2015-03-23_STAR_LANE_&_STAR_CIRCLE_RECONSTRUCTIONREVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
t
it
le
.d
g
n
4
/
13
/
20
15
1:3
5:0
8
PM
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
MAP
L
E
ST .
W.
E
G
GEOR
AVE.
GLEN
CO
AVE.MON
PARK
ST.
G
L
ENC
O
E
R
D.
RD.
WOOD
D
U
C
K
C
I
R
.
GILLETTE
CLOVER
LA.
DERLE
TR.
M
CLAIN
TI
M
BER
M
I
N
NET
O
N
K
A
DR.
Lake
Linden
Mary
L
A
K
E
DR.
R
I
V
IE
RA
L
A.
ECHO
RD.
SHOR LA.LA.
Gideon Bay
P
E
N
S
T.LAKEVIEW
CRABAPPLE LA.BIRCH
BLUFF
L
I
L
A
H
L
A
.
WOO DLAWN AVE.
M
O
U
N
D
A
V
E.
AVE.AMLEE RD.
MA
NIT
OU
LA.
GLEN RD.
S
T
A
R
L
A
.
M
A
L
L
A
R
D
T
E
A
L
L
A.L
A.
C
LUB
L
A
.
M
A
NI
T
O
U
MA
N
I
T
OU
R
D.
WOO
D
L
A
N
E
S
T
.
B
AY
S
T
.
C
O
U
NT
R
Y
CL
U
B
RD.
T
E
E
T
R.
C
LUB
VA
LL
E
Y
RD.
YELLOWSTONE TR.
S
E
A
MA
N
S
DR
.
E
U
R
E
KA
WA
Y
LEE
CI
R.
RD.BLUFF
ORCHARD
CIR.
V
I
E
W
SUNNY VALESY
LV
A
N
LA.
W
IL
DR.
LA.
LA.
MEADO
W
L
A.
SMITHTOWN
LA.
D ROSE
GEDI
OAK R CIR.
DG
E
RD.
BARBER
R
YCIR.D
R.L
A
.
AV
E.
V
E.
AVE.CHASKA
MANN LA.
City
Hall
E
U
RE
KA
R
D
.
CHARLES
TON
CI
R
.
Island Island
Duck Frog
RD.
19
19
7
7
LI
N
DEN
35. ELM ST.
39. ELM PL.
40.
40. LAFAYETTE ST.
AVE.
PEACH CIR.
HAR
D
ING
L
A
.
AKNO
LAW
T
D
R.
WILTSEY LA.
MANORRD.N.
WAS
LA.
ORCHARD
WOOD DR.RA
MPART
CT.
RIDGE POINT
CIR.
E
U
RE
KA
M
A
P
L
E
L
E
A
F
C
I
R
.
OAKS
OAK LEAF
BUR
LWOOD
S
T
R
AWBE
R
R
Y
LA.
BERRY
S
P
R
U
C
E
H
I
L
L
C
T
.
36. MINNETONKA BLVD.
37. AREY LA.
38. LINDEN ST.
L
A
.
MARY LAKE TR.VIEW
WAY
S
MI
T
H
T
OWN
STAR
CIR.
RD.
AV E.
C
HR
I
S
T
O
P
HE
R
R
D
.
ACAD
ROE
LAKE
S
MI
T
H
T
O
W
N
CI
R.
CT.
P
L
E
A
S
A
N
T
A
V
E.
41. FLORENCE DR.
41.
4
1.
PARK LA.P
O
N
D
VIEW
DR.
OR
I
O
L
E AVE.
CURVE
D
R
.
SHOR
NT
SA
P
L
E
A
E.
UPHRRT
NO AVE.
OR
CH
RD.
WAS
EC
A
MA P L E CT
.
D
R.
SMITH
TOWN F
A
I
RWA
Y
HARDING
KE
L
S
E
Y
DR
.
PLEASANT AVE.
L.LIN
C
T
.
D
N
HI
GHP
OI
NT
ERD.OAK
S
A
M
S
WA
Y
R
D.
L
A.
P
LE
AS
ANT
LA.
W.
GI
D
E
O
N
S
WOO
D
E
19
R
D.
BRENTWOOD
SMITH TOWN RD.
OD LA.VALLEYWOVALL
EYWOOD
CI
R
.
W EDG E W O OD
DR.
NELSINE
ASH
TA
W
BA
B
O
R
C
H
U
R
C
H
R
D.
EWOOD
TR.
APLE
ERRY
CREEK
ARBOR
LA.
BIRCH
G
RAN
T
R
D
.
LOR
E
NZ
E
EL
A
KE
R
D
.
Title Sheet
PROPOSED EDGE OF BITUMINOUS
PROPOSED FACE OF CURB
EXISTING HYDRANT
PROPOSED HYDRANT
EXISTING WATERMAIN
PROPOSED WATERMAIN
EXISTING CATCH BASIN
PROPOSED CATCH BASIN
EXISTING STORM
PROPOSED STORM
EXISTING SANITARY
PROPOSED SANITARY
INDEX
EXCAVATION NOTICE SYSTEM
PERFORMING ANY EXCAVATION.
REQUIRED A MINIMUM OF 48 HOURS PRIOR TO
A CALL TO GOPHER STATE ONE (454-0002) IS
AVOID DAMAGE THERETO.
IS TO DETERMINE THE TYPE AND LOCATION OF PRIVATE UTILITIES AS MAY BE NECESSARY TO
PRIVATE UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE THE CONTRACTOR
THE INFORMATI0N SHOWN ON THESE DRAWINGS CONCERNING THE TYPE AND LOCATION OF
"STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE DATA".
THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF CI/ASCE 38-02, ENTITLED
AND LOCATION OF PRIVATE UTILITIES HAS BEEN DESIGNATED UTILITY QUALITY LEVEL D.
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE
TO OBTAIN A FIELD LOCATE OF ALL UTILITIES.
STATE LAW REQUIRES ANYONE DIGGING, GRADING OR EXCAVATING
SHEET NO.DESCRIPTION
WITH IN THE CONSTRUCTION OF THIS PROJECT.
ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES WILL BE COMPLIED
INFORMATION IS FOR GENERAL USE ONLY AND NOT INTENDED TO BE USED FOR EXCAVATION PURPOSES.
TO THE BEST OF OUR KNOWLEDGE, FROM DRAWINGS SUPPLIED BY OTHERS. THIS
TYPE AND LOCATION OF PRIVATE UTILITIES, AS OF THE PRINTED DATE, HAS BEEN DEPICTED
THE SUBSURFACE UTILITY INFORMATION REPRESENTED ON THESE DRAWINGS CONCERNING
33THIS PLAN CONTAINS SHEETS.
1
GOVERNING SPECIFICATIONS
for the City of Shorewood , Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
150560755
TICKET NUMBER:
PLAN SYMBOLS
0 30 60
30 - 33
24 - 29
20 - 23
16 - 19
13 - 15
12
11
10
7-9
6
5
4
3
2
1
TRAFFIC CONTROL ZONE LAYOUTS, DATED JANUARY 2014.
DATED MAY 2013, INCLUDING THE FIELD MANUAL FOR TEMPORARY
TO THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
ALL TRAFFIC CONTROL DEVICES AND SIGNING SHALL CONFORM
OR AS MODIFIED IN THE PROJECT MANUAL.
AND STORM SEWER INSTALLATION" REFERENCED "CEAM" DATED 2013,
"STANDARD UTILITIES SPECIFICATION FOR WATERMAIN SERVICE LINE INSTALLATION
SPECIAL PROVISIONS, AND ANY AMENDMENTS THERETO AND THE
OF THE "MATERIALS LAB SUPPLEMENTAL SPECIFICATIONS FOR CONSTRUCTION" SHALL GOVERN,
"STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION." AND THE 2014 EDITION
THE 2014 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION
Storm Water Pollution Prevention Plan
Cross Sections
Street Construction Plan
Storm Sewer Construction Plan
Watermain Construction Plan
Erosion Control / Turf Establishment Plan
Existing Conditions / Removal Plan
Typical Section
Miscellaneous Details
General Layout / Directional Surface Drainage
Earthwork Tabulation
Sign / Storm Sewer Tabulation
Statement of Estimated Quantities
Construction Notes / Standard Plates
Title Sheet
HENNEPIN COUNTY (CITY OF SHOREWOOD)
CARVER COUNTY (CITY OF CHANHASSEN)
PROJECT LOCATION
UTILITY NOTES
CONSTRUCTION NOTES CONSTRUCTION NOTES
UTILITY CONTACTS
THE FOLLOWING LIST SHOWS THE CONTACT PERSON AT THE UTILITY COMPANIES INVOLVED IN THIS PROJECT
2
EROSION CONTROL NOTES
Construction Notes / Standard Plates
SURFACE AND THE BOTTOM OF THE EXCAVATION.
PROJECTING A 1(V) : 2(H) OR FLATTER SLOPE BETWEEN THE EDGE OF THE TRAFFIC
EXCAVATION. THE DELINEATION SHOULD COINCIDE WITH POINTS ESTABLISHED BY
MUST BE DELINEATED TO KEEP VEHICLES A SAFE DISTANCE AWAY FROM THE ADJACENT
C12. AS A PRECAUTIONARY MEASURE, TRAFFIC LANES TO BE USED DURING CONSTRUCTION
A 1(V):20(H) TAPER TO THE BOTTOM OF THE RECOMMENDED SUBGRADE EXCAVATION.
CONSTRUCTION, CUT VERTICALLY TO THE BOTTOM OF THE IN PLACE SURFACING THEN AT
C11. WHERE CONNECTING TO IN PLACE ROADWAYS AT THE TERMINI OF THE PROPOSED NEW
C10. SELECT GRANULAR MATERIAL SHALL MEET THE REQUIREMENTS OF MN/DOT SPECIFICATION 3149.2B
IN ACCORDANCE WITH MN/DOT SPECIFICATION 2104.3D3.
PROPERTY OF THE CONTRACT0R AND SHALL BE DISPOSED OUTSIDE OF THE RIGHT OF WAY
C9. BITUMINOUS AND CONCRETE ITEMS DISTURBED BY CONSTRUCTION SHALL BECOME THE
CONSTRUCTION TO PROVIDE A MEDIUM FOR ESTABLISHING TURF.
C8. SLOPE DRESSING ON THIS PROJECT IS DEFINED AS THE TOPSOIL PLACED DURING
BY CONSTRUCTION AND REUSE AS SLOPE DRESSING.
C7. STRIP ALL IN PLACE TOPSOIL AND SLOPE DRESSING IN AREAS TO BE DISTURBED
WITH MN/DOT SPECIFICATION 2104.3D3.
CONSIDERED EXCESS MATERIAL AND DISPOSED OF OUTSIDE THE RIGHT OF WAY IN ACCORDANCE
C6. EXCAVATED MUCK AND UNSTABLE ORGANIC MATERIAL (SUBGRADE EXCAVATION) SHALL BE
EXISTING BITUMINOUS LAYER TO THE TOP OF THE PROPOSED SUBGRADE.
C5. COMMON EXCAVATION MATERIAL SHALL CONSIST OF ALL SOILS ENCOUNTERED BELOW THE
IN ACCORDANCE WITH ALL OSHA REQUIREMENTS.
C4. ALL CONSTRUCTION AS CALLED FOR IN THESE CONTRACT DOCUMENTS SHALL BE PERFORMED
NECESSARY TO AVOID DAMAGE THERETO.
CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR OWN DETERMINATION AS MAY BE
PRIVATE UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL-INCLUSIVE. THE
C3. THE INFORMATION SHOWN ON THESE PLANS CONCERNING TYPE AND LOCATION OF
SHALL CALL GOPHER STATE ONE CALL A MINIMUM OF 48 HOURS PRIOR TO EXCAVATION.
UTILITIES SUCH AS TELEPHONE, GAS, CABLE TV, ETC. (INCIDENTAL). THE CONTRACTOR
C2. THE CONTRACTOR IS TO COORDINATE ALL SURFACE CONSTRUCTION WITH PRIVATE
AREA AS IDENTIFIED IN THE PLANS.
REVIEW AND APPROVAL. THE CONTRACTOR SHALL CONTAIN OPERATIONS TO THE STAGING
C1. THE CONTRACTOR SHALL DEVELOP AND SUBMIT A STAGING PLAN TO THE ENGINEER FOR
cthompson1@mediacomcc.com
(612) 730-2900
Chris Thompson
MEDIACOMM
traci.n.miest@xcelenergy.com
(952) 470-3343
Traci Carlson
XCEL ENERGY
bradley.steber@centerpointenergy.com
(612) 321-5043
Bradley Steber
CENTERPOINT ENERGY
lbrown@shorewoodpw.com
(952) 960-7913
Larry Brown
CITY OF SHOREWOOD
michael.spieker@centurylink.com
(612) 381-2599
Michael Spieker
CENTURY LINK
FEDERAL THE BY APPROVED PLATES, STANDARD FOLLOWINGTHE
PROJECT THIS ON APPLY SHALL ADMINISTRATION,HIGHWAY
PLATES STANDARD MNDOT
PLATE No.DESCRIPTION
3000L SHEETS) (5 PIPE CONCRETEREINFORCED
3006G SHEETS) (2 PIPE R.C. FOR JOINTGASKET
3007E STRUCTURES DRAINAGE PRECAST FOR REINFORCEMENTSHEAR
3014J SHEETS) (2 ARCH PIPE CONCRETEREINFORCED
3110G PIPE-ARCH CONCRETE REINFORCED FOR APRONCONCRETE
3131C DRAINS SUBSURFACE FOR HEADWALL CONCRETEPRECAST
4007C MANHOLE SEWER JOINT MECHANICALPRECAST
4010H CONCRETE) (SECTIONAL RING ADJUSTING & CONE SHORTCONCRETE
4011E BASE CONCRETEPRECAST
4020J SHEETS) (2 LOADS) TRAFFIC WITHOUT OR WITH USE (FOR BASIN CATCH ORMANHOLE
4022A OPENING) ft. 2 X ft. (3 COVER BASIN CATCH ORMANHOLE
4024A SD DESIGN - BASIN CATCH DEPTH SHALLOW PRECAST DIA.48"
4026A RINGS ADJUSTING CONCRETE ENCASEDCONCRETE
4101D BASIN CATCH OR MANHOLE FOR CASTINGRING
4108F MANHOLES AND BASINS CATCH FOR RINGSADJUSTING
4110F 716AND 715 NO. CASTING AREAS) TRAFFIC ALL IN USE (FOR MANHOLE FOR CASTINGCOVER
4180J STEP BASIN CATCH ORMANHOLE
7111J GUTTER) AND CURB (CONCRETE CASTINGS BASIN CATCH OFINSTALLATION
NOT BE SHOWN ON THESE PLANS.
