August 3, 2018 Road Construction Updater �J
Riviera Lane, Shorewood Lade, and Mann Lame
Street and Utility Improvement Project Cirl,y OF
Construction Update #2 SHOREWOOD
Current Events
The Contractor has completed directional drilling operations along Yellowstone Trail and will continue to install the
hydrants, gate valves, and existing watermain connections next week. The installation of the hydrants, gate valves, and
existing watermain connections will require the contractor to close the intersection at Club Valley Road and Yellowstone
Trail. Residents are encouraged to find alternates routes. The closure is anticipated to begin Monday, August 6, 2018,
and continue until watermain installation has been completed along Yellowstone Trail and the road has been restored to
a driveable surface.
The Contractor has begun directional drilling operations between Riviera Lane and TH 7 and is anticipated to complete this
work next week, week of August 6, 2018.
Future Events
As stated above, the Contractor will continue to focus construction operations on Yellowstone Trail to ensure the roadway
is available to the traveling public by Labor Day. Once Yellowstone Trail has been completed, the Contractor will continue
to Shorewood Lane and begin sanitary sewer and storm sewer installations along the roadway.
The above schedule is tentative and is subject to change due to weather or scheduling conflicts.
Tips of the Week
• Please observe posted detour and warning signs.
• Please do not park vehicles on streets under construction.
• Slow down and watch for uneven surfaces.
• Stay alert! Watch for signs, equipment, and workers
• Please remind children to stay away from the construction site, equipment, and stockpiles of materials.
• Access through the site may change throughout the day as construction progresses; your patience is appreciated.
Project Contacts
Onsite Project Rep: Matt Havlik (612) 246 -9347
Project Manager: Katie Koscielak (612) 282 -3641
City Engineer. Alyson Fauske (952) 960 -7910