Loading...
03-14-16 CC-Parks WS Agenda Packet CITY OF SHOREWOOD 5755 COUNTRY CLUB ROAD CITY COUNCIL/PARK COMMISSION WORK SESSION COUNCIL CHAMBERS MONDAY, MARCH 14,2016 6:00 P.M. AGENDA 1. CONVENE CITY COUNCIL/PARK COMMISSION WORK SESSION A. Roll Call City Council: Park Commission: Mayor Zerby Justin Mangold Labadie Paul Kobs Siakel Ed Rock Sundberg Paul Stelmachers Woodruff Stepany Vassar B. Review Agenda ATTACHMENTS 2. BADGER PARK PLAYFIELD IMPROVEMENTS 03-08-16 Park Comm Mtg item Proposals 3. ADJOURN March 2, 2016 City of Shorewood Brad Nielsen, Planning Director 5755 Country Club Road Shorewood, MN 55331 RE: Shorewood Lacrosse/Football Field RFP TCPN Proposal Quote # R5175-MN-9429 Dear Brad, AstroTurf, LLC is pleased to submit the following TCPN proposal R5175-MN-9429 for approximately 54,400 square feet of AstroTurf® Synthetic Turf to be installed at Badger Park, Shorewood, MN 55331. Our quote includes all labor, materials, tools and equipment nec-place the synthetic turf applications referenced (in accordance with our published product specifications) and described as follows: Base Bid: XPe(42): = $ 435,750.00 Alternate #1Q(44): = $ 439,456.00 Alternate #2: = $ 452,802.00 Alternate #3: Practice Shooting area with netting, 30x90 = $ 45,670.00 Inclusions: Sitework All concrete curbing, excavation, drainage pipe, and base stone required to install synthetic turf field. Labor and material Synthetic Turf Material & Installation Installation of selected AstroTurf® Synthetic Turf System by manufacturer-certified crews. Main panels are to be installed per manufactur XPe & Q Systems Seams to be sewn o 3D Systems Seams to be installed with AstroFusion o Inlaid markings to be installed with hot melt Inlaid markings for the sport of Youth Football Inlaid markings for the sport of Mens Lacrosse Inlaid markings for the sport of Womens Lacrosse An infill of Ambient SBR and Silica Sand at the manufacturer-approved weights and ratios for the selected that will achieve a minimum infill depth of 1.46 inches at completion of infill installation. Gmax Testing One (1) at substantial completion rd AstroTYear 3 Party Insured Warranty Provide eight sets of removable goal area panels Wages as appropriate for City of Shorewood, Private/Non-Prevailing Cleanup and disposal of our debris into dumpsters Payment & Performance Bonds Pricing is based on standard color palette AstroTurf employs an ASBA Certified Field Builder Synthetic Fields on staff This proposal is based on complete access to the jobsite. This proposal is based on normal working hours. All off-hour, weekend, and overtime work will be an additional cost for premium charges for labor, p increased hauling charges. Athletic Equipment Boys and Girls Lacrosse Safety Netting Material and Installation Exclusions: Any damage to existing asphalt track base, pavement curb, retainetc. as a result of our construction operations. All repairs will be made quoted. Any survey, layout, certification, testing, or inspection costs, with permits through Minnehaha Creek Watershed District, visual base inspection, G- rd Max Testing, and 3 Party Warranty verification Repair of any un-marked utilities. Relocation, removal or repairs of existing utilities. Any survey, layout, certification, testing, or inspection costs, other than those associated rd with visual base inspection, G-Max Testing, and 3 Party Warranty verification Field Maintenance Equipment Use/Sales Taxes Prevailing Wages Any Liquidated Damages surcharges. Our proposal is submitted based on our assumption that all architect-approved net payments will be received within thirty (30) days of the approval date, and that final payment will be