ENGINEER PRIOR TO START OF REMOVAL / SALVAGE WORK, AND MAY
C22. THE LIMITS OF DRIVEWAY REMOVAL SHALL BE DETERMINED BY THE
RESPONSIBILITY TO VERIFY EXACT LOCATIONS AND ELEVATIONS.
SHOWN ON THESE PLANS ARE APPROXIMATE IT IS THE CONTRACTORS
CONSTRUCTION AT NO ADDITIONAL COMPENSATION. EXISTING UTILITIES
C21. THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES DURING
AND AS AMENDED BY THE SPECIAL PROVISIONS.
AS SET IN MN/DOT SPECIFICATIONS 1717, 1803, 2101, 2105, 2573, AND 2575,
CONSTRUCTION IN A MANNER THAT WILL CONTROL EROSION. MAINTAIN EROSION CONTROL
HOWEVER RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO CONDUCT
BEEN SHOWN ON THE PLANS ALONG WITH PAY ITEMS FOR THEIR USE. THIS DOES NOT
C20. TEMPORARY EROSION CONTROL DEVICES AND THEIR SUGGESTED LOCATIONS HAVE
A BID ITEM HAS BEEN PROVIDED IN THE PROPOSAL FORM.
INCIDENTAL TO THE ITEM WHICH REQUIRES THE REMOVAL AND/OR RELOCATION, UNLESS
WITHIN THE PROJECT LIMITS WITH THE APPROPRIATE OWNERS. THIS WORK SHALL BE
MISCELLANEOUS STRUCTURES SUCH AS PRIVATE SIGNS, GARBAGE PICK UPS, ETC.
C19. THE CONTRACTOR SHALL COORDINATE THE REMOVAL AND REINSTALLATION OF ALL
EMBANKMENT, AND/OR BORROW MATERIAL.
C18. NO EXTRA PAYMENT WILL BE MADE FOR TEMPORARY STOCKPILING OF EXCAVATION,
NO DIRECT PAYMENT SHALL BE MADE.
C17. WHENEVER THE WORD "INCIDENTAL" IS USED IN THIS PLAN, IT SHALL MEAN THAT
WITH MN/DOT SPECIFICATION 2357.
THE ASPHALT EMULSION MAY BE FURTHER DILUTED IN THE FIELD IN ACCORDANCE
UNDILUTED EMULSIONS (AS SUPPLIED FROM THE REFINERY) OR MC RC LIQUID ASPHALTS.
LAYERS AND AT THE FACE OF CURB & GUTTER. THE APPLICATION RATE IS FOR
SHALL BE APPLIED AT A UNIFORM RATE OF 0.05 GAL/SQ YD BETWEEN BITUMINOUS
BITUMINOUS MIXTURES ON EXISTING PAVEMENT. THE BITUMINOUS TACK COAT MATERIAL
C16. USE TACK COAT BETWEEN ALL BITUMINOUS LAYERS AND PRIOR TO PLACING ANY
SPECIFICATIONS OR AS MODIFIED IN THE SPECIAL PROVISIONS.
C15. TEST ROLLING OF THE SUBGRADE WILL BE REQUIRED, ACCORDING TO THE 2014 MN/DOT
C14. DITCH GRADES AND TOP OF DITCH BLOCK ELEVATIONS ARE TO THE TOP OF TOPSOIL.
IN THE GROUND WATER ELEVATION.
ANNUAL PRECIPITATION. THE CONTRACTOR WILL NOT BE COMPENSATED FOR ANY CHANGES
C13. GROUND WATER ELEVATIONS MAY FLUCTUATE DUE TO VARIATIONS IN SEASONAL AND
SHALL BE DEPRESSED .04’ (1/2").
U6. ALL GATE VALVE BOXES LOCATED IN BITUMINOUS STREET SECTION
U5. CATCH BASIN TOP OF CASTINGS ARE DEPRESSED .17’ (2"). (NEENAH R-3067-V).
THIS WORK SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT.
STORM SEWER SYSTEM. ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY TO COMPLETE
U4. THE CONTRACTOR SHALL STAGE CONSTRUCTION TO MAINTAIN DISCHARGE FROM EXISTING
72 HOURS IN ADVANCE. CITY WILL TURN ALL GATE VALVES ON/OFF (NOT CONTRACTOR).
OWNERS AND THE CITY PUBLIC WORKS STAFF A MINIMUM OF
WATERMAIN, THEY MUST ALSO COORDINATE WITH THE AFFECTED PROPERTY
U3. IF THE CONTRACTOR SHALL COORDINATES WITHG THE CITY TO SHUT OFF THE
CONSTRUCTION SHALL BE REPLACED AT NO ADDITIONAL COMPENSATION.
SECTION DURING GRADING OPERATIONS. VALVE BOXES THAT ARE DAMAGED DURING
U2. ALL VALVE BOXES SHALL BE LOWERED TO AN ELEVATION BELOW THE SUBGRADE
ADJUSTED TO MATCH THE FINISH GRADE.
U1. ALL EXISTING GATE VALVE BOXES WITHIN THE GRADING AND ROADWAY AREA ARE TO BE
EROSION CONTROL MEASURES TO BE USED.
E14. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER FOR STAGING OF TEMPORARY
AT THE CONTRACTOR’S EXPENSE, PER SWPPP.
E13. MULTIPLE STREET SWEEPINGS MAY BE AUTHORIZED AT THE DISCRETION OF THE ENGINEER
ON SITE. THE CONTRACTOR SHALL USE SELF CONTAINED TRUCK WASHOUT SYSTEM ONLY.
E12. CONCRETE WASHOUT AND CONSTRUCTION EQUIPMENT CLEANING / REPAIR IS PROHIBITED
E11. FINAL STABILIZATION MUST BE IMPLEMENTED WITHIN 7 DAYS OF FINAL GRADING.
E10. SILT FENCE TO BE INSTALLED AS DIRECTED BY THE ENGINEER.
THERE IS EXPOSED SOIL UP GRADIENT OF THE STREET.
E9. SEDIMENT CONTROLS ARE REQUIRED ALONG THE BACK OF CURB AT ALL TIMES WHEN
DEVICES FOR STOCKPILES.
E8. THE CONTRACTOR SHALL PROVIDE APPROPRIATE EROSION AND SEDIMENT CONTROL
OFTEN TO ENSURE PUBLIC SAFETY.
AT ALL TIMES. ANY SEDIMENT OR DEBRIS SHALL BE REMOVED WITHIN 24 HOURS OR AS
E7. ALL STREETS IN AND ADJACENT TO THE PROJECT SHALL REMAIN CLEAN AND PASSABLE
ESTABLISHMENT WHENEVER POSSIBLE.
E6. STABILIZATION OF DISTURBED AREAS SHALL BE DONE BY PERMANENT TURF
BEST MANAGEMENT PRACTICES MANUAL, SWPPP AND MINNESOTA STORM WATER MANUAL.
E5. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED ACCORDING TO THE MPCA
AS SHOWN UNTIL ALL DISTURBED SURFACES ARE RESTORED.
INFILTRATION OF SILT DURING CONSTRUCTION BY APPROVED INLET PROTECTION
E4. ALL EXISTING AND NEW STORM SEWER STRUCTURES SHALL BE PROTECTED FROM
CONSTRUCTION AS DIRECTED BY THE ENGINEER.
E3. ADDITIONAL SEDIMENT CONTROLS MAY BE ADDED DURING ANY PHASE OF
ANY PHASE OF CONSTRUCTION BEGINS.
E2. EROSION CONTROL MUST BE IN PLACE AND APPROVED BY THE ENGINEER BEFORE
E1. FURNISH AND INSTALL SEDIMENT CONTROLS AS APPROVED BY THE ENGINEER.
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
c
s
n
.d
g
n
4
/
13
/
20
15
1:3
5:15
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
3
Statement of Estimated Quantities
QUANTITIES ESTIMATED OFSTATEMENT
No.
Item
No.
Specification
MN/DOT
Description Notes Unit
Quantity
Total
Estimated
IMPROVEMENTS STREET A.SCHEDULE
1 2021.501 MOBILIZATION SUMLUMP 1
2 2101.501 CLEARING 1 ACRE 0.07
3 2101.502 CLEARING 1 TREE 19
4 2101.505 GRUBBING 1 ACRE 0.07
5 2101.507 GRUBBING 1 TREE 19
6 2104.501 RAIL BARRIER TIMBER REMOVE FTLIN 10
7 2104.505 PAVEMENT BITUMINOUS REMOVE 2 YDSQ 3600
8 2104.505 PAVEMENT DRIVEWAY BITUMINOUS REMOVE 3 YDSQ 370
9 2104.509 SIGN REMOVE EACH 3
10 2104.509 SUPPORT MAILBOX REMOVE EACH 2
11 2104.513 DEPTH) (FULL PAVEMENT BITUMINOUS SAWING FTLIN 340
12 2104.521 FENCE WOODEN SALVAGE 3,4 FTLIN 270
13 2104.523 LIGHT YARD SALVAGE 3 EACH 1
14 2104.601 STRUCTURES LANDSCAPE REINSTALL & SALVAGE SUMLUMP 1
15 2104.602 MAILBOX REINSTALL AND SALVAGE EACH 15
16 2104.618 PAVER BRICK REINSTALL AND SALVAGE 4 FTSQ 320
17 2105.501 (P) (EV) EXCAVATION COMMON YDCU 3650
18 2105.507 (EV) EXCAVATION SUBGRADE 3 YDCU 370
19 2105.522 (CV) BORROW GRANULAR SELECT YDCU 2700
20 2105.604 V TYPE FABRIC GEOTEXTILE 3 YDSQ 4100
21 2112.501 PREPARATION SUBGRADE STAROAD 10
22 2123.610 BROOM) PICKUP (WITH SWEEPER STREET 2 HOUR 20
23 2130.501 WATER 2 MGAL 20
24 2211.501 CRUSHED) (100% 5 CLASS BASE AGGREGATE 5 TON 1700
25 2357.502 COAT TACK FOR MATERIAL BITUMINOUS GALLON 190
26 2360.501 (2,C) MIX COURSE WEARING 9.5 SP TYPE TON 420
27 2360.502 (2,C) MIX COURSE WEAR NON 12.5 SP TYPE TON 420
28 2360.503 DWY THICK) (3.0" (2,C) MIX COURSE WEARING 9.5 SP TYPE 6 YDSQ 370
29 2504.602 REPAIR SYSTEM IRRIGATION EACH 2
30 2505.601 COORDINATION UTILITY SUMLUMP 1
31 2531.501 B618) DESIGN & (SURMOUNTABLE GUTTER & CURB CONCRETE FTLIN 2040
32 2540.601 (TEMPORARY) BOX MAIL EACH 15
33 2540.602 SUPPORT BOX MAIL EACH 2
34 2545.602 LIGHT YARD SALVAGED INSTALL 3 EACH 1
35 2557.602 FENCE DOG REPAIR 4 EACH 1
36 2563.601 CONTROL TRAFFIC SUMLUMP 1
37 2564.531 C TYPE PANELS SIGN FTSQ 13
38 2564.602 SPECIAL TYPE PANELS SIGN EACH 2
39 2571.501 B&B HT 8’ TREE CONIFEROUS TREE 2
40 2571.502 B&B CAL 2.5" TREE DECIDUOUS TREE 2
41 2572.502 CUTTING ROOT CLEAN 1 FTLIN 100
42 2573.502 SLICED MACHINE TYPE FENCE, SILT FTLIN 500
43 2573.530 PROTECTION INLET DRAIN STORM EACH 12
44 2573.540 FIBER WOOD TYPE LOG CONTROL SEDIMENT FTLIN 500
45 2573.602 ENTRANCE CONSTRUCTION ROCK TEMPORARY EACH 1
46 2574.525 (CV) BORROW TOPSOIL COMMON 3 YDCU 50
47 2575.502 33-261 MIX SEED LBS 10
48 2575.505 FERT) & TOPSOIL (INCL LAWN TYPE SODDING YDSQ 3400
49 2575.523 2 CATEGORY BLANKET CONTROL EROSION YDSQ 730
50 2575.571 3 METHOD STABILIZATION RAPID MGAL 100
51 2575.604 FERT) & TOPSOIL (INCL. SEEDING ACRE 0.15
QUANTITIES ESTIMATED OFSTATEMENT
No.
