01/22/2018 101 -13- 4331 -0000 Dec - 2017 -Moore SSCC - Facebook 10.00 01/22/2018 201 -00- 4433 -0000 Dec - 2017 -Moore SSCC - Email - Constant Contact 273.08 01/22/2018 201 -00- 4433 -0000 Dec - 2017 - Pounde Shorewood True 25.98 01/22/2018 101 -52- 4245 -0000 Dec - 2017 - Pounde Red Wing Shoe 250.00 01/22/2018 101 -32- 4245 -0000 Dec - 2017 - Pounde Gas 170.44 01/22/2018 101 -32- 4212 -0000 Dec - 2017 - Pricco Office Depot 95.85 01/22/2018 101 -13- 4200 -0000 Dec - 2017 - Pricco Office Depot 86.34 01/22/2018 101 -13- 4200 -0000 Dec - 2017 - Pricco Office Depot 357.26 01/22/2018 101 -13- 4200 -0000 Dec - 2017 - Pricco Ferguson - Water Meters 1,419.80 01/22/2018 601 -00- 4265 -0000 Dec - 2017 - Pricco Ferguson - Water Meters 1,230.00 01/22/2018 601 -00- 4265 -0000 Dec - 2017 -Stark Gas 222.91 01/22/2018 101 -32- 4212 -0000 Dec - 2017 -Stark Red Wing Shoe 250.00 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Stark Menards 26.52 01/22/2018 101 -32- 4245 -0000 AP- Computer Check Proof List by Vendor (01/18/2018 - 9:14 AM) Page 2 Invoice No Description Amount Payment Date Acct Number Reference Dec - 2017 -Stark The Home Depot 63.90 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Stark Shorewood True 77.30 01/22/2018 101 -32- 4245 -0000 Dec - 2017 -Stark Shorewood True 44.99 01/22/2018 101 -32- 4240 -0000 Dec - 2017 -Thone Crown Trophy 290.00 01/22/2018 101 -11- 4245 -0000 Dec - 2017 -Thone Kowalskis Coffee 14.98 01/22/2018 101 -19- 4245 -0000 Dec - 2017 -Thone Cubs 11.28 01/22/2018 101 -19- 4245 -0000 Dec - 2017 -Thone Dollar Tree 16.13 01/22/2018 101 -19- 4245 -0000 Dec - 2017 -Thone Target 45.37 01/22/2018 101 -19- 4245 -0000 Dec - 2017 -Thone Amazon 28.90 01/22/2018 101 -19- 4245 -0000 Check Total: 52,797.35 Vendor: 891 C. S. McCROSSAN CONSTRUCTION, INC. Check Sequence: 2 ACH Enabled: False PV #11- P02925 -40 P.V. #1 - Project 02925 -40 - Street Reclamation I 101,457.71 01/22/2018 404 -00- 4680 -0027 Check Total: 101,457.71 Vendor: 192 G & K SERVICES Check Sequence: 3 ACH Enabled: False December -2017 City Hall 144.94 01/22/2018 101 -19- 4400 -0000 December -2017 Public Works 1,216.56 01/22/2018 101 -32- 4400 -0000 December -2017 Southshore Center 53.38 01/22/2018 201 -00- 4400 -0000 Check Total: 1,414.88 Vendor: 869 MINNESOTA UNEMPLOYMENT INSURANC Check Sequence: 4 ACH Enabled: False DocID- 11778955 4th Qtr- 2017 - Unemployment -Bruce DeJong 8,851.57 01/22/2018 101 -15- 4141 -0000 Check Total: 8,851.57 Vendor: 421 VERIZON WIRELESS Check Sequence: 5 ACH Enabled: False 9799093645 Sewer & Water - Acct842017386 48.78 01/22/2018 601 -00- 4321 -0000 Acct #842017386 -00001 9799093645 Sewer & Water - Acct842017386 48.79 01/22/2018 611 -00- 4321 -0000 Acct #842017386 -00001 9799093645 S & W Lines - Acct842017386 48.78 01/22/2018 631 -00- 4321 -0000 Acct #842017386 -00001 Credit -Brad -Cell S & W Lines - Acct842017386 -6.64 01/22/2018 631 -00- 4321 -0000 Acct #842017386 -00001 Credit -Brad -Cell Sewer & Water - Acct842017386 -6.64 01/22/2018 611 -00- 4321 -0000 Acct #842017386 -00001 Credit -Brad -Cell Sewer & Water - Acct842017386 -6.64 01/22/2018 601 -00- 4321 -0000 Acct #842017386 -00001 Check Total: 126.43 Vendor: 411 XCEL ENERGY, INC. Check Sequence: 6 ACH Enabled: True 5102846200 -0118 5655 Merry Lane 25.23 01/22/2018 101 -52- 4380 -0000 5655 Merry Lane 5145317119 - 011218 Parks 148.35 01/22/2018 101 -52- 4380 -0000 Parks 5145317119 - 011218 P.W. Street Lights Svc 1,799.53 01/22/2018 101 -32- 4399 -0000 P.W. Street Lights Svc 5145317119 - 011218 C.H.Svcs 2.43 01/22/2018 101 -19- 4380 -0000 C.H.Svcs AP- Computer Check Proof List by Vendor (01/18/2018 - 9:14 AM) Page 3 Invoice No Description Amount Payment Date Acct Number Reference 5145317119 - 011218 P.W. Bldg Svc 33.44 01/22/2018 101 -32- 4380 -0000 5145317119 - 011218 Boulder Bridge 1,271.21 01/22/2018 601 -00- 4396 -0000 5145317119 - 011218 S.E. Area Svc 2,154.38 01/22/2018 601 -00- 4398 -0000 5145317119 - 011218 Street Lights 522.42 01/22/2018 611 -00- 4380 -0000 5145368132122717 5700 County Rd 19 36.01 01/22/2018 101 -32- 4399 -0000 5145368132122717 5700 County Rd 19 - Unit Light 295.88 01/22/2018 101 -32- 4399 -0000 Check Total: 6.288.88 Total for Check Run: 170,936.82 Total of Number of Checks: 6 P.W. Bldg Svc Boulder Bridge S.E. Area Svc Street Lights 5700 County Rd 19 5700 County Rd 19 - Unit Light AP- Computer Check Proof List by Vendor (01/18/2018 - 9:14 AM) Page 4 Accounts Payable Computer Check Proof List by Vendor User: mnguyen Printed: 01/18/2018 - 9:50AM Batch: 00008.01.2018 - CC- 01 -22 -18 Invoice No Description Amount Payment Date Acct Number Reference Vendor: 817 ARCPOINT LABS OF EDEN PRAIRIE Check Sequence: 1 ACH Enabled: False 915 Annual Random Pool Mgmt Fee 480.00 01/22/2018 101 -32- 4305 -0000 Check Total: 480.00 Vendor: 137 CENTURY LINK Check Sequence: 2 ACH Enabled: False 612E451785 -JA18 612 -E45- 1785 -Bldr Brdg 294.00 01/22/2018 601 -00- 4396 -0000 612E458019 -JA18 612 -E45- 8019 -SE Areas 220.50 01/22/2018 601 -00- 4398 -0000 Check Total: 514.50 Vendor: 150 CLASSIC CLEANING COMPANY Check Sequence: 3 ACH Enabled: False 26121 City Hall Monthly Svc 525.00 01/22/2018 101 -19- 4400 -0000 26122 Public Works Monthly Svc 295.00 01/22/2018 101 -32- 4400 -0000 Check Total: 820.00 Vendor: 573 COMPASS MINERALS AMERICA Check Sequence: 4 ACH Enabled: False 159631 Salt & Sand 2,135.45 01/22/2018 101 -33- 4245 -0000 Check Total: 2,135.45 Vendor: 167 ECM PUBLISHERS INC Check Sequence: 5 ACH Enabled: True 562705 Zoning & Subd Teat Amendment 58.75 01/22/2018 101 -18- 4351 -0000 562822 Zoning & Subd Teat Amendment 38.55 01/22/2018 101 -18- 4351 -0000 Check Total: 97.30 Vendor: 200 GOPHER STATE ONE CALL Check Sequence: 6 ACH Enabled: True 8000717 AnnualFee 16.67 01/22/2018 601 -00- 4433 -0000 8000717 AnnualFee 16.66 01/22/2018 611 -00- 4433 -0000 8000717 AnnualFee 16.67 01/22/2018 631 -00- 4433 -0000 Check Total: 50.00 AP- Computer Check Proof List by Vendor (01/18/2018 - 9:50 AM) Page 1 Invoice No Description Amount Payment Date Acct Number Reference Vendor: 707 LAKE MINNETONKA COMMUNICATION G Check Sequence: 7 ACH Enabled: False 1186 Install Shock Mount Plate 99.00 01/22/2018 101 -11- 4400 -0000 Check Total: 99.00 Vendor: 281 METRO CITIES Check Sequence: 8 ACH Enabled: False 72 2018 Membership Dues 3,218.00 01/22/2018 101 -11- 4331 -0000 Check Total: 3,218.00 Vendor: 792 METROPOLITAN AREA MANAGEMENT AS Check Sequence: 9 ACH Enabled: False 2734 Membership - Sandie Thone 45.00 01/22/2018 101 -13- 4433 -0000 Check Total: 45.00 Vendor: 456 MINNESOTA PIPE & EQUIP Check Sequence: 10 ACH Enabled: False 394219 Retainer Nozzle Wrench Head 803.55 01/22/2018 601 -00- 4245 -0000 394248 Parts 56.08 01/22/2018 601 -00- 4245 -0000 Check Total: 859.63 Vendor: 890 EMMANELSON Check Sequence: 11 ACH Enabled: False 2018- ArcticFev 2018 - Arctic Fever Princess Brunch 400.00 01/22/2018 101 -53- 4441 -0000 Check Total: 400.00 Vendor: 317 JEREMY NORMAN Check Sequence: 12 ACH Enabled: False 2018- ArcticFev 2018 - Arctic Fever Expenses Reimbursement 245.65 01/22/2018 101 -53- 4441 -0000 Check Total: 245.65 Vendor: 240 KENNETH POTTS, PA Check Sequence: 13 ACH Enabled: True Campbell- 200513M Forfeiture - Campbell - 2005 BMW 557.00 01/22/2018 101 -16- 4304 -0000 January -2018 Prosectution Monthly Services 2,500.00 01/22/2018 101 -16- 4304 -0000 Olson- 2014Lexus Forfeiture - Olson -2004 Lexus 938.00 01/22/2018 101 -16- 4304 -0000 Check Total: 3,995.00 Vendor: 360 SOUTH LAKE MINNETONKA POLICE DEPA Check Sequence: 14 ACH Enabled: False January- 2018 -013 Monthly- Operating Budget Exp 102,886.08 01/22/2018 101 -21- 4400 -0000 Check Total: 102, 886.08 Vendor: 365 STAR TRIBUNE Check Sequence: 15 ACH Enabled: False 2018 - Newspaper 2018 - Newspapers 171.60 01/22/2018 101 -19- 4433 -0000 AP- Computer Check Proof List by Vendor (01/18/2018 - 9:50 AM) Page 2 Invoice No Description Amount Payment Date Acct Number Reference Check Total: Vendor: 657 SUMMIT COMPANIES 1233271 Annual Fire Extinguisher Inspection Check Total: Total for Check Run: Total of Number of Checks: AP- Computer Check Proof List by Vendor (01/ 18/2018 - 9:50 AM) Check Sequence: 16 73.00 01/22/2018 201 -00- 4400 -0000 73.00 116,090.21 16 ACH Enabled: False Page 3 I M M City of Shorewood Council Meeting Item Title / Subject: Resolution Appointing Hearing Officers 2 D :::] Meeting Date: Monday, January 22, 2018 MEETING TYPE Prepared by: Sandie Thone, City Clerk Regular Meeting Reviewed by: Greg Lerud, City Administrator Attachments: Resolution Policy Consideration: Pursuant to Shorewood City Code Chapter 104 allows for a process for general penalty and enforcement for violation of any provision of the code. City Code, Chapter 104.03 ADMINISTRATIVE ENFORCEMENT OF CODE REGULATIONS, Subdivision 3, Appeal to Hearing Officer. b. Hearing Officer. states that the Shorewood City Council shall by resolution from time to time appoint a list of persons authorized to act as a Hearing Officer. The Hearing Officer is authorized to conduct an informal hearing to determine if a code offense has occurred. The Hearing Officer shall have the authority to uphold or dismiss the citation or reduce, stay or waive the civil penalty imposed upon such terms and conditions as the Hearing Officer shall determine. The Hearing Officer's decision is final, except for appeal in limited cases to the City Council, as set forth in 104.03 Subdivision 4 in the Shorewood City Code. Background: The following persons or entities are recommended for appointment as hearing Officers for the City of Shorewood Code Enforcement: 1) Peter Beck Beck Law Office 4746 Sheridan Avenue South Minneapolis, MN 55410 612.991.1350 2) Karen E. Marty Marty Law Firm, LLC 3800 American Boulevard West Suite 1500 Bloomington, MN 55431 952.921.5859 Mission Statement: The City of Shorewood is committed to providing residents quality public services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial management through effective, efficient, and visionary leadership. Page 1 If appointed Hearing Officers are unavailable, other hearing officers may be obtained. Action Requested: Staff respectfully recommends the city council approve the Resolution Appointing Hearing Officers for the administrative enforcement of code regulations. Motion, second and simple majority vote required. Connection to Vision /Mission: Consistency in providing residents quality public services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial management through effective, efficient, and visionary leadership. CITY OF SHOREWOOD COUNTY OF HENNEPIN STATE OF MINNESOTA RESOLUTION 18 -XX A RESOLUTION APPOINTING ADMINISTRATIVE HEARING OFFICERS FOR THE CITY OF SHOREWOOD WHEREAS, Shorewood City Code, Chapter 104 allows for a process of general penalty and enforcement for violation of any provision of the City Code; and WHEREAS, Shorewood City Code, Chapter 104.03 ADMINISTRATIVE ENFORCEMENT OF CODE REGULATIONS, Subdivision 3, Appeal to Hearing Officer. b. Hearing Officer. states that the Shorewood City Council shall by resolution from time to time appoint a list of persons authorized to act as a Hearing Officer. The Hearing Officer is authorized to conduct an informal hearing to determine if a code offense has occurred. The Hearing Officer shall have the authority to uphold or dismiss the citation or reduce, stay or waive the civil penalty imposed upon such terms and conditions as the Hearing Officer shall determine. The Hearing Officer's decision is final, except for appeal in limited cases to the City Council, as set forth in 104.03 Subdivision 4 in the Shorewood City Code. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Shorewood that the following are appointed as Hearing Officers for the City of Shorewood Administrative Enforcement of Code Regulations: 1) Peter Beck Beck Law Office 4746 Sheridan Avenue South Minneapolis, MN 55410 612.991.1350 2) Karen E. Marty Marty Law Firm, LLC 3800 American Boulevard West Suite 1500 Bloomington, MN 55431 952.921.5859 3) If appointed Hearing Officers are unavailable, other hearing officers may be obtained. ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 22nd day of January 2018. Scott Zerby, Mayor Sandie Thone, City Clerk #2E MEETING TYPE City of Shorewood Council Meeting Item REGULAR Title / Subject: Assessment For Unpaid Utility charge Meeting Date: January 22, 2018 Prepared by: Greg Lerud, City Administrator Policy Consideration: Should the city council approve a utility assessment for 4405 Enchanted Point? Background: Late last year Jack Molin, owner of 4405 Enchanted Point, contacted me about his utility bill. Mr. Molin presented a history of correspondence dating back to 2008 regarding questions he raised then about the charges to the property that is seasonal in nature and can only be occupied for part of the year. The total charges amount to $4,283.76 for all utilities and recycling. It appears from the correspondence and notes that Mr. Molin provided me, he and his wife contacted the city many times to get a resolution to the matter — having been told that it was being worked on. I was not able to find anything here regarding a response. I explained to Mr. Molin that the council makes the final determination on appeals of charges but there are some charges that I explained simply could not be waived — storm sewer and recycling. Financial or Budget Considerations: No material financial consideration. However, as the city council will be considering utility rates in February, the question of charges for seasonal residences should be considered by the council. Options: Assess the $4,283.76 or approve a lesser assessment. Recommendation / Action Requested: Given these circumstances I recommend that the council accept payment of $2,575.43 to settle the outstanding charges for this assessment, with credit for payment received of $571.94. This amount represents the full payment of recycling ($457.00, full storm sewer, $552.51, half of sanitary sewer charge, $1565.92, and waiving late fees, $129.56.) 1 further recommend that the council examine utility rates that could be put in place for properties that are not usable for a portion of the year. A Resolution is not included here because I believe the owner will immediately pay. If he does not, this will be included with the year end comprehensive assessment. Next Steps and Timeline: Staff will communicate the council's decision to the property owner. Mission Statement: The City of Shorewood is committed to providing residents quality public services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial management through effective, efficient, and visionary leadership. Page 1 CITY OF SHOREWOOD PLANNING COMMISSION MEETING TUESDAY, JANUARY 16, 2018 MINUTES CALL TO ORDER Chair Maddy called the meeting to order at 7:03 P.M. ROLL CALL Present Absent: Chair Maddy; Commissioners Davis, Bean, Riedel and Councilmember Kristine Sundberg APPROVAL OF AGENDA Davis moved, Riedel seconded, approving the agenda APPROVAL OF MINUTES November 7, 2017 Reedel moved, Davis seconded, approving the Pl as presented. Motion passed 4/0/1 with Commiss PUBLIC HEARIN The amendments fees are listed. COUNCIL CHAMBERS 5755 COUNTRY CLUB ROAD 7:00 P.M. Planning Director Darling passed 510. Minutes of November 7, 2017, his absence from the meeting. AMENDMENTS REGARDING PROCEDURES JCATIONS noting that the amendments concern a few basic cants furnish mailing labels es are sent for rezonings, preliminary plats, and PUDs een submission of applications and the date of the public e to fees identified in Chapter 1301, the city code chapter where land use In reference to the proposed amendment regarding the amount of time between application submission and the date of the public hearing /meeting, Commissioner Riedel asked if the applicants were protected by the 60 -day rule so that staff couldn't arbitrarily take longer to review applications. He also asked if the language should be amended to say that the public hearing should take place within 60 days. Director Darling replied that the city is able to extend the review period by an additional 60 days and that the deadline is placed on the front page of each staff report. If the applicant needs to revise plans multiple times, the hearing could be scheduled 70 days into the review period and Director Darling asked for the flexibility. Commissioner Riedel stated he was satisfied because the statutory review period protects the applicant. CITY OF SHOREWOOD PLANNING COMMISSION MEETING January 16, 2018 Page 2 of 5 The Planning Commission the reviewed the amendments line by line. In reference to the amendments concerning distance requirements, Commissioner Bean raised a concern that residents could be confused by having the mailing distance at 750 feet for some applications and 500 feet for others. Chair Maddy asked if all applications would be noticed 750 feet or just some. Director Darling replied that the proposal was to increase the notice distance for the most controversial applications (rezoning, subdivisions, and PUDs) to 750 feet, the remainder would be 500 feet. Commissioner Bean suggested that 750 feet may be appropriate for all applications. He asked if the Councilmembers had a passion for the increased notice. Director Darling replied that the Councilmembers were comfortable with the existing 500 feet, but were interested in approving greater distances on a case by case basis. Staff was concerned that some applications would be submitted and could be mailed a notice consistent with the code, but the Council right have preferred a wider notice. Staff thought it was worth one more discussion to avoid a situation where the Council sends the request back to staff to have a wider notice sent. Such a delay could also present an issue with the statutory review deadline. Commissioner Riedel asked what the Council's motivation is for varying the notification distance on a case by case basis. Director Darling responded that it would reflect the controversial nature of an application, like another Minnetonka Golf Course or Oppidan redevelopment application. Commissioner Riedel asked if staff would follow the code or would they increase the distance on their own. Director Darling replied that they would follow code unless directed otherwise. Commissioner Bean said that what the proposal does is stipulate a larger, required distance. Commissioner Riedel Director Darling agreed, but Commissioner Sylvester was c difference was .confusing, stati distance. Commissioner Riedel said that mailed a notice but weren't. Commissioner Davis said enough. doesn't say it can't be sent to a wider notice area. known ahead of time. shouldn't be a problem. d about the cost implications of the greater distance and disagreed that the it is appropriate that the more impactful applications have a wider mailing a set distance would avoid having people upset that they should have been she agreed that having 750 was appropriate for all applications. The lots are big Chair Maddy asked Director Darling if the additional distance was a hardship. Director Darling indicated that it is a lot of notification for variances. Commissioner Bean remembered that the Council thought that notices for variances didn't need to be enlarged. Most variances don't impact the wider neighborhood. Commissioner Riedel asked if the proposal would increase CUPS as most of those are smaller in nature. CITY OF SHOREWOOD PLANNING COMMISSION MEETING January 16, 2018 Page 3 of 5 Chair Maddy summarized that the distance requirements would be left as proposed. Chair Maddy opened the Public Hearing at 7:25 P.M. noting the procedures used in a Public Hearing. As no one was present to speak on the item, he closed the public testimony portion and the public hearing at 7:26 P.M. Bean moved, Davis seconded, recommending approval of the amendment to City Code sections 1201.04, 1201.05, 1201.25, 1202.03 and 1202.09 of City Code as recommended by staff. Motion passed 510. PUBLIC MEETING — SETBACK VARIANCE Applicants: Robert and Joan Wright Location: 6110 Club Valley Road Chair Maddy introduced the item. Director Darling summarized the staff report. Director Darling added a letter received in support of the Road into the minutes. Commissioner Riedel asked if the request would confirmed it would. Chair Maddy recognized the applicant and his c <<compromised audio>> Rob( bought the home in 2001 infer property file to show where the room to accommodate a garage and third stall garage additions, much of their backyard and th <<compromised a the garage addition Commissioner Riedel ask <<compromised audio>> 150 Club Valley Director Darling Builders and Remodelers. Road and Richard . Indicated that he and his wife There was no survey or other documentation in the e property, but staff thought there would be enough fferent options, including detached storage buildings space they need. The detached building takes up too d a greater variance. They have elected to propose )n must show practical difficulties and that the request is the asked if the addition could be setback farther from the property nt and his contractor responded that the curving was not an option and that that reducing the width would not produce a workable space. the addition would require modified trusses. applicant. Commissioner Riedel indicated that the floorplan was helpful to see what could be added without a variance. <<compromised audio>> Mr. Olson stated that he felt that the rain garden/infiltration basin requirement was onerous because the application was under the impervious surface amount allowed by code. Commissioner Riedel asked about how large a rain garden that would be? CITY OF SHOREWOOD PLANNING COMMISSION MEETING January 16, 2018 Page 4 of 5 Mr. Olson indicated that they haven't calculated out the exact size at this point. The applicant indicated that he is trying to preserve as much of the backyard as he can. His yard picks up the water from properties further south and they all drain north through a culvert under Yellowstone Trail. Commissioner Riedel stated that if the property already collects water and then drains to the west, there is a natural area to place the rain garden. The concept is fairly simple. The watershed districts have grants for this type of improvement. Their website has information on grants. Commissioner Davis noted their web address and where the watershed district has then'.. offices. She also stated that the Commission isn't recommending a retention pond, but a lovely natural area and he could add vegetation for pollinators and be a local hero. Commissioner Maddy asked who gives the final approval for the rain garden. Director Darling replied that the City Engineer does. Commissioner Davis gave examples of rain gardens at the Commissioner Maddy indicated the discussion needs to Commissioner Bean indicated that the applicant has shown° nonconformity he meets practical difficulties and, the design is neighborhood. Commissioner Riedel noted that he found the difficulties. Commissioner Maddy asked if anyone had concerns Commissioner Maddy Commissioner Bean raised a'conc the condition have to be deferred u Commissioner Maddy asked if the Director Darling indicated that the heavier clay soils is about 25 perce feet of additional impervious (assu in sandier soils could be smaller as have been requiring rain gardens /it Riedel moved, Sylveste to be 27.1 feet from the conditions: ition for the didn't know items, minim garden. variance and hough the addition increases the with the rest of the house and the ary to alleviate the practical No concerns were noted. large the rain garden would have to be and would designed. should be applied to the building permit. edition should remain with the variance approval. A typical rule of thumb for of the area to be treated. In that case, the addition would be about 800 square ag clay soils), so the rain garden would be about 200 square feet. Rain gardens ey infiltrate faster. They would need to be about 10 percent of the area. Staff tration basins with redevelopment of residential lots and substantial additions. d, recommending approval of the variance application to allow an addition erty line abutting Yellowstone Trail where 35 feet is required subject to two 1. The applicants must submit a survey for the entire property including dimensions. 2. The applicants must submit plans to accommodate on -site storm -water infiltration for the increase in impervious surface coverage using either a rain garden or infiltration basin, show the location of the basin on the survey, and submit all necessary documentation indicating that the feature would function as proposed. Motion passed 510. CITY OF SHOREWOOD PLANNING COMMISSION MEETING January 16, 2018 Page 5 of 5 Director Darling indicated that this item would be on the February 12, 2018 City Council meeting. 5. MATTERS FROM THE FLOOR - None 6. REPORTS • Council Meeting Report Director Darling summarized the following items from the Council's January 8, 20 • Setting the 2018 City Council Regular Meeting Schedule. Dii 2018 Planning Commission meeting schedule at the February • Update on the Mill Street Speed Issues. • Annual Appointments and Designation for the Planning Cc Darling would report the Darling indicated that Councilmember Kristine Sundberg would be 1 the year and Councilmember Johnson for the second half of the year. 2018. Director r the first half of Additionally, two Commissioners (Sylvester and Bean) have indicated that they will not request reappointment. The Council has interviewed replacement candidates and would likely appoint persons to the open positions at their January 22,, 2018 meeting. Commissioner Bean also indicated that he will be absent at next months' meeting. o Director Darling also indicated that long -time Commission recording secretary Christine Freeman has resigned. Her presence and accurate notes were valued and will be missed. • Update on Projects Director Darling noted that the developer for the Minnetonka Country Club has submitted the third and final phase of the development for final plat approval. The proposed development is consistent with the preliminary plat and PUD plans that were reviewed and approved by the Planning Commission and City Council. • Draft Next Meeting Agenda February 6, 2018 conflicts with caucuses scheduled for the state, consequently the next meeting would be February 20, 2018. Director Darling stated there are no applications slated for the February 20, 2018, Planning Commission meeting. She noted she may have some housekeeping items for discussion. 7. ADJO Riedel moved, Davis seconded, adjourning the Planning Commission Meeting of January 16, 2018 at 8:07 P.M. Motion passed 510. RESPECTFULLY SUBMITTED, Marie Darling, Planning Director. #7B MEETING TYPE City of Shorewood Council Meeting Item Regular Meeting Title / Subject: Fees, Procedures and Application Materials Amendment — Chapters 1301, 1201 and 1202 of the Shorewood City Code Meeting Date: January 22, 2018 Prepared by: Marie Darling, Planning Director Reviewed by: Patti Helgesen, Assistant Planner Attachments: Planning Directors Memorandum for January 16, 2018 PC meeting Ordinance Resolution and Summary Publication Ordinance Policy Consideration: Should the Shorewood Fees and Zoning and Subdivision Regulations be amended to revise the Land Use Application fees, procedures and application requirements? Background: See attached memorandum for background. At their January 16, 2018 meeting, the Planning Commission held a public hearing and voted unanimously to recommend adoption of the proposed amendments with no changes. Their discussion is summarized in the minutes. No one from the public requested to speak. Notice of the Planning Commission public hearing was published in both official newspapers. In conformance with State Statute, notice of City Council consideration of the amendment was also posted at City Hall and included in the email notification for general city information and notices. The proposed ordinance was also posted on the city's website. Financial or Budget Considerations: The fee increases are proposed to cover additional expenses related to preparing mailing labels, recording documents with Hennepin County, and publishing legal notices. The increase in the escrow amounts are proposed to cover the cost of having the consulting engineers and attorneys review the initial application, although City Code allows the City to charge additional consulting fees to the applicant. Options: Adopt the draft code amendment; modify the amendments; or refer the amendments back to staff. Recommendation / Action Requested: Staff agrees with the Planning Commission's recommendation and recommends approval. Staff provide the following draft motions: Move to approve an ordinance amending City Code section 1301.03 related to land use fees; sections 1201.04, 1201.05, and 1201.25 (zoning regulations), and sections 1202.03 and 1202.09 of the subdivision regulations. Mission Statement: The City of Shorewood is committed to providing residents quality public services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial management through effective, efficient, and visionary leadership. S:�Plonning�Plonning Files �Applicotions�2017 CURRENT CASES�Fee Increase and procedures amendments�CAF January 22, 2019.d— Page 1 2. Move to approve a resolution adopting a summary publication ordinance and the text of the summary pursuant to MN Statute 331A.01 which would inform the public of the intent and effect of the ordinance without publishing the entire ordinance. Next Steps and Timelines: Once adopted, the summary will be published in the official newspaper. Once published, the ordinance becomes effective. All applications received prior to publication in the official newspaper would be reviewed under the existing standards. Connection to Vision / Mission: Provision of quality public services MEMORANDUM CITY OF SHOREWOOD 5755 Country Club Road • Shorewood, Minnesota 55331 • 952- 960 -7900 Fax: 952- 474 -0128 • www.ci.shorewood.mmus • cityha11 @ci.shorewood.mn.us TO: Planning Commission FROM: Marie Darling, Planning Director MEETING DATE: January 16, 2018 RE: City Code Text Amendments for Zoning and Subdivision Regulations Concerning Administration and Procedures for Applications FILE: 18.01 (Sections 1201.04, 1201.05, 1201.25, 1202.03 and 1202.09 of City Code) Staff proposes "housekeeping amendments" to modify the procedures for zoning and subdivision regulations to accomplish the following tasks: Reflect changing practices regarding mailing labels practices at Hennepin County Increase the distance mailed notices are sent for requests for rezoning, subdivision, and PUD applications Modify the time allowed between submission of applications and the date of the public hearing The proposed language is attached. Staff are also proposing changes to the fees to make sure that application review is self - sustaining and to cover the increased notification and recording costs associated with development applications. The City Council reviews fee increases. Staff also propose to correct two references in the subdivision regulations to the appropriate city code section where the fees for subdivision applications are codified. Mailing labels Many cities' code (including Shorewood's) requires mailing labels to be provided and certified by Hennepin County. Hennepin County has informed all their cities that they will no longer be certifying lists of property owners or providing mailing labels, but has created a service on their website to allow users the ability to create lists of property owners, maps of affected properties and mailing labels. Initially, staff had begun to require that applicants use the website to provide the information. What staff has found in the short time the data base has been available is that we are spending more time assisting and correcting problems with the labels than if we initially created the labels ourselves. Consequently, staff propose to amend the ordinance language to remove the requirement that applicants submit mailing labels and staff will use Hennepin and Carver County mailing label services. Page 2 Mailed notices At a recent City Council worksession, the Council asked staff to research whether the mailing distance is adequate for most applications. As a result of the discussion, the City Council decided to keep the mailing distances the same and review changes on a case by case basis. To be able to provide as much direction as possible for applicants and developers up front, staff proposes to increase the distance requirements for rezoning, subdivision and PUD applications and avoid a situation where the Council needs to redirect staff to widen the notice distance after an application is submitted. Setting the distance requirements ahead of time also prevents conflicts with the land use application review deadlines imposed by State Statute. Public hearing /meeting schedules The current ordinance requirements are very inflexible concerning the time between submission of application materials and the scheduling of public hearings. Staff has proposed allowing more flexibility in the language to permit staff to work with an applicant to improve their application to better meet code requirements prior to bringing the application before the Planning Commission and City Council as may be needed. ATTACHMENTS: Draft Ordinance Amendments Comparison of Cities notice requirements (from City Council worksession) City Site Plan Variance Conditional Use Interim Use Rezoning Comp Plan Amendment Preliminary Plat Minor Subdivision Notice for hearing /meetings Comments on mailed notices Statute 0 0 350 350 350 0 0 0 10 days NA Shorewood 0 500 500 500 500 500 500 0 10 days NA Plymouth 200 200 500 500 750 750 750 NA 10 days Two notices, one upon receipt of app for comp plan, rez, PUD Chaska 350 400 400 NA 400 400 400 NA 10 days NA Chanhassen 500 500 500 500 500 500 500 500 10 days NA Minnetonka 400 400 400 400 400 400 400 400 10 days Both renters and owners are noticed. Excelsior 350 350 350 350 350 350 350 0 10 days NA Maple Grove 0 350 500 NA 500 500 500 500 10 days NA St. Louis Park NA 350 350 NA 350 500 500 0 10 days Two notices, one notifying of PC meeting and one for CC meeting Bloomington 500 200 500 500 500 500 500 0 10 days NA 0 350 350 NA 350 350 350 350 10 days 600 feet for PUDs 500 500 500 NA 500 500 500 500 10 days administrative lot splits have no notice CITY OF SHOREWOOD ORDINANCE NO. 550 AN ORDINANCE AMENDING THE SHOREWOOD CITY CODE AS IT PERTAINS TO FEES, PROCEDURES AND APPLICATION MATERIALS Section 1. City Code Section 1301.03 is hereby amended as follows: 1301.03 LAND USE FEES. LICENSE, PERMIT, SERVICE CHARGES AND MISCELLANEOUS FEES Type of Charge /Fee City Code Charge /Fee VI. Building, Zoning, Land Use Site »�ia fe e :,iee ft;r;,.., l i 2n�2 I $450 Comprehensive plan amendment Pre - application Formal Application $200 $800 plus $1,000 escrow Conditional use permit Residential Non - residential Non residential (tel tien� 1201.04 $200$400 $400 plus $ 100 o $500 plus $1,000 escrow $ 1000 $ 1000 plus esefew Fence permit 1 1201.03 I $20 Interim use permit Residential Non - residential 1201.04 $400 $500 plus $1,000 escrow Planned unit development Concept Stage Development Stage Final Stage By Conditional Use Permit 1201.25 1201.25 1201.25 1201.06 $300 $100 o plus $500 plus $1,000 escrow $300 pips $ 00 o $700 plus $1,000 escrow $300 $100 o plus $500 plus $1,000 escrow $500 plus $1,000 escrow Sign permits TemporgU Permanent 1201.03.1 if $20 Per 1997 U.B.C. Table 1 -A Site plan review 1201.03 $50$200 plus $1,000 escrow Subdivision sketch plan review 1 1202.034 I $200 Subdivision (metes and bo „'^minor subdivision) JJ 1 1202.03 I $35&500 plus $54-00 escrow (thfee lots e less LICENSE, PERMIT, SERVICE CHARGES AND MISCELLANEOUS FEES Type of Charge /Fee City Code Reference Charge /Fee Subdivision (preliminary plat) 5 or fewer lots Over 5 lots 1202.034a(2) $3-5-0600 plus $25 /lot plus an escrow deposit, as follows: $1,000 esefe�v $3,000 Subdivision (final plat) 5 or fewer lots Over 5 lots 1202.03 $500 plus $25 /lot plus an escrow deposit, as follows: $1,000 esefe�v $2,000 Traffic Studies when required as part of another Multiple Escrow for estimated cost application of study to be completed by the City's consulting engineers plus $500. Variances Residential Non - residential 1201.05 and 1202.09 $250 plus WO ° $400 $300 $100 ° plus $500 Zoning Amendment (Text or Mai) 1 1201.04 I $600 plus $1,000 escrow Zoning Permits 1 1201.07 1$20 Park dedication (cash in lieu of land) 1202.07 $6,500 /dwelling unit or 8% of raw land value Extension of plat approval deadline f r fee,.,-ding nesekAiens 1202.03 $200 501 of e figs -n applieatien ° *Note: Base fees are non - refundable. Escrow deposits are to cover consulting engineer, and attorney, and other consultant expenses. Applicants are informed that any city expenses not covered by these fees will be billed to them. Unused escrow fees will be returned to applicant upon written request. Applications with more than one required escrow account shall be required to submit the escrow based on the highest required escrow amount. Building permit D ° t; . v °s'al Reefing pefmit Sidi ° mi 1i n� c S.B.C. S 1997 T T u C SECTION T 4-07 1997 U.B.C. TABLE 1 A A 'TE AND STATE vrrr>: 1300 .0160 $35 LICENSE, PERMIT, SERVICE CHARGES AND MISCELLANEOUS FEES Type of Charge /Fee City Code Reference Charge /Fee Window pefmit T\ eeh a1 pe mit Plumbing permit $7-5 $7-5 StateStuttAe or- value, $35 minimum State Statt A° or- e 1 c /4;. ufe $35 ,,, Removal .,b.,,,,a,.,,ment ,,,1 °,,,,,,,,,,,,,1 tanks U.F.C. $35 fifst tank plus $20 ° 1, additional Demoliti exit S.B.C. $50—* A,ppfoved sign pefmit 4°° D 1997 T T T2 (` 'Table !-A Fenee pe mit 11 ll�z $-20 (_fading /4;11;, g ,-,efmit S.B.C. D 1997 U.B.C. 