08-12-19 CC Reg Mtg Agenda PacketCITY OF SHOREWOOD
CITY COUNCIL REGULAR MEETING
MONDAY, AUGUST 12, 2019
AGENDA
1. CONVENE CITY COUNCIL MEETING
A. Roll Call
5755 COUNTRY CLUB ROAD
COUNCIL CHAMBERS
7:00 P.M.
Mayor Zerby_
Johnson_
Labadie_
Siakel_
Sundberg_
B.
Review and Adopt Agenda
Attachments
2. CONSENT AGENDA — Motion to approve items on the Consent Agenda
& Adopt
Resolutions Therein:
A.
City Council Work Session Minutes from July 22, 2019
Minutes
B.
City Council Regular Meeting Minutes from July 22, 2019
Minutes
C.
City Council Special Work Session Minutes of July 31, 2019
Minutes
D.
Approval of the Verified Claims List
Claims List
E.
Accept Final Improvements, Authorize Final Payment, Director of Public Works Memo
Boulder Bridge MCC Project, City Project 18 -01
Resolution 19 -075
3. MATTERS FROM THE FLOOR
(No Council Action will be taken)
4. PUBLIC HEARING
5. REPORTS AND PRESENTATIONS
A.
Laura Hotvet and Jen Weiss — Excelsior Chamber of Commerce
B.
Curt Mackey, EFD Fire Chief
City Administrator Memo
C.
Mike Meehan, SLMPD Chief
City Administrator Memo
6. PARKS
A. Request for Cathcart Hockey Boards Painting Event Funding Planning Director Memo
7. PLANNING
CITY COUNCIL REGULAR MEETING AGENDA — August 12, 2019
Page 2
8. ENGINEERING /PUBLIC WORKS
A. Approve Quote to Replace Culvert Crossing Engineer Memo
On Lake Linden Drive Resolution 19 -076
B. Accept Proposal for Professional Services, AE2S Director of Public Works Memo
SE Well and Filter Plant PLC Replacement, City Project 19 -07
9. GENERAL /NEW BUSINESS
10. STAFF AND COUNCIL REPORTS
A. Administrator and Staff
1. Date of First City Council Meeting in September
B. Mayor and City Council
11. ADJOURN
2A
CITY OF SHOREWOOD 5755 COUNTRY CLUB ROAD
CITY COUNCIL WORK SESSION MEETING COUNCIL CHAMBERS
MONDAY, JULY 22, 2019 5:30 P.M.
MINUTES
1. CONVENE CITY COUNCIL WORK SESSION MEETING
Mayor Zerby called the meeting to order at 5:30 P.M.
A. Roll Call
Present. Mayor Zerby; Councilmembers Johnson,
at 5:35 PM); City Administrator Lerud; PIe
Works Brown.
B. Review Agenda
Labadie moved, Johnson seconded, approvin
4/0.
2. ENGINEERING FIRM PRES
City Administrator Lerud explained there are
presentations to the Council.
A. WSB
City Engineer Fauske introduced Lee Gu
Hansen.
Lee Gustafson thanked the
for the road bumps that the,.
fully-commits to getting,thiE
noted that the team they a
proposing, quarterly meetir
meetings more often, if ne
meetings with the Council
the City.
lie, Siakel,, and Sundberg (arrived
Director Darling; Director of Public
presented. Motion passed
firms that will be making
Katie Koscielak, Earth Evans, and Justin
y for allowing WSB to serve them for many years. He apologized
ve hit with some staff members and projects. He stated that WSB
issues resolved. He reviewed some of the proposal details and
roposing has a lot of municipal experience. He stated that he is
with City staff, but noted that they are open to holding these
�sary. He stated that they are also proposing two semi - annual
/ell as an annual meeting to bring some new technology ideas to
Councilmember Sundberg arrived at the meeting.
City Engineer Fauske gave an overview of the projects that she has been involved in and
communication efforts surrounding the projects. She gave an overview of some of the
communications that has happened outside of the City boundaries so the community members
can see what projects are happening in the area, even if they are not officially "our" project. She
explained that she has worked with LMCC to put together a professional video for residents when
there is an upcoming project. She stated that she has learned in her years at the City to utilize
the expertise available at WSB and reviewed some of the team members that have worked with
the City.
CITY OF SHOREWOOD WORK SESSION COUNCIL MEETING MINUTES
JULY 22, 2019
Page 2 of 5
Katie Koscielak gave a brief overview of how the team works and the ways they can collaborate
and have face to face time with the City. She stated that their team approach ensures that there
is always a City Engineer on site.
Earth Evans gave a brief description of what she does in the water resources group. She
explained that the water resources group is very large and has a number of ways they can assist
the City and noted that they have pretty quick turnaround times and a good understanding of the
requirements of the Minnehaha Creek Watershed District.
Justin Hansen stated that he is the Director of GIS and gave an overview of the ways that they
have worked with the City over the last five years. He gave an overview of their Datalink services
for web mapping. He stated that he is excited about the opportunity to meet with the City annually
to discuss the new technologies that become available. He'stated that they try to empower the
City and have them be the caretakers and enable them to'keep the information up to date for GIS
and do not hold it hostage from the City.
Mr. Gustafson stated that he believes WSB is ti
problems and solutions. He stated that they are
Councilmember Sundberg asked how long Mr. Gu
team.
Mr. Gustafson stated that he had known abo
involved. He stated that he got directly involve
has been for about the last four months.
Councilmember Sundbera asked how involved
Mr. Gustafson stated that he wil
work on long range planning w
and work session meetinas: ,
olton &
ive and innovative in their approach for
=d to the Citv and to the area.
been working with the Shorewood
of the issues, but he was not directly
ere were some changes at WSB which
Gustafson would be moving forward.
ng forward and is open to brainstorm and
that he is also open to attending Council
Dave Martini introduced Andrew Budde who they are proposing becomes the City Engineer. He
explained that Bolton & Menk are a full- service engineering firm that includes GIS services. He
explained the reason that he felt they would be a good fit for the City and their understanding of
being in close proximity to Lake Minnetonka. He stated that they specialize in municipal services
and noted that they currently serve about one - hundred and sixty communities in the State as their
city engineers. He stated that he thinks the team that they have put together will be a great fit for
the City.
Andrew Budde gave a brief overview of some of the services Bolton & Menk can offer to the City
and gave examples of some of the visionary leadership they have been able to do in communities
like Watertown. He reviewed some of the items in the City mission statement that he feels their
company can help with. He stated that they approach every client and situation uniquely and with
the understanding that their services are an investment in the City's future.
CITY OF SHOREWOOD WORK SESSION COUNCIL MEETING MINUTES
JULY 22, 2019
Page 3 of 5
Councilmember Johnson stated that something that he has struggled with is the bedside manner
of an engineer and being able to make the transition from "engineering speak" to something that
a layperson can understand. He asked what Mr. Budde's bedside manner would be in this
situation.
Mr. Budde stated that he is generally pretty straight forward in his approach. He stated that he
tries to look at things from an engineering perspective but try to explain it in an easy to understand
fashion.
Councilmember Johnson asked how many of the references listed in the packet refer specifically
to Mr. Budde.
Mr. Budde stated that he had worked with Watertown and Mound: He noted that he is also the
City Engineer in Independence and represents Louisville and Jackson Township.
Councilmember Johnson stated that if any of the
be passed along to City Administrator Lerud.
Councilmember Siakel stated that there may be sore
of the residents may not fully support. She asked if
with residents that were unhappy and were less than
are specific to Mr: Budde that those
coming up in the City that some
examples where he had to work
Mr. Budde stated that he has been yelled at quite a bit by residents and in some cases if things
have gotten too emotional, he has suggested that they meet again another time to discuss things
further. He stated that sometimes you have to just take the feedback and hope for an opportunity
to incorporate their concerns into the overall plan.
Councilmember Siakel stated that she appreciated that Mr. Budde took the time to read the City's
mission statement. She stated that he said he was forward thinking and asked if he had taken a
drive around the City and had any thoughts about'anything in the City.
Mr. Bud
through
he
character of having rural i
there is a completely urba
map, it appears as thoug
probably arise.
Mayor Zerby asked whe
engineering planning., ,
fen around the City, watched some Council meetings and read
stated that what he noticed is that the City has the unique
s with large trees on either side and then a short distance away
action with curb and gutter. He stated that in looking at the utility
is watermain to about half of the City and thinks that issue will
biggest mistake he sees cities making with regard to their
Mr. Budde stated that the biggest mistake he has seen in the communities he has been involved
in, it would be lack of vision and foresight.
Mayor Zerby stated that mistakes will happen and asked how Mr. Budde and Bolton & Menk deal
with mistakes.
Mr. Budde stated that they will own up to their mistakes and have paid for changes in projects
when there has been an engineering mistake.
CITY OF SHOREWOOD WORK SESSION COUNCIL MEETING MINUTES
JULY 22, 2019
Page 4 of 5
Mr. Martini stated that regardless of whether the mistake is reality or perception, they come to the
table and ask what the expectation is from the City. He stated that they are much more concerned
with the long -term relationship than they are with short term financial gain.
C. Stantec
Dave Ahrens introduced himself and noted that he has ten years of experience working with Lino
Lakes and Shoreview.
Phil Gravel introduced himself and stated that they had put together a "stantastic" team for the
City. He stated that they have arranged things for the City and this `would be Mr. Ahrens top
responsibility.
Heidi Peper introduced herself and noted that she is a funding specialist and works in funding to
try to help cities find the financing they need in order to advance their projects.
Mr. Ahrens gave a brief overview of Stantec and their approach to projects. He stated that their
four core values are: put people first; do what is righf; better together; and driven to achieve. He
shared some examples of projects that he believes show these core values in Red Lake Falls,
MN and Johnson Creek, WI. He stated that personally he likes to explore new and innovative
solutions and does not take a cookie cutter approach to issues. He stated that he knows the City
is looking to hire a construction observer, and noted that if the City finds someone, their services
can be adjusted and not include those services, but noted that if the City does not find a suitable
candidate that can also provide full - service construction services.
Ms. Peper stated that they have a network of
Country. She stated that the City, does not ha
funding assistance. She noted that their fundir
needed and can be on a project by project basi
Mr. Gravel gave a brief overview of their fees ,
be transparent so there are no surprise invoice':
r one- hundred funding specialists across the
o be a low- income community in order to get
pecialists can be used as much or as little as
billing practices. He noted that they strive to
unnecessary projects.
Councilmember Johnsen asked if, Stantec could provide references that would be specific to Mr.
Ahrens. He stated that as he has interacted with engineers, once of his biggest issues has been
their "bedside manner" and asked how Mr. Ahrens would communicate engineering concepts to
a layman.
Mr. Ahrens stated that things need to be explained without using engineering terms whenever
possible.
Mayor Zerby asked if Ms. Peper had been successful in getting funding from watershed districts.
Ms. Peper stated that they have had some success with getting funding from BWSR what was
channeled through the watershed district.
Mayor Zerby stated that everybody makes mistakes and asked how their firm deals with mistakes.
Mr. Ahrens stated that he has made mistakes and gave the example of working on the Mystic
Lake Casino where he neglected to calculate a zero -point three degree rotation for the golf
CITY OF SHOREWOOD WORK SESSION COUNCIL MEETING MINUTES
JULY 22, 2019
Page 5 of 5
clubhouse. He stated that they covered the expense for the change order that was necessary for
that project because he had made a mistake. He stated that they do own up to their mistakes
and do not try to shy away from them and noted that it is important for them to have a good plan
and peer review so the mistakes can be minimized. He stated that good communication between
the engineer and the people out in the field is very important.
3. ADJOURN
The City Council Work Session Meeting of July 22, 2019 adjourned 7:02 P.M.
ATTEST:
Sar
Mayor
CITY OF SHOREWOOD
CITY COUNCIL REGULAR MEETING
MONDAY, JULY 22, 2019
MINUTES
1. CONVENE CITY COUNCIL REGULAR MEETING
Mayor Zerby called the meeting to order at 7:05 P.M.
Present.
Absent:
Mayor Zerby; Councilmembers Johnson,
Attorney Keane; City Administrator Lerui
Rigdon; Planning Director Darling; Direr
Engineer Fauske
B. Review Agenda
Sundberg moved, Labadie seco
5/0.
F,
CONSENT AGEN
Mayor Zerby reviewec
Siakel moved, Laba
Agenda and Adoptin
E.
F.
G.
5755 COUNTRY CLUB ROAD
COUNCIL CHAMBERS
7:00 P.M.
I, and Sundberg; City
one; Finance Director
)rks Brown; and, City
as presented. Motion passed
e Motions Contained on the Consent
_ nutes of Julv 8, 2019
Claims List
per - Installed Improvements on Vine Hill Road: 19285 State
irbucks) RESOLUTION NO. 19 -071, "A Resolution Accepting
and Maintenance of Developer - Installed Improvements in the
Constructed in Conjunction with the Development of the Site
85 State Highway 7."
Update Mobile Communications Policy
Accept Proposal for Entry and Security System
Election Judge Compensation Rates, Adopting RESOLUTION NO. 19 -072 "A
Resolution Approving Election Judge Compensation Rates."
Accept Proposal for Fire Suppression Repairs: City Hall
CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES
July 22, 2019
Page 2 of 6
H. Accept Contract for Uniforms Public Works
Motion passed 5/0.
3. MATTERS FROM THE FLOOR
Janet Sylvester, 27110 West 62nd Street, stated that she has e- mailed the City quite often on the
sewer back -up issue and wanted to give an update in person. She stated that she spoke with
Matt from Met Council last Friday and was told that it is still under investigation and they were
trying to figure out if they had done anything wrong. She told him that they had put 1,000 gallons
of raw sewage in her house so somebody did something wrong. She stated that Matt from Met
Council stated that they are looking into other parties that may be involved to see who may be
liable. She stated that it has been over a month that half of their home is trashed down to the
studs and subflooring. She asked if the City had any additional information on her situation.
Public Works Director Brown stated that he heard for the first time today that Met Council was
looking at other parties in this situation. He stated that'the Met Council has not contacted the City
nor included them in their investigation at this paint. He stated that his understanding is that this
situation involved infrastructure that was solely owned by the Met Council.
Mayor Zerby asked how long claims typically took when they involve the Met Council.
Public Works Director Brown stated that he would think within two to three weeks there should be
a good handle on the cause and effect. F
as to what the cause was in this situation.
Mayor Zerby asked if
answers from Met Cc
City Administrator
finds out.
Mayor Zerby expressed h
Council and staff would wo
Councilmember Johnson a
Ms. Sylvester indicated eig
Aster Trail but noted that tl
that at least two other homy
that the situation is still heir
for the
co
e did not think there was much question
rvene and try to get some more immediate
m and will let Ms. Sylvester know what he
by for Ms. Sylvester's situation and assured her that the
try to help get her some answers from the Met Council.
homes on her street were impacted in this situation.
:o ten homes were impacted street including her street and three on
new home near her was not impacted. She stated that she knows
ners have contacted Met Council and have gotten the same answer
investigated.
Public Works Director Brown suggested that Ms. Sylvester consider contacting her State
Representative to get some assistance with Met Council.
4. PUBLIC HEARING - NONE
5. REPORTS AND PRESENTATIONS - NONE
CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES
July 22, 2019
Page 3 of 6
6. PARKS
A. Report by Commissioner Rock on July 9, 2019 Parks Commission Meeting
Commissioner Rock gave a brief overview of the July 9, 2019 Parks Commission Meeting. He
stated that they have asked staff to look into the possibility of a board painting party for the hockey
boards at Cathcart Park. He stated that the Parks Commission toured Manor, Southshore, and
Silverwood Parks. He reviewed some of the items discussed at each park.
Councilmember Labadie asked if the Parks Commission was actively trying to recruit use for the
greenspace at Silverwood Park because it was suggested that Tonka United Soccer be
contacted.
Councilmember Johnson stated that he can answer that question because it was his idea. He
stated that he suggested that Tonka United be contacted and suggest that this greenspace could
be used for K -2 soccer. He noted that when his daughter played, they practiced over in Carver
County at Roundhouse Park and felt this would be a possible way for them to utilize the space
and be closer.
Councilmember Labadie stated that she likes the idea to utilize the space for soccer fields. She
asked if there had been an update on the condition of the pond in Manor Park.
Planning Director Darling stated that the City, is working with Barr Engineering to do a bathymetric
survey. She stated that the City is also looking ''at algaecides and would contract to have Alum
treatments for the pond in August and September with more to follow next year.
Public Works Director Brown stated that they are looking at doing an herbicide and alum treatment
in August and September and noted that the cast is more reasonable than anticipated, so they
are also looking at a contract to provide these services in the future. He stated that he has
suggested that Barr Engineering came to a future Council work session and present the results
of the bathymetric survey can Manor Pond.
Mayor Zerby suggested that the meeting regarding Manor Pond happen on site again in order to
give the residents an opportunity to also hear the information and ask questions.
Councilmember Siakel stated that she had not been out to Manor Pond recently and asked about
its conditions and noted that the Council had committed to residents that the City would take
action on their pond issues.
Councilmember Labadie stated that she agrees with Mayor Zerby's suggestion to open up the
meeting with Barr Engineering to the community group.
City Administrator Lerud stated that when the final report comes from Barr Engineering, he will
send it out to the community group and also let them know when the Council meeting is scheduled
to discuss it.
B. Change Order #1 for Badger Park Playground Project
Planning Director Darling stated that the contractor found electrical conduit buried that has all the
wiring for the field lighting. She stated that the conduit is too shallow and will no longer meet code
CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES
July 22, 2019
Page 4 of 6
at its current depth. She explained that the site contractor was unable to complete the trenching
work, so the City found an electrician that was willing to do the work. She apologized for this
being an after the fact change because of the timing.
Councilmember Sundberg asked if the conduit being installed so shallow was a mistake on
someone's part.
Public Works Director Darling stated that it was okay for the way the lights were originally put in
but with the change in grading, it would be too shallow. She stated that there were not plans that
showed where the conduit was located, so they could not have planned for this prior to
construction.
Councilmember Johnson stated that he commends staff for taking action in order to avoid
increased project costs and delays, but suggested that there be a conversation at the annual
retreat about the possibility of having a certain dollar amount where staff is allowed to make
decisions without needing to bring it before council every time.
Councilmember Siakel stated that there is already 'a policy like that in place and believes the
allowed amount is $7,500.
Sundberg moved, Johnson secs
Resolution Accepting Change On
Complications at the Badger Park P
5/0.
7. PLANNING
A. Report by Commissi
Commissioner Gault gave a bri
commended Planning director,
accessory structure.
nded, To Approve ''RESOLUTION NO. 19 -073, "A
let Number One to Resolve Unexpected Electrical
aygrourild Project, City Project 19 -01." Motion passed
Gault on July 2, 2019 Planning Commission Meeting
iew of the July 2, 2019 Planning Commission Meeting. He
for all the work she put into the ordinance amendment for
Ordinance Amendment Accessory Structure
Planning Director Darling explained that this amendment removes the requirement for conditional
use permits for accessory structures over 1,200 or 1,000 square feet, but noted that the same
standards would be required. She gave a brief overview of the other proposed changes and
language clean -up throughout the document. She stated that the Planning Commission and staff
recommend approval of the proposed changes.
Johnson moved, Siakel seconded, Approving ORDINANCE 567, "An Ordinance Approving
an Amendment to Section 1201 (Zoning Regulations) of City Code to Remove the
Requirement for a Conditional Use Permit for Oversized Accessory Building." Motion
passed 5/0.
Johnson moved, Siakel seconded, Approving RESOLUTION NO. 19 -074, "A Resolution
Approving Publication of Ordinance No. 567 by Title and Summary." Motion passed 5/0.
8. ENGINEERING /PUBLIC WORKS
CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES
July 22, 2019
Page 5 of 6
9. GENERAL /NEW BUSINESS
10. STAFF AND COUNCIL REPORTS
A. Administrator and Staff
1. June General Fund Report
Finance Director Rigdon noted that the report is for January through June of 2019. He gave a
brief overview of the revenues and expenditures through June.
There was a consensus of the Council to accept the General Fond report.
2. Investments 2 "d Quarter 2019 Report
Finance Director Rigdon noted that the investments are handled on the basis of safety, liquidity
and yield or the SLY method. He gave a brief overview of the investments for the ,2nd quarter of
2019.
Mayor Zerby stated that he appreciates that the City has gotten about 100,000 dollars from their
investments this year and hopes that will continue through the remainder of the year.
Other
Public Works Director Brown reported they have slacked aff,in pumping Mary Lake because Lake
Linden is at its brink and cannot have any more water added to it. He stated they are hopeful the
dry weather will allow for some natural percolation to bring both water bodies down to a more
normal water level. He explained the Amesbury well SCADA project is complete and was very
successful. He stated when the alum and herbicide treatments are scheduled for Manor Pond he
will make sure an e-mail is sent out'and it is published on the website so people are aware. He
stated there is a lot of anticipation around the Tour De Tonka event and noted that Public Works
began patching today along the route and will continue that work throughout the weekend now
that there has been some dry weather. He noted the No Parking signage in the Shorewood Pond
community has been completed. He explained the patching in the Glen Road area is almost
completed.
Mayor Zerby stated he had e- mailed Public Works Director Brown about the cell towers and asked
if there was anv information on that issue.
Public Works Director Brown explained he spoke to the consultant from Owl Engineering and
determined that both cell towers are well within the safety limits for electromagnetic frequency
radiation. He noted that this will be inspected annually.
City Engineer Fauske reported the striping contractor has been out working in the City. She stated
that there was a good turnout for the Open House for the 2019 Mill and Overlay project. She
explained they are working to get some of the frequently asked questions posted to the website
for people that were unable to attend. She stated that the contractor has indicated that the work
would start in early September but there is not a specific schedule at this time.
CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES
July 22, 2019
Page 6 of 6
City Administrator Lerud asked how the Council would like to proceed following up on the
presentations made at the Council Work Session.
Councilmember Sundberg stated that she would like to have a work session discussion about it
in order to be able to go into more detail.
City Administrator Lerud explained that he would like to conduct reference checks and also
wondered if the Council had questions that time did not allow for this evening. He will look into
scheduled a work session in August for this discussion.