Item
No.
Specification
MN/DOT
Description Notes Unit
Quantity
Total
Estimated
IMPROVEMENTS SEWER SANITARY B.SCHEDULE
52 2104.523 CASTING SALVAGE 8 EACH 5
53 2503.602 SEALS CHIMNEY EACH 5
54 2503.603 REPAIR SPOT LINER SEWER EACH 2
55 2503.603 MANHOLE GROUT CHEMICAL EACH 1
56 2506.516 ASSEMBLY CASTING EACH 5
57 2506.602 (SPECIAL) CASTING RING AND FRAME ADJUST 4 EACH 2
IMPROVEMENTS SEWER STORM C.SCHEDULE
58 2104.501 (STORM) PIPE SEWER REMOVE FTLIN 100
59 2105.601 GRADING SITE 1 SUMLUMP 1
60 2105.604 IV TYPE FABRIC GEOTEXTILE YDSQ 50
61 2451.509 (CV) BEDDING AGGREGATE 3 YDCU 40
62 2451.601 BEDDING AND/OR FOUNDATION GRANULAR 3 YDCU 300
63 2501.501 HEADWALL CONCRETE PRECAST 4"EACH 3
64 2501.521 CULVERT PIPE-ARCH CS SPAN 28" FTLIN 40
65 2501.525 APRON PIPE-ARCH RC SPAN 28"EACH 1
66 2501.525 APRON PIPE-ARCH CAS SPAN 28"EACH 2
67 2501.602 APRON PIPE SPAN 28" FOR GUARD TRASH EACH 3
68 2502.541 DRAIN PIPE PVC 4" FTLIN 60
69 2502.541 DRAIN PIPE PVC PERF 4"7 FTLIN 220
70 2502.541 DRAIN PIPE PE PERF 4"7 FTLIN 1560
71 2502.602 CLEANOUT DRAIN PIPE PVC 4"EACH 6
72 2503.521 IIA CL SEWER PIPE-ARCH RC SPAN 28" FTLIN 560
73 2503.541 V CL 3006 DESIGN SEWER PIPE RC 12" FTLIN 180
74 2503.541 V CL 3006 DESIGN SEWER PIPE RC 15" FTLIN 150
75 2506.501 48-4020 DES STRUCTURE DRAINAGE CONST FTLIN 13
76 2506.501 60-4020 DES STRUCTURE DRAINAGE CONST FTLIN 5
77 2506.501 72-4020 DES STRUCTURE DRAINAGE CONST FTLIN 28
78 2506.501 SPECIAL DES STRUCTURE DRAINAGE CONST EACH 5
79 2506.516 ASSEMBLY CASTING EACH 9
80 2511.501 III CLASS RIPRAP RANDOM YDCU 20
81 2511.501 II CLASS RIPRAP RANDOM YDCU 10
82 2531.604 FLUME DRAINAGE CONCRETE YDSQ 10
83 2573.602 BLOCK DITCH EACH 1
IMPROVEMENTS MAIN WATER 1.ALTERNATE
1 2021.501 MOBILIZATION SUMLUMP 1
2 2104.501 MAIN WATER REMOVE FTLIN 20
3 2104.509 BOX AND VALVE GATE REMOVE EACH 1
4 2104.523 VALVE AND HYDRANT SALVAGE EACH 1
5 2503.620 FITTINGS IRON DUCTILE POUND 1300
6 2504.602 BOX AND VALVE GATE 8"EACH 1
7 2504.602 BOX AND VALVE GATE 6"EACH 4
8 2504.602 HYDRANT SALVAGED INSTALLED EACH 1
9 2504.602 HYDRANT EACH 3
10 2504.602 BOX AND STOP CURB 1"EACH 13
11 2504.602 STOP CORPORATION 1"EACH 13
12 2504.602 SADDLE 6"EACH 2
13 2504.602 MAIN WATER EXISTING TO CONNECT EACH 1
14 2504.603 52 CL IRON MAIN-DUCT WATER 8" FTLIN 780
15 2504.603 52 CL IRON MAIN-DUCT WATER 6" FTLIN 250
16 2504.603 PIPE COPPER K TYPE 1" FTLIN 460
17 2504.604 INSULATION POLYSTYRENE 4" YD.SQ 30
NOTES:
(P) QUANTITY. PLANDEONTES
1. MOBILIZATIONS). MULTIPLE REQUIRE (MAY FIELD THE IN ENGINER THE BY DIRECTEDAS
2. REMOVAL. PAVEMENT BITUMINOUS IN INCLUDED CURB BITUMINOUS OFREMOVAL
3. WORK. OF START TO PRIOR ENGINEER THE BY PRE-APPROVED BEMUST
4. SPECIFICATIONSSEE
5. CRUSHED.100%
6. 5. CLASS BASE AGGREGATE 6" AND EXCAVATIONINCLUDES
7. FABRIC. GEOTEXTILE AND GRAVEL, PEA SOCK, KNITINCLUDES
8. FACILITY. WORKS PUBLIC TODELIVER
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
e
s
t
-
q
t
y.d
g
n
4
/
14
/
20
15
12:42:00
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
4
Sign / Storm Sewer Tabulation
TABULATION SIGN "C"TYPE
NO.
SIGN QUANTITY NOTES TYPEPOST LENGTH
POST
HEIGHT
MOUNTING
NO.SIGN
Mn/DOT SIZE AREASIGN AREATOTAL LEGEND
(FEET)(FEET)(INCHES) FEET)(SQ. FEET)(SQ.
C-1 1 21, SQ1 14.0 7.0 R1-1 30"x30"6.25 6.25 STOP
C-2 1 1,2 SQ1 14.0 7.0 W14-1 30"x30"6.25 6.25 ENDDEAD
TOTAL 2 POSTS2 12.50
NOTES:
1. LENGTH ADDITIONAL INCLUDE NOT DO BUT EMBEDMENT, INCLUDE AND APPROXIMATE ARE LENGTHSPOST
SPLICE. FORREQUIRED
2. SIGNS. "C" TYPE OF DRAWINGS DETAILED AND CODE PUNCHING FOR MANUAL SIGNS STANDARDSEE
TABULATION SIGN "D"TYPE
NO.SIGN QUANTITY NOTES HEIGHT
MOUNTING SIZE EACH SIZE TOTALSIZE LEGEND
(FEET)(INCHES) FEET)(SQ. FEET)(SQ.
D-1 1 3 2,1,10.0 9"x30"1.875 1.88 RDSMITHTOWN
D-2 2 3 2,1,10.0 9"x30"1.875 3.75 LNSTAR
D-3 1 3 2,1,10.0 9"x30"1.875 1.88 CIRSTAR
TOTAL 4 7.50
NOTES:
1. EMBEDMENT. INCLUDE AND APPROXIMATE ARE LENGTHSPOST
2. SET. PLAN IN DETAILS SIGNSEE
3. SIGN. STOP AS POST SAME TO MOUNTED BE TOSIGN
HEIGHTS PAYSTRUCTURE CIRCULAR ARCH APRONS PIPEARCHED TODRAINS
TOP
ARCH SPAN28"
GEOTEXTILE
STRUCT.STREET STATION OFFSET SIDE SPECIAL (2’X3’ BOX)4020-48 4020-60 4020-72 CASTING CASTING OUTLET RCP12" RCP15" RCP SPAN28"PIPE RIPRA RIPRAP FABRIC
NO.FT EACH FTLIN FTLIN FTLIN ASSEMBLY ELEV ELEVATION VCL VCL IIACL APRON GUARDTRASH STRUCT GRADE INVERT IICL IIICL IVTYPE
FINISHED BOTTOM FT FT FT EACH EACH NO FT/FT ELEVATION YDCU YDCU YDSQ.REMARKS
5100 CIRCLESTAR 11+05 14 RT 1 R-3067-V 990.07 986.03 66.0 5102 0.01 985.37
5101 CIRCLESTAR 10+38 14 LT 1 R-3067-V 989.63 985.51 28.0 5102 0.005 985.37
5102 CIRCLESTAR 10+38 14 RT 4.26 R-3067-V 989.63 985.37 25.0 5004 0.007 985.19
5000 LANESTAR 7+38 14 LT 1 R-3067-V 990.13 985.94 28.0 5001 0.005 985.80
5001 LANESTAR 7+38 14 RT 4.33 R-3067-V 990.13 985.80 70.0 5003 0.005 985.45
5002 LANESTAR 6+68 14 LT 1 R-3067-V 989.71 985.59 28.0 5003 0.005 985.45
5003 LANESTAR 6+68 14 RT 4.26 R-3067-V 989.71 985.45 52.0 5004 0.005 985.19
5004 LANESTAR 6+16 14 RT 6.31 1642 -R 989.50 985.19 26.0 5006 0.002 985.14 SUMP2’
5005 LANESTAR 5+90 14 LT 1 R-3067-V 989.17 985.28 28.0 5006 0.005 985.13
5006 LANESTAR 5+90 14 RT 6.04 R-3067-V 989.17 985.13 243.0 5007 0.0028 984.46 SUMP2’
5007 LANESTAR 3+46 14 RT 5.34 R-3067-V 987.80 984.46 176.0 5008 0.0025 984.02 SUMP2’
5008 LANESTAR 1+84 14 RT 35.03 R-3067-V 987.05 954.02 28.0 5009 0.003 983.95 SUMP2’
5009 LANESTAR 1+84 14 LT 5.10 1642 -R 987.05 983.95 34.0 5010 0.003 983.86 SUMP2’
5010 LANESTAR 1+37 5 LT 5.77 R-3067-V 987.63 983.86 16.0 5011 0.0025 983.80 SUMP2’
5011 LANESTAR 0+34 30 LT 983.80 1 1 5 10 20 FES
5012 LANESTAR 0+40 25 rt 984.98 28.0 1 1 5010 0.04 983.86 5 10 20 INLET
5 13 5 58 178 147 551 2 2 10 20 40
NOTES:
GRATE OF CENTER TO ARE OFFSETS1.
GRATE OF CENTER TO ARE ELEVATIONS CASTING OF TOP2.
APPLICABLE) (IF SUMP 2’ PLUS INVERT TO CASTING OF TOP FROM ARE HEIGHTS PAY3.
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
e
a
r
t
h
wo
r
k
.d
g
n
4
/
13
/
20
15
1:3
5:2
4
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
5
Earthwork Tabulation
PROJECT IMPROVEMENTS UTILITY AND STREET CIRCLE STAR AND LANESTAR
LANESTAR
STATION
EXCAVATION SECTIONROAD
AREACUT VOLUMECUT VOLUME
CUTCUM.
AGGREGATE
5CLASS
AGGREGATE
5 CLASSCUM.
BORROW
GRANULAR
SELECT
BORROW
GRANULAR
SELECTCUM.
FT][SQ YD.][CU YD.][CU YD.][CU YD.][CU YD.][CU
1+00 0.00 3.239 0.00 0.00 0.00 0.00
1+25 76.01 65.13 68.37 16.53 16.53 50.09 50.09
1+50 74.21 64.30 132.67 16.53 33.06 50.09 100.18
1+75 80.73 66.90 199.57 16.53 49.59 50.09 150.27
2+00 83.43 69.45 269.02 16.53 66.12 50.09 200.36
2+16 82.87 58.18 327.20 10.58 76.70 32.06 232.42
2+25 80.84 42.65 369.85 5.95 82.65 18.03 250.45
2+50 77.89 54.76 424.62 16.53 99.18 50.09 300.55
2+56 77.63 36.61 461.23 3.97 103.15 12.02 312.57
2+75 77.76 44.06 505.28 12.56 115.72 38.07 350.64
3+00 78.18 55.60 560.88 16.53 132.25 50.09 400.73
3+25 79.03 61.76 622.64 16.53 148.78 50.09 450.82
3+31 78.52 40.21 662.85 3.97 152.74 12.02 462.84
3+50 77.65 45.82 708.67 12.56 165.31 38.07 500.91
3+68 77.82 47.41 756.08 11.90 177.21 36.07 536.97
3+75 77.82 34.23 790.31 4.63 181.84 14.03 551.00
4+00 77.04 50.16 840.47 16.53 198.37 50.09 601.09
4+06 76.96 34.23 874.70 3.97 202.34 12.02 613.11
4+25 79.24 43.39 918.09 12.56 214.90 38.07 651.18
4+43 78.34 46.37 964.46 11.90 226.80 36.07 687.25
4+50 76.98 33.60 998.06 4.63 231.43 14.03 701.27
4+75 80.30 51.35 1049.41 16.53 247.96 50.09 751.36
5+00 80.20 60.18 1109.59 16.53 264.49 50.09 801.45
5+04 80.51 37.00 1146.59 2.64 267.14 8.01 809.47
5+25 83.66 49.09 1195.67 13.89 281.02 42.08 851.55
5+50 82.44 60.08 1255.76 16.53 297.55 50.09 901.64
5+75 79.40 64.18 1319.93 16.53 314.08 50.09 951.73
6+00 78.25 65.69 1385.63 16.53 330.61 50.09 1001.82
6+25 74.45 64.69 1450.32 16.53 347.15 50.09 1051.91
6+29 74.04 38.77 1489.09 2.64 349.79 8.01 1059.92
6+35 72.80 28.08 1517.16 3.97 353.76 12.02 1071.95
6+50 72.39 33.22 1550.38 9.92 363.68 30.05 1102.00
6+75 72.11 47.37 1597.76 16.53 380.21 50.09 1152.09
7+00 72.10 54.44 1652.19 16.53 396.74 50.09 1202.18
7+25 72.10 57.97 1710.17 16.53 413.27 50.09 1252.27
7+50 72.64 59.99 1770.16 16.53 429.80 50.09 1302.36
7+72 72.23 57.31 1827.47 14.55 444.35 44.08 1346.44
7+75 72.01 33.77 1861.23 1.98 446.33 6.01 1352.46
8+00 72.12 47.65 1908.88 16.53 462.86 50.09 1402.55
8+25 71.95 54.51 1963.39 16.53 479.39 50.09 1452.64
8+34 254.30 65.01 2028.40 28.44 507.83 56.33 1508.96
8+50 71.95 52.73 2081.12 10.58 518.41 32.06 1541.02
8+75 71.95 57.05 2138.17 16.53 534.94 50.09 1591.11
8+81 256.56 54.48 2192.66 18.96 553.90 37.55 1628.66
8+84 267.21 41.62 2234.28 9.48 563.38 18.78 1647.44
9+00 71.95 41.03 2275.32 10.58 573.96 32.06 1679.50
9+11 71.95 34.93 2310.24 7.27 581.24 22.04 1701.54
9+24 76.01 35.30 2345.54 8.66 589.90 26.25 1727.79
PROJECT IMPROVEMENTS UTILITY AND STREET CIRCLE STAR AND LANESTAR
CIRCLESTAR
STATION
EXCAVATION SECTIONROAD
AREACUT VOLUMECUT VOLUME
CUTCUM
AGGREGATE
5CLASS
AGGREGATE
5 CLASSCUM.
BORROW
GRANULAR
SELECT
BORROW
GRANULAR
SELECTCUM.