'Table A- 33 A and A 33 B Homeoe 'HA 1 2n1 n� 1 2 z e200 isp° ; r -nde,-,.,-,.,,n ; gatio system pe 901�� R.O.W. Enefeaeliment 901.01.2b $40 R.O.W. of easementva it 8 R.O.W. A fee 90i.09 $7-5 exe administration Pef additional exeavatien tuVaved area 90i.09 $2-9 r -nde,,,,,,,,,,,,,1 utility /teleee ,., installation direetbefing of tumekng 90i.09 $45 pef 100 r Ft (plus- ° rlfmit fee) r hide,- .,-,.,,,,,a tAility /teleex.,., installation open tFenehing 9 $60 r 100 r Ft (plus- ° LICENSE, PERMIT, SERVICE CHARGES AND MISCELLANEOUS FEES Type of Charge /Fee City Code Charge /Fee Reference Obstmaie 90i.09 $N D fee 1901.09 I dies Section 2. Zoning Regulations Section 1201.04 is hereby amended as follows: 1201.04 ADMINISTRATION, AMENDMENTS AND CONDITIONAL USE PERMITS. Subd.1. Procedure. a. Application. Requests for amendments or conditional use permits, as provided within this chapter, shall be filed with the Zoning Administrator on an official application form. The application shall be accompanied by a fee as provided for by City Council ordinance. This fee shall not be refunded. The application shall also be accompanied by five copies of detailed written and graphic materials fully explaining the proposed change, development or use and list - v^ rprvpcM - owners zvcucr5vv- feet - v^rthe srvdccc b. Staff review /technical assistance reports. Upon receipt of an application for an amendment or conditional use permit, the Zoning Administrator shall, when deemed necessary, refer the request to appropriate staff to insure that informational requirements are complied with. When all informational requirements have been complied with, the request shall be considered officially submitted. Also, when deemed necessary, the Zoning Administrator shall instruct the appropriate staff persons to prepare technical reports and /or provide general assistance in preparing a recommendation on the request to the Planning Commission and City Council. (1) Notwithstanding anything to the contrary in this chapter, all applications for any site plan, conditional use permit, land use permit, variance, or for any other city approval required by this chapter, or to amend this chapter, shall be made in writing on a form provided by the city, if the city has a form, to the Zoning Administrator. The Zoning Administrator is authorized to reject in writing any incomplete application within 15 business days of receipt if the application is incomplete, stating the reasons or its rejection, including what information is missing. This rejection shall be sent by first -class mail to the applicant. Every application shall contain the legal description of the property and a statement of the specific permit or action being sought. Nothing in this section shall be deemed to prevent the city from requesting additional information from the applicant upon which to base a decision. (2) If a dispute arises over a specific fee imposed by the city, the amount of the fee must be deposited and held in escrow, and the person aggrieved by the fee may appeal to district court, as provided by M.S. § 462.361, as it may be amended from time to time. The application shall proceed as if the fee had been paid, pending a decision of the court. C. Public hearing. Upon official submission of the request, the Zoning Administrator shall set a public hearing on the request for the neM a regularly scheduled Planning Commission meeting occurring at least ten working days from the date as a notice of the hearing is published in the official newspaper. The notice shall contain a legal property description and description of the request and shall be published no more than 30 days and no less than ten days prior to the hearing. Written notification of the hearing shall also be mailed at least ten working days prior to the date of the hearing to all owners of land within 500 feet of the boundary of the property in uestienrelated to a conditional /interim use permit and 750 feet of the boundary of the property related to an amendment. Failure of a property owner to receive the notice shall not invalidate any proceedings as set forth within this chapter. Section 3. Zoning Regulations Section 1201.05 Subd. 3 is hereby amended as follows: 1201.05 ADMINISTRATION, VARIANCES AND APPEAL Subd. 3. Variances. a. Criteria. In considering all requests for a variance and in taking subsequent action, the city staff, the Planning Commission and the City Council, serving as the Board of Adjustments and Appeals, may approve a variance application upon finding that all of the following criteria, as applicable, are met: (1) The variance, and its resulting construction and use, is consistent with the intent of the comprehensive plan and in harmony with the general purposes and intent of this Chapter. (2) The applicant has established that there are practical difficulties in complying with this Chapter. Practical difficulties mean: (a) The property owner proposes to use the property in a reasonable manner not permitted by this Chapter. (b) The plight of the landowner is due to circumstances unique to the property not created by the landowner. (c) The variance, if approved, would not alter the essential character of the locality. (3) The variance would not be based exclusively on economic considerations. (4) The variance shall not impair an adequate supply of light and air to adjacent property, unreasonably increase the congestion in the public street, or increase the danger of fire or endanger the public safety. (5) The variance, and its resulting construction or project, would not be detrimental to the public welfare, nor would it be injurious to other land or improvements in the neighborhood. (6) The variance is the minimum variance necessary to address or alleviate the practical difficulties. b. Procedure. (1) Application. Requests for variances, as provided within this chapter, shall be filed with the Zoning Administrator on an official application form. The application shall be accompanied by a fee as provided for by City Council resolution. The application shall also be accompanied by three copies of a survey signed by a land surveyor licensed in the State of Minnesota, and detailed written and graphic materials fully explaining the proposed change, development or use and ° mailing list ails label and ° map or all efty o s leeated within 500 feet o f the subjeet Hennevin Co- Section 4. Zoning Regulations Section 1201.25 Subd. 6 is hereby amended as follows: Subd. 6. Procedure for processing a P. U.D. a. Application conference. Upon filing of an application for P.U.D., the applicant of the proposed P.U.D. is encouraged to arrange for and attend a conference with the Zoning Administrator. The primary purpose of the conference shall be to provide the applicant with an opportunity to gather information and obtain guidance as to the general suitability of his or her proposal for the area for which it is proposed and its conformity to the provisions of this chapter before incurring substantial expense in the preparation of plans, surveys and other data. b. General concept plan. (1) Purpose. The general concept plan provides an opportunity for the applicant to submit a plan to the city showing his or her basic intent and the general nature of the entire development without incurring substantial cost. The following elements of the proposed general concept plan represent the immediately significant elements for city review and comment: (a) Overall maximum P.U.D. density range; (b) General location of major streets and pedestrian ways; (c) General location and extent of public and common open space; (d) General location of residential and nonresidential land uses with approximate type and intensities of development; (e) Staging and time schedule of development; (f) Other special criteria for development; (2) Schedule: (a) Developer meets with the Zoning Administrator to discuss the proposed development; (b) The applicant shall file the concept stage application, together with all supporting data and filing fee as established by City Council resolution; (c) Withi,, 30 days afte - v efifieatio by the staff that � o requife d plan an s "pe .frog data is adequate, Me Planning Commission shall hold a public hearing; (d) The Zoning Administrator, upon verification of the application, shall instruct the City Administrator /Clerk to set a public hearing f�e at a regular meeting of the Planning Commission. The Planning Commission shall conduct the hearing and report its findings and make recommendations to the City Council. Notice of the hearing shall consist of a legal property description, description of request and be published in the official newspaper at least ten days prior to the hearing. Written notification of the hearing shall be mailed at least ten days prior to the hearing to all owners of land within X750 feet of the boundary of the property in question; (e) Failure of a property owner to receive the notice shall not in validate any proceedings as set forth within this chapter; (f) The Zoning Administrator shall instruct the appropriate staff persons to prepare technical reports where appropriate and provide a general assistance in preparing a recommendation on the action to the City Council. Additionally, the request shall be referred to the Park Commission for their review and comment; (g) Upon consent of the City Council, the Planning Commission and city staff shall have the authority to request additional information from the applicant concerning operational factors or to retain expert testimony with the consent and at the expense of the applicant concerning operational factors, the information to be declared necessary to establish performance conditions in relation to all pertinent sections of this chapter; (h) The applicant or a representative thereof shall appear before the Planning Commission at the public hearing in order to answer questions concerning the proposed development; (i) Within 60 days of the public hearing, or the further time as may be agreed to by the applicant, the Planning Commission shall itself review the reports and plans and submit its written report and recommendations to the Council and applicant. The report shall contain the findings of the Planning Commission with respect to the general concept plan. If the planning commission fails to act within the time specified herein, it shall be deemed to have recommended the plan for approval; 0) The Zoning Administrator, upon receipt of the Planning Commission recommendation, shall instruct the City Administrator /Clerk to set a public hearing before the City Council. Notice of the hearing shall consist of a legal property description, description of request and map detailing property location and be published in the official newspaper at least ten days prior to the hearing. Written notification of the hearing shall be mailed at least ten days prior to the hearing to all owners of land within X750 feet of the boundary of the property in question; (k) Council action: (i) Following the required publishing and notification procedure, the City Council shall hold a public hearing; (ii) The applicant or a representative thereof shall appear before the City Council in order to present the planned unit development and answer questions concerning the proposed project; (iii) The Council shall review the proposed development, any reports and recommendations of advisory commissions and city staff and testimony from the public hearing; (iv) In evaluating the request, the Council shall determine the relationship between the proposed development, the Comprehensive Plan and this chapter. Where any question exists as to city policy, the Council may, at any time, refer the project or any specific item within the project back to the Planning Commission for further study and with clarification as to the policy; (v) The City Council shall have the authority to request additional information from the applicant concerning operational factors or to retain expert testimony with the consent and at the expense of the applicant concerning operational factors, the information to be declared necessary to establish performance conditions in relation to all pertinent sections of this chapter; (vi) The City Council may require revisions to or modifications of the general concept plan where deemed necessary. Any revision or modification shall be referred to the Planning Commission for informational purposes; (vii) Within 60 days of their receipt of the concept plan and any reports or recommendations from advisory commissions or city staff, the City Council shall grant approval, resubmit the plan to the Planning Commission for further consideration of specified items or deny approval of the concept plan; (3) Optional submission of development stage plan. In cases of single stage P.U.D.'s or where the applicant wishes to begin the first stage of a multiple stage P.U.D., immediately he or she may, at his or her option, initially submit development stage plans for the proposed P.U.D. In this case, the Planning Commission and Council shall consider the plans, grant or deny development stage plan approval in accordance with the provisions of Subd. 6c. (4) Effect of concept plan approval. Unless the applicant shall fail to meet time schedules for filing development stage and final plans or shall fail to proceed with development in accordance with the plans as approved or shall in any other manner fail to comply with any condition of this chapter or of any approval granted pursuant to it, a general concept plan which has been approved shall not be modified, revoked or otherwise impaired pending the application of development stage and final plans by any action of the city without the consent of the applicant. Problems arising or found to exist during the development or final plan stage of a project may provide cause for the city to require modification of the general concept plan. (5) Limitation ofgeneral concept plan approval. Unless a development stage plan covering at least ten dwelling units or the area designated in the general concept plan as the first stage of the P.U.D., whichever is greater, has been filed within six months from the date Council grants general concept plan approval, or in any case where the applicant fails to file development stage and final plans and to proceed with development in accordance with the provisions of this chapter and of an approved general concept plan, the approval may be revoked by Council action. In this case, the Council shall forthwith adopt a resolution repealing the general concept plan approval for that portion of the P.U.D. that has not received final approval and re- establishing the zoning and other ordinance provisions that would otherwise be applicable. Upon application by the applicant, the Council, at its discretion, may extend for additional periods not in excess of six months each, the filing deadline for any development stage plan, when for good cause shown, the extension is necessary. C. Development stage. (1) Purpose. The purpose of the development stage plan is to provide a specific and particular plan upon which the Planning Commission will base its recommendation to the Council and with which substantial compliance is necessary for the preparation of the final plan. (2) Submission of development stage. Upon approval of the general concept plan and within the time established in Subd. 6b(5) above, the applicant shall file with the Zoning Administrator a development stage plan consisting of the information and submissions required by subdivision 5b for the entire P.U.D. or for one or more stages thereof in accordance with a staging plan approved as part of the general concept plan. The Development Stage Plan shall refine, implement and be in substantial conformity with the approved General Concept Plan. (3) Review and action by city staff and Planning Commission. Immediately upon receipt of a completed Development Stage Plan, the Administrator shall refer the plan to the following city staff and /or official bodies for the indicated action: (a) The City Attorney for legal review of all documents; (b) The City Engineer for review of all engineering data and the City /Developer Agreement; (c) The City Building Official for review of all building plans; (d) The Zoning Administrator for review of all plans for compliance with the intent, purpose and requirements of this chapter and conformity with the General Concept Plan and Comprehensive Plan; (e) The City Planning Commission for review and recommendation to the Council; (f) The Park Commission for review of public recreation and /or open space provisions; (g) When appropriate, as determined by the Zoning Administrator to other special review agencies such as the Watershed Districts, Soil Conservation Services, Highway Departments or other affected agencies. All staff or commissions designated in paragraphs (a) through (d) hereof shall submit their reports in writing to the Planning Commission and applicant at least five days prior to the date of the Planning Commission meeting at which the request is to be heard. (4) Schedule. (a) Developer meets with the Zoning Administrator and city staff to discuss specific development plans. (b) The applicant shall file the Development Stage application within six months after Concept Plan review, together with all supporting data and filing fee as established by City Council resolution. (c) Technical staff reports shall be prepared on the proposed development and distributed to the Planning Commission and the applicant at least five days prior to the date of the Planning Commission meeting at which the request is to be heard. (d) The applicant or a representative thereof shall appear before the Planning Commission in order to answer questions concerning the proposed development. (e) The Planning Commission will make a recommendation to the City Council on the Development Stage Plan. (f) Council action: (i) The applicant or a representative thereof shall appear before the City Council in order to present the Development Stage Plan and answer questions concerning the Plan; (ii) The Council shall review the Development Stage Plan and any reports and recommendations of advisory commissions and city staff, (iii) The Council shall determine the relationship between the Development Stage Plan and the previously approved Concept Plan. (iv) Where deemed necessary, an additional public hearing may be required during the Development Stage of the P.U.D. The public hearing shall be held at the discretion of the City Council and shall comply with the procedures set forth in subdivisions 6b(2)(c) through 0) of this section. (v) The City Council may require revisions to or modifications of the Development Stage Plan where deemed necessary. Any revision or modification shall be referred to the Planning Commission for informational purposes. (vi) The Council shall approve or deny the Development Stage Plan. (vii) If approved, the Council shall instruct the City Attorney to draw up a P.U.D. agreement which stipulates the specific terms and conditions approved by the City Council and accepted by the applicant. This agreement shall be signed by the Mayor of the City of Shorewood, City Administrator /Clerk and the applicant within 30 days of Council approval of the Development Stage Plan. Where the Development Stage Plan is to be resubmitted or denied approval, the Council action shall be by written report setting forth the reasons for its action. In all cases, a certified copy of the document evidencing Council action shall be promptly delivered to the applicant by the Zoning Administrator. (5) Limitation on Development Stage Plan approval. Unless a Final Plan covering the area designated in the Development Stage Plan as the first stage of the P.U.D. has been filed within six months from the date Council grants Development Stage Plan approval, or in any case where the applicant fails to file Final Plans and to proceed with development in accordance with the provisions of this chapter and /or approved Development Stage Plan, the approval shall expire. Upon application by the applicant, the Council, at its discretion, may extend for not more than six months, the filing deadline for any Final Plan when, for good cause shown, the extension is necessary. In any case where Development Plan approval expires, the Council shall forthwith adopt a resolution repealing the General Concept Plan approval and the Development Stage Plan approval for that portion of the P.U.D. that has not received Final Plan approval and reestablishing the zoning and other ordinance provisions that would otherwise be applicable. (6) Site improvements. At any time following the approval of a Development Stage Plan by the Council, the applicant may, pursuant to the applicable ordinances of the city, apply for, and the City Engineer may issue, grading permits for the area within the P.U.D. for which Development Stage Plan approval has been given. d. Final Plan. (1) Purpose. The Final Plan is to serve as a complete, thorough and permanent public record of the P.U.D. and the manner in which it is to be developed. It shall incorporate all prior approved plans and all approved modifications thereof resulting from the P.U.D. process. It shall serve in conjunction with other city ordinances as the land use regulation applicable to the P.U.D. The Final Plan is intended only to add detail to, and to put in final form, the information contained in the Development Stage Plan and shall conform to the Development Stage Plan in all respects. (2) Schedule. (a) Upon approval of the Development Stage Plan, and within the time established by Subd. 6.c.(5) above, the applicant shall file with the Zoning Administrator a Final Plan consisting of the information and submissions required by Subd. 5.c. of this section for the entire P.U.D. or for one or more stages. This plan will be reviewed and approved /denied by city staff, unless otherwise specified by the City Council. (b) Within 30 days of its approval, the applicant shall cause the Final Plan, or the portions thereof as are appropriate, to be recorded with the County Registrar of Titles. The applicant shall provide the city with a signed copy verifying county recording within 40 days of the date of approval. (3) Building and other permits. Except as otherwise expressly provided herein, upon receiving notice from the Zoning Administrator that the approved Final Plan has been recorded and upon application of the applicant pursuant to the applicable ordinances of the city, all appropriate officials of the city may issue building and other permits to the applicant for development, construction and other work in the area encompassed by the approved Final Plan; provided, however, that no permit shall be issued unless the appropriate official is first satisfied that the requirements of all codes and ordinances which are applicable to the permit sought have been satisfied. (4) Limitations on Final Plan approval. Within one year after the approval of the Final Plan for P.U.D., or shorter time as may be established by the approved development schedule, construction shall commence in accordance with the approved plan. Failure to commence construction within the period shall, unless an extension shall have been granted as hereinafter provided, automatically render void the P.U.D. permit and all approvals of the P.U.D. plan and the area encompassed within the P.U.D. shall thereafter be subject to those provisions of the zoning ordinance and other ordinances applicable in the district in which it is located. In this case, the Council shall forthwith adopt an ordinance repealing the P.U.D. permit and all P.U.D. approvals and re- establishing the zoning and other ordinance provisions that would otherwise be applicable. (5) Inspection during development. (a) Compliance with overall plan. Following Final Plan approval of a P.U.D., or a stage thereof, the Zoning Administrator shall, at least annually until the completion of development, review all permits issued and construction undertaken and compare actual development with the approval development schedule. (b) Development not proceeding according to schedule. If the Zoning Administrator finds that development is not proceeding in accordance with the approved schedule, or that it fails in any other respect to comply with the P.U.D. plans as finally approved, he or she shall immediately notify the Council. Within 30 days of the notice, the Council shall either by ordinance revoke the P.U.D. permit and the land shall thereafter be governed by the regulations applicable in the district in which it is located or shall take the steps as it shall deem necessary to compel compliance with the Final Plans as approved or shall require the landowner or applicant to seek an amendment of the Final Plan. Section 5. Subdivision Regulations Section 1202.03 Subd. 2 is hereby amended as follows: 1202.03 PROCEDURES FOR FILING AND REVIEW. Subd. 2. Preliminary Plat. a. Filing. Five copies of the preliminary plat Hennepin County shall be submitted to the Zoning Administrator. The required filing fee as established by City Code Section 1301.03 Couneil fesehi ien shall be paid and any necessary applications for variances from the provisions of this chapter shall be submitted with the required fee. The pfoposal must be submitted by the fif st Tuesday of any given men-th in efdef to be plaeed on the Planning Commission agenda f6f the fifst Tuesday of the following men-th. The plan shall be considered as being officially submitted when all the information requirements have been complied with. b. Public hearing. Upon receipt of the subdivision application, the Zoning Administrator shall set a public hearing for public review of the preliminary plat. The hearing shall be established once adequate time has been allowed for staff and advisory body review of the plat. The Planning Commission shall conduct the hearing and report its findings and make recommendations to the City Council. Notice of the hearing shall contain a legal property description, description of request detailing property location and be published in the official newspaper no more than 30 and no less than ten days prior to the hearing. Written notification of the hearing shall be mailed no more than 30 and no less than ten days prior to the hearing to all owners of land within X750 feet of the boundary of the property in question. Section 6. Subdivision Regulations Section 1202.03 Subd. 2 a. 1. is hereby amended as follows: 1202.09 VARIANCES AND APPEALS. Subd. 1. Findings. The Planning Commission may recommend a variance from the minimum standards of this chapter, but not procedural provisions, when in its opinion, undue hardship may result from strict compliance. In recommending any variance, the Commission shall prescribe any conditions that it deem necessary to or desirable for the public interest. In making its recommendations, the Planning Commission shall take into account the nature of the proposed use of land and the existing use of land in the vicinity, the number of persons to reside or work in the proposed subdivision and the probable effect of the proposed subdivision upon traffic conditions in the vicinity. A variance shall only be recommended when the Planning Commission finds: a. There are special and highly unique circumstances or conditions affecting the property that are not common to other properties in the city and that the strict application of the provisions of this chapter would deprive the applicant of the reasonable and minimum use of its land; b. That the granting of the variance will not be detrimental to the public health or welfare or injurious to other property in the vicinity in which the property is situated; C. That the variance is to correct inequities resulting from an extreme hardship limited to topography, soils or other physical factors of the land. d. After consideration of the Planning Commission recommendations, the City Council may grant variances, subject to a, b, and c, above. Subd. 2. Variance application procedures. a. Procedure. (1) Application. Appeals or requests for variances, as provided within this chapter, shall be filed with the Zoning Administrator on an official application form. The application shall be accompanied by a fee as p,-,.vide,a f r established by City Code Chapter 1301.03'�-� r'4-� r�,.,,nei fese Aie . This fee shall not be refunded. The application shall also be accompanied by five copies of detailed written and graphic materials fully explaining the proposed change, development or use and ° mailing list of pfope fty o ° s leeated .. it —hi,, 500 Section 7. This Ordinance shall be in full force and effect upon publication in the Official Newspaper of the City of Shorewood. ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this day of 2018. Scott Zerby, Mayor ATTEST: Sandie Thone, City Clerk CITY OF SHOREWOOD RESOLUTION NO. A RESOLUTION APPROVING PUBLICATION OF ORDINANCE NO. 550 BY TITLE AND SUMMARY WHEREAS, at a duly called meeting on January 22, 2018, the City Council of the City of Shorewood adopted Ordinance No. 550 entitled "AN ORDINANCE AMENDING CHAPTERS 1301, 1201 AND 1202 OF THE SHOREWOOD CITY CODE RELATED TO FEES, PROCEDURES AND APPLICATION MATERIALS "; and, WHEREAS, The City Council has adopted a lengthy ordinance related to fees, procedures and application procedures for land use applications. The purpose of this summary is to inform the public of the intent and effect of the ordinance and to publish only a summary of the ordinance with the full ordinance being on file in the office of the City Clerk during regular office hours; NOW THEREFORE, IT IS HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD: The City Council finds that the above title and summary of Ordinance No. 550 clearly informs the public of intent and effect of the Ordinance. 2. The City Clerk is directed to publish Ordinance No. 550 by title and summary, pursuant to Minnesota Statutes, Section 412.191, subdivision 4. Such summary is to be substantially the same as the attached form. A full copy of the Ordinance is available at Shorewood City Hall and on the city's website. ADOPTED by the Shorewood City Council on this 22"d day of January 2018. ATTEST: Sandie Thone, City Clerk Scott Zerby, Mayor (Official Publication) CITY OF SHOREWOOD COUNTY OF HENNEPIN STATE OF MINNESOTA ORDINANCE 550 (SUMMARY PUBLICATION) AN ORDINANCE AMENDING CHAPTERS 1301, 1201 AND 1202 OF THE SHOREWOOD CITY CODE RELATING TO FEES, PROCEDURES AND APPLICATION MATERIALS 1301.03 LAND USE FEES 1201.04 ADMINISTRATION, AMENDMENTS AND CONDITIONAL USE PERMITS 1201.05 ADMINISTRATION, VARIANCE AND APPEAL 1201.25 P.U.D. PLANNED UNIT DEVELOPMENT DISTRICT 1202.03 PROCEDURES FOR FILING AND REVIEW 1202.09 VARIANCES AND APPEALS Ordinance becomes effective upon publication. The amendments in their entirety are available for review in the City Clerk's office. Adopted by the Shorewood City Council on January 22, 2018. s/s Sandie Thone, City Clerk y #8A MEETING TYPE City of Shorewood Council Meeting Item Regular Meeting Title / Subject: Receive Updated Feasibility Report and Authorize Preparation of Plans and Specifications for the 2018 Street and Utility Improvement Project, City Project 17 -04 Meeting Date: January 22, 2018 Prepared by: Alyson Fauske, PE, City Engineer Reviewed by: Larry Brown, PE, Public Works Director Attachments: Feasibility Report prepared by WSB, January 22, 2018 Resolution Resident comments (2) Background: On September 6, 2017, the Shorewood City Council authorized the preparation of a revision to the Engineering Feasibility Report for the 2018 Street and Utility Improvement Project to include Mann Lane and Maple Street; the original improvement project included the reconstruction of Riviera Lane from Yellowstone Trail to the cul -de -sac and Shorewood Lane from Smithtown Road to the cul -de -sac. Subsequent to the October 9, 2017 City Council Work Session, WSB was directed to analyze the feasibility of installing a trail along Country Club Road (current terminus to Yellowstone Trail) and Yellowstone Trail (Country Club Road to Lake Linden Drive) since Yellowstone Trail is contiguous to Riviera Lane. The project includes street, drainage and utility improvements generally consisting of reconstruction of the street meeting City design standards with concrete curb and gutter, storm sewer, and minor sanitary sewer improvements related to reduction in inflow and infiltration into the system. Watermain extension was evaluated with the original feasibility study. The watermain work was removed from the project scope due to the significant impact to the city's water fund to extend the portion within Yellowstone Trail and the extended time anticipated to replenish the fund via water connections. Staff has been contacted by two residents on Riviera Lane who want the watermain to be included in the project and has explained why watermain extension is not proposed at this time. An email from one of the residents is included in the packet. The other resident requested the City's petition form in effort to provide staff and council proof of resident support for the watermain extension, including residents along Yellowstone Trail. Staff indicated that the council would be considering the project scope at the January 22nd meeting and has not heard back from the resident at the time of writing this report. Staff recommends that Maple Street be removed from the project since storm sewer improvements outside of the project area are required. Improvements to Maple Street should be included with future improvements to Lake Linden Drive. Staff recommends not to proceed with the trail extension as it is typically more cost - effective to construct trails in conjunction with a street improvement project, anticipated additional future costs during street reconstruction as portions of the trail would likely need to be removed and replaced due Mission Statement; The City of Shorewood is committed to providing residents quality public services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial management through effective, efficient, and visionary leadership. Page 1 alignment changes, and watershed district permitting would be an issue without installing storm water mitigation features within the right of way corridor. The street improvements described in the Feasibility Report are necessary, cost effective, and feasible. Financial or Budget Considerations: The total estimated project cost is summarized below. Street Improvement Cost Total Project Cost Surface Improvements $600,300.00 Riviera Lane Sanitary Improvements $19,300.00 $779,700.00 Drainage Improvements $160,100.00 Surface Improvements $411,000.00 Shorewood Lane Sanitary Improvements $54,300.00 $524,600.00 Drainage Improvements $59,300.00 Surface Improvements $280,400.00 Mann Lane Sanitary Improvements $12,200.00 $362,800.00 Drainage Improvements $70,200.00 Surface Improvements $366,900.00 Maple Street Sanitary Improvements $0.00 $466,600.00 Drainage Improvements $99,700.00 Surface Improvements $572,900.00 Country Club Road Sanitary Improvements $2,500.00 $588,400.00 Drainage Improvements $41,100.00 Surface Improvements $488,100.00 Yellowstone Trail Sanitary Improvements $4,900.00 $574,700.00 Drainage Improvements $81,700.00 TOTAL $3,324,900.00 Options: Staff recommends that the Council consider the following actions: 1. Approve the attached resolution Receiving the Feasibility Report and Authorize the Preparation of Plans and Specifications for the Mann Lane, Riviera Lane and Shorewood Lane Street and Utility Improvements. 2. Direct staff to modify plans. 3. Take no action at this time Recommendation /Action Requested: Staff recommends the City Council approve the attached resolution Receiving the Feasibility Report and Authorize the Preparation of Plans and Specifications for the Mann Lane, Riviera Lane and Shorewood Lane Street and Utility Improvements, City Project 17 -04. Next Steps and Timelines: City Council approves final plans and specifications, authorizes advertisement for bids- March, 2018 City Council award construction contract- May, 2018 Begin construction- May /June, 2018 Construction substantially complete- September, 2018 Final completion — Spring, 2019 RIVIERA LANE, SHOREWOOD LANE, MANN LANE, AND MAPLE STREET IMPROVEMENTS AND TRAIL EXTENSION ALONG COUNTRY CLUB ROAD AND YELLOWSTONE TRAIL CITY OF SHOREWOOD I HENNEPIN COUNTY I MINNESOTA JANUARY 22, 2018 Prepared for: City of Shorewood 5755 Country Club Road Shorewood, MN 55331 CITY OF SHOREWOOD PROJECT NO. 17 -04 WSB PROJECT NO. 2925 -24 FEASIBILITY REPORT RIVIERA LANE, SHOREWOOD LANE, MANN LANE, AND MAPLE STREET IMPROVEMENTS AND TRAIL EXTENSION ALONG COUNTRY CLUB ROAD AND YELLOWSTONE TRAIL CITY PROJECT NO. 17 -04 CITY OF SHOREWOOD, MINNESOTA January 22, 2018 Prepared By: A Feasibility Report Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 AP 178 East g`" Street, Suite 200 1 St. Paul, MN 55101 1 (651) 286 -8450 January 22, 2017 Honorable Mayor and City Council City of Shorewood 5755 Country Club Road Shorewood, MN 55331 Re: Feasibility Report Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 W SB Project No. 2925 -24 Dear Honorable Mayor and City Council: Transmitted herewith for your review is a Feasibility Report for the above referenced project. The report addresses the improvements along Riviera Lane south of Yellowstone Trail, Shorewood Lane north of Smithtown Road, Mann Lane east of Eureka Road, and Maple Street east of Lake Linden Drive. The proposed project includes road reconstruction complete with bituminous paving and concrete curb and gutter. Additional improvements included in this report include extension of trail along Country Club Road from Mary Lake Trail to Yellowstone Trail and along Yellowstone Trail from Country Club Road to Lake Linden Drive. The report contained herein presents costs for the project as well as proposed funding. We are available at your convenience to discuss this report. Please feel free to contact me at (763) 512 -5244 if you have any questions regarding this proposed project. Sincerely, WSB & Associates, Inc. Alyso Fauske, PE City Engineer Enclosure Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com CERTIFICATION I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Date: January 22, 2018 Lic. No. 23359 Quality Control Review Completed By: on Fauske, PE Date: Date: January 22, 2018 Lic. No. 42437 Feasibility Report Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 TABLE OF CONTENTS TITLE SHEET LETTER OF TRANSMITTAL CERTIFICATION SHEET TABLE OF CONTENTS 1. EXECUTIVE SUMMARY ....................................................................... ..............................2 2. STREET AND UTILITY IMPROVEMENT PROJECT ...................... ..............................3 2.1 Introduction ........... ............................... 2. 1.1 Authorization ........................... 2.1.2 Scope ........ ............................... 2.1.3 Data Available ......................... 2.1.4 Project Background ................. 2.2 Existing Conditions .............................. 2.2.1 Roadway ... ............................... 2.2.2 Drainage ... ............................... 2.2.3 Sanitary Sewer ......................... 2.2.4 Watermain ............................... 2.2.5 Private Utilities ........................ 2.3 Proposed Improvements ....................... 2.3.1 Roadway ... ............................... 2.3.2 Drainage ... ............................... 2.3.3 Sanitary Sewer ......................... 2.3.4 Watermain ............................... 2.3.5 Trail Extension ........................ 2.3.6 Street Sign Replacement.......... 2.3.7 Mailbox Replacement .............. 2.3.8 Easements . ............................... 2.3.9 Permits /Approvals ................... 2.3.10 Detour Routes /Project Phasing 2.3.11 Public Involvement .................. 3. FINANCING 3.1 Opinion of Cost 3.2 Funding ............ 4. PROJECT SCHEDULE 5. CONCLUSIONS AND RECOMMENDATIONS Appendix A - Figures Appendix B - Opinion of Probable Cost Appendix C - Geotechnical Boring Logs Appendix D - Sanitary Sewer Televising Summary .3 .3 .3 .3 .4 .5 .5 .5 .6 .6 .6 .7 .7 .7 .8 .8 .8 .9 .9 10 10 10 10 11 11 11 12 13 Feasibility Report Page 1 Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 1. EXECUTIVE SUMMARY The Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension along Country Club Road and Yellowstone Trail, City Project No. 17 -04, was initiated by the City Council at their September 11, 2017, regular City Council meeting. Improvements proposed for construction in 2018 include the reconstruction of Riviera Lane south of Yellowstone Trail, Shorewood Lane north of Smithtown Road, Mann Lane east of Eureka Road, and Maple Street east of Lake Linden Drive, approximately 2,450 feet (0.47 miles). The proposed improvements include removing the existing pavement, correcting the subgrade, installing concrete curb and gutter, storm sewer, and installing new pavement. Additional improvements for consideration include extension of bituminous trail along Country Club Road from Mary Lake Trail to Yellowstone Trail and along Yellowstone Trail from Country Club Road to Lake Linden Drive. A map illustrating the project location can be found on Figure 1 of Appendix A. The total estimated project cost for the Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension along Country Club Road and Yellowstone Trail is approximately $3,324,900. Funding for the project will be provided through the City's Street Reconstruction Fund, Storm Water Fund, and Sanitary Sewer Fund. The project reconstruction can be completed, including the first lift of bituminous paving and restoration items, in 2018. The final lift of bituminous paving is proposed to be installed in June of 2019. This project is feasible, necessary, and cost effective from an engineering standpoint and should be constructed as proposed herein. Financial feasibility will need to be considered by the City Council. Feasibility Report Page 2 Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 2. STREET AND UTILITY IMPROVEMENT PROJECT 2.1 Introduction 2.1.1 Authorization On September 11, 2017, the Shorewood City Council authorized the preparation of an Engineering Feasibility Report for the Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension along Country Club Road and Yellowstone Trail. This project has been designated as City Project No. 17 -04. 2.1.2 Scope Improvements outlined within this report include the reconstruction of Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street to an urban section with concrete curb and gutter meeting the current City design standard, drainage improvements, and sanitary sewer rehabilitation. Additional improvements for consideration include extension of bituminous trail along Country Club Road from Mary Lake Trail to Yellowstone Trail and along Yellowstone Trail from Country Club Road to Lake Linden Drive. The project area is shown in Figure 1 of Appendix A. 2.1.3 Data Available Information and materials used in the preparation of this report include the following: • City of Shorewood Pavement Management Plan • City of Shorewood Record Plans • City of Shorewood Base and Topography Maps • Private Utility Maps • Field Observations of the Area • Field Topography Survey • Geotechnical Evaluation Report prepared by American Engineering Testing dated January 2017 • Televising Reports of the Sanitary Sewer System, Hydro -Klean dated December 2016 • City of Shorewood Assessment Policy • Neighborhood Informational Meeting held December 7, 2017 Feasibility Report Page 3 Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 2.1.4 Project Background The feasibility report for the project was originally presented to City Council in 2017 and included the reconstruction of Riviera Lane and Shorewood Lane only complete with extension of watermain to serve properties currently being service by individual, onsite wells. However, extension of watermain was determined not to be cost effective for the budget at that time and the project was postponed. On August 14, 2017, the Council was presented with a revised Capital Improvement Plan schedule that included the reconstruction of Riviera Lane, Shorewood Lane, Mann Lane and Maple Street for the 2018 construction season, excluding extension of watermain. This project was initiated through the continued development and implementation of the City of Shorewood's Pavement Management Plan. The Pavement Management Plan provides a schedule for the various roadway improvements that are necessary to maintain the City streets in an effective and efficient manner. City streets are evaluated and the pavement management plan schedule revised according to the pavement condition ratings. Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street have been evaluated with a Pavement Surface Evaluation and Rating (PASER) rating of 6, 5, 5, and 4 respectively, on a condition scale from 1 to 10 in 2016. Prior year's ratings ranged from 3 to 4 but have increased mainly due to patching and sealcoat activities. The following conditions have been identified within the project area: • Existing streets do not meet City minimum roadway standards with concrete curb and gutter. • Deterioration of the existing streets including alligator cracking, edge cracking, transverse cracking, and longitudinal cracking. • The roadway exhibits drainage issues due to roadway deformation and inadequate drainage systems (ditches or storm sewer). • Sanitary sewer has been found to have minor deficiencies including leaking joints and traces of mineral deposits. Feasibility Report Page 4 Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 2.2 Existing Conditions 2.2.1 Roadway Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street were originally constructed in 1972 when the sanitary sewer was constructed and are experiencing various severities of distresses including alligator, block, transverse, and longitudinal cracking, along with localized drainage issues. The proposed reconstruction area consists of 22 -32- foot -wide rural section (no curb and gutter) roadways. Soil borings taken within Riviera Lane and Shorewood Lane indicate the existing asphalt thickness ranges from 2.75 inches to 5.25 inches and the underlying soils in the area consist of silty sand fill, clayey sand fill, and sandy lean clay. A copy of the soil boring results is included in Appendix C of this report. Additional boring will be completed along Mann Lane and Maple Street during final design. The City right -of -way within the proposed reconstruction project consists of 50 feet along Riviera Lane and Shorewood Lane, 33 feet — 41.5 feet along Mann Lane, and 60 feet along Maple Street. The project area is surrounded primarily by residential properties that contain landscaping, trees, and numerous other private improvements beyond the edge of the roadway and within the City right -of -way. 2.2.2 Drainage Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street are currently graded as rural section roads with and without ditches The existing drainage system does not provide an adequate means for conveyance of storm water runoff Coupled with the lack of curb, localized ponding occurs on and adjacent to the roadways, within the boulevards and yard areas. Runoff from Riviera Lane is conveyed to the south where surface water outlets to existing ponds located on the east side of Riviera Lane midblock, and southwest of Riviera Lane through side yards at the cul -de -sac. Runoff from Shorewood Lane is conveyed to the north and collected at a catch basin located on the east side of the cul -de -sac that outlets to a pond located east of Shorewood Lane and west of Lawtonka Drive. Runoff from Mann Lane is conveyed to an existing low point east of the driveway at 25350 Mann Lane. Surface water continues north to an existing wetland. Runoff from Maple Street is conveyed to the north along the east side of Lake Linden Drive where it eventually drains to Lake Linden. Lake Linden Drive consists of a shallow ditch system along the west side of the roadway. The lack of ditches and storm facilities along the east side of the roadway has created erosion issues along the existing banks and contributed to the deterioration of the roadway edges. Feasibility Report Page 5 Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 2.2.3 Sanitary Sewer The existing sanitary sewer system in the project area consists of 9- inch - diameter polyvinyl chlorinated (PVC) pipe sewer constructed in 1972. The existing sanitary sewer along Riviera Lane and Shorewood Lane was televised by Hydro -Klean in 2016 and the mainline sewer was found to be in good condition with minor deficiencies including traces of mineral deposits and manhole joints in need of re- grouting. A summary of the sanitary sewer televising and manhole inspections can be found in Appendix D of this report. The remaining sanitary sewer along Mann Lane and Maple Street will be televised during final design. 2.2.4 Watermain There is no existing watermain along Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street and properties are served by private wells for water supply. 2.2.5 Private Utilities Private utilities within the project area include communications, gas, and electric facilities. A meeting will be held with the utility companies during the final design stage to coordinate utility conflicts and construction schedule. Private utility companies that have been identified with facilities in the general project area include: • CenturyLink (Telephone /Internet) • CenterPoint Energy (Gas) • Jaguar Communications (Telephone /Internet) • Mediacom (Cable) • Xcel Energy (Electric) • Metropolitan Council Environmental Services (MCES) Commission Feasibility Report Page 6 Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 2.3 Proposed Improvements 2.3.1 Roadway Riviera Lane, Shorewood Lane, and Maple Street are proposed to be reconstructed to the City's Design Standard for a residential, urban roadway, consisting of a 28 -foot street width, as measured to back -of -curb, with surmountable concrete curb and gutter. Shorewood Lane was previous reconstructed from County Road 19 to the Fire Station entrance. This segment is proposed to be milled with bituminous overlay. Mann Lane is proposed to be constructed as a residential, urban roadway, consisting of a reduced width of 26 feet, as measured to back -of -curb due to limited right -of -way. Reconstruction of the roadways will include the following section: two - inches (2 ") of bituminous wear course, two - inches (2 ") of bituminous base course, eight- inches (8 ") of Class 5 aggregate base, twenty- four - inches (24 ") of select granular material, and geotextile fabric over an acceptable and compacted subgrade. The geotextile fabric is intended to separate the underlying in -situ clayey materials from the new granular materials. Improvements along Riviera Lane and Shorewood Lane include reconstructing the existing cul -de -sac to meet the City's Design Standard of 90 feet in diameter. To reconstruct the cul -de -sac on Riviera Lane, the work may impact adjacent property area and may require temporary construction easements. Improvements along Maple Street include constructing a 50 -foot diameter cul -de -sac at the east side. In order to construct the cul -de -sac to the City standard of 90 feet, the work would not only impact adjacent property area but would require additional permanent right -of -way. Maple Street is a short street section of 200 feet with only three properties with direct access to the roadway. The proposed typical sections for Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street are shown on Figure 2, Figure 3, Figure 4, and Figure 5 in Appendix A. Reconstruction of the existing streets is intended to improve the design strength of the pavement system and provide a street surface with an extended life meeting current City Design Standards. 2.3.2 Drainage Reconstruction of the road provides the opportunity to improve drainage in the area with the installation of storm sewer facilities. The drainage system will be improved with the addition of catch basins along the roadway to better accommodate area drainage and the extension of new storm sewer where facilities do not currently exist. Feasibility Report Page 7 Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 Additional drainage improvements proposed along Maple Street include expanding storm sewer facilities along Lake Linden Drive and replacing the existing outlet to Lake Linden. Expansion of the storm sewer along Lake Linden Drive will require the existing bituminous trail to be removed and replaced, tree impacts, and portions of the roadway to be patched to facilitate construction. The proposed storm sewer for Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street are shown on Figure 2, Figure 3, Figure 4, and Figure 5 in Appendix A. 2.3.3 Sanitary Sewer The proposed sanitary sewer improvements include adjusting existing manhole castings to the new roadway surface with chimney seals to reduce inflow and infiltration of storm water into the manholes. It is also proposed to repair damaged sanitary sewer identified in the sewer televising tapes including minor point repairs, pipe sewer cleaning and manhole grouting. Public Works has identified sanitary sewer that is close to a house and will cause problematic maintenance in the future. The project includes relocation of the sanitary sewer in the Shorewood Lane right -of -way. The relocation of the sanitary sewer is identified in Figure 3 of Appendix A. 2.3.4 Watermain Extension of the watermain is not proposed with these improvements. The Water Fund is not sufficient to fund watermain extension for these projects along with other projects within the City's Capital Improvements. 2.3.5 Trail Extension Trail extension improvements include a 10 -foot bituminous trail along Country Club Road from Mary Lake Trail to Yellowstone Trail and along Yellowstone Trail from Country Club Road to Lake Linden Drive. The design will consider the preservation of neighborhood features such as trees, landscaping, driveways, and wetlands; however, there will be impacts to these items throughout the corridor. Trail extension along the west side of Country Club Road and south side of Yellowstone Trail will provide an off - street access route for pedestrians between Minnetonka Country Club and Lake Linden Drive. The proposed location of the trail provides a route for pedestrians to avoid crossing higher volume roadways. Proposed trail improvements along Country Club Road include reconstructing Country Club Road between Mary Lake Trail and Yellowstone trail, installing new concrete curb and gutter along the west side of Country Club Road to provide separation from the trail and convey drainage of the street section. The proposed typical section for Country Club Road is shown on Figure 6 in Appendix A. Feasibility Report Page 8 Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 Proposed trail improvements along Yellowstone Trail include installing new concrete curb and gutter as necessary along the south side of the roadway to minimize impacts to adjacent wetlands. The proposed trail would be constructed with a variable boulevard (Yellowstone Trail is not centered on the existing road right -of -way) and a 2- foot -wide grass buffer from the outside edge of the trail to the right -of -way line when possible. In areas of limited right -of -way, topographic features, or that have potential for wetland impacts, retaining walls are proposed to minimize impacts and reduce easement requirements. Topographic survey will be completed during final design. The proposed typical section for Yellowstone Trail is shown on Figure 7 in Appendix A. The proposed pavement section for the trails will consist of 3 inches of bituminous pavement and 6 inches of class 5 aggregate base over an acceptable, compacted subgrade. Geotechnical evaluation will be completed during final design to determine if the existing subgrade material is suitable for use. The trail is proposed to be installed where pedestrian facilities currently do not exist, and will impact adjacent properties. Typical impacts associated with the construction of a new trail include tree removal, fence removal /replacement, grading within front lawn areas, irrigation relocation, removal and replacement of driveway approaches, relocation of existing private utilities, stormwater facilities, and modifications to existing driveway grades. Work associated with these items will primarily occur within the public right -of- way, but driveway removal and grading within the yard may extend further into adjacent properties. Detailed impacts to properties are typically determined during the final design process. New trail construction will require additional water quality improvements as the construction will result in an increase in impervious area. Perforated drain the will be installed along the majority of the trail within the buffer area and sumped drainage structures are proposed to collect sediment prior to stormwater discharge as a means to improve water quality. 2.3.6 Street Sign Replacement All existing street signs within the project will be replaced with new street signs that meet the Federal Highway Administration's (FHWA) requirements for retro - reflectivity. 2.3.7 Mailbox Replacement Mailboxes are proposed to be salvaged and relocated temporarily during construction, then reinstalled near the end of construction activities. Mailboxes will be reinstalled to meet the United States Postal Service (LISPS) requirements. In the event the condition of the existing mailbox support warrants replacement prior to reinstallation, the City is proposing to salvage the existing mailbox and install a new mailbox support that will meet both City standards and USPS requirements. Feasibility Report Page 9 Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 2.3.8 Easements It is anticipated that work will take place within the existing roadway right -of -way or within existing drainage and utility easements. Additional permanent right -of -way or easement acquisition may be required and will be determined during final design. 2.3.9 Permits /Approvals The anticipated permits and the respective regulatory agencies are listed below: Minnesota Pollution Control Agency (MPCA) (NPDES) ...Erosion /Stormwater Permit Minnehaha Creek Watershed District (MCWD) .... .............Erosion /Stormwater Permit Hennepin County (HC) ........ ............................... Work in County Right of way 2.3.10 Detour Routes/Project Phasing Construction of the proposed improvements will require limited resident access during the work day when construction activities are in progress. However, the contractor will be required to provide access to properties to the extent possible. City staff will work with the contractor to provide notice to residents for activities that may affect access. Traffic control devices meeting the Minnesota Manual on Uniform Traffic Control Devices will be required for posting roadway closures. In order to accommodate the property owners along the excavated roads, temporary parking on the adjacent streets may be necessary when vehicle access is not possible, such as when excavation is within the roadway during daytime hours. The contractor will be responsible for providing access to properties throughout the duration of the project. Access to the Fire Station will be maintained during construction with minor coordinated interruptions. 2.3.11 Public Involvement A public informational open house meeting for the proposed project was conducted December 7, 2017. Preliminary information was presented to attendees regarding the proposed improvements, schedule, impacts associated with the project and what to expect during construction. Residents were encouraged to share their knowledge of the project area, specifically any known areas of concern. Feasibility Report Page 10 Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 3. FINANCING 3.1 Opinion of Cost A detailed engineer's opinion of probable costs for the proposed improvements can be found in Appendix B of this report. The opinion of probable cost incorporates bid prices from the 2017 construction season projected to a 2018 cost basis including a 10% construction contingency (20% for trail extension improvements along Country Club Road and Yellowstone Trail). Indirect costs are typically 27% of the construction cost and include engineering, legal, financing, and administrative costs for budgetary purposes. Table 1 below provides a summary of the opinion of probable costs for the Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvement Project: Table 1 Opinion of Probable Costs Street Improvement Cost Total Project Cost Riviera Lane Surface Improvements $600,300.00 $779,700.00 Sanitary Improvements $19,300.00 Drainage Improvements $160,100.00 Shorewood Lane Surface Improvements $411,000.00 $524,600.00 Sanitary Improvements $54,300.00 Drainage Improvements $59,300.00 Mann Lane Surface Improvements $280,400.00 $362,800.00 Sanitary Improvements $12,200.00 Drainage Improvements $70,200.00 Maple Street Surface Improvements $366,900.00 $466,600.00 Sanitary Improvements $0.00 Drainage Improvements $99,700.00 Country Club Road Surface Improvements $572,900.00 $616,500.00 Sanitary Improvements $2,500.00 Drainage Improvements $41,100.00 Yellowstone Trail Surface Improvements $488,100.00 $574,700.00 Sanitary Improvements $4,900.00 Drainage Improvements $81,700.00 TOTAL $3,324,900.00 3.2 Funding Funding for the project will be provided through the City's Street Reconstruction Fund, Storm Water Fund, and Sanitary Sewer Fund. Feasibility Report Page 11 Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 4. PROJECT SCHEDULE The proposed project schedule for the Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvement Project is as follows: Neighborhood Informational Meeting ..................... ............................... December 7, 2017 Accept Feasibility Report /Order Project ..................... ............................... January 22, 2018 Approve Plans and Specifications /Authorize Ad for Bid ..... ............................... April 2018 OpenBids ............................................................................... ............................... May 2018 Award Construction Contract ................................................ ............................... June 2018 Begin Construction ................................................................ ............................... June 2018 Construction Substantially Complete .......................... ............................... September 2018 Final Completion (Final Lift of Bituminous Wear Course) .............................. Spring 2019 * Schedule assumes all private utility and gas main relocation work is completed prior to start of construction. Feasibility Report Page 12 Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 5. CONCLUSIONS AND RECOMMENDATIONS The Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension along Country Club Road and Yellowstone Trail project consists of roadway, trail, drainage, and minor sanitary sewer improvements. The total estimated project cost for the Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension along Country Club Road and Yellowstone Trail project is approximately $3,324,900. Funding for the project will be provided through City's Street Reconstruction Fund, Storm Water Fund, and Sanitary Sewer Fund. This project is feasible, necessary, and cost - effective from an engineering standpoint. The project funding feasibility is subject to financial review by the City. Based on the information contained in this report, it is recommended to proceed with the improvements as outlined herein. Council will determine the financial feasibility of the improvements. Council may want to consider reconstructing Maple Street at the time Lake Linden Drive is improved due to the necessary construction of storm sewer along Lake Linden Drive. Council may also want to consider financial feasibility of the trail improvements. Trail extension may require removal and replacement of some of the proposed trail and associated drainage improvements at the time Yellowstone Trail is reconstructed. Previous studies have shown it is more cost effective to construct trails along roadways when the road is reconstructed to reduce costs to reconstruct portions of the trail improvements with the future roadway. Feasibility Report Page 13 Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 APPENDIX A Figures Feasibility Report Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 AV r R/W ��wre� v reisxr o�r n..v � eaPeo�or�e EEgo aere RIVIERA LANE R/W u uenrarn..v AL RIVIERA LANE LEGEND WSB 5 FIGURE 2 STREET AND UTILITY IMPROVEMENT PROJECT STREET RECONSTRUCTION TURF RESTORATION EIT w oesza.zaa a„ FOR THE CITY OF SHOREWOOD, MN ❑ — _ x E N FEET PROPOSED TRAIL — PROPOSED STORM CONTINUE STORI I EXTENSION TO LAKE LINDEN \\._�. mm so, \ \` �: 6070 6090 R/ W I I 6" SELECT TOPSOIL BORROW AND SOD \\ �7 \ 6067 - \�p\ --606 \ \\ o �a\ Mil ep .�� SURAIOUNTABLE CURB a 23800 Al A CUB FOODS R/W I I WRIGHT OF WAY 30 RIGHT OF VJAY 14' TO BACK 14' TO BACK OF CURB OF CURB VARIES SURMOUNTABLECONCRETE SURHOUNTASLE CONCRETE VAS RIES CURB AND GUTTER 2.50% 2.50% CURSANDGUTTER 6" SELECT TOPSOIL ________ _______________________________ / BORROW AND SOD 2" TYPE SP 9.5 BITUMINOUS WEARING COURSE 2357 BITUMINOUS TACK COAT 2" TYPE SP 12.5 BITUMINOUS WEARING COURSE 8" AGGGREGATE BASE. CLASS 5 24" SELECT GRANULAR BORROW GEOTEXTILE FABRIC (TYPE V) FOR THE CITY OF SHOREWOOD, MN LEGEND N MAPLE STREET WSB FIGURE 5 STREET AND UTILITY IMPROVEMENT PROJECT STREET RECONSTRUCTION —>—>— PROPOSED STORM w WSB PROJECT NO.: H.6® CITY OF 02925 -240 12/28117 SCALE IN FEET SHORE RIiWOOD �\� \ s 90 IR — \ OF �„ \ �\\ \;,� \\ \ „ \.<' ,. \��\ �� � : \\ �•\ v., ��\��,, � \\ � \ \\ \.�. �``�' _ 5955 � RIW RIW 14 TO BACK zs reioH, of w.sv zs relou, of v:FV V� ,o TreF.a curesnu scures za TO EDGE ETI UTTER 2 501, C IS, 0ss�scT TOasou esE1ECT TOasoii SORROI AND SOD z vas aa.s sl,uzniuouswsF.rewc couress ,vas E s IUDUIuouswso.aiuc couuss si BITURIMOUS TACK COAT I A-.EC..TE e..sE, a „ss s l,00%CRUSREO aocrcl „ GGGREGATE BASE s s (1010 %CRUSHED ROCK) _TErnLE EHERIC wP a rere, LEGEND COUNTRY CLUB ROAD WS�+ R FIGURE 7 STREET AND UTILITY IMPROVEMENT PROJECT STREET RECONSTRUCTION PROPOSED TRAIL ® FOR THE CITY OF SHOREWOOD, MN ME PROJECT NO.: IT El I V ol: 02925-240 121 2817 ACALE IN FEET S110M1';W000 APPENDIX B Opinion of Probable Cost Feasibility Report Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 Opinion of Probable Cost WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: WE and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK Project Location: City of Shorewood City Project No.: 17 -04 WSB Project No: 02925 -24 Date: 1/4/2018 No. L NIN/DOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost A. Riviera Lane Surface Improvements 1 2021.501 MOBILIZATION LUMP SUM 1 $20,500.00 $20,500.00 2 2101.524 CLEARING TREE 42 $250.00 $10,500.00 3 2101.524 GRUBBING TREE 42 $250.00 $10,500.00 4 2104.502 REMOVE MAIL BOX SUPPORT EACH 3 $25.00 $75.00 5 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 20 $5.00 $100.00 6 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 80 $3.001 $240.00 7 2104.503 SALVAGE FENCE LIN FT 130 $10.00 $1,300.00 8 2104.504 REMOVE BITUMINOUS PAVEMENT SO YD 2400 $3.50 $8,400.00 9 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SO YD 400 $3.50 $1,400.00 10 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT SO YD 20 $6.50 $130.00 11 2104.509 REMOVE SIGN EACH 2 1 $50.00 $100.00 12 2104.601 RELOCATE MISCELLANEOUS STRUCTURES LUMP SUM 1 $1,000.00 $1,000.00 13 2104.602 SALVAGE & REINSTALL MAILBOX EACH 20 $100.00 $2,000.00 14 2105.504 GEOTEXTILE FABRIC TYPE V SO YD 4300 $3.50 $15,050.00 15 2105.507 COMMON EXCAVATION (EV) (P) CU YD 1900 $18.00 $34,200.00 16 2105.507 MUCK EXCAVATION CU YD 300 $18.00 $5,400.00 17 2105.507 SUBGRADE EXCAVATION (EV) (P) CU YD 3000 $18.00 $54,000.00 18 2105.507 SELECT GRANULAR BORROW (P) CU YD 3000 $20.00 $60,000.00 19 2105.507 SELECT GRANULAR BORROW CU YD 300 $20.00 $6,000.00 20 2105.604 MINOR GRADING LUMP SUM 1 $1,000.00 $1,000.00 21 2112.501 SUBGRADE PREPARATION ROAD STA 9 $200.00 $1,800.00 22 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 20 $150.00 $3,000.00 23 2130.523 WATER (DUST CONTROL) MGAL 35 $50.00 $1,750.00 24 2211.507 AGGREGATE BASE CLASS (100% CRUSHED) (P) CU YD 1900 $28.00 $53,200.00 25 2331.501 -5 JOINT ADHESIVE - MASTIC LIN FT 2000 $1.00 $2,000.00 26 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GALLON 200 $3.50 $700.00 27 2360.503 TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY SO YD 240 $35.00 $8,400.00 28 2360.509 TYPE SP 9.5 WEARING COURSE MIX (2,C) TON 360 $64.00 $23,040.00 29 2360.509 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON 360 $64.00 $23,040.00 30 2504.602 IRRIGATION SYSTEM REPAIR EACH 4 $200.00 $800.00 31 2505.601 UTILITY COORDINATION LUMP SUM 1 $1,000.00 $1,000.00 32 2531.501 CONCRETE CURB AND GUTTER (SURMOUNTABLE) LIN FT 2000 $18.00 $36,000.00 33 2531.504 6" CONCRETE DRIVEWAY PAVEMENT SO YD 70 $65.00 $4,550.00 34 2540.602 MAIL BOX (TEMPORARY) EACH 20 $50.00 $1,000.00 35 2540.602 MAIL BOX SUPPORT EACH 3 $75.00 $225.00 36 2551.603 INSTALL FENCE LIN FT 130 $15.00 $1,950.00 37 2557.602 REPAIR DOG FENCE EACH 4 $250.00 $1,000.00 38 2563.601 TRAFFIC CONTROL LUMP SUM 1 $1,500.00 $1,500.00 39 2564.518 SIGN PANELS TYPE C SO FT 7 $65.00 $455.00 40 2564.602 SIGN PANELS TYPE SPECIAL EACH 1 $250.00 $250.00 41 2571.524 CONIFEROUS TREE 8' HT B &B EACH 10 $550.00 $5,500.00 42 2571.524 DECIDUOUS TREE 2.5" CAL B &B EACH 10 $550.00 $5,500.00 43 2572.510 PRUNE TREES EACH 10 $100.00 $1,000.00 44 2573.502 STORM DRAIN INLET PROTECTION EACH 4 $200.00 $800.00 45 2573.503 SILT FENCE, TYPE MACHINE SLICED LIN FT 2000 $2.50 $5,000.00 46 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER LIN FT 2000 $3.50 $7,000.00 47 2573.604 STABILIZED CONSTRUCTION ENTRANCE EACH 1 $1,000.00 $1,000.00 48 2575.502 SEED MIXTURE 25 -151 LB 50 $20.00 $1,000.00 49 2575.523 EROSION CONTROL BLANKET CATEGORY 3 S Y 1 100 1 $5.00 $500.00 B. Riviera Lane Sanitary Improvements Opinion of Probable Cost 2105.504 52 2104.502 REMOVE CASTING WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: DJE $500.00 and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK Project Location: City of Shorewood $300.00 City Project No.: 17 -04 $3,500.00 WSB Project No: 02925 -24 Date: 1/4/2018 CASTING ASSEMBLY NIN/DOT EACH 3 Estimated $2,250.00 55 2506.602 CHEMICAL GROUT MANHOLE 2502.541 EACH 1 Estimated Estimated Item No. Specification Description Unit Total 3 $350.00 $1,050.00 63 2503.503 15' RC PIPE SEWER DESIGN 3006 CL V Subtotal - B Riviera Lane Sanitary Improvements +10% Contingency Subtotal - B Riviera Lane Sanitary Improvements + 27% Indirect Costs Total - B Riviera Lane Sanitary Improvements Unit Price Total Cost $26,000.00 No. 2503.503 18" RC PIPE SEWER DESIGN 3006 CL V Quantity 70 $55.00 50 2575.604 SEEDING (INCL TOPSOIL AND FERT) ACRE 0.3 $10,000.00 $3,000.00 51 2575.605 HYDRAULIC MULCH MATRIX LB 900 $2.00 $1,800.00 $2,000.00 Subtotal - A Riviera Lane Surface Improvements $429,655.00 CONST DRAINAGE STRUCTURE DES SPECIAL 2 +10% Contingency $42,965.50 $15,000.00 Subtotal - A Riviera Lane Surface Improvements $472,620.50 2506.502 + 27% Indirect Costs $127,607.54 1 5 Total -A Riviera Lane Surface Improvements $600,228.04 B. Riviera Lane Sanitary Improvements 57 2105.504 52 2104.502 REMOVE CASTING $5.00 EACH 3 $500.00 $1,500.00 53 2503.603 SEWER LINER SPOT REPAIR $300.00 EACH 2 $3,500.00 $7,000.00 54 2506.502 CASTING ASSEMBLY 60 EACH 3 $750.00 $2,250.00 55 2506.602 CHEMICAL GROUT MANHOLE 2502.541 EACH 1 $2,000.00 $2,000.00 56 2506.602 CHIMNEY SEALS 4" PVC PIPE DRAIN CLEANOUT EACH 3 $350.00 $1,050.00 63 2503.503 15' RC PIPE SEWER DESIGN 3006 CL V Subtotal - B Riviera Lane Sanitary Improvements +10% Contingency Subtotal - B Riviera Lane Sanitary Improvements + 27% Indirect Costs Total - B Riviera Lane Sanitary Improvements $13,800.00 $1,380.00 $15,180.00 $4,098.60 $19,278.60 C. Riviera Lane Drainage Improvements Improvements 57 2105.504 GEOTEXTILE FABRIC TYPE IV SO YD 40 $5.00 $200.00 58 2451.507 COURSE AGGREGATE BEDDING (CV) CU YD 10 $30.00 $300.00 59 2501.502 15' RC PIPE APRON EACH 2 $1,000.00 $2,000.00 60 2501.502 18" RC PIPE APRON EACH 1 $1,000.00 $1,000.00 61 2502.541 4" PERF PVC PIPE DRAIN LIN FT 2000 $22.00 $44,000.00 62 2502.602 4" PVC PIPE DRAIN CLEANOUT EACH 10 $350.00 $3,500.00 63 2503.503 15' RC PIPE SEWER DESIGN 3006 CL V LIN FT 500 $52.00 $26,000.00 64 2503.503 18" RC PIPE SEWER DESIGN 3006 CL V LIN FT 70 $55.00 $3,850.00 65 2506.501 CONST DRAINAGE STRUCTURE DES 48 -4020 LIN FT 30 $350.00 $10,500.00 66 2506.502 CONST DRAINAGE STRUCTURE DES SPECIAL EACH 1 $2,000.00 $2,000.00 67 2506.502 CONST DRAINAGE STRUCTURE DES SPECIAL 2 EACH 1 $15,000.00 $15,000.00 68 2506.502 CASTING ASSEMBLY I EACH 1 5 $750.001 $3,750.00 61 2511.507 RANDOM RIPRAP CLASS III I CU YD 1 25 1 $100.001 $2,500.00 Subtotal - C Riviera Lane Drainage Improvements $114,600.00 +10% Contingency $11,460.00 Subtotal - C Riviera Lane Drainage Improvements $126,060.00 + 27% Indirect Costs $34,036.20 Total - C Riviera Lane Drainage Improvements $160,096.20 Opinion of Probable Cost WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: WE and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK Project Location: City of Shorewood City Project No.: 17 -04 WSB Project No: 02925 -24 Date: 1/4/2018 Item No. NIN/DOT Specificatio n No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost D. Shorewood Lane Surface Improvements 62 2021.501 MOBILIZATION LUMP SUM 1 $14,100.00 $14,100.00 63 2101.505 CLEARING ACRE 0.01 $10,000.00 $100.00 64 2101.505 GRUBBING ACRE 0.01 $10,000.00 $100.00 65 2101.524 CLEARING TREE 4 $350.00 $1,400.00 66 2101.524 GRUBBING TREE 4 $350.00 $1,400.00 67 2104.502 REMOVE MAIL BOX SUPPORT EACH 2 $25.00 $50.00 68 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 40 $5.00 $200.00 69 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 200 $3.00 $600.00 70 2104.504 REMOVE BITUMINOUS PAVEMENT SO YD 2930 $3.50 $10,255.00 71 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SO YD 100 $3.50 $350.00 72 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT SO YD 40 $6.50 $260.00 73 2104.509 REMOVE SIGN EACH 1 $50.00 $50.00 74 2104.518 REMOVE CONCRETE WALK SO FT 200 $3.00 $600.00 75 2104.601 RELOCATE MISCELLANEOUS STRUCTURES LUMP SUM 1 $1,000.00 $1,000.00 76 2104.602 SALVAGE & REINSTALL MAILBOX EACH 10 $100.00 $1,000.00 77 2105.504 GEOTEXTILE FABRIC TYPE V SO YD 3400 $3.50 $11,900.00 78 2105.507 COMMON EXCAVATION (EV) (P) CU YD 700 $18.00 $12,600.00 79 2105.507 MUCK EXCAVATION CU YD 230 $18.00 $4,140.00 80 2105.507 SUBGRADE EXCAVATION (EV) (P) CU YD 2300 $18.00 $41,400.00 81 2105.507 SELECT GRANULAR BORROW (P) CU YD 2300 $20.00 $46,000.00 82 2105.507 SELECT GRANULAR BORROW CU YD 230 $20.00 $4,600.00 83 2105.604 MINOR GRADING LUMP SUM 1 $1,000.00 $1,000.00 84 2112.501 SUBGRADE PREPARATION ROAD STA 7 $200.00 $1,400.00 85 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 20 $150.00 $3,000.00 86 2130.523 WATER (DUST CONTROL) MGAL 50 $50.00 $2,500.00 87 2211.507 AGGREGATE BASE CLASS 5 (100% CRUSHED) (P) CU YD 700 $20.00 $14,000.00 88 2232.504 MILL BITUMINOUS SURFACE SO YD 850 $5.00 $4,250.00 89 2331.501 JOINT ADHESIVE - MASTIC LIN FT 1500 $1.00 $1,500.00 90 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GALLON 220 $3.50 $770.00 91 2360.503 TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY SO YD 170 $35.00 $5,950.00 92 2360.509 TYPE SP 9.5 WEARING COURSE MIX (2,C) TON 400 $64.00 $25,600.00 93 2360.509 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON 400 $64.00 $25,600.00 94 2504.602 IRRIGATION SYSTEM REPAIR EACH 3 $200.00 $600.00 95 2505.601 UTILITY COORDINATION LUMP SUM 1 $1,000.00 $1,000.00 96 2521.518 6" CONCRETE WALK SO FT 200 $8.00 $1,600.00 97 2531.501 CONCRETE CURB AND GUTTER (SURMOUNTABLE) LIN FT 1500 $18.00 $27,000.00 98 2531.504 6" CONCRETE DRIVEWAY PAVEMENT SO YD 60 $65.00 $3,900.00 99 2531.618 TRUNCATED DOMES SO FT 32 $50.00 $1,600.00 100 2540.602 MAIL BOX (TEMPORARY) EACH 10 $50.00 $500.00 101 2540.602 MAIL BOX SUPPORT EACH 2 $75.00 $150.00 102 2557.602 REPAIR DOG FENCE EACH 3 $250.00 $750.00 103 2563.601 TRAFFIC CONTROL LUMP SUM 1 $2,500.00 $2,500.00 104 2564.518 SIGN PANELS TYPE C SO FT 4 $65.00 $260.00 105 2564.602 SIGN PANELS TYPE SPECIAL EACH 2 $250.00 $500.00 106 2571.524 CONIFEROUS TREE 8' HT B &B EACH 2 $550.00 $1,100.00 107 2571.524 1 DECIDUOUS TREE 2.5" CAL B &B EACH 2 1 $550.001 $1,100.00 108 2573.502 STORM DRAIN INLET PROTECTION EACH 6 $200.00 $1,200.00 109 2573.503 SILT FENCE, TYPE MACHINE SLICED LIN FT 1500 $2.50 $3,750.00 110 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER LIN FT 1500 $3.50 $5,250.00 E. Shorewood Opinion of Probable Cost 116 2104.501 REMOVE SANITARY SEWER LIN FT WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: DJE 117 and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK Project Location: City of Shorewood $500.00 City Project No.: 17 -04 2104.525 WSB Project No: 02925 -24 Date: 1/4/2018 $500.00 NIN/DOT 119 2104.603 Estimated LIN FT 238 $25.00 $5,950.00 120 2503.602 CONNECT TO EXISITING SANITARY SEWER Estimated Estimated Item No. Specificatio Description Unit Total LIN FT 230 $45.00 $10,350.00 122 2503.603 SEWER LINER SPOT REPAIR Unit Price Total Cost $3,500.00 n No. 123 2506.502 Quantity EACH 3 111 2573.604 STABILIZED CONSTRUCTION ENTRANCE EACH 1 $1,000.00 $1,000.00 112 2575.502 SEED MIXTURE 25 -151 LB 20 $20.00 $400.00 113 2575.523 EROSION CONTROL BLANKET CATEGORY 3 S Y 1 150 j $5.00 j $750.00 114 2575.604 SEEDING (INCL TOPSOIL AND FERT) ACRE 0.1 $10,000.00 $1,000.00 115 2575.605 HYDRAULIC MULCH MATRIX LB 300 $2.00 $600.00 $1,000.00 Subtotal - D Shorewood Lane Surface Improvements $294,185.00 +10% Contingency $29,418.50 Subtotal - D Shorewood Lane Surface Improvements $323,603.50 + 27% Indirect Costs $87,372.95 Total - D Shorewood Lane Surface Improvements $410,976.45 E. Shorewood Lane Sanitary Improvements 116 2104.501 REMOVE SANITARY SEWER LIN FT 20 $10.00 $200.00 117 2104.502 REMOVE CASTING EACH 1 $500.00 $500.00 118 2104.525 ABANDON SANITARY MANHOLE EACH 2 $500.00 $1,000.00 119 2104.603 ABANDON SANITARY SEWER LIN FT 238 $25.00 $5,950.00 120 2503.602 CONNECT TO EXISITING SANITARY SEWER EACH 2 $2,000.00 $4,000.00 121 1 2503.603 8" PVC SANITARY SEWER - SDR 35 LIN FT 230 $45.00 $10,350.00 122 2503.603 SEWER LINER SPOT REPAIR EACH 1 $3,500.00 $3,500.00 123 2506.502 CASTING ASSEMBLY EACH 3 $750.00 $2,250.00 124 2506.602 CHEMICAL GROUT MANHOLE EACH 1 $2,000.00 $2,000.00 125 2506.602 CHIMNEY SEALS EACH 3 $350.00 $1,050.00 126 2506.603 1 CONST 48" DIA SAN SEWER MANHOLE LIN FT 40.0 1 $200.001 $8,000.00 Subtotal - E Shorewood Lane Sanitary Improvements $38,800.00 +10% Contingency $3,880.00 Subtotal - E Shorewood Lane Sanitary Improvements $42,680.00 + 27% Indirect Costs $11,523.60 Total - E Shorewood Lane Sanitary Improvements $54,203.60 F. Shorewood Lane Drainage Improvements 127 2104.502 REMOVE DRAINAGE STRUCTURE EACH 1 $500.00 $500.00 128 2104.503 REMOVE SEWER PIPE (STORM) LIN FT 40 $10.00 $400.00 129 2105.504 GEOTEXTILE FABRIC TYPE IV SO YD 20 $5.00 $100.00 130 2451.507 COURSE AGGREGATE BEDDING (CV) CU YD 10 $30.00 $300.00 131 2501.502 18" RC PIPE APRON EACH 1 $1,000.00 $1,000.00 132 2502.541 4" PERF PVC PIPE DRAIN LIN FT 100 $22.00 $2,200.00 133 2502.602 4" PVC PIPE DRAIN CLEANOUT EACH 2 $350.00 $700.00 134 2503.503 15' RC PIPE SEWER DESIGN 3006 CL V LIN FT 369 $52.00 $19,188.00 135 2503.503 18" RC PIPE SEWER DESIGN 3006 CL V LIN FT 100 $55.00 $5,500.00 136 2506.501 CONST DRAINAGE STRUCTURE DES 48 -4020 LIN FT 15 $350.00 $5,250.00 137 2506.502 CONST DRAINAGE STRUCTURE DES SPECIAL EACH 2 $2,000.00 1 $4,000.00 138 2506.502 CASTING ASSEMBLY I EACH 1 3 1 $750.001 $2,250.00 139 2511.507 RANDOM RIPRAP CLASS III I CU YD 1 10 1 $100.001 $1,000.00 Subtotal - F Shorewood Lane Drainage Improvements $42,388.00 +10% Contingency $4,238.80 Subtotal - F Shorewood Lane Drainage Improvements $46,626.80 + 27% Indirect Costs $12,589.24 Total - F Shorewood Lane Drainage Improvements $59,216.04 Opinion of Probable Cost WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: WE and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK Project Location: City of Shorewood City Project No.: 17 -04 WSB Project No: 02925 -24 Date: 1/4/2018 Item No. NIN/DOT Specificatio n No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost G. Mann Lane Surface Improvements 140 2021.501 MOBILIZATION LUMP SUM 1 $9,600.00 $9,600.00 141 2101.524 CLEARING TREE 4 $250.00 $1,000.00 142 2101.524 GRUBBING TREE 4 $250.00 $1,000.00 143 2104.502 REMOVE MAIL BOX SUPPORT EACH 1 $25.00 $25.00 144 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 120 $3.00 $360.00 145 2104.504 REMOVE BITUMINOUS PAVEMENT SO YD 1650 $3.50 $5,775.00 146 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SO YD 100 $3.50 $350.00 147 2104.509 REMOVE SIGN EACH 4 $50.00 $200.00 148 2104.601 RELOCATE MISCELLANEOUS STRUCTURES LUMP SUM 1 $500.00 $500.00 149 2104.602 SALVAGE & REINSTALL MAILBOX EACH 10 $100.00 $1,000.00 150 2105.504 GEOTEXTILE FABRIC TYPE V SO YD 1900 $3.50 $6,650.00 151 2105.507 COMMON EXCAVATION (EV) (P) CU YD 500 $18.00 $9,000.00 152 2105.507 MUCK EXCAVATION CU YD 160 $18.00 $2,880.00 153 2105.507 SUBGRADE EXCAVATION (EV) (P) CU YD 1600 $18.00 $28,800.00 154 2105.507 SELECT GRANULAR BORROW (P) CU YD 1600 $20.00 $32,000.00 155 2105.507 SELECT GRANULAR BORROW CU YD 160 $20.00 $3,200.00 156 2105.604 MINOR GRADING LUMP SUM 1 $1,000.00 $1,000.00 157 2112.501 SUBGRADE PREPARATION ROAD STA 10 $200.00 $2,000.00 158 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 15 $150.00 $2,250.00 159 2130.523 WATER (DUST CONTROL) MGAL 30 $50.00 $1,500.00 160 2211.507 AGGREGATE BASE CLASS 5 (100% CRUSHED) (P) CU YD 500 $20.00 $10,000.00 161 2331.501 JOINT ADHESIVE - MASTIC LIN FT 1400 $1.00 $1,400.00 162 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GALLON 90 $3.50 $315.00 163 2360.503 TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY SO YD 80 $35.00 $2,800.00 164 2360.509 TYPE SP 9.5 WEARING COURSE MIX (2,C) TON 210 $64.00 $13,440.00 165 2360.509 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON 210 $64.00 $13,440.00 166 2504.602 IRRIGATION SYSTEM REPAIR EACH 1 $200.00 $200.00 167 2505.601 UTILITY COORDINATION LUMP SUM 1 $1,000.00 $1,000.00 168 2531.501 CONCRETE CURB AND GUTTER (SURMOUNTABLE) LIN FT 1400 $18.00 $25,200.00 169 2540.602 MAIL BOX (TEMPORARY) EACH 10 $50.00 $500.00 170 2540.602 MAIL BOX SUPPORT EACH 1 $75.00 $75.00 171 2557.602 REPAIR DOG FENCE EACH 1 $250.00 $250.00 172 2563.601 TRAFFIC CONTROL LUMP SUM 1 $500.00 $500.00 173 2564.518 SIGN PANELS TYPE C SO FT 18 $65.00 $1,170.00 174 2564.602 SIGN PANELS TYPE SPECIAL EACH 2 $250.00 $500.00 175 2571.502 DECIDUOUS TREE 2.5' CAL B &B EACH 4 $550.00 $2,200.00 176 2573.502 STORM DRAIN INLET PROTECTION EACH 7 $200.00 $1,400.00 177 2573.503 SILT FENCE, TYPE MACHINE SLICED LIN FT 1400 $2.50 $3,500.00 178 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER LIN FT 1400 $3.50 $4,900.00 179 2573.604 STABILIZED CONSTRUCTION ENTRANCE EACH 1 $1,000.00 $1,000.00 180 2575.502 SEED MIXTURE 25 -151 LB 30 1 $20.00 $600.00 181 2575.523 EROSION CONTROL BLANKET CATEGORY 3 S Y 800 $5.00 $4,000.00 182 2575.604 SEEDING (INCL TOPSOIL AND FERT) ACRE 0.2 $10,000.00 $2,000.00 183 2575.605 HYDRAULIC MULCH MATRIX LB 600 $2.00 $1,200.00 Subtotal - G Mann Lane Surface Improvements $200,680.00 +10% Contingency $20,068.00 Subtotal - G Mann Lane Surface Improvements $220,748.00 + 27% Indirect Costs $59,601.96 Total - G Mann Lane Surface Improvements $280,349.96 H. Mann Lane Sanitary Improvements Opinion of Probable Cost 2104.503 184 2104.502 REMOVE CASTING $10.00 EACH WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: DJE 2503.603 and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK Project Location: City of Shorewood $3,500.00 186 City Project No.: 17 -04 192 EACH WSB Project No: 02925 -24 Date: 1/4/2018 2506.602 NIN/DOT 2502.541 EACH Estimated Estimated Estimated Item No. Specificatio Description Unit Total Unit Price Total Cost $700.00 n No. 2502.602 4" PVC PIPE DRAIN CLEANOUT Quantity $8,700.00 $870.00 $9,570.00 $2,583.90 $12,153.90 $350.00 H. Mann Lane Sanitary Improvements 189 2104.503 184 2104.502 REMOVE CASTING $10.00 EACH 2 $500.00 $1,000.00 185 2503.603 SEWER LINER SPOT REPAIR $100.00 EACH 1 $3,500.00 $3,500.00 186 2506.502 CASTING ASSEMBLY 192 EACH 2 $750.00 $1,500.00 187 2506.602 CHEMICAL GROUT MANHOLE 2502.541 EACH 1 $2,000.00 $2,000.00 188 2506.602 CHIMNEY SEALS 8" PERF PVC PIPE DRAIN EACH 2 $350.00 $700.00 195 2502.602 4" PVC PIPE DRAIN CLEANOUT Subtotal - H Mann Lane Sanitary Improvements +10% Contingency Subtotal - H Mann Lane Sanitary Improvements + 27% Indirect Costs Total - H Mann Lane Sanitary Improvements $8,700.00 $870.00 $9,570.00 $2,583.90 $12,153.90 I. Mann Lane Drainage Improvements 189 2104.503 REMOVE SEWER PIPE (STORM) LIN FT 35 $10.00 $350.00 190 2105.504 GEOTEXTILE FABRIC TYPE IV SO YD 20 $5.00 $100.00 191 2451.507 COURSE AGGREGATE BEDDING (CV) CU YD 10 $30.00 $300.00 192 2501.502 15' RC PIPE APRON EACH 3 $1,000.00 $3,000.00 193 2502.541 4" PERF PVC PIPE DRAIN LIN FT 200 $22.00 $4,400.00 194 2502.541 8" PERF PVC PIPE DRAIN LIN FT 200 $26.00 $5,200.00 195 2502.602 4" PVC PIPE DRAIN CLEANOUT EACH 4 $350.00 $1,400.00 196 2502.602 8" PVC PIPE DRAIN CLEANOUT EACH 2 $400.00 $800.00 197 2503.503 15' RC PIPE SEWER DESIGN 3006 CL V LIN FT 378 $52.00 $19,656.00 198 2506.501 CONST DRAINAGE STRUCTURE DES 48 -4020 LIN FT 20 $350.00 $7,000.00 199 2506.502 CONST DRAINAGE STRUCTURE DES SPECIAL EACH 2 $2,000.00 1 $4,000.00 200 2506.502 CASTING ASSEMBLY EACH 4 $750.001 $3,000.00 201 2511.507 RANDOM RIPRAP CLASS III CU YD 10 1 $100.001 $1,000.00 Subtotal - I Mann Lane Drainage Improvements $50,206.00 +10% Contingency $5,020.60 Subtotal - I Mann Lane Drainage Improvements $55,226.60 + 27% Indirect Costs $14,911.18 Total - I Mann Lane Drainage Improvements $70,137.78 Opinion of Probable Cost WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: WE and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK Project Location: City of Shorewood City Project No.: 17 -04 WSB Project No: 02925 -24 Date: 1/4/2018 Item No. MN /DOT Specificatio n No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost J. Maple Street Surface Improvements 202 2021.501 MOBILIZATION LUMPSUM 1 $12,600.00 $12,600.00 203 2101.505 CLEARING ACRE 0.04 $10,000.00 $400.00 204 2101.505 GRUBBING ACRE 0.04 $10,000.00 $400.00 205 2101.524 CLEARING TREE 5 $250.00 $1,250.00 206 2101.524 GRUBBING TREE 5 $250.00 $1,250.00 207 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 1000 $3.00 $3,000.00 208 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD 2300 $3.50 $8,050.00 209 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD 100 $3.50 $350.00 210 2104.509 REMOVE SIGN EACH 1 $50.00 $50.00 211 2104.518 REMOVE BITUMINOUS TRAIL SO FT 7200 $5.00 $36,000.00 212 2104.601 RELOCATE MISCELLANEOUS STRUCTURES LUMPSUM- 1 $500.00 $500.00 213 2104.602 SALVAGE & REINSTALL MAILBOX EACH 1 $100.00 $100.00 214 2105.504 GEOTEXTILE FABRIC TYPE V SQ YD 1200 $3.50 $4,200.00 215 2105.507 COMMON EXCAVATION (EV) (P) CU YD 500 $18.00 $9,000.00 216 2105.507 MUCK EXCAVATION CU YD 80 $18.00 $1,440.00 217 2105.507 SUBGRADE EXCAVATION (EV) (P) CU YD 800 $18.00 $14,400.00 218 2105.507 SELECT GRANULAR BORROW (P) CU YD 680 $20.00 $13,600.00 219 2105.507 SELECT GRANULAR BORROW CU YD 80 $20.00 $1,600.00 220 2105.604 MINOR GRADING LUMPSUM 1 $1,000.00 $1,000.00 