Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Howards Point Road - Minger Executed Quote Form
Im AWIff NINE', r ,. ,'1 !#, 6-2.4) ( " P-4,% 952t T. To: City Of Shorewood Contact: Address: Shorewood, MN Phone: Fax: Project Name: Howards Point Water Services Bid Number: Project Location: Shorewood, MN Bid Date: 5/312018 Item # Item Description 7`.--.--.-:Umt Estimated Quantity i r;7.t �Pric, Total p� rice I Mobilization 1.00 LS $6,350.00 $6,350.00 2 Bituminous Pavement Removal 165.00 SY $10.90 $1,798.50 3 Bituminous Sawcut 192.00 LF $4.45 $854.40 4 Aggregate Base Class 5 (CV) 40.00 CY $65.00 $2,600.00 5 1" Curb Stop & Box 4.00 EACH $1,690.00 $6,760.00 6 1" Corp Stop 4.00 EACH $1,575.00 $6,300.00 7 1" Type K Copper 250.00 LF $12.55 $3,137.50 8 Traffic Control 1.00 LS $2,950.00 $2,950.00 9 Blanket W/ Topsoil, Seed And Fertilizer 400.00 SY $4.00 $1,600.00 10 Replace Valve Bolts 4.00 EACH $1,575.00 $6,300.00 11 Replace Hydrant Valve Bolts, Bonnet Bolts 6.00 EACH $1,700.00 $10,200.00 12 Anode Bag - 9 LB 4.00 EACH $60.00 $240.00 Total Base Bid Price: $49,090.40 01. Valve Box Replacement 13 Replace Valve Box 10.00 EACH $200.00 $2,000.00 The above prices, specifications and conditions are satisfactory and are hereby accepted, Buyer: Signature: 0 Date of Acceptance: 5/4/2018 10:41:38 AM CONFIRMED: VwTqer Construction Co., Inc. Authorized Signature: . . ........ ...... . Estimator: LwY-v Page 1 of 1