B. Mayor and City Council
11. ADJOURN
Johnson moved, Labadie seconded, Adjourning the City Council Regular Meeting of July
22, 2019, at 7:39 P.M. Motion passed 5/0.
ATTEST:
Zerby, Mayor
Sandie Thone, City Clerk
2c
CITY OF SHOREWOOD 5755 COUNTRY CLUB ROAD
CITY COUNCIL WORK SESSION MEETING COUNCIL CHAMBERS
MONDAY, JULY 31, 2019 5:00 P.M.
MINUTES
1. CONVENE CITY COUNCIL WORK SESSION MEETING
Mayor Zerby called the meeting to order at 5:00 P.M.
A. Roll Call
Present. Mayor Zerby; Councilmembers Siakel, Sun
Lerud; Director of Public Works Brown. Cc
B. Review Agenda
Sundberg moved, Siakel seconded, approv
4/0.
2. ENGINEERING FIRM DISCU
City Administrator Lerud provided information'
as well as comments he received during the r
the quick turn - around time from the presents
information provided. He said he still thought;
until late August. Lerud said there is no dea
further discussions at future council meetinas.
There was a general discussio
can bring to the table.
e age
`g, and Labadie; City Administrator
Imember Johnson was absent.
la, as presented. Motion passed
the three engineering firms
nd checks. He said due to
m able to review all of the
tant to discuss the matter rather than waiting
to this process, and he said there would be
neering firm as well as what the other firms
Council member Siakel said that there is still some confusion regarding the retainer fee as the
dollar:amounts were several thousand dollars difference between the three firms. She suggested
that a matrix or spreadsheet be developed that would allow easier comparison.
Council member Sundberg asked if a different firm was selected, how difficult would the transition
be to a new firm: Director of Public Work Brown said that there will some difficulties with any
transition, but it should not be the determining factor in the council making the decision.
Lerud said as part of the RFP all the firms had to offer hosting the city's GIS information. He said
that the city will be evaluating LOGIS and having them host the city's GIS system. He said LOGIS
is a joint powers agency in the state, and if the city hosts its information there, the choice of city
engineer would not be impacted.
Council member Labadie said she was impressed that Stantec brought a funding person to the
presentation and wondered how much value there was to having that asset. Brown said that most
engineering firms have that type of position. Lerud added that a funding person could add value
in the way projects are prepared — ensuring that if there is available outside funding, plans and
CITY OF SHOREWOOD WORK SESSION COUNCIL MEETING MINUTES
JULY 31, 2019
Page 2 of 2
specifications could be prepared in a way that gives the city the best chance possible for that
funding.
Mayor Zerby asked if the city was prepared to reduce the number of firms under consideration.
After a brief discussion it was decided to continue to consider all three firms.
Brown said that one thing he and Lerud discussed was the idea that the engineer that would be
assigned to the city from each firm be invited to be interviewed by the council. He said that a half
hour is not enough time to gauge the qualities of the engineers, as his opinion of the firms has
changed between initially meeting them and following their presentations.
The consensus of the council was to get further clarification on the following items:
• A better break down on retainer costs and overall costs on a spread sheet.
• Answering the question of how the firm will approach taking on a project that is in- progress.
Will the firm start over producing their own information from the beginning, or review the
in- progress plans and revised as needed?
• Try to assess the value of a dedicated funding person.
Lerud said that staff would continue to work on this
With no other business
Motion passed 4/0 and,
ATTEST:
Sa
chedule the interviews.
ie, second by Sundberg.
Scott Zerby, Mayor
#2 D
MEETING TYPE
City of Shorewood Council Meeting Item Regular Meeting
Title / Subject: Verified Claims
Meeting Date: August 12, 2019
Prepared by: Michelle Nguyen, Senior Accountant
Greg Lerud, City Administrator
Joe Rigdon, Finance Director
Attachments: Claims lists
Policy Consideration:
Should the attached claims against the City of Shorewood be paid?
Background:
Claims for council authorization.
65571— 65621 & ACH 482,958.19
Total Claims $482,958.19
We have also included a payroll summary for the payroll period ending July 21, 2019 & August 4, 2019.
Financial or Budget Considerations:
These expenditures are reasonable and necessary to provide services to our residents and funds are
budgeted and available for these purposes.
Options:
The City Council is may accept the staff recommendation to pay these claims or may reject any
expenditure it deems not in the best interest of the city.
Recommendation / Action Requested:
Staff recommends approval of the claims list as presented.
Next Steps and Timelines:
Checks will be distributed following approval.
Account Number Debit Amount Credit Amount Description
FUND 101
General Fund
101 -00- 1010 -0000
0.00
66,180.88
CASH AND INVESTMENTS
101 -11- 4103 -0000
1,716.64
0.00
PART -TIME
101 -11- 4122 -0000
131.31
0.00
FICA CONTRIB - CITY SHARE
101 -13- 4101 -0000
10,775.09
0.00
FULL -TIME REGULAR
101 -13- 4103 -0000
946.20
0.00
PART -TIME
101 -13- 4121 -0000
879.10
0.00
PERA CONTRIB - CITY SHARE
101 -13- 4122 -0000
877.62
0.00
FICA CONTRIB - CITY SHARE
101 -13- 4131 -0000
1,745.21
0.00
EMPLOYEE INSURANCE - CITY
101 -13- 4151 -0000
92.67
0.00
WORKERS COMPENSATION
101 -15- 4101 -0000
5,011.44
0.00
FULL -TIME REGULAR
101 -15- 4121 -0000
375.91
0.00
PERA CONTRIB - CITY SHARE
101 -15- 4122 -0000
377.75
0.00
FICA CONTRIB - CITY SHARE
101 -15- 4131 -0000
517.31
0.00
EMPLOYEE INSURANCE - CITY
101 -15- 4151 -0000
29.04
0.00
WORKERS COMPENSATION
101 -18- 4101 -0000
5,571.55
0.00
FULL -TIME REGULAR
101 -18- 4103 -0000
274.20
0.00
PART -TIME
101 -18- 4121 -0000
438.47
0.00
PERA CONTRIB - CITY SHARE
101 -18- 4122 -0000
442.54
0.00
FICA CONTRIB - CITY SHARE
101 -18- 4131 -0000
922.13
0.00
EMPLOYEE INSURANCE - CITY
101 -18- 4151 -0000
25.75
0.00
WORKERS COMPENSATION
101 -24- 4101 -0000
5,457.69
0.00
FULL -TIME REGULAR
101 -24- 4121 -0000
285.60
0.00
PERA CONTRIB - CITY SHARE
101 -24- 4122 -0000
408.57
0.00
FICA CONTRIB - CITY SHARE
101 -24- 4131 -0000
541.60
0.00
EMPLOYEE INSURANCE - CITY
101 -24- 4151 -0000
27.50
0.00
WORKERS COMPENSATION
101 -32- 4101 -0000
12,970.41
0.00
FULL -TIME REGULAR
101 -32- 4102 -0000
427.69
0.00
OVERTIME
101 -32- 4121 -0000
842.18
0.00
PERA CONTRIB - CITY SHARE
101 -32- 4122 -0000
953.47
0.00
FICA CONTRIB - CITY SHARE
101 -32- 4131 -0000
2,580.27
0.00
EMPLOYEE INSURANCE - CITY
101 -32- 4151 -0000
811.69
0.00
WORKERS COMPENSATION
101 -33- 4101 -0000
235.37
0.00
FULL -TIME REGULAR
101 -33- 4121 -0000
14.87
0.00
PERA CONTRIB - CITY SHARE
101 -33- 4122 -0000
29.48
0.00
FICA CONTRIB - CITY SHARE
PR - G/L Distribution Report (07/22/2019 - 12:48 PM) Page 1
Account Number Debit Amount Credit Amount Description
101 -33- 4131 -0000
255.26
0.00
EMPLOYEE INSURANCE - CITY
101 -33- 4151 -0000
21.06
0.00
WORKERS COMPENSATION
101 -52- 4101 -0000
4,132.34
0.00
FULL-TIME REGULAR
101 -52- 4103 -0000
1,584.00
0.00
PART -TIME
101 -52- 4121 -0000
425.96
0.00
PERA CONTRIB - CITY SHARE
101 -52- 4122 -0000
425.66
0.00
FICA CONTRIB - CITY SHARE
101 -52- 4131 -0000
727.87
0.00
EMPLOYEE INSURANCE - CITY
101 -52- 4151 -0000
299.89
0.00
WORKERS COMPENSATION
101 -53- 4101 -0000
1,290.43
0.00
FULL -TIME REGULAR
101 -53- 4121 -0000
96.81
0.00
PERA CONTRIB - CITY SHARE
101 -53- 4122 -0000
96.64
0.00
FICA CONTRIB - CITY SHARE
101 -53- 4131 -0000
23.46
0.00
EMPLOYEE INSURANCE - CITY
101 -53- 4151 -0000
65.18
0.00
WORKERS COMPENSATION
FUND Total:
66,180.88
66,180.88
FUND 201
Shorewood Comm. & Event
Center
CASH AND INVESTMENTS
201 -00- 1010 -0000
0.00
1,957.14
CASH AND INVESTMENTS
201 -00- 4101 -0000
1,358.75
0.00
FULL -TIME REGULAR
201 -00- 4103 -0000
284.08
0.00
PART -TIME
201 -00- 4121 -0000
101.88
0.00
PERA CONTRIB - CITY SHARE
201 -00- 4122 -0000
121.83
0.00
FICA CONTRIB - CITY SHARE
201 -00- 4131 -0000
17.59
0.00
EMPLOYEE INSURANCE - CITY
201 -00- 4151 -0000
73.01
0.00
WORKERS COMPENSATION
FUND Total:
1,957.14
1,957.14
FUND 601
Water Utility
601 -00- 1010 -0000
0.00
8,546.72
CASH AND INVESTMENTS
601 -00- 4101 -0000
6,404.04
0.00
FULL -TIME REGULAR
601 -00- 4105 -0000
192.84
0.00
WATER PAGER PAY
601 -00- 4121 -0000
491.94
0.00
PERA CONTRIB - CITY SHARE
601 -00- 4122 -0000
466.08
0.00
FICA CONTRIB - CITY SHARE
601 -00- 4131 -0000
818.56
0.00
EMPLOYEE INSURANCE - CITY
601 -00- 4151 -0000
173.26
0.00
WORKERS COMPENSATION
FUND Total:
8,546.72
8,546.72
FUND 611
Sanitary Sewer Utility
611 -00- 1010 -0000
0.00
7,216.46
CASH AND INVESTMENTS
611 -00- 4101 -0000
4,901.46
0.00
FULL -TIME REGULAR
611 -00- 4102 -0000
506.21
0.00
OVERTIME
611 -00- 4105 -0000
192.84
0.00
SEWER PAGER PAY
611 -00- 4121 -0000
417.30
0.00
PERA CONTRIB - CITY SHARE
611 -00- 4122 -0000
382.43
0.00
FICA CONTRIB - CITY SHARE
PR - G/L Distribution Report (07/22/2019 - 12:48 PM) Page 2
Account Number Debit Amount Credit Amount Description
611 -00- 4131 -0000 664.83 0.00 EMPLOYEE INSURANCE - CITY
611 -00- 4151 -0000 151.39 0.00 WORKERS COMPENSATION
FUND Total:
7,216.46
7,216.46
FUND 621
Recycling Utility
621 -00- 1010 -0000
0.00
655.31
CASH AND INVESTMENTS
621 -00- 4101 -0000
507.18
0.00
FULL -TIME REGULAR
621 -00- 4121 -0000
38.03
0.00
PERA CONTRIB - CITY SHARE
621 -00- 4122 -0000
32.87
0.00
FICA CONTRIB - CITY SHARE
621 -00- 4131 -0000
75.14
0.00
EMPLOYEE INSURANCE - CITY
621 -00- 4151 -0000
2.09
0.00
WORKERS COMPENSATION
FUND Total:
655.31
655.31
FUND 631
Storm Water Utility
631 -00- 1010 -0000
0.00
2,300.87
CASH AND INVESTMENTS
631 -00- 4101 -0000
1,808.13
0.00
FULL -TIME REGULAR
631 -00- 4121 -0000
116.50
0.00
PERA CONTRIB - CITY SHARE
631 -00- 4122 -0000
126.55
0.00
FICA CONTRIB - CITY SHARE
631 -00- 4131 -0000
186.90
0.00
EMPLOYEE INSURANCE - CITY
631 -00- 4151 -0000
62.79
0.00
WORKERS COMPENSATION
FUND Total:
2,300.87
2,300.87
FUND 700
Payroll Clearing Fund
700 -00- 1010 -0000
86,857.38
0.00
CASH AND INVESTMENTS
700 -00- 2170 -0000
0.00
42,162.43
GROSS PAYROLL CLEARING
700 -00- 2171 -0000
0.00
8,782.20
HEALTH INSURANCE PAYABLE
700 -00- 2172 -0000
0.00
5,006.60
FEDERAL WITHHOLDING PAYABLE
700 -00- 2173 -0000
0.00
2,552.36
STATE WITHHOLDING PAYABLE
700 -00- 2174 -0000
0.00
9,745.60
FICA/MEDICARE TAX PAYABLE
700 -00- 2175 -0000
0.00
8,445.85
PERA WITHHOLDING PAYABLE
700 -00- 2176 -0000
0.00
5,182.00
DEFERRED COMPENSATION
700 -00- 2177 -0000
0.00
1,835.32
WORKERS COMPENSATION
700 -00- 2179 -0000
0.00
95.00
SEC 125 DEP CARE REIMB PAYABLE
700 -00- 2181 -0000
0.00
1,300.72
DISABILITY INSURANCE
700 -00- 2183 -0000
0.00
710.00
HEALTH SAVINGS ACCOUNT
700 -00- 2184 -0000
0.00
591.30
DENTAL DELTA
700 -00- 2185 -0000
0.00
448.00
DENTAL - UNION
FUND Total:
86,857.38
86,857.38
PR - G/L Distribution Report (07/22/2019 - 12:48 PM) Page 3
Account Number Debit Amount Credit Amount Description
Report Total: 173,714.76 173,714.76
PR - G/L Distribution Report (07/22/2019 - 12:48 PM) Page 4
Account Number Debit Amount Credit Amount Description
FUND 101
General Fund
101 -00- 1010 -0000
0.00
66,706.66
CASH AND INVESTMENTS
101 -13- 4101 -0000
11,081.75
0.00
FULL -TIME REGULAR
101 -13- 4103 -0000
838.20
0.00
PART -TIME
101 -13- 4121 -0000
893.99
0.00
PERA CONTRIB - CITY SHARE
101 -13- 4122 -0000
907.87
0.00
FICA CONTRIB - CITY SHARE
101 -13- 4131 -0000
1,745.21
0.00
EMPLOYEE INSURANCE - CITY
101 -13- 4151 -0000
97.35
0.00
WORKERS COMPENSATION
101 -15- 4101 -0000
5,030.43
0.00
FULL -TIME REGULAR
101 -15- 4121 -0000
377.30
0.00
PERA CONTRIB - CITY SHARE
101 -15- 4122 -0000
390.47
0.00
FICA CONTRIB - CITY SHARE
101 -15- 4131 -0000
517.31
0.00
EMPLOYEE INSURANCE - CITY
101 -15- 4151 -0000
27.62
0.00
WORKERS COMPENSATION
101 -18- 4101 -0000
5,609.40
0.00
FULL -TIME REGULAR
101 -18- 4103 -0000
277.63
0.00
PART -TIME
101 -18- 4121 -0000
441.58
0.00
PERA CONTRIB - CITY SHARE
101 -18- 4122 -0000
455.57
0.00
FICA CONTRIB - CITY SHARE
101 -18- 4131 -0000
922.13
0.00
EMPLOYEE INSURANCE - CITY
101 -18- 4151 -0000
41.86
0.00
WORKERS COMPENSATION
101 -24- 4101 -0000
5,471.70
0.00
FULL -TIME REGULAR
101 -24- 4121 -0000
282.75
0.00
PERA CONTRIB - CITY SHARE
101 -24- 4122 -0000
415.50
0.00
FICA CONTRIB - CITY SHARE
101 -24- 4131 -0000
541.60
0.00
EMPLOYEE INSURANCE - CITY
101 -24- 4151 -0000
28.59
0.00
WORKERS COMPENSATION
101 -32- 4101 -0000
15,650.59
0.00
FULL -TIME REGULAR
101 -32- 4102 -0000
93.38
0.00
OVERTIME
101 -32- 4105 -0000
349.32
0.00
STREET PAGER PAY
101 -32- 4121 -0000
1,020.54
0.00
PERA CONTRIB - CITY SHARE
101 -32- 4122 -0000
1,160.64
0.00
FICA CONTRIB - CITY SHARE
101 -32- 4131 -0000
2,581.24
0.00
EMPLOYEE INSURANCE - CITY
101 -32- 4151 -0000
941.50
0.00
WORKERS COMPENSATION
101 -33- 4101 -0000
302.79
0.00
FULL -TIME REGULAR
101 -33- 4121 -0000
21.79
0.00
PERA CONTRIB - CITY SHARE
101 -33- 4122 -0000
35.46
0.00
FICA CONTRIB - CITY SHARE
101 -33- 4131 -0000
256.24
0.00
EMPLOYEE INSURANCE - CITY
PR - G/L Distribution Report (08/05/2019 - 1:05 PM) Page 1
Account Number Debit Amount Credit Amount Description
101 -33- 4151 -0000
26.19
0.00
WORKERS COMPENSATION
101 -52- 4101 -0000
3,300.60
0.00
FULL -TIME REGULAR
101 -52- 4103 -0000
1,303.50
0.00
PART -TIME
101 -52- 4121 -0000
344.38
0.00
PERA CONTRIB - CITY SHARE
101 -52- 4122 -0000
362.78
0.00
FICA CONTRIB - CITY SHARE
101 -52- 4131 -0000
727.87
0.00
EMPLOYEE INSURANCE - CITY
101 -52- 4151 -0000
248.71
0.00
WORKERS COMPENSATION
101 -53- 4101 -0000
1,299.95
0.00
FULL -TIME REGULAR
101 -53- 4121 -0000
97.52
0.00
PERA CONTRIB - CITY SHARE
101 -53- 4122 -0000
100.72
0.00
FICA CONTRIB - CITY SHARE
101 -53- 4131 -0000
23.46
0.00
EMPLOYEE INSURANCE - CITY
101 -53- 4151 -0000
61.68
0.00
WORKERS COMPENSATION
FUND Total:
66,706.66
66,706.66
FUND 201
Shorewood Comm. & Event
Center
CASH AND INVESTMENTS
201 -00- 1010 -0000
0.00
1,873.37
CASH AND INVESTMENTS
201 -00- 4101 -0000
1,212.85
0.00
FULL -TIME REGULAR
201 -00- 4102 -0000
166.53
0.00
OVERTIME
201 -00- 4103 -0000
205.32
0.00
PART -TIME
201 -00- 4121 -0000
90.94
0.00
PERA CONTRIB - CITY SHARE
201 -00- 4122 -0000
109.38
0.00
FICA CONTRIB - CITY SHARE
201 -00- 4131 -0000
17.59
0.00
EMPLOYEE INSURANCE - CITY
201 -00- 4151 -0000
70.76
0.00
WORKERS COMPENSATION
FUND Total:
1,873.37
1,873.37
FUND 601
Water Utility
601 -00- 1010 -0000
0.00
7,814.05
CASH AND INVESTMENTS
601 -00- 4101 -0000
5,485.52
0.00
FULL -TIME REGULAR
601 -00- 4102 -0000
431.29
0.00
OVERTIME
601 -00- 4121 -0000
441.08
0.00
PERA CONTRIB - CITY SHARE
601 -00- 4122 -0000
424.01
0.00
FICA CONTRIB - CITY SHARE
601 -00- 4131 -0000
829.26
0.00
EMPLOYEE INSURANCE - CITY
601 -00- 4151 -0000
202.89
0.00
WORKERS COMPENSATION
FUND Total:
7,814.05
7,814.05
FUND 611
Sanitary Sewer Utility
611 -00- 1010 -0000
0.00
5,913.76
CASH AND INVESTMENTS
611 -00- 4101 -0000
4,444.26
0.00
FULL -TIME REGULAR
611 -00- 4121 -0000
332.41
0.00
PERA CONTRIB - CITY SHARE
611 -00- 4122 -0000
325.19
0.00
FICA CONTRIB - CITY SHARE
611 -00- 4131 -0000
671.64
0.00
EMPLOYEE INSURANCE - CITY
611 -00- 4151 -0000
140.26
0.00
WORKERS COMPENSATION
PR - G/L Distribution Report (08/05/2019 - 1:05 PM) Page 2
Account Number Debit Amount Credit Amount Description
FUND Total:
5,913.76
5,913.76
FUND 621
Recycling Utility
621 -00- 1010 -0000
0.00
391.02
CASH AND INVESTMENTS
621 -00- 4101 -0000
273.46
0.00
FULL -TIME REGULAR
621 -00- 4121 -0000
20.51
0.00
PERA CONTRIB - CITY SHARE
621 -00- 4122 -0000
19.98
0.00
FICA CONTRIB - CITY SHARE
621 -00- 4131 -0000
75.14
0.00
EMPLOYEE INSURANCE - CITY
621 -00- 4151 -0000
1.93
0.00
WORKERS COMPENSATION
FUND Total:
391.02
391.02
FUND 631
Storm Water Utility
631 -00- 1010 -0000
0.00
1,804.56
CASH AND INVESTMENTS
631 -00- 4101 -0000
1,276.10
0.00
FULL -TIME REGULAR
631 -00- 4102 -0000
96.42
0.00
OVERTIME
631 -00- 4121 -0000
101.96
0.00
PERA CONTRIB - CITY SHARE
631 -00- 4122 -0000
103.80
0.00
FICA CONTRIB - CITY SHARE
631 -00- 4131 -0000
186.90
0.00
EMPLOYEE INSURANCE - CITY
631 -00- 4151 -0000
39.38
0.00
WORKERS COMPENSATION
FUND Total:
1,804.56
1,804.56
FUND 700
Payroll Clearing Fund
700 -00- 1010 -0000
84,503.42
0.00
CASH AND INVESTMENTS
700 -00- 2170 -0000
0.00
40,966.41
GROSS PAYROLL CLEARING
700 -00- 2171 -0000
0.00
8,782.20
HEALTH INSURANCE PAYABLE
700 -00- 2172 -0000
0.00
5,190.25
FEDERAL WITHHOLDING PAYABLE
700 -00- 2173 -0000
0.00
2,630.46
STATE WITHHOLDING PAYABLE
700 -00- 2174 -0000
0.00
9,622.74
FICA/MEDICARE TAX PAYABLE
700 -00- 2175 -0000
0.00
8,337.94
PERA WITHHOLDING PAYABLE
700 -00- 2176 -0000
0.00
5,182.00
DEFERRED COMPENSATION
700 -00- 2177 -0000
0.00
1,928.72
WORKERS COMPENSATION
700 -00- 2179 -0000
0.00
95.00
SEC 125 DEP CARE REIMB PAYABLE
700 -00- 2180 -0000
0.00
665.62
LIFE INSURANCE
700 -00- 2182 -0000
0.00
392.08
UNION DUES
700 -00- 2183 -0000
0.00
710.00
HEALTH SAVINGS ACCOUNT
FUND Total:
84,503.42
84,503.42
Report Total: 169,006.84 169,006.84
PR - G/L Distribution Report (08/05/2019 - 1:05 PM) Page 3
Accounts Payable
Computer Check Proof List by Vendor
User: mnguyen
Printed: 07/22/2019 - 2:25PM
Batch: 00004.07.2019 - PR -07 -22 -2019
Invoice No
Description
Amount
Payment Date
Acct Number
Reference
Vendor: 4
AFSCME CO 5 MEMBER HEALTH FUND
Check Sequence: 1
ACH Enabled: True
July -2019
PR Batch 00002.07.2019 Dental - Union
448.00
07/22/2019
700 -00- 2185 -0000
PR Batch 00002.07.2019 Dental - Union
Check Total:
448.00
Vendor: 112
AMERICAN LEGAL PUBLISHING CORPOR
Check Sequence: 2
ACH Enabled: False
0128822
S -14 Supplement Pages
323.00
07/22/2019
101 -13- 4400 -0000
Check Total:
323.00
Vendor: 3
DELTA DENTAL OF MINNESOTA
Check Sequence: 3
ACH Enabled: True
July -2019
PR Batch 00002.07.2019 Dental - Non Union
591.30
07/22/2019
700 -00- 2184 -0000
PR Batch 00002.07.2019 Dental - Non Uni
Check Total:
591.30
Vendor: 5
EFTPS - FEDERAL W/H
Check Sequence: 4
ACH Enabled: True
RP -07 -22 -2019
PR Batch 00002.07.2019 Federal Income Tax
5,006.60
07/22/2019
700 -00- 2172 -0000
PR Batch 00002.07.2019 Federal Income I
RP -07 -22 -2019
PR Batch 00002.07.2019 FICA Employee Portio
3,949.22
07/22/2019
700 -00- 2174 -0000
PR Batch 00002.07.2019 FICA Employee _
RP -07 -22 -2019
PR Batch 00002.07.2019 FICA Employer Portioj
3,949.22
07/22/2019
700 -00- 2174 -0000
PR Batch 00002.07.2019 FICA Employer ]
RP -07 -22 -2019
PR Batch 00002.07.2019 Medicare Employee Pc
923.58
07/22/2019
700 -00- 2174 -0000
PR Batch 00002.07.2019 Medicare Emplo,.
