Loading...
20-025CITY OF SHOREWOOD COUNTY OF HENNEPIN STATE OF MINNESOTA RESOLUTION 20 -025 A RESOLUTION TO PREPARE FEASIBILITY REPORT AND PRELIMINARY DESIGN FOR THE SHOREWOOD OAKS DRAINAGE PROJECT CITY PROJECT 20 -04 WHEREAS, a draintile was installed in the Shorewood Oaks development that was intended to provide outlets to sump pumps, potentially footing drains, and lower the elevations of groundwater; and WHEREAS, over the years there has been storm events which have caused sump pumps backups and damage to basements; and WHEREAS, the current Capital Improvement Plan (CIP) identifies improvements to the Shorewood Oaks Drainage in 2020; and WHEREAS, staff has worked with Barr Engineering to review concept alternatives as part of the Western Shorewood Drainage Study, in which a recommended solution has been identified; and WHEREAS, the City Council as appointed Bolton & Menk as the City Engineer and will prepare the feasibility report and preliminary design for the Shorewood Oaks Drainage project; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD, MINNESOTA AS FOLLOWS: 1. The City Council of the City of Shorewood, Minnesota authorizes Bolton & Menk to complete a feasibility report and preliminary design for the Shorewood Oaks Drainage project. Passed by the City Council of Shorewood, Minnesota this 23rd day of March, 2020. Sco Zerby, M or