FT][SQ YD.][CU YD.][CU YD.][CU YD.][CU YD.][CU YD.][CU
10+00 73.92 0 0 0.00 0.00 0.00 0.00
10+25 72.65 62 62.02 16.53 16.53 50.09 50.09
10+50 73.10 62 124.24 16.53 33.06 50.09 100.18
10+75 72.44 62 186.27 16.53 49.59 50.09 150.27
10+83 72.29 42 228.25 5.29 54.88 16.03 166.30
10+87 72.31 27 255.54 2.64 57.53 8.01 174.32
11+00 72.33 30 286.01 8.60 66.12 26.05 200.36
11+25 71.95 46 331.93 16.53 82.65 50.09 250.45
11+50 71.95 54 385.57 16.53 99.18 50.09 300.55
11+75 71.95 58 443.08 16.53 115.72 50.09 350.64
11+94 105.19 62 504.84 35.95 151.67 38.07 388.71
11+98 105.19 39 543.94 7.57 159.24 8.01 396.72
12+00 79.72 24 567.73 1.90 161.13 4.01 400.73
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
e
a
r
t
h
wo
r
k
.d
g
n
4
/
14
/
20
15
12:52:14
PM
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
572025040
5655
5715
24930
5700
5680
5695
5660
5640
5620
5600
5605
5625
5645
5655
56655675
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
g
e
n
e
r
a
l_la
y
o
ut
.d
g
n
4
/
13
/
20
15
1:3
5:3
7
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE General Layout / Directional Surface Drainage
0 60 120
AVOID DAMAGE THERETO.
IS TO DETERMINE THE TYPE AND LOCATION OF PRIVATE UTILITIES AS MAY BE NECESSARY TO
PRIVATE UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE THE CONTRACTOR
THE INFORMATI0N SHOWN ON THESE DRAWINGS CONCERNING THE TYPE AND LOCATION OF
"STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE DATA".
THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF CI/ASCE 38-02, ENTITLED
AND LOCATION OF PRIVATE UTILITIES HAS BEEN DESIGNATED UTILITY QUALITY LEVEL D.
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE
THIS INFORMATION IS FOR GENERAL USE ONLY AND NOT INTENDED TO BE USED FOR EXCAVATION PURPOSES.
TO THE BEST OF OUR KNOWLEDGE, FROM DRAWINGS SUPPLIED BY OTHERS.
TYPE AND LOCATION OF PRIVATE UTILITIES, AS OF THE PRINTED DATE, HAS BEEN DEPICTED
THE SUBSURFACE UTILITY INFORMATION REPRESENTED ON THESE DRAWINGS CONCERNING
TO OBTAIN A FIELD LOCATE OF ALL UTILITIES.
STATE LAW REQUIRES ANYONE DIGGING, GRADING OR EXCAVATING
EXCAVATION NOTICE SYSTEM
PERFORMING ANY EXCAVATION.
REQUIRED A MINIMUM OF 48 HOURS PRIOR TO
A CALL TO GOPHER STATE ONE (454-0002) IS
Sta
r L
an
e
Smithtown Road
Fairw
a
y D
r
*
HP
HP
*
HP
LP
Star Circle
LP
6
LP
150560755
TICKET NUMBER:
STREET CONSTRUCTION PLAN
STORM SEWER CONSTRUCTION PLAN
WATERMAIN CONSTRUCTION PLAN
PROJECT DISCHARGE POINT
SURFACE DRAINAGE DIRECTION
LOW POINT
HIGH POINT
13
16
20
13
16
20
14
17
21
15
18
19
22
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
d
e
t
ail-0
1.dg
n
4
/
13
/
20
15
1:3
5:4
1 P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE Miscellaneous Details
7
Gate Valve and Box InstallationConcrete Thrust Blocking
Clean Out for Subsurface Drainsfor RCP and DIP
Improved Pipe Foundation
Typical Hydrant InstallationService Connections
Sewer and Water
Storm Sewer Manhole
With Reinforced Top Slab
Storm Sewer Junction Manhole
CONCRETE
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
d
e
t
ail-0
2.dg
n
4
/
13
/
20
15
1:3
7:5
2
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE Miscellaneous Details
8
Riprap at OutletsCatch Basin Manhole Catch Basin Manhole With Sump Catch Basin
Concrete Curb and Gutter TransitionCurb and Gutter Construction at Catch Basin
Surmountable Curb and Gutter
SECTION
SECTION
TOP VIEW
Concrete Flume
0.5% MIN. 2.5% MAX.
CURB & GUTTER (VARIES)
6" CONCRETE SLAB
4"
EXISTING ROAD SECTION
6" CLASS 5 AGGREGATE BASE
FABRIC
TYPE IV GEOTEXTILE
12"
12"
4"
#4 BARS @ 12’ O.C.
TRANSITION CURB SECTION
CURB & GUTTER (VARIES)
4.0’
3.0’
2’
EXPANSION JOINT
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
d
e
t
ail-0
3.dg
n
4
/
13
/
20
15
1:3
9:5
3
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE Miscellaneous Details
9
Concrete Flume
Street Name Blade Sign
Typical Traffic Sign Installation
Traffic Sign Installation Mail Box Installation
Road Construction
for Catch Basin During
Inlet Protection Rock Filter
Machine Sliced
Silt Fence
Catch Basin Insert
Inlet Protection
Rock Construction Entrance
98
4
.
9
4
985
.
4
9
15"
r
c
p
b
i
t
bi
t
bi
t
bi
t
g
r
a
vel
b
i
t
b
r
i
ck
bi
t b
i
t
b
i
t
bi
t
bi
t
bi
t
bi
t
b
i
t
concCSB
GUY
GSV
S
S
S
S
S
SI
GN
sign
SI
GN
SI
GN
S
M BMB
M
B
M
B
MB
MB
MB
MBMB
MB MB
bi
t
MB
MBMB
MB
CSB
8
2
2
12
4
6
4
4
22
26
28
8
101
2 12
1
6
12 1
2
16
3
1
6
26
1
2
3
2
1
6
1
6
8
8
2
6
1
0
1
0
1
036
1016
8
32
16
1
6
16
16
26
1
0
12
16
T
T T T
T
T
T
mulch
r
o
c
k
s
mu
l
ch
mulch
mu
l
ch
EB
TB
TB
T
B
TB
TB
TB
TB
T
B
TBT
B
TB
T
T T T
SB1
SB2
SB3
S
B5
SB4
E
E
mulch
mul
c
h
gar
d
e
n
r
oc
k
s
r
o
c
k
s
12 EB
rwall
planter
CTB
C
TB
EB
T
TV
T
T TT
E
i
n=974.
7
0
i
n=975.
0
0
t
c=987.
9
8
in=9
76.
00
t
c=988
.
41
i
n=98
1.30
t
c=99
0.48
in
=977.
00
in
=979.
00
tc
=9
89.
83
i
n
=977.
70
tc
=990.
65
gr
ave
l
x
5720
250
40
5715
24
930
5700
5680
5695
5660 5640
5620
5600
5605
5625
5645
5655
5665
5675
x xx
xxx
x x
x
x
xxxxxxxx
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
r
e
m-0
1.dg
n
4
/
13
/
20
15
1:4
1:15
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
Star Lane
S
m
ith
to
w
n R
oa
d
0 30 60
10
S
ta
r C
ircle
REMOVE BITUMINOUS PAVEMENT
V
LEGEND
SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH)
S
M
REMOVE SIGN
M
M M
M
M M
M
MM
M
M
M
M
B
V
S
S S
C C
C
C
Existing Conditions / Removal Plan
M
REMOVE 60’ STORM PIPE
B
B
B B
B
B B
B
BB
B B
B
B
B
PAVERS
SALVAGE AND REINSTALL
C
CLEAR AND GRUB TREES BY ACRE
REMOVE BITUMINOUS DRIVEWAY
CONSTRUCTION LIMITS
YARD LIGHT
SALVAGE AND REINSTALL
C
x
SALVAGE AND REINSTALL MAIL BOX
0.06 ACRES
CLEAR & GRUB
M
SALVAGE 50’ FENCE
SALVAGE 50’ FENCE
SALVAGE 121’ FENCE
SALVAGE CASTING
BARRIER RAIL
SALVAGE TIMBER
HOMEOWNER
SUPPORT REMOVAL WITH
COORDINATE MAILBOX AND
FENCE (INCIDENTAL)
PROTECT INVISIBLE
FENCE (INCIDENTAL)
PROTECT INVISIBLE
9. PROTECT ALL SAWED BITUMINOUS PAVEMENT EDGES.
TO VERIFY THEIR EXACT LOCATION AND ELEVATION.
APPROXIMATE IT IS THE CONTRACTORS RESPONSIBILITY
8. THE EXISTING UTILITIES SHOWN ON THESE PLANS ARE
DURING CONSTRUCTION AT NO ADDITIONAL COMPENSATION.
7. CONTRACTOR SHALL PROTECT EXISTING UTILITIES
COMPENSATION, UNLESS OTHERWISE NOTED.
ITEMS DURING CONSTRUCTION AT NO ADDITIONAL
SHRUBS, RETAINING WALLS, AND OTHER LANDSCAPING
6. CONTRACTOR SHALL PROTECT EXISTING TREES,
CITY MAINTENANCE GARAGE.
5. SALVAGE ALL CASTINGS AND DELIVER TO THE
PAVEMENT REMOVALS.
4 SAW CUT PAVEMENT (FULL DEPTH) FOR BITUMINOUS
BITUMINOUS PAVEMENT BID ITEM.
3. BITUMINOUS CURB REMOVAL IS INCIDENTAL TO REMOVE
THE MINIMUM REQUIRED TO COMPLETE THE WORK.
2, CONTRACTOR SHALL LIMIT THE DISTURBED AREA TO
FIELD BY THE ENGINEER.
1. ALL REMOVALS WILL BE MARKED IN THE
NOTES:
REMOVE 10’- 6" DIP
AND 6" GATE VALVE
SALVAGE HYDRANT
SALVAGE GATE VALVE
REMOVE TREE (EACH)
SALVAGE 40’ FENCE
PROTECT BOULDER WALL (INCIDENTAL)
(INCIDENTAL)
PROTECT RETAINING WALL
BOP Sta = 10+00.00
EOP Sta = 12+29.86
11+00
12+00
BOP
St
a =
1
+00.
0
0
PI
Sta
=
7+97
.
11
EOP Sta = 9+24.10
2+00 3+00 4+00 5+00 6+00 7+00 8+00
9
+00
9
84.
94
9
85.
49
1
5
"
r
c
p
bi
t
bi
t
bi
t
b
i
t
gr
a
v
e
l
bi
t
br
i
c
k
b
i
t bi
t
bi
t
b
i
t
bi
t
b
i
t
b
i
t
bi
t
concCSB
GUY
GSV
S
S
S
S
S
SI
GN
sign
SI
GN
S
IGN
S
M B M B
M
B
M
B
MB
MB
MB
MBMB
MB MB
b
i
t
MB
MBMB
MB
CSB
8
22
1
2
4
6
4
4
2
2
2
6
2
8
8
1
012 1
2
16
1
2 12
16
3
16
2
6
12
32
16
16
8
8
26
10 10
103
6
1
01
6
8
3
2
1
6
16
1
6
1
6
2
6
10
1
2
1
6
T
T T T
T
T
T
mulch
rocks
mul
c
h
mulch
mul
c
h
EB
TB
T
B
TB
TB
T
B
TB
T
B
TB
TBTB
T
B
T
T T T
S
B1
SB2
SB3
SB5
S
B4
E
E
mulch
mu
l
ch
g
a
r
den
r
o
cks
rocks
1
2 EB
rwall
planter
CT
B
CTB
EB
T
TV
T
T TT
E
in=9
74.
70
in=9
75.
00
tc
=9
87.
98
i
n=97
6.00
t
c
=988.