221 2112.501 SUBGRADE PREPARATION ROAD STA 2 $200.00 $400.00 222 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 10 $150.00 $1,500.00 223 2130.523 WATER (DUST CONTROL) MGAL 10 $50.00 $500.00 224 2211.507 AGGREGATE BASE CLASS 5 (100% CRUSHED) (P) CU YD 500 $20.00 $10,000.00 225 2231.501 BITUMINOUS PATCHING MIXTURE TON 300 $200.00 $60,000.00 226 2331.501 JOINT ADHESIVE - MASTIC LIN FT 500 $1.00 $500.00 227 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GALLON 40 $3.50 $140.00 228 2360.503 TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY SQ YD 80 $35.00 $2,800.00 229 2360.509 TYPE SP 9.5 WEARING COURSE MIX (2,C) TON 90 $64.00 $5,760.00 230 2360.509 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON 90 $64.00 $5,760.00 231 2504.602 IRRIGATION SYSTEM REPAIR EACH 1 $200.00 $200.00 232 2505.601 UTILITY COORDINATION LUMPSUM 1 $1,000.00 $1,000.00 233 2521.511 3" BITUMINOUS WALK SO FT 7200 $5.00 $36,000.00 234 2531.501 CONCRETE CURB AND GUTTER (SURMOUNTABLE) LIN FT 500 $18.00 $9,000.00 235 2540.602 MAIL BOX (TEMPORARY) EACH 1 $50.00 $50.00 236 2563.601 TRAFFIC CONTROL LUMPSUM- 1 $10,000.00 $10,000.00 237 2564.518 SIGN PANELS TYPE C SO FT 7 $65.00 $455.00 238 2564.602 SIGN PANELS TYPE SPECIAL EACH 1 $250.00 $250.00 239 2571.524 CONIFEROUS TREE 8' HT B &B EACH 2 $550.00 $1,100.00 240 2571.524 DECIDUOUS TREE 2.5" CAL B &B EACH 2 $550.00 $1,100.00 241 2573.502 STORM DRAIN INLET PROTECTION EACH 2 $200.00 $400.00 242 2573.503 SILT FENCE, TYPE MACHINE SLICED LIN FT 100 $2.50 $250.00 243 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER LIN FT 500 $3.50 $1,750.00 244 2573.604 STABILIZED CONSTRUCTION ENTRANCE EACH 1 $1,000.00 $1,000.00 245 2575.502 SEED MIXTURE 25 -151 LB 20 $20.00 $400.00 246 2575.523 EROSION CONTROL BLANKET CATEGORY 3 S Y 300 $5.00 $1,500.00 247 2575.604 SEEDING (INCL TOPSOIL AND FERT) ACRE 0.1 $10,000.00 $1,000.00 248 2575.605 HYDRAULIC MULCH MATRIX LB 300 $2.00 $600.00 Subtotal - G Mann Lane Surface Improvements $262,605.00 +10% Contingency $26,260.50 K. Maple Street Opinion of Probable Cost 249 2105.504 GEOTEXTILE FABRIC TYPE IV WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: DJE $5.00 and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK Project Location: City of Shorewood CU YD 10 City Project No.: 17 -04 251 2501.502 WSB Project No: 02925 -24 Date: 1/4/2018 $1,000.00 MN /DOT 252 2503.503 Estimated Estimated Estimated Item No. Specificatio Description Unit Total Unit Price Total Cost LIN FT n No. $55.00 $38,500.00 Quantity 2506.501 CONST DRAINAGE STRUCTURE DES 48 -4020 Subtotal -G Mann Lane Surface Improvements $288,865.50 $350.00 $17,150.00 + 27% Indirect Costs $77,993.69 CONST DRAINAGE STRUCTURE DES SPECIAL Total - G Mann Lane Surface Improvements $366,859.19 K. Maple Street Drainage Improvements 249 2105.504 GEOTEXTILE FABRIC TYPE IV SO YD 30 $5.00 $150.00 250 2451.507 COURSE AGGREGATE BEDDING (CV) CU YD 10 $30.00 $300.00 251 2501.502 18" RC PIPE APRON EACH 1 $1,000.00 $1,000.00 252 2503.503 15' RC PIPE SEWER DESIGN 3006 CL V LIN FT 120 $52.00 $6,240.00 253 2503.503 18" RC PIPE SEWER DESIGN 3006 CL V LIN FT 700 $55.00 $38,500.00 254 2506.501 CONST DRAINAGE STRUCTURE DES 48 -4020 LIN FT 49.0 $350.00 $17,150.00 255 2506.502 CONST DRAINAGE STRUCTURE DES SPECIAL EACH 1 $2,000.00 $2,000.00 256 2506.502 CASTING ASSEMBLY EACH 6 $750.00 $4,500.00 257 2511.507 RANDOM RIPRAP CLASS III CU YD 15 $100.00 $1,500.00 Subtotal - K Maple Street Drainage Improvements +10% Contingency Subtotal -K Maple Street Drainage Improvements +27 %Indirect Costs Total - K Maple Street Drainage Improvements $71,340.00 $7,134.00 $78,474.00 $21,187.98 $99,661.98 Opinion of Probable Cost WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: WE and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK Project Location: City of Shorewood City Project No.: 17 -04 WSB Project No: 02925 -24 Date: 1/4/2018 Item No. MN /DOT Specificatio n No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost L. Country Club Road Surface Improvements 258 2021.501 MOBILIZATION LUMP SUM 1 $17,900.00 $17,900.00 259 2101.505 CLEARING ACRE 0.12 $10,000.00 $1,200.00 260 2101.505 GRUBBING ACRE 0.12 $10,000.00 $1,200.00 261 2101.524 CLEARING TREE 6 $350.00 $2,100.00 262 2101.524 GRUBBING TREE 6 $350.00 $2,100.00 263 2104.502 REMOVE MAIL BOX SUPPORT EACH 1 1 $25.00 $25.00 264 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 180 $3.00 $540.00 265 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD 1900 $3.50 $6,650.00 266 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD 10 $3.50 $35.00 267 2104.509 REMOVE SIGN EACH 4 $50.00 $200.00 268 2104.601 RELOCATE MISCELLANEOUS STRUCTURES LUMP SUM 1 $500.00 $500.00 269 2104.602 SALVAGE & REINSTALL MAILBOX EACH 10 $100.00 $1,000.00 270 2105.504 GEOTEXTILE FABRIC TYPE V SQ YD 28300 $3.50 $99,050.00 271 2105.507 COMMON EXCAVATION (EV) (P) CU YD 700 $18.00 $12,600.00 272 2105.507 MUCK EXCAVATION CU YD 160 $18.00 $2,880.00 273 2105.507 SUBGRADE EXCAVATION (EV) (P) CU YD 1600 $18.00 $28,800.00 274 2105.507 SELECT GRANULAR BORROW (P) CU YD 1600 $20.00 $32,000.00 275 2105.507 SELECT GRANULAR BORROW CU YD 160 $20.00 $3,200.00 276 2105.604 MINOR GRADING LUMPSUM 1 $1,000.00 $1,000.00 277 2112.501 SUBGRADE PREPARATION ROAD STA 10 $200.00 $2,000.00 278 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 20 $150.00 $3,000.00 279 2130.523 WATER (DUST CONTROL) MGAL 35 $50.00 $1,750.00 280 2211.507 AGGREGATE BASE CLASS 5 (100% CRUSHED) (P) CU YD 700 $20.00 $14,000.00 281 2331.501 JOINT ADHESIVE - MASTIC LIN FT 1500 $1.00 $1,500.00 282 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GALLON 120 $3.50 $420.00 283 2360.503 TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY SQ YD 10 $35.00 $350.00 284 2360.509 TYPE SP 9.5 WEARING COURSE MIX (2,C) TON 300 $64.00 $19,200.00 285 2360.509 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON 300 $64.00 $19,200.00 286 2504.602 IRRIGATION SYSTEM REPAIR EACH 1 $200.00 $200.00 287 2505.601 UTILITY COORDINATION LUMPSUMI 1 $1,000.00 $1,000.00 288 2521.511 3" BITUMINOUS WALK SO FT 7200 $5.00 $36,000.00 289 2521.518 6" CONCRETE WALK SO FT 200 $8.00 $1,600.00 290 2531.501 CONCRETE CURB AND GUTTER (SURMOUNTABLE) LIN FT 1500 $18.00 $27,000.00 291 2531.618 TRUNCATED DOMES SO FT 32 $50.00 $1,600.00 292 2540.602 MAIL BOX (TEMPORARY) EACH 10 $50.00 $500.00 293 2540.602 MAIL BOX SUPPORT EACH 1 $75.00 $75.00 294 2557.602 REPAIR DOG FENCE EACH 1 $250.00 $250.00 295 2563.601 TRAFFIC CONTROL LUMP SUM 1 $10,000.00 $10,000.00 296 2564.518 SIGN PANELS TYPE C SO FT 13 $65.00 $845.00 297 2564.602 SIGN PANELS TYPE SPECIAL EACH 2 $250.00 $500.00 298 2571.524 CONIFEROUS TREE 8' HT B &B EACH 2 $550.00 $1,100.00 299 2571.524 DECIDUOUS TREE 2.5" CAL B &B EACH 2 $550.00 $1,100.00 300 2573.502 STORM DRAIN INLET PROTECTION EACH 2 $200.00 $400.00 301 2573.503 SILT FENCE, TYPE MACHINE SLICED LIN FT 1500 $2.50 $3,750.00 302 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER LIN FT 1500 $3.50 $5,250.00 303 2573.604 STABILIZED CONSTRUCTION ENTRANCE EACH 2 $1,000.00 $2,000.00 304 2575.502 SEED MIXTURE 25 -151 LB 30 1 $20.00 $600.00 305 2575.523 EROSION CONTROL BLANKET CATEGORY 3 S Y 900 $5.00 $4,500.00 306 2575.604 SEEDING (INCL TOPSOIL AND FERT) ACRE 0.2 $10,000.00 $2,000.00 M. Country Club Road Sanitary Improvements Opinion of Probable Cost 2104.503 308 2104.502 REMOVE CASTING WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: DJE 1 $500.00 and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK Project Location: City of Shorewood $100.00 City Project No.: 17 -04 $750.00 WSB Project No: 02925 -24 Date: 1/4/2018 CHIMNEY SEALS MN /DOT EACH 1 Estimated $350.00 $1,000.00 Subtotal - H Mann Lane Sanitary Improvements $1,600.00 2502.503 +20% Contingency $320.00 Estimated Estimated Item No. Specificatio Description Unit Total Total - H Mann Lane Sanitary Improvements $2,438.40 $1,000.00 317 2503.503 15' RC PIPE SEWER DESIGN 3006 CL V LIN FT Unit Price Total Cost $4,160.00 n No. 2506.501 CONST DRAINAGE STRUCTURE DES 48 -4020 Quantity 4 $350.00 307 2575.605 HYDRAULIC MULCH MATRIX LB 600 $2.00 $1,200.00 $2,000.00 Subtotal - L Country Club Road Surface Improvements $375,870.00 CASTING ASSEMBLY +20% Contingency $75,174.00 $750.00 Subtotal - L Country Club Road Surface Improvements $451,044.00 2511.507 + 27% Indirect Costs $121,781.88 1 15 Total - L Country Club Road Surface Improvements $572,825.88 M. Country Club Road Sanitary Improvements 311 2104.503 308 2104.502 REMOVE CASTING $10.00 EACH 1 1 1 $500.00 1 $500.00 309 2506.502 CASTING ASSEMBLY $100.00 EACH 1 $750.00 $750.00 310 2506.602 CHIMNEY SEALS 314 EACH 1 1 $350.00 $350.00 $1,000.00 Subtotal - H Mann Lane Sanitary Improvements $1,600.00 2502.503 +20% Contingency $320.00 1000 Subtotal - H Mann Lane Sanitary Improvements $1,920.00 316 + 27% Indirect Costs $518.40 EACH Total - H Mann Lane Sanitary Improvements $2,438.40 N. Country Club Road Drainage Improvements 311 2104.503 REMOVE SEWER PIPE (STORM) LIN FT 70 $10.00 $700.00 312 2105.504 GEOTEXTILE FABRIC TYPE IV SO YD 20 $5.00 $100.00 313 2451.507 COURSE AGGREGATE BEDDING (CV) CU YD 10 $30.00 $300.00 314 2501.502 15' RC PIPE APRON EACH 1 $1,000.00 $1,000.00 315 2502.503 4" PERF PVC PIPE DRAIN LIN FT 1000 $14.00 $14,000.00 316 2502.602 4" PVC PIPE DRAIN CLEAN OUT EACH 4 $250.00 $1,000.00 317 2503.503 15' RC PIPE SEWER DESIGN 3006 CL V LIN FT 80 $52.00 $4,160.00 318 2506.501 CONST DRAINAGE STRUCTURE DES 48 -4020 LIN FT 4 $350.00 $1,400.00 319 2506.502 CONST DRAINAGE STRUCTURE DES SPECIAL EACH 1 $2,000.00 $2,000.00 320 2506.502 CASTING ASSEMBLY EACH 1 $750.00 $750.00 321 2511.507 RANDOM RIPRAP CLASS III CU YD 1 15 1 $100.00 1 $1,500.00 Subtotal - N Country Club Road Drainage Improvements $26,910.00 +20% Contingency $5,382.00 Subtotal - N Country Club Road Drainage Improvements $32,292.00 + 27% Indirect Costs $8,718.84 Total - N Country Club Road Drainage Improvements $41,010.84 Opinion of Probable Cost WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: WE and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK Project Location: City of Shorewood City Project No.: 17 -04 WSB Project No: 02925 -24 Date: 1/4/2018 Item No. MN /DOT Specificatio n No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost O. Yellowstone Trail Surface Improvement 322 2021.501 MOBILIZATION LUMP SUM 1 $15,300.00 $15,300.00 323 2101.505 CLEARING ACRE 0.14 $10,000.00 $1,400.00 324 2101.505 GRUBBING ACRE 0.14 $10,000.00 $1,400.00 325 2101.524 CLEARING TREE 80 $350.00 $28,000.00 326 2101.524 GRUBBING TREE 80 $350.00 $28,000.00 327 2104.502 REMOVE MAIL BOX SUPPORT EACH 2 $25.00 $50.00 328 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 340 $3.00 $1,020.00 329 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 20 $5.00 $100.00 330 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD 380 $3.50 $1,330.00 331 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD 170 $3.50 $595.00 332 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT SQ YD 40 1 $6.50 $260.00 333 2104.509 REMOVE SIGN EACH 6 $50.00 $300.00 334 2104.601 RELOCATE MISCELLANEOUS STRUCTURES LUMP SUM 1 $2,500.00 $2,500.00 335 2104.602 SALVAGE & REINSTALL MAILBOX EACH 10 $100.00 $1,000.00 336 2105.507 COMMON EXCAVATION (EV) (P) CU YD 100 $18.00 $1,800.00 337 2105.604 MINOR GRADING LUMPSUMI 1 $1,000.00 $1,000.00 338 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 20 $150.00 $3,000.00 339 2211.507 AGGREGATE BASE CLASS 5 (100% CRUSHED) TON 200 $20.00 $4,000.00 340 2231.501 BITUMINOUS PATCHING MIXTURE TON 100 $200.00 $20,000.00 341 2331.501 JOINT ADHESIVE - MASTIC LIN FT 300 $1.00 $300.00 342 2360.503 TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY SQ YD 100 $35.00 $3,500.00 343 2411.618 MODULAR BLOCK RETAINING WALL SO FT 1800 $25.00 $45,000.00 344 2504.602 IRRIGATION SYSTEM REPAIR EACH 1 $200.00 $200.00 345 2505.601 UTILITY COORDINATION LUMPSUM 1 $1,000.00 $1,000.00 346 2521.511 3" BITUMINOUS WALK SO FT 18500 $5.00 $92,500.00 347 2521.518 6" CONCRETE WALK SO FT 400 $8.00 $3,200.00 348 2531.501 CONCRETE CURB AND GUTTER B618 LIN FT 300 $22.00 $6,600.00 349 2531.504 6" CONCRETE DRIVEWAY PAVEMENT SQ YD 40 $65.00 $2,600.00 350 2531.618 TRUNCATED DOMES SO FT 64 $50.00 $3,200.00 351 2540.602 MAIL BOX (TEMPORARY) EACH 10 $50.00 $500.00 352 2540.602 MAIL BOX SUPPORT EACH 2 $75.00 $150.00 353 2557.602 REPAIR DOG FENCE EACH 2 $250.00 $500.00 354 2563.601 TRAFFIC CONTROL LUMPSUMI 1 $10,000.00 $10,000.00 355 2564.518 SIGN PANELS TYPE C SO FT 22 $65.00 $1,430.00 356 2564.602 SIGN PANELS TYPE SPECIAL EACH 2 $250.00 $500.00 357 2571.524 CONIFEROUS TREE 8' HT B &B EACH 10 $550.00 $5,500.00 358 2571.524 DECIDUOUS TREE 2.5" CAL B &B EACH 10 $550.00 $5,500.00 359 2573.502 STORM DRAIN INLET PROTECTION EACH 4 $200.00 $800.00 360 2573.503 SILT FENCE, TYPE MACHINE SLICED LIN FT 1800 $2.50 $4,500.00 361 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER LIN FT 1800 $3.50 $6,300.00 362 2575.502 SEED MIXTURE 25 -151 LB 50 $20.00 $1,000.00 363 2575.523 EROSION CONTROL BLANKET CATEGORY 3 S Y 2,000 $5.00 $10,000.00 364 2575.604 SEEDING (INCL TOPSOIL AND FERT) ACRE 0.4 $10,000.00 $4,000.00 365 2575.605 HYDRAULIC MULCH MATRIX LB 200 $2.00 $400.00 Subtotal - O Yellowstone Trail Surface Improvements $320,235.00 +20% Contingency $64,047.00 Subtotal - O Yellowstone Trail Surface Improvements $384,282.00 + 27% Indirect Costs $103,756.14 Total -O Yellowstone Trail Surface Improvements $488,038.14 Q. Yellowstone Trail Drainage Improvements Opinion of Probable Cost 369 2105.504 GEOTEXTILE FABRIC TYPE IV WSB Project: Riviera Lane, Shorewood Lane, Mann Lane, Maple Street Improvements Design By: DJE $300.00 and Trail Extension along Country Club Road and Yellowstone Trail Checked By: KAK Project Location: City of Shorewood 10 $30.00 City Project No.: 17 -04 2501.502 15' RC PIPE APRON WSB Project No: 02925 -24 Date: 1/4/2018 $3,000.00 MN /DOT 2502.503 4" PERF PVC PIPE DRAIN Estimated LIN FT 1850 $14.00 $25,900.00 373 2502.602 4" PVC PIPE DRAIN CLEAN OUT Estimated Estimated Item No. Specificatio Description Unit Total 15' RC PIPE SEWER DESIGN 3006 CL V LIN FT 195 $52.00 $10,140.00 375 Unit Price Total Cost n No. 12 $350.00 Quantity 376 2506.502 P. Yellowstone Trail Sanitary Improvements EACH 366 2104.502 REMOVE CASTING EACH 2 $500.00 $1,000.00 367 2506.502 CASTING ASSEMBLY EACH 2 $750.00 $1,500.00 368 2506.602 CHIMNEY SEALS EACH 2 $350.00 $700.00 Subtotal - P Yellowstone Trail Sanitary Improvements $3,200.00 +20% Contingency $640.00 Subtotal - P Yellowstone Trail Sanitary Improvements $3,840.00 + 27% Indirect Costs $1,036.80 Total - P Yellowstone Trail Sanitary Improvements $4,876.80 Q. Yellowstone Trail Drainage Improvements 369 2105.504 GEOTEXTILE FABRIC TYPE IV SO YD 60 $5.00 $300.00 370 2451.507 COURSE AGGREGATE BEDDING (CV) CU YD 10 $30.00 $300.00 371 2501.502 15' RC PIPE APRON EACH 3 $1,000.00 $3,000.00 372 2502.503 4" PERF PVC PIPE DRAIN LIN FT 1850 $14.00 $25,900.00 373 2502.602 4" PVC PIPE DRAIN CLEAN OUT EACH 6 $250.00 $1,500.00 374 2503.503 15' RC PIPE SEWER DESIGN 3006 CL V LIN FT 195 $52.00 $10,140.00 375 2506.501 CONST DRAINAGE STRUCTURE DES 48 -4020 LIN FT 12 $350.00 $4,200.00 376 2506.502 CONST DRAINAGE STRUCTURE DES SPECIAL EACH 1 $2,000.00 $2,000.00 377 2506.502 CASTING ASSEMBLY EACH 3 $750.00 $2,250.00 378 2511.507 RANDOM RIPRAP CLASS III CU YD 40 $100.00 $4,000.00 Subtotal - Q Yellowstone Trail Drainage Improvements +20% Contingency Subtotal - Q Yellowstone Trail Drainage Improvements + 27% Indirect Costs Total - Q Yellowstone Trail Drainage Improvements $53,590.00 $10,718.00 $64,308.00 $17,363.16 $81,671.16 APPENDIX C Geotechnical Boring Logs Feasibility Report Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 PROJECT SUBJECT Scale As shown Shorewood Lane Reconstruction Shorewood, Minnesota Soil Boring Locations Drawn By I Checked By Him), i AET NO, 01-07092 DATE January 2017 AMERICAN ENGINEERING TESTING, INC. SUBSURFACE BORING LOG AET JOB NO: 01 -07092 LOG OF BORING NO. B-1 (p. 1 Of 1) PROJECT: Riviera and Shorewood Lane Reconstruction; Shorewood, MN DEPTH FEET ELEVATION: MATERIAL DESCRIPTION GEOLOGY N MC SAMPLE TYPE REC IN' FIELD & LABORATORY TESTS WC DEN LL PL ,H20 5.25" Bituminous pavement FILL 8.25" FILL, silty sand with gravel, brown, frozen (A -1 -b) 1 M FILL, mostly silty sand, a little gravel, brown, frozen to 2'(A-2-4) 2 FILL, mostly sandy lean clay, slightly organic, a little gravel and silty sand, trace roots, dark 3 8 M x SS 10 13 4 brown and brown (A -6) FILL, mostly sandy lean clay, a little gravel, TILL 5 brown, gray and dark brown (A -6) 9 M SS 12 19 48 LEAN CLAY WITH SAND, slightly organic, 6 trace roots, black, firm to stiff (CL) (A -6) 7 8 8 M SS 16 25 9 10 9 M SS 14 27 11 12 27 LEAN CLAY, trace roots, gray, firm (CL) (A -7 -6) 13 5 M SS 18 20 SANDY LEAN CLAY, a little gravel, gray, a 14 little brown, firm, laminations of silty sand (CL) (A -6) FINE LEAN CLAY WITH SAND, a little gravel, ALLUVIUM 24 15 gray, a little brown, stiff, laminations of sandy silt and silty sand (CL) (A -6) j 13 M x SS 14 18 TILL 16 CLAYEY SAND, a little gravel, gray, a little brown, stiff, laminations of silty sand (SC) (A -6) END OF BORING DEPTH: DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO I n 0 -14 /Z 3.25 HSA TIME SAMPLED DTH DEPTH DEPTH FLUIID LEVEL LEVEL THE ATTACHED F12/28/16 12:00 16.0 14.5 15.5 None SHEETS FOR AN EXPLANATION OF BORING COMPLETED: 12/28/16 TERMINOLOGY ON DR: DTS LG: DO Rig: 1C THIS LOG 06/04 AMERICAN ENGINEERING SUBSURFACE BORING LOG TESTING, INC. AFT JOB NO: 01 -07092 LOG OF BORING NO. B-2 (p. I of 1) PROJECT: Riviera and Shorewood Lane Reconstruction; Shorewood, MN D DEPTH IN SURFACE ELEVATION: GEOLOGY N MC SAMPLE REC FIELD &LABORATORY TESTS WC DEN LL PL o- #20 FEET MATERIAL DESCRIPTION TYPE IN. 3" Bituminous pavement FILL 1 M FILL, mostly silty sand with gravel, dark brown, frozen (A -1 -b) FILL, mostly silty sand, a little gravel and clayey 2 sand, frozen to 20 (A -2 -4) FINE ALLUVIUM 8 M SS 14 25 78 LEAN CLAY, a little gravel, brown, a little gray, 3 firm, laminations of silty sand and clayey sand (CL) (A -6) 4 SANDY LEAN CLAY, a little gravel, brown, a TILL 5 little gray and dark brown, stiff, laminations of 11 M SS 14 19 silty sand and sandy silt (CL) (A -6) 6- CLAYEY SAND, a little gravel, brown, very stiff (SC) (A -6) 16 M SS 16 19 8 9 10 16 M SS 16 19 I1 SANDY LEAN CLAY, a little gravel, brownish 12 gray, a little brown, very stiff, laminations of sandy silt (CL) (A -6) 17 M SS 18 19 13 14 SANDY LEAN CLAY, a little gravel, brown, very stiff (CL) (A -6) 15 16 M SS 14 19 16 END OF BORING DEPTH: DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO 1 " 0 -14/2 3.25 HSA DATE TIME SAMPLED DEPTIH DEPTH FLUIID LEVEL LEVEL THE ATTACHED 12/28/16 11:10 16.0 14.5 16.0 None SHEETS FOR AN EXPLANATION OF BORING TERMINOLOGY ON COMPLETED: 12/28/16 THIS LOG DR: DTS LG: DO Rig: 1C 06/04 AMERICAN ENGINEERING SUBSURFACE BORING LOG TESTING, INC. AET JOB NO: 01 -07092 LOG OF BORING NO. B-3 (p. 1 of 1) PROJECT: Riviera and Shorewood Lane Reconstruction; Shorewood, MN DIN SURFACE ELEVATION: GEOLOGY N MC SAMPLE REC FIELD & LABORATORY TESTS WC DEN LL PL o - #20 FEET MATERIAL DESCRIPTION TYPE IN. 3.75" Bituminous pavement FILL 1 9.5" Crushed limestone base, light brown, frozen (A -1 -b) M 12 FILL, mixture of clayey sand and silty sand, a 2 little gravel, dark brown and brown, frozen (A -2 -6) 14 D SS 14 9 3 FILL, mostly clayey sand, a little gravel and silty sand, brown, frozen to 20" (A -6) 4 SANDY LEAN CLAY, a little gravel, brown, a TILL little gray, stiff, laminations of silty sand (CL) 5— (A -6) 11 M SS 16 19 61 6 7 16 M SS 14 17 8 9 10 14 M SS 12 16 11 LEAN CLAY, a little gravel, brown and gray, FINE 12 stiff, laminations of silty sand (CL) (A -6) ALLUVIUM 25 10 M SS 18 CLAYEY SAND, a little gravel, brown, a little TILL 13 gray and dark brown,s tiff, laminations of silty 18 san Band sandy silt (SC) (A -6) 14 15 14 M SS 18 19 16 END OF BORING DEPTH: DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO 1 , „ 0 -14/2 3.25 HSA DATE TIME SAMPLED PTH DEPTH CAVE-IN E H FLUID LEVEL LEVEL THE ATTACHED 12/28/16 1:40 16.0 14.5 15.8 None SHEETS FOR AN EXPLANATION OF BORING COMPLETED: 12/28/16 TERMINOLOGY ON DR: DTS LG: DO Rig: 1C TIES LOG 06/04 AMERICAN ENGINEERING SUBSURFACE BORING LOG TESTING, INC. AET JOB NO: 01 -07092 LOG OF BORING NO. B-4 (p. I of 1) PROJECT: Riviera and Shorewood Lane Reconstruction; Shorewood, MN DEPTH SURFACE ELEVATION: GEOLOGY N MC SAMPLE REC FIELD & LABORATORY TESTS WC DEN LL PL a #20 FEET MATERIAL DESCRIPTION TYPE ' 2.75" Bituminous pavement FILL 1 M 16 14" Crushed limestone base, light brown, frozen SANDY LEAN CLAY, a little gravel, brown, TILL OR 2 frozen to 24" then very stiff, laminations of silty FILL sand (CL) (A -6) (possible fill) 18 M SS 14 18 55 3 4 CLAYEY SAND, a little gravel, brown mottled, TILL very stiff, laminations of silty sand (SC) (A -6) 5 15 M SS 16 18 39 6 SANDY LEAN CLAY, a little gravel, brown, firm, laminations of silty sand (CL) (A -6) 5 M SS 8 20 8 9 10 6 M SS 10 21 11 LEAN CLAY WITH SAND, brown, a little dark FINE 12 brown and gray, firm, laminations of silty san ALLUVIUM 19 dand sandy silt (CL) (A -6) 5 M SS 10 13 26 14 15 7 M SS 10 23 16 END OF BORING DEPTH: DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO 0- 141/2' 3.25" HSA DATE TIME SAMPLED DEPTH CASING DEPTH CAVE -IN DEPTH DRILLING FLUID LEVEL WATER LEVEL THE ATTACHED 12/28/16 1:30 16.0 14.5 15.7 None SHEETS FOR AN EXPLANATION OF BORING COMPLETED: 12/28/16 TERMINOLOGY ON DR: DTS LG: DO Rig: 1C I I THIS LOG 06/04 APPENDIX D Sanitary Sewer Televising Summary Feasibility Report Riviera Lane, Shorewood Lane, Mann Lane, and Maple Street Improvements and Trail Extension Along Country Club Road and Yellowstone Trail City of Shorewood Project No. 17 -04 WSB Project No. 2925 -24 CHYDRIO KLEAM www.hydro - klean.com toll free 855.845.5326 Des Moines, IA Mankato, MN Rogers, MN Sioux Falls, SD Watertown, SD January 6, 2017 Paul Hornby City of Shorewood 5755 Country Club Road Shorewood, Minnesota 55331 Dear Paul; Thank you for the opportunity to provide the televising of your sanitary sewer in 2016. Based upon NASSCO PACP Condition Grades 1 -5, only one line had minor attached deposits /encrustation. NASSCO condition grade for this defect is a 2 which is very minor. Please see the PACP Codes and Grading information in your bound report for additional information. ............................................................... ............................... Fourteen manholes were identified throughout the project area. Two of the manholes were buried. Three of these manholes can benefit from rehabilitation. Manhole # Rehabilitation Required Video 35 -1 No rehab Video 35 -1A No rehab Video 35 -2 No rehab Buried, no video 35 -3 No rehab Video 35 -4 No rehab Video 35 -5 No rehab Video 35 -6 Grout 2 pipe connections and bottom barrel joint Video 35 -7 No rehab Video 37 -7 No rehab Video 38 -16 No rehab Buried, no video 38 -17 No rehab Video 38 -18 Grout lift hole, 3 pipe connection and 3 barrel joints Video 38 -19 Remove casting, install new adjustment rings, reset casting and new asphalt surface Video 75 -7 No rehab Video Expalrience the difference. One cWIL One service previder. One experience. The hand - written manhole reports are printed in the bound copy of your report. The videos are located on your flash drive in a folder labelled Manholes. A proposal to address the rehabilitation on these structures is included in the package. Maintenance Your collection system will benefit from a yearly cleaning, televising and manhole inspection schedule to locate deficiencies before they pose a problem. Hydro - Klean's P.I.P.E. program will allow you to schedule maintenance items now at today's costs can save money while offering you the additional benefit of prioritized recommendations as well as no cost manhole inspections. Please contact us for a maintenance proposal suitable to your needs. Please call with any questions. Paul, we look forward to working with the City again. Sincerely, Michele McGreal Hydro - Klean, LLC Cell 612.845.4394 Hydro -Klean LLC 333 NW 49th Place Des Moines, IA 50313 Phone: (515) 283 -0500 Fax: (515) 283 -0505 Main Inspections Pipe Run and Scoring :)roject qairn i lli :II:ID ft treeU Shorewood MN 123016 38 -17 A SHOREWOOD RIVIERA LN. Start dateffiirne' )'irec 'iioim� Wealgeru" ocadoin cock' 12/30/2016 7:57 AM D Grade Rating Rating Index q Il e' " ter II'.. eki IhU \NNNii 'dglq C PVC 9 in. Scores Calculated at: 1/6/2017 5:03:24 PM Started at 0.0 ft. with flow on 12/3012,0116 7:57:00 A D �,f parr N Nt Stopped at 1110.5 ft with flow an 12130/20,16, 7:57:00, A , MH '3.8 -17 �abr:°ic H - IManhole 01.0 ft., V1- Water Level 110.,5 ft„ HI - Manholle; Main Inspections Pipe Run and Scoring Page 1 of 11 Structural: O &M: Overall: Grade Segment Pipe Quick Pipe Rating Segment Pipe Quick Pipe Rating Pipe Rating Pipe Rating Grade Rating Rating Index Grade Rating Rating Index Index 1 0 0 2 0 E 0 3 0 0 0000 0 0 0000 0 Started at 0.0 ft. with flow on 12/3012,0116 7:57:00 A D �,f parr N Nt Stopped at 1110.5 ft with flow an 12130/20,16, 7:57:00, A , MH '3.8 -17 �abr:°ic H - IManhole 01.0 ft., V1- Water Level 110.,5 ft„ HI - Manholle; Main Inspections Pipe Run and Scoring Page 1 of 11 Main Inspections Pipe Run and Scoring :)Iroject qairn i lli :II:ID ft treeU Shorewood MN 123016 38 -18 A SHOREWOOD RIVIERA LN. Start dateffiirne' )'irec 'iioim� Weadgeru" doini cock' 12/30/2016 8:13 AM U Grade Sq Il e' ter'i II'.. c'ki IhU 1 N'ii 'dglq C PVC 9 in. Index Scores 0 Calculated at: 1/6/2017 5:03:24 PM Stopped at 1.82.1 ft. against how ­ . ° t 1821111 ft- �. own 12,/30 2016 &13: 00 A 41H - M4ainhol 4­4 vw °.F CPA 77C a. Started at 110 ft. against flow „ �, + 2� „31 fL 1 . one 12/30/20168:11.010 AM I'F - -'Tap Factory t d 3, ft., AMH - Manhole MH "38 -17' m At. tk � iii fly., MWL. - Water Lovel Main Inspections Pipe Run and Scoring Page 2 of 11 Structural: O &M: Overall: Grade Segment Pipe Quick Pipe Rating Segment Pipe Quick Pipe Rating Pipe Rating Pipe Rating Grade Rating Rating Index Grade Rating Rating Index Index 1 0 0 2 0 0 3 0 0 0000 0 0 0000 0 Stopped at 1.82.1 ft. against how ­ . ° t 1821111 ft- �. own 12,/30 2016 &13: 00 A 41H - M4ainhol 4­4 vw °.F CPA 77C a. Started at 110 ft. against flow „ �, + 2� „31 fL 1 . one 12/30/20168:11.010 AM I'F - -'Tap Factory t d 3, ft., AMH - Manhole MH "38 -17' m At. tk � iii fly., MWL. - Water Lovel Main Inspections Pipe Run and Scoring Page 2 of 11 Main Inspections Pipe Run and Scoring :)Iroject qairn i lli :II:ID ft treeU Shorewood MN 123016 38 -19 A SHOREWOOD RIVIERA LN. Start dateffiirne' )'irec 'iioim� Weadgeru" lion cock' 12/30/2016 8:30 AM U 2 2100 Sq Il e' ter'i II'.. c'ki Il iU 1 N ddglq C PVC 9 in. 0 4 0 Scores 0 Calculated at: 1/6/2017 5:03:23 PM Grade Structural: Segment Pipe Quick Pipe Rating Grade Rating Rating Index O &M: Segment Pipe Quick Pipe Rating Grade Rating Rating Index Overall: Pipe Rating Pipe Rating Index 1 0 0 0000 0 2 2100 2.00 2 2.00 2 0 2 0 0 0 3 0 4 0 5 0 Stopped at 3093 ft. against floe awn 12130 2016 8:30:00 A At 246 6 fl::IO3 , T - Tap Factory oM ry Ifl UN L79 At 1.32. fli,� 9/. a� TFA, - Tap Factory Active (.w, ulN' A Started ,at OX ft. .against flow on 12/3,012016 8:30 :00 AGE . 3,09 .7 ft° H - r4ainh of At 241.E fit. 2/° TF - Tai Factory At 240.8 ft °,12 paw - Deposits Attached Encrustation Sating: 3 Category: O &M 0 0 fl:o, H - Manhole GA) ft ' K _ Water Level Main Inspections Pipe Run and Scoring Page 3 of 11 Main Inspections Pipe Run and Scoring :)Iroject qairn i lli :II:ID ft treeU Shorewood MN 123016 38 -7 A SHOREWOOD RIVIERA LN. Start to iiir nc' )'irec 'iioim� Weadgeru" Lion cock' 12/30/2016 9:43 AM D Grade Ilgi Il e' ter Ikk c'ki IhU 1 N'ii 'tllgi' C PVC 9 in. Index Scores 0 Calculated at: 1/6/2017 5:03:23 PM Started at 0.0 ft. with flow on 12/3012,01 9,410 A Lry Ln �, . C "T , b I' At 236.5 ft,. 3',j. 91 � (.7 TFA Tap. Factory Active g a i LrA At 326.9 ft. 3/. I � TF - Tap Factory Stopped at 410.5 ft. with Flo on 12/3617316 0:41010, A, MN '38-7' H - IMan�hole 0.0 ft., Vt - Water Level At 64,3 ft.. 1.0/. TF - Tap Factory At 278.0 ft, 101. TF - Tap Factory Active At 382.2 ft, 10/., TiFA - Tap, Factory Active 410.5 ft.' H - Manhole Main Inspections Pipe Run and Scoring Page 4 of 11 Structural: O &M: Overall: Grade Segment Pipe Quick Pipe Rating Segment Pipe Quick Pipe Rating Pipe Rating Pipe Rating Grade Rating Rating Index Grade Rating Rating Index Index 1 0 0 2 0 0 3 0 0 0000 0 0 0000 0 Started at 0.0 ft. with flow on 12/3012,01 9,410 A Lry Ln �, . C "T , b I' At 236.5 ft,. 3',j. 91 � (.7 TFA Tap. Factory Active g a i LrA At 326.9 ft. 3/. I � TF - Tap Factory Stopped at 410.5 ft. with Flo on 12/3617316 0:41010, A, MN '38-7' H - IMan�hole 0.0 ft., Vt - Water Level At 64,3 ft.. 1.0/. TF - Tap Factory At 278.0 ft, 101. TF - Tap Factory Active At 382.2 ft, 10/., TiFA - Tap, Factory Active 410.5 ft.' H - Manhole Main Inspections Pipe Run and Scoring Page 4 of 11 Main Inspections Pipe Run and Scoring :)Iroject qairn i lli :II:ID ft treeU Shorewood MN 123016 35 -4 A SHOREWOOD SHOREWOOD LN. Start ate iiir nc' )'irec 'iioim� Weadgeru" lion cock' 12/30/2016 10:32 AM D Grade q Il e' ter'i Ikk c'ki Il iU 1 N ddglq C PVC 9 in. Scores Calculated at: 1/6/2017 5:03:22 PM r� Key �;b ,7. p Started at 0,0 ft. rith tlo on 12/301/2016 10:32:00 AM Stopped at: 99.9 ft„ with flow on 12/30,12016 1022 :00 AMI 9IIHI "35,3® N " 3'S - -4' 0.0 ft., Vt - Water Level At 14.9 ft. 1.0/. TFA - Tap Factory Active At 41.3 . 9/, TFC - Tap Factory Capped 99.9 ft. H - Manhole Main Inspections Pipe Run and Scoring Page 5 of 11 Structural: O &M: Overall: Grade Segment Pipe Quick Pipe Rating Segment Pipe Quick Pipe Rating Pipe Rating Pipe Rating Grade Rating Rating Index Grade Rating Rating Index Index 1 0 0 2 0 0 3 0 0 0000 0 0 0000 0 r� Key �;b ,7. p Started at 0,0 ft. rith tlo on 12/301/2016 10:32:00 AM Stopped at: 99.9 ft„ with flow on 12/30,12016 1022 :00 AMI 9IIHI "35,3® N " 3'S - -4' 0.0 ft., Vt - Water Level At 14.9 ft. 1.0/. TFA - Tap Factory Active At 41.3 . 9/, TFC - Tap Factory Capped 99.9 ft. H - Manhole Main Inspections Pipe Run and Scoring Page 5 of 11 Main Inspections Pipe Run and Scoring :)Iroject qairn i lli :II:ID ft treeU Shorewood MN 123016 35 -3 A SHOREWOOD SHOREWOOD LN. Start ate iiir nc' )'irec 'iioim� Weadgeru" lion cock' 12/30/2016 10:45 AM D Grade q Il e' ter'i Ikk c'ki Il iU 1 N ddglq C PVC 9 in. Scores Calculated at: 1/6/2017 5:03:25 PM ��ti and f, �t• �M N r� Key �;b ,7. p Started at 6,0 ft. rith flow on 12/301/2016 10.45.00 AM At 9..4 . 31., TF - Taup Factory Stopped ate 41.5 tt„ with Flo on 12/30,12016 10;45.00 AMl , UHi °35 -210 0.0 ft., Vt - Water Level 41.5 ft. H - Manhole Main Inspections Pipe Run and Scoring Page 6 of 11 Structural: O &M: Overall: Grade Segment Pipe Quick Pipe Rating Segment Pipe Quick Pipe Rating Pipe Rating Pipe Rating Grade Rating Rating Index Grade Rating Rating Index Index 1 0 0 2 0 0 3 0 0 0000 0 0 0000 0 ��ti and f, �t• �M N r� Key �;b ,7. p Started at 6,0 ft. rith flow on 12/301/2016 10.45.00 AM At 9..4 . 31., TF - Taup Factory Stopped ate 41.5 tt„ with Flo on 12/30,12016 10;45.00 AMl , UHi °35 -210 0.0 ft., Vt - Water Level 41.5 ft. H - Manhole Main Inspections Pipe Run and Scoring Page 6 of 11 Main Inspections Pipe Run and Scoring :)Iroject qairn i lli :II:ID ft treeU Shorewood MN 123016 35 -2 A SHOREWOOD SHOREWOOD LN. Start ate iiir nc' )'irec 'iioim� Weadgeru" lion cock' 12/30/2016 10:56 AM D Grade q Il e' ter'i Ikk c'ki Il iU 1 N ddglq C PVC 9 in. Scores Calculated at: 1/6/2017 5:03:24 PM q �7 L � B. i F, F,, r� 0 ,7. p Started at 0.0 ft. Frith flow on 12/301/2516 10.56:00 AM Stoppedat 75.0 ft, with Flo on 12/30,12016 10:56:00 AMl , H "F'5 -1® H - Manhole 0.0 ft., Vt - Water Level At 3T9 ft. /:w TF - Tap Factory y 75.0 ft. H - Manhole Main Inspections Pipe Run and Scoring Page 7 of 11 Structural: O &M: Overall: Grade Segment Pipe Quick Pipe Rating Segment Pipe Quick Pipe Rating Pipe Rating Pipe Rating Grade Rating Rating Index Grade Rating Rating Index Index 1 0 0 2 0 0 3 0 0 0000 0 0 0000 0 q �7 L � B. i F, F,, r� 0 ,7. p Started at 0.0 ft. Frith flow on 12/301/2516 10.56:00 AM Stoppedat 75.0 ft, with Flo on 12/30,12016 10:56:00 AMl , H "F'5 -1® H - Manhole 0.0 ft., Vt - Water Level At 3T9 ft. /:w TF - Tap Factory y 75.0 ft. H - Manhole Main Inspections Pipe Run and Scoring Page 7 of 11 Main Inspections Pipe Run and Scoring :)Iroject qairn i lli :II:ID ft treeU Shorewood MN 123016 35 -1 A SHOREWOOD SHOREWOOD LN. Start ate iiir nc' )'irec 'iioim� Weadgeru" lion cock' 12/30/2016 11:03 AM D Grade q Il e' ter'i Ikk c'ki Il iU 1 N ddglq C PVC 9 in. Index Scores 0 Calculated at: 1/6/2017 5:03:24 PM q b I' (.7 w, Started at 0.0 ft. rith flow on 12/301/2016 11:03:00 AM Stopped at 144.8 ft. with Flo on 12/301,20,16 11:810,0 A 0.0 ft., Vt - Water Level 144.8 ft. H - Manhole Main Inspections Pipe Run and Scoring Page 8 of 11 Structural: O &M: Overall: Grade Segment Pipe Quick Pipe Rating Segment Pipe Quick Pipe Rating Pipe Rating Pipe Rating Grade Rating Rating Index Grade Rating Rating Index Index 1 0 0 2 0 0 3 0 0 0000 0 0 0000 0 q b I' (.7 w, Started at 0.0 ft. rith flow on 12/301/2016 11:03:00 AM Stopped at 144.8 ft. with Flo on 12/301,20,16 11:810,0 A 0.0 ft., Vt - Water Level 144.8 ft. H - Manhole Main Inspections Pipe Run and Scoring Page 8 of 11 Main Inspections Pipe Run and Scoring :)Iroject qairn i lli :II:ID ft treeU Shorewood MN 123016 35 -5 A SHOREWOOD SHOREWOOD LN. Start ate iiir nc' )'irec 'iioim� Weadgeru" lion cock' 12/30/2016 11:33 AM U Grade IIqapc ter akk ck;plhU 1 N'ii 'dq' C PVC 9 in. Index Scores 0 Calculated at: 1/6/2017 5:03:24 PM oM d, Stopped at 319.9 ft. against hove on 12130 2016 11,33;00 All At ' 271.9 ft. 10/ 3T _ 'T a-p Factory Im'l b I' t 1.'11.4 ft. 9 iF _. -FDp Factory Ac re u1:li A Started ,at OX ft. ,against flow on 12/3,012016 11:33:00 AM I �rlthll1YC9�'�yi 311.9 ° H - planh of At 242. fit °, 21, TF - Tap Factor At 1016 9 ft, / TF - Tap Factor :ctiv +e 0 0 ft o, H - Manhole GA) 'ft" K _ Water Level Main Inspections Pipe Run and Scoring Page 9 of 11 Structural: O &M: Overall: Grade Segment Pipe Quick Pipe Rating Segment Pipe Quick Pipe Rating Pipe Rating Pipe Rating Grade Rating Rating Index Grade Rating Rating Index Index 1 0 0 2 0 0 3 0 0 0000 0 0 0000 0 oM d, Stopped at 319.9 ft. against hove on 12130 2016 11,33;00 All At ' 271.9 ft. 10/ 3T _ 'T a-p Factory Im'l b I' t 1.'11.4 ft. 9 iF _. -FDp Factory Ac re u1:li A Started ,at OX ft. ,against flow on 12/3,012016 11:33:00 AM I �rlthll1YC9�'�yi 311.9 ° H - planh of At 242. fit °, 21, TF - Tap Factor At 1016 9 ft, / TF - Tap Factor :ctiv +e 0 0 ft o, H - Manhole GA) 'ft" K _ Water Level Main Inspections Pipe Run and Scoring Page 9 of 11 Main Inspections Pipe Run and Scoring :)Iroject qairn i lli :II:ID ft treeU Shorewood MN 123016 35 -7 A SHOREWOOD SHOREWOOD LN. Start ate iiir nc' )'irec 'iioim� Weadgeru" lion cock' 12/30/2016 12:16 PM D Grade q Il e' ter'i Ikk c'ki Il iU 1 N ddglq C PVC 9 in. Scores Calculated at: 1/6/2017 5:03:24 PM Started at 0.0 ft. with 6a on 12/3012016 12:16:00 PAN CywV R °y�"1 At 49.0 'ft. 2,1. TF - Tap IFa;ctor b I' (. w, "" g A Stopped at 1113 ft. with flow on 12/301,20,16 1.2:16:0,0 pM UHi 135-610 H - Mianh ole 01.0 ft,, Vt - Water Level At 43.6 ft. 10/,. TF - Tap P'atto:ry 111.3 ft. Main Inspections Pipe Run and Scoring Page 10 of 11 Structural: O &M: Overall: Grade Segment Pipe Quick Pipe Rating Segment Pipe Quick Pipe Rating Pipe Rating Pipe Rating Grade Rating Rating Index Grade Rating Rating Index Index 1 0 0 2 0 0 3 0 0 0000 0 0 0000 0 Started at 0.0 ft. with 6a on 12/3012016 12:16:00 PAN CywV R °y�"1 At 49.0 'ft. 2,1. TF - Tap IFa;ctor b I' (. w, "" g A Stopped at 1113 ft. with flow on 12/301,20,16 1.2:16:0,0 pM UHi 135-610 H - Mianh ole 01.0 ft,, Vt - Water Level At 43.6 ft. 10/,. TF - Tap P'atto:ry 111.3 ft. Main Inspections Pipe Run and Scoring Page 10 of 11 Main Inspections Pipe Run and Scoring :)Iroject qairn i lli :II:ID ft treeU Shorewood MN 123016 35 -5 B SHOREWOOD SHOREWOOD LN. Start dateffiirne' )'irec 'iioim� Weadgeru" lion cock' 12/30/2016 12:50 PM U Grade Sq Il e' ter'i II'.. c'ki Il iU 1 N ddglq C PVC 9 in. Index Scores 0 Calculated at: 1/6/2017 5:03:24 PM t::a gym; C F m" �^v� b I' a� (. w, N' LrA Stopped at 218.0 ft. against drove — awn 12,/30 2016 12:50,00 P ,At 1.t65 ft, R,u 01 f 1i= - Tap Factory Started ,at OX ft„ ,against flow on 12/3,012010 12:50:,00 pH �r1r4*tnlllYC9�'�bli LS 0 ft- 4H - Mleinhol'e dH - Manhole GA) ft" x"L _ Water Level Main Inspections Pipe Run and Scoring Page 11 of 11 Structural: O &M: Overall: Grade Segment Pipe Quick Pipe Rating Segment Pipe Quick Pipe Rating Pipe Rating Pipe Rating Grade Rating Rating Index Grade Rating Rating Index Index 1 0 0 2 0 0 3 0 0 0000 0 0 0000 0 t::a gym; C F m" �^v� b I' a� (. w, N' LrA Stopped at 218.0 ft. against drove — awn 12,/30 2016 12:50,00 P ,At 1.t65 ft, R,u 01 f 1i= - Tap Factory Started ,at OX ft„ ,against flow on 12/3,012010 12:50:,00 pH �r1r4*tnlllYC9�'�bli LS 0 ft- 4H - Mleinhol'e dH - Manhole GA) ft" x"L _ Water Level Main Inspections Pipe Run and Scoring Page 11 of 11 CITY OF SHOREWOOD Preliminary Layout Riviera Lane and Shorewood Lane Street and Utility Improvements SHOREWOOD, MINNESOTA 0 100 200 SCALE IN FEET WSB PROJECT NO. 2925 -24 DATE: DECEMBER 2016 FIGURE 1 CITY OF SHOREWOOD Preliminary Layout Riviera Lane and Shorewood Lane Street and Utility Improvements SHOREWOOD, MINNESOTA 0 100 200 SCALE IN FEET WSB PROJECT NO. 2925 -24 DATE: DECEMBER 2016 FIGURE 2 CITY OF SHOREWOOD RESOLUTION NO. 18- A RESOLUTION RECEIVING FEASIBILITY REPORT AND AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS FOR MANN LANE, RIVIERA LANE AND SHOREWOOD LANE STREET AND UTILITY IMPROVEMENT PROJECT, CITY PROJECT 17 -04 WHEREAS, the City Council authorized preparation of a revision to the Feasibility Report for the Riviera Lane and Shorewood Lane Street and Utility Improvement Project, City Project 17 -04, to include Mann Lane and Maple Street on September 6, 2017; and WHEREAS, subsequent to the October 9, 2017 City Council work session discussion regarding trail improvements within the City, the trail extension next to Country Club Road from the current terminus to Yellowstone Trail, and the trail extension next to Yellowstone Trail from Country Club Road to Lake Linden Drive was to be included the feasibility report; and WHEREAS, the report provides information regarding whether the proposed improvements are necessary, cost - effective, and feasible; whether it should best be made as proposed or in connection with some other improvement; and the estimated cost of the improvement as recommended. NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Shorewood, Minnesota: 1. The Council receives the Feasibility Report prepared by WSB; and 2. The Council will consider the improvement of Mann Lane, Riviera Lane and Shorewood Lane Street and Utility Improvement Project, City Project 17 -04, in accordance with the report at an estimated cost of $1,578,300; and 3. Authorizes the preparation of plans and specifications for the improvements on Mann Lane, Riviera Lane and Shorewood Lane. ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 221 day of January, 2018. Scott Zerby, Mayor ATTEST: Sandie Thone, City Clerk PLEASE COMMENT ON ANY ISSUES 'SHE CITY SHOULD CONSIDER WHEN ES 16, 'KING OR CONSTRUCTING THIS PROJECT. D t"e'f'5 'vq -I L 14, 7Z) /75 j 7vi, n 4-t Your Name °l Phone Address CITYOF SHOREWOOD Engineer From: Sandra Ahlstrom Sent: Tuesday, December 12, 2017 10:12 PM To: Engineer Subject: Re: Remarks Re: 2018 Street Improvements for Riviera Lane (City Project No. 17 -04) Good evening, Alyson, "Yes, the cost - sharing is for the water main.`We already have the sewer connection. I reread what I composed for you and missed that as you've noted. Is there a way to add the water main to my letter so it does make sense? What would you suggest? I could just rewrite my letter and make the correction... And then, we do want to include our email in the council packet. Sincerely, Tom and Sandy Ahlstrom > On Dec 12, 2017, at 3:32 PM, Engineer < CityEngineer @ci.shorewood.mn.us> wrote: > Hello Tom and Sandy, > Thank you for the email. The cost -share scenario you present is for the water main, correct? That is my recollection from our telephone conversation last week. > Would you like me to include your email in the council packet for the public hearing? If so, I will block out your email address. > Regards, > Alyson Fauske, PE (MN) > City Engineer > Shorewood MN > 952.960.7910 > - - - -= Original Message---- - > From: Sandra Ahlstrom [mailto > Sent: Monday, December 11, 2017 8:27 PM > To: Sandra Ahlstrom <sandy.earth350 @gmail.com> > Subject: Remarks Re: 2018 Street Improvements for Riviera Lane (City Project No. 17 -04) > Good morning, Alyson Sauske, City Engineer with the City of Shorewood, > I appreciated being able to talk with you about the above mentioned street improvement project that includes Riviera Lane. We live at 6085 Riviera Lane and have previously attended two informational City Council mtgs. concerning the improvement plans but we were then told that the project was on hold till a future date. We were not able to attend the Neighborhood Mtg. - Open House the evening of November 22 but want to reiterate our understanding of the cost - sharing of this project on the homeowners affected. We stated at the earlier council mtgs. that we believe the 4 homes on the south side of Yellowstone Trail leading east to Riviera Lane should share in the cost of the road improvement to be done. If those 4 homes plus the 14 on Riviera share the costs, all of our costs will be lessened. That is the fairest plan for all concerned, in our estimation. > Many thanks for understanding and we hope to be able to speak with the city again at another date > Sincerely, > Tom and Sandy Ahlstrom > 6085 Riviera Lane > Shorewood, MN 55331 Sandra Ahlstrom #8B MEETING TYPE City of Shorewood Council Meeting Item REGULAR Title / Subject: Sewer Jet Vac Joint Purchase Agreement Meeting Date: January 22, 2018 Prepared by: Greg Lerud, City Administrator Reviewed by: Larry Brown, Public Works Director Attachments: Redline contract Policy Consideration: Should the City Council consider approving a revised agreement to purchase and operate a sewer jet vac truck? Background: At the November 27, 2017 regular council meeting, the Council approved an agreement with the cities of Excelsior and Tonka Bay for the purchase and operation of a sewer jet vac truck. The agreement was prepared by Tonka Bay and the council unanimously approved the agreement, as did the City of Excelsior. When the agreement went back to the Tonka Bay Council, they made revisions to the agreement and sent it back to Shorewood and Excelsior for re- approval. Staff has been reluctant to bring this bak to Council because we cannot recommend approval of the Tonka Bay modifications and suggested to our counterparts in the other cities that staff try to work out the issues before bringing the agreement back for council consideration. At their meeting on January 9, the Tonka Bay council formally requested the agreement be presented to both Excelsior and Shorewood councils for consideration. That is the reason it is coming back to you. Financial or Budget Considerations: Some of the Tonka Bay changes could have an impact on Shorewood's share of the operating cost. The proposed language does not allow for any future analysis for sharing the cost except for the one -time determination four years from now. Additionally, the "take it or leave it" terms in Section 4 G d are unacceptable, and there are potential issues with the recordkeeping requirements in Section 5d that do not exist with the approved 33 -33 -33 split. Options: The council has the following options: 1. Take no action on the revised agreement and reiterate support only for the approved agreement. 