RP -07 -22 -2019
PR Batch 00002.07.2019 Medicare Employer Po
923.58
07/22/2019
700 -00- 2174 -0000
PR Batch 00002.07.2019 Medicare Emplo,.
Check Total:
14,752.20
Vendor: 184
GREGORY FASCHING
Check Sequence: 5
ACH Enabled: True
07 -22 -2019
Child Care Reimbursement
302.25
07/22/2019
700 -00- 2179 -0000
Check Total:
302.25
Vendor: 6
HEALTH PARTNERS -GROUP
Check Sequence: 6
ACH Enabled: False
July -2019
PR Batch 00002.07.2019 Health Ins - CoPay
3,596.88
07/22/2019
700 -00- 2171 -0000
PR Batch 00002.07.2019 Health Ins - Cop;
July -2019
PR Batch 00002.07.2019 Health Insurance -HSA
5,185.32
07/22/2019
700 -00- 2171 -0000
PR Batch 00002.07.2019 Health Insurance
July -2019
PR Batch 00001.07.2019 Health Ins - CoPay
3,596.88
07/08/2019
700 -00- 2171 -0000
PR Batch 00001.07.2019 Health Ins - Cop;
July -2019
PR Batch 00001.07.2019 Health Insurance -HSA
5,185.32
07/08/2019
700 -00- 2171 -0000
PR Batch 00001.07.2019 Health Insurance
AP- Computer Check Proof List by Vendor (07/22/2019 - 2:25 PM) Page 1
Invoice No Description Amount Payment Date Acct Number Reference
Mar -19- Pazandak
March - Refund - Joe Pazandak
- 1,871.82
07/08/2019
700 -00- 2171 -0000
PR Batch 00001.07.2019 Health Insurance
Check Total:
15,692.58
Vendor: 471
HENNEPIN COUNTY PROPERTY TAX
Check Sequence: 7
ACH Enabled: False
0619 -26
Special Assessment Annual Svc
331.32
07/22/2019
601 -00- 4400 -0000
0619 -26
Special Assessment Annual Svc
331.32
07/22/2019
611 -00- 4400 -0000
0619 -26
Special Assessment Annual Svc
341.36
07/22/2019
631 -00- 4400 -0000
Check Total:
1,004.00
Vendor: 2
ICMA RETIREMENT TRUST - 302131 -457
Check Sequence: 8
ACH Enabled: False
RP -07 -22 -2019
PR Batch 00002.07.2019 Deferred Comp Flat Ai
5,182.00
07/22/2019
700 -00- 2176 -0000
PR Batch 00002.07.2019 Deferred Comp I
Check Total:
5,182.00
Vendor: 686
KANSAS CITY LIFE INSURANCE COMPAN'
Check Sequence: 9
ACH Enabled: True
July -2019
PR Batch 00002.07.2019 Long Term Disability
610.48
07/22/2019
700 -00- 2181 -0000
PR Batch 00002.07.2019 Long Term Disat
July -2019
PR Batch 00002.07.2019 Short Term Disability
690.24
07/22/2019
700 -00- 2181 -0000
PR Batch 00002.07.2019 Short Term Disat
Check Total:
1,300.72
Vendor: 965
MCI COMM SERVICE
Check Sequence: 10
ACH Enabled: False
July -11 -2019
6N372303 -- 952 - 470 -9606
34.93
07/22/2019
601 -00- 4394 -0000
July -11 -2019
6N372302 -- 952 - 470 -9605
34.93
07/22/2019
601 -00- 4394 -0000
Check Total:
69.86
Vendor: 11
MINNESOTA DEPARTMENT OF REVENUE
Check Sequence: 11
ACH Enabled: True
RP -07 -22 -2019
PR Batch 00002.07.2019 State Income Tax
2,552.36
07/22/2019
700 -00- 2173 -0000
PR Batch 00002.07.2019 State Income Tax
Check Total:
2,552.36
Vendor: 305
MNSPECT, LLC
Check Sequence: 12
ACH Enabled: True
7897
Inspection Services
1,575.00
07/22/2019
101 -24- 4400 -0000
Check Total:
1,575.00
Vendor: 665
OPTUM BANK
Check Sequence: 13
ACH Enabled: True
RP -07 -22 -2019
PR Batch 00002.07.2019 HSA - OPTUM BANK
710.00
07/22/2019
700 -00- 2183 -0000
PR Batch 00002.07.2019 HSA - OPTUM B.
Check Total:
710.00
Vendor: 9
PERA
Check Sequence: 14
ACH Enabled: True
RP -07 -22 -2019
PR Batch 00002.07.2019 MN -PERA Deduction
3,921.30
07/22/2019
700 -00- 2175 -0000
PR Batch 00002.07.2019 MN -PERA Dedu
AP- Computer Check Proof List by Vendor (07/22/2019 - 2:25 PM) Page 2
Invoice No
Description
Amount
Payment Date
Acct Number
Reference
RP -07 -22 -2019
PR Batch 00002.07.2019 MN PERA Benefit Em
4,524.55
07/22/2019
700 -00- 2175 -0000
PR Batch 00002.07.2019 MN PERA Benel
Check Total:
8,445.85
Vendor: 734
SCIENCE EXPLORERS, INC.
Check Sequence: 15
ACH Enabled: False
4516
Spy Science at Freeman Park Event
135.00
07/22/2019
101 -53- 4248 -0000
Check Total:
135.00
Vendor: UB *00267
Sandra Sherman
Check Sequence: 16
ACH Enabled: False
Refund Check
17.27
07/22/2019
601 -00- 2010 -0000
Refund Check
20.14
07/22/2019
611 -00- 2010 -0000
Refund Check
8.64
07/22/2019
631 -00- 2010 -0000
Refund Check
8.63
07/22/2019
621 -00- 2010 -0000
Check Total:
54.68
Vendor: 355
SHRED -N -GO INC
Check Sequence: 17
ACH Enabled: False
92080
Spring Clean up
1,200.00
07/22/2019
621 -00- 4347 -0000
Check Total:
1,200.00
Vendor: 360
SOUTH LAKE MINNETONKA POLICE DEPA
Check Sequence: 18
ACH Enabled: False
August- 2019 -013
Monthly- Operating Budget Exp
105,474.42
07/22/2019
101 -21- 4400 -0000
Check Total:
105,474.42
Vendor: 657
SUMMIT COMPANIES
Check Sequence: 19
ACH Enabled: True
2151132
Install Temp Air Compressor in Basement
615.00
07/22/2019
101 -19- 4223 -0000
Check Total:
615.00
Total for Check Run:
160,428.22
Total of Number of Checks:
19
AP- Computer Check Proof List by Vendor (07/22/2019 - 2:25 PM) Page 3
Accounts Payable
Computer Check Proof List by Vendor
User: mnguyen
Printed: 07/25/2019 - 3:26PM
Batch: 00005.07.2019 - CC -07 -25 -2019
Invoice No Description
Amount Payment Date Acct Number
Reference
Vendor:
950
BARR ENGINEERING COMPANY
Check Sequence: 1
ACH Enabled: False
23271697.00
-1
Stormwater Management Plan
9,371.22
07/24/2019
631 -00- 4303 -0000
Check Total:
9,371.22
Vendor:
167
ECM PUBLISHERS INC
Check Sequence: 2
ACH Enabled: True
711173
2018 Annual TIE Disclosure
65.45
07/24/2019
101 -13- 4351 -0000
711174
Ord. No. 568
65.45
07/24/2019
101 -13- 4351 -0000
711285
2018 Annual TIE Disclosure
42.41
07/24/2019
101 -13- 4351 -0000
711286
Ord. No. 568
42.41
07/24/2019
101 -13- 4351 -0000
Check Total:
215.72
Vendor:
1060
GENERAL SECURITY SERVICES CORPORA
Check Sequence: 3
ACH Enabled: False
11306 -2 -0
Security Svcs
3,123.08
07/24/2019
403 -00- 4620 -0000
11363 -2 -0
Security Svcs
2,422.52
07/24/2019
201 -00- 4620 -0000
Check Total:
5,545.60
Vendor:
757
GONYEA HOMES & REMODELING
Check Sequence: 4
ACH Enabled: False
5885PrestwickCt
Escrow Refund - 5885 Prestwick Court - Bradle)
7,206.00
07/24/2019
880 -00- 2200 -0000
Check Total:
7,206.00
Vendor:
896
HUEBSCH SERVICES
Check Sequence: 5
ACH Enabled: True
4332062
SSCC Mats
36.47
07/24/2019
201 -00- 4400 -0000
4332062
City Hall Mats
112.49
07/24/2019
101 -19- 4400 -0000
Check Total:
148.96
Vendor:
968
LOUCKS, INC.
Check Sequence: 6
ACH Enabled: False
36136
Badger Park Playground
3,331.04
07/24/2019
402 -00- 4400 -0000
Check Total:
3,331.04
AP- Computer Check Proof List by Vendor (07/25/2019 - 3:26 PM) Page 1
Invoice No Description Amount Payment Date Acct Number Reference
Vendor: 286
MIDWEST MAILING SYSTEMS INC
Check Sequence: 7
ACH Enabled: True
78086
Newsletter Postages
500.94
07/24/2019
101 -13- 4208 -0000
78086
Newsletter Svc
431.12
07/24/2019
101 -13- 4400 -0000
Check Total:
932.06
Vendor: 452
PREHALL ELECTRIC INC.
Check Sequence: 8
ACH Enabled: False
897
Badger Park Playground
13,700.00
07/24/2019
402 -00- 4400 -0000
Check Total:
13,700.00
Vendor: 336
PURCHASE POWER
Check Sequence: 9
ACH Enabled: True
Refilled- 06/28/2019
Acct #8000-9000-0743-8223
1,000.00
07/24/2019
101 -13- 4208 -0000
Refilled- 06/28/2019
Acct #8000-9000-0743-8223
20.99
07/24/2019
101 -13- 4208 -0000
Check Total:
1,020.99
Vendor: 360
SOUTH LAKE MINNETONKA POLICE DEPA
Check Sequence: 10
ACH Enabled: False
June - 2019 -HCPF
Monthly -Henn Cry Process Fee
30.00
07/24/2019
101 -21- 4400 -0000
Check Total:
30.00
Vendor: 384
TOTAL PRINTING SERVICES
Check Sequence: 11
ACH Enabled: False
12529
Newsletters
721.50
07/24/2019
101 -13- 4351 -0000
12529
Park Insert
161.25
07/24/2019
101 -53- 4351 -0000
Check Total:
882.75
Vendor: 415
WARNER CONNECT
Check Sequence: 12
ACH Enabled: True
29937775
PWs Computers
3,705.59
07/24/2019
403 -00- 4640 -0000
Check Total:
3,705.59
Vendor: 411
XCEL ENERGY, INC.
Check Sequence: 13
ACH Enabled: True
5102846200 - 071119
5655 Merry Lane
21.33
07/24/2019
101 -52- 4380 -0000
5655 Merry Lane
5145317119 - 072219
C.H.Svcs
398.75
07/24/2019
101 -19- 4380 -0000
C.H.Svcs
5145317119 - 072219
P.W. Bldg Svc
276.95
07/24/2019
101 -32- 4380 -0000
P.W. Bldg Svc
5145317119 - 072219
P.W. Street Lights Svc
3,248.36
07/24/2019
101 -32- 4399 -0000
P.W. Street Lights Svc
5145317119 - 072219
Parks
410.46
07/24/2019
101 -52- 4380 -0000
Parks
5145317119 - 072219
Amesbury
144.34
07/24/2019
601 -00- 4394 -0000
Amesbury
5145317119 - 072219
Boulder Bridge
217.17
07/24/2019
601 -00- 4396 -0000
Boulder Bridge
5145317119 - 072219
S.E. Area Svc
2,697.48
07/24/2019
601 -00- 4398 -0000
S.E. Area Svc
5145317119 - 072219
Lift Station Street Lights
682.96
07/24/2019
611 -00- 4380 -0000
L. S. Street Lights
AP- Computer Check Proof List by Vendor (07/25/2019 - 3:26 PM) Page 2
Invoice No Description Amount Payment Date Acct Number Reference
Check Total:
8,097.80
Total for Check Run: 54,187.73
Total of Number of Checks: 13
AP- Computer Check Proof List by Vendor (07/25/2019 - 3:26 PM) Page 3
Accounts Payable
Computer Check Proof List by Vendor
User: mnguyen
Printed: 08/01/2019 - 11:14AM
Batch: 00007.07.2019 - CC- 07 -25- 2019 -BOM
Invoice No Description
Amount Payment Date Acct Number
Reference
Vendor: 868
BANK OF MONTREAL
Check Sequence: 1 ACH Enabled: True
Jun - 2019 -AUTO
Culligan Bottled Water - Drink
61.35
07/25/2019
101 -19- 4245 -0000
Jun - 2019 -AUTO
Republic Services
10,443.41
07/25/2019
621 -00- 4400 -0000
Jun - 2019 -AUTO
Waste Mgmt- Public Works
615.30
07/25/2019
101 -32- 4400 -0000
Jun - 2019 -AUTO
Waste Mgmt -SSCC
243.84
07/25/2019
201 -00- 4400 -0000
Jun - 2019 -AUTO
Chanhassen- 18505 -002 - Stormwa
60.56
07/25/2019
101 -52- 4380 -0000
Jun - 2019 -AUTO
Republic Services- Spring Cleanup
5,543.73
07/25/2019
621 -00- 3732 -0000
Jun - 2019 -AUTO
Ferguson - Water Meters
11,178.76
07/25/2019
601 -00- 4265 -0000
Jun - 2019 -Grout
Office Max
8.53
07/25/2019
201 -00- 4245 -0000
Jun - 2019 -Grout
True Value -Video Cable
11.82
07/25/2019
201 -00- 4245 -0000
Jun - 2019 - Hanson
Gas
195.00
07/25/2019
101 -32- 4212 -0000
Jun - 2019 -Lerud
Kowalski's - Gift Cards for Step to it awards
75.00
07/25/2019
101 -14- 4245 -0000
Jun - 2019 -Lerud
Sam's - TV
602.96
07/25/2019
101 -19- 4221 -0000
Jun - 2019 -Lerud
Amazon- TV
27.99
07/25/2019
101 -19- 4221 -0000
Jun - 2019 -Lerud
Al & Alma's Charter Cruises - Deposit
500.00
07/25/2019
101 -11- 4245 -0000
Jun - 2019 -Lerud
Sam's
86.77
07/25/2019
101 -19- 4245 -0000
Jun - 2019 -Moore
Brownpaperticket - Recyling event
37.74
07/25/2019
621 -00- 4331 -0000
Jun - 2019 -Moore
Facebook
2.78
07/25/2019
201 -00- 4331 -0000
Jun - 2019 -Moore
Surveymonkey
37.00
07/25/2019
101 -13- 4433 -0000
Jun - 2019 -Moore
Adobe
29.99
07/25/2019
101 -13- 4433 -0000
Jun - 2019 - Pricco
Office Depot - Supplies
372.61
07/25/2019
101 -13- 4200 -0000
Jun - 2019 - Pricco
Thestampmaker- Stamp
31.54
07/25/2019
101 -13- 4245 -0000
Jun - 2019 - Pricco
SP- Dscntrubberstamps -Stamp
25.81
07/25/2019
101 -13- 4245 -0000
Jun - 2019 - Pricco
MCFOA - Membership
46.00
07/25/2019
101 -13- 4433 -0000
Jun - 2019 - Pricco
International Institution Membership
110.00
07/25/2019
101 -13- 4433 -0000
Jun - 2019 - Rigdon
GFOA -2018 CAFR
460.00
07/25/2019
101 -16- 4301 -0000
Jun - 2019 -Stark
Gas
205.32
07/25/2019
101 -32- 4212 -0000
Jun - 2019 -Thone
Amazon- kitchen
33.09
07/25/2019
101 -19- 4245 -0000
Jun - 2019 -Thone
Amazon -Office
14.71
07/25/2019
101 -13- 4200 -0000
Jun - 2019 -Thone
Crown Trophy - Comm Award
55.00
07/25/2019
101 -11- 4245 -0000
Jun - 2019 -Thone
MN State College - Municipal Clerk's Advanced
215.00
07/25/2019
101 -13- 4331 -0000
Jun - 2019 -Thone
Arrowwod Resort- Annual Conf - Hotel
100.00
07/25/2019
101 -13- 4331 -0000
Jun - 2019 -Thone
Amazon
30.87
07/25/2019
101 -13- 4200 -0000
AP- Computer Check Proof List by Vendor (08/01/2019 - 11:14 AM) Page 1
Invoice No
Description
Amount
Payment Date
Acct Number Reference
Jun - 2019 -Thone
Inernational Instiution - Membership
170.00
07/25/2019
101 -13- 4433 -0000
Jun - 2019 -Thone
Amazon - Burniture Front Counter
289.99
07/25/2019
101 -19- 4223 -0000
Jun - 2019 -Thone
Amazon - Books for Leadership Development
114.16
07/25/2019
101 -13- 4245 -0000
Jun - 2019 -Thone
Amazon - Workbooks for Leadership Developme
71.92
07/25/2019
101 -13- 4245 -0000
Jun - 2019 -Thone
Nepelra- MPELPRAAnnual Conf.
