20-058 CITY OF SHOREWOOD
COUNTY OF HENNEPIN
STATE OF MINNESOTA
RESOLUTION 20-058
A RESOLUTION TO PREPARE FEASIBILITY STUDY AND PRELIMINARY DESIGN
FOR THE SMITHTOWN POND PROJECT
CITY PROJECT 20-07
WHEREAS, the current Capital Improvement Plan (CIP) identifies improvements to
Smithtown Pond which is a new regional storm water pond that will benefit upstream
and downstream watersheds by providing water storage and rate control; and
WHEREAS, the above improvements are identified in the CIP for 2021 construction and
is required to be constructed prior to Strawberry Lane Reconstruction and Trail project
which is scheduled for 2022 construction; and
WHEREAS, the City has completed the Western Shorewood Drainage Study and the
recommended alternatives for the project area will be incorporated into the design; and
WHEREAS, the City Council as appointed Bolton & Menk as the City Engineer and will
prepare the feasibility report and preliminary design for the Smithtown Pond project; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
SHOREWOOD, MINNESOTA AS FOLLOWS:
1. The City Council of the City of Shorewood, Minnesota authorizes Bolton & Menk
to complete a feasibility study and preliminary design for the Smithtown Pond
project.
Passed by the City Council of Shorewood, Minnesota this 8th day of June, 2020.
tt Zer y r
Sandie Thone, City Clerk