Quote Howards PtCITY OF SHOREWOOD 5755 Country Club Road • Shorewood, Minnesota 55331 • 952- 960 -7900 Fax 952- 474 -0128 • www.ci.shorewood.mmus • cityha11 @ci.shorewood.mn.us MEORANDUM TO: Project File, Howard's Point Watermain Work FROM: Larry Brown, Director of Public Works DATE: May 7, 2018 RE: Quotes Received for Howard's Point Road Watermain Work The City of Shorewood had previously let a contract for roadway reclamation on September 17, 2017, known as the 2017 Pavement Reclamation Project (Howard's Point Road, Kathleen Court, Oakridge Circle and Summit Avenue), City Project 17 -23. After that award it was suggested that staff pursue a contract to replace all of the watermain bolts that tend to be an issue, due to hot soil conditions. Staff solicited quotes from Minger Construction and C.S. McCrossan Construction. It is noted that McCrossan had been awarded the bid for the reclamation project. Quotes were received and reviewed, McCrossan's quote was substantially less than the quote received by Minger Construction. However, in follow up conversations with representatives of Mccrossan it was found that while they were able to perform the work, as quoted, they were not willing to do so in a timely manner and claimed that this would also prolong their startup of the original project 17 -23. Due t the political pressures to get these roadways constructed in a timely manner and keep the project on time, the quote was awarded to Minger Construction.