CST Fully signed CO1CHANGE ORDER NO. I 5755 COUNTRY CLUB ROAD 100 S FULLER ST, SUITE 130 SHOREWOOD, MN 55331 SHAKOPEE, MN 55379 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE THE FOLLOWING ITEMS AS DIRECTED BY THE CITY ENGINEER: WATERMAIN REPAIR AT CLUB VALLEY ROAD AND YELLOWSTONE TRAIL DIRECTIONAL DRILL STORM SEWER CHANGE IN MATERIAL ADDITION OF 2-12* RCP STORM APRONS WET TAP CONNECTION OF WATERMAIN ON LAKE LINDEN DRIVE IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE- CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $1,708,509.00 ORIGINAL CONTRACT TIME: 6/1512019 PREVIOUS CHANGE ORDERS: $0-00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $1,708,509.00 CONTRACT TIME PRIOR TO THIS CHANGE ORDER; 6/15/2019 NET INCREASE OF THIS CHANGE ORDER: $10,801.73 NET INCREASE WITH CHANGE ORDER: NIA CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $1,719,310,73 CONTRACT TIME WITH APPROVED CHANGE ORDERS: 6/15/2019 APP D A :E, PE, PROJECT MANAGER WSB & ASSOCIATES, INC. ENGINEER ATE APPROVED BY: A 4*CONT' TOR SIG rfATURE MIDWEST CIVIL CONSTRUCTORS, LLC. CONTRACTOR CITY'AD !NIS TOR I k' DATE &W2925-240t4dmialConstruction AdadalChange OrdvalChanpo Order No. ItChango O"ki No, 100.1 CHANGE ORDER NO. I DETAIL 2018 STREET AND UTILITY IMPROVEMENT PROJECT CITY OF SHOREWOOD, MN WSB PROJECT NO. 2925.24 ADDED ITEMS August 2, 2016 Item No. Mat. Na, Description Unit Qty Price Extended Amount 118 2504,603 18" PVC PIPE SEWER (DIRECTIONAL DRILL) L F 190 -$295.00 -$56,050-00 127 2504.603 20'WATERMAIN HOPE (DIRECTIONAL DRILL) L F 190 $273.00 $51,87000 128 2504.602 CONNECT TO EXISTING WATERMAIN (SPEC) EACH 1 $3,756.73 $3,756.73 129 2504,602 8* X 6" WET TAP EACH 1 $9,425.00 $9,425.00 130 2501.602 12" RC PIPE APRON EACH 2 $900.00 $1,800.00 TOTAL ADDED ITEMS CHANGE ORDER NO, 1 $10,801.73 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $10,8011.73 K Adi,llnlChango OtdoislChango Od" No I lCtwago WO. No lCQ# Mw#