41
in=9
81.
30
t
c=990
.
48
i
n=977.
0
0
i
n=979.
0
0
t
c=989.
8
3
i
n=977
.
70
t
c=990.
6
5
gr
a
v
e
l
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
e
r
o
-
01.d
g
n
4
/
13
/
20
15
1:4
1:2
1 P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
5720
25
04
0
5715
2
493
0
5700
5680
5695
5660 5640
5620
5600
5605
5625
5645
5655
5665
5675
8"
1
0"
10"
24
"
24"
10
"
20"
30"
6"
T
bit
bitgrav
bitgrav
grav
bit
garden
18"
1
8"CSB
CSB
CSB
CSB
CSB
CSBCSB
CTL AER
CTL
AER
CTL
AER
CTL
AER
CTL
AER
CTL
AER
CT
L
AER
CTL
AE
R
CT
L
AER
CTL
AER
CTL
AER
Star Lane
S
m
ith
to
w
n
R
o
ad
0 30 60
S
ta
r
C
ircle
F F
I
F
Erosion Control / Turf Establishment Plan
FFFF
F
F FFF
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
LEGEND
I
I
I I
I
I I
I
I
I
I
I
F
11
ROCK CONSTRUCTION ENTRANCE
23-0-23 @ 200 lbs/acre
SOD WITH 6" TOPSOIL AND FERTILIZER
CATEGORY 2 WOOD FIBER 15,RD
Mn/DOT EROSION CONTROL BLANKET
Mn/DOT SEED MIX 33-261 @ 35lbs/acre
INLET PROTECTION
FILTER LOG (BIO ROLL)
DIRECTED BY THE ENGINEER.
4. INSTALL MACHINE SLICED SILT FENCE AS
AND EROSION CONTROL.
3. CONTRACTOR TO BE RESPONSIBLE FOR ALL SEDIMENT
COORDINATING OFF SITE DISPOSAL.
AND MAINTAINING CONCRETE WASHOUT AREA OR
2. CONTRACTOR TO BE RESPONSIBLE FOR DESIGNATING
UNTIL FINAL STABILIZATION.
1. PROVIDE INLET PROTECTION FOR ALL INLETS
NOTES:
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
t
yp
ic
a
l-
01.d
gn
4
/
13
/
20
15
1:4
1:2
5
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
Replacement
Bituminous Driveway
12
Typical Section
1:
1
R/W R/WROADWAY
>
2.5%
PROFILE GRADE
14’ TO BACK 14’ TO BACK
2.0%
MAX.3:1 MAX.3:1
2.5%2.0%
IN THE FIELD
AS DIRECTED BY THE ENGINEER
4" PERFORATED PE DRAINTILE
25’25’
APPROVED SUBGRADE (INCIDENTAL)
(MnDOT 3138) (INCIDENTAL)
4" CLASS 5 AGGREGATE BASE OR RECYCLED EQUAL
SPWEA240C
3" TYPE SP 9.5 BITUMINOUS WEAR COURSE MIX
(TYPICAL)
CONCRETE CURB & GUTTER
SURMOUNTABLE
(SEE SPECIFICATION)
AND SOD OR SEED
6" TOPSOIL BORROW
(SEE SPECIFICATION)
AND SOD OR SEED
6" TOPSOIL BORROW
APPROVED SUBGRADE (PAID AS SUBGRADE PREP)
GEOTEXTILE FABRIC (Mn/DOT 3733, TYPE V)
24" SELECT GRANULAR MATERIAL (MnDOT 3149.2B)
8" CLASS 5 AGGREGATE BASE (100% CRUSHED LIMESTONE)
2" SPNWB230C BITUMINOUS NON WEARING COURSE (MnDOT 2360)
2357 BITUMINOUS TACK COAT
2" SPWEA240C BITUMINOUS WEARING COURSE (MnDOT 2360)
BOP
St
a
= 1+0
0.00
2+00 3+00 4+00 5+00
9
8
4
.
94
9
8
5
.
49
15
"
r
c
p
b
i
t
bi
t
b
i
t
b
i
t
g
r
ave
l
b
i
t
CS
B
GUY
GSV
S
S
S
IGN
sign
S
IGN
MB
MB
MBMB
MB
8
2
2
12
4
6
4
4
22
26
2
8
8
1012 1
2
16
1
2 1
2
16
3
16
2
6
12
32
16
8
8
2
6
1
0
10
T
T T T
Tmulch
r
o
c
ks
mul
ch
mulch
mul
ch
EB
TB
TB
T
T T T
SB1
S
B2
E
E
mul
c
h
i
n=974
.
70
i
n=975
.
00
t
c=987
.
98
i
n
=976.
00
tc=9
88.
41
gr
a
v
e
l
5720
5715
5700
5680
5695
5675
X
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
p
lan
-
0
1.d
g
n
4
/
13
/
20
15
1:4
1:3
4
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
975.00n
974.70
976.00
ex. 9" pvc
ex. 9" pvc
s
t
a
.
1
+
2
2
e
x
t
c
=
9
8
7
.
8
8
s
t
a
.
3
+
7
6
e
x
t
c
=
9
8
8
.
4
1
-0.66%0.40%0.50%0.50%
9
8
7
.
6
9
9
8
7
.
6
7
9
8
7
.
8
7
9
8
8
.
0
7
9
8
8
.
3
2
9
8
8
.
5
7
9
8
8
.
8
2
9
8
9
.
0
7
9
8
9
.
4
0
9
8
7
.
6
5
9
8
7
.
4
5
9
8
7
.
4
9
9
8
7
.
5
2
9
8
7
.
8
0
9
8
8
.
0
3
9
8
8
.
3
1
9
8
8
.
7
3
9
8
9
.
0
9
9
8
9
.
3
4
1+00 2+00 3+00 4+00 5+00
975
970
980
985
990
995
980
985
990
995
975
970
MIN.
7.5’ COVER
MAT
CH
L
I
N
E
S
T
A.
5
+
5
0
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
Star Lane
EXISTING > PROFILE
PROPOSED > PROFILE
PROPOSED > ELEVATION
EXISTING > ELEVATION
MAT
C
H
L
I
NE
S
T
A.
5
+
5
0
13
Watermain Construction Plan
0 30 60
CONNECT TO EXISTING 8" WATERMAIN
TO VERIFY THEIR EXACT LOCATION AND ELEVATION.
APPROXIMATE IT IS THE CONTRACTORS RESPONSIBILITY
5. THE EXISTING UTILITIES SHOWN ON THESE PLANS ARE
CONSTRUCTION AT NO ADDITIONAL COMPENSATION.
4. CONTRACTOR SHALL PROTECT EXISTING UTILITIES DURING
THE MINIMUM REQUIRED TO COMPLETE THE WORK.
3. CONTRACTOR SHALL KEEP DISTURBED AREAS TO
CURB STOP BOX PLACED ON THE PROPERTY LINE.
2. WATER SERVICES TO BE 1" TYPE "K" COPPER WITH
THE ENGINEER
1. WATER SERVICES TO BE INSTALLED AS DIRECTED BY
NOTES:
S
m
i
t
h
t
o
w
n
R
o
a
d
8"- 45 BEND
STA 1+83, 10’ LT
8" DIP 8" DIP
10’ MIN.
261’ - 8" DIP CL 52 POLY WRAPPED
5675
8"- 45 BEND
STA 1+09, 8’ RT
(TYP)
WATER SERVICE
WITH 8" GATE VALVE
TO EXISTING 8" WATER MAIN
STA. 1+50, 10’ RT CONNECT
10’- 6" DIP
AND NEW 6" GATE VALVE AND
INSTALL SALVAGED HYDRANT
STA, 1+55, 19’ RT
8"x6" TEE
STA 1+54, 9’ RT
4" INSULATION
SEPARATION
MAINTAIN 18"
(TYPICAL)
4" INSULATION
BOP Sta = 10+00.00 PI
St
a =
7
+97.
1
1
EOP Sta = 9+24.10
6+00 7+00 8+00
9+00
bi
t
bi
t
b
i
t
bi
t
bi
t
conc
S
S
SI
GN
S
M BMB
M
B
M
B
MB
MB
bi
t
CS
B
1
6
10
1
03
6
16
1
6
2
6
10
12
16
T
T
T
B
T
B
TBTB
TB
SB3
SB4
mulch planter
C
TB
CT
B
EB
T
TV
T
T TT
E i
n=97
7.00
i
n=97
9.00
t
c
=989.
83
i
n=97
7.70
t
c=99
0.65
5660 5640
5620
5600
5605
5645
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
p
lan
-
0
2
.d
g
n
4
/
13
/
20
15
1:4
1:3
9
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
979.00e
977.00
977.70ex. 9" pvc
s
t
a
.
6+
2
9
e
x
t
c
=9
9
0
.
65
s
t
a
.
7
+9
5
e
x
t
c
=
99
0
.
6
5
0.67%1.50%0.58%
2.38%-2.50%22.0 0%
9
8
9
.
4
0
9
8
9
.
7
4
9
9
0
.
1
1
9
9
0
.
4
0
9
9
0
.
7
4
9
9
1
.
5
2
9
9
2
.
4
1
9
9
2
.
0
7
9
8
9
.
3
4
9
8
9
.
6
9
9
8
9
.
8
6
9
9
0
.
1
1
9
9
0
.
4
5
9
9
0
.
8
8
9
9
1
.
6
5
9
9
1
.
5
5
6+00 7+00 8+00 9+00
975
970
980
985
990
995
980
985
990
995
975
970
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
Star Lane
MATCH LINE
S
ta
r C
ircle
EXISTING > PROFILE
PROPOSED > PROFILE
MAT
C
H
L
I
NE
S
T
A.
5
+
5
0
PROPOSED > ELEVATION
EXISTING > ELEVATION
MIN.
7.5’ COVER
MATC
H
L
I
NE
S
T
A.
5
+
5
0
14
Watermain Construction Plan
0 30 60
TO VERIFY THEIR EXACT LOCATION AND ELEVATION.
APPROXIMATE IT IS THE CONTRACTORS RESPONSIBILITY
5. THE EXISTING UTILITIES SHOWN ON THESE PLANS ARE
CONSTRUCTION AT NO ADDITIONAL COMPENSATION.
4. CONTRACTOR SHALL PROTECT EXISTING UTILITIES DURING
THE MINIMUM REQUIRED TO COMPLETE THE WORK.
3. CONTRACTOR SHALL KEEP DISTURBED AREAS TO
CURB STOP BOX PLACED ON THE PROPERTY LINE.
2. WATER SERVICES TO BE 1" TYPE "K" COPPER WITH
THE ENGINEER
1. WATER SERVICES TO BE INSTALLED AS DIRECTED BY
NOTES:
STA 7+98, 10’ LT8"x6" TEE
STA 6+40, 10’ LT
HYDRANT ASSEMBLY
6" GATE VALVE
8"x6" REDUCER
STA 9+16, 18’ LT
8"x6" TEE
STA 5+55, 10’ LT
HYDRANT ASSEMBLY
6" GATE VALVE
8’- 6" DIP CL 52
STA 5+55, 19’ LT
STA 8+90, 10’ LT
8" DIP
10’ MIN.
122’- 8" DIP CL 52 POLY WRAPPED
5675
5625
(TYP)
WATER SERVICE
SEPARATION
MAINTAIN 18"
(TYPICAL)
4" INSULATION
SEPARATION
MAINTAIN 18"
(TYPICAL)
4" INSULATION
SEPARATION
MAINTAIN 18"
(TYPICAL)
4" INSULATION
BOP
St
a
=
10+00
.
00
EOP
Sta
=
12+2
9.86
11+00 12+00
6+0
0 brick
bit
bit
bit
S S
SIGN
MB
MB
MB
MB
MB
bit
10
16
8
32
1616
16
10
T
T TB
TB
TB
TB
SB3
SB5
mu
l
ch
garden rocks
rocks
12
EB
r
wa
l
l
pl
ant
e
r
T
T
T
E
in=981.30
tc=990.48
in=977.00
in=979.00
tc=989.83
56
60
5
64
5
5
655
56
65567
5
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH
03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
p
lan
-
0
3
.d
g
n
4
/
13
/
20
15
1:4
1:4
4
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
981.30
977.00
979.00e
ex. 9" pvc
e
x
t
c
=
9
8
9.
8
3
s
t
a
.
1
0
+
00
e
x
t
c
=
9
9
0.
4
8
s
t
a
.
1
1
+
78
0.50%0.95%0.70%2 2.00%
1.34%
9
8
9
.
9
3
9
9
0
.
1
8
9
9
0
.
4
3
9
9
0
.
7
4
9
9
1
.
1
7
9
8
9
.
8
3
9
9
0
.
0
5
9
9
0
.
2
0
9
9
0
.
4
4
9
9
0
.
6
3
10+00 11+00 12+00
975
970
980
985
990
995
980
985
990
995
975
970
PROPOSED > PROFILE
EXISTING > PROFILE
PROPOSED > ELEVATION
EXISTING > ELEVATION
13MATCH LINE SEE SHEET
CONSTRUCTION LIMITS
0 30 60
MATCH LINE SEE SHEET
MIN.
7.5’ COVER
15
Watermain Construction Plan
Star Circle
CONSTRUCTION LIMITS
14
HYDRANT ASSEMBLY
6" GATE VALVE
STA 12+15.7, 10’ LT
6" DIP
8
"
DI
P
8
"
DI
P
TO VERIFY THEIR EXACT LOCATION AND ELEVATION.
