Loading...
Newsletter 071116The 2016 Mill and Overlay Project is Beginning! Construction is beginning the week of July 18, 2016 and will generate dust, noise, vibrations, and temporary inconveniences. It will be the projects team’s goal to minimize the impact to residents during the construction activities. As with all construction projects, patience and communication are needed to complete a successful project. Please contact us with your questions, comments, and concerns. Trees, Shrubs, Landscaping, and Lawn Irrigation Systems? The on-site project representative will be out marking landscaping items within the City right-of-way that will need to be removed in order to replace deficient concrete curb and gutter and resolve minor drainage issues. If you have any landscaping items such as shrubs, flowers, rock gardens, yard lights, etc. that you would like to save and reinstall yourself after construction please remove these items from the City right-of-way. If you have a lawn irrigation system within the City right- of-way, please mark the location of the sprinkler heads, this will allow the contractor to take precautionary measures to protect your irrigation system or identify where to replace the system if it cannot be avoided. If you are unsure whether your landscaping items will be impacted by construction, please contact Matt Havlik to schedule a meeting at your residence. Garbage Service During construction, garbage haulers may not have access to the front of your home. Please add your home address to your trash receptacle using a piece of tape and a permanent maker. Please have your trash receptacles curbside by 6:00 am on collection days. If necessary, the contractor will move your trash receptacle to a location accessible to the garbage hauler. 2016 Mill and Overlay Improvement Project July 11, 2016 Garden Road, Gillette Curve, McKinley Place N, McKinley Place S, Shady Hills Circle Special events, deliveries, garage sales, etc. If you are anticipating a special delivery, open house, or any other activity during the summer construction schedule, please notify the on-site project representative of the time and date in which this will occur. The contractor and project staff will do their best to provide access. Changes to Construction Schedule Please be aware the construction schedule may change throughout the project as a result of weather conditions or other activities beyond the contractor’s control. Should a major change in the schedule be anticipated, we will do our best to communicate the change through this newsletter and door hangers through your field contact, Matt Havlik Driveway Access Residents will have access to their driveways for the majority of the construction projects. There may be short periods during the day where a resident may not have access to his/her driveway due to roadway construction. Property owners will be provided as much advance notification as possible when access to driveways will be restricted. Thank you for your patience The project team will do its best to complete the project in a timely fashion and minimize disturbances to your property. Please be patient and if you have questions don't hesitate, call us! Project Notifications Sign up to receive email updates and notification regarding City road construction projects on the City’s website at www.ci.shorewood.mn.us Working Hours Working hours for the City of Shorewood are limited to 7:00 a.m. to 7:00 :.m. Monday through Friday, and from 9:00 a.m. to 5:00 p.m. on Saturdays. No work shall be performed on Sundays and holidays unless authorized by the Engineer. Matt Havlik Onsite Project Rep (612) 246-9347 Paul Hornby City Engineer (952) 960-7910 Project Contacts  Please observe posted detour and warning signs.  Please do not park vehicles on streets under construction.  Slow down and watch for uneven surfaces.  Stay alert! Watch for signs, equipment, and workers.  Please remind children to stay away from the construction site, equipment, and stockpiles of materials. Additional Information and Tips: