Loading...
August 8, 2018 Road construction update CITY OF SHOREWOOD ROAD CLOSURES AND ACTIVITY UPDATED AUGUST 8, 2018 /Ò©©;“· -š“­·©Ò-·zš“ -·zÝz·ä z“ÝšŒÝ;­ ©š7Þä­ z“ {wš©;ޚš7u 1.ROAD CLOSURE: Yellowstone Trail from Club Valley Road to Riviera Lane 2.FUTURE ROAD CLOSURE: Shorewood Lane from CR 19 to Cul-de-sac 3.FUTURE ROAD CLOSURE: Mann Lane from Eureka Road (South) to Seama Drive 4.FUTURE ROAD CLOSURE: Riviera Lane from Yellowstone Trail to Cul-de-sac 1.ROAD CLOSURE: Yellowstone Trail from Club Valley Road to Riviera Lane This roadway will be totally closed to through traffic starting tomorrow, August 9, 2018. While signs have been erected, traffic has still been utilizing the route. As of tomorrow, the roadway will be closed off and additional signage has been installed to warn drivers. It is anticipated that this will be closed for the remainder of the week. 2.FUTURE ROAD CLOSURE: Shorewood Lane from CR 19 to Cul-de-sac This roadway is currently open & experience some construction activity (reclamation of the existing bituminous surface in anticipation for construction). Construct- alignment of the existing main to the center of the roadway just entrance) is anticipated to begin the week of August 20 th, weather permitting. Stay tuned as construction proceeds. 3.FUTURE ROAD CLOSURE: Mann Lane from Eureka Road (South) to Seamans Dr This roadway is currently open. Stay tuned as constructionproceeds. 4.FUTURE ROAD CLOSURE: Riviera Lane from Yellowstone Trail to Cul-de-sac This roadway is currently open & experience some construction activity (small utility relocations, tree removals, & pavement removals as necessary to facilitate directional drillin Stay tuned as construction proceeds.