APPROXIMATE IT IS THE CONTRACTORS RESPONSIBILITY
5. THE EXISTING UTILITIES SHOWN ON THESE PLANS ARE
CONSTRUCTION AT NO ADDITIONAL COMPENSATION.
4. CONTRACTOR SHALL PROTECT EXISTING UTILITIES DURING
THE MINIMUM REQUIRED TO COMPLETE THE WORK.
3. CONTRACTOR SHALL KEEP DISTURBED AREAS TO
CURB STOP BOX PLACED ON THE PROPERTY LINE.
2. WATER SERVICES TO BE 1" TYPE "K" COPPER WITH
THE ENGINEER
1. WATER SERVICES TO BE INSTALLED AS DIRECTED BY
NOTES:
10’ MIN.
227’- 6" DIP CL 52 POLY WRAPPED
SEPARATION
MAINTAIN 18"
TYPICAL
4" INSULATION
6" SADDLE (TYP)
WATER SERVICE WITH
6" SADDLE (TYP)
WATER SERVICE WITH
BOP
St
a
= 1+0
0.00
2+00 3+00 4+00 5+00
9
8
4
.
94
9
8
5
.
49
15
"
r
c
p
b
i
t
bi
t
b
i
t
b
i
t
g
r
ave
l
b
i
t
CS
B
GUY
GSV
S
S
S
IGN
sign
S
IGN
MB
MB
MBMB
MB
8
2
2
12
4
6
4
4
22
26
2
8
8
1012 1
2
16
1
2 1
2
16
3
16
2
6
12
32
16
8
8
2
6
1
0
10
T
T T T
Tmulch
r
o
c
ks
mul
ch
mulch
mul
ch
EB
TB
TB
T
T T T
SB1
S
B2
E
E
mul
c
h
i
n=974
.
70
i
n=975
.
00
t
c=987
.
98
i
n
=976.
00
tc=9
88.
41
gr
a
v
e
l
5720
5715
5700
5680
5695
5675
X
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
p
lan
-
0
4
.d
g
n
4
/
14
/
20
15
6
:5
6:33
AM
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
7
2
-
4
0
2
0
TC
=
9
8
7
.
6
3
5
’
LT
S
T
A.
1
+
3
7
5007500850095010
7
2
-
4
0
2
0
TC
=
9
8
7
.
0
5
1
4
’
RT
S
T
A.
1
+
7
0
.
5
7
2
-
4
0
2
0
TC
=
9
8
7
.
0
5
1
4
’
L
T
ST
A.
1
+
7
0
.
5
CL IV @ 0.28%
243’- 28" SPAN ARCH RCP
CL IV @ 0.30%
28’- 28" SPAN ARCH RCP
9
8
1
.
8
6
s
u
mp
9
8
3
.
8
6
9
8
1
.
9
5
s
u
mp
9
8
3
.
9
5 982.02 sump
984.02 982.46 sump
984.46
CL IV @ 0.25%
176’- 28" SPAN ARCH RCP
CL IV @ 0.30%
34’- 28" SPAN ARCH RCP
6
0
-
4
0
2
0
T
C
=
9
8
7
.
8
0
1
4
’
RT
S
TA
.
3
+
4
6
.
5
-0.66%0.40%0.50%0.50%
9
8
7
.
6
9
9
8
7
.
6
7
9
8
7
.
8
7
9
8
8
.
0
7
9
8
8
.
3
2
9
8
8
.
5
7
9
8
8
.
8
2
9
8
9
.
0
7
9
8
9
.
4
0
9
8
7
.
6
5
9
8
7
.
4
5
9
8
7
.
4
9
9
8
7
.
5
2
9
8
7
.
8
0
9
8
8
.
0
3
9
8
8
.
3
1
9
8
8
.
7
3
9
8
9
.
0
9
9
8
9
.
3
4
1+00 2+00 3+00 4+00 5+00
R
C
AP
RO
N
3
0
’
L
T
S
T
A.
0
+
3
4
981.86 sump
983.86
5010
5011
983.80
5012
RC
AP
R
ON
2
5
’
R
T
S
T
A.
0
+
4
0
984.98
GUARD
@ 3.29% + RC APRON WITH TRASH
28’- 28" SPAN ARCH RCP CL IV
GUARD
@ 0.25% + RC APRON WITH TRASH
16’- 28" SPAN ARCH RCP CL IV
975
970
980
985
990
995
980
985
990
995
975
970
MATC
H
L
I
NE
S
T
A.
5
+
5
0
CONSTRUCTION LIMITS
Star Lane
S
m
i
t
h
t
o
w
n
R
o
a
d
EXISTING > PROFILE
PROPOSED > PROFILE
PROPOSED > ELEVATION
EXISTING > ELEVATION
MAT
C
H
L
I
NE
S
T
A.
5
+
5
0
16
Storm Sewer Construction Plan
STORM SEWER
CONNECT TO EXISTING
LEGEND
2
(MNDOT 3131C)
INSTALL PRECAST CONCRETE HEADWALL
TO VERIFY THEIR EXACT LOCATION AND ELEVATION.
APPROXIMATE IT IS THE CONTRACTORS RESPONSIBILITY
3. THE EXISTING UTILITIES SHOWN ON THESE PLANS ARE
CONSTRUCTION AT NO ADDITIONAL COMPENSATION.
2. CONTRACTOR SHALL PROTECT EXISTING UTILITIES DURING
THE MINIMUM REQUIRED TO COMPLETE THE WORK.
1. CONTRACTOR SHALL KEEP DISTURBED AREAS TO
NOTES:
2
2
50075008
5009
5010
5011
SEE TYPICAL SECTION
4" PERFORATED DRAINTILE
SEE TYPICAL SECTION
4" PERFORATED DRAINTILE
0 30 60
4" PVC DRAINTILE
(SEE SPECIFICATION)
& GEOTEXTILE FABRIC
RIPRAP (CLASS II & III)
(SEE SPECIFICATION)
& GEOTEXTILE FABRIC
RIPRAP (CLASS II & III)
CONSTRUCTION LIMITS
5675
CONRETE FLUME 987.35
STA. 1+58.5 CONSTRUCT
CONRETE FLUME 987.35
STA. 1+58.5 CONSTRUCT
5012
987.87
TOP BACK OF CURB
BOP Sta = 10+00.00 PI
St
a =
7
+97.
1
1
EOP Sta = 9+24.10
6+00 7+00 8+00
9+00
bi
t
bi
t
b
i
t
bi
t
bi
t
conc
S
S
SI
GN
S
M BMB
M
B
M
B
MB
MB
bi
t
CS
B
1
6
10
1
03
6
16
1
6
2
6
10
12
16
T
T
T
B
T
B
TBTB
TB
SB3
SB4
mulch planter
C
TB
CT
B
EB
T
TV
T
T TT
E i
n=97
7.00
i
n=97
9.00
t
c
=989.
83
i
n=97
7.70
t
c=99
0.65
5660 5640
5620
5600
5605
5645
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
p
lan
-
0
5
.d
g
n
4
/
13
/
20
15
1:4
1:5
5
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
983.13 SUMP
985.13
985.45
4
8
-
4
0
2
0
TC
=
9
8
9
.
7
1
1
4
’
RT
S
T
A.
6
+
6
8
@ 0.50%
52’- 15" RCP CL V
985.80
5001
4
8
-
4
0
2
0
TC
=
9
9
0
.
1
3
1
4
’
RT
S
T
A.
7
+
3
8
@ 0.50%
70’- 15" RCP CL V
5003
50045006
CL IV @ 0.25%
26’- 28" SPAN ARCH RCP
7
2
-
4
0
2
0
T
C
=
9
8
9
.
5
0
1
4
’
R
T
S
T
A.
6
+1
6
7
2
-
4
0
2
0
T
C
=
9
8
9
.
1
7
1
4
’
RT
S
T
A.
5
+
9
0
985.19
0.67%1.50%0.58%
2.38%-2.50%22 .0 0%
9
8
9
.
4
0
9
8
9
.
7
4
9
9
0
.
1
1
9
9
0
.
4
0
9
9
0
.
7
4
9
9
1
.
5
2
9
9
2
.
4
1
9
9
2
.
0
7
9
8
9
.
3
4
9
8
9
.
6
9
9
8
9
.
8
6
9
9
0
.
1
1
9
9
0
.
4
5
9
9
0
.
8
8
9
9
1
.
6
5
9
9
1
.
5
5
6+00 7+00 8+00 9+00
2
x
3
CB
T
C
=
9
8
9
.
7
1
1
4
’
L
T
S
TA
.
6
+
6
8
5002 5003
985.45
@ 0.50%
28’- 12" RCP CL V
985.59
@ 0.50%
28’- 12" RCP CL V
2
x
3
C
B
T
C
=
9
9
0
.
1
3
1
4
’
L
T
S
T
A.
7
+3
8
985.94 985.80
50015000
983.14 SUMP
985.14
5006
@ 0.50%
28’- 12" RCP CL V
2
x
3
CB
T
C
=
9
8
9
.
1
7
1
4
’
L
T
S
TA
.
5
+
9
0
985.28
5005
975
970
980
985
990
995
980
985
990
995
975
970
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
Star Lane
MATCH LINE
S
tar C
ircle
EXISTING > PROFILE
PROPOSED > PROFILE
MAT
C
H
L
I
NE
S
T
A.
5
+
5
0
PROPOSED > ELEVATION
EXISTING > ELEVATION
MATC
H
L
I
NE
S
T
A.
5
+
5
0
17
5000
50015003
5002
5004
5006
5005
Storm Sewer Construction Plan
TO VERIFY THEIR EXACT LOCATION AND ELEVATION.
APPROXIMATE IT IS THE CONTRACTORS RESPONSIBILITY
3. THE EXISTING UTILITIES SHOWN ON THESE PLANS ARE
CONSTRUCTION AT NO ADDITIONAL COMPENSATION.
2. CONTRACTOR SHALL PROTECT EXISTING UTILITIES DURING
THE MINIMUM REQUIRED TO COMPLETE THE WORK.
1. CONTRACTOR SHALL KEEP DISTURBED AREAS TO
NOTES:
0 30 60
SEE TYPICAL SECTION
4" PERFORATED DRAINTILE
SEE TYPICAL SECTION
4" PERFORATED DRAINTILE
4" PVC DRAINTILE
5675
5625
BOP St
a
=
10
+00.
0
0
EOP
Sta
=
12+2
9.86
11+00 12+00
6+00 brick
bit
bit
bit
S S
SIGN
MB
MB
MB
MB
MB
bit
10
16
8
32
1616
16
10
T TB
TB
TB
TB
SB3
SB5
mu
l
ch
garden rocks
rocks
12
EB
r
wa
l
l
pl
ant
e
r
T
E
in=981.30
tc=990.48
in=977.00
in=979.00
tc=989.83
5
66
0
564
5
565
5
5
66556
75
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
p
lan
-
0
6
.d
g
n
4
/
13
/
20
15
1:4
2:0
1 PM
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
2
x
3
CB
T
C
=
9
9
0
.
0
7
1
4
’
RT
S
TA.
1
1
+0
5
5100
4
8
-
4
0
2
0
T
C
=
9
8
9
.
3
0
1
4
’
RT
S
TA.
1
0
+3
8
5102
986.32
9
8
5
.
1
9
@ 0.70%
25’- 15" RCP CL V
@ 1.00%
66’- 12" RCP CL V
5004
985.37
985.66e
0.50%0.95%0.70%2 2.00%
1.34%
9
8
9
.
9
3
9
9
0
.
1
8
9
9
0
.
4
3
9
9
0
.
7
4
9
9
1
.
1
7
9
8
9
.
8
3
9
9
0
.
0
5
9
9
0
.
2
0
9
9
0
.
4
4
9
9
0
.
6
3
10+00 11+00 12+00
985.37985.51
@ 0.50%
28’- 12" RCP CL V
5102
2
x
3
CB
T
C
=
9
8
9
.
6
3
1
4
’
LT
S
TA
.
1
0
+
3
8
5101
975
970
980
985
990
995
980
985
990
995
975
970
PROPOSED > PROFILE
EXISTING > PROFILE
PROPOSED > ELEVATION
EXISTING > ELEVATION
MATCH LINE SEE SHEET
CONSTRUCTION LIMITS
MATCH LINE SEE SHEET
18
5100
Storm Sewer Construction Plan
TO VERIFY THEIR EXACT LOCATION AND ELEVATION.
APPROXIMATE IT IS THE CONTRACTORS RESPONSIBILITY
3. THE EXISTING UTILITIES SHOWN ON THESE PLANS ARE
CONSTRUCTION AT NO ADDITIONAL COMPENSATION.
2. CONTRACTOR SHALL PROTECT EXISTING UTILITIES DURING
THE MINIMUM REQUIRED TO COMPLETE THE WORK.
1. CONTRACTOR SHALL KEEP DISTURBED AREAS TO
NOTES:
16
17
Star Circle
5101
5102
5004
SEE TYPICAL SECTION
4" PERFORATED DRAINTILE
SEE TYPICAL SECTION
4" PERFORATED DRAINTILE
0 30 60
4" PVC DRAINTILE
BOP Sta = 1+00.00
2+00
3+0
0
982.97
982.77
15" c
mp
18" cmp
983.68
983.66
984.94
985.4915" rcp
bit
bit
CSB
GUYGSV
S
SIGN
sign
SIGN
MB
MB
MB
8
22
12
4
6
4
4
22
26
28
8
10
12
12
T
T
T
T
T
mu
l
ch
rocks
TB
TB
T
SB1
E
in=974.70
in=975.00
tc=987.98
X
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
p
lan
-
0
7
.d
g
n
4
/
13
/
20
15
1:4
2:0
7
PM
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
PT Sta = 25+30.72
PC Sta = 27+10.06
PT
S
t
a
=
3
1
+
22
.
