Change Order No. 3CHANGE ORDER NO.3 2018 STREET AND UTILITY IMPROVEMENT PROJECT January 9, 2019 CITY OF SHOREWOOD, MN WSB PROJECT NO. 2925-24 OWNER: CITY OF SHOREWOOD 5755 COUNTRY CLUB ROAD SHOREWOOD, MN 55331 CONTRACTOR: MIDWEST CIVIL CONSTRUCTORS, LLC 100 S FULLER ST, SUITE 130 SHAKOPEE, MN 55379 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE THE FOLLOWING ITEMS AS DIRECTED BY THE CITY ENGINEER: REMOVAL OF BURIED DEBRIS WITHIN RIVIERA LANE CUL-DE-SAC PRECONSTRUCTION SURVEY AT 6025 RIVIERA LANE MUCK EXCAVATION, BYPASS PUMPING AND DRAIN TILE REPAIR NECCESSARY DUE TO THE UNKNOWN DRAIN TILE CROSSING ON MANN LANE IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $1,708,509.00 ORIGINAL CONTRACT TIME: 6/15/2019 PREVIOUS CHANGE ORDERS: $10,801.73 NET CHANGE FROM PREVIOUS CHANGE ORDERS: N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $1,719,310.73 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 6/15/2019 NET INCREASE OF THIS CHANGE ORDER: $21,534.65 NET INCREASE WITH CHANGE ORDER: NIA CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $1,740,845.38 CONTRACT TIME WITH APPROVED CHANGE ORDERS 6115/2019 APPROVE¢$Y: �ACYSOM FAOSKE, P8, PROJECT MA ER WSB & ASSOCIATES, INC. ENGINEER I APPROVED BY: CON ACTOR SIG ATURE MIDWEST CIVIL CONSTRUCTORS, LLC, CONTRACTOR TY ADMINISTRATOR DATE K:102925-240lAdmintConstruction AdminiChengo OrdorstChengs Order No. 31Chenga Order No. 3CO-3 CHANGE ORDER NO.3 DETAIL 2018 STREET AND UTILITY IMPROVEMENT PROJECT January 9, 2019 CITY OF SHOREWOOD, MN WSB PROJECT NO. 2925-24 ADDED ITEMS Item No. Mat. No. Descri 140 2105.607 EXCAVATION SPECIAL 141 2011.601 CONSTRUCTION SURVEYING 142 2105.507 MUCK EXCAVATION TOTAL ADDED ITEMS CHANGE ORDER NO. 3 Unit Qty Price Extended Amount L S 1 $11,465.35 $11,465.35 L S 1 $550.00 $550.00 C Y 90 $105.77 $9,519.30 $21,534.65 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $21,534.65 K:102925- 24014dminIConstruction AdminlChange OrderslChange Order No. 31Change Order No. 3CO3 Detail