250.00
07/25/2019
101 -13- 4331 -0000
Jun- 2019Baumann
Gas
56.56
07/25/2019
101 -32- 4212 -0000
Jun- 2019Baumann
Sams
244.36
07/25/2019
101 -52- 4245 -0000
Jun- 2019Baumann
Amazon - Furnace Filters
77.03
07/25/2019
101 -32- 4223 -0000
Jun- 2019Baumann
Amazon- Computer Cables
30.46
07/25/2019
101 -32- 4245 -0000
Jun- 2019Baumann
Office Max - Lamination Supplies
33.33
07/25/2019
101 -32- 4245 -0000
Jun- 2019Brown
Reflective Tape
-95.00
07/25/2019
101 -32- 4245 -0000
Jun- 2019Brown
Reflective Tape
439.89
07/25/2019
101 -32- 4245 -0000
Jun- 2019Brown
Amazon - Rocker Swithces
32.25
07/25/2019
101 -32- 4221 -0000
Jun- 2019Brown
Amazon -GPS Utility
26.85
07/25/2019
601 -00- 4245 -0000
Jun- 2019Brown
Shorewood True -Light Bulb
15.05
07/25/2019
601 -00- 4245 -0000
Jun- 2019Brown
Int *in *enabling
22.75
07/25/2019
601 -00- 4321 -0000
Jun- 2019Darling
Home Depot
23.61
07/25/2019
101 -24- 4245 -0000
Jun- 2019Eslinge
Gas
353.80
07/25/2019
101 -32- 4212 -0000
Jun- 2019Eslinge
True Value
13.95
07/25/2019
101 -32- 4245 -0000
Jun- 2019Faschin
Gas
93.26
07/25/2019
101 -32- 4212 -0000
Jun- 2019Heitz
Gas
170.73
07/25/2019
101 -32- 4212 -0000
Jun- 2019Heitz
The Home Depot
16.39
07/25/2019
101 -32- 4245 -0000
Jun- 2019Heitz
True Value
1.36
07/25/2019
101 -32- 4245 -0000
Jun- 2019Mason
Gas
308.00
07/25/2019
101 -32- 4212 -0000
Jun- 2019Mason
Amazon- Beacon New
245.16
07/25/2019
403 -00- 4640 -0000
Jun- 2019Mason
True Value
20.98
07/25/2019
101 -32- 4245 -0000
Jun- 2019Mason
True Value
9.98
07/25/2019
101 -32- 4245 -0000
Jun- 2019Mason
Titan
299.83
07/25/2019
101 -32- 4221 -0000
Jun- 2019Mason
Carquest
89.77
07/25/2019
101 -32- 4221 -0000
Jun- 2019Mason
Cub Foods
15.98
07/25/2019
101 -32- 4245 -0000
Jun- 2019Mason
US PumShaft Rep Water Tower
415.20
07/25/2019
101 -32- 4221 -0000
Jun- 2019Mason
Carquest
27.19
07/25/2019
101 -32- 4221 -0000
Jun- 2019Pounder
Gas
113.35
07/25/2019
101 -32- 4212 -0000
Jun- 2019Schroed
True Value
14.99
07/25/2019
101 -52- 4245 -0000
Jun- 2019Schroed
True Value - Staples
25.99
07/25/2019
101 -32- 4245 -0000
Check Total: 35,501.60
AP- Computer Check Proof List by Vendor (08/01/2019 - 11:14 AM) Page 2
Invoice No Description Amount Payment Date Acct Number Reference
Total for Check Run: 35,501.60
Total of Number of Checks:
AP- Computer Check Proof List by Vendor (08/01/2019 - 11:14 AM) Page 3
Accounts Payable
Computer Check Proof List by Vendor
User: mnguyen
Printed: 08/05/2019 - 3:24PM
Batch: 00001.08.2019 - PR -08 -05 -2019
Invoice No Description
Vendor:
12
AFSCME MN COUNCIL 5 - UNION DUES
August -2019
08/02/2019
PR Batch 00001.08.2019 Union Dues
13.74
08/02/2019
Check Total:
Vendor:
UB *00268
Erica & Gerald Arne
37.32
Refund Check
Refund Check
20.56
08/02/2019
Refund Check
20.56
08/02/2019
Refund Check
47.98
08/02/2019
Check Total:
Vendor:
UB *00270
Daryl & Cheryl Campbell - Patten
Refund Check
Refund Check
Refund Check
Check Total:
Vendor:
UB *00271
Carrington Mortgage Services, LLC
Refund Check
Refund Check
Refund Check
Refund Check
Check Total:
Vendor:
UB *00272
Eric & Barbara Cowan
Refund Check
Refund Check
Refund Check
Refund Check
Amount Payment Date Acct Number
Check Sequence: 1
392.08 08/05/2019 700 -00- 2182 -0000
Check Sequence: 2
5.90
08/02/2019
631 -00- 2010 -0000
11.79
08/02/2019
601 -00- 2010 -0000
13.74
08/02/2019
611 -00- 2010 -0000
5.89
08/02/2019
621 -00- 2010 -0000
37.32
Check Sequence: 3
20.56
08/02/2019
621 -00- 2010 -0000
20.56
08/02/2019
631 -00- 2010 -0000
47.98
08/02/2019
611 -00- 2010 -0000
Check Sequence: 4
81.35
08/02/2019
611 -00- 2010 -0000
69.74
08/02/2019
601 -00- 2010 -0000
34.87
08/02/2019
631 -00- 2010 -0000
34.87
08/02/2019
621 -00- 2010 -0000
220.83
Check Sequence: 5
29.33
08/05/2019
621 -00- 2010 -0000
29.32
08/05/2019
631 -00- 2010 -0000
58.65
08/05/2019
601 -00- 2010 -0000
68.44
08/05/2019
611 -00- 2010 -0000
Reference
ACH Enabled: True
PR Batch 00001.08.2019 Union Dues
ACH Enabled: False
ACH Enabled: False
ACH Enabled: False
ACH Enabled: False
AP- Computer Check Proof List by Vendor (08/05/2019 - 3:24 PM) Page 1
Invoice No
Description
Amount
Payment Date
Acct Number
Reference
Check Total:
185.74
Vendor: 5
EFTPS - FEDERAL W/H
Check Sequence: 6
ACH Enabled: True
PR -08 -05 -2019
PR Batch 00001.08.2019 Federal Income Tax
5,190.25
08/05/2019
700 -00- 2172 -0000
PR Batch 00001.08.2019 Federal Income I
PR -08 -05 -2019
PR Batch 00001.08.2019 FICA Employee Portio
3,899.39
08/05/2019
700 -00- 2174 -0000
PR Batch 00001.08.2019 FICA Employee _
PR -08 -05 -2019
PR Batch 00001.08.2019 FICA Employer Portioj
3,899.39
08/05/2019
700 -00- 2174 -0000
PR Batch 00001.08.2019 FICA Employer ]
PR -08 -05 -2019
PR Batch 00001.08.2019 Medicare Employee Pc
911.98
08/05/2019
700 -00- 2174 -0000
PR Batch 00001.08.2019 Medicare Emplo,.
PR -08 -05 -2019
PR Batch 00001.08.2019 Medicare Employer Po
911.98
08/05/2019
700 -00- 2174 -0000
PR Batch 00001.08.2019 Medicare Emplo,.
Check Total:
14, 812.99
Vendor: 1061
EJ MAYERS, INC.
Check Sequence: 7
ACH Enabled: False
26020SmithtwnRd
Escrow Refund- Security Deposit - 26020 Smithi
2,000.00
08/05/2019
880 -00- 2200 -0000
Check Total:
2,000.00
Vendor: 2
ICMA RETIREMENT TRUST - 302131 -457
Check Sequence: 8
ACH Enabled: False
PR -08 -05 -2019
PR Batch 0000 1.08.2019 Deferred Comp Flat Ai
5,182.00
08/05/2019
700 -00- 2176 -0000
PR Batch 00001.08.2019 Deferred Comp I
Check Total:
5,182.00
Vendor: UB *00269
Stephanie & John Massart
Check Sequence: 9
ACH Enabled: False
Refund Check
25.54
08/02/2019
631 -00- 2010 -0000
Refund Check
25.54
08/02/2019
621 -00- 2010 -0000
Refund Check
59.60
08/02/2019
611 -00- 2010 -0000
Refund Check
51.08
08/02/2019
601 -00- 2010 -0000
Check Total:
161.76
Vendor: 11
MINNESOTA DEPARTMENT OF REVENUE
Check Sequence: 10
ACH Enabled: True
PR -08 -05 -2019
PR Batch 00001.08.2019 State Income Tax
2,630.46
08/05/2019
700 -00- 2173 -0000
PR Batch 00001.08.2019 State Income Tax
Check Total:
2,630.46
Vendor: 7
MINNESOTA LIFE
Check Sequence: 11
ACH Enabled: True
August -2019
PR Batch 00001.08.2019 Life Insurance
649.62
08/05/2019
700 -00- 2180 -0000
PR Batch 00001.08.2019 Life Insurance
Check Total:
649.62
Vendor: 10
NCPERS GROUP LIFE INSURANCE
Check Sequence: 12
ACH Enabled: False
August -2019
PR Batch 0000 1.08.2019 PERA Life
16.00
08/05/2019
700 -00- 2180 -0000
PR Batch 0000 1.08.2019 PERA Life
Check Total:
16.00
AP- Computer Check Proof List by Vendor (08/05/2019 - 3:24 PM)
Page 2
Invoice No Description Amount Payment Date Acct Number Reference
Vendor: 1062
CONRAD LEE & LYNN NILL
Check Sequence: 13
5885Eurekand
Partial Escrow Refund - 5885 Eureka Road
30,288.00
08/05/2019
880 -00- 2200 -0000
Check Total:
30,288.00
Vendor: 665
OPTUM BANK
Check Sequence: 14
PR -08 -05 -2019
PR Batch 00001.08.2019 HSA - OPTUM BANK
710.00
08/05/2019
700 -00- 2183 -0000
Check Total:
710.00
Vendor: 9
PERA
Check Sequence: 15
PR -08 -05 -2019
PR Batch 0000 1.08.2019 MN -PERA Deduction
3,871.19
08/05/2019
700 -00- 2175 -0000
PR -08 -05 -2019
PR Batch 0000 1.08.2019 MN PERA Benefit Em
4,466.75
08/05/2019
700 -00- 2175 -0000
Check Total:
8,337.94
Vendor: 878
WATSON VINEHILL, LLC
Check Sequence: 16
19285Hwy7 -Aug19
Escrow Refund - 19285 Highway 7
18,750.00
08/05/2019
880 -00- 2200 -0000
Check Total:
18,750.00
Total for Check Run:
84,463.84
Total of Number of Checks:
16
AP- Computer Check Proof List by Vendor (08/05/2019 - 3:24 PM)
ACH Enabled: False
ACH Enabled: True
PR Batch 00001.08.2019 HSA - OPTUM B
ACH Enabled: True
PR Batch 0000 1.08.2019 MN -PERA Dedu
PR Batch 0000 1.08.2019 MN PERA Benei
ACH Enabled: False
Page 3
Accounts Payable
Computer Check Proof List by Vendor
User: mnguyen
Printed: 08/07/2019 - 1:47PM
Batch: 00002.08.2019 - CC -08 -12 -2019
Invoice No Description
Amount Payment Date Acct Number
Reference
Vendor: 364
ACCELA, INC.
Check Sequence: 1
ACH Enabled: True
INV- ACC47746
Web Payments- Online Bills
356.00
08/06/2019
601 -00- 4450 -0000
INV- ACC47746
Web Payments- Online Bills
356.00
08/06/2019
611 -00- 4450 -0000
Check Total:
712.00
Vendor: 105
ADVANCED IMAGING SOLUTIONS
Check Sequence: 2
ACH Enabled: True
INV202293
Konica Minolta/C658 Copier
28.60
08/06/2019
101 -19- 4221 -0000
Check Total:
28.60
Vendor: 171
AE2S CONSTRUCTION, LLC
Check Sequence: 3
ACH Enabled: False
PV #6- Proj05481
P.V. #6 - Project #05481 - Shorewood - Boulder Bri
9,290.02
08/06/2019
601 -00- 4680 -0000
Check Total:
9,290.02
Vendor: 1063
RYAN AUSMUS
Check Sequence: 4
ACH Enabled: False
4485EnchantedPt
Security Deposit Refund - 4485 Enchanted Point
2,000.00
08/06/2019
880 -00- 2200 -0000
5480Tea1Circle
Security Deposit Refund - 5480 Teal Circle - Per
2,000.00
08/06/2019
880 -00- 2200 -0000
6000Chaskand
Security Deposit Refund - 6000 Chaska Rd - Pei
2,000.00
08/06/2019
880 -00- 2200 -0000
6055RivieraLn
Security Deposit Refund - 6055 Riviera Lane - P
2,000.00
08/06/2019
880 -00- 2200 -0000
Starbucks Hwy?
Security Deposit Refund - Starbuck Highway 7 -
2,000.00
08/06/2019
880 -00- 2200 -0000
Check Total:
10,000.00
Vendor: 125
BOYER FORD TRUCKS
Check Sequence: 5
ACH Enabled: False
869866
Hydrant Line
174.46
08/06/2019
101 -32- 4221 -0000
870922
Hydrant Lines
900.83
08/06/2019
101 -32- 4221 -0000
Check Total:
1,075.29
Vendor: 508
BRYAN ROCK PRODUCTS, INC.
Check Sequence: 6
ACH Enabled: False
36393
Aggregates Lime
255.05
08/06/2019
101 -52- 4245 -0000
AP- Computer Check Proof List by Vendor (08/07/2019 - 1:47 PM) Page 1
Invoice No Description Amount Payment Date Acct Number Reference
AP- Computer Check Proof List by Vendor (08/07/2019 - 1:47 PM) Page 2
Check Total:
255.05
Vendor: 136
CENTERPOINT ENERGY
Check Sequence: 7
ACH Enabled: True
08 -01 -2019
25200 Highway 7
35.55
08/06/2019
101 -52- 4380 -0000
08 -01 -2019
24200 Smithtown Rd
91.06
08/06/2019
101 -32- 4380 -0000
08 -01 -2019
5755 Country Club Rd
32.01
08/06/2019
101 -19- 4380 -0000
08 -01 -2019
20405 Knighsbridge Rd
26.47
08/06/2019
601 -00- 4394 -0000
08 -01 -2019
28125 Boulder Bridge
31.00
08/06/2019
601 -00- 4396 -0000
79456885 - 072619
5735 Country Club Rd
39.60
08/06/2019
201 -00- 4380 -0000
86501806 - 072619
20630 Manor Rd
19.00
08/06/2019
101 -52- 4380 -0000
Check Total:
274.69
Vendor: 137
CENTURY LINK
Check Sequence: 8
ACH Enabled: False
9524702294 -JL19
952 - 470 - 2294 -PW
62.82
08/06/2019
101 -32- 4321 -0000
9524706340 -JL19
952 - 474 - 6340 -CH
123.53
08/06/2019
101 -19- 4321 -0000
9524707819 -JL19
952 - 470 - 7819 -SSCC
120.64
08/06/2019
201 -00- 4321 -0000
New Line
Check Total:
306.99
Vendor: 1064
D.C. ANNIS SEWER CO., INC.
Check Sequence: 9
ACH Enabled: False
123723
Camera Sewer Service
300.38
08/06/2019
611 -00- 4400 -0000
Check Total:
300.38
Vendor: 167
ECM PUBLISHERS INC
Check Sequence: 10
ACH Enabled: True
712607
Zoning Admend of Bonds
53.55
08/06/2019
101 -18- 4351 -0000
712774
Ord. No. 567
38.55
08/06/2019
101 -13- 4351 -0000
714354
Ord. No. 567
59.50
08/06/2019
101 -13- 4351 -0000
Check Total:
151.60
Vendor: 184
GREGORY FASCHING
Check Sequence: 11
ACH Enabled: True
08 -06 -2019
Child Care Reimbursement
380.00
08/06/2019
700 -00- 2179 -0000
Check Total:
380.00
Vendor: 799
GAPPA SECURITY SOLUTIONS, LLC
Check Sequence: 12
ACH Enabled: False
19022
Keys
68.60
08/06/2019
101 -32- 4223 -0000
Check Total:
68.60
Vendor: 200
GOPHER STATE ONE CALL
Check Sequence: 13
ACH Enabled: True
9070733
Monthly Rental
167.85
08/06/2019
631 -00- 4400 -0000
AP- Computer Check Proof List by Vendor (08/07/2019 - 1:47 PM) Page 2
Invoice No Description Amount Payment Date Acct Number Reference
9070733
Monthly Rental
167.85
08/06/2019
611 -00- 4400 -0000
9070733
Monthly Rental
167.85
08/06/2019
601 -00- 4400 -0000
Check Total:
503.55
Vendor: 206
TWILA GROUT
Check Sequence: 14
ACH Enabled: True
July -2019
Tablecloths
10.00
08/06/2019
201 -00- 4245 -0000
July -2019
Dollar Tree -Heat Fuel
10.75
08/06/2019
201 -00- 4245 -0000
Check Total:
20.75
Vendor: 208
HACH COMPANY
Check Sequence: 15
ACH Enabled: False
11568422
Water Chemical
276.03
08/06/2019
601 -00- 4245 -0000
Check Total:
276.03
Vendor: 985
HENNEPIN COUNTY ACCOUNTS RECEIVA
Check Sequence: 16
ACH Enabled: False
1000134280
REC0001086- MonthlySubscription
15.00
08/06/2019
101 -31- 4303 -0000
RecordEase Payment
1000134280
REC0001086- MonthlySubscription
15.00
08/06/2019
101 -24- 4303 -0000
RecordEase Payment
Check Total:
30.00
Vendor: 215
HENNEPIN COUNTY INFORMATION TECH]
Check Sequence: 17
ACH Enabled: True
1000134114
Monthly Radio Fleet & MESB
152.11
08/06/2019
101 -32- 4321 -0000
Check Total:
152.11
Vendor: 896
HUEBSCH SERVICES
Check Sequence: 18
ACH Enabled: True
4340817
SSCC Mats
36.47
08/06/2019
201 -00- 4400 -0000
4340817
City Hall Mats
101.99
08/06/2019
101 -19- 4400 -0000
Check Total:
138.46
Vendor: 226
INTEGRATED FIRE & SECURITY
Check Sequence: 19
ACH Enabled: False
77676
Fix Alarm System
325.00
08/06/2019
201 -00- 4223 -0000
Check Total:
325.00
Vendor: 239
KENNEDY & GRAVEN CHARTERED
Check Sequence: 20
ACH Enabled: False
149586
Ron Johnson Litigation
123.25
08/06/2019
101 -16- 4304 -0000
Check Total:
123.25
Vendor: UB *00266
TRACY KOFSKI
Check Sequence: 21
ACH Enabled: False
008524 -000
4760 Regents Walk
28.24
08/06/2019
601 -00- 2010 -0000
AP- Computer Check Proof List by Vendor (08/07/2019 - 1:47 PM) Page 3
Invoice No Description Amount Payment Date Acct Number Reference
008524 -000
4760 Regents Walk
32.94
08/06/2019
611 -00- 2010 -0000
008524 -000
4760 Regents Walk
14.12
08/06/2019
631 -00- 2010 -0000
008524 -000
4760 Regents Walk
14.12
08/06/2019
621 -00- 2010 -0000
Check Total:
89.42
Vendor: 482
KUTAK ROCK, LLP
Check Sequence: 22
ACH Enabled: True
2581290
General Corporate
1,850.00
08/06/2019
101 -16- 4304 -0000
2581292
Public Improvement Project
448.50
08/06/2019
404 -00- 4620 -0014
2581295
Administrative Code - Violation Code Enforcemr
78.00
08/06/2019
101 -16- 4304 -0000
2581295
Administrative Code
117.00
08/06/2019
101 -16- 4304 -0000
2581580
Right of Way Ordinance
195.00
08/06/2019
601 -00- 4400 -0000
2582046
Ronald R. Johnson
156.00
08/06/2019
101 -16- 4304 -0000
2582368
Shoerwood Ln Ravine Easement
78.00
08/06/2019
631 -00- 4304 -0000
2582388
5815 Club Lane
195.00
08/06/2019
101 -24- 4304 -0000
2582675
Grant Street ST Issues
838.50
08/06/2019
621 -00- 4304 -0000
2583254
Water Tower Lease Agreements
778.00
08/06/2019
601 -00- 4304 -0000
Check Total:
4,734.00
Vendor: 466
MCFOA TREASURER -BETSY SNYDER
Check Sequence: 23
ACH Enabled: False
2019 -Grout
2019 - MCFOA Membership Renewal
45.00
08/06/2019
201 -00- 4433 -0000
2019 - Nguyen
2019- MCFOAMembership Renewal
45.00
08/06/2019
101 -15- 4433 -0000
2019 -Thone
2019- MCFOAMembership Renewal
45.00
08/06/2019
101 -13- 4433 -0000
Check Total:
135.00
Vendor: 453
METROPOLITAN COUNCIL (SAC)
Check Sequence: 24
ACH Enabled: False
July -2019
Quarterly SAC Report
12,300.75
08/06/2019
611 -00- 2082 -0000
Check Total:
12,300.75
Vendor: 1039
MID - COUNTY COOP
Check Sequence: 25
ACH Enabled: False
36905
Fuel
279.05
08/06/2019
101 -32- 4212 -0000
36906
Fuel
608.78
08/06/2019
101 -32- 4212 -0000
Check Total:
887.83
Vendor: 313
MICHELLE THU -THAO NGUYEN
Check Sequence: 26
ACH Enabled: True
July -2019
Mileage Reimbursement
113.22
08/06/2019
101 -15- 4331 -0000
Check Total:
113.22
Vendor: 866
PAINT * PAPER * SCISSORS
Check Sequence: 27
ACH Enabled: False
AP- Computer Check Proof List by Vendor (08/07/2019 - 1:47 PM) Page 4
Invoice No Description Amount Payment Date Acct Number Reference
INV -0203
Funky Fish
140.00
08/06/2019
101 -53- 4248 -0000
Check Total:
140.00
Vendor:
903
PERRILL
Check Sequence: 28
ACH Enabled: True
2481759
ROWay Web App - Monthly
75.00
08/06/2019
611 -00- 4400 -0000
2481759
ROWay Web App - Monthly
75.00
08/06/2019
601 -00- 4400 -0000
Check Total:
150.00
Vendor:
240
KENNETH POTTS, PA
Check Sequence: 29
ACH Enabled: True
July -2019
Prosectution Monthly Services
2,500.00
08/06/2019
101 -16- 4304 -0000
Check Total:
2,500.00
Vendor:
452
PREHALL ELECTRIC INC.
Check Sequence: 30
ACH Enabled: False
902
Pressure Washer
1,890.00
08/06/2019
403 -00- 4640 -0000
Check Total:
1,890.00
Vendor:
840
RANDY'S ENVIRONMENTAL SERVICES
Check Sequence: 31
ACH Enabled: False
19515SilverLkTr
19515 Silver Lake Trail
69.95
08/06/2019
621 -00- 4400 -0026
Check Total:
69.95
Vendor:
355
SHRED -N -GO INC
Check Sequence: 32
ACH Enabled: False
94812
Shredded Svc
85.46
08/06/2019
101 -13- 4400 -0000
Check Total:
85.46
Vendor:
670
SIR LINES -A -LOT
Check Sequence: 33
ACH Enabled: False
PV #1- R014097000
P.V. #1 - Project #R - 014097 - Pavement Marking
36,540.92
08/06/2019
404 -00- 4620 -0007
Check Total:
36, 540.92
Vendor:
821
SANDRA LEE THONE
Check Sequence: 34
ACH Enabled: True
July- 2019 -IPMA
Reimbursement - League of MN Citeis - IPMA -E
34.80
08/06/2019
101 -13- 4331 -0000
Check Total:
34.80
Vendor:
694
TIMESAVER OFF SITE SECRETARIAL, INC.