7
2
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
984
9
8
6
98
6
9
8
6
988
988
9
9
0
9
9
2
992
GUY
GUY
GUY
GUY
GUY
GUY
6"
6"8"
8"
6"
24"
24"
10"
10"
24"24"
10"
20"
30"
GUY
6"
14"14"14"
SIGN
SIGN
SIGNSIGN
SIGN
CB
S
S
S
T
MB MB
MB
MB
MBMB GSV
TB
12" rcp
12" rcp
8" cpm
12" cmp 10" cmp
15" rcp
10" cmp
10" cmp
10"
r
c
p
bit
bit
grav
bit
grav
grav
bit
garden
18"18"
gravel
12"
6"
6"
6"6"6"
12"
7"
CSB
CSBCSB
CSB
CSB
CSB
CSBCSB
edge of vegetation
edge of vegetation
edge of vegetation
CT
L
AE
R
CTL AER
CTL AER
CTL AER
CTL AER
CTL AER
CTL AER
CTL AER
CTL AER CTL AER CTL AER CTL AER
CTL AER
CTL AER
CTL AER
CTL AER
CTL AER
CTL AER
CTL AER
19
Infiltration Swale Construction Plan
WITH APRONS WITH TRASH GUARDS
INSTALL 40’- 28" SPAN ARCH CMP
REMOVE 40’- 18" CMP AND
INVERT = 984.00
INVERT = 983.70
12.5 SY GEOTEXTILE FABRIC
6.3 CY RIPRAP
12.5 SY GEOTEXTILE FABRIC
6.3 CY RIPRAP
4" WYE
4" BEND
60’- 4" PVC
TO MAINTAIN GRADE
MINOR DITCH GRADING
2’
4’
3:
1
0 30 60
6’
CATEGORY 2 WOOD FIBER 1S RD.
Mn/DOT EROSION CONTROL BLANKET
Mn/DOT SEED MIX 33-261 @ 35lbs/acre
INSTALL RIRPAP AND FABRIC
MINOR DITCH GRADING TO
WITH FILTER SOCK
218’- 4" PERFORATED PVC
A
A
TYPICAL DITCH SECTION A-A
SEE SPECIFICATION
15% COMPOST, Mn/DOT GRADE 2
15% TOP SOIL;
70% CONSTRUCTION SAND
Mn STORMWATER MAUAL
6" ENGINEERED SOIL MIX A
Mn/DOT DETAIL 3131C
CONCRETE HEADWALL
INSTALL PRECAST
CONTROL/TURF ESTABLISHMENT PLAN.
3. SEED ALL DISTURBED AREAS AS IDENTIFIED ON EROSION
TO VERIFY THEIR EXACT LOCATION AND ELEVATION.
APPROXIMATE IT IS THE CONTRACTORS RESPONSIBILITY
2. THE EXISTING UTILITIES SHOWN ON THESE PLANS ARE
DURING CONSTRUCTION AT NO ADDITIONAL COMPENSATION.
1. CONTRACTOR SHALL PROTECT EXISTING UTILITIES
NOTES:
MATERIAL (MODIFIED) (INCIDENTAL)
6" DEPTH SELECT GRANUALAR
STAPLE 1’ O.C.
6" OVERLAP
CATEGORY3B, 1S, RD
Mn/DOT EROSION CONTROL BLANKET
POINT 1
FLO
WFLO
W
DITCH CHECK
PERMANENT POINT 2
RECOMENDATION
MANUFACTURERS
STAPLES PER
MIN. 1’ BEYOND TOIE
FABRICH TO EXTEND A
NOTE:
THE ENDS.
OVER THE DITCH CHECK AND NOT AROUND
POINT 2 TO ENSURE THAT WATER FLOWS
POINT 1 MUST BE A MIN. 6" HIGHER THAN
NOTE:
CHECK 6 12
CL OR CL-SC (PER ASTM 2487)
UNIFIED SOIL CLASSIFICATION
MATERIAL MUST MEET THE FOLLOWING
(INCHES)
HEIGHT
(INCHES)
WIDTH MATERIAL
SOIL AND COMPACT
4. BACK FILL WITH NATURAL
3. STAPLE @ 1.5’ INTERVALS
2. LAY BLANKET IN TRENCH
1. DIG 6"x6" TRENCH
ANCHOR TRENCH
1’-3’
6"
6"
FLOW
1
1.5
6"
PER Mn/DOT 2575
ANCHORED IN 6"x6" TRENCH,
EROSION STABILIZATION MAT
(SEE TABLE)
WIDTH
(SEE TABLE)
HIGHT
MANUFACTURER
SIDE OF FABRIC PER
STAPLE DOWNSTREAM
(SEE TABLE)
MATERIALS
984
986
INVERT = 983.0
WITH FILTER SOCK
4" PERFORATED PVC
AND RIPRAP (SEE DETAIL)
COVERED WITH GEOTEXTILE FABRIC
EARTH DITCH BLOCK TO 985.00
(SEE DETAIL)
CLEAN OUT
(SEE DETAIL)
CLEAN OUT
BOP
St
a
= 1+0
0.00
2+00 3+00 4+00 5+00
9
8
4
.
94
9
8
5
.
49
15
"
r
c
p
b
i
t
bi
t
b
i
t
b
i
t
g
r
ave
l
b
i
t
CS
B
GUY
GSV
S
S
S
IGN
sign
S
IGN
MB
MB
MBMB
MB
8
2
2
12
4
6
4
4
22
26
2
8
8
1012 1
2
16
1
2 1
2
16
3
16
2
6
12
32
16
8
8
2
6
1
0
10
T
T T T
Tmulch
r
o
c
ks
mul
ch
mulch
mul
ch
EB
TB
TB
T
T T T
SB1
S
B2
E
E
mul
c
h
i
n=974
.
70
i
n=975
.
00
t
c=987
.
98
i
n
=976.
00
tc=9
88.
41
gr
a
v
e
l
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
p
lan
-
0
8
.d
g
n
4
/
13
/
20
15
1:4
2:12
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
-0.66%0.40%0.50%0.50%
BOP
ST
A
=
1
+2
5
.
0
0
BOP
EL
=
9
8
7.
8
5
VPI STA = 1+70.50
VPI EL = 987.55
CURVE LEN = 0.00
VPI STA = 3+00.00
VPI EL = 988.07
CURVE LEN = 0.00
VPI STA = 4+06.00
VPI EL = 988.60
CURVE LEN = 0.00
VPI STA = 5+04.00
VPI EL = 989.09
CURVE LEN = 0.00
9
8
7
.
6
9
9
8
7
.
6
7
9
8
7
.
8
7
9
8
8
.
0
7
9
8
8
.
3
2
9
8
8
.
5
7
9
8
8
.
8
2
9
8
9
.
0
7
9
8
9
.
4
0
9
8
7
.
6
5
9
8
7
.
4
5
9
8
7
.
4
9
9
8
7
.
5
2
9
8
7
.
8
0
9
8
8
.
0
3
9
8
8
.
3
1
9
8
8
.
7
3
9
8
9
.
0
9
9
8
9
.
3
4
1+00 2+00 3+00 4+00 5+00
5720
5715
5700
5680
5695
5675
X
975
970
980
985
990
995
980
985
990
995
975
970
28’ BACK TO BACK
18’ R.
18’ R.
5’ CURB TRANSISTION
5’ CURB TRANSISTION
MATC
H
L
I
NE
S
T
A.
5
+
5
0
MAT
C
H
L
I
NE
S
T
A.
5
+
5
0
EXISTING > PROFILE
PROPOSED > PROFILE
PROPOSED > ELEVATION
EXISTING > ELEVATION
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
Star Lane
S
m
ith
to
w
n
R
o
ad
0 30 60
20
Street Construction Plan
CONCRETE CURB & GUTTER
SURMOUNTABLE
TC=988.36
ASSEMBLY
NEW CASTING
& GUTTER
CONCRETE CURB
SURRMOUNTABLE
5675
BOP Sta = 10+00.00 PI
St
a =
7
+97.
1
1
EOP Sta = 9+24.10
6+00 7+00 8+00
9+00
bi
t
bi
t
b
i
t
bi
t
bi
t
conc
S
S
SI
GN
S
M BMB
M
B
M
B
MB
MB
bi
t
CS
B
1
6
10
1
03
6
16
1
6
2
6
10
12
16
T
T
T
B
T
B
TBTB
TB
SB3
SB4
mulch planter
C
TB
CT
B
EB
T
TV
T
T TT
E i
n=97
7.00
i
n=97
9.00
t
c
=989.
83
i
n=97
7.70
t
c=99
0.65
5660 5640
5620
5600
5605
5645
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
p
lan
-
0
9
.d
g
n
4
/
14
/
20
15
12:42:10
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
0.67%1.50%0.58%
2.38%-2.50%22.0 0%
VPI STA = 6+29.00
VPI EL = 989.93
CURVE LEN = 0.00
VPI STA = 6+35.00
VPI EL = 990.02
CURVE LEN = 0.00
VP
C
STA
=
7
+
2
7
.
0
0
VP
C
E
L
=
9
90
.
5
6
VPI STA = 7+72.00
VPI EL = 990.82
CURVE LEN = 90.00
K = 50.04
E = 0.20
VPT
S
T
A
=
8
+1
7.
0
0
VP
T
E
L
=
9
9
1
.
8
9
VP
C
S
TA
=
8
+
18
.
5
0
VP
C
E
L
=
9
9
1
.
9
3
HP
S
TA
=
8
+
62
.
4
2
HP
E
L
=
9
9
2
.
4
5
VPI STA = 8+63.50
VPI EL = 993.00
CURVE LEN = 90.00
K = 18.43
E = 0.55
VPT
ST
A
=
9
+0
8
.
5
0
VPT
EL
=
9
9
1.
8
8
VPI STA = 9+13.50
VPI EL = 991.75
CURVE LEN = 0.00
EOP
S
TA
=
9
+
15
.
0
0
EOP
E
L
=
9
9
2
.
0
8
9
8
9
.
4
0
9
8
9
.
7
4
9
9
0
.
1
1
9
9
0
.
4
0
9
9
0
.
7
4
9
9
1
.
5
2
9
9
2
.
4
1
9
9
2
.
0
7
9
8
9
.
3
4
9
8
9
.
6
9
9
8
9
.
8
6
9
9
0
.
1
1
9
9
0
.
4
5
9
9
0
.
8
8
9
9
1
.
6
5
9
9
1
.
5
5
6+00 7+00 8+00 9+00
975
970
980
985
990
995
980
985
990
995
975
970
28’ BACK TO BACK
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
MATC
H
L
I
NE
S
T
A.
5
+
5
0
MAT
C
H
L
I
NE
S
T
A.
5
+
5
0
MATCH LINE
25’ R.
25’ R.
50’ R.
EXISTING > PROFILE
PROPOSED > PROFILE
PROPOSED > ELEVATION
EXISTING > ELEVATION
Star Lane
S
tar C
ircle
0 30 60
21
Street Construction Plan
CONCRETE CURB & GUTTER
SURMOUNTABLE
TC=989.89
NEW CASTING ASSEMBLY
5625
5675
TC=991.41
NEW CASTING ASSEMBLY
CASTING SPECIAL
ADJUST FRAME AND RING
& GUTTER
CONCRETE CURB
SURMOUNTABLE
TC=992.70
NEW CASTING ASSEMBLY
CHEMICAL GROUT MANHOLE
CASTING SPECIAL
ADJUST FRAME AND RING
BOP
St
a
=
10+00
.
00
EOP
Sta
=
12+2
9.86
11+00 12+00
6+0
0 brick
bit
bit
bit
S S
SIGN
MB
MB
MB
MB
MB
bit
10
16
8
32
1616
16
10
T TB
TB
TB
TB
SB3
SB5
mu
l
ch
garden rocks
rocks
12
EB
r
wa
l
l
pl
ant
e
r
T
E
in=981.30
tc=990.48
in=977.00
in=979.00
tc=989.83
5
66
0
564
5
565
5
5
66556
75
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
p
lan
-
10
.d
g
n
4
/
13
/
20
15
1:4
2:2
2
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
0.50%0.95%0.70%2 2.00%
1.34%
BOP
ST
A
=
1
0+
0
0
.
00
BOP
EL
=
9
8
9.
9
3
VPI STA = 11+38.10
VPI EL = 990.63
CURVE LEN = 0.00
VPI STA = 11+82.80
VPI EL = 991.05
CURVE LEN = 0.00
VPI STA = 12+12.80
VPI EL = 991.26
CURVE LEN = 0.00
VPI STA = 12+14.30
VPI EL = 991.59
CURVE LEN = 0.00
EOP
S
TA
=
12
+
2
9
.
8
6
EOP
E
L
=
9
9
1
.
8
0
9
8
9
.
9
3
9
9
0
.
1
8
9
9
0
.
4
3
9
9
0
.
7
4
9
9
1
.
1
7
9
8
9
.
8
3
9
9
0
.
0
5
9
9
0
.
2
0
9
9
0
.
4
4
9
9
0
.
6
3
10+00 11+00 12+00
975
970
980
985
990
995
980
985
990
995
975
970
Star Circle
S
ta
r L
an
e
0 30 60
15’ R.
15’ R.
40’ R.
40’ R.
30’ R.
