Loading...
18-026 - Recieving Feasibility Addendum and Auth Preparation of Plans and SpecsRESOLUTION NO. 18 -026 A RESOLUTION RECEIVING THE ADDENDUM TO THE FEASIBILITY REPORT AND AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS FOR THE WATERMAIN EXTENSION ALONG YELLOWSTONE TRAIL (CLUB VALLEY ROAD TO RIVIERA LANE) AND RIVIERA LANE TO LAKE LINDEN DRIVE STREET AND UTILITY IMPROVEMENT PROJECT, CITY PROJECT 17 -04 WHEREAS, the City Council authorized received a revised Feasibility Report for the 2018 Street and Utility Improvement Project, City Project 17 -04, on January 31, 2018; and WHEREAS, at the January 31, 2018 meeting the city council discussed the trunk watermain benefit of extending watermain along Yellowstone Trail to Riviera Lane and looping to the watermain within Lake Linden Drive; and WHEREAS, an addendum to the feasibility report was prepared and provides information regarding whether the proposed watermain improvements are necessary, cost - effective, and feasible; and the estimated cost of the improvement as recommended. NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Shorewood, Minnesota: 1. The Council receives the Addendum to the Feasibility Report prepared by WSB; and 2. The Council will consider the improvement of watermain extension along Yellowstone Trail (Club Valley Road to Riviera Lane), and Riviera Lane to Lake Linden Drive, City Project 17 -04, in accordance with the report at an estimated cost of $741,600; and 3. Authorizes the preparation of plans and specifications for the watermain improvements on Yellowstone Trail (Club Valley Road to Riviera Lane), and Riviera Lane to Lake Linden Drive. ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 1211' day of March, 2018. DMIM Sandie Thone, City Clerk Secs t Zerby a or