August 24, 2018, Road Construction Updates
Riviera Lane, Shorewood Lane, and Mann Lane
Street and Utility Improvement Project
Construction Update #5
Current Events
The Contractor has completed all watermain connection work and b
th
Yellowstone Trail this week (week of August 20). Additionally, the Contractor has completed directionally dri
storm sewer outlet at the south end of Riviera Lane.
Future Events
The Contractor is anticipated to complete the installation of water services along Yellowstone Trail early next week and
begin utility construction along Shorewood Lane (week of August th). Areas disturbed within the pavement along
Yellowstone Trail are anticipated to be patched by the end of the week, weather permitting.
PLEASE NOTE: the installation of water services on Yellowstone Trail at Riviera Lane will require closing access to
Riviera Lane temporarily until the work is completed. Residents are to have their vehicle(s) out of their driveway by 9:00
A.M. and park on adjacent streets currently NOT under construction. The closure is anticipated to begin Monday, August
27 th with the road anticipated to be reopened by 2:00 P.M., pending unforeseen circumstances (including weather).
The above schedule is tentative and is subject to change due to
Tips of the Week
Please observe posted detour and warning signs.
Please do not park vehicles on streets under construction.
Slow down and watch for uneven surfaces.
Stay alert! Watch for signs, equipment, and workers
Please remind children to stay away from the construction site,
Access through the site may change throughout the day as construction progresses; your patience is appreciated.
Project Contacts
Onsite Project Rep: Matt Havlik (612) 246-9347
Project Manager: Katie Koscielak (612) 282-3641
City Engineer: Alyson Fauske (952) 960-7910