2. Approve the changes to the agreement as proposed by Tonka Bay. 3. Decline approval of the revised agreement but direct staff to see if there are changes that could be made to make the agreement acceptable. Recommendation / Action Requested: Staff cannot recommend approval of the revised agreement. These changes were done by the Tonka Bay Council after Shorewood and Exceslior approval without any input from our staff. In addition, if there are revisions to be made to the agreement, staff has a few changes that it would like to include in any new agreement. Because staff believes that ownership of this piece of equipment is important, we recommend the council decline to approve the revised agreement and direct staff to negotiate changes. Staff further recommends that the period of Mission Statement: The City of Shorewood is committed to providing residents quality public services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial management through effective, efficient, and visionary leadership. Page 1 negotiations be no longer than 45 days. Staff will then present a revised agreement that it can support, or recommend other action, including looking at a different purchase and use arrangement with a single city. Next Steps and Timeline: Staff will communicate the council's decision to Tonka Bay and Excelsior. The city of Excelsior will consider this revised agreement at their first meeting in February. JOINT PURCHASE AGREEMENT BETWEEN THE CITY OF TONKA BAY, THE CITY OF EXCELSIOR, AND THE CITY OF SHOREWOOD FOR THE COOPERATIVE PURCHASE AND USE OF PUBLIC WORKS EQUIPMENT This Joint Purchase Agreement ( "Agreement ") is made and entered into this day of , 2017 by and between the City of Tonka Bay ( "Tonka Bay "), the City of Excelsior ( "Excelsior "), and the City of Shorewood ( "Shorewood "), each a municipal corporation under the law of the State of Minnesota, collectively referred to herein as the "Parties" or individually as a "Party." RECITALS A. Each of the Parties hfl-vehas a limited need for a JetterNactor truck (generally, the "Equipment "). B. The estimated cost of the Equipment is approximately $ , exclusive of any costs (e.g., tax, title, license, etc.). C. Rather than each Party incurring the costs to purchase, maintain, and store such Equipment, the Parties agree it is in their mutual best interests to establish a cooperative agreement whereby they share in the acquisition and use of such new Equipment. D. The Parties are authorized pursuant to Minnesota Statutes, section 471.59 to exercise their shared powers cooperatively and jointly in the purchase and use of such Equipment. AGREEMENT In consideration of the mutual undertakings and understandings expressed herein, the Parties hereby agree as follows: Purpose. The purpose of this Agreement is to establish a process for the Parties to agree to cooperatively purchase, use, maintain, and store the Equipment as outlined herein. 2. Responsible Party. Tonka Bay shall serve as the responsible Party ( "Responsible Party ") for purchasing and insuring the Equipment cooperatively purchased under this Agreement. 3. Storage. The City of Excelsior shall primarily store the Equipment when it is not being used by another Party. Each Party shall be responsible for short -term storage while the Equipment is being used by that Party, as well as returning the Equipment to Excelsior following such use. The Excelsior Public Works Superintendent ( "Excelsior Superintendent ") shall notify the Tonka Bay Public Works Superintendent ( "Tonka Bay Superintendent ") and the Shorewood Public Works Director ( "Shorewood Director ") of the process for removal and return of the Equipment from its storage location. Each Party hereto shall have the right to remove and return the Equipment in accordance with the use schedule required under this 5091300 AMB TN115 -1 Agreement. In return for Excelsior storing the Equipment, each Party agrees to pay Excelsior an annualized rate of $1200.00--,l .2 00.00. or $100.00 per month per Party. Such payment shall be made in full by each Party to Excelsior, without demand, no later than January 31St of each year. 4. Cooperative Purchase of Equipment. The Parties agree that the cooperative purchase of the Equipment shall be accomplished in accordance with this section. (a) Proposal to Purchase. Each Party, through its Director or Superintendent, may propose to the other Directors or Superintendents the cooperative purchase of a new or replacement item of Equipment that would be beneficial to the Parties in providing public works services within their respective cities. If the Directors and Superintendents agree to proceed with the proposed purchase, each shall seek such approvals as may be required to authorize the cooperative purchase of the identified item of Equipment. (b) Purchase. Upon the authorization by all Parties, the Responsible Party agrees to undertake the necessary process to purchase the item of Equipment in accordance with all applicable public contracting laws. The Director or Superintendent for each Party shall agree on the specifications for the item of Equipment before the Responsible Party formally undertakes the purchasing process. (c) Cost Share. Each Party shall be responsible for one -third of the purchase price of the Equipment, inclusive of all costs associated therewith. The respective cost - sharing responsibilities of each Party are identified in Exhibit A, attached hereto. (d) Payment. The Responsible Party shall notify each Party in writing of the required payment for its equal 1/3 share of the Equipment prior to the Responsible Party purchasing such Equipment. Each Party shall remit payment for their invoiced amount within 30 days of receiving such invoice. Upon receipt of each Party's payment hereunder, the Responsible Party shall purchase and pay for the Equipment in full. (e) Ownership. The Equipment shall be owned in equal undivided shares by the Parties hereto. Upon disposition of the Equipment cooperatively purchased under this Agreement, each Party shall be entitled to one -third of the proceeds of the sale as provided in the following paragraph. (f) Disposition. The Director or Superintendent for each Party must agree, in writing, to dispose of the Equipment cooperatively purchased under this Agreement. The Party who served as the Responsible Party to purchase the item of Equipment shall be responsible for disposing of it and promptly paying theeach other Party its one -third share of the proceeds from the sale. If an item of Equipment is being traded in on a new item of Equipment, the trade -in value shall reduce the purchase price of the new item of Equipment in equal shares for each Peftie-sParty. The item of Equipment acquired through the trade -in shall be subject to the approval process outlined in paragraphs 4(a) and (b) above and owned, used, and maintained in accordance with the 2 509130v69 AM B T N 115 -1 terms of this Agreement. Before the item of Equipment is made available for purchase by the general public, a Party hereto may elect to purchase the other Parties' interests in the item of Equipment by paying one -third of the agreed upon value of the item of Equipment. Notice of an election to purchase must be provided in writing to the other Parties within €iftee thirty (4-530) days of the determination of the weed upenaapnraised value of the item of Equipment. NE) Prafft , may elect to ptff .hale Should one Party purchase the equitable share in the Equipment of another party, such purchase shall not confer on the purchasing Party any greater or additional rights to use the Equipment over the remaining Party holding an interest in the Property. The sale of a Party's interest in the Property shall dispose of that Party's right to use the Equipment under the terms of this Agreement. (g) Costs. Costs incurred in the purchase, maintenance and operation, administration, and disposition of the Equipment shall be allocated as provided herein. All ongoing payment obligations shall follow the process provided in paragraph a, below. a. Administrative Costs. Each Party agrees to reimburse the Responsible Party for the administrative costs incurred pursuant to the administration of this Agreement, including but not limited to the costs associated with the preparation of this Agreement, securing bids for the purchase of the Equipment, executing the purchase of the Equipment, and any other administrative costs incurred. The Responsible Party shall provide each Party with a written invoice outlining its share of the costs incurred hereunder, and each Party shall remit payment to the Responsible Party within 30 days of receiving such invoice. The Parties agree that the Responsible Party shall invoice each Party semi - annually on March 31St and September 30th of each calendar year, except that if at any time the balance due to the Responsible Party exceeds $500.00 per Party, the Responsible Party may immediately invoice each Party in addition to the semi - annual invoices allowed hereunder. In the event that the administrative costs incurred under this Agreement are reasonably expected to exceed $1,000.00, the Responsible Party shall obtain prior written permission from each Party prior to incurring such costs. All initial costs incurred by the Responsible Party up to the date of delivery of the Equipment shall be invoiced to each Party within 30 days of delivery of such Equipment, and future costs shall be invoiced according to the provisions of this section. b. Maintenance and Minor Repairs. The Responsible Party agrees to perform routine maintenance on the Equipment cooperatively purchased under this Agreement. Routine maintenance includes lubricants (grease, oil, or other fluids), repair of flat tire, replacement or repair of any minor damage reasonably caused during normal use, etc. The other Parties agree to reimburse the Responsible Party for one -third of the costs of routine maintenance, including a reasonable charge for labor to conduct such maintenance. Each Party agrees to ensure that the Equipment is cleaned and all fuel and fluids are full after use. In the event a 3 509130v69 AM B T N 115 -1 shared maintenance cost is estimated to exceed $10,000.00, the Responsible Party agrees to obtain the prior written consent and /or prepayment of the other Parties prior to undertaking such maintenance. c. Insurance. The Responsible Party shall insure the Equipment purchased under this Agreement and agrees to name the other Parties as an additional insured on the policy. Each Party shall be responsible for one -third of the annual insurance premium to insure the Equipment. The non - responsible Parties agree to reimburse the Responsible Party for their one -third share of the costs of such insurance. Each Party shall be responsible for maintaining its own general liability insurance and workers' compensation insurance covering its own employees while they are operating, maintaining, or otherwise utilizing the Equipment pursuant to this Agreement. d. Re- allocation of Costs. The Parties acknowledge that, upon the conclusion of the initial term of this Agreement. the Parties will re- allocate the on-going costs associated with the Equipment based on the actual proportional usage of the Equipment between the Parties. Following the completion of the fourth ey ar of the initial term. the Responsible Party shall review the records related to usage which are required herein, and shall determine the proportionate percentage use of each party over the initial term of this Agreement. If any Party does not agree such re- allocation of the costs in subsequent terms as provided above, they may withdraw from the Agreement pursuant to the terms contained herein. 5. Cooperative Use of Equipment. The Parties agree that the Equipment cooperatively purchased under this Agreement shall be available for use by the Parties in accordance with this section. (a) Schedule. The Parties shall establish a schedule for the use of the Equipment to allow all Parties a reasonable period of time to utilize the Equipment. Such schedule shall be reduced to writing and signed by all Directors and Superintendents annually. All changes to the schedule must be made in writing, signed by each of the Directors and Superintendents. (b) Use. Equipment shall only be used for its intended purpose. No Party shall lease, rent, loan, or otherwise permit Equipment cooperatively purchased pursuant to this Agreement to be used by anyone who is not a party to this Agreement without the written consent of each of the other Parties. (c) Liability. If the Equipment is damaged while it is being used by one of the Parties, that Party shall be responsible for paying 100% of any deductible on the insurance claim. Notwithstanding this provision, to the extent that such damage can reasonably be repaired pursuant to the maintenance responsibilities under paragraph (c) above, the Responsible Party shall make stffesuch repairs and invoice each Party for their respective share pursuant to the payment terms herein. Any repair which is required due to the negligence of any Party shall be the sole responsibility of that Party to repair. 4 509130v69 AM B T N 115 -1 Failure by any Party to repair any such damage within a reasonable time shall result in the suspension of that Party's right to use the Equipment under this Agreement until such time as the repairs are made to the reasonable satisfaction of the other Parties. If such party fails to make such repairs, the Responsible Party may elect, at its discretion, to make such repairs and invoice the negligent Party for the full costs of such repairs. The negligent Party shall not regain its right to use the Equipment until such time as it repays the Responsible Party for those repairs. Failure to repay for such repairs after 180 days' written notice shall result in the negligent Party abandoning its equitable interest in the Equipment, and such interest shall transfer in equal shares to the non - negligent Parties. (d) Record - keeping. Each Party shall be responsible for keeping records, in a format approved by the Responsible Party' Superintendent, outlining its use of the Equipment, any maintenance or repairs that are completed, any issues that may be experienced with the Equipment, and any other information which the Responsible Party's Superintendent may request. Such records shall be maintained during the full term of this Agreement, and shall be made available to the other parties. Further. each party shall annually provide the Responsible Party's Superintendent with a coR f such records. (e) Truck Labeling, The Parties hereto agree that fetter /vactor truck to be j intly=purchased by the Parties shall display the name of each City which is a party to his Agreement. Such truck shall read "Cities of Excelsior, Shorewood, Tonka Bay". Any further displayed names or images y be agreed upon by all of the Directors and Superintendents. 6. Hold Harmless. Each Party shall be liable for its own acts to the extent provided by law and hereby agrees to indemnify, hold harmless and defend the other Parties, their officers and employees against any and all liability, loss, costs, damages, expenses, claims or actions, including attorneys' fees, which any other Party, its officers and employees, may hereafter sustain, incur or be required to pay, arising out of or by reason of any act or omission of the indemnifying Party, its agents, servants or employees, in the execution or performance or failure to adequately perform its obligations pursuant to this Agreement. Nothing in this Agreement shall require a Party to indemnify, hold harmless, or defend any other Party for the other Party's own acts or omissions. 7. Liability Limits. It is understood and agreed that the Parties' liabilities shall be limited by the provisions of Minnesota Statutes, chapter 466, and /or other applicable law. The hold harmless provision of this Agreement does not constitute a waiver by any Party of limitations on liability provided under Minnesota Statutes, section 466.04, as amended. To the fullest extent permitted by law, actions by the Parties pursuant to this Agreement are intended to be and shall be construed as a "cooperative activity" and it is the intent of the Parties that they shall be deemed a "single governmental unit" for the purposes of liability, all as set forth in Minnesota Statutes, section 471.59, subdivision I a(a), as amended. Each Party to this Agreement expressly declines responsibility for the acts or omissions of any other Party. Each Party agrees to promptly notify the other if it knows or becomes aware of any facts or 5 509130v69 AM B T N 115 -1 allegations reasonably giving rise to actual or potential liability, claims, causes of action, judgments, damages, losses, costs or expenses, involving or reasonably likely to involve the other Party, and arising out of acts or omissions related to this Agreement. 8. Workers Compensation. It is hereby understood and agreed that any and all employees of a Party, the Party's contractors and subcontractors, and all other persons employed, retained, contracted with or otherwise engaged and all other persons employed by the Party related to this Agreement shall not be considered employees of the other Party and that any and all claims that may or might arise under the Workers' Compensation Act of the State of Minnesota on behalf of said employees shall in no way be the obligation or responsibility of the other Party. 9. Records. Pursuant to Minnesota Statutes, section 16C.05, Subd. 5, the Parties agree that each other Party, the State Auditor, the Legislative Auditor, and any of their duly authorized representatives at any time during normal business hours and as often as they may reasonably deem necessary, shall have access to and the right to examine, audit, excerpt, and transcribe any books, documents, papers, records, etc., which are pertinent to the accounting practices and procedures of the Parties and involve transactions relating to this Agreement. 10. Data Privacy. Each Party, its employees, agents, owners, partners, and subcontractors, agree to abide by the provisions of the Minnesota Government Data Practices Act, Minnesota Statutes, chapter 13 and implementing regulations, if applicable, and all other applicable state and federal laws, rules, regulations and orders relating to data privacy or confidentiality, and as any of the same may be amended. 11. Default. Default in this Agreement may occur when a Party fails to perform any of the provisions of this Agreement or so fails to administer the work as to endanger the performance of this Agreement. 12. Withdrawal. ArryExce t durin the initial term. anv Party may terminate this Agreement upon 180 days' written notice given to the other Parties. No Party may withdraw from this Agreement during the initial term. Only the governing bodies of the Parties have the authority to act pursuant to this provision of this Agreement. Upon a notice to withdraw from this Agreement by any Party, the Equipment shall be sold at a fair market value in a manner consistent with state law. The proceeds from such a sale shall be divided in equal shares and distributed among the Parties. In the alternative, the non - withdrawing Parties may, in equal portions, pay to the withdrawing Party an amount equal to one -third of the fair market value of the Equipment. In such event, the non - withdrawing Parties shall acquire equal 50% shares in the Equipment, including equal responsibility for the ongoing costs thereof. 13. Term. The Parties agree the duration of this Agreement shall be governed by this section. (a) Duration. This Agreement will be in force for a period of five years from the date of execution. Any Party may withdraw from this Agreement as outlined herein. This Agreement will automatically renew for subsequent five -year terms unless any Party 6 509130v69 AM B T N 115 -1 provides the other Parties written notice at least ninety (90) days before the end of the then current term of its intent to not renew this Agreement. (b) Equipment Division. On or before the expiration of this Agreement the Parties will determine whether to retain or dispose of the cooperatively purchased Equipment. The Parties agree to work in good faith to reach agreement on an equitable division of the retained Equipment. The disposal of any Equipment shall be accomplished in accordance with the disposition of cooperatively purchased Equipment as stated in paragraph 4(f) of this Agreement (based on its useful life remaining as determined by industry standards, or by a dealer appraisal if requested by a Party. if inere than one Pafty wants to Fetain one the Equipment, the Par-ties shall determine W-he will fetain th Equipment by fandem a,..,w ing Value will be determined by dealer appraisal selected by mutual agreement of the Parties. This disposition of the Equipment shall be completed as soon as is reasonably possible after the termination of the Agreement. If more than one Party desires to retain the Equipment. the Responsible Party shall arrange for the Equipment to be sold at auction, which auction shall be administered by an independent third - party. The Parties hereto may participate in the auction pursuant to any pplicable laws. 14. Entire Agreement. It is understood and agreed that the entire agreement between the Parties is contained herein and that this Agreement supersedes all oral agreements and negotiations between the Parties relating to the subject matter hereof. Any alterations, variations, modifications, or waivers of provisions of this Agreement shall only be valid when they have been reduced to writing as an amendment to this Agreement and signed by all Parties. 15. Severability. If any part of this Agreement is rendered void, invalid or unenforceable by a court of competent jurisdiction, such rendering shall not affect the remainder of this Agreement unless it shall substantially impair the value of the entire Agreement with respect to any Party. The Parties agree to substitute for the invalid provision a valid provision that most closely approximates the intent of the invalid provision. 16. Applicable Laws. The laws of the State of Minnesota shall apply to this Agreement. 17. Third Parties. This Agreement does not create any rights, claims or benefits inuring to any person that is not a party hereto nor create or establish any third party beneficiary. [SIGNATURE PAGE FOLLOWS] 7 509130v69 AM B T N 115 -1 IN WITNESS WHEREOF, the Parties hereto have executed and entered into this Agreement effective as of the date first written above. City of Tonka Bay By: Mayor Attest: By: City Administrator Date: City of Shorewood By: Mayor Attest: By: City Administrator Date: 8 509130v69 AM B T N 115 -1 City of Excelsior By: Mayor Attest: By: City Manager Date: EXHIBIT A Cost Sharing Payments Total Purchase Cost of the Equipment: $357,620.00 City of Tonka Bay $119,206.67 City of Excelsior $119,206.67 City of Shorewood $119,206.67 Trade -in Credits. Each party shall be entitled to the following deductions from the cost sharing payments specified herein, should they choose to trade in their currently -owned equipment and apply the monies received from those trade -ins to the Total Purchase Cost of the Equipment: City of Tonka Bay $4,000.00 City of Excelsior $4,000.00 City of Shorewood $25,000.00 These trade -in credits are based on reasonably anticipated trade -in values for the existing equipment owned by each city. If the actual trade -in values differ, the actual trade -in values shall be used to calculate the appropriate credits. Because the Cities of Excelsior and Tonka Bay currently jointly own similar equipment, each City shall be entitled a trade -in credit equal to 50% of the trade in value, should they option to make such trade. Nothing herein shall require any Party to trade in its currently -owned equipment. 5091300 AMB TN115 -1 Document comparison by Workshare Compare on Thursday, December 07, 2017 9:45:17 AM Input: Document 1 ID Powerpocs: / /DOCSOPEN /509130/6 Description DOCSOPEN- #509130 -v6 -Joint Purchase_ Agreement Document 2 ID Powerpocs: / /DOCSOPEN /509130/9 Description DOCSOPEN- #509130 -v9 -Joint Purchase_ Agreement Rendering set Standard Legend: Style change Format change Inserted cell Deleted cell Moved cell Split /Merged cell Padding cell Statistics: Count Insertions 23 Deletions 13 Moved from 0 Moved to 0 Style change 0 Format changed 0 Total changes 36 #8C MEETING TYPE City of Shorewood Council Meeting Item Regular Meeting Title / Subject: Shorewood Lane Ravine Meeting Date: January 22, 2018 Prepared by: Alyson Fauske, PE, City Engineer Reviewed by: Larry Brown, PE, Public Works Director Attachments: WSB Memo Policy Consideration: Given the information gathered thus far, which option should be pursued for final design? Background: At the October 9, 2017 meeting the City Council authorized WSB to perform preliminary design work to address erosion issues within the ravine that lies east of Shorewood Lane. Storm sewer conveying drainage from a portion of County Road 19, City Hall /Badger Park and portions of Echo Road discharges at the northeast corner of County Road 19 and Shorewood lane. The grade in the ravine drops 30 feet over approximately 500 feet, with steep sideslopes. WSB performed a hydrologic /hydraulic analysis and presents two options for consideration: OPTION 1. Extend the storm sewer approximately 400' through the areas where the worst erosion has occurred. This work would require significant tree removal and import of a large amount of fill. The estimated cost for this option is $183,500. OPTION 2. Install rock weirs to direct flow away from the banks, thereby reducing the erosive forces of the banks of the ravine. Tree removal and import of fill is required for this option, though not as extensive what would be required with Option 1. The estimated cost for this option is $46,200. Both options would mitigate the erosion issue. The first option would address the aesthetics of the ravine in that the eroded channel would be backfilled over the storm sewer and revegetated. The watershed district may have concerns with Option 1 as it involved extending storm sewer. With Option 2 the banks will essentially remain as is, with some fill and rock installed to decrease velocities. Recommendation /Action Requested: Staff recommends proceeding with Option 2. Next Steps and Timelines: Early February- Meet with Minnehaha Creek Watershed District Mid - March- Solicit bids or quotes for the project Late April- Award the contract Construction- May to July Mission Statement: The City of Shorewood is committed to providing residents quality public services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial management through effective, efficient, and visionary leadership. Page 1 A WS 701 Xenia Avenue South I Suite 300 1 Minneapolis, MN 55416 1 (763) 541 -4800 Memorandum To: Alyson Fauske, PE, City Engineer, City of Shorewood Bill Alms, PE, Project Engineer, WSB & Associates From: Amy Anderson, PE, Project Engineer, WSB & Associates Date: January 17, 2018 Re: Shorewood Lane Ravine Stabilization WSB Project No. 010930 -000 Executive Summary WSB recommends proceeding with permitting and design of rock weirs in Shorewood Lane Ravine to provide grade control and reduce erosive pressures on the ravine banks. Project Background and Objectives The City wishes to stabilize the existing ravine east of Shorewood Lane and north of Smithtown Road. The ravine centerline is shown with a blue line on Figure 1. The existing ravine is forested with largely mature trees and very little undergrowth. The sides of the ravine are very steep and in some cases nearly vertical. Some areas are also exhibiting undercutting, which may lead to large escarpments and bank failures during or after future storm events. Finally, the erosion in the ravine has undermined at least one utility pole supporting existing overhead power lines. The City has the following objectives for stabilization of the Shorewood Lane Ravine: • Protect existing utility poles from future undermining and erosion • Stabilize existing banks to reduce sediment loading to the downstream stormwater pond and minimize likelihood of bank failures • Preserve and enhance ravine aesthetics for the benefit of surrounding homeowners Survey WSB conducted an existing conditions survey of the ravine on November 6, 2017. The survey collected information on the surrounding roads and utilities and cross sections of the ravine and its banks. The survey also marked the locations of the wetland delineation boundary and the water elevation of the existing stormwater pond. WSB also took aerial photos of the ravine using an Unmanned Aerial Vehicle (UAV) to document the existing conditions of the ravine banks on October 31, 2017. Modeling WSB used the existing conditions survey data to build a HEC -RAS model of the existing ravine. The HEC -RAS model used cross sections collected by the survey and flow information from a HydroCAD model of the Badger Park pond and Smithtown Road area upstream of the Shorewood Lane Ravine. Figure 1 shows the ravine location and the subwatersheds used in the HydroCAD model. The flow rates used in the HEC -RAS model are shown in Table 1. Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com K: \010930- 00MAdmin\Docs \Council Memo 20180117\Feasibility Memo 20180117.docx Shorewood Lane Ravine Stabilization January 17, 2018 Page 2 Table 1 — Flow rates used in modeling software Modeling Results A typical ravine cross section with modeled water surface elevations is shown in Figure 2. Figure 2 shows that the ravine is not flowing full, even in large storm events. The maximum modeled depth in the ravine channel is 3.1 feet in the 100 -year event. The maximum modeled velocity in the Shorewood Lane ravine is 7.1 feet per second in the 100 -year event. Higher frequency events such as the 25 -year storm have lower maximum velocities, usually ranging from 5 to 6 feet per second at cross sections throughout the ravine. Velocities in this range are enough to cause erosion at the toe of the ravine banks, especially since there is very little vegetation on the banks due to the presence of mature trees which shade out undergrowth. Stabilization Options Considered WSB considered two primary options for stabilizing Shorewood Lane ravine. The first is extending the existing stormwater pipe and filling the existing ravine to accommodate a bedded and backfilled pipe trench for a 30" Reinforced Concrete Pipe (RCP). Option 2 is to reduce the slope of the existing ravine and channel the flow towards the center and away from the sides of the ravine by constructing four rock weirs. These options will be discussed as Options 1 and 2. Option 1 — Extending the Existing Stormwater Pipe Figure 3 shows the approximate extent of Option 1, which consists of extending the existing stormwater pipe that currently outlets at the top of the ravine from Smithtown Road. Option 1 would extend the existing 30" stormwater pipe approximately 400 feet down the centerline of Shorewood Lane Ravine. The trench would need to be backfilled to properly bed the stormwater pipe, and this backfill would serve to fill in the bottom few feet of the ravine as well as the undercut areas which have developed along the sides of the ravine. The length of the pipe extension has been set at 400 feet to bring the pipe outlet past the worst area of erosion while allowing construction work to remain outside of the delineated wetland boundary, shown on Figure 3. Option 1 includes major construction within Shorewood Lane Ravine. There would be some tree loss and large quantities of soil and rock would need to be brought on -site in order to properly bed and backfill the pipe. The estimated cost of Option 1 is $183,500. Further detail on the construction quantities and cost breakdown of Option 1 is provided in Table 2. The proposed condition for Option 1 has not been modeled to determine the effect on velocities in the reach, but velocities in the pipe are expected to remain approximately the same as those in the existing ravine. Modeling the proposed condition will be part of the next step in the design process. Option 2 — Slope Reduction using Rock Weirs The second option for addressing erosion in Shorewood Lane Ravine is to reduce the slope of the channel by constructing a series of rock weirs. Figure 4 shows the approximate location of four rock weirs within the ravine. These rock weirs would cross the entire channel and would be lower in the middle of the channel and higher near the channel banks. This will direct flow away from the banks and toward the center of the channel, reducing the erosive pressure on the banks. Multiple weirs would also create a step -pool system in the channel, where high velocities would occur over the face of the weirs and then water would pool behind them, creating areas of low velocities. Multiple weirs would also prevent further downcutting of the channel through the ravine, since each weir will serve as an anchor point for the channel grade. K: \010930- 000 \Admin \DOGS \Council Memo 20180117 \Fea sibl llry Memo 20180117.docx 1YR 2YR 5YR 10YR 25YR 50YR 100YR Flow to Ravine (cfs) 16.34 19.90 26.97 34.15 44.98 54.28 63.70 Modeling Results A typical ravine cross section with modeled water surface elevations is shown in Figure 2. Figure 2 shows that the ravine is not flowing full, even in large storm events. The maximum modeled depth in the ravine channel is 3.1 feet in the 100 -year event. The maximum modeled velocity in the Shorewood Lane ravine is 7.1 feet per second in the 100 -year event. Higher frequency events such as the 25 -year storm have lower maximum velocities, usually ranging from 5 to 6 feet per second at cross sections throughout the ravine. Velocities in this range are enough to cause erosion at the toe of the ravine banks, especially since there is very little vegetation on the banks due to the presence of mature trees which shade out undergrowth. Stabilization Options Considered WSB considered two primary options for stabilizing Shorewood Lane ravine. The first is extending the existing stormwater pipe and filling the existing ravine to accommodate a bedded and backfilled pipe trench for a 30" Reinforced Concrete Pipe (RCP). Option 2 is to reduce the slope of the existing ravine and channel the flow towards the center and away from the sides of the ravine by constructing four rock weirs. These options will be discussed as Options 1 and 2. Option 1 — Extending the Existing Stormwater Pipe Figure 3 shows the approximate extent of Option 1, which consists of extending the existing stormwater pipe that currently outlets at the top of the ravine from Smithtown Road. Option 1 would extend the existing 30" stormwater pipe approximately 400 feet down the centerline of Shorewood Lane Ravine. The trench would need to be backfilled to properly bed the stormwater pipe, and this backfill would serve to fill in the bottom few feet of the ravine as well as the undercut areas which have developed along the sides of the ravine. The length of the pipe extension has been set at 400 feet to bring the pipe outlet past the worst area of erosion while allowing construction work to remain outside of the delineated wetland boundary, shown on Figure 3. Option 1 includes major construction within Shorewood Lane Ravine. There would be some tree loss and large quantities of soil and rock would need to be brought on -site in order to properly bed and backfill the pipe. The estimated cost of Option 1 is $183,500. Further detail on the construction quantities and cost breakdown of Option 1 is provided in Table 2. The proposed condition for Option 1 has not been modeled to determine the effect on velocities in the reach, but velocities in the pipe are expected to remain approximately the same as those in the existing ravine. Modeling the proposed condition will be part of the next step in the design process. Option 2 — Slope Reduction using Rock Weirs The second option for addressing erosion in Shorewood Lane Ravine is to reduce the slope of the channel by constructing a series of rock weirs. Figure 4 shows the approximate location of four rock weirs within the ravine. These rock weirs would cross the entire channel and would be lower in the middle of the channel and higher near the channel banks. This will direct flow away from the banks and toward the center of the channel, reducing the erosive pressure on the banks. Multiple weirs would also create a step -pool system in the channel, where high velocities would occur over the face of the weirs and then water would pool behind them, creating areas of low velocities. Multiple weirs would also prevent further downcutting of the channel through the ravine, since each weir will serve as an anchor point for the channel grade. K: \010930- 000 \Admin \DOGS \Council Memo 20180117 \Fea sibl llry Memo 20180117.docx Shorewood Lane Ravine Stabilization January 17, 2018 Page 3 Rock weirs do not directly address the undercutting of existing banks; however some additional rock and borrow material could be used to fill in undercut areas to increase roughness and decrease velocities. Rock could be used to protect existing utility poles, possibly with grout to keep the rocks in place and prevent damage to the poles during large storm events. Installation of rock weirs would still include access issues during construction but would not require large amounts of grading, nor would it cause extensive tree loss, except what is necessary to provide access for construction vehicles. Option 2 involves less construction work within and around Shorewood Lane Ravine than Option 1, including significantly smaller quantities of rock and backfill. There would be some tree loss, but it is expected to be less than in Option 1. The estimated cost of Option 2 is $46,200. Further detail on the construction quantities and cost breakdown of Option 2 is provided in Table 3. The proposed condition for Option 2 has not been modeled to determine the effect on velocities in the reach, but velocities in the ravine are expected to decrease due to increased roughness and decreased slope in the ravine. Modeling the proposed condition will be part of the next step in the design process. Revised Project Schedule WSB has revised the project schedule as provided to the City in November 2017. Coordinate Meeting with Minnehaha Creek Watershed District to discuss construction and permitting — Early February Provide detailed design for public comment by city residents and staff — Late February Finalize selected design and permit acquisition — February and March Advertise Project for Public Bids — by March 15 Bid opening — early April Contract award — late April Construction — May - July Recommendations Pursue additional design of Option 2, including building a HEC -RAS model including rock weir structures to quantify slope and velocity reductions provided by this option. Attachments Figure 1 — Existing Drainage Map Figure 2 — Representative Cross Section with Modeled Water Surface Elevations Figure 3 — Approximate Stormwater Pipe Extension Extent Figure 4 — Approximate Rock Weir Locations Table 2 - Cost Estimate for Option 1 Table 3 - Cost Estimate for Option 2 K: \010930- 000 \Admin \DOGS \Council Memo 20180117 \Feasibility Memo 20180117.docx C O LL � N ` Q N N Tw n a Q t 10 z< aue� �1..A ._ N Q ma W J O L ai in F.6�. �HI � �i F.,E �❑ � � ] FF Eli � LL Elk °``fir- "'oJ,�„�,,. f- - - El A A 6G }O sm }� O O 00 v v M V In In z N O Q (6 N C C O O M N .9 M t 7 O M N 7 C N Q (6 N X O r [Sj UOiaenel3 E U T m U O (6 s N T O Q U E m W O A M j 0 Q 6 Q O m � D s W Table 2, Opinion of Probable Cost - Option 1, Pipe Extension WSB Project: Shorewood Lane Ravine Design By: KAK Project Location: City of Shorewood Checked By: City Project No.: WSB Pro ject No: 010930 -000 Date: 1/12/2018 Item No. MN /DOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost SCHEDULE A - DRAINAGE IMPROVEMENTS (30" RCP EXTENSION) 1 2021.501 MOBILIZATION LUMP SUM 1 $6,200.00 $6,200.00 2 2101.501 CLEARING ACRE 0.4 $10,000.00 $4,000.00 3 2101.506 GRUBBING ACRE 0.4 $10,000.00 $4,000.00 4 2104.501 REMOVE SEWER PIPE (STORM) LIN FT 10 $20.00 $200.00 5 2105.603 SITE GRADING LUMP SUM 1 $9,500.00 $9,500.00 6 2105.604 GEOTEXTILE FABRIC TYPE IV SQ YD 1 30 $3.50 $105.00 7 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 10 $150.00 $1,500.00 8 2451.602 GRANULAR FOUNDATION AND /OR BEDDING CU YD 60 $25.00 $1,500.00 9 2501.515 30" RC PIPE APRON EACH 1 $4,000.00 $4,000.00 10 2501.561 30" RC PIPE SEWER DES 3006 CL III LIN FT 400 $75.00 $30,000.00 11 2505.601 UTILITY COORDINATION LUMP SUM 1 $2,500.00 $2,500.00 12 2506.501 CONST DRAINAGE STRUCTURE DES 72 -4020 LIN FT 6 $550.00 $3,300.00 13 2506.516 CASTING ASSEMBLY EACH 1 $750.00 $750.00 14 2511.501 RANDOM RIPRAP CL III TON 10 $200.00 $2,000.00 15 2563.601 TRAFFIC CONTROL LUMP SUM 1 $500.00 $500.00 16 2573.502 SILT FENCE, TYPE MACHINE SLICED LIN FT 900 $2.50 $2,250.00 17 2573.533 SEDIMENT CONTROL LOG TYPE WOOD FIBER LIN FT 900 $3.50 $3,150.00 18 2573.535 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 $1,500.00 $1,500.00 19 2574.525 COMMON BORROW CU YD 1780 $22.00 $39,160.00 20 2574.525 TOPSOIL BORROW CU YD 300 $22.00 $6,600.00 21 2575.502 SEED MIX TYPE 34 -261 POUND 20 $5.00 $100.00 22 2575.523 EROSION CONTROL BLANKET CATEGORY 3N SQ YD 2230 $2.00 $4,460.00 23 2575.604 SEEDING (INCL FERT) ACRE 0.5 $2,000.00 $1,000.00 Total Schedule A - Drainage Improvements (30" RCP Extension) $128,275.00 +10% Contingency $12,827.50 Subtotal Schedule A - Drainage Improvements (30" RCP Extension) $141,102.50 + 30% Indirect Costs $42,330.75 Total Schedule A - Drainage Improvements (30" RCP Extension) $183,433.25 K:\ 010930 - 000 \Quantity \Preliminary\010930 -000 OPC KAK 011218 1 of 1 Table 3, Opinion of Probable Cost - Option 2, Weir Installation WSB Project: Shorewood Lane Ravine Design By: ARA Project Location: City of Shorewood Checked By: City Project No.: WSB Pro ject No: 010930 -000 Date: 1/12/2018 Item No. MN /DOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost SCHEDULE A - DRAINAGE IMPROVEMENTS (INSTALLATION OF FOUR ROCK WEIRS) 1 2021.501 MOBILIZATION LUMP SUM 1 $6,200.00 $6,200.00 2 2101.501 CLEARING ACRE 0.1 $10,000.00 $1,000.00 3 2101.506 GRUBBING ACRE 0.1 $10,000.00 $1,000.00 4 2105.603 SITE GRADING LUMP SUM 1 $9,500.00 $9,500.00 5 2105.604 GEOTEXTILE FABRIC TYPE IV SQ YD 30 $3.50 $105.00 6 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 10 $150.00 $1,500.00 7 2451.602 GRANULAR FOUNDATION AND /OR BEDDING CU YD 10 $25.00 $250.00 8 2505.601 UTILITY COORDINATION LUMP SUM 1 $2,500.00 $2,500.00 9 2511.501 RANDOM RIPRAP CL III TON 10 $200.00 $2,000.00 10 2563.601 TRAFFIC CONTROL LUMP SUM 1 $500.00 $500.00 11 2573.502 SILT FENCE, TYPE MACHINE SLICED LIN FT 900 $2.50 $2,250.00 12 2573.533 SEDIMENT CONTROL LOG TYPE WOOD FIBER LIN FT 900 $3.50 $3,150.00 13 2573.535 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 $1,500.00 $1,500.00 14 2574.525 COMMON BORROW CU YD 10 $22.00 $220.00 15 2574.525 TOPSOIL BORROW CU YD 10 $22.00 $220.00 16 2575.502 SEED MIX TYPE 34 -261 POUND 10 $5.00 $50.00 17 2575.523 EROSION CONTROL BLANKET CATEGORY 3N SQ YD 60 $2.00 $120.00 18 2575.604 SEEDING (INCL FERT) ACRE 0.1 $2,000.00 $200.00 Total Schedule A - Drainage Improvements (Installation of 4 Rock Weirs) $32,265.00 +10% Contingency $3,226.50 Subtotal Schedule A - Drainage Improvements (Installation of 4 Rock Weirs) $35,491.50 +30% Indirect Costs $10,647.45 Total Schedule A - Drainage Improvements (Installation of 4 Rock Weirs) $46,138.95 K:\ 010930 - 000 \Quantity \Preliminary\010930 -000 OPC KAK 011218 1 of 1 #9A MEETING TYPE City of Shorewood Council Meeting Item Regular Meeting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Title / Subject: Amendments to City Code section 104.03 Administrative Enforcement Meeting Date: January 22, 2018 Prepared by: Marie Darling, Planning Director Reviewed by: Patti Helgesen, Assistant Planner Attachments: Ordinance Resolution and Summary Publication Ordinance Policy Consideration: Should the City of Shorewood charge a fee for a request to appeal an administrative citation and should the fees for the hearing officer be borne by the city or the appellant? Background /Financial or Budget Considerations: Staff noticed that the cost of hiring hearing officers is rarely covered by the cost of fines that are collected. That trend was especially apparent this year when staff fined a property owner $3,300 and they appealed. The final agreement reduced the fines in that case by 50 percent to $1,750 with the understanding that the property owners were in the process of selling their home. However, the hearing officer's charges were $2,943. That charge doesn't include the costs for staff time to provide countless inspections, write and send violation notices and citations, organize evidence, contact and schedule the hearing, prepare affidavits and assemble witnesses, prepare testimony, etc. No matter the outcome of the hearing officer's decision, the city currently bears the entire cost of all appeals. To counter that problem, staff propose amendments to two subdivisions of City Code Chapter 104.03: • Section 104.03 Subd. 3. a. Appeal to Hearing Officer To decrease the tax burden on the residents, staff propose to modify the language in Section 104.03 to require an application fee for appeals to cover a portion of staff time needed to schedule and prepare an appeal (noted as $200 in the revised master fee schedule — item 9C). • New Section 104.03 Subd. 3. d. Outcome of hearing. This amendment would put the burden of paying the cost of the hearing officer on the appellant if they should lose their appeal or on the city if the citation(s) is (are) overturned. Should a citation be overturned by the hearing officer, the cost of the appeal would also be refunded. Options: Adopt the draft code amendments; modify the amendments; or refer the amendments back to staff. Mission Statement: The City of Shorewood is committed to providing residents quality public services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial management through effective, efficient, and visionary leadership. S:�Plonning�Plonning Files �Applicotions�2017 CURRENT CASES �Administrotiv Enforcement Amendmenr�CAF January 22, 2019.d— Page 1 Recommendation / Action Requested: Staff provide the following draft motions for approval: 1. Move to approve an ordinance amending City Code section 104.03 Administrative Enforcement of Code Regulations. 2. Move to approve a resolution adopting a summary publication ordinance and the text of the summary pursuant to MN Statute 331A.01 which would inform the public of the intent and effect of the ordinance without publishing the entire ordinance. Next Steps and Timelines: Once adopted, the summary will be published in the official newspaper. Once published, the ordinance becomes effective. Connection to Vision / Mission: Providing quality public services, a sustainable tax base and sound financial management. CITY OF SHOREWOOD ORDINANCE NO. 551 AN ORDINANCE AMENDING CHAPTER 104°03 OF THE SHORE WOOD CITY CODE AS IT PERTAINING TO ADMINISTRATIVE ENFORCEMENT Section 1. City Code Section 1 04.03 Subd. 3 is hereby amended as follows: 104.03. ADMINISTRATIVE ENFORCEMENT OF CODE REGULATIONS, Subd. 3. 14ppecil to Hecrr•ing- off icer. a. Requesting cr hecrr ing. Any person contesting a citation issued pursuant to this section nay, within ten days of the issuance of the citation, request a hearing before a Hearing officer. Any request for a hearing shall be made in writing on a form provided by the city, shall be accompanied by the fee required in the City of Shorewood Master Fee Schedule, and either delivered personally to the city at City Hall or mailed to the city by United States first class mail, postage prepaid and postmarked within the prescribed ten days. The hearing shall be held at City Hall within 30 days of the date the city receives a timely hearing request. Failure to attend the hearing constitutes a waiver of the violator's rights to an administrative hearing and an admission of the violation. A. Hearing Officer may waive this result upon good cause shown. The Hearing officer shall determine good cause, which shall not include forgetfulness or intentional delay. b. Hecrring Officer. The City Council shall by resolution from time to time appoint a list of persons authorized to act as a Hearing officer. The Hearing Officer is authorized to conduct an informal hearing to determine if a code offense has occur -ed. The Hearing officer shall have the authority to uphold or dismiss the citation or reduce, stay or waive the civil penalty imposed upon such terms and conditions as the Hearing Officer shall determine. The Hearing officer's decision shall be made in writing on a form provided by the city for such purpose. A copy of the Hearing officer's decision shall be served either in person or by United States first class mail upon the person requesting the hearing. The Hearing officer's decision is final, except for appeal in limited cases to the City Council, as set forth below, or as allowed under state law. C. Conduct of hecrring. At the hearing, the parties will have the opportunity to present testimony, documents and exhibits and question witnesses. The Hearing officer shall tape record the proceedings and receive testimony and exhibits. Strict rules of evidence will not apply. The Hearing officer must receive and give weight to evidence, including hearsay evidence that possesses probative value commonly accepted by reasonable and prudent persons in the conduct of their affairs. d. Outcorrre of hearing. If the Hearing Officer upholds the citation, the appellant shall pay the cost of the Hearing Officer plus any civil penalties that result from the citation. If the Hearing Officer dismisses the citation and waives the penalty, the City shall pay the costs for the Hearing 0fflcer and refund the application fee for the appeal request. Section Z. This ordinance shall be in full force and effect upon publication in the Official Newspaper of the City of Shorewood. CITY OF SHOREWOOD ORDINANCE NO. 551 AN ORDINANCE AMENDING CHAPTER 104.03 OF THE SHOREWOOD CITY CODE AS IT PERTAINING TO ADMINISTRATIVE ENFORCEMENT Section 1. City Code Section 104.03 Subd. 3 is hereby amended as follows: 104.03. ADMINISTRATIVE ENFORCEMENT OF CODE REGULATIONS. Subd. 3. Appeal to Hearing Officer. a. Requesting a hearing. Any person contesting a citation issued pursuant to this section may, within ten days of the issuance of the citation, request a hearing before a Hearing Officer. Any request for a hearing shall be made in writing on a form provided by the city„ sh ffl .be ac;c;onij,,)a ied by the fled; required in the City ofShoreivood Master Fee Sched use,,. and either delivered personally to the city at City Hall or mailed to the city by United States first class mail, postage prepaid and postmarked within the prescribed ten days. The hearing shall be held at City Hall within 30 days of the date the city receives a timely hearing request. Failure to attend the hearing constitutes a waiver of the violator's rights to an administrative hearing and an admission of the violation. A Hearing Officer may waive this result upon good cause shown. The Hearing Officer shall determine good cause, which shall not include forgetfulness or intentional delay. b. Hearing Officer. The City Council shall by resolution from time to time appoint a list of persons authorized to act as a Hearing Officer. The Hearing Officer is authorized to conduct an informal hearing to determine if a code offense has occurred. The Hearing Officer shall have the authority to uphold or dismiss the citation or reduce, stay or waive the civil penalty imposed upon such terms and conditions as the Hearing Officer shall determine. The Hearing Officer's decision shall be made in writing on a form provided by the city for such purpose. A copy of the Hearing Officer's decision shall be served either in person or by United States first class mail upon the person requesting the hearing. The Hearing Officer's decision is final, except for appeal in limited cases to the City Council, as set forth below, or as allowed under state law. C. Conduct of hearing. At the hearing, the parties will have the opportunity to present testimony, documents and exhibits and question witnesses. The Hearing Officer shall tape record the proceedings and receive testimony and exhibits. Strict rules of evidence will not apply. The Hearing Officer must receive and give weight to evidence, including hearsay evidence that possesses probative value commonly accepted by reasonable and prudent persons in the conduct of their affairs. cfl.cfl.ca �� c � li d� fl.caaY the .cost of the Ileal•ing.a ilic er 1 "flu any c ivi� 1,wi uddc;a. that res u�t fli•oni the Citation Ifthe f l cc•uiug (-)ifluc ei; dismisses the c;it tioii sand ivai,ves the fl. eiu dty, the City flu cfl fl)aa . the assts 6or the I learn g Oili er and r flu d the afl.)fl.flie ation bee 6or the �cfl.cfl.a� ��� request Section 2. This Ordinance shall be in full force and effect upon publication in the Official Newspaper of the City of Shorewood. ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this day of 2018. Scott Zerby, Mayor ATTEST: Sandie Thone, City Clerk CITY OF SHOREWOOD RESOLUTION NO. A RESOLUTION APPROVING PUBLICATION OF ORDINANCE NO. 551 BY TITLE AND SUMMARY WHEREAS, at a duly called meeting on January 22, 2018, the City Council of the City of Shorewood adopted Ordinance No. 551 entitled "AN ORDINANCE AMENDING CHAPTER 104.03 OF THE SHOREWOOD CITY CODE PERTAINING TO ADMINISTRATIVE ENFORCEMENT "; and, WHEREAS, The City Council has adopted a lengthy ordinance amending City Code section 104.03 to require an application fee for appeals and adding procedures for determining who pays for the cost of the administrative hearing officer. The purpose of this summary is to inform the public of the intent and effect of the ordinance and to publish only a summary of the ordinance with the full ordinance being on file in the office of the City Clerk during regular office hours; NOW THEREFORE, IT IS HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD: The City Council finds that the above title and summary of Ordinance No. 551 clearly informs the public of intent and effect of the Ordinance. 2. The City Clerk is directed to publish Ordinance No. 551 by title and summary, pursuant to Minnesota Statutes, Section 412.191, subdivision 4. Such summary is to be substantially the same as the attached form. A full copy of the Ordinance is available at Shorewood City Hall and on the city's website. ADOPTED by the Shorewood City Council on this 22"d day of January 2018. ATTEST: Sandie Thone, City Clerk Scott Zerby, Mayor (Official Publication) CITY OF SHOREWOOD COUNTY OF HENNEPIN STATE OF MINNESOTA ORDINANCE 551 (SUMMARY PUBLICATION) AN ORDINANCE AMENDING CHAPTER 104.03 OF THE SHOREWOOD CITY CODE AS IT PERTAINS TO ADMINISTRATIVE ENFORCEMENT 104.03 ADMINISTATIVE ENFORCEMENT OF CODE REGULATIONS Subd. 3. a. Appeal to Hearing Officer — Adding a fee for appeals New Subd. 3. d. Outcome of Hearing — Assigning the cost of the hearing officer based on the outcome of the decision. Ordinance becomes effective upon publication. The amendments in their entirety are available for review in the City Clerk's office. Adopted by the Shorewood City Council on January 22, 2018. s/s Sandie Thone, City Clerk #9B MEETING TYPE City of Shorewood Council Meeting Item REGULAR Title / Subject: Right -of -Way Ordinance Meeting Date: January 22, 2018 Prepared by: Greg Lerud, City Administrator Reviewed by: Larry Brown, Public Works Director; Alyson Fauske, City Engineer; Tim Keane, City Attorney Attachments: Right -of -Way Ordinance Background: City staff presented a draft revision of the city's right of way ordinance at the January 8 work session. During that meeting there were some questions the council asked, and staff pledged to have answers prepared for this presentation. The changes to the ordinance text since the last meeting follow after this memo. Does the city have the authority to charge non - franchise utilities "rent" for right of way usage or charge more for their annual registration? The answer is that authority does not exist in statute. However, alternatively, staff proposes additional language found in Section 901.18 that requires utility right of way users to provide service drops to properties adjacent to where they have a permit for work, even if the work was not part of the permit. In addition, staff required a higher security fee for non - franchise right of way utility users and that language is found in Section 901.08. Could solar panels be used to provide power for small cell wireless equipment? The solar equipment today is not sufficient to provide the power needed to run the small cell facilities. Can the small cell wireless equipment be screened or disguised? This is still an open question. Staff added language in Section 901.08 of this ordinance that references the zoning code. Once developed, that is where screening requirements will be added. The other question did not relate to the ordinance per se, and that has to do with making permit information available, so residents can know what is happening on their street. Staff is working with a GIS software to manage our infrastructure. Financial or Budget Considerations: Determining an exact budget impact of an effective right -of -way ordinance is difficult. Maintaining streets and public grounds is a significant annual expense to the city and the taxpayers. It is important that the city require users of the city rights -of -way to operate within these corridors in a way that is as minimally invasive as possible, and that any improvements they do are for the betterment of the community and not for the sole benefit of the utility. In addition, when a user is given permission by the city to work on the city's property it is critical that the restoration be done as efficiently as possible and that the city has established a process that ensures the restoration is as good, or better than it was before the utility started their work. The proposed fee schedule for the right of way fees is attached to this memo as well, and these amounts are in the master fee schedule that the council will consider tonight. The council can modify any of the fees contained in the Resolution. Mission Statement: The City of Shorewood is committed to providing residents quality public services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial management through effective, efficient, and visionary leadership. Page 1 Options: The council can approve the ordinance as submitted, direct staff to make additional changes and either approve them tonight or at a future meeting, or not approve the ordinance. Recommendation /Actions: Staff recommends adopting the ordinance as submitted, along with any changes that are made at the meeting. Timeline: The ordinance will be published. Staff will start the registration process immediately. Text changes since work session: 901.08 PERMIT APPLICATIONS; FEES; SECURITY; OTHER. Subd.6. Security. Unless specifically stated in a franchise agreement with the city, companies shall provide a surety bond, letter of credit or cash deposit_ in the amount determined by the City Engineer but not less than $2,000 shall be required from each applicant. A surety bond shall be from a corporate surety authorized to do business in the State. Security required pursuant to this Subd. 2 shall be conditioned that the holder will perform the work in accordance with this Section and applicable regulations, will pay to the City any costs incurred by the City in performing work pursuant to this Section; and will indemnify and save the City and its officers, agents and employees harmless against any and all claims, judgment or other costs arising from any excavation and other work covered by the permit or for which the City, Council or any City officer may be liable by reason of any accident or injury to persons or property through the fault of the permit holder, either in improperly guarding the excavation or for any other injury resulting from the negligence of the permit holder. In addition to the above - referenced security, non - franchise utility right of way users shall provide an irrevocable letter of credit, or cash deposit that shall remain in force as long as the non - franchise utility user has facilities in the city's right of way. The amount of this security shall be determined from time to time by the City Council. This security shall be in addition to the security required from any subcontractor doing work on behalf of the non - franchise right of way utility. The bond, letter of credit or cash deposit shall be released by the City upon completion of the work and compliance with all conditions imposed by the permit. For permits allowing excavations within public streets, such bond, letter of credit or cash deposit shall be held for a period of 24 months to guaranty the adequacy of all restoration work. 901.08 PERMIT APPLICATIONS; FEES; SECURITY; OTHER. Subd. 8. Small Wireless Facility Conditions. In addition to subdivision 3, the erection or installation of a wireless support structure, the collocation of a small wireless facility, or other installation of a small wireless facility in the right -of -way, shall be subject to the following conditions: g) Screening, disguising, or other zoning requirements shall be found in the City Code, Section 1201.03, Subdivision 21. 901.18 LOCATION OF FACILITIES AND EQUIPMENT. Subd. 1. Undergrounding by Telecommunications Right -of -Way Users. Any new construction and the installation of new equipment and replacement of old equipment of telecommunication right -of -way users shall be underground or contained within buildings or other structures in conformity with applicable codes. Provided, telecommunications right -of -way users may attach equipment and facilities to existing poles and structures maintained by a service or utility service. New and improved telecommunications facilities shall be made available for service to abutting parcels on the same terms and conditions available to others in the same service area. RIGHT OF WAY FEE SCHEDULE CODE SECTION 901.08 Subd 2 901.03 Subd 2 (a) 901.03 Subd 2 (d) 901.06 Subd 1 901.11 Subd 5 901.08 Subd 6 901.07 Subd 3 901.19 Subd 1 TITLE CURRENT $ NEW $ ROW PERMITS Excavation 150 200 Directional drilling or boring 40 per 100 LF1 40 per 100 LF1 Open trenching 60 per 100 LF1 60 per 100 LF1 Obstruction 20 Small Wireless Facility (per site) - Pole /Pole Attachment - ROW ENCROACHMENT UNDERGROUND SPRINKLER ANNUAL REGISTRATION FEE (non - utility) ANNUAL REGISTRATION FEE (non- franchise right of right of way user ADMINISTRATION CHARGE SECURITY /DAMAGE DEPOSIT (non - utility) VARIES D E LAY D E LAY 1- in addition to permit fee 2 - in addition to actual costs 150 2 20 40 40 20 20 200 300 2000 200 2 VARIES 250 PER DAY 250 PER DAY CITY OF SHOREWOOD ORDINANCE NO. 552 AN ORDINANCE AMENDING TITLE 900, CHAPTER 901 OF THE SHOREWOOD CITY CODE RELATING TO STREETS AND PUBLIC RIGHT -OF -WAY THE CITY COUNCIL OF THE CITY OF SHOREWOOD, MINNESOTA ORDAINS AS FOLLOWS: Section 1. Title 900, Chapter 901 of the Shorewood City Code are hereby repealed and replaced with the following: TITLE 900 CHAPTER 901 STREETS AND PUBLIC RIGHT -OF -WAY Section 901.01 Right of Way Management 901.02 Administration 901.03 Encroachments 901.04 House numbering 901.05 Underground utilities 901.06 Registration 901.07 Permit Required 901.08 Permit Applications; Fees; Security; Other 901.09 Diligence in Performing Work 901.10 Standards During Construction or Installation 901.11 Repair and Restoration 901.12 Permit Limitations 901.13 Denial of Permit 901.14 Emergency Work 901.15 Revocation of Permits 901.16 Appeal 901.17 Mapping 901.18 Location of Facilities and Equipment 901.19 Undergrounding and Relocation of Facilities 901.20 Pre - excavation Facilities Location 901.21 Inspection 901.22 Authority of Director or City Engineer 901.23 Right -of -Way Vacation 901.24 Abandoned and Unusable Equipment 901.25 Indemnification and Liability 901.26 Franchise Holders 901.27 Supplementary Applications 901.28 Other Obligations 901.29 Severability 901.30 Violation 901.01 RIGHT OF WAY MANAGEMENT. Subd. 1. Findings and Purpose. To provide for the health, safety and welfare of its citizens, and to ensure the integrity of its streets and the appropriate use of the rights -of -way, the City strives to keep its rights -of -way in a state of good repair and free from unnecessary encumbrances. Accordingly, the City hereby enacts this new chapter of this code relating to right -of -way permits and administration. This chapter imposes reasonable regulation on the placement and maintenance of facilities and equipment currently within its rights -of -way or to be placed therein at some future time. It is intended to complement the regulatory roles of state and federal agencies. Under this chapter, persons excavating and obstructing the rights -of -way will bear financial responsibility for their work. Finally, this chapter provides for recovery of out -of- pocket and projected costs from persons using the public rights -of -way. This chapter shall be interpreted consistently with 1997 Session Laws, Chapter 123, substantially codified in Minnesota Statutes Sections 237.16, 237.162, 237.163, 237.79, 237.81, and 238.086 (the "Act ") and 2017 Session laws, Chapter 94 amending the Act, and the other laws governing applicable rights of the City and users of the right -of -way. This chapter shall also be interpreted consistent with Minnesota Rules 7819.0050 — 7819.9950 where possible. To the extent any provision of this chapter cannot be interpreted consistently with the Minnesota Rules, Minnesota Rules, that interpretation most consistent with the Act and other applicable statutory and case law is intended. It is the purpose of this section to provide for lawful incidental private use of publicly -owned rights -of -way not inconsistent with public use. This chapter shall not be interpreted to limit the regulatory and police powers of the City to adopt and enforce general ordinances necessary to protect the health, safety and welfare of the public. Subd. 2. Election to Manage the Public Rights -of -Way. Pursuant to the authority granted to the City under state and federal statutory, administrative and common law, the City hereby elects, pursuant Minn. Stat. 237.163 subd. 2(b), to manage rights -of -way within its jurisdiction. Subd. 3. Definitions. The following words, terms and phrases, as used herein, have the following meanings: The following definitions apply in this chapter of this code. References hereafter to "sections" are, unless otherwise specified, references to sections in this chapter. Defined terms remain defined terms, whether or not capitalized. "Abandoned Facility" means a facility no longer in service or physically disconnected from a portion of the operating facility, or from any other facility, that is in use or still carries service as determined by the City Engineer. "Applicant" means any person requesting permission to excavate or obstruct a right -of -way. "City" means the City of Shorewood, Minnesota. For purposes of section 901, "City" means its elected officials, officers, employees and agents. "City Costs" means the actual costs the City incurs in managing its rights -of -way, including such costs, if incurred, as those associated with registering applicants; issuing, processing, and verifying right -of -way permit or small wireless facility permit applications; inspecting job sites and restoration projects; maintaining, supporting, protecting, or moving user facilities during right -of -way work; determining the adequacy of right -of -way restoration; restoring work inadequately performed after providing notice and the opportunity to correct the work; and revoking right -of -way or small wireless facility permits. City costs do not include payment by a telecommunications right -of -way user for the use of the right -of -way, unreasonable fees of a third -party contractor used by the city including fees tied to or based on customer counts, access lines, or revenues generated by the right -of -way or for the city, the fees and cost of litigation relating to the interpretation of Minnesota Session Laws 1997, Chapter 123; Minnesota Statutes Sections 237.162 or 237.163; or any ordinance enacted under those sections, or the City fees and costs related to appeals taken pursuant to Section 901.16 of this chapter. "Collocate or Collocation. To install, mount, maintain, modify, operate, or replace any piece of equipment, including small wireless facility on, under, within, or adjacent to an existing wireless support structure or utility pole that is owned privately, or by the city or other governmental unit. "Commission" means the State Public Utilities Commission. "Congested Right -of -Way" means a crowded condition in the subsurface of the public right -of -way that occurs when the maximum lateral spacing between existing underground facilities does not allow for construction of new underground facilities without using hand digging to expose the existing lateral facilities in conformance with Minnesota Statutes, section 216D.04. subdivision 3, over a continuous length in excess of 500 feet. "Construction Performance Bond " means any of the following forms of security provided at permittee's option: a. Cash deposit; b. Security of a form listed or approved under Minn. Stat. Sec. 15.73, subd. 3; C. Letter of Credit, in a form acceptable to the City; "Department" means the City. "Department Inspector" means any person authorized by the City to carry out inspections related to the provisions of this chapter. "Director" means the City. "Delay Penalty" is the penalty imposed as a result of unreasonable delays in right -of -way excavation, obstruction, patching, or restoration as established by permit. "Emergency" means a condition that (1) poses a danger to life or health, or of a significant loss of property; or (2) requires immediate repair or replacement of facilities in order to restore service to a customer. "Equipment" means any tangible asset used to install, repair, or maintain facilities in any right -of -way. "Excavate" means to dig into or in any way remove or physically disturb or penetrate any part of a right - of -way. "Excavation permit" means the permit which, pursuant to this chapter, must be obtained before a person may excavate in a right -of -way. An Excavation permit allows the holder to excavate that part of the right -of -way described in such permit. "Excavation permit fee" means money paid to the City by an applicant to cover the costs as provided in Section 901.08. "Facility" or "Facilities" means any tangible asset in the right -of -way required to provide Utility Service. "High Density Corridor" means a designated portion of the public right -of -way within which telecommunications right -of -way users having multiple and competing facilities may be required to build and install facilities in a common conduit system or other common structure. "Hole" means an excavation in the pavement, with the excavation having a length less than the width of the pavement. "Landscaping" means the use of living plants to modify an area of land, including ornamental shrubs, plants and flowers. For purposes of this chapter, the definition excludes trees, boulders, other natural obstructions, and manmade features such as fences, structures, patios, parking pad, and the like. "Local Representative" means a local person or persons, or designee of such person or persons, authorized by a registrant to accept service and to make decisions for that registrant regarding all matters within the scope of this chapter. "Obstruct" means to place any tangible object in a right -of -way so as to hinder free and open passage over that or any part of the right -of -way. "Obstruction Permit" means the permit which, pursuant to this chapter, must be obtained before a person may obstruct a right -of -way, allowing the holder to hinder free and open passage over the specified portion of that right -of -way, for the duration specified therein. "Obstruction Permit Fee" means money paid to the City by a permittee to cover the costs as provided in Section 901.08 "Patch" or "Patching" means a method of pavement replacement that is temporary in nature. A patch consists of (1) the compaction of the sub base and aggregate base, and (2) the replacement, in kind, of the existing pavement for a minimum of two feet beyond the edges of the excavation in all directions. A patch is considered full restoration only when the pavement is included in the City's five -year project plan. "Pavement" means any type of improved surface that is within the public right -of -way and that is paved or otherwise constructed with bituminous, concrete, aggregate, or gravel. "Permit" has the meaning given "right -of -way permit" in Minnesota Statutes, section 237.162. "Permittee" means any person to whom a permit to excavate or obstruct a right -of -way has been granted by the City under this chapter. "Person" means an individual or entity subject to the laws and rules of this state, however organized, whether public or private, whether domestic or foreign, whether for profit or nonprofit, and whether natural, corporate, or political. "Public Ground" means land owned or otherwise controlled by the City for park, open space, fire lanes, or similar public purpose which are held for public use which land is not a Public Right -of -Way. "Public Right -of -Way" or "Right -of -Way" means the area on, below, or above a public roadway, highway, street, cartway, bicycle lane or public sidewalk in which the City has an interest, including other dedicated rights -of -way for travel purposes and utility easements of the City. A right -of -way does not include the airwaves above a right -of -way with regard to cellular or other non -wire telecommunications or broadcast service. "Pole Attachment Permit" A City required permit for any equipment or appurtenance attached to any pole located in the Public Way or Public Ground, whether owned by the City or not. "Public Street" The improved, traveled or surfaced portion of any public right -of -way or roadway. "Registrant" means any person who (1) has or seeks to have its equipment or facilities located in any right -of -way, or (2) in any way occupy or uses, or seeks to occupy or use, the right -of -way or place its facilities or equipment in the right -of -way. "Restore" or "Restoration" means the process by which an excavated right -of -way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. "Restoration Cost" means the amount of money paid to the City by a permittee to achieve the level of restoration according to plates 1 to 13 of Minnesota Public Utilities Commission rules. "Right -of -Way Permit" means either the excavation permit or the obstruction permit, or both, depending on the context, required by this chapter. "Right -of -Way User" means (1) a telecommunications right -of -way user as defined by Minnesota Statutes, section 237.162, subd. 4; or (2) a person owning or controlling a facility in the right -of -way that is used or intended to be used for providing utility service, and who has a right under law, franchise, or ordinance to use the public right -of -way. "Service" or "Utility Service" includes (1) those services provided by a public utility as defined in Minn. Stat. 216B.02, subds. 4 and 6; (2) services of a telecommunications right -of -way user, including transporting of voice or data information; (3) services of a cable communications systems as defined in Minn. Stat. Chapter. 238; (4) natural gas or electric energy or telecommunications services provided by the City; (5) services provided by a cooperative electric association organized under Minn. Stat., Chapter 308A; and (6) water, and sewer, including service laterals, steam, cooling or heating services. "Service Lateral" means an underground facility that is used to transmit, distribute, or furnish a common source to an end -use customer. A service lateral is also an underground facility that is used in the removal of wastewater, storm water, or sump pump discharge from a customer's premises. "Small Wireless Facility" means a wireless facility that meets both of the following qualifications: a) Each antenna is located inside an enclosure of no more than six cubic feet in volume or could fit within such an enclosure; and b) All other wireless equipment associated with the small wireless facility provided such equipment is, in aggregate, no more than 28 cubic feet in volume, not including electric meters, concealment elements, telecommunications demarcation boxes, battery backup power systems, grounding equipment, power transfer switches, cutoff switches, cable, conduit, vertical cable runs for the connection of power and other services, and any equipment concealed from public view within or behind an existing structure or concealment. "Storm Water" means water that originates during precipitation events and snow /ice melt. "Supplementary Application" means an application made to excavate or obstruct more of the right -of -way than allowed in, or to extend, a permit that had already been issued. "Temporary Surface" means the compaction of sub base and aggregate base and replacement, in kind, of the existing pavement only to the edges of the excavation. It is temporary in nature except when the replacement is of pavement included in the City's two -year plan, in which case it is considered full restoration. "Trench" means an excavation in the pavement, with the excavation having a length equal to or greater than the width of the pavement. "Telecommunication right -of -way user" means a person or company installing or owning or controlling a facility in the right -of -way, or seeking to own or control a Facility in the right -of -way that is used or is intended to be used for providing wireless service, or transporting telecommunication or other voice or data information. For purposes of this chapter, a cable communication system defined and regulated under Minn. Stat. Chap. 238, and telecommunication activities related to providing natural gas or electric energy services, a public utility as defined in Minn. Stat. Sec. 21613.02, a municipality, a municipal gas or power agency organized under Minn. Stat. Chaps. 453 and 453A, or a cooperative electric association organized under Minn. Stat. Chap. 308A, are not telecommunications right -of -way users for purposes of this chapter, except to the extent such entity is offering wireless services. "Utility Pole" means a pole that is used in whole or in part to facilitate telecommunications or electric service. "Wireless Facility" means equipment at a fixed location that enables the provision of wireless services between user equipment and a wireless service network, including equipment associated with wireless service, a radio transreceiver, antenna, coaxial or fiber -optic cable, regular and backup power supplies, and a small wireless facility, but not including wireless support structures, wireline backhaul facilities, or cables between utility poles or wireless support structures, or not otherwise immediately adjacent to and directly associated with a specific antenna. "Wireless Service" means any service using licensed or unlicensed wireless spectrum, including the use of Wi -Fi, whether at a fixed location or by means of a mobile device, that is provided using wireless facilities. Wireless service does not include services regulated under Title VI of the Communications Act of 1934, as amended, including cable service 901.02 ADMINISTRATION. The City Engineer is the principal City official responsible for the administration of the rights -of -way, right -of -way permits, and the ordinances related thereto. The City Engineer may delegate any or all of the duties hereunder. 