Check Sequence: 35
ACH Enabled: True
M24953
Council Meeting
241.00
08/06/2019
101 -13- 4400 -0000
Check Total:
241.00
AP- Computer Check Proof List by Vendor (08/07/2019 - 1:47 PM) Page 5
Invoice No Description Amount Payment Date Acct Number Reference
Vendor: 895
TOW MASTER
Check Sequence: 36
ACH Enabled: False
418641
Equipment Replacement
27,007.00
08/06/2019
403 -00- 4640 -0000
Check Total:
27,007.00
Vendor: 386
TWIN CITY WATER CLINIC
Check Sequence: 37
ACH Enabled: False
13370
Monthly Bacteria Svc
120.00
08/06/2019
601 -00- 4400 -0000
Check Total:
120.00
Vendor: 408
WM MUELLER & SONS INC
Check Sequence: 38
ACH Enabled: True
246050
Road Maint
1,104.00
08/06/2019
101 -32- 4250 -0000
246140
Road Maint
2,215.59
08/06/2019
101 -32- 4250 -0000
246311
Road Maint
2,207.31
08/06/2019
101 -32- 4250 -0000
246430
Road Maint
2,765.52
08/06/2019
101 -32- 4250 -0000
246597
Road Maint
1,102.62
08/06/2019
101 -32- 4250 -0000
246673
Road Maint
1,103.31
08/06/2019
101 -32- 4250 -0000
246748
Road Maint
1,106.07
08/06/2019
101 -32- 4250 -0000
246938
Road Maint
1,107.45
08/06/2019
101 -32- 4250 -0000
Check Total:
12,711.87
Vendor: 974
THOMAS WADE WOODWARD
Check Sequence: 39
ACH Enabled: True
July -2019
Mileage
167.04
08/06/2019
101 -24- 4331 -0000
Check Total:
167.04
Vendor: 410
WSB AND ASSOCIATES, INC.
Check Sequence: 40
ACH Enabled: True
0- 002925 - 120 -35
Minnetonka Country Club
238.50
08/06/2019
450 -00- 4302 -0016
0- 002925 - 240 -29
Riviera Land & Shorewood Ln St
2,387.50
08/06/2019
404 -00- 4680 -0020
R-010930-000-16
Shwd Ln Ravine Stabilization
1,845.00
08/06/2019
631 -00- 4303 -0000
R- 011308 -000 -9
Minnetonka Country Club 3rd Ad
293.25
08/06/2019
450 -00- 4302 -0016
R- 012063 -000 -3
Chaska Road Traffic Study
1,000.00
08/06/2019
101 -31- 4303 -0000
R- 012786 -000 -4
Glen Rd- Manitou Ln -Amlee Rd St
7,470.00
08/06/2019
407 -00- 4303 -0000
R- 012809 - 000 -10
Street Reclamation- Enchanted
62.00
08/06/2019
404 -00- 4680 -0023
R- 012957 -000 -8
Sewer Lining
260.00
08/06/2019
611 -00- 4303 -0000
R- 013226 -000 -6
Gen Eng Svc
4,000.00
08/06/2019
101 -31- 4400 -0000
R- 013234 -000 -6
Misc. Engineering Support-City Special Update
1,190.50
08/06/2019
101 -31- 4303 -0000
R- 013234 -000 -6
Misc. Engineering Support-Mill & Overlay
1,208.00
08/06/2019
404 -00- 4620 -0005
R- 013234 -000 -6
Misc. Engineering Support- Paving Marking
69.00
08/06/2019
404 -00- 4620 -0007
R- 013501 -000 -2
Echo Road Easement Acquisition
53.75
08/06/2019
101 -31- 4303 -0000
R- 013659 -000 -3
24775 Glen Road
79.50
08/06/2019
101 -00- 3414 -0000
AP- Computer Check Proof List by Vendor (08/07/2019 - 1:47 PM) Page 6
Invoice No Description Amount Payment Date Acct Number Reference
AP- Computer Check Proof List by Vendor (08/07/2019 - 1:47 PM)
ACH Enabled: True
5755 Country Club Rd
28125 Boulder Bridge Drive
5700 County Rd 19
5700 County Rd 19 - Unit Light
24253 Smithtown Rd
5735 Country Club Rd
ACH Enabled: False
Page 7
Check Total:
20,157.00
Vendor: 411
XCEL ENERGY, INC.
Check Sequence: 41
51120425586JL19
5755 Country Club Rd
43.87
08/06/2019
101 -19- 4380 -0000
5 1 1 24 192662JL19
28125 Boulder Bridge Drive
506.53
08/06/2019
601 -00- 4396 -0000
5145368132 -JL19
5700 County Rd 19
48.09
08/06/2019
101 -32- 4399 -0000
5145368132 -JL19
5700 County Rd 19 - Unit Light
173.50
08/06/2019
101 -32- 4399 -0000
5175061613 -JL19
24253 Smithtown Rd
1,790.00
08/06/2019
601 -00- 4395 -0000
5191102220 -JL19
5735 Country Club Rd
612.18
08/06/2019
201 -00- 4380 -0000
Check Total:
3,174.17
Vendor: 709
XTREME ELECTRICAL SERVICES, INC.
Check Sequence: 42
19 -2863
Re -hang Meter Socket
715.00
08/06/2019
601 -00- 4223 -0000
Check Total:
715.00
Total for Check Run:
148,376.80
Total of Number of Checks:
42
AP- Computer Check Proof List by Vendor (08/07/2019 - 1:47 PM)
ACH Enabled: True
5755 Country Club Rd
28125 Boulder Bridge Drive
5700 County Rd 19
5700 County Rd 19 - Unit Light
24253 Smithtown Rd
5735 Country Club Rd
ACH Enabled: False
Page 7
2E
MEETING TYPE
City of Shorewood Council Meeting Item Regular Meeting
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Title / Subject: Accept Final Improvements and Authorize Final Payment for the Boulder
Bridge MCC Project, City Project 18 -01
Meeting Date: August 12, 2019
Prepared by: Larry Brown, Director of Public Works
Attachments: Resolution
Policy Consideration: None
Background / Previous Action: On July 23, 2018, the Shorewood City Council awarded the
contract for the Boulder Bridge Motor Control Replacement Project, City Project 18 -01 to
Electrical Installation and Maintenance.
The project has been completed, in accordance to the approved plans and specifications. Final
payment is being requested in the amount of $9,290.02.
A summary of the project costs is as follows:
Original Contract Amount: $129,900.00
Change Order Amount: $ 8,227.47
Revised Contract Amount: $138,127.47
The Contractor has already submitted the required documentation for withholdings and
consent of surety for final payment.
Options:
1. Approve the Resolution that accepts final improvements and authorizes final payment.
2. Provide Staff with alternative direction.
Recommendation: Staff is recommending approval of the attached Resolution that accepts
final improvements and authorizes final payment in the amount of $9,290.02
Mission Statement: The City of Shorewood is committed to providing residents quality public services, a
healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial
management through effective, efficient, and visionary leadership. Page 1
CITY OF SHOREWOOD
COUNTY OF HENNEPIN
STATE OF MINNESOTA
RESOLUTION 19-
A RESOLUTION ACCEPTING FINAL IMPROVEMENTS AND
AUTHORIZING FINAL PAYMENT FOR THE
BOULDER BRIDGE MOTOR CONTROL CENTER PROJECT,
CITY PROJECT 18 -01
WHEREAS, on July 23, 2018, the Shorewood City Council awarded the contract for the
Boulder Bridge Motor Control Center Replacement Project, City Project 18 -01 to
Electrical Installation and Maintenance. Inc.; and
WHEREAS, the Contractor has completed the project work and has requested City
acceptance of the project and final payment for the work performed and documented to
date; and
WHEREAS, the Director of Public Works has made final inspection of the project and
recommends acceptance and final payment be made by the City.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
SHOREWOOD, MINNESOTA AS FOLLOWS:
1. The City hereby accepts the work completed, pursuant to said contract and
authorizes final payment to the Contractor.
2. All warranties shall commence as of the date of substantial completion, of
April 12, 2019.
Passed by the City Council of Shorewood, Minnesota this 12th day of August, 2019.
Scott Zerby, Mayor
Attest:
Sandie Thone, City Clerk
OLans" ON ,
City of Shorewood Council Meeting Item
Title /Subject: 2020 Excelsior Fire District Budget Approval
Meeting Date: August 12, 2019
Prepared By: Greg Lerud, City Administrator
Attachments: Proposed 2020 EFD Budget
6:
MEETING
TYPE
REGULAR
Policy Consideration: Should the City of Shorewood approve the draft 2020 Excelsior
Fire District budget?
Background: The 2020 EFD budget is proposed to increase 2.95% from the 2019
budget, which is an increase of $52,407. The budget proposes to increase the use of
reserves to bring the departments funding in line with their adopted policy.
Shorewood's share is proposed to increase 2.5% or $16,327 to $668,296 in 2020.
Work on the budget began under the previous chief, Ken Prillaman, and has been
approved by the EFD Board.
New Fire Chief Curt Mackey will be at the meeting to introduce himself to the council
and to answer questions you have regarding the proposed budget.
Financial or Budget Considerations: These numbers have been incorporated into
the city's budget planning process and is at a level that is acceptable to staff.
Recommended Action: Staff recommends the City Council approve the 2020 EFD
budget as presented.
Next Steps and Timeline: City Staff will continue work on the entire 2020 budget.
Mission Statement: The City of Shorewood is committed to providing residents quality public
services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and
sound financial management through effective, efficient, and visionary leadership. Page 1
June 21, 2019
Excelsior Fire District
Serving the Communities of
Deephaven- Excelsior- Greenwood - Shorewood -Tonka Bay
24100 Smithtown Road
Shorewood, MN 55331
Excelsior Fire District Board & Member Cities,
The attached documents represent the proposed 2020 budget for the district. Please find attached the
following documents for your review;
• 2020 Operating Budget Packet (12 pages)
• 2020 Capital Equipment Plan
• Hennepin County Tax Capacity Report
As the board is aware, this version is the culmination of work started by Chief Gerber and modified through
two working sessions and meeting of the board. Among the goals of this year's budget process were;
• Reducing the member cities increase in contribution from the original drafted budget
• Create equilibrium between operating cost needs and required municipal contributions
• Enhance the administrative staff
• Strategically reduce general fund balance to align with district policy
Highlights of the proposed budget are outlined below.
• The proposed budget, as presented, represents a $52,407 or 2.95% increase over the 2019 municipal
contribution, and is a reduction from the originally proposed 3.97% increase.
• The proposed budget includes specific strategic spending of fund balance which results in expenses
exceeding revenue by $58,288 and reduces the fund balance to an estimated 28.75 %. At this level, the
fund balance remains at the top end of the district's fund balance policy.
• The proposed budget increases the contribution to the Capital Equipment Plan by $10,000.
• Staffing costs are the primary driver of increases in 2020 and represent the strategic spending of fund
balance reserves in 2020. Specific staffing changes include;
o Increase the Duty Officer daily coverage rate from $85 /day to $90 /day.
o Increase evening Duty Crew to 24 hours per week. This staffs our stations 6 nights vs 4
currently.
• Expands overnight Duty Crew from 4 nights to 7 beginning January 1, 2020.
• Add $10,000 for Exceptional Service Award
• Provide $500 for any firefighter with 400 or more response points
• Provide $500 for any firefighter with 150 or more duty crew points — not
including required nighttime staffing
• Add a part -time administrative assistant to help shift administrative duties from the Fire Chief
• Increase the part -time inspector hours from 270 per year to 780 per year to address increasing
demands on the Fire Marshal
2020 Excelsior Fire District Budget Cover memo, Page 2
• Increasing $6,000 to the Building Improvement Fund to allow for adequate funding for the foreseen
building improvement projects
• Increase the Capital Equipment Fund from $180,000 to $190,000 to insure an adequate CEP fund
balance.
During the Board Working Session on Wednesday June 26, 2019, 1 will review the attached schedules, discuss
justifications for the changes outlined above and will be prepared to answer questions.
I look forward to our discussion.
Curt Mackey, Fire Chief
Excelsior Fire District
24100 Smithtown Road
Shorewood, MN 55331
Office: 952 - 960 -1650
Fax: 952 - 960 -1690
Cell: 952 - 210 -6718
Email: cmackey @excelsiorfire.org
Excelsior Fire District 2015 - 202 Budget
2015 - 2018 Actual Ex enses, 2019 Approved with YTD,: 2020 Proposed
21-Jun-19 Version 3
2015
2016
2017��5:
Actual
Actual
Actual
Account Code
Object Description
Amount
Budget
BudaP'
Fund 230
FIRE OPERATING FUND
Dep't 42200
Fire Operations
' ersonal Services
230 - 42200 -101
Employees Regular
161,269
214,302
215,143
218,491
227,315
(8,824)
223,992
122,765
54.81%
220,998
(2,994)
-1.34%
230 - 42200 -103
Part-Time Employees
22,328
6,614
5,431
5,846
2,832
3,014
5,846
-
0.00%
27,807
21,961
375.66%
230 - 42200 -106
Firefighter's Salaries
182,741
182,640
188,337
245,834
211,375
34,459
282,167
75,010
26.58%
337,756
55,589
19.70%
230- 42200 -107
Fire Officer's Salaries
35,400
34,807
36,241
38,222
37,521
701
39,990
13,326
33.32%
40,790
800
2.00%
230 - 42200 -121
PERA
27,323
30,489
31,567
31,887
32,375
(488)
32,602
10,478
32.14%
32,890
288
0.88%
230 -42200 -122
FICA/MC
19,711
22,650
23,133
28,159
25,005
3,154
29,106
9,969
34.25%
37,288
8,182
28.11%
23042200 -129
State Aid
-
143,743
147,183
-
-
-
-
-
230- 42200 -131
Employer Paid Health
27,460
41,463
32,046
40,305
49,071
(8,766)
43,500
14,429
33.171/6
40,953
(2,547)
-5.86%
230 - 42200 -133
Employer Paid Life Insuram
12
18
18
18
18
-
18
6
33.33%
18
0.00%
23042200 -151
Worker's Comp Insurance
22,571
25,799
27,538
28.000
28,585
585
29,300
29,510
100.72%
35,759
6,459
22.04%
636,762
614,097
22,665
686,521
275,493
40.13%
774,259
87,738
12.781/6
Total Personal Services 498,815 702,525 706,637
230 - 42200 -170
Firefighter Pension Contribt
-
152,546
-
-
Supplies
_
230 - 42200 -200
Office Supplies
2,832
2,703
3,486
3,800
2,824
976
3,800
1,001
26.34%
3,800
-
0.00%
230 - 42200 -212
Motor Fuels
9,567
9,405
11,667
13,000
14,833
(1,833)
12,500
4,062
32.50%
13,000
500
4.00%
230-42200-217
Clothing
34,090
22,775
40,322
28,750
26,305
2,445
29,750
16,509
55.49%
30,250
500
1.68%
230 -42200 -220
Repair /Maint. Supplies
11,864
8,956
6,502
6,120
4,262
1,858
6,620
1,415
21.37%
6,620
-
0.00%
230 -42200 -221
First Aid Supplies
2,878
4,363
4,662
2,340
4,881
(2,541)
2,500
1,175
47.00%
4,800
2,300
92.00%
230 -42200 -222
Firefighting Supplies
14,852
13,693
17,904
10,900
6,411
4,489
10,900
4,191
38.45%
9,600
(1,300)
- 11.93%
230 - 42200 -241
Fire Prevention Tools
11,829
7,581
5.995
4,300
4,796
496
4.300
194
4.51%
4,200
100
- 2.33%
69,210
64,312
4,898
70,370
28,547
40.57%
72,270
11900
2.70%
Total Supplies 87,912 69,476 90,538
ofessional Services
-
230 - 42200 -304
Legal
-
-
5
3,ODO
21,087
(18,087)
3,000
-
0.00%
3,000
-
0.00%
230 - 42200 -307
Fiscal Management Fees
16,480
16,975
18,000
18,540
18,540
-
19,096
6,365
33.33%
22,500
3,404
17.83%
23042200 -311
Auditing
11,785
12,675
12,955
15,025
12,060
2,965
15,025
9,800
65.22%
15,025
-
0.00%
230 -42200 -312
Refuse & Recycling Collecti
224
668
821
1,800
722
1,078
1,200
427
35.58%
800
(4DO)
- 33.33%
230 - 42200 -313
Janitorial Services
7,387
8,578
10,760
7,000
9,605
(2,605)
8,000
3,904
48.80%
10,500
2,500
31.25%
230 -42200 -318
Medical Fees
9,158
11,337
6,057
7,000
8,755
(1,755)
7,000
479
6.84%
7,000
-
0.00%
230 -42200 -319
Professional Services
52,510
26,407
27,260
30,845
23,742
7,103
30,845
12.310
39.91%
30,345
500
-1.62%
83,210
94,511
(11,301)
84,166
33,285
39.55%
89,170
5,004
5.95%
Total Professional Services 97,544 76,640 75,858
Other Services and Charges
-
230- 42200 -321
Telephone /Communication!
