09/21/2018 Road Construction Update (2)Riviera Lane, Shorewood Lane, and Mann Lane Street and Utility Improvement Project CITY OF Construction Update #9 SHOREWOOD Current Events The Contractor has continued excavating and constructing Shorewood Lane up to and including aggregate surface this week (week of September 17th) Future Events The weather conditions this week (week of September 17th) were not favorable to begin watermain construction along Riviera Lane or continue open excavation installation of the remaining watermain connections on Lake Linden Drive and work has been postponed to next week (week of September 24th) The Contractor is anticipated to complete the remaining watermain construction on Lake Linden Drive early next week. The roadway is not anticipated to be closed to traffic, but a flagman will be onsite directing traffic to ensure safe passage. The Contractor will begin the watermain construction along Riviera Lane mid -week next week, weather permitting. Extension of the newly installed watermain along Yellowstone Trail to Riviera Lane will require the intersection to be closed (Yellowstone Trail traffic will have access through the intersection but access to and from Riviera Lane will be closed). The closure is anticipated to last one day and residents will be notified prior to the closure via door hanger. The Contractor has tentatively scheduled the closure for Wednesday, September 26th, weather permitting. The Contractor is anticipated to place concrete curb and gutter along Shorewood Lane mid -next week. Once the concrete curb and gutter is placed, it cannot be driven on for 5 days for curing. Residents will be notified via door hanger prior to the installation of curb and gutter. The above schedule is tentative and is subject to change due to weather orscheduling conflicts. The City of Shorewood strongly encourages all residents and property owners to use the City website for construction activity updates, and to sign up for construction activity email, text, or Facebook messages. The website is located at http: / /www.ci.shorewood.mn.us Tips of the Week • Please observe posted detour and warning signs. • Please do not park vehicles on streets under construction. • Slow down and watch for uneven surfaces. Stay alert! Watch for signs, equipment, and workers Please remind children to stay away from the construction site, equipment, and stockpiles of materials. Access through the site may change throughout the day as construction progresses; your patience is appreciated. Project Contacts Onsite Project Rep: Matt Havlik (612) 246 -9347 Project Manager. Katie Koscielak (612) 282 -3641 City Engineer. Alyson Fauske (952) 960 -7910