901.03 ENCROACHMENTS. Subd. 1. Purpose. The public welfare requires that the public rights -of -way within the City, including highways, roads, streets and alleys, be reserved for public purposes. Public use of the full width of the rights -of -way is necessary to public safety and the proper and efficient maintenance of the rights -of -way. However, it is recognized that limited private use or encroachment onto the rights -of -way is not necessarily inconsistent with public use. It is the purpose of this section to provide for lawful incidental private use of publicly -owned rights -of -way not inconsistent with public use. Subd. 2. Permit to encroach. a) Permit required. The right to use publicly -owned rights -of -way within the City for any private use or purpose other than the primary purpose of public travel, whether the use constitutes a substantial or incidental use, may be acquired only through permit granted pursuant to this section. b) Application for permit. Any person may apply to the City Council for a permit to keep or maintain private property within a publicly -owned right -of -way. The application shall be in writing and must describe with specificity the private property and right -of -way involved and the nature and extent of the requested encroachment. c) Issuance of permit, conditions. The City Council may grant the permit if it is determined that the use applied for is incidental and not inconsistent with safe and efficient public use. However, no permit will be issued until the applicant has agreed in writing to waive any right to recover from the City for damage occurring to the property located within the right -of -way which may result from the performance of the City or its agents of its public duties as required by law. d) Special permit for underground sprinkler systems. The City Engineer may approve an application for a special permit for the installation of an underground sprinkler system within the public right -of -way, providing the installation is not inconsistent with the public use of the right - of -way. In the application, in addition to the information required by subsection b above, the applicant shall provide a legal description of the private property served by the sprinkler system and agree in writing to waive all rights to recover from the City for damage occurring to the sprinkler system as a result of the City's performance of its public duties within the right -of -way. The applicant shall further provide a survey or plat drawing showing the location of the sprinkling system within the right -of -way and pay the special permit fee as may be prescribed by ordinance passed by the City Council from time to time. The special permit shall become effective upon its being duly recorded at the offices of the County Recorder or Registrar of Titles and the applicant's providing to the City satisfactory proof thereof. e) Revocation of permit. The City reserves the right to revoke any permit granted under this section as may be required by the public interest. Subd. 3. Unlawful encroachments. Any privately -owned property located within or encroaching upon public -owned rights -of -way which has not been authorized in accordance with this section shall be unlawful and be subject to removal by the City at the owner's expense. Subd. 4. Exemption from provisions. The following uses of the public right -of -way shall be exempt from the permit requirements of this section providing the following conditions are met: a) Mailbox 1. The mailbox shall be on a single post located on the side of the right -of -way contiguous with the mailbox owner's property or is positioned or clustered according to specific directions of the United States Postal Service; 2. Mailboxes servicing a planned unit development (PUD) are positioned or clustered with the platted portion of the PUD or on the side of the right -of -way contiguous with the PUD; 3. The location of the mail box or mailboxes does not interfere with the City's maintenance of the right -of -way. b) Landscaping 1. All landscaping must be vegetative and remain under three feet in height. (1987 Code, § 901.02) (Ord. 121, passed 5 -28 -1980; Ord. 204, passed 2 -8 -1988; Ord. 239, passed 6 -24- 1991) 901.04 HOUSE NUMBERING. Subd. 1. Numbering system. To assist in providing immediate access to all lots, buildings and structures in the City, the same shall be numbered in accordance with the following plan: a) North -south numbers shall commence at the south border of the City and north -south streets shall begin at the number 4600 and run to 6200; b) East -west numbers shall commence at the east border of the City and east -west streets shall begin at the number 19200 and run to 28400; c) Odd numbers shall be on the south and east sides of the streets; even numbers shall be on the north and west sides of the streets. There shall be 100 numbers to each block, as assigned on a grid of 330 feet for east -west numbers; and 100 numbers to each block as assigned on a grid of 660 feet for north -south numbers. d) On Enchanted and Shady Islands, numbers shall be assigned on a west to east basis only. Commencing at the west border of Enchanted Island and running to the tip of Shady Island, numbers shall begin at the number 4200 and run to 5400. There shall be 100 numbers to each block assigned on a grid of 330 feet for each block west to east. Subd. 2. House numbers assigned, chart kept. The City shall assign a street number to each house and /or structure in the City, and shall maintain records showing the proper street number of every lot, parcel and building in the City which shall be open to inspection by any interested person. Subd. 3. Placement and size of numbers. It shall be the duty of the owners and occupants of every house and structure in the city to display in a place visible from the street, figures at least six inches high showing the number of the house or other residential structure. The size of figures on all other occupancies shall be governed by the fire code regulations and shall conform to Minnesota Statutes 299F.011. Subd. 4. Violation. Any person violating the terms of this section shall be guilty of a petty misdemeanor. (1987 Code, § 901.03) (Ord. 76, passed 10 -8 -1973; Ord. 105, passed 9 -11 -1978) Penalty, see § 104.01 901.05 UNDERGROUND UTILITIES. Subd. 1. All utilities installed after the effective date of these regulations, including, but not limited to electrical, telephone and cable television lines, shall be buried unless otherwise approved by the City Council. Subd. 2. Existing overhead utilities within road rights -of -way in this section and of a capacity less than 115 kilovolts are declared to be nonconforming and must be buried at the time they are replaced due to aging or capacity limitations or relocated due to road construction or reconstruction within the rights -of- way in which they share space, unless otherwise approved by the City Council. Any modification to an existing facility or new facility with a capacity of 115 kilovolts or greater shall be subject to the conditional use permit requirements provided in Section 1201.04. This provision shall not apply to existing overhead utilities located on rear or side lot line easements which directly serve adjacent properties. Subd. 3. Existing overhead utilities which are to be buried in conformance with Subd. 2 shall be done so under the terms and requirements as provided in the applicable franchise agreement for the affected utility, if so stipulated. In the absence of franchise agreement stipulations for the affected utility, the burial shall occur under the terms, expense and scheduling requirements as required by the City at the time the overhead utility is replaced or relocated. Substitute stipulations may be provided between the affected utility and the City. (Am. Ord. 378, passed 1 -14 -2002) 901.06 REGISTRATION. Subd. 1. Annual Registration Required. Each person who occupies or uses, or seeks to occupy or use, the right -of -way or place any equipment or facilities in or on the right -of -way, including persons with installation and maintenance responsibilities by lease, sublease or assignment, must register with the City. Such registration shall be made on an application form provided by the City Engineer and shall be accompanied by the registration fee provided in Section 1301.02 of this Code. Subd. 2. Registration Prior to Work. No person may construct, install, repair, remove, relocate, or perform any other work on, or use any facilities or any part thereof, in any right -of -way without first being registered with the City. Subd. 3. Registration Information. The registrant shall provide the following at the time of registration: a) Registrant's name, address, telephone number, facsimile number, email address and Gopher One - Call registration certificate number if required by State law. b) Name, address, telephone number, email address and facsimile number of the person responsible for fulfilling the obligations of the registrant. c) A Certificate of Insurance from a company licensed to do business in the State of Minnesota. Such certificate shall verify that the registrant is insured against claims for personal injury, including death, as well as claims for property damage arising out of the (1.) use and occupancy of the right -of -way by the registrant, its officers, agents, employees and permittees, and (2.) placement and use of equipment or facilities in the right -of -way by the registrant, its officers, agents, employees and permittees, including but not limited to; protection against liability arising from completed operations, damage of underground equipment and collapse of property. Such certificate shall also name the City as an additional insured as to whom the coverage's required herein are in force and applicable and for whom defense will be provided as to all such coverages. Such certificate shall require that the City be notified 30 days prior to cancellation of the policy. Such insurance shall provide coverage in accordance with MN Statute 466.04 and provide minimum coverage in the following amounts, as Council may amend from time to time: General liability: a. Public Liability, including premises, products and complete operations; Bodily injury liability: $1,000,000 each person, $3,000,000 each occurrence and Property damage liability: $3,000,000 each occurrence b. In lieu of above requirements, bodily injury and property damage combined: $3,000,000 single limit. 2. Comprehensive: a. Automobile liability insurance, including owned, non -owned and hired vehicles: b. Bodily injury liability: $1,000,000 each person, $3,000,000 each occurrence and Property damage; $3,000,000 each occurrence. c. In lieu of above Comprehensive insurance coverage, bodily injury and property damage combined $3,000,000 single limit. d) 24 hour emergency number. e) An acknowledgment by the registrant of the indemnification pursuant to Subd. 2 of Subsection 901.25. f) If the person is a corporation, a copy of the certificate is required to be filed under Minn. Stat. 300.06 as recorded and certified to by the Secretary of State. g) When applicable, a copy of the person's order granting a certificate of authority from the Minnesota Public Utilities Commission or other authorization or approval from the applicable state or federal agency to lawfully operate, where the person is lawfully required to have such authorization or approval from said commission or other state or federal agency. h) The registrant shall keep all of the information listed above current at all times by providing to the City information as to changes within fifteen (15) days following the date on which the registrant has knowledge of any change. i) Such other information the City may require. Subd. 4. Exceptions. The following are not subject to the requirements of this Subsection. a) Persons engaged in snow removal activities. b) Federal, State, County, and City agencies. c) Persons acting as agents, contractors or subcontractors for a registrant who has properly registered in accordance with this Subsection 901.06. Subd. 5. Term. Registrations issued pursuant to this Section shall expire on December 31 of each calendar year. Subd. 6. Registrant obligations. All registrants are obligated to: a) Respond, in a timely manner, and in all cases no longer than 30 (thirty) days, to all requests, inquiries, and correspondence from the City. b) Attend any pre - construction, progress meetings upon notification from the City of their required attendance. Failure to attend such meetings shall be considered a default on the registration conditions, and result in the Registrant being removed from the city's registration without refund of any fees. Re- registration cannot occur for the remainder of that calendar year. 901.07 PERMIT REQUIRED. Subd. 1. Permit Required. Except as otherwise provided in this code, no person may obstruct or excavate any right -of -way, or install or place facilities in the right -of -way without first having obtained the appropriate right -of -way permit from the City to do so. a) Excavation Permit. An excavation permit is required by a registrant to excavate that part of the right -of -way described in such permit and to hinder free and open passage over the specified portion of the right -of -way by placing facilities described therein, to the extent and for the duration specified therein. b) Obstruction Permit. An obstruction permit is required by a registrant to hinder free and open passage over the specified portion of right -of -way by placing equipment described therein on the right -of -way, to the extent and for the duration specified therein. An obstruction permit is not required if a person already possesses a valid excavation permit for the same project. c) Small Wireless Facility Permit. A small wireless facility permit is required by registrant to erect or install a wireless support structure, to collocate a small wireless facility, or to otherwise install a small wireless facility in the specified portion of the right -of -way, to the extent specified therein, provided that such permit shall remain in effect for the length of time the facility is in use, unless lawfully revoked. d) Pole/ Pole Attachment Permit. A pole permit shall be required for the placement of new utility poles as well as anytime a new attachment is made to any pole, new or existing, privately or publicly owned. Subd. 2. Permit Extensions. No person may excavate or obstruct the right -of -way beyond the date or dates specified in the permit unless (i) such person makes a supplementary application for another right- of -way permit before the expiration of the initial permit, and (ii) a new permit or permit extension is granted. Subd. 3. Delay Penalty. In accordance with Minnesota Rule 7819.1000 subd. 3 and notwithstanding subd. 2 of this Section, the City shall establish and impose a delay penalty for unreasonable delays in right -of -way excavation, obstruction, patching, or restoration. The delay penalty shall be established from time to time by City council resolution. Subd. 4. Permit Display. Permits issued under this chapter shall be conspicuously displayed or otherwise available at all times at the indicated work site and shall be available for inspection by the City. 901.08 PERMIT APPLICATIONS; FEES; SECURITY; OTHER. Application for a permit is made to the City. An application for a permit shall be made on forms provided by the City Engineer and shall be accompanied by the fees as determined by the City Council from time to time, which are established to reimburse the City for City costs. Permit applications shall contain, and will be considered complete only upon compliance with the requirements of the following provisions: Subd. 1. Application. a) Scaled drawings showing the location of all facilities and improvements existing and proposed by the applicant. b) A description of the methods that will be used for installation. c) A proposed schedule for all work. d) The location of any public streets, sidewalks or alleys that will be temporarily closed to traffic during the work. e) The location of any public streets, sidewalks or alleys that will be disrupted by the work. f) A description of methods for restoring any public improvements disrupted by the work. g) Any other information reasonably required by the City Engineer. h) Traffic control plan referencing the Minnesota Manual on Uniform Traffic Control Devices. i) Registration with the City pursuant to this chapter j) Permit fees, estimated restoration costs and other management costs k) Prior obstructions or excavations, any undisputed loss, damage, or expense suffered by the City because of applicant's prior excavations or obstructions of the rights -of -way or any emergency actions taken by the City; 1) Franchise fees or other charges, if applicable. m) If the work is to be performed by an agent, contractor or subcontractor on behalf of a registrant, such application shall be signed by the registrant. Subd. 2. Permit Fee. a) The City shall impose permit fees in an amount sufficient to recover the City's costs. b) Payment of disputed amounts due the City by posting letter of credit or depositing in an escrow account an amount equal to at least 110% of the amount owing. c) Posting an additional or larger construction cash deposit or letter of credit for additional facilities when applicant requests an excavation permit to install additional facilities and the City deems the existing construction performance bond inadequate under applicable standards. Subd. 3. Payment of Permit Fees. No excavation permit or obstruction permit shall be issued without payment of excavation or obstruction permit fees. The City may allow applicant to pay such fees within thirty (30) days of billing. Subd. 4. Non Refundable. Permit fees that were paid for a permit that the City has revoked for a breach as stated in Section 901.15 are not refundable. Subd. 5. To Franchises. Unless otherwise agreed to in a franchise, City costs may be charged separately from and in addition to the franchise fees imposed on a right -of -way user in the franchise. Subd.6. Security. Unless specifically stated in a franchise agreement with the city, companies shall provide a surety bond, letter of credit or cash deposit_ in the amount determined by the City Engineer but not less than $2,000 shall be required from each applicant. A surety bond shall be from a corporate surety authorized to do business in the State. Security required pursuant to this Subd. 2 shall be conditioned that the holder will perform the work in accordance with this Section and applicable regulations, will pay to the City any costs incurred by the City in performing work pursuant to this Section; and will indemnify and save the City and its officers, agents and employees harmless against any and all claims, judgment or other costs arising from any excavation and other work covered by the permit or for which the City, Council or any City officer may be liable by reason of any accident or injury to persons or property through the fault of the permit holder, either in improperly guarding the excavation or for any other injury resulting from the negligence of the permit holder. In addition to the above - referenced security, non - franchise utility right of way users shall provide an irrevocable letter of credit, or cash deposit that shall remain in force as long as the non - franchise utility user has facilities in the city's right of way. The amount of this security shall be determined from time to time by the City Council. This security shall be in addition to the security required from any subcontractor doing work on behalf of the non - franchise right of way utility. The bond, letter of credit or cash deposit shall be released by the City upon completion of the work and compliance with all conditions imposed by the permit. For permits allowing excavations within public streets, such bond, letter of credit or cash deposit shall be held for a period of 24 months to guaranty the adequacy of all restoration work. Subd. 7. Permit Issuance; Conditions. The City may impose reasonable conditions upon the issuance of the permit and the performance of the applicant thereunder to protect the health, safety and welfare or when necessary to protect the right -of -way and its current use. In addition, a permittee shall comply with all requirements of local, state and federal laws, including but not limited to Minnesota Statutes§ 216D.01 -.09 (Gopher One Call Excavation Notice System) and Minnesota Rules Chapter 7560.No permit shall be issued to anyone who has failed to register in accordance with Subsection 901.06. Subd. 8. Small Wireless Facility Conditions. In addition to subdivision 3, the erection or installation of a wireless support structure, the collocation of a small wireless facility, or other installation of a small wireless facility in the right -of -way, shall be subject to the following conditions: a) A small wireless facility shall only be collocated on the particular wireless support structure, under those attachment specifications, and at the height indicated in the applicable permit application. b) No new wireless support structure installed within the right -of -way shall exceed 50 feet in height without the city's written authorization, provided that the city may impose a lower height limit in the applicable permit to protect the public health, safety, and welfare or to protect the right -of- way and its current use, and further provided that the registrant may replace an existing wireless support structure exceeding 50 feet in height with a structure of the same height subject to such conditions or requirements as may be imposed in the applicable permit. c) No wireless facility may extend more than 10 feet above its wireless support structure. d) Where an applicant proposes to install a new wireless support structure in the right -of -way, the city may impose separation requirements between such structure and any existing wireless support structure or other facilities in and around the right -of -way. e) Where an applicant proposes collocation on a decorative wireless support structure, sign or other structure not intended to support small wireless facilities, the city may impose reasonable requirements to accommodate the particular design, appearance or intended purpose of such structure. f) Where an applicant proposes to replace a wireless support structure, the city may impose reasonable restocking, replacement, or relocation requirements on the replacement of such structure. g) Screening, disguising, or other zoning requirements shall be found in the City Code, Section 1201.03, Subdivision 21. Subd. 9. Small Wireless Facility Agreement. A small wireless facility shall only be collocated on a small wireless support structure owned by or controlled by the city, or any other city asset in the right -of- way, after the applicant has executed a standard small wireless facility collocation agreement with the city. The standard collocation agreement shall require payment of the following fees: • S150 per year for rent to collocate on the city structure. • $25 per year for maintenance associated with the collocation. • A monthly fee for electrical service as follows: i. $73 per radio node less than or equal to 100 maximum watts; ii. $182 per radio node over 100 maximum watts; or iii. The actual costs of electricity, if the actual cost exceeded the foregoing. The standard collocation agreement shall be in addition to, and not in lieu of, the required small wireless facility permit, provided, however, that the applicant shall not be additionally required to obtain a license or franchise in order to collocate. Issuance of a small wireless facility permit does not supersede, alter or affect any then - existing agreement between the city and applicant. Subd. 10. Action on Small Wireless Facility Permit Applications. a) Deadline for Action. The City shall approve or deny a small wireless facility permit within 90 days after filing of such application, except as provided for in paragraph 3 of this section. The small wireless facility permit and any associated building permit application, shall be deemed approved if the city fails to approve or deny the application within the review period established in this paragraph. b) Consolidated Applications. An applicant may file a consolidated small wireless facility permit application addressing the proposed collocation of up to 15 small wireless facilities, or a greater number if agreed to by a local government unit, provided that all small wireless facilities in the application: 1. Are located within a two -mile radius; 2. Consist of substantially similar equipment; and 3. Are to be placed on similar types of wireless support structures. In rendering a decision on a consolidated permit application, the city may approve some small wireless facilities and deny others, but may not use denial of one or more permits as a basis to deny all small wireless facilities in an application c) Tolling of Deadline. The 90 -day deadline for action on a small wireless facility permit application may be tolled if: 1. The City receives applications from one or more applicants seeking approval of permits for more than 30 small wireless facilities within a seven -day period. In such case, the City may extend the deadline for all such applications by 30 days by informing the affected applicants in writing of such extension. 2. The applicant fails to submit all required documents or information and the city provides written notice of incompleteness to the applicant within 30 days of receipt of the application. Upon submission of additional documents or information the city shall have ten days to notify the applicant in writing of any still - missing information. Once the complete application has been submitted, the 90 day deadline for action will begin. Subd. 11. Exceptions. No permit shall be required for the following: • Snow removal activities; • Activities of the City; or, • Installation and maintenance of sewer or water services provided that no excavation or other work is done within a street, sidewalk or alley and all work is confined to unimproved portions of rights -of -way or easements. 901.09 DILIGENCE IN PERFORMING WORK. Work shall progress in an expeditious manner as reasonably permitted by weather conditions until completion in order to avoid unnecessary inconvenience to traffic. In the event that the work is not performed in accordance with applicable regulations pertaining to excavations and utility connections, or the work is not done in an expeditious manner, or shall cease or be abandoned without due cause, the City may, after 72 hour notice to the permit holder, correct the work and fill the excavation or repair the street. The entire cost of such work shall be paid by the permit holder upon demand made by the City. If permit holder fails to pay, the City will exercise a claim on the security. 901.10 STANDARDS DURING CONSTRUCTION OR INSTALLATION. The permit holder shall comply with the following standards when engaging in the work: a) Conduct the operations and perform the work in a manner as to ensure the least obstruction and interference to traffic. b) Take adequate precautions to ensure the safety of the general public and those who require access to abutting property. c) If required by the City Engineer, notify adjoining property owners prior to the commencement of work which may disrupt the use of and access to such adjoining properties. d) In all cases where construction work interferes with the normal use of the construction area, provide for closing the construction area to traffic or to afford it restricted use of the area and comply with the Minnesota Manual On Uniform Traffic Control Devices traffic safety signing requirements. e) Exercise precaution at all times for the protection of persons, including employees and property. f) Protect and identify excavations and work operations with barricade flags, and if required, by flagmen in the daytime, and by warning lights at night. g) Provide proper trench protection as required by O.S.H.A. when necessary and depending upon the type of soil, in order to prevent cave -ins endangering life or tending to enlarge the excavation. h) Protect the root growth of trees and shrubbery. i) Installation of pipe (utility conductors) under Portland Cement Concrete, asphalt concrete, or other high -type bituminous pavements shall be done by jacking, auguring or tunneling as directed by the City Engineer unless otherwise authorized. HDPE sleeving shall be an acceptable casing or sleeving material for telecommunications installations. j) When removing pavement of Portland Cement Concrete, asphalt concrete or high -type built -up bituminous surfacing, the pavement shall be removed on each side of the trench or excavation a distance of nine inches beyond the trench width and length, in order to provide a shoulder and solid foundation for the surface restoration. k) To obtain a straight edge and neat - appearing opening in pavement surfaces, the following procedure is required: 1. Portland Cement Concrete Pavement - The surface shall be saw -cut scored two inches deep and the concrete broken out by sledge or pneumatic hammer chisel. 2. Asphalt Concrete — The surface shall be cut full depth by pneumatic hammer chisel. 1) Excavations, trenches and jacking pits off the roadway or adjacent to the roadway or curbing shall be sheathed and braced depending upon location and soil stability, and as directed by the City. m) Excavations, trenches, directional borings, and jacking pits shall be protected when unattended to prevent entrance of surface drainage. n) All backfilling must be placed in six inch lifts at optimum moisture and compacted 100 percent of AASHTO density. Compaction shall be accomplished with hand, pneumatic or vibrating compactors as appropriate. Backfill material shall be Class 5, or better in the judgment of the City Engineer. The City Engineer may permit backfilling with the material from the excavation provided such material is granular in nature and acceptable to the City Engineer. o) Compacted backfill shall be brought to street grade and crowned to match the existing driving surface. p) Street and pedestrian traffic shall be maintained throughout construction unless provided otherwise by the permit. q) No lugs damaging to roadway surfaces may be used. r) Dirt or debris must be promptly removed during construction. s) Other reasonable standards and requirements of the City Engineer. 901.11 REPAIR AND RESTORATION. Subd. 1. Timing. The work to be done under the excavation permit, and the patching and restoration of the right -of -way as required herein, must be completed within the dates specified in the permit, increased by as many days as work could not be done because of circumstances beyond the control of the permittee. Permanent restoration of the driving surface shall be completed within three working days of completion of the backfilling. Permanent restoration of all other work shall be completed within ten days following backfilling or completion of the excavation work. Subd. 2. Patch and Restoration. Permittee shall patch its own work. The City may choose either to have the permittee restore the right -of -way or to restore the right -of -way itself. a) City Restoration. If the City restores the right -of -way, permittee shall pay the costs thereof within thirty (30) days of billing. If, following such restoration, the pavement settles due to permittee's improper backfilling, the permittee shall pay to the City, within thirty (30) days of billing, all costs associated with correcting the defective work. The permit holder may request that the City restore the right -of -way. The permit holder shall pay to the City, in advance, a cash deposit equaling 150% of the estimated restoration cost. The restoration cost shall be estimated by the City Engineer. Following completion of the restoration, any funds in excess of the actual restoration cost shall be returned to the permit holder. b) Permittee Restoration. If the permittee restores the right -of -way itself, it shall at the time of application for an excavation permit post security as required by this ordinance. Subd. 3. Standards. The permittee shall perform excavation, backfilling, patching and restoration according to the standards and with the materials specified by the City and shall comply with Minnesota Rule 7819.1100. The permit holder shall perform repairs and restoration according to the standards and with the materials specified by the City. The City shall have the authority to prescribe the manner and extent of the restoration, and may do so in written procedures of general application or on a case -by -case basis. The City in exercising this authority shall be guided by the following standards and consideration: a) The number, size, depth and duration of the excavations, disruptions or damage to the right -of- way. b) The traffic volume carried by the right -of -way; the character of the neighborhood surrounding the right -of -way; c) The pre- excavation condition of the right -of -way; the remaining life - expectancy of the right -of- way affected by the excavation; d) Whether the relative cost of the method of restoration to the permit holder is in reasonable balance with the prevention of an accelerated depreciation of the right -of -way that would otherwise result from the excavation, disturbance or damage to the right -of -way; and e) The likelihood that the particular method of restoration would be effective in slowing the depreciation of the right -of -way that would otherwise take place. f) The excavation, backfilling, patching and restoration, and all other work performed in the right - of -way shall be done in conformance with Minnesota Rules 7819.1100 and 7819.5000 and other applicable local requirements, in so far as they are not inconsistent with the Minnesota Statutes, Sections 237.162 and 237.163. Installation of service laterals shall be performed in accordance with Minnesota Rules Chapter 7560 and these ordinances. Service lateral installation is further subject to those requirements and conditions set forth by the City in the applicable permits and /or agreements referenced in Section 901.18 subd. 2 of this ordinance. Subd. 4. Duty to Correct Defects. The permittee shall correct defects in patching or restoration performed by permittee or its agents. The permittee , shall correct all restoration work to the extent necessary, using the method required by the City. Said work shall be completed within seven (7) calendar days of the notice being sent by the City, not including days during which work cannot be done because of circumstances constituting force majeure or days when work is prohibited as unseasonable or unreasonable. Subd. 5. Failure to Restore. If the permittee fails to restore the right -of -way in the manner and to the condition required by the City, or fails to satisfactorily complete all restoration required by the City, the City, at its option may do such work or hire a contractor to complete the work. Any restoration done in this manner will include an administrative charge to cover the City's cost, but said charge will in no event be less than $100.00 and the City will withhold permits for future work until reimbursement is made by the permittee. In that event the permittee shall pay to the City, within thirty (30) days of billing, the cost of restoring the right -of -way. If permittee fails to pay as required, the City may exercise its rights under the letter of credit, cash deposit, or other financial guarantee. Failure to restore shall also be considered a violation of the registration requirements and may subject permittee to removal from city registration. Subd. 6. Guarantees. The permit holder shall guarantee its work and shall maintain it for twenty -four (24) months following its completion. During this twenty -four month period it shall, upon notification from the City Engineer, promptly correct all restoration work to the extent necessary, using the method required by the City Engineer. 901.12 PERMIT LIMITATIONS. Permits issued pursuant to this Section are valid only for the area of the right -of -way specified in the application and the permit and only for the dates so specified. No work shall be extended beyond the permitted area or dates without a new permit being procured therefore, provided the City Engineer may extend the completion date of the work in accordance with Subd. 1 of Subsection 901.11. 901.13 DENIAL OF PERMIT. Subd. 1. Reasons for Denial. The City may deny a permit for failure to meet the requirements and conditions of this chapter or if the city determines that the denial is necessary to protect the health, safety, and welfare or when necessary to protect the right -of -way and its current use. Subd. 2. Procedural Requirements. The denial or revocation of a permit must be made in writing and must document the basis for the denial. The City must notify the applicant or right -of -way user in writing within three business days of the decision to deny or revoke a permit. If an application is denied, the applicant may address the reasons for denial identified by the City and resubmit its application. If the application is resubmitted within 30 days of receipt of the notice of denial, no additional application fee shall be imposed. The City must approve or deny the resubmitted application within 30 days after submission. 901.14 EMERGENCY WORK. Subd. 1. Emergency Situations. Each registrant shall immediately notify the director of any event regarding its facilities that it considers to be an emergency. Excavators' notification to Gopher State One Call regarding an emergency situation does not fulfill this requirement. Within two (2) business days after the occurrence of the emergency, the registrant shall apply for the necessary permits, pay the fees associated Therewith, and fulfill the rest of the requirements necessary to bring itself into compliance with this chapter for the actions it took in response to the emergency. If the City Engineer becomes aware of an emergency, the City Engineer shall attempt to contact the local representative of each registrant affected, or potentially affected, by the emergency. In any event, the City Engineer may take whatever action deemed necessary to respond to the emergency, the cost of which shall be borne by the registrant whose facilities or equipment occasioned the emergency. Subd. 2. Non - Emergency Situations. Except in an emergency, any person who, without first having obtained the necessary permit, obstructs or excavates a right -of -way must subsequently obtain a permit and, as a penalty, pay double the normal fee for said permit, pay double all the other fees required by the City code, deposit with the City the fees necessary to correct any damage to the right -of -way, and comply with all of the requirements of this chapter. 901.15 REVOCATION OF PERMITS. Subd. 1. Substantial Breach. The City reserves its right, as provided herein, to revoke any right -of -way permit without a fee refund, if there is a substantial breach of the terms and conditions of any statute, ordinance, rule or regulation, or any material condition of the permit. A substantial breach by permittee shall include, but shall not be limited to, the following: a) The violation of any material provision of the right -of -way permit; b) An evasion or attempt to evade any material provision of the right -of -way permit, or the perpetration or attempt to perpetrate any fraud or deceit upon the City or its citizens; Any material misrepresentation of fact in the application for a right -of -way permit; c) The failure to complete the work in a timely manner, unless a permit extension is obtained or unless the failure to complete work is due to reasons beyond the permittee's control; or d) The failure to correct, in a timely manner, work that does not conform to a condition indicated on an order issued pursuant to Sec. 901.21. Subd.2. Written Notice of Breach. If the city determines that the permittee has committed a substantial breach of a term or condition of any statute, ordinance, rule, regulation, or any condition of the permit, the city shall make a written demand upon the permittee to remedy such violation. The demand shall state that continued violations may be cause for revocation of the permit. A substantial breach, as stated above, will allow the city, at its discretion, to place additional or revised conditions on the permit to mitigate or remedy the breach. Subd. 3. Response to Notice of Breach. Within forty -eight (48) hours of the city sending notification of the breach, permittee shall provide the city with a plan, acceptable to the city, which will cure the breach. Permittee's failure to so contact the city, or permittee's failure to timely submit an acceptable plan, or permittee's failure to reasonably implement the approved plan, shall be cause for immediate revocation of the permit. Subd. 4. Reimbursement of City Costs. If a permit is revoked, the permittee shall also reimburse the city for the city's reasonable costs, including, but not limited to, restoration costs and the costs of collection and reasonable attorneys' fees incurred in connection with such revocation. 901.16 APPEAL. Subd. 1. Filing of Appeal. Any person aggrieved by, 1) the denial of a permit application, 2) the denial of a registration, 3) the revocation of a permit or, 4) the application of the fee imposed by the City of Shorewood's master fee schedule, may appeal to the Council by filing a written notice of appeal with the Clerk. Said notice must be filed with 20 days of the action causing the appeal. Subd. 2. Notice of Hearing. The Council shall hear the appeal not later than 30 days after the date the appeal is filed. Notice of the date, time, place, and purpose of the hearing shall be mailed to the appellant not less than 10 days before the date of the hearing. Subd. 3. Hearing and Decision. The Council shall, at such hearing, hear and consider any evidence offered by the appellant, the City Engineer, and anyone else wishing to be heard. After hearing the oral and written views of all interested persons, the Council shall make its decision at the same meeting or at a specified future meeting. 901.17 MAPPING. Subd. 1. Information Required. Each registrant and permittee, upon request by the City, shall provide mapping information required by the City in accordance with Minnesota Rules 7819.4000 and 7819.4100. Following completion of any work pursuant to a permit, and upon City request, the permittee shall provide the City Engineer accurate maps and drawings certifying the "as- built" location of all equipment installed, owned and maintained by the permittee. Such maps and drawings shall include the horizontal and vertical location of all facilities and equipment and shall be provided consistent with the City's mapping system. Failure to provide maps and drawings pursuant to this subsection shall be grounds for revoking the permit holder's registration. Subd. 2. Service Laterals. All permits issued for the installation or repair of service laterals, other than minor repairs as defined in Minnesota Rules 7560.0150 subpart 2, shall require the permittee's use of appropriate means of establishing the horizontal locations of installed service laterals. Permittees or their subcontractors shall submit to the director evidence satisfactory to the director of the installed service lateral locations. Compliance with this subdivision 2 and with applicable Gopher State One Call law and Minnesota Rules governing service laterals install after December 31, 2005, shall be a condition of any City approval necessary for 1) payments to contractors working on a public improvement project including those under Minnesota Statutes, Chapter 429, and 2) City approval of performance under development agreements, or other subdivision or site plan approval under Minnesota Statutes, Chapter 462. The director shall reasonably determine the appropriate method of providing such information to the City. Failure to provide prompt and accurate information on the service laterals installed may result in the revocation of the permit issued for the work or for future permits to the offending permittee or its subcontractors. 