25,970
26,657
29,879
26,100
22,500
3,600
26,600
14,981
56.32%
26,600
-
0.00%
230 -42200 -322
Postage
301
205
23
500
209
291
500
205
41.00%
400
(100)
- 20.00%
230 -42200 -323
Radio Units
22,333
25,707
34,771
34,260
32,193
2,067
41,260
14,464
35.06%
41,260
-
0.00%
230 -42200 -331
Conferences
6,126
4,477
4,130
4,850
2,606
2,244
4,850
320
6.60%
6,650
1,800
37.11%
23042200 -332
Mileage
-
-
89
200
16
184
200
-
0.00%
150
(50)
- 25.00%
230 -42200 -333
Meeting Expenses
3,845
3,937
3,296
4,000
3,926
74
4,000
2,204
55.10%
4,000
-
0.00%
230 -42200 -334
Training & Schools
25,533
20,883
22,167
26,800
23,359
3,441
27,000
9,529
35.29%
26,676
(324)
- 1.20%
230 -42200 -350
Printing & Publishing
1,112
892
1,607
1,100
1,095
5
1,375
227
16.51%
1,375
-
0.00%
230- 42200 -360
Insurance
23,942
20,872
8,000
25,000
20,265
4,735
21,000
15,805
75.26%
24,000
3,000
14.29%
'30- 42200 -381
Electric Utilities
33,582
33,418
33,378
33,400
31,977
1,423
33,500
10,616
31.69%
33,500
0.00%
'30- 42200 -383
Gas Utilities
10,604
7,821
8,621
13,000
12,327
673
10,000
7,601
76.01%
11,000
1,000
10.00%
30- 42200 -386
Water and Sewer Utilities
1,254
1,038
740
1,100
1,594
(494)
1,100
947
86.09%
1,400
300
27.27%
30- 42200 -401
Repairs & Maint. Contractei
37,185
30,963
27,351
28,250
61,086
(32,836)
28,250
16,129
57.09%
30,000
1,750
6.19%
30 -42200 -404
Repairs /Maint. Machinery/E
20,517
32,765
28,332
25,650
26,686
(1,036)
25,650
11,317
44.12%
26,650
1,000
3.90%
30- 42200 -405
Fire Equipment Maintenanc
9,068
12,857
12,525
18,985
15,652
3,333
19,450
703
3.61%
19,450
-
0.00%
30- 42200 -430
Misc Expenses (Bank)
1,434
1,025
766
1,220
811
409
1,220
218
17.87%
1,220
-
0.00%
30- 42200 -433
Dues and Subscriptions
3,225
3,119
2,129
3,184
1,766
1,418
3,184
1,744
54.77%
6,761
3,577
112.34%
30- 42200 -439
Contingency
Total Other Services
226,031
226,636
217,804
247,599
258,068
(10,469)
249,139
107,010
42.95%
261,092
11,953
4.86%
Total Operating Budget
910,302
1,075,277
1,090,837
1,036,781
1,183,534
830,588
1,090,196
444,335
40.76%
1,196,791
106,595
9.78%
Capital Outlay
30- 42200 -720
Building Fund Transfer
30,000
5,642
24,000
24,000
-
30- 42200 -720
Fire Relief Fund Transfer
30,000
5,000
-
-
30- 42200 -720
Fund Balance/ Reserve
-
-
Building Imp Fund Transfer
-
24,000
0.00%
30,000
6,000
25.00%
30- 42200 -720
Capital Equip Transfer
170,000
170,000
170,000
170,000
170,000
-
180,000
90,000
50.00%
190,000
10,000
5.56%
30 -42200 -720
Fire Facilities Transfer
547,091
549,098
527,250
532,800
532,800
538,050
269,026
50.00%
528,150
(9,900r
-1.84%
726,800
726,800
742,050
359,026
48.38%
748,150
6,100
0.82%
Total capital outlay 777,091 724,098 742,892
Totals Fund230 Fire Operating
1,687,393
1,799,375
1,833,729
1,763,581
1,910,334
(146,753)
1,832,246
803,361
43.85%
1,944,941
112,695
6.15%
2015
2016
2017
2019
2019
2019
2020
2019
Actual
Actual
Actual
pproved
Actual
Actual
'Zen
R"
peratinn Revenue
Amount
Budget
Bud-
Budget
YTD (APR)
YTD %
4202
Municipal Contribution
1,560,827
1,635,079
1,642,870
1,708,762
1,708,762
-
1,776,498
888,256
50.00%1
1,828,905
2.95%
Shared Services Income
-
31,696
34.048
34.319
34,051
268
35,248
8,812
25.00%
35,248
0.00%
6210
Interest Income
2,432
1,227
2,049
2,000
1,187
813
2,000
694
34.70%
2,000
0.00%
6228
Refunds and Reimburseme
19,703
15,360
38,328
14,000
14,850
(850)
14,000
25,108
179.34%
15,000
7.14%
6230
Donations / Other Income
143,868
147,183
-
485
(485)
0
0
-
9203
Special Events
8,915
6,045
4,500
11,550
(7,050)
4,500
160
3.56%
5,500
22.22%
9203
Fund Transfers
-
-
-
0
0
-
State Fire Aid
152,546
Total Revenue
1,582,962
1,836,145
1,870,523
1,763,581
1,923,431
1( 59,850)
1,832,246
923,030
50.38%
1,886,653
2.97%
Balance
104,431
36,770
36,794
13,097
0
119,669
(58,288)
Balance, January 1st
388,822
315,660
352,430
389,224
402,321
402,321
402,321
Adjustment
31,269
Balance, December 31st
315.660'
352,430 /
389,224
402,321 �f+f
344,033
Fund Balance %
34.68%
32.78%
35.68010
33.99%
28.75%
2020 Payroll & Benefit Worksheet
Overview: Staffing Includes:
Fire Chief, Fire Marshal (both full -time)
Keep part-time administrative specialist (Shared services)
INCREASE part-time Inspector from 270 hours to 780 hours
- ADDITION of admin clerical 15 hours per week
INCREASE evening duty crew from 4FFI15 hours per week to 4FF 124 hours per week
INCREASE overnight duty crew to 7 days per week
Shared Services Calculation
Inc Salary
TOTALS
101
Fire Chief 108,974
Salary
48,351
Fire Inspector 2.0% 63,673
PERA
3,626
Admin Specialist 2.0% 48,351
FICA
2,998
Total
220,998
MC
701
Ins
8,515
103
PT Employees
Life
72
Rate HrslWk Wks
Work Comp
2,756
PT Fire Inspector 21.65 15 52
16,887
Adi
3477
Admin 2 14.00 15 52
10,920
TOTAL
70,496
27,807
106
Firefighters Salary
SHARE
35,248
Station 1 Call Pay Rate Calls FF'S hire
13.26 256 15 1
50,918
Station 2 Call Pay Rate Calls FFs Hire
13.26 144 10 1
79,094
All Call Pay Rate Calls FF'S Hire
13.26 50 20 1.5
19,890
Station 1 Drill Pay Rate Weeks FFs Hire
13.26 50 25 2
331150
Station 2 Drill Pav Rate Weeks FFs Hire
1326 50 12 2
15,912
Duly Officer Pa v Rate Days
$90.00 per day x 365 90 365
32,850
$26.52 per call x 120 Rate Calls Hire
13.26 120 1.5
2,387
Evening Duly Crew Pay Rate Weeks FFs Hire
13.26 52 4 24
88194
Night Time Duty Crew Staffing Rate Weeks FFs Days
60 52 4 7
87,360
Exceptional Service Award 10,000
10,000
337,756
107
Fire Officer's Salaries
Assistant Chief 2.0% 5,593
Battalion Chiefs (2) 2.0% 9,436
Captains (5) 2.0% 14,280
Apparatus Coordinator 2.0% 2,292
Coordinators (8) 2.0% 91169
40,790
121
PERA
Fire Chief Formula 15,471
Fire Marshal Formula 10,793
Admin Specialist Formula 3,626
PT Fire Inspector Formula 0
32,890
122
FICA
Firefighters Formula 20,941
PT Fire Inspector Formula 1,047
Admin Specialist Formula 2,998
Admin 2 Formula 677
Fire Officers Formula 2,529
28,192
123
Medicare
Fire Chief Formula 1,580
Fire Marshal Formula 923
PT Fire Inspector Formula 245
Firefighters Formula 4,897
Admin 2 Formula 158
Fire Officers Formula 591
Admin Specialist Formula 701
u_ • 97
Total FICAIMC 37,288
131
Health Insurance
Fire Chief 10.0% 19,353
Fire Marshal 10.0% 11,480
Admin Specialist 10.0% 8,515
Dental Insurance 5.0% 1,605
(2) employees
40;653
133
LHelnsurance
-'
3 employees x $0.50 per month 18
18
151
Workers Compensation 5.70% 35,759
35,759
TOTAL PERSONNEL SERVICES
774,259
CATEGORY
SUPPLIES
TOTAL SUPPLIES
PROFESSIONAL SERVICES
304 Legal
Detail Item Amount
Line Item Total
200 Office Supplies
3,800
212 Motor Fuels
15,100
13,000
217 Clothing
10.500
30.250
Turnout Gear (5 sets)
11,500
Helmets (6)
1,000
ID for helmets
200
800
Hoods (10)
1,000
10.500
Gloves (10 pairs)
500
7,000
Bouts (6 pairs)
1,400
30,345
Turnout Gear Cleaning
6,000
4t 260
Turnout Gear Repair
1,800
Firefighter Uniforms (6)
1,650
Badges & Uniform Brass
800
Firefighter Work Uniforms (10)
1,100
6 550
Fire Inspector Uniforms
400
Duty Uniforms
500
Fire Chief Uniforms
400
Cold Water Rescue Suits (1)
700
Class A Uniforms
1,300
220 Repair and Maintenance Supplies
6.620
Batteries
720
Culligan Water Station 1 & 2
700
Solar Salt Station 2
700
Small Tools
1,500
Vehicle and Station Supplies
3,000
221 First Aid Supplies
4,800
222 Fire Fighting SuppliesfTo0ls
9,600
Fire Extinguisher Powder
450
Cartridge Refills
350
Oxygen Refills
2,000
Firefighting Foam
1,600
Extinguisher Refill
1,700
Small tools (Acct Tags, Saws, Wn
2,000
Hazmat Supplies
500
Hose
1,000
241 Fire Prevention
5200
Code Books
500
Open House
1,200
Supplies & Handouts
2,000
Sparky Costume Maintenance
200
Life Safety Video
300
TOTAL SUPPLIES
PROFESSIONAL SERVICES
304 Legal
Detail Item Amount
3,000
307 Fiscal Management
22,500
311 Auditing
15,100
15.=
District Audit
10.500
Northland Securities
1,525
Relief Achrarial
3,000
312 Refuse
1,450
800
313 Janitorial
800
10.500
318 Medical Fees
1,300
7,000
319 Professional services
30,345
Recording Secretary
2,500
4t 260
Computer Services
26,345
CISO
500
LMCC Recording Fees
1,000
TOTAL PROFESSIONAL SERVICES
6 550
CATEGORY
OTHER SERVICES AND CHARGES
Category Total
72,270
89,170
Category Total
Detail Item Amount
Line Item Total
321 Communications
Telephone
15,100
Cell Phones
4,350
Pagers (4 @ 475)
1,g00
Pager Repair
1,700
Internet
1,450
MDC Air Cams
800
IPAD Connectivity
1,300
322 Postage
400
323 Radio Units
4t 260
Hennepin County Radio Lease
39,760
Hennepin County Radio Repair
600
MDC Maintenance
1,000
331 Conferences
6 550
Mn Fire Dept. Conference
Mn Fire Chiefs Conference
1,200
1 Chiefs Conference
1,600
Category Total
72,270
89,170
Category Total
Fire Department Instr. Cord. 3,000
Emergency Mgnt Gonf. 400
Fire Inspectors Conference 250
332 Mileage and Travel
150
333 Meeting Expenses
4,000
334 Training Expenses
26,676
Training Tower /Simulator 2,500
EMT (4 @ 1800) 7,200
EMT Refresher 5,500
FFI 2,000 (No longer fully funded by MSFTE Funds)
FFII 1,200
Haz-Mat Ops 2,000
Vo-Tech Schools 775
State Sectional Schools -
Boat Training 300
BloodbomeJRlght To Know 100
Training Aids 600
Support Staff training 300
Fire Chief Training 300
Fire Inspector Training 700
Blue Card ICS Training 2,700
Training Equipment 500
350 Printing And Publishing
1,375
Call Sheets 700
Film 8 Developing 100
Stationary 350
Printer cartridges 225
Other Printing
360 Insurance
24,000
381 Electric Utilities
33,500
383 Gas Utilities
11,000
386 Water and Sewer Utilities
1,400
401 Building Repair
30,000
STATION 1
HVAC
4,700
Boiler
500
Generator
2,700
Garage Doors
5,600
Air Compressor Maim
900
Bathroom Fixtures Repair
700
Elevator Maint
450
Light Bulb Replacement
900
Outdoor Maint (mulch, trees, plants, weeds)
800
Outdoor Sprinkler Main!
900
Data/Phone jack repairs
500
Fire Sprinkler /Alarm (Repair, Monitoring, Permits)
2,000
Elevator Inspection
1,850
Garage Floor MaIM
600
STATION 2
HVAC
800
Generator
1,500
Garage Doors
700
Air Compressor Ml
500
Bathroom Fixtures Repair
200
Light Bulb Replacement
500
Outdoor Maint (mulch, trees, plants, weeds)
300
Outdoor Sprinkler Maint
200
Garage Floor Mart
400
Water Softener Maint & Repairs
400
Fire Sprinkler /Alarm (Repair, Monitoring, Pen
1,500
404 Repair And Maintenance Of Apparatus
26,650
Truck Repair 15,880
Pump Testing 1,720
Service 5,500
Major Repairs 2,700
Supplies 850
CATEGORY
OTHER SERVICES AND CHARGES (Cant.)
Detail Nam Amount
Line Rem Total Category Total
405 Fire Equipment Maintenance
19,450
Compressor Service 1,500
Air 475
Gas Powered Equipment 500
SCBA Service 5,425
31 packs @$175/per pack
Fit Testing
SCBA Flow Testing
SCBA Hydro Testing 2,000
SCBA Maintenance 1,000
Ladder Testing 2,000
Hose Testing 4,900
Air Monitor 850
Air Monitor Calibration 300
Maint. Agreement Fitness Room 500
430 Misc Expenses
i.220
Bank Expenses 500
Payroll Direct Deposit Fees 720
433 Dues And Subscriptions
Nat. Volunteer Fire Council
IAFC /Int Assoc Of Fire Chiefs
Int Assn Of Arson Investigators
NAFI
Mn State Fire Chiefs Assoc
ACFEI
MSFDA
Fire Marshals Assoc Of Mn (2)
NFPA
ACS Firehouse Solutions
Hennepin County Fire Chiefs
Hennepin County Fire Chiefs (FIT
United Firefighters Assoc
Firehouse Magazine
Smoke Eater (22)
Lake Region Mutual Aid
Southwest Mutual Aid
Metro Fire Chiefs
Fire Chiefs
Vol FF Benefit Association
439 Contingency
440 Fund Balance / Reserve
.6,791
30
210
50
40
275 130
130
355
3,252 Change to Emergency Reporting Records Management
20
500
30
30
160
75
100
100
74
350 760
TOTAL OTHER SERVICES AND CHARGES 261,092
Building Maintenance
2020 Major Project Summary
Requested Budget
June, 2019
Station 1
Carpet Replacement (Year 3 of 4) $ 8,908
Phone System Replacement (Year 2 of 2) $ 7,500
Total $15,000
Painting $ 2,500
Fitness Equipment $ 3,500
Gear Dryer Purchase $ 7,000
Station 2
Carpet Replacement (Year 3 of 4) $ 3,000
Painting $ 2,000
Phone System Replacement (Year 2 of 2) $ 2,000
Total $4,000
Gear Dryer Purchase $ 7,000
2020 Computer Cost Projections
Requested Budget
June, 2019
a. Computer Services —The costs included in this area include the following:
i.
Computers
• Virus Protection
$400
• Station 2 internet speed
$1000
• Exchange filtering
$900
• Office 2013
$600
ii.
Disaster Recovery Costs
$500
iii.
Laptop Computers for Trucks
• Maintenance of computers (3)
$2,000
iv.
Computer Replacement (2)
$2,145
v.
Monitor Replacement (2)
$600
vi.
Aladtec Scheduling Software
$3,000
vii.
IPAD Maintenance
$1,500
viii.
Records Management Support
$1,800
ix.
Copiers
$2,400
•
Ongoing lease for copier at Station 1 in the
administrative area. This is the annual cost of a four year
lease including the service and supply contract.
x.
Computer Consultant
$8,500
•
Monthly technology /networking consulting costs
xi.
Website Consultant
$1,000
•
Monthly technology /networking consulting costs
Total technology costs for 2020 $26,345
Excelsior Fire District
2020-2040
Capital Improvement Program
Current CIP Budget
Notes:
1. Interest Income estimated at 2.0% to FY 2040.
2. Equipment Inflation is estimated to be approximately 5% per year.
3. Financing estimated at 5% interest rate
4. Hazmat f LSU Trailer - trailer originally obtained thru grant from Hennepin County Emergency Management (Homeland Security funds). Trailer Replaced in 2017 as a result of crash.
rrlwt��wwrl�w�
■■■w����ww��wrwww�
w�w■��!
��!■liw�ww■w�wlw�ww����ww�
l�w�!!�■i
��Q�mw�wrwl���w(��w■�-���!
l����!!!
����7�Q�iwwl��wl�wlwlw■w■www■
!w
■:"�w!
����Q��Q�wwl�wwl
w�wl���wl.
lw�wl
�����Q��
���wwlwiwlwlwlw�l��i.
lwww!
��������w�lr
-
w����Q�w■ww
l���!
w���oQ�sw
■����
�ww■■■■w,w�ww!
wlwlwlw!
��ww��!
w�wi
-
Q�������w■wwlwlwwlww
r���mmw�
®w■w��>�a�ww�w■�ww!
!ww
!
w�wf��ar��a�w■w��www
wwlQ��w■
w!
lwww
�!
Q���m�����rwlww
w���il�w�o�wfww��
■�wwwwwtw■wlwww■.
lwww�
-
w����ww�o�������
■���wrww�w
w��rwt�!
-
w��a�oQ�mwir��wEwwwwwt�w��w
,w■ww�a
!w■w�lw,�
w���oQOO
��wwww�w■w■wsw�
!mow
■�!!
w��i�w�o�i��wwww��ww�w����
�■�■��ww�w�
_
Q���O
�'Fi;.7��w■wlww
®ww
w■w■wwfw■
l��w!
�a�m�r�saQm�aw
.���wwwww�iw■w■ww�r
■�rw■ww!
-
Qwlrl�wwlwl�wR�wwww■wwlw■w■
!
lwww!
Q
��wwl�
�wlwwE�fJwwwlw■Q�wi!
lQ��ww■
: , :.
w����w��
���wwww�w■wa�awwa�a
l�www
...:
i���Q�Q�w■wiwlw��Q���'��!
l���!
Q��_
i !!rw_�_�wa■a�
®�w�_w_w__�w��w_w�
�waw_w_w
Q����Q�������www�w■www!
. !w■�w■!
Qwlwl��wiww■wwl�wwwwwl
w!
!w■wwl�!
w����w�w�■�wr�lr
■rwwwww�w■w■ww�
�w■www■r®■i
wwlwl��wwlwwlwwlwlwwwwwlw
■w■w�w■
w�w■ww!
.. -
w■■■(w��w�w
w��wwww�rr■!i■�wiwM
lwww!!
Notes:
1. Interest Income estimated at 2.0% to FY 2040.
2. Equipment Inflation is estimated to be approximately 5% per year.
3. Financing estimated at 5% interest rate
4. Hazmat f LSU Trailer - trailer originally obtained thru grant from Hennepin County Emergency Management (Homeland Security funds). Trailer Replaced in 2017 as a result of crash.
Equipment Item
Date Aquired
Original Cost
Life
Benchmark -
pro Re pi
D P
Prof Equip
Prof Finance
Prof Apparatus
Total Cost of
Yrs
Date
Coats
Costs
Coats
Apparatus
BeQinning Apparatus/Equip Balance
APPARATUS
728 - Chief Vehicle
2016
39,500
10
2026
11000
0
28500
39500
3950
#23 - Inspector Vehicle
2008
31,805
12
2022
12900
0
31000
43900
3658
#25 - Command Utility Vehicle
2010
32,500
12
2019
10500
0
30000
40500
3375
#30 - Duty Vehicle
2018
37,744
14
2032
11000
0
30500
41500
2964
#21 - Rescue/Utility 21
2005
40,000
18
2023
4000
0
44000
48000
2667
#16 - Rescue 12 - Excursion
2002
37,500
17
2019
3500
0
42000
45500
2676
#17 - Utility 11 -P /U Truck
2002
37,500
18
2020
0
0
42000
42000
2333
#24 -Hea Rescue /Rescue 11
2009
284,688
24
2033
25000
60185
430000
515185
21466
#27 -Engine 22
2013
425,000
25
2038
35000
95000
620000
750000
30000
#29- Ladder 11
2018
762,000
25
2043
35000
97225
1200000
1332225
53289
#18 -Engine 11
2002
327,000
21
2023
30000
63540
595000
688540
32788
#22 -En ine 21
2007
309,000
21
2028
35000
68125
600000
703125
33482
#19 - Tanker 11
2002
181,000
0
Tank for Rescue 21
2008
5,000
Hazmat ! L5U Trailer
2017
12,000
_
20
2037
15000
0
14000
0
29000
1450
AN -John Deere Gator - Utility 21
2014
17,663
15
2029
0
0
20000
20000
Boat 11
2016
27,000
10
2026
0
0
72000
72000
1333
7200
Boat 12
8,000
_
2024
0
0
0
0
Boat 21
2007
31,380
0
Boat Trailer - #11
2016
5,000
2026
Q
p
0
0
Boat Trailer - #12
2,000
2024
0
0
1500
1500
Boat Trailer - #21
2008
2,860
AN - Mule - Utility 12
2006
12,000
15
2021
0
0
17000
0
17000
1133
AN - Mule Trailer
2006
1,700
15
2021
0
0
2000
2000
133
Total Apparatus Expenses
203899
Quarterly Billings
EXCELSIOR FIRE DISTRICT
Per
Per
Proposed Budget 20211
Sim
S1K
81,183.836 Operating
Market
Tax
Allocation by C8y using Joint Powers Agreement 2010 Fund -mg Formula
(locrations
Buildin
Reserves Other Income
Total
Capita
gee
Gana,
Deephaven
$748.180 Fx:ilities
87,627,70
$ 55.378.16
S
(3.486.57) S (4. 143.50)
S 135,375.79
Deephaven
5139.63
$407,13
$35.62
Excelsior
S
37.349.16
$ 23.603.58
Reu-
(1.486.07) S (1- 766.06)
S 57,700.61
Excelsior
$99.44
Proposed 2020 Budget $ 1,828.905
$35.62
Greenwood
$
24,038.67
$ 15,191.74
S
(956.46) S (1.136.67)
S 37.137.27
OIFKrinc�me
$210.41
5416.16
$35.62
Shorewood**
S
108.145.72
$69,344.96
S
(4.302.95) S (5.113.70)
$ 167,074.03
Shorewood **
S6&87
$395.93
51.828,905
Tanks Bay
Tax C pKHY
38.797.76
Fc ima wt Market
Value Fct. Pmndathn* Tar Panels
.4 year
V.11 Data
Share
Citics Calculated
5408.19
$35.62
(Inc. Personal Propertyl
S 457.226.25
Overall
Per
Shure
fCm,
S 1,828,905.00
JPd
D>ilLwS
Percent
I]nllats
Prrrrnt �is7D percent iaCCClti I'E[esnl
Sells
tY.rcent
Deephaven
Excelsior
SI5,200,500
29.61%
$1.330.049,170
29.71%, 3,878 24.02% 1,568 22.939E
155
20.45%
24.61%
00erations
5350,511
FAcIllits Reserves
S221 1513
- 513.946
OM see
- 516.574
73!891
554 1 503
Greenwood
$6.478.840
$4.169.912
12.62%
8.12%
5514,707,660
5356.952.800
11,50% 2.321 14.37% 925 13.53%
7.97%
203
26.78%
12.62%
5149.397
$94.414
- $5,944
- 57.064
S230,802
Shorewood **
$18,7,59,696
36.54%
$1.687,904.947
706 4.379E 354 5.18%
37.70% 7.693 47.64% 3,191 46.66%
35
294
4.62%
&12%
$96.155
360,767
- $3.826
44.547
$148,549
Tanks Bay
56.730.124
13.11%
$587,357,640
13.12% 1,550 9.60% 801 11.719E
71
38.79%
937%
36.,54%
5432,583
$273,380
417,212
- 520.455
5668.296
l kll%
5155,191
598.076
- 56,175
- 573)8
5239.754
S I� ;9 -071
Al&
54.476.972.217
1=
109,00%
-1749-150
rS47.1e31
(S55.979)
tip
(Using 2019 Hennepin
County Assessors valuations)
..Total 2019 Tax Capacity less reduction for The Islands
served by the Mound FD.
Quarterly Billings
Per
Per
Per
Sim
S1K
Market
Tax
(locrations
Buildin
Reserves Other Income
Total
Capita
gee
Gana,
Deephaven
S
87,627,70
$ 55.378.16
S
(3.486.57) S (4. 143.50)
S 135,375.79
Deephaven
5139.63
$407,13
$35.62
Excelsior
S
37.349.16
$ 23.603.58
S
(1.486.07) S (1- 766.06)
S 57,700.61
Excelsior
$99.44
5448.41
$35.62
Greenwood
$
24,038.67
$ 15,191.74
S
(956.46) S (1.136.67)
S 37.137.27
Greenwood
$210.41
5416.16
$35.62
Shorewood**
S
108.145.72
$69,344.96
S
(4.302.95) S (5.113.70)
$ 167,074.03
Shorewood **
S6&87
$395.93
$35.62
Tanks Bay
$
38.797.76
$24.519.06
S
(1.543.70) $ (1.834.56)
S 59.938.55
Tanks Bay
$154.68
5408.19
$35.62
S 457.226.25
Overall
$113.26
S 1,828,905.00
2020 Allocation by City Compared to 2018 & 2019
2020 Operating Budget and Capital less Reserves Use and Other Income
Total Contribution
Inc
Inc
City
2018
Contribution
2019 Budget
Increase
%
2020 Proposed
Increase
%
Deephaven
$
503,390.00
$
516,565.00
$ 13,175.00
2.62%
$541,503.00
$
24,938.00
4.83%
Excelsior
$
206,681.00
$
221,100.00
$ 14,419.00
6.98%
$230,802.00
$
9,702.00
4.39%
Greenwood
$
141,335.00
$
146,435.00
$ 5,100.00
3.61%
$148,549.00
$
2,114.00
1.44%
Shorewood
$
625,953.00
$
651,969.00
$ 26,016.00
4.16%
$668,296.00
$
16,327.00
2.50%
Tonka Bay
$
231,402.00
$
240,428.00
$ 9,026.00
3.90%
$239,754.00
$
(674.00)
- 0.28%
$
1,708,761.00
$
1,776,497.00
$ 67,736.00
3.96%
$1,828,904.00
$
52,407.00
2.95%
oLans" ON ,
City of Shorewood Council Meeting Item
Title /Subject: Approval of the 2020 SLMPD Proposed Budget
Meeting Date: August 12, 2019
Prepared By: Greg Lerud, City Administrator
Attachments: Proposed 2020 SLMPD budget
61
MEETING
TYPE
REGULAR
Background: The 2020 SLMPD operating budget is proposed to increase by 2.1%
from 2019 to $2.61 million in 2020. Shorewood's share, based on the funding formula,
is proposed to be $1.292 million, which represents a $26,912 increase over the 2019
contribution.