EXISTING > PROFILE
PROPOSED > PROFILE
PROPOSED > ELEVATION
EXISTING > ELEVATION
28’ BACK TO BACK
CONSTRUCTION LIMITS
MATCH LINE SEE SHEET
MATCH LINE SEE SHEET 13
13
Street Construction Plan
22
CONCRETE CURB & GUTTER
SURMOUNTABLE
TC=991.00
NEW CASTING ASSEMBLY
b
i
t
b
i
t
b
i
t
b
i
t
b
i
t
conc
M B M B
M
B
M
B
MB
1
2
1
6
T
B
T
BT
B
T
B
S
B
4
C
T
B
C
T
B
E
B
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
p
lan
-
11.d
gn
4
/
13
/
20
15
1:4
2:2
7
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
BOP Sta = 10+00.00
EOP Sta = 12+29.86
1
1
+
0
0
1
2
+
0
0
6+00 7+00
b
r
i
c
k
b
i
t b
i
t
b
i
t
S
I
GN
MB
MB
MBMB
MB
b
i
t
C
S
B
1
6
8
1
0
1
03
6
1
01
6
8
3
2
1
6
1
6
1
6
1
6
2
6
1
0T
B
T
B
T
B
T
B
T
B
S
B3
S
B
5
mulch
g
a
r
d
e
n
r
o
c
k
s
r
o
c
k
s
1
2 E
B
rwall
planter
E
P
I
S
t
a
=
7
+
9
7
.
1
1
EOP
S
ta = 9+
24.10
8
+
0
0
9
+00
991.12
x
x
992.75
x
990.85
991.18
990.85
991.18
x
x
991.12
991.45
x991.67
992.00
991.14990.81x
991.36
991.03
x
991.23
990.89
x
991
.
32
99
0
.
99
x
1.70%
0.50
%
0.50%
0.50%
1
.
7
0
%
1.70%
2.
11
%
3.
7
2
%
9
9
0
.
6
3
9
9
0
.
30
x
9
9
0
.
6
3
9
9
0
.
3
0
x
990.63
x
991.05
x
991.29
990.96
x
991.06
990.73
x991.08
990.75
x
0.70%
0.
7
0
%
0
.
7
0
%
0
.
7
0
%
Street Construction Plan
23
0
.
5
0
%
x
983.93
x
990.15
x
989.73
x
989.46
989.79
989.46
989.79
x
9
8
9
.
5
2
9
8
9
.
8
5
x
9
8
9
.
5
2
9
8
9
.
8
5
x
989.79
x
0
.
5
0
%
1.42%0.58%
x
989.88
990.21
989.88
990.21
x
0 15 30
0 15 30
HP
HP
24
Cross Sections
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
x
s
e
c
t
-
01.d
gn
4
/
13
/
20
15
1:4
2:3
3
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
CL
CL
10
10
20
20
30
30
40
40
50
50
60
60
70
70
10
10
20
20
30
30
40
40
50
50
60
60
70
70
CL
CL
10
10
20
20
30
30
40
40
50
50
60
60
70
70
10
10
20
20
30
30
40
40
50
50
60
60
70
70
1 1
00 00
++990 990
995 995
985 985
STA =1+00
ORIGINAL EL =987.67
1 1
25 25
++985 985
990 990
980 980
STA =1+25
ORIGINAL EL =987.85
DESIGN EL =987.85
1 1
50 50
++985 985
990 990
980 980
STA =1+50
ORIGINAL EL =987.63
DESIGN EL =987.57
1 1
75 75
++985 985
990 990
980 980
STA =1+75
ORIGINAL EL =987.66
DESIGN EL =987.42
2 2
00 00
++985 985
990 990
980 980
STA =2+00
ORIGINAL EL =987.70
DESIGN EL =987.39
2 2
16 16
++985 985
990 990
980 980
STA =2+16
ORIGINAL EL =987.72
DESIGN EL =987.45
2 2
25 25
++985 985
990 990
980 980
STA =2+25
ORIGINAL EL =987.73
DESIGN EL =987.50
2 2
50 50
++985 985
990 990
980 980
STA =2+50
ORIGINAL EL =987.77
DESIGN EL =987.62
2 2
56 56
++985 985
990 990
980 980
STA =2+56
ORIGINAL EL =987.81
DESIGN EL =987.65
2 2
75 75
++985 985
990 990
980 980
STA =2+75
ORIGINAL EL =987.94
DESIGN EL =987.75
3 3
00 00
++985 985
990 990
980 980
STA =3+00
ORIGINAL EL =988.12
DESIGN EL =987.87
3 3
25 25
++985 985
990 990
980 980
STA =3+25
ORIGINAL EL =988.22
DESIGN EL =988.08
25
Cross Sections
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
x
s
e
c
t
-
01.d
gn
4
/
13
/
20
15
1:4
2:3
5
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
CL
CL
10
10
20
20
30
30
40
40
50
50
60
60
70
70
10
10
20
20
30
30
40
40
50
50
60
60
70
70
CL
CL
10
10
20
20
30
30
40
40
50
50
60
60
70
70
10
10
20
20
30
30
40
40
50
50
60
60
70
70
3 3
31 31
++
990 990
995 995
985 985
STA =3+31
ORIGINAL EL =988.25
DESIGN EL =988.11
3 3
50 50
++990 990
995 995
985 985
STA =3+50
ORIGINAL EL =988.32
DESIGN EL =988.22
3 3
68 68
++990 990
995 995
985 985
STA =3+68
ORIGINAL EL =988.41
DESIGN EL =988.33
3 3
75 75
++990 990
995 995
985 985
STA =3+75
ORIGINAL EL =988.45
DESIGN EL =988.37
4 4
00 00
++990 990
995 995
985 985
STA =4+00
ORIGINAL EL =988.59
DESIGN EL =988.51
4 4
06 06
++990 990
995 995
985 985
STA =4+06
ORIGINAL EL =988.62
DESIGN EL =988.55
4 4
25 25
++990 990
995 995
985 985
STA =4+25
ORIGINAL EL =988.74
DESIGN EL =988.65
4 4
43 43
++990 990
995 995
985 985
STA =4+43
ORIGINAL EL =988.84
DESIGN EL =988.75
26
Cross Sections
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
x
s
e
c
t
-
01.d
gn
4
/
13
/
20
15
1:4
2:3
8
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
CL
CL
10
10
20
20
30
30
40
40
50
50
60
60
70
70
10
10
20
20
30
30
40
40
50
50
60
60
70
70
CL
CL
10
10
20
20
30
30
40
40
50
50
60
60
70
70
10
10
20
20
30
30
40
40
50
50
60
60
70
70
4 4
50 50
++990 990
995 995
985 985
STA =4+50
ORIGINAL EL =988.88
DESIGN EL =988.79
4 4
75 75
++990 990
995 995
985 985STA =4+75
ORIGINAL EL =989.04
DESIGN EL =988.93
5 5
00 00
++990 990
995 995
985 985STA =5+00
ORIGINAL EL =989.20
DESIGN EL =989.07
5 5
04 04
++990 990
995 995
985 985STA =5+04
ORIGINAL EL =989.22
DESIGN EL =989.09
5 5
25 25
++990 990
995 995
985 985STA =5+25
ORIGINAL EL =989.37
DESIGN EL =989.23
5 5
50 50
++990 990
995 995
985 985STA =5+50
ORIGINAL EL =989.55
DESIGN EL =989.40
5 5
75 75
++990 990
995 995
985 985STA =5+75
ORIGINAL EL =989.68
DESIGN EL =989.57
6 6
00 00
++990 990
995 995
985 985STA =6+00
ORIGINAL EL =989.77
DESIGN EL =989.74
27
Cross Sections
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
x
s
e
c
t
-
01.d
gn
4
/
13
/
20
15
1:4
2:4
0
PM
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
CL
CL
10
10
20
20
30
30
40
40
50
50
60
60
70
70
10
10
20
20
30
30
40
40
50
50
60
60
70
70
CL
CL
10
10
20
20
30
30
40
40
50
50
60
60
70
70
10
10
20
20
30
30
40
40
50
50
60
60
70
70
6 6
25 25
++990 990
995 995
985 985STA =6+25
ORIGINAL EL =989.82
DESIGN EL =989.91
6 6
35 35
++990 990
995 995
985 985STA =6+35
ORIGINAL EL =989.83
DESIGN EL =990.02
6 6
50 50
++990 990
995 995
985 985STA =6+50
ORIGINAL EL =989.85
DESIGN EL =990.11
6 6
75 75
++990 990
995 995
985 985STA =6+75
ORIGINAL EL =989.92
DESIGN EL =990.25
7 7
00 00
++990 990
995 995
985 985
STA =7+00
ORIGINAL EL =990.03
DESIGN EL =990.40
7 7
25 25
++990 990
995 995
985 985
STA =7+25
ORIGINAL EL =990.12
DESIGN EL =990.55
7 7
50 50
++990 990
995 995
985 985
STA =7+50
ORIGINAL EL =990.21
DESIGN EL =990.69
7 7
72 72
++990 990
995 995
985 985
STA =7+72
ORIGINAL EL =990.35
DESIGN EL =990.82
7 7
75 75
++990 990
995 995
985 985
STA =7+75
ORIGINAL EL =990.39
DESIGN EL =990.88
8 8
00 00
++990 990
995 995
985 985
STA =8+00
ORIGINAL EL =990.68
DESIGN EL =991.41
8 8
34 34
++990 990
995 995
985 985
STA =8+34
ORIGINAL EL =991.30
DESIGN EL =992.07
28
Cross Sections
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
x
s
e
c
t
-
01.d
gn
4
/
13
/
20
15
1:4
2:4
3
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
CL
CL
10
10
20
20
30
30
40
40
50
50
60
60
70
70
10
10
20
20
30
30
40
40
50
50
60
60
70
70
CL
CL
10
10
20
20
30
30
40
40
50
50
60
60
70
70
10
10
20
20
30
30
40
40
50
50
60
60
70
70
8 8
81 81
++990 990
995 995
985 985
STA =8+81
ORIGINAL EL =991.72
DESIGN EL =992.23
8 8
84 84
++990 990
995 995
985 985
STA =8+84
ORIGINAL EL =991.67
DESIGN EL =992.20
9 9
00 00
++990 990
995 995
985 985
STA =9+00
ORIGINAL EL =991.53
DESIGN EL =992.00
29
Cross Sections
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
x
s
e
c
t
-
01.d
gn
4
/
13
/
20
15
1:4
2:4
5
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
CL
CL
10
10
20
20
30
30
40
40
50
50
60
60
70
70
10
10
20
20
30
30
40
40
50
50
60
60
70
70
CL
CL
10
10
20
20
30
30
40
40
50
50
60
60
70
70
10
10
20
20
30
30
40
40
50
50
60
60
70
70
10 10
00 00
++990 990
995 995
985 985
STA =10+00
ORIGINAL EL =989.83
DESIGN EL =989.94
10 10
25 25
++990 990
995 995
985 985STA =10+25
ORIGINAL EL =989.88
DESIGN EL =990.06
10 10
50 50
++990 990
995 995
985 985STA =10+50
ORIGINAL EL =990.05
DESIGN EL =990.18
10 10
75 75
++990 990
995 995
985 985STA =10+75
ORIGINAL EL =990.11
DESIGN EL =990.31
10 10
83 83
++990 990
995 995
985 985
STA =10+83
ORIGINAL EL =990.14
DESIGN EL =990.35
10 10
87 87
++990 990
995 995
985 985
STA =10+87
ORIGINAL EL =990.15
DESIGN EL =990.37
11 11
00 00
++990 990
995 995
985 985
STA =11+00
ORIGINAL EL =990.20
DESIGN EL =990.44
11 11
50 50
++990 990
995 995
985 985
STA =11+50
ORIGINAL EL =990.44
DESIGN EL =990.69
11 11
94 94
++990 990
995 995
985 985
STA =11+94
ORIGINAL EL =990.59
DESIGN EL =990.91
11 11
98 98
++990 990
995 995
985 985
STA =11+98
ORIGINAL EL =990.62
DESIGN EL =990.94
30
Storm Water Pollution Prevention Plan
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
s
w
p
p
p
.d
g
n
4
/
13
/
20
15
1:4
2:5
0
PM
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
31
Storm Water Pollution Prevention Plan
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
s
w
p
p
p
.d
g
n
4
/
13
/
20
15
1:4
5:13
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
32
Storm Water Pollution Prevention Plan
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
s
w
p
p
p
.d
g
n
4
/
13
/
20
15
1:4
7:0
5
PM
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE
33
Storm Water Pollution Prevention Plan
REVISIONSNO.DATE BY CHK
LIC. NO:
Plan By:
Design By:
Checked By:
Approved By:
THE LAWS OF THE STATE OF MINNESOTA
MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY OR UNDER
THC
KAK
THC
PTH 03/23/15 45782K:\
0
1459-9
7
0\
Ca
d\
Pla
n
\
s
w
p
p
p
.d
g
n
4
/
13
/
20
15
1:4
8:4
7
P
M
DATE:engineering planning environmental construction...
St. Paul, MN 55101
477 Temperance Street
wsbeng.com
Tel: (651)286 8450 Fax: (651)286 8488...
33
OF
SHEET
James L. Stremel, PE
Shorewood City Project No. 14-11
WSB Project 01459-970
for the City of Shorewood, Minnesota
and Appurtenant Work
Street and Utility Improvements Project
Star Lane & Star Circle
LIC. NO:LIC. NO:45782
James L. Stremel, PE