901.18 LOCATION OF FACILITIES AND EQUIPMENT. Subd. 1. Undergrounding by Telecommunications Right -of -Way Users. Any new construction and the installation of new equipment and replacement of old equipment of telecommunication right -of -way users shall be underground or contained within buildings or other structures in conformity with applicable codes. Provided, telecommunications right -of -way users may attach equipment and facilities to existing poles and structures maintained by a service or utility service. New and improved telecommunications facilities shall be made available for service to abutting parcels on the same terms and conditions available to others in the same service area. Subd. 2. Corridors. The City Engineer may assign specific corridors within the right -of -way, or any particular segment thereof as may be necessary, for each type of equipment that is or, pursuant to current technology, the City Engineer expects will someday be located within the right -of -way. All permits issued by the City Engineer involving the installation or replacement of equipment shall designate the proper corridor for the equipment at issue. Subd. 3. Limitation of Space. To protect health and safety, the City Engineer shall have the power to prohibit or limit the placement of new or additional equipment within the right -of -way if there is insufficient space to accommodate all of the requests of registrants or persons to occupy and use the right -of -way. In making such decisions, the City Engineer shall strive to the extent possible to accommodate all existing and potential users of the right -of -way, but shall be guided primarily by considerations of the public interest, the public's needs for the particular utility service, the condition of the right -of -way, the time of year with respect to essential utilities, the protection of existing equipment in the right -of -way, and future City plans for public improvements and development projects which have been determined to be in the public interest. 901.19 RELOCATION OF FACILITIES. Subd.l. Placement, location, and relocation of facilities must comply with the Act, with other applicable law, and with Minnesota Rules 7819.3100, 7819.5000, 7819.5100, to the extent the rules do not limit authority otherwise available to cities. a) Relocation notification procedure. The City shall notify the utility owner at least 90 days in advance of the need to relocate existing facilities so the owner can determine if relocation or replacement is required and plan for any required work. The City shall provide a second notification to the owner one (1) month before the owner needs to begin the relocation. The utility owner shall begin relocation of the facilities within one (1) month of the second notification. To the extent technically feasible, all utilities shall be relocated within one (1) month or in a time frame determined by the City. The City may allow a different schedule if it does not interfere with the City's project. The utility owner shall diligently work to relocate the facilities within the above schedule. The registrant shall restore any rights -of -way to the condition it was prior to removal and relocation. b) Delay to City Project. The City shall notify the utility owner if the owner's progress will not meet the relocation schedule. If the owner fails to meet the relocation schedule due to circumstances within its control, the City may charge the utility owner for all costs incurred and requested by a contractor working for the City who is delayed because the relocation is not completed in the scheduled timeframe and for all costs incurred by the City due to the delay. c) Delay Penalties. Delay penalties under this section shall be set time to time by the City Council. d) For relocations or requests made by the City that are matters of convenience, and where the city shall be charged for such costs, the utility owner shall provide the city a detailed estimate of all relocation costs, including, but not limited to: quantities of all materials and supplies, cost for each quantity, labor costs, other. The City shall have the right to independently verify the cost to determine reasonableness. Subd. 2. Undergrounding of Relocated Telecommunications Facilities. A telecommunications right -of -way user shall relocate all above ground facilities and equipment to underground locations at its own cost and expense at the City's request when, i) the City requires the relocation of all telecommunications facilities and equipment to underground locations or ii) structures or poles to which the registrant's facilities or equipment is attached are abandoned or removed by the owner of such structures or poles, or as ordered removed by the City. Subd. 3. Nuisance. One year after the passage of this chapter, any facilities found in a right -of -way that have not been registered shall be deemed to be a nuisance. The City may exercise any remedies or rights it has at law or in equity, including, but not limited to, abating the nuisance or taking possession of the facilities and restoring the right -of -way to a useable condition. Subd. 4. Limitation of Space. To protect health, safety, and welfare, or when necessary to protect the right -of -way and its current use, the City shall have the power to prohibit or limit the placement of new or additional facilities within the right -of -way. In making such decisions, the City shall strive to the extent possible to accommodate all existing and potential users of the right -of -way, but shall be guided primarily by considerations of the public interest, the public's needs for the particular utility service, the condition of the right -of -way, the time of year with respect to essential utilities, the protection of existing facilities in the right -of -way, and future City plans for public improvements and development projects which have been determined to be in the public interest. Subd. 5. Fee Waiver. When relocation occurs in conjunction with a public improvement project, the City Engineer shall have discretion to waive all or a portion of the fees associated with the work that is occurring within the boundaries of the public improvement project. 901.20 PRE - EXCAVATION FACILITIES LOCATION. In addition to complying with the requirements of Minn. Stat. 216D.01 -.09 ( "One Call Excavation Notice System ") before the start date of any right -of -way excavation, each registrant who has facilities or equipment in the area to be excavated shall mark the horizontal and vertical placement of all said facilities. Any registrant whose facilities are less than twenty (20) inches below a concrete or asphalt surface shall notify and work closely with the excavation contractor to establish the exact location of its facilities and the best procedure for excavation. 901.21 INSPECTION. Subd. 1. Notice of Completion. When the work under any permit hereunder is completed, the permittee shall furnish a completion certificate in accordance Minnesota Rule 7819.1300. Subd. 2. Site Inspection. Permittee shall make the work -site available to the City and to all others as authorized by law for inspection at all reasonable times during the execution of and upon completion of the work. 901.22 AUTHORITY OF DIRECTOR OR CITY ENGINEER. a) At the time of inspection, the director or City Engineer may order the immediate cessation of any work which poses a serious threat to the life, health, safety or well -being of the public. b) The director or City Engineer may issue an order to the permittee for any work that does not conform to the terms of the permit or other applicable standards, conditions, or codes. The order shall state that failure to correct the violation will be cause for revocation of the permit. Within ten (10) days after issuance of the order, the permittee shall present proof to the director that the violation has been corrected. If such proof has not been presented within the required time, the director may revoke the permit pursuant to Sec. 901.15. 901.23 RIGHT -OF -WAY VACATION. Subd. 1. Reservation of right. If the City vacates a right -of -way that contains the facilities of a registrant, the registrant's rights in the vacated right -of -way are governed by Minnesota Rules 7819.3200. Subd. 2. Relocation of Equipment. If the vacation requires the relocation of registrant facilities and equipment; and (a) if the vacation proceedings are initiated by the registrant, the registrant must pay the relocation costs; or (b) if the vacation proceedings are initiated by the City, the registrant must pay the relocation costs unless otherwise agreed to by the City and the registrant; or (c) if the vacation proceedings are initiated by a person or persons other than the registrant or permit holder, such other person or persons must pay the relocation costs. Subd. 3. Notice. Required notification of request to vacate shall be done pursuant to MN Statutes 645.11. 901.24 ABANDONED AND UNUSABLE EQUIPMENT. Subd. 1. Discontinued Operations. A registrant who has determined to discontinue its operations in the City must either: a) Provide information satisfactory to the City Engineer that the registrant's obligations for its equipment in the right -of -way under this Section have been lawfully assumed by another registrant; or b) Submit to the City Engineer an action plan for the removal or abandonment of equipment and facilities. The City Engineer shall require removal of such facilities and equipment if the City Engineer determines such removal is necessary to protect the public health, safety and welfare. The City Engineer may require the registrant to post a bond in an amount sufficient to reimburse the City for reasonably anticipated costs to be incurred in removing the facilities and equipment. Subd. 2. Abandoned Facilities and Equipment. Facilities and equipment of a registrant located on the surface of or above a right -of -way or on public grounds which remains unused shall be deemed to be abandoned. Such abandoned equipment is deemed to be a nuisance. The City may exercise any remedies or rights it has at law or in equity, including, but not limited to; a) Abating the nuisance; or b) Requiring removal of the equipment or facilities by the registrant, or the registrant's successor in interest. Appeals under this section shall follow the procedures in Section 901.16. Subd. 3. Removal of Underground Equipment. Any registrant who has unusable and abandoned underground facilities or equipment in any right -of -way shall promptly remove it from that right -of -way. 901.25 INDEMNIFICATION AND LIABILITY. By registering with the City, or by accepting a permit under this chapter, a registrant or permittee agrees to defend and indemnify the City in accordance with the provisions of Minnesota Rule 7819.1250. Subd. 1. Limitation of Liability. By reason of the acceptance of a registration or the grant of a right -of- way permit, the City does not assume any liability (a) for injuries to persons, damage to property, or loss of service claims by parties other than the registrant or the City, or (b) for claims or penalties of any sort resulting from the installation, presence, maintenance, or operation of equipment by registrants or activities of registrants. Subd. 2. Indemnification. By registering with the City Engineer, a registrant agrees, or by accepting a permit under this Section, a permit- holder is required, to defend, indemnify, and hold the City whole and harmless from all costs, liabilities, and claims for damages of any kind arising out of the construction, presence, installation, maintenance, repair or operation of its equipment, or out of any activity undertaken in or near a right -of -way , whether or not any act or omission complained of is authorized, allowed, or prohibited by a right -of -way permit. It further agrees that it will not bring, nor cause to be brought, any action, suit or other proceeding claiming damages, or seeking any other relief against the City for any claim nor for any award arising out of the presence, installation, maintenance or operation of its equipment, or any activity undertaken in or near a right -of -way, whether or not the act or omission complained of is authorized, allowed or prohibited by a right -of -way permit. The foregoing does not indemnify the City for its own negligence except for claims arising out of or alleging the City's negligence where such negligence arises out of or is primarily related to the presence, installation, construction, operation, maintenance or repair of said equipment by the registrant or on the registrant's behalf, including but not limited to, the issuance of permits and inspection of plans or work. This section is not, as to third parties, a waiver of any defense or immunity otherwise available to the registrant or to the City; and the registrant, in defending any action on behalf of the City, shall be entitled to assert in any action every defense or immunity that the City could assert in its own behalf. 901.26 FRANCHISE HOLDERS. If there is a conflict in terms between the franchise of an entity holding a valid franchise agreement with the City and this Section, the terms of the franchise shall prevail. For definitions and timelines contained within both this ordinance and the franchise agreement, the more restrictive provision shall govern. 901.27 SUPPLEMENTARY APPLICATIONS. Subd. 1. Limitation on Area. A right -of -way permit is valid only for the area of the right -of -way specified in the permit. No permittee may do any work outside the area specified in the permit, except as provided herein. Any permittee which determines that an area greater than that specified in the permit must be obstructed or excavated must before working in that greater area (i) make application for a permit extension and pay any additional fees required thereby, and (ii) be granted a new permit or permit extension. Subd. 2. Limitation on Dates. A right -of -way permit is valid only for the dates specified in the permit. No permittee may begin its work before the permit start date or, except as provided herein, continue working after the end date. If a permittee does not finish the work by the permit end date, it must apply for a new permit for the additional time it needs, and receive the new permit or an extension of the old permit before working after the end date of the previous permit. This supplementary application must be submitted before the permit end date. 901.28 OTHER OBLIGATIONS. Subd. 1. Compliance With Other Laws. Obtaining a right -of -way permit does not relieve permittee of its duty to obtain all other necessary permits, licenses, and authority and to pay all fees required by the City or other applicable rule, law or regulation. A permittee shall comply with all requirements of local, state and federal laws, including but not limited to Minnesota Statutes, Section 216D.01 -.09 (Gopher One Call Excavation Notice System) and Minnesota Rules Chapters 7560 and 7819. A permittee shall perform all work in conformance with all applicable codes and established rules and regulations, and is responsible for all work done in the right -of -way pursuant to its permit, regardless of who does the work. Subd. 2. Prohibited Work. Except in an emergency, and with the approval of the City, no right -of -way obstruction or excavation may be done when the City determines it is seasonally prohibited or when the City determines that the conditions are unreasonable for such work. Subd. 3. Interference with Right -of -Way. A permittee shall not so obstruct a right -of -way that the natural free and clear passage of water through the gutters or other waterways shall be interfered with. Private vehicles of those doing work in the right -of -way may not be parked within or next to a permit area, unless parked in conformance with City parking regulations. The loading or unloading of trucks must be done solely within the defined permit area unless specifically authorized by the permit. Subd. 4. Trenchless Excavation. As a condition of all applicable permits, permittees employing trenchless excavation methods, including but not limited to Horizontal Directional Drilling, shall follow all requirements set forth in Minnesota Statutes, Chapter 216D and Minnesota Rules Chapter 7560, and shall require potholing or open cutting over existing underground utilities before excavating. If any trenchless excavation crosses or intersects with a city sanitary sewer main or lateral, storm sewer main or lateral, catch basin, manhole or any associated structure, a post excavation televised inspection in accordance with the City's current standard specifications shall be made of all such crossings within 30 days of said work to ensure that the city utilities were not damaged or impacted by the trenchless excavation. Televised results shall be provided in a format acceptable to the city, and sent to the city within 30 days of the televising. 901.29 SEVERABILITY. If any portion of this chapter is for any reason held invalid by any court of competent jurisdiction, such portion shall be deemed a separate, distinct, and independent provision and such holding shall not affect the validity of the remaining portions thereof. Nothing in this chapter precludes the City from requiring a franchise agreement with the applicant, as allowed by law, in addition to requirements set forth herein. 901.30 VIOLATION. Any person who shall violate any of the provisions of this chapter shall be guilty of a misdemeanor, unless otherwise specified. (1987 Code, § 901.04) (Ord. 121, passed 5 -28 -1980) Penalty, see § 104.01 PASSEDBY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this day of , 2018. ATTEST: Sandie Thone, City Clerk Scott Zerby, Mayor M City of Shorewood Council Meeting Item Title / Subject: Approving 2018 Master Fee Schedule Update Meeting Date: Monday, January 22, 2018 Prepared by: Sandie Thone, City Clerk Reviewed by: Greg Lerud, City Administrator Attachments: Resolution 9C MEETING TYPE Regular Meeting Policy Consideration: Pursuant to MN State Law municipalities shall set forth fees to be reimbursed for administrative costs and expenses associated with issuing permits, licenses and providing other city services. Background: The City of Shorewood is required to set forth fees and charges to reimburse the city for administrative and other expenses related to the issuing of permits, licenses and other services. The city is required to maintain the relevant schedule of fees and regularly audit their effectiveness and ensure the cost to issue permits or provide services are covered but that costs do not exceed the cost to issue the permit or provide the service as municipalities are not to profit from the fees and charges. In May of 2017 the City of Shorewood adopted Ordinance 541 repealing and replacing Chapter 1301 of the Shorewood Municipal Code to allow for reference of a Master Fee Schedule to allow the establishment and amendment of fees by resolution, with the exception of land use fees that will remain in the ordinance and adopted by ordinance. This change ensured a more efficient and economical process while still keeping council control of the fees charged by the city. At that time, staff made plans to review the fees for relevance and has since completed their review and the following document: 2018 Master Fee Schedule is the proposed city fee schedule proposed resulting from this analysis. It incorporates the changes, deletions and /or additions that have come before you tonight. The proposed changes are delineated in the items presented at the meeting and incorporated into the 2018 Master Fee Schedule. Financial or Budget Considerations: The city fees proposed should adequately cover the cost of issuing permits and providing the services as described. Recommendation /Action Requested: 1) Staff respectfully recommends the city council approve the resolution approving the 2018 Master Fee Schedule as proposed or make the appropriate changes as deemed necessary. Motion, second and simple majority vote required. Connection to Vision / Mission: Consistency in providing residents quality public service, a sustainable tax base, and sound financial management through effective, efficient, and visionary leadership. Mission Statement: The City of Shorewood is committed to providing residents quality public services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial management through effective, efficient, and visionary leadership. Page 1 CITY OF SHOREWOOD COUNTY OF HENNEPIN STATE OF MINNESOTA RESOLUTION 18 -XX APPROVING 2018 UPDATED MASTER FEE SCHEDULE WHEREAS, the City of Shorewood and its activities as a municipality requires setting forth fees and charges to reimburse the city for administrative and other expenses related to the issuing of permits, licenses and other services; and WHEREAS, the City of Shorewood must maintain a relevant schedule of fees and regularly audit their effectiveness; and WHEREAS, the City of Shorewood has established fees for licensing, permits, programs, and services that include but are not limited to building, zoning, planning, business, animal, park and recreation, rentals, solicitors, fire prevention, utility, franchise, administrative citations, and other miscellaneous fees that further the health, safety and welfare of the community at large; and WHEREAS, all fees and charges shall be fixed and determined by the council and set forth in the master fee schedule which will be adopted by resolution and uniformly enforced; and WHEREAS, the Shorewood Master Fee Schedule has been audited and the following changes have been recommended for the 2018 Master Fee Schedule as described for the city council at the regular city council meeting held on January 22, 2018 and as delineated in the Proposed Master Fee Schedule for 2018 attached as Appendix A. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Shorewood, the updated 2018 Master Fee Schedule for the City of Shorewood is adopted. ADOPTED BY THE CITY COUNCIL of the City of Shorewood this 22nd day of January 2018. ATTEST: Scott Zerby, Mayor Sandie Thone, City Clerk 5755 Country Club Road * Shorewood, MN * 55331 2 0 18 952. 960.7900 /www.ci.shorewood.mn.us City of Shorewood MASTER FEE SCHEDULE City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 Introduction In May of 2017 the Shorewood City Council approved an amendment to Chapter 1300: Municipal Fees of the Shorewood City Code removing the actual fees from the Code, with the exception of Land Use Fees, and replacing it with referencing the Master Fee Schedule which will establish fees by Council resolution. Land Use Fees are required pursuant to MN State statutes to be amended and established by ordinance in communities that collect in excess of $5,000 in said fees on an annual basis. Previous and future resolutions and ordinances amending or establishing new fees will be collated into the Master Fee Schedule as necessary and prudent. These updates are set forth by Council resolution (and ordinance in the case of land use fees) and incorporated into the Master Fee Schedule upon adoption of the proposed established fees. This provides a cost - effective and expedient process for reviewing fees for relevance and providing annual updates to the schedule of city fees and a user - friendly document for public use. A copy of the Master Fee Schedule is available on the city website at www.ci.shorewood.mn.us or at city offices located at 5755 Country Club Road in Shorewood, MN 55331. To obtain an electronic copy please email cityofshorewood @gmail.com. z City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 TABLE OF CONTENTS SECTION I: License and Permit Service Fees 4 -6 SECTION II: Liquor License Fees and Charges 7 SECTION III: Utility Rates; Sewer, Water, Stormwater, Recycling 8 -9 SECTION IV: Miscellaneous Fees and Charges 10 -12 SECTION V: Park and Recreation Fees 13 SECTION VI: Building and Right of Way Fees 14 -15 SECTION VII: Zoning and Land Use Fees (Ordinance) 16 -17 3 City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 LICENSE, PERMIT, SERVICE CHARGES AND MISCELLANEOUS FEES Type of Charge /Fee City Code Reference Charge /Fee I. License and Permit Service Fees Administrative enforcement 104.03 Class A Offenses: $100 Violations of Public Health Regulations (Chapters 501 -503, except those violations which are also Zoning Code Violations) Class B Offenses: $300 Violations of Rental Housing Regulations (Chapter 1004) Subsequent Class B Violations $1,000 Class C Offenses: $300 Violations of Building Regulations (Chapters 1001 -1003 and 1005) Violations of Wetland Regulations (Chapter 1102) Violations of Tree Preservation Regulations (Chapter 1103) Violations of Zoning Regulations (Chapter 1201) Subsequent Class C Violations: 2nd citation within 24 months of issuance of previous citation: 25% increase over scheduled civil penalty 3rd citation within 24 months of issuance of previous citation: 50% increase over scheduled civil penalty 4th citation within 24 months of previous citation: 100% increase over scheduled civil penalty Administrative Enforcement Appeal 104.03 $200 4 City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 LICENSE, PERMIT, SERVICE CHARGES AND MISCELLANEOUS FEES Type of Charge /Fee City Code Reference I. License and Permit Service Fees Adult use license 1 309 Investigative fee Adult use facility license Animal impound fees Daily boarding fee Additional services when required Commercial lawn fertilizer application license (annual) Dock - Boat docks and boat storage facility license Dock - Multiple dock facility license Dog licenses, per animal Domestic partnership registry Registration Amendment Termination certificate, certified Farm and other animals Charge /Fee $500 $1,675 + $50 /video booth or stall 701.08.4 $25 first offense of year, $50 thereafter $25 $95 inoculation $35 bath 310.03.2d $30 304.05 1 $35 1201.24, Subd. 10 $2 per slip /per year 701.03.2 $101$5 license late fee 110.06 $25 $25 $25 $2 704.09 1 $50 Fire alarm permits 601.06.1 $200 2nd false alarm and thereafter Fire (recreational fire permit) 501.03 No charge Fireworks dealer license /permit $100 per site /per year Gambling permit - exempt Gambling premises permit - new investigation fee 301.09.3 1 $25 301.08.4 1 $100 Horse permit 702.04 $25 Kennel license 701.04.2 $25 /initial license $10 /renewal license Police alarm permits System contractor license 601.06.1 $100 3rd false alarm and thereafter $1,000 bond Therapeutic massage annual I 1 $100 1 City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 business license fee Tobacco retailer license 302 $250/ remise Tobacco administrative fines: Tobacco licensees in violation $75 /first offense $200 /second offense in 24 -month period $250 /thereafter within 24 -month period Individuals in tobacco violation $50 per offense 6 City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 II. Liquor License Fees and Liquor Violation Fines Type of Charge /Fee City Code Reference Charge /Fee Intoxicating liquor license - on -sale 401.06.1 $7,500 Wine license - on -sale 401.06.1 $1,000 Intoxication malt liquor/wine license - on -sale 401.06.1 $2,000 Intoxicating liquor - off -sale 401.06.1 $310 special club license 401.06.1 $250 -Liquor Sunday license 401.06.1 $200 -Special 3.2% malt/liquor license - on -sale 401.06.2 $300 3.2% malt liquor license - off -sale 401.06.2 $50 3.2% malt liquor or intoxicating liquor license 401.06.2 $25 -Temporary license investigation fee -New license 401.06.1 $500 -Liquor Liquor license investigation fee - Renewal with change in managers/owners/like 401.06.1 $250 Liquor licensees' in violation 40121 $500 /first offense $1,000 /second offense in 24- months $1,500 /third offense in 24- months $2,000 /fourth offense in 24- months 7 City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 III. Utility Rates Sewer Type of Charge /Fee City Code Charge /Fee Reference Sewer connection permit 904.07.1 $150 Residential: Sanitary Sewer Service 904.15.1a $77.29/qtr/sewer only $51.53 /qtr /low income sewer only Commercial: $8.75 Base $2.02/1,000 gallons Sanitary sewer surcharge 904.09.5 $100 /month Local sewer availability charge 904.18.3 $1,200 Water Type of Charge /Fee City Code Charge /Fee Reference Water connection permit 903.03.1a Inside $50 Outside $60 Watering restriction violation 903.12 $50 first violation $25 increase each succeeding violation (e.g. 2nd violation $75, 3rd violation $100, and the like) $17.50 /quarter first 5,000 gallons, plus $2.95 per 1,000 gallons in excess of 5,000 gallons up to 50,000 gallons, and $4.25 per 1,000 gal in Water service 903.09.1a excess of 50,000 gal/qtr Water service - low income 903.09.la(1) $15 /quarter minimum Water turn -on and shut -off fee 903.04 $50 Water connection fee 903.03.3 $10,000 Single - family residential See chart and formula in 903.04 Multi- family residential, Commercial Subd. 3. Schools, churches, government and other non- residential See chart and formula in 903.04 Subd. 3.a. 8 City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 Stormwater Management Type of Charge /Fee City Code Charge /Fee Reference Stormwater Management Utility $18.30 /qtr: lots less than 10,000 sq. ft. Residential equivalent factor $26.13 /qtr: lots 10,000 - 50,000 sq. ft. Basic system rate 905.03 $34.01 /qtr: lots 50,000 plus sq. ft. Recycling Type of Charge /Fee City Code Charge /Fee Reference Residential recycling fee $14 /quarter/household 9 City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 IV. Miscellaneous Fees and Charges Type of Charge /Fee City Code Charge /Fee Reference Special assessment search $25 Mailed minutes (nonresident) $75.00 annual $.25 /page /individual Mailed agendas $35 annual $.25 /page /individual Copies $.25 /page /single side 8.5 x 11 @ $.50 /page /single side anything larger Color copies $1 /page /single side Mailing labels (all city residents) $35 all residents on printed mailing Labels Aerial topography: Mylar copy $16 /acre plus $5 /mylar Electronic $50 /megabyte of data City Code book $75 CD Rom $25 Updates $25 /year City Zoning Code $25 per page plus binding costs Assessment Certification Fee 903.10.3(e) $50 Comprehensive Plan (softbound color copy) Cost of production 10 City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 City Subdivision Ordinance (softbound copy) $25 per page plus binding costs Election filing fee $2 Spring clean -up fees 507.09.1 Up to $10 507.09.2 $20 air conditioners* $20 water softeners* $12 appliances, including water heaters* $10 mattresses and rolled carpets /padding * $15 large furniture* $5 tires with or without rims* $13 truck tires without rims* $0 auto batteries* * Or as determined based upon actual cost of disposal Transient business, 308.08 peddling/soliciting $50/appl icant Sand barrel/sand charge $40 barrel and sand/$30 sand only *Rental Housing Licenses are effective for a period of three (3) years. Appeal filing fee $100 *License application fee, per rental dwelling in 1004.06.6 $75 building with one to five rental units (includes up to two inspections per unit) *License application fee, per rental dwelling in 1004.03(3) $400 plus $10 per rental unit up to building with six or more rental units (includes (Res. $750 maximum up to two inspections per unit) Additional inspections as necessary 1004.03(3) $35 /inspection (Res. 17-089) Rental license application fee for buildings with six (6) or more units constructed within 1004.03(3) one year from date of application shall be base (Res. 17-089) license fee excluding $10 per rental unit fee. 11 City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 Return check fee $25 Plans and specifications, paper copy $35 Plans and specifications, CD copy $25 12 City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 V. Park and Recreation Type of Charge /Fee City Code Charge /Fee Reference Park and recreation use fees 902.06.3 Organized sports participant $10 /per participant, per sport, per Skating rinks (per rink) season Lights $15/hour Tournaments, per rink $30 /day plus attendant salary 505.02.4 Special Event Registration and Permit $50 /day for events on public property with 75 or more attendees /participants. Soccer /Football/Baseball/Softball Fields (per field) Damage deposit, all fields $125 /flat fee Football Field, unlighted $50/hour or $210 /day Lights $30/hour Diamond field (baseball) $50 /day Entire soccer area, unlighted $150 /day Tennis Courts $5 /court/hour Multi -use buildings Resident Base Fee Damage deposit, all buildings $50 Manor /Badger $25 Eddy Station $100 Picnic Pavilions Resident Base Fee Manor /Freeman $25 Eddy Station Pavilions $50 13 City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 VI. Building and Right of Way Fees Note: Base fees are non - refundable. Escrow deposits are to cover consulting engineer and attorney expenses. Applicants are informed that any city expenses not covered by these fees will be billed to them. Unused escrow fees will be returned to applicant upon written request. Building permit 1001.03 1997 U.B.C. SECTION 107 1997 U.B.C. TABLE I -A AND STATE RULE 1300.0160 Reinspection fee $35 Residential $75 Roofing permit $75 Siding permit S.B.C. $75 Window permit S.B.C. Mechanical permit State Statute or 2.5% of value, $35 S.B.C. minimum Plumbing permit State Statute or $15 /fixture, $35 minimum Removal or abandonment, U.F.C. $35 first tank plus $20 each underground tanks additional Demolition permit S.B.C. $50 (Fee waived when done in conjunction with a building permit or burned by the fire department) Sign permit application fee 1201.03.11 f $20 (Temporary) Per 1997 U.B.C. Table I -A for permanent Fence permit 1201.03.2f $20 Grading /filling permit S.B.C. Per 1997 U.B.C. Table A -33 -A and A -33 -B 14 City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 R.O.W Administrative Charge 901.11 Subd. 5 $200 (in addition to actual costs) R.O.W. Annual 901.06 Subd.1 $300 Registration Fee (non - utility) R.O.W. Annual 901.06 Subd.1 $2,000 Registration Fee (non- franchise right -of -way user) R.O.W. Encroachment 901.01.2a $40 Permit R.O.W. or Public Ground Excavation 901.08 Subd. 2 $200 Permit Directional Drilling or Boring 901.08 Subd. 2 $45 per 100 L. Ft. (in addition to permit fee) 901.08 Subd. 2 Open Trenching $60 per 100 L. Ft. (in addition to permit fee) 901.08 Subd. 2 Obstruction Permit $20 Small Wireless Facility (per site) 901.08 Subd. 2 $150 (in addition to actual costs) Security /Damage Deposit (non - utility) 901.08 Subd. 6 Varies Street Excavation Permit Pole /Pole Attachment 901.08 Subd. 2 $20 Underground Sprinkler /Irrigation 901.01.2d $20 System Permit City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 VII. Zoning and Land Use Fees (Ordinance) LICENSE, PERMIT, SER VICE CHARGES AND MISCELLANEOUS FEES Type of Charge /Fee City Code Charge /Fee Reference Comprehensive plan amendment Pre - application $200 Formal Application $800 plus $1,000 escrow 1201.04 Conditional use permit $400 Residential $500 plus $1,000 escrow Non - residential Fence permit 1201.03 $20 Interim use permit 1201.04 Residential $400 Non - residential $500 plus $1,000 escrow Planned unit development Concept Stage 1201.25 $500 plus $1,000 escrow Development Stage 1201.25 $700 plus $1,000 escrow Final Stage 1201.25 $500 plus $1,000 escrow By Conditional Use Permit 1201.06 $500 plus $1,000 escrow Sign permits 1201.03.1 If Temporary $20 Permanent Per 1997 U.B.C. Table I -A Site plan review 1201.03 $200 plus $1,000 escrow Subdivision sketch plan review 1202.03 $200 Subdivision (minor subdivision) 1202.03 $500 plus $500 escrow Subdivision (preliminary plat) 1202.03 $600 plus $25 /lot plus an escrow deposit, as follows: 5 or fewer lots $1,000 Over 5 lots $3,000 Subdivision (final plat) 1202.03 $500 plus $25 /lot plus an escrow deposit, as follows: 16 City of Shorewood Master Fee Schedule /Adopted 5/22 /2017 /Updated 2 10/25 /2017 /Updated 1/22/2018 VII. Zoning and Land Use Fees (Ordinance) LICENSE, PERMIT, SER VICE CHARGES AND MISCELLANEOUS FEES Type of Charge /Fee City Code Charge /Fee Reference 5 or fewer lots $1,000 Over 5 lots $2,000 Traffic Studies when required as part of another Multiple Escrow for estimated cost of application study to be completed by the City's consulting engineers plus $500. Vacation or Easement $300 Variances 1201.05 and $400 Residential 1202.09 Non - residential $500 Zoning Amendment (Text or Map) j 1201.04 j $600 plus $1,000 escrow Zoning Permits 1201.07 $20 Park dedication (cash in lieu of land) 1202.07 $6,500 /dwelling unit or 8% of raw land value Extension of deadline for recording resolutions 1202.03 $200 Extension of plat approval 1202.03 $200 *Note: Base fees are non - refundable. Escrow deposits are to cover consulting engineer, attorney, and other consultant expenses. Applicants are informed that any city expenses not covered by these fees will be billed to them. Unused escrow fees will be returned to applicant upon written request. Applications with more than one required escrow account shall be required to submit the escrow based on the highest required escrow amount. 17 #9D MEETING TYPE City of Shorewood Council Meeting Item REGULAR Title / Subject: Appointments and Reappointments to Planning Commission and Parks Commission Meeting Date: January 22, 018 Prepared by: Greg Lerud Reviewed by: Sandie Thone and Marie Darling Attachments: Resolutions Policy Consideration: Appointing City residents to serve on the Planning and Parks Commissions. Background: Robert Bean and Janet Sylvester have submitted their resignations from the city's Planning Commission creating two vacancies effective March 1, 2018. Todd Eggenberger recently submitted an application to serve on the city's planning commission, and on January 8, the City Council interviewed Mr. Eggenberger. Previously, the city interviewed Nathaniel Gorham and Holly Ashmore for a Commission appointment, subsequently appointing Gorham to the Parks Commission June 12, 2017. Mr. Gorham notified staff that he prefers serving on the Planning Commission and requested that the council consider him for one of the Planning Commission vacancies. Should the council appoint Mr. Gorham to the planning commission it will create a vacancy on the Parks Commission. Holly Ashmore also recently spoke with staff and she stated she wishes to be considered again for a parks commission appointment should there be a vacancy. Financial or Budget Considerations: None Next Steps and Timeline: There are two Resolutions attached to this memo. The first Resolution is for reappointments and appointment to the Planning Commission. Depending on the council's decision regarding appointments to the Planning Commission vacancies, the appointment section in the second Resolution may not be needed. Options: The Council can make appointments to fill up to three commission vacancies. If the Council chooses to not fill any number of the openings, staff requests that you provide direction on how to proceed in filling the remaining vacancies. Recommendations: Staff recommends appointing these three candidates to open commission positions. Timeline /Further Action: Staff will notify the candidates of the City Council's decision. Mission Statement: The City of Shorewood is committed to providing residents quality public services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial management through effective, efficient, and visionary leadership. Page 1 CITY OF SHOREWOOD RESOLUTION NO. 18 - xxx A RESOLUTION MAKING PLANNING COMMISSION APPOINTMENTS WHEREAS, the City of Shorewood has received resignation from two commission members, Robert Bean and Janet Sylvester; and, WHEREAS, the City of Shorewood has advertised for Shorewood residents to apply to serve on the Planning Commission; and, WHEREAS, the City Council has completed interviews and selection procedure for appointment to said Commission; NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Shorewood hereby makes the following appointments to the Planning Commission effective March 1, 2017, with the term expiration as indicated: Planning Commission: Member Term 1. February 28, 2021 February 28, 2021 ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 22nd day of January, 2018. ATTEST: Sandie Thone, City Clerk Scott Zerby, Mayor CITY OF SHOREWOOD RESOLUTION NO. 18 - xxx A RESOLUTION MAKING APPOINTMENT TO THE SHOREWOOD PARKS COMMISSION WHEREAS, the City of Shorewood City Council has an opening on the City's Park Commission; and NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Shorewood hereby makes the following reappointments and appointment to the Shorewood Park Commission effective March 1, 2018, with the term expiration as indicated: Park Commission Member Term Expiring 1. Justin Mangold February 28, 2021 2. Molly Barr February 28, 2021 Park Commission Member Term Expiring 1. February 28, 2019 ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 22nd day of January, 2018. ATTEST: Sandie Thone, City Clerk Scott Zerby, Mayor