Options: Chief Meehan will be at the meeting on August 12 to answer questions you
have about the proposed budget. The budget as presented has been recommended for
approval by the SLMPD Coordinating Committee.
Recommended Action: Staff has been using the proposed budget in its preparation of
the 2020 city budget and levy and recommends approval as presented.
Next Steps and Timeline: Staff will continue discussions about the entire 2020 budget
through final approval in December.
Mission Statement: The City of Shorewood is committed to providing residents quality public
services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and
sound financial management through effective, efficient, and visionary leadership. Page 1
W
SOUTH LAKE MINNETONKA POLICE DEPARTMENT
Serving Excelsior, Greenwood, Shorewood and Tonka Bay
24150 Smithtown Road
Shorewood, Minnesota 55331
MEMORANDUM
Mike Meehan
Chief of Police
Office (952) 474 -3261
Fax (952) 474 -4477
TO: Kristi Luger, Excelsior City Manager
Dana Young, Deephaven City Administrator Representing City of Greenwood
Greg Lerud, Shorewood City Administrator
Lindy Crawford, Tonka Bay City Administrator
FROM: Mike Meehan., Chief of Police
DATE: July 30, 2019
RE: 2020 Operating Budget
Coordinating Committee Recommendation
As you are aware, the Coordinating Committee for the South Lake Minnetonka Police Department
(SLMPD) passed, by a unanimous vote, a recommended operating budget for 2020. This took
place at their quarterly meeting held on July 30, 2019.
The recommended operating budget has been attached for your convenience. Overall the budget
increased by 3.6 % over the 2019 operating budget. The majority of this increase is due to wages
and benefits. However, surplus funds from the 2018 operating budget were reinvested into the
2020 budget (46600 Other Reimbursements) mitigating the increase to the cities. The resulting
net increase to the contributing cities is 2.1 %.
The recommended budget now goes to your respective city councils for consideration prior to the
September 1st deadline. Approval of all four member cities is required to avoid the budget being
determined by the default provision in the Joint Powers Agreement.
2020 OPERATING
BUDGET
PROPOSED
OPERATING
BUDGET
Tuesday - July 30, 2019
SOUTH LAKE MINNETONKA POLICE DEPARTMENT
2020 OPERATING BUDGET
SOUTH LAKE MINNETONKA POLICE DEPARTMENT
2020 OPERATING BUDGET
Projected Revenues
COORDINATING COMMITTEE RECOMMENDATION
Tuesday - July 30, 2019
ITEM
CATEGORY
AMOUNT
40110
Court Overtime
$7,500
40120
Excelsior Park and Dock Patrol
$22,000
42100
State Police Officer Aid
$115,000
42200
State Training Reimbursement
$13,500
43100
Minnetonka School District
$5,000
43200
Administrative Requests
$7,000
43400
Special Policing Details
$28,000
44000
Investment Income
$7,000
46400
Forfeitures
--
46500
Grant Reimbursements
$20,000
46600
Other Reimbursements
$92,000
TOTAL PROJECTED REVENUES
$315,000
Expenses in Excess of Revenues
$2,610,276
PROJECTED COST TO MEMBER CITIES
$2,610,276
Projected Expenses
COORDINATING COMMITTEE RECOMMENDATION
Tuesday - July 30, 2019
ITEM
CATEGORY
AMOUNT
50100
Salaries - Full -Time
$1,611,211
50200
Salaries - General Overtime
$35,000
50230
Salaries - Reimbursed Overtime
$54,500
50300
Salaries - Part-Time
$60,885
50500
Social Security & Medicare
$33,000
50600
PERA Pensions
$285,000
50700
Insurance Benefits
$305,000
51000
Contracted Services
$26,000
521.00
Equipment Leases
$58,100
52200
Repairs & Maintenance
$58,000
52300
Utilities
$62,680
52400
Janitorial & Cleaning
$8,500
52500
Printing & Publishing
$2,500
52800
Care of Persons
$0
53000
Supplies
$69,200
54000
Uniforms & Gear
$15,000
54500
Training & Development
$30,000
56000
Insurance
$116,000
56100
Subscriptions & Memberships
$3,100
57000
Special Projects
$19,600
58000
Capital Outlay
$72,000
59000
Undesignated Allocation
$0
TOTAL PROJECTED EXPENSES
$2,925,276
SOUTH LAKE MINNETONKA POLICE DEPARTMENT
2020 OPERATING BUDGET
COORDINATING COMMITTEE RECOMMENDATION
Tuesday - July 30, 2019
Projected Contributions from Member Cities - Year 2020
2019 Reallocation Formula (2017 -2021)
$INCREASE
MEMBER CITY
TOTAL AMOUNT
% SHARE
$ SHARE
OVER 2019
Excelsior
$2,623,276
26.9319%
$702,996
$14,636
Greenwood
$2,623,276
7.6689%
$200,179
$4,168
Shorewood
$2,623,276
49.5199%
$1,292,606
$26,912
Tonka Bay
$2,623,276
15.8794%
$414,496
$8,629
2020 Total Contributions from Member Cities
$2,610,276
2019 Total Contributions from Member Cities
$2,555,930
The funding formula used to determine each member city's
percentage contribution toward the operating budget is based on an
arbitration ruling in 2006. Every five years the funding formula is
subject to an automatic adjustment based on the criteria set forth in
this ruling. The 2017 operating budget was the second time since
the ruling took effect that the funding formula was subject to
adjustment. Barring an amendment to the JPA, the reset funding
formula is not subject to change again until 2022.
Dollar Increase Over 2019
$54,346
Percentage Increase Over 2019
2.1%
SOUTH LAKE MINNETONKA POLICE DEPARTMENT
2019 OPERATING BUDGET
COORDINATING COMMITTEE RECOMMENDATION
Tuesday - July 30, 2019
Proposed Contributions from Member Cities
Reallocation Formula (2017 -2021)
Total Amount - $2,610,276
49.5199%
$1,200,000
$1,000,000
-- -
26.9319%
$800,000 .-
- - - - --
$600,000
- - - .4 --
-
15.8794%
$400,000
7.6689%
$200,000
-
$702,996 $200,179
$1,292,606
$414,496
$0
— - - -- -
-- - --
Excelsior Greenwood
Shorewood
Tonka Bay
SOUTH LAKE MINNETONKA POLICE DEPARTMENT
2020 OPERATING BUDGET
COORDINATING COMMITTEE RECOMMENDATION
Tuesday- July 30, 2019
PENDING TRANSFERS TO SPECIAL FUNDS
Line
Item
Operating Budget Expenses
Transfer
Amount
Assigned Funds
Category
Sub - Category
52100
Equipment Leases
Communications
Records Management
$50,780
Technology
52200
Repairs & Maintenance
Building Maintenance
$5,800
Firearms Range
56000
Insurance
N/A
$116,000
Insurance
57000
Special Projects
Reserve Unit
$0
Reserve Officer
58000
Capital Outlay
Vehicle
$70,000
Vehicle
58000
Capital Outlay
Equipment
$2,000
Equipment
Total 1 $244,580
Prepared by Chief Mike Meehan -July 2019
NA
MEETING TYPE
Regular Meeting
City of Shorewood Council Meeting Item
Title / Subject: Update on the Hockey Board Volunteer Event
Location: Cathcart Park
Meeting Date: August 12, 2019
Prepared by: Marie Darling, Planning Director and Twila Grout, Park and Rec Director
Background: At the 2018 park tour, the Parks Commission
suggested that the hockey boards be painted white to improve
the appearance, especially during spring -fall when the rink is
not obscured by snow. The Shorewood CIP includes an item
to replace the boards in 2021. Earlier this year, Tonka Bay
painted the hockey boards using volunteer labor. Staff intends
this project and event would: 1) improve the appearance of the
boards; 2) extend their life; and 3) allow the project in the CIP
to be rescheduled for a few years later.
Public works staff would replace the existing boards that are in
disrepair (about four). The September 28, 2019 (9:00 a.m.)
volunteer event would entail painting the rink and would likely
take around three hours, depending on the number of
volunteers. The city would rent a powerwasher and one
sprayer and purchase the items needed for the project,
including brushes, rollers and paint. The City would also
provide beverages and lunch for the volunteers when the
painting is finished.
White paint was originally discussed, but the color would be
discussed in greater depth at the Park Commission's tour of
Cathcart on August 13, 2019.
Financial or Budget Considerations:
The total cost for the project would be about $1,200 for the cost
Above - Cathcart Park, Below — Manitou Park,
Tonka Bay
of the project from the parks maintenance fund. The City also has $700 remaining from a
KaBoom! Grant received in 2017 that must be used before the end of the year. The CIP
includes a $150,000 estimate for board replacement that could be rescheduled from 2021 to
2024 or 2025.
Mission Statement: The City of Shorewood is committed to providing residents quality public services, a
healthy environment, a variety of attractive amenities, a sustainable tax base, and sound financial
management through effective, efficient, and visionary leadership.
5: \Parks \Council Staff reports \2019 \190812 \CC memo for Hockey Board Event -Cat hcart.docx
MEETING TYPE
Regular Meeting
City of Shorewood Council Meeting Item #sA
Title / Subject: Resolution Accepting Quote and Award of Construction Contract for the
Lake Linden Drive Culvert Replacement
Meeting Date: August 12, 2019
Prepared by: Katie Koscielak, Project Manager
Reviewed by: Alyson Fauske, City Engineer
Attachments: Resolution
Background: This spring, a sink hole developed at the culvert crossing located south of Yellowstone Trail
on Lake Linden Drive. Public Works repaired the sink hole and requested Staff investigate the cause of
the sink hole at the culvert.
Staff met with EJ Mayers Inc., a local contractor that has performed numerous sewer and water service
installation throughout the City, to discuss the repair of the culvert and impacts to traffic along Lake
Linden Drive. As Lake Linden Drive is a high traffic roadway, Staff investigated trenchless options to
avoid impact to vehicles. Due to the Contractor's experience in the community and availability to
complete the work in a timely manner, the quote was solicited to EJ Mayers Inc. solely.
Following the site visit, EJ Mayers Inc. provided a quote to include directionally drilling a new storm
culvert to match the existing invert elevations and pipe capacity, abandon the existing culvert,
installation of a new catch basin on the west side of the road, and restoration as necessary to facilitate
construction. Staff requests approval of the quote provided from EJ Mayers Inc. in the amount of
$35,000.
Financial Impact: Funding for the improvement will come from the City Stormwater Management Fund.
Options:
1. Approve the resolution accepting the quote and awarding the contract to the lowest responsible
and responsive quote for the Lake Linden Drive Culvert Replacement.
2. Reject quote for the Lake Linden Drive Culvert Replacement.
3. Take no action on this item at this time.
Recommendation: Staff recommends the City Council approve the attached resolution "Accepting
Quote and Awarding the Contract for the Lake Linden Drive Culvert Replacement"
Mission Statement. The City of Shorewood is committed to providing residents quality public
services, a healthy environment, a variety of attractive amenities, a sustainable tax base, and
sound financial management through effective, efficient, and visionary leadership. Page 1
CITY OF SHOREWOOD
COUNTY OF HENNEPIN
STATE OF MINNESOTA
RESOLUTION 19-
A RESOLUTION ACCEPTING QUOTE AND AWARDING CONTRACT FOR
THE LAKE LINDEN DRIVE CULVERT REPLACEMENT PROJECT
WHEREAS, pursuant to an invitation to provide a quote for local improvements
designated as the Lake Linden Drive Culvert Replacement Project, a quote was
received, opened on July 22, 2019, and tabulated according to law; and
WHEREAS, Due to the Contractor's experience in the community and availability to
complete the work in a timely manner, the quote was solicited to EJ Mayers Inc. solely;
and
WHEREAS, the City Council has determined that EJ Mayers Inc. the lowest quote in
compliance with the quote documents in the amount of $35,000.
WHEREAS, the Director of Public Works has reviewed said proposal and found it to be
in order.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
SHOREWOOD, MINNESOTA AS FOLLOWS:
The City Council and City Clerk of the City of Shorewood, Minnesota are hereby
authorized and directed to enter into a contract with EJ Mayers Inc. in the name
of the City of Shorewood.
Passed by the City Council of Shorewood, Minnesota this 12th day of August, 2019.
Scott Zerby, Mayor
Attest:
Sandie Thone, City Clerk
813
MEETING TYPE
City of Shorewood Council Meeting Item Regular Meeting
Title / Subject: Accept Proposal for Professional Services Agreement, AE2S for the SE Well
and Filter Plant PLC and Interface Engineering and Replacement Project,
City Project 19 -08
Meeting Date: August 12, 2019
Prepared by: Larry Brown, Director of Public Works
Attachments: Excerpt Cl P, Site Location Map, and Proposal by AE2S
Policy Consideration: None
Background / Previous Action: The 2019 Capital Improvement Program has funds dedicated to
replacement of what is known as the PLC (aka Programmable Logic Controller), located at the
SE Area Well and Water Plant at 5755 Covington Road. This is also the location of Silverwood
Park. Attachment 1 is an excerpt from the CIP, with Attachment 2 being a site location map.
The PLC is an industrial computer that controls the well, chemical treatment, water filtration
plant, and water reclamation system. The existing controller is approximately twenty five
years old and is no longer supported.
Staff solicited a proposal for the design build from the firm of Advanced Engineering and
Environmental Services, Inc. (aka AE2S). AE2S just successfully completed the Boulder Bridge
MCC Replacement Project and performed very well on that project. AE2S' proposal has been
included as Attachment 3 to this report.
The attached proposal includes:
• Furnish and install a new PLC, power supply, input /output modules and associated
programming and perform the necessary wiring
• Provide a new interface to the PLC mounted in a new steel cabinet door to replace the
existing interface
• Perform startup and testing
• Provide asbuilt drawings for installation and logic diagrams.
Mission Statement: The City of Shorewood is committed to providing residents quality public services, o
healthy environment, o variety of attractive amenities, o sustainable tax base, and sound financial
management through effective, efficient, and visionary leadership. Page 1
The Water Fund Capital Improvement Program has a budgeted amount of $45,000 for the
design, hardware, construction and startup. The proposal submitted by AE2S is for an amount
of $20,688. Staff has reviewed the proposal submitted and finds it to be in order.
Financial Consideration
As mentioned above, this project is funded from the Municipal Water Fund. The amount
budgeted for the project has adequate resources for this project.
Recommendation
Staff is recommending approval of the motion that accepts the proposal provided from AE2S
for an amount of $20,688 for the PLC Replacement Project at the SE Area Well.
Source # Priority 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Total
Edgewood Rd reconstruction
sT- -21 -01
n/a
500,000
Excelsior Blvd reclamation
sT- -21 -02
n/a
200,000
Birch Bluff Rd reconstruction
sT- -22 -01
n/a
Noble Rd reclamation /reconstruction
sT- -22 -02
n/a
Strawberry Ln reconstruction
sT- -23 -01
n/a
Grant Lorenz Rd reconstruction
sT- -23 -02
n/a
Eureka Rd N reconstruction
sT- -23 -03
n/a
Boulder Bridge VT Well Motor
W -18 -01
n/a
Replace
Amesbury Well Pipe Coatings and
W -19 -02
n/a
25,000
Corrosion Prev
Replace Well House Meter - SE
W -19 -03
n/a
12,000
Area Well
Programmable Logic Controller SE
W -19 -04
n/a
45,000
Area Well /Plant
Rebuild Well Pump SE VT Well
W -19 -05
n/a
20,000
Amesbury Well House LED Light
W -19 -06
n/a
5,000
Conversion
Programmable Logic Controller
W -20 -02
n/a
35,000
Badger Well
SE Area Well Motor Replace
W -20 -03
n/a
45,000
Dehumidification System Amesbury
W -20 -04
n/a
5,000
Well
Rebuild Well Pump Amesbury VT
W -20 -05
n/a
20,000
Well
Programmable Logic Controller
W -21 -01
n/a
37,000
Amesbury Well
Rebuild Well Pump Badger VT Well
W -21 -02
n/a
22,000
SE Area Well & Iron Plant LED Light
W -21 -03
n/a
18,000
Conversion
Badger Field Well LED Light
W -21 -04
n/a
10,000
Conversion
Rebuild Well Control Valve SE Well
W -21 -05
n/a
15,000
SE Area Well Pipe Coatings and
W -22 -01
n/a
Corrosion Prev
Rebuild Well Pump Boulder Bridge
W -22 -02
n/a
VT Well
FilterMediaChangeout /RehablronRe
W -22 -03
n/a
movalFilterSEPlant
Rebuild Well Pump Amesbury
W -23 -01
n/a
Submersible Well
Rebuild Well Pump Boulder Bridge
W -24 -01
n/a
Submersible Well
350,000
250,000
35,000
25,000
30,000
40,000
250,000
350,000
350,000
20,000
22,000
25,000
25,000
24,000
32,000
500,000
200,000
350,000
250,000
250,000
350,000
350,000
35,000
25,000
12,000
45,000
45,000
5,000
35,000
45,000
5,000
45,000
37,000
46,000
18,000
10,000
15,000
25,000
62,000
40,000
20,000
22.000
Tuesday, November 27, 2018
ATTACHMENT 1 CIP EXCERPT
+ 5
t
horewood
Christmas 7
La Ice
PROJECT LOCATION
Christmas
.Silver Lake
0 5 1004i#
• i r _
y
x
IT T�
r �Ii
_ i I
1p
f- -- f
II
ATTACHMENT 2
SITE LOCATION MAP
,9% A
www.ae2s.com
August 7, 2019
Mr. Larry Brown
Director of Public Works
City of Shorewood
24200 Smithtown Rd
Excelsior, MN 55331
RE: Agreement Between City of Shorewood and AE2S
City of Shorewood, MN — South East Well Control Panel Upgrade
Dear Mr. Brown:
Advanced Engineering and Environmental Services, Inc. (AE2S) shall render professional services for the South
East Well Control Panel upgrade (Assignment) to the City of Shorewood (CLIENT).
This Agreement, including Exhibit A, sets forth the terms and conditions under which the CLIENT and AE2S shall
be governed regarding the Assignment.
Scope of Basic Services
AE2S will perform the following tasks:
1. Remove Existing PanelView Plus 300.
2. Remove Existing Control Panel Door and Existing Door Hardware
3. Install new Prefabricated Enclosure Door on Existing Panel
4. Install New PV Plus 7 — 10" (2711P- T10C22D8S)
5. Provide New Updated Programming for PV Plus 7 - 10" (2711P- T10C22D8S)
6. Remove Existing SLC 5/03 PLC, Power Supply, IO modules and Corresponding Wiring
7. Install New 1769- L33ER, Power Supply, and IO Modules
8. Provide New Updated Programming for 1769 -L33ER
9. Provide new updated electrical documentation
10. Rewire and Reconfigure Existing Mission SCADA System to Work with Updated PLC
Programming
Remove Existing PanelView Plus 300:
1. The following modifications will be performed to the SE Well existing control enclosure:
a. Remove Existing PanelView Plus 600
Remove Existing Control Panel Door and Existing Door Hardware:
E -100 03/2016
1. The following modifications will be performed to the SE Well existing control
enclosure:
a. Remove Existing Control Panel Door and all associated hardware
ATTACHMENT 3
Advanced Engineering and Environmental Services, Inc.
6901 East Fish Lake Road, Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763- 463 -5036
Mr. Brown
RE: Letter Agreement for City of Shorewood
South East Well Control Panel Upgrade
August 7, 2019
Page 2 of 9
Install new Prefabricated Enclosure Door on Existing Panel:
The following modifications will be performed to the SE Well existing control
enclosure:
a. Install new 30.25 x 36.25 prefabricated door and all associated hardware
Install New PV Plus 7 —10" (2711P- TIOC22D8S):
1. The following modifications will be performed to the SE Well existing control enclosure:
a. Cut -out to fit new PV Plus 7 — 10" (2711P- T10C22D8S)
i. Dimensions- (9.92 x 11.69 x 2.22 in.)
b. Provide design services and as- installed drawings
c. Commission and test assembly installation
d. 1 -year warranty.
Provide New Updated Programming for PV Plus 7 -10" (2711P- T10C22D8S):
1. The following modifications will be performed to the SE Well existing control enclosure:
a. Provide new updated programming PV Plus 7 - 10" (2711P- T10C22D8S):
i. New Programming to be done in Factorytalk View version 9.0
b. Commission and test assembly installation
c. 1 -year warranty.
Remove Existing SLC 5/05 PLC and Corresponding Wiring:
2. The following modifications will be performed to the SE Well existing control enclosure:
a. Disconnect SLC 5/03 from existing wiring and remove from enclosure
b. Disconnect 8xAI IO Module 91 1746 -IA8 from existing wiring and remove
from enclosure
c. Disconnect 8xDO IO Module 92 1746 -OX8 from existing wiring and remove
from enclosure
d. Disconnect 4xA1/2xAO IO 1746 -NIO4I Module 43 from existing wiring and
remove from enclosure
e. Remove existing PLC Backplane from enclosure back -panel
Note 1— All existing wiring to be reused and landed to corresponding new PLC and Modules
Install New 1769- L33ER, Power Supply, and IO Modules:
2. The following modifications will be performed to the SE Well existing control enclosure:
a. Install new Din Rail on the existing enclosure Back -Panel
b. Install the following;
i. New 1769 -L33ER Processor
ii. New 1769 -PA4 Power Supply
in. New 1769 -IA16 16xDI- 120VAC Module 91
iv. New 1769 -OW8I 8xRO (isolated) Module 92
v. New 1769- IF4FXOF2F 4xAI /2xAO (isolated) Module #3
Mr. Brown
RE: Letter Agreement for City of Shorewood
South East Well Control Panel Upgrade
August 7, 2019
Page 3 of 9
c. Land all existing wiring to corresponding PLC, Power Supply, and new IO Modules
d. Provide design services and as- installed drawings
e. Commission and test assembly installation
f. 1 -year warranty.
