21-011 Approving the Feasibility Study and Authorizing Preparing Plans and Specifications for the Smithtown Pond Project, City Project 20-07CITY OF SHOREWOOD
COUNTY OF HENNEPIN
STATE OF MINNESOTA
RESOLUTION 21-011
A RESOLUTION APPROVING THE FEASIBILITY STUDY AND AUTHORIZING
PREPARING PLANS AND SPECIFICATIONS FOR THE SMITHTOWN POND
PROJECT
CITY PROJECT 20-07
WHEREAS, the City of Shorewood ("City") authorized the preparation of a Feasibility
Study for the Smithtown Pond project, City Project 20-07, on June 8, 2020; and
WHEREAS, the preliminary engineering and Feasibility Study confirms that the
proposed improvements will reduce flow in downstream Grant Lorenz Channel, provide
for improved drainage in the upstream watershed, provide improved water quality for
the watershed, and provide treatment for the future Smithtown Road and Trail project
scheduled for 2022; and
WHEREAS, the proposed improvements are necessary, cost effective, and feasible;
and
WHEREAS, the project is included in the 2021 Capital Improvements Plan and will fund
the project from the Stormwater Fund; and
NOW THEREFORE, IT RESOLVED: that the City Council of the City of Shorewood
hereby receives the Feasibility Study prepared by Bolton & Menk and Authorizes the
preparation of Final Plans & Specifications for the Smithtown Pond project.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 25th day of January,
2021.
- a , I � i� 6 Ze 1�, la,�- ,
J nife Labadie, Mayor
I%k
Sandie Thone, City Clerk