Loading...
10/4/2018 Construction Updates Riviera Lane, Shorewood Lane, and Mann Lane Street and Utility Improvement Project Construction Update #11 /Ò©©;“· 9Ý;“·­ The Contractor has completed the mainline watermain installationalong st Riviera Lane this week (week of October 1). Residents along Riviera Lane are encouraged to park their vehicles during working hours (7:00 a.m. to 7:00 p.m. Monday through Friday) alo Riviera Lane will limit access to driveways during working hours Additionally, the Contractor has completed the bituminous base p driveways disturbed by construction operations. CÒ·Ò©; 9Ý;“·­ The Contractor is anticipated to continue water service installation and storm s week (week of October 8 th), weather permitting. The forecast for next week I currently not favorable for utility construction. To preserve the integrity of the subgrade of the roadway, the Co service installation and storm sewer construction if the weather is favorable (dry). The above schedule is tentative and is subject to change due to w; /z·ä šE {wš©;ޚš7 ­·©š“mŒä ;“-šÒ©m;­ ŒŒ ©;­z7;“·­ “7 ¦©š¦;©·ä šÞ“;©­ ·š Ò­; ·w; /z·ä Þ;,­z·; Eš© -š“­·©Ò-·zš“ -·zÝz·ä Ò¦7·;­r “7 ·š ­zm“ Ò¦ Eš© -š“­·©Ò-·zš“ -·zÝz·ä ;’zŒ w··¦t‰‰ÞÞÞu-zu­wš©;ޚš7u’“uÒ­ z¦­ šE ·w; ‘;;‰ Please observe posted detour and warning signs. Please do not park vehicles on streets under construction. Slow down and watch for uneven surfaces. Stay alert! Watch for signs, equipment, and workers Please remind children to stay away from the construction site, equipme Access through the site may change throughout the day as construction progresses; your patience is appreciated. t©š†;-· /š“·-·­ Onsite Project Rep: Matt Havlik (612) 246-9347 Project Manager: Katie Koscielak (612) 282-3641 City Engineer: Alyson Fauske (952) 960-7910