Provide New Updated Programming for 1769 - L33ER:
2. The following modifications will be performed to the SE Well new PLC:
a. Provide new updated programming for 1769 -L33ER PLC:
i. New Programming to be done in RS 5000 version 30
b. Commission and test assembly installation
c. 1 -year warranty.
Mission wiring and Configuration:
3. The following modifications will be performed to the SE Well new PLC:
a. Rewire Mission Control System to match new PLC Alarming
b. Commission and test assembly installation
Additional Services
Services resulting from significant changes in the general scope, extent, or character of the Assignment are not
included as a part of the Scope of Basic Services. If authorized in writing by the CLIENT, AE2S will provide
services beyond the scope of this Agreement on an hourly basis in accordance with the Hourly Fee Schedule
attached as Exhibit B.
CLIENT's Responsibilities
CLIENT shall do the following in a timely manner, so as not to delay the services of AE2S:
1. Designate a person to act as CLIENT's representative with respect to the services to be rendered under
this Agreement. Such person shall have authority to transmit instructions, receive information, and
interpret and define CLIENT's policies and decisions with respect to services for the Assignment.
2. Provide relevant information regarding requirements for the Assignment. AE2S shall be entitled to
use and rely upon all information provided by CLIENT or others in performing AE2S's services under
this Agreement.
3. Provide access to the relevant sites sufficient for AE2S to perform its services under this Agreement.
4. CLIENT shall, so long as AE2S is not in default, promptly pay AE2S for such services as have been
performed satisfactorily hereunder in accordance with the fee terms set forth herein.
Mr. Brown
RE: Letter Agreement for City of Shorewood
South East Well Control Panel Upgrade
August 7, 2019
Page 4 of 9
CLIENT shall bear all costs incident to compliance with its responsibilities pursuant to this section.
Fees
AE2S shall render services under this Agreement on an hourly basis in accordance with the Hourly Fee Schedule
attached as Exhibit B not to exceed $20,688 without written authorization from CLIENT, including reimbursement
for all project related expenses.
Task
Professional Fees
SE Well PLC & OIT Removal and Replacement (28 hrs)
$3,600
SE Well — Control Panel Door Removal and Replacement 3 hrs
$390
SE Well - Updated Programming 54 hrs
$7,020
SE Well — Mission Reconfiguration (4 hrs)
$520
SE Well Hardware Supply
$9,158
Total Professional Services
$20,688
Anticipated Proiect Schedule
AE2S proposes completion of the Scope of Services outlined in this Agreement in accordance with the following
proposed schedule:
Task
I Est. Completion Date
SE Well PLC and IO Module Replacement - Installation and Commissioning
4 -6 weeks after authorization
Mr. Brown
RE: Letter Agreement for City of Shorewood
South East Well Control Panel Upgrade
August 7, 2019
Page 5 of 9
Contract Documents
This Agreement includes the following documents, incorporated herein by reference:
1. Exhibit A - Terms and Conditions;
2. Exhibit B - Hourly Fee and Expense Schedule;
3. All other attached Exhibits referenced in this Agreement;
4. Any drawings or specifications provided by the CLIENT in writing; and
5. Any duly executed written amendments.
There are no contract documents other than this Agreement and those documents listed above.
If this Agreement sets forth your understanding of our agreement, including the scope of work desired, fees, terms,
and conditions, please sign in the space provided and return a copy to AE2S. Thank you for the opportunity to
assist in this project and we look forward to working with you.
Sincerely,
AE2S
CLIENT
Accepted this day of
1�* Ak 2019
Anthony Pittman
Instrumentation & Controls Regional Mgr.
Lo
Name (Print):
Aaron Vollmer, P.E.
Operations Manager Title:
Standard Terms and Conditions
The Agreement is supplemented to include the following terms and conditions:
1. Standard of Care
a. 'The standard of care for all professional services performed or
famished by AE2S under this Agreement will be the care and skill
ordinarily used by members of AE2S's profession practicing under
similar circumstances at the same time and in the same locality. AE2S
makes no warranties, express or implied, under this Agreement or
otherwise, in connection with AE2S's services.
b. CLIENT shall be responsible for, and AE2S may rely upon, the
accuracy and completeness of all requirements, programs, instructions,
reports, data, and other information fumished by CLIENT to AE2S
pursuant to this Agreement. AE2S may use such requirements, reports,
data, and information in performing or furnishing services under this
Agreement.
2. Payments to AE2S
Invoices will be prepared in accordance with AE2S's standard invoicing
practices and will be submitted to CLIENT by AE2S monthly, unless
otherwise agreed. Invoices are due and payable within 30 days. If
CLIENT fails to make any payment due AE2S for services and expenses
within 30 days, the amounts due AE2S will be increased at the rate of
1.75% per month (or the maximum rate of interest permitted by law, if
less) from said thirtieth day. In addition, AE2S may, after giving seven
days written notice to CLIENT, suspend services under this Agreement
until AE2S has been paid in full all amounts due for services, expenses,
and other related charges. All payments shall be made in United States
Dollars.
3. Insurance
AE2S will maintain insurance coverage for Workers' Compensation,
Professional Liability, General Liability, and Automobile Liability and
will provide certificates of insurance to CLIENT upon request.
4. Indemnification and Allocation of Risk
a. To the fullest extent permitted by law, AE2S shall indemnify and hold
harmless CLIENT and CLIENT's officers, directors, members, and
employees from any and all costs, losses, and damages (including but
not limited to all reasonable fees and charges of engineers, architects,
attorneys, and other professionals, and all court, arbitration, or other
dispute resolution costs) arising out of or relating to the Project, provided
that any such cost, loss, or damage is attributable to bodily injury,
sickness, disease, or death, or to injury to or destruction of tangible
property (other than the Work itself), including the loss of use resulting
therefrom, but only to the extent caused by any negligent act or omission
of AE2S or AE2S's officers, directors, members, partners, employees,
or Consultants. "The parties expressly agree that AE2S or AE2S's
officers, directors, members, partners, or employees have no duty to
defend CLIENT and CLIENT's officers, directors, members, and
employees against any claims, causes of action, demands, lawsuits, or
proceedings of any kind.
b. To the fullest extent permitted by law, CLIENT shall indemnify and
hold harmless AE2S, AE2S's officers, directors, partners, employees,
and consultants from and against costs, losses, and damages (including
but not limited to reasonable fees and charges of engineers, architects,
attorneys, and other professionals, and reasonable court or arbitration or
other dispute resolution costs) to the extent caused by the negligent acts
or omissions of CLIENT or CLIENTS officers, directors, partners,
employees, and consultants with respect to this Agreement.
c. In addition to the indemnity provided under paragraph 4.b. of this
Exhibit, and to the fullest extent permitted by law, CLIENT shall
indemnify and hold harmless AE2S and AE2S's officers, directors,
partners, employees, and consultants from and against injuries, losses,
damages and expenses (including but not limited to all reasonable fees
This is EXfIIBIT A, consisting of 2 pages, referred to in and part of
the Agreement between CLIENT and AE2S dated August 7, 2019.
and charges of engineers, architects, attorneys, and other professionals,
and all court or arbitration or other disputes resolution costs) caused by,
arising out of, or resulting from Hazardous Environmental Condition,
provided that (i) any such injuries, losses, damages and expenses are
attributable to bodily injury, sickness, disease, or death, or to injury to or
destruction of tangible property, including the loss of use resulting
therefrom, and (ii) nothing in this paragraph 4.c. shall obligate CLIENT
to indemnify any individual or entity to the extent of that individual or
entity's own negligence or willful misconduct.
d. To the fullest extent permitted by law, AE2S's total liability to
CLIENT and anyone claiming by, through, or under CLIENT for any
injuries, losses, damages and expenses caused in part by the negligence
of AE2S and in part by the negligence of CLIENT or any other negligent
entity or individual, shall not exceed the percentage share that AE2S's
negligence bears to the total negligence of CLIENT, AE2S, and all other
negligent entities and individuals.
5. Exclusion of Special, Incidental, Indirect, and Consequential Damages
To the fullest extent permitted by law, and notwithstanding any other
provision in the Agreement, AE2S and AE2S's officers, directors,
partners, employees, agents, and Consultants, or any of them, shall not
be liable to CLIENT or anyone claiming by, through, or under CLIENT
for any special, incidental, indirect, or consequential damages
whatsoever arising out of, resulting from, or in any way related to the
Assignment or this Agreement, from any cause or causes, including but
not limited to any such damages caused by the negligence, professional
errors or omissions, strict liability, breach of contract or warranties,
express or implied, of AE2S or AE2S's officers, directors, partners,
employees, agents, or AE2S's Consultants, or any of them.
6. Limit of Liability
To the fullest extent permitted by law, notwithstanding any other
provision of this Agreement, the total liability, in the aggregate, of AE2S
and AE2S's officers, directors, partners, employees, agents, and AE2S's
Consultants, and any of them, to CLIENT and anyone claiming by,
through, or under CLIENT for any and all claims, losses, costs, or
damages whatsoever arising out of, resulting from or in any way related
to the Project or the Agreement from any cause or causes, including but
not limited to the negligence, professional errors or omissions, strict
liability or breach of contract, or warranty express or implied of AE2S
or AE2S's officers, directors, partners, employees, agents, or AE2S's
Consultants, or any of them, shall not exceed total compensation
received by AE2S as part of this agreement.
7. Termination of Contract
Either party may at any time, upon seven days prior written notice to the
other party, terminate this Agreement. Upon such termination, CLIENT
shall pay to AE2S all amounts owing to AE2S under this Agreement, for
all work performed up to the effective date of termination, plus
reasonable termination costs.
8. Access
CLIENT shall arrange for safe access to and make all provisions for
AE2S and AE2S's Consultants to enter upon public and private property
as required for AE2S to perform services under this Agreement.
9. Hazardous Environmental Conditions
It is acknowledged by both parties that AE2S's scope of services does
not include any services related to a "Hazardous Environmental
Condition," i.e. the presence at the site of asbestos, PCBs, petroleum,
hazardous waste, or radioactive materials in such quantities or
circumstances that may present a substantial danger to persons or
property exposed thereto in connection with the Assignment. In the
event AE2S or any other party encounters a Hazardous Environmental
Condition, AE2S may, at its option and without liability for
consequential or any other damages, suspend performance of services on
the portion of the Assignment affected thereby until CLIENT: (i) retains
Exhibit A - Standard Terms and Conditions
Page 1 of 2
appropriate specialist consultant(s) or contractor(s) to identify and, as
appropriate, abate, remediate, or remove the Hazardous Environmental
Condition; and (ii) warrants that the site is in full compliance with
applicable laws and regulations. CLIENT acknowledges that AE2S is
performing professional services for CLIENT and that AE2S is not and
shall not be required to become an "arranger," "operator," "generator,"
or "transporter" of hazardous substances, as defined in the
Comprehensive Environmental Response, Compensation, and Liability
Act of 1990 (CERCLA), which are or may be encountered at or near the
site in connection with AE2S's activities under this Agreement.
14. Force Majeure
AE2S shall not be liable for any loss or damage due to failure or delay
in rendering any service called for under this Agreement resulting from
any cause beyond AE2S's reasonable control.
15.
10. Patents
AE2S shall not conduct patent searches in connection with its services
under this Agreement and assumes no responsibility for any patent or
copyright infiingement arising therefrom. Nothing in this Agreement
shall be construed as a warranty or representation that anything made, 16.
used, or sold arising out of the services performed under this Agreement
will be free from infringement of patents or copyrights.
11. Ownership and Reuse of Documents
All documents prepared or furnished by AE2S pursuant to this
Agreement are instruments of service, and AE2S shall retain an
ownership and property interest therein. Reuse of any such documents
by CLIENT shall be at CLIENTS sole risk; and CLIENT agrees to
indemnify, and hold AE2S harmless from all claims, damages, and
expenses including attorney's fees arising out of such reuse of documents
by CLIENT or by others acting through CLIENT.
No 'Ibird Party Beneficiaries
All duties and responsibilities undertaken pursuant to this Agreement
will be for the sole and exclusive benefit of CLIENT and AE2S and not
for the benefit of any other party. Nothing contained in this Agreement
shall create a contractual relationship with or a cause of action in favor
of a third party against either CLIENT or AE2S. AE2S's services under
this Agreement are being performed solely for CLIENT's benefit, and
no other entity shall have any claim against AE2S because of this
Agreement or the performance or nonperformance of services hereunder.
Assignment
Neither party shall assign its rights, interests or obligations under this
Agreement without the express written consent of the other party.
17. Binding Effect
'Ibis Agreement shall bind, and the benefits thereof shall inure to the
respective parties hereto, their legal representatives, executors,
administrators, successors, and assigns.
18.
12. Use of Electronic Media
a. Copies of Documents that may be relied upon by CLIENT are limited
to the printed copies (also known as hard copies) that are signed or sealed
by the AE2S. Files in electronic media format of text, data, graphics, or
of other types that are furnished by AE2S to CLIENT are only for
convenience of CLIENT. Any conclusion or information obtained or
derived from such electronic files will be at the user's sole risk. 19.
b. When transferring documents in electronic media format, AE2S
makes no representations as to long -term compatibility, usability, or
readability of documents resulting from the use of software application
packages, operating systems, or computer hardware differing from those 20
used by AE2S at the beginning of this Assignment.
c. If there is a discrepancy between the electronic files and the hard
copies, the hard copies govern.
d. Because data stored in electronic media format can deteriorate or be
modified inadvertently or otherwise without authorization of the data's
creator, the party receiving electronic files agrees that it will perform
acceptance tests or procedures within 60 days, after which the receiving
party shall be deemed to have accepted the data thus transferred. Any
errors detected within the 60 -day acceptance period will be corrected by
the party delivering the electronic files. AE2S shall not be responsible
to maintain documents stored in electronic media format after
acceptance by CLIENT.
13. Contractors
AE2S shall not at any time supervise, direct, control, or have authority
over any contractor's work, nor shall AE2S have authority over or be
responsible for the means, methods, techniques, sequences, or
procedures of construction selected or used by any contractor, or the
safety precautions and programs incident thereto, for security or safety
at a project site, nor for any failure of a contractor to comply with laws
and regulations applicable to such contractor's furnishing and performing
of its work. AE2S neither guarantees the performance of any contractor
nor assumes responsibility for any contractor's failure to furnish and
perform its work in accordance with the contract between CLIENT and
such contractor. AE2S shall not be responsible for the acts or omissions
of any contractor, subcontractor, or supplier, or of any of their agents or
employees or of any other persons (except AE2S's own employees) at a
project site or otherwise furnishing or performing any construction work;
or for any decision made regarding the construction contract
requirements, or any application, interpretation, or clarification of the
construction contract other than those made by AE2S.
Severability and Waiver of Provisions
Any provision or part of the Agreement held to be void or unenforceable
under any laws or regulations shall be deemed stricken, and all remaining
provisions shall continue to be valid and binding upon CLIENT and
AE2S, who agree that the Agreement shall be reformed to replace such
stricken provision or part thereof with a valid and enforceable provision
that comes as close as possible to expressing the intention of the stricken
provision. Non - enforcement of any provision by either party shall not
constitute a waiver of that provision, nor shall it affect the enforceability
of that provision or of the remainder of this Agreement.
Survival
All express representations , indemnifications, or limitations of liability
included in this Agreement will survive its completion or termination for
any reason.
Headings
The headings used in this Agreement are for general reference only and
do not have special significance.
21. Controlling Law
'Ibis Agreement is to be governed by the law of the State of Minnesota
without regard to its conflicts of laws principles.
22. Notices
Any notice required under this Agreement will be in writing, addressed
to the appropriate party at its address on the signature page and given
personally, or by registered or certified mail postage prepaid, or by a
commercial courier service. All notices shall be effective upon the date
of receipt.
23. Executed in Counterparts
'Ibis Agreement may be executed in counterparts, each of which together
will constitute one and the same instrument. Delivery of an executed
counterpart of this Agreement shall constitute effective delivery of this
Agreement. Each party agrees that the delivery of the Agreement by
facsimile or electronic mail shall have the same force and effect as
delivery of original signature and that each Party may use such facsimile
or electronic mail signatures as evidence of the execution and delivery
of the Agreement by the parties to the same extent that an original
signature could be used.
Exhibit A - Standard Terms and Conditions
Page 2 of 2
This is EXIIIBIT B, consisting of 2 pages, referred to in and part of the
Agreement between CLIENT and AUS dated [August 7, 2019].
Hourly Fee and Expense Schedule
Reimbursable Expenses and Standard Hourly rates in effect on the date of the Agreement are set forth below. Rates are subject to annual
adjustment effective January 1.
1.9har Rates*
Administrative I
$59.00
I &C Assistant
$82.00
Administrative II
$73.00
I &C Technician I
$100.00
Administrative III
$87.00
I &C Technician II
$112.00
I &C Technician III
$128.00
Communications Specialist I
$90.00
I &C Technician IV
$140.00
Communications Specialist II
$103.00
I &C Technician V
$153.00
Communications Specialist III
$118.00
I &C Specialist
$166.00
Communications Specialist IV
$142.00
I &C Senior Specialist
$175.00
Communications Specialist V
$157.00
I &C Manager
$184.00
Construction Services Rep I
$83.00
IT I
$100.00
Construction Services Manager I
$136.00
IT II
$123.00
Construction Services Manager II
$147.00
IT III
$139.00
Construction Services Manager III
$166.00
IT IV
$157.00
Construction Services Manager IV
$183.00
ITV
$173.00
Construction Services Manager V
$201.00
IT VI
$183.00
IT Manager
$203.00
Engineering Assistant 1
$69.00
Engineering Assistant 2
$88.00
Land Surveyor Assistant
$82.00
Engineer I
$103.00
Land Surveyor I
$98.00
Engineer II
$132.00
Land Surveyor II
$118.00
Engineer III
$157.00
Land Surveyor III
$132.00
Engineer IV
$178.00
Land Surveyor IV
$146.00
Engineer V
$194.00
Engineer VI
$218.00
Marketing Consultant I
$83.00
Engineer VII
$233.00
Marketing Consultant II
$105.00
Engineer VIII
$243.00
Marketing Consultant III
$129.00
Marketing Consultant IV
$147.00
Engineering Technician I
$68.00
Marketing Consultant V
$166.00
Engineering Technician II
$87.00
Engineering Technician III
$103.00
Operations Specialist I
$83.00
Engineering Technician IV
$120.00
Operations Specialist II
$100.00
Engineering Technician V
$136.00
Operations Specialist III
$126.00
Engineering Technician VI
$150.00
Operations Specialist IV
$142.00
Engineering Technician VII
$166.00
Operations Specialist V
$165.00
Financial Analyst I
$90.00
Program Coordinator I
$178.00
Financial Analyst II
$105.00
Program Coordinator II
$190.00
Financial Analyst III
$123.00
Program Coordinator III
$202.00
Financial Analyst IV
$139.00
Financial Analyst V
$157.00
Project Coordinator I
$98.00
Financial Analyst VI
$178.00
Project Coordinator II
$106.00
Financial Analyst VII
$194.00
Project Coordinator III
$119.00
Financial Analyst VIII
$212.00
Project Coordinator IV
$135.00
GIS Specialist I
$88.00
Project Manager I
$168.00
GIS Specialist II
$105.00
Project Manager II
$183.00
GIS Specialist III
$126.00
Project Manager III
$202.00
GIS Specialist IV
$141.00
GIS Specialist V
$155.00
Senior Designer
$190.00
Senior Consultant I
$212.00
Senior Consultant II
$234.00
Senior Consultant III
$248.00
Technical Expert I
$250.00
Technical Expert II
$272.00
Technical Expert III
Negotiable
Exhibit B - Hourly Fee and Expense Schedule
Page 1 of 2
Reimbursable Expense Rates
Transportation
$0.65 /mile
Survey Vehicle
$0.70 /mile
B &W Photocopies 8'/z" x11"
$0.10 /copy
B &W Laser Printouts 8'/z" x11"
$0.20 /page
Color Laser Printouts /Copies 8'/z" x11"
$0.68 /page
Plots — Color Bond
$1.25 /s.f.
Plots — Monochrome Bond/Vellum
$0.75/s.f.
Plots — Fihn/Photo High Gloss
$2.00 /s.f.
UAS - Photo/Video Grade
$100.00 /day
Video Equipment
$100.00 /each
Total Station — Robotic
$35.00/hour
Geo 7 PR GPS
$25.00/hour
Fast Static/RTK GPS
$50.00/hour
RI GNSS GPS
$30.00 /day
Sonar Mite
$50.00 /day
All- Terrain Vehicle/Boat
$100.00 /day
Air Transportation - Pilatus
$1,600.00/hour
Air Transportation — Cirrus
$700.00/hour
In -house Lodging
$150.00 /day
Legal Services Reimbursement
$224.00/hour
Outside Services **
cost *1.15
Geotechnical Services
cost *1.30
Out of Pocket Expenses * **
cost *1.15
Rental Car
cost *1.20
* Position titles are for labor rate grade purposes only.
** Includes laboratory testing, architectural and
engineering consultants, surveying, etc.
* ** Includes toll telephone, shipping, postage,
subsistence, technical literature, equipment rental, etc.
These rates are subject to adjustment each year on January 1.
Exhibit B — Hourly Fee and Expense Schedule
Page 2 of 2
+ 5
t
horewood
Christmas 7
La Ice
PROJECT LOCATION
Christmas
.Silver Lake
0 5 1004i#
• i r _
y
x
IT T�
r �Ii
_ i I
1p
f- -- f
II
ATTACHMENT 2
SITE LOCATION MAP