Loading...
051120 Park Tour Packet CITY OF SHOREWOOD 2021 PARK TOURS The Shorewood Park Commission has set aside two days for touring the parks. The first tour is scheduled for: May 11, 2021 Meet at Freeman Park Eddy Station at 6:00 p.m. Tours Start at 6:15 p.m. Tour Freeman Park Three Rivers Park District – Trail Options Cathcart Park Majority of the City Council May be Present for the Park Tours. No Action Will be Taken. Attachments: Freeman Park Trail Access Memo and Trail options 2020 Park Tour Items Park Inventory and Dates Installed Liaison for City Council Meeting on May 24 is Commissioner Tauer 2020 Park Tours Freeman Park:  Ballfield washout – needs to be addressed – This has been completed  Talk to applicator regarding spraying around community gardens  Building near men’s bathroom starting to wash away and one of the gutters is dumping water right down the side of the building  Fencing around the ballfields needs to be addressed Cathcart Park:  Chains on basketball hoops need to be replaced  Tree branches hanging over the court on the south end of the basketball court  Plastic edging around swing set needs to be fixed  Gaga ball pit – Maybe an Eagle Scout project – Added to Eagle Scout List  Layout of playground and possibly joining it together – Made note for when PK Comm look at updating playground  Weeds in playground area Badger Park:  Free library needs to be repaired – glass is out  Possible erosion issue on the path behind the lacrosse field – This is being repaired Silverwood Park:  Bare metal on some of the playground equipment – Equipment being replaced  Retaining blocks starting to shift  Big slide – suggested putting some playground mulch at the end – Being replaced  Railings to the big slide are in rough shape and in some placed rotted away and need to be fixed – Being replaced  Port-a-potty – put up bollards to prevent trucks driving on court(this was mentioned at last year’s tours)  2-3 dead trees along the pond area that should be removed Manor Park:  Expressed concerns about the parking lot layout and confusion on where to park ndrd  Home plate, 2 base and 3 base are sticking way out of the ground  Suggested putting a sign up at the tennis courts warning people that the surface can be slick, especially if wet South Shore Community Park:  Look into planting a couple trees between the entrance and highway 7  Check to see if expansion of community garden is needed – Expanding Spring 2021 Christmas Lake Boat Access:  Ongoing issue with the operating system for the gate 2020 Park Inventory & Priority Needs Assessment AmenityDate InstalledCondition Proposed ReplacementNotes/Budget Estimate Date of Last Review Park Entrance Signs20115 Bike Racks 20135 Message Boards20125 Picnic Tables20125all parks Cathcart Park Little League field199452019 Painted the rink Hockey Rink199052015 2019 Warming House Updated summer of Trailer 19785 2016 Basketball Tennis Court196622023$9,000 Resurface 2019 Tot lot - playground equipment2024 Aug-953$100,000 New Swing Set/tireAug-115203625 yr Parking Lot surface3 Freeman Park Softball Fields (3)1990525 yr update fence in bat cage should be replaced 2012 - Replaced 500' Little League field (2)19875every 15 yrs on field 2 Babe Ruth Field1990425 yr update Soccer Fields (6+)1990525 yr update Trails19924No Date Community Garden20135 Fenced/water 2015 Volleyball Courts 1994525 yr update Interior Partitions installed 5 Eddy Station20002017 2017/2018 Installed Rink & Lights Free Skate2017 2017/2018 season Picnic Shelter19944 Re-roofed 2014 Some maintenance Concession stand LL19943needed Plaza - tables amenities 20054 updated 2019Tot lot equip South199042019100,000 Tot lot equip North19945 Manor Park Pond Skating Rinks19665 Rink lights19793 rehabbed in 1999 Window to parking lot, Warming House201052018repair floors/stoop Playground equip Swing Set20105203525 yr replcmnt Pickle ball court20135 Versa Tennis Court 20135 Multi-Purpose Field4 Softball Field1979425 yr update Silverwood Park Playground equip19943-Jan2021rough, $60,000 Swing Set19943 to 4202125 yr replcmnt Sliding Hill/slides198742021metal/replace? half court Basketball 201542023overlay Resurface 2019 Picnic Shelter201052035 Benches4 Skate Park Water Fountain20115 Done New Facility2020 Community Garden20145 Badger Park Playground equip Swing Set3201920 yr /$65,000 Shelter2019$80,000 Tennis Courts New 2020 Tennis Court Signs198722020$200,000 Lacrosse/Football field20165 Restrooms20192019 Trails/Sidewalks20192019 Parking Lot 2018 completed 2018 Condition Scale :1 unacceptable condition - 2 poor/watch - 3 acceptable/fair - 4 good - 5 excellent General Replacement/Upgrade Policy Guidelines: Hockey Rinks25 yrs Swing Sets/Playground Equipment25 yrs Ball Fields25 yrs Batting Cages20 yrs Lighting Systems30 yrs Stripping/Painting updates to Bldgs.8-10-yrs Reshinglingevery 12 yrs Tennis Court Resurfacing4 yr rotation Trails resurfacing20 yrs Irrigation Systems20 yrs Water fountains15 yrs