released to us within thirty (30) days of the completion of all final punch list items We certainly do look forward to working with you. Sincerely, Kim Summers Kim Summers AstroTurf, LLC Contract Management cc: Troy Johnson, AstroTurf, LLC Regional Sales Manager Date: Friday, February 26, 2016 To: Bradley J. Nielsen, Planning Director City of Shorewood 5755 Country Club Road Shorewood, MN 55331 Phone: 952-960-7900 Email: bnielsen@ci.shorewood.mn.us From: Brian Kramer, Regional Sales Manager Phone: 319-265-2448 Email: Brian.Kramer@fieldturf.com Subject: City of Shorewood Badger Park Lacrosse Field Budget Estimate FieldTurf USA, Inc. is pleased to present the following proposal. Price estimates are based off of The National Joint Powers Alliance (NJPA) pricing. NJPA provides predetermined preferential pricing through approved vendors. Since the products have already been bid at the national level, individual schools do not have to duplicate the bidding process per NJPA Contract # 082114. Description Quantity Units Unit Price Total Site Work 1 Civil Scope (See Description Below) 54,400 SF $4.85 $263,840.00 Total Site Work $263,840.00 Synthetic Turf 2 Fieldturf XT-57 2.25" 54,400 SF $3.66802 $199,540.52 3 Inlaid Boy's Lacrosse Markings 1 EA $7,087.50 $7,087.50 4 Inlaid Girl's Lacrosse Markings 1 EA $7,087.50 $7,087.50 5 Inlaid Youth Football Markings 1 EA $7,087.50 $7,087.50 6 Maintenance Equipment: GroomRight & SweepRight 1 LS $6,075.00 $6,075.00 Total Synthetic Turf $226,878.02 7 Performance & Payment Bonds 1 LS $5,653.99 $5,653.99 Total Project $496,372.01 Voluntary Add Alternates A1 1 LS $29,873.81 $29,873.81 netting at each end of field. Performance & Payment Bonds 1 LS $344.20 $344.20 Total Alternate #1 $30,218.01 7445 C˜te-de-Liesse Road Suite 200 Montreal Quebec H4T 1G2 Tel 1-800-724-2969 Fax (514) 340-9374 www.FieldTurf.com City of Shorewood Badger Park Lacrosse Field Budget Estimate Friday, February 26, 2016 Page 2 of 4 Furnish and install 6' high chainlink fence along both A2 1 LS $7,256.59 $7,256.59 ends of field to protect netting system. Performance & Payment Bonds 1 LS $83.61 $83.61 Total Alternate #2 $7,340.20 settlement and frost heave: A3 1 LS $108,970.31 $108,970.31 material to prepare for sand placement. Performance & Payment Bonds 1 LS $1,255.54 $1,255.54 Total Alternate #3 $110,225.85 Furnish and install H-Style goal post and soccer goal combo to include: -style goal post complete A4 1 LS $14,352.19 $14,352.19 with footings - style goals Performance & Payment Bonds 1 LS $165.36 $165.36 Total Alternate #4 $14,517.55 A5 Furnish and assemble two lacrosse goals 1 LS $3,136.73 $3,136.73 Performance & Payment Bonds 1 LS $36.14 $36.14 Total Alternate #5 $3,172.87 topsoil for reuse around practice area, strip and remove remaining topsoil offsite and properly dispose, tolerance subgrade to achieve half percent grade ready for placement of base stone, and respread/ finish grade topsoil ready for restoration. outlet pipe from field to wetland on east side of project A6 1 LS $29,023.31 $29,023.31 or attached to main turf field outlet pipe. incased in rock and fabric ter of field. 12 concrete curb tolerance graded ready for turf installation. Fieldturf XT-57 2.25" 2,700 SF $3.668024 $9,903.67 Performance & Payment Bonds 1 LS $448.51 $448.51 Total Alternate #6 $39,375.49 City of Shorewood Badger Park Lacrosse Field Budget Estimate Friday, February 26, 2016 Page 3 of 4 Civil Scope of work Includes: a) Third Party Design and Engineering documentation for the FieldTurf limits (all proposed areas to receive artificial turf surfacing only) including: a. Topographic survey of proposed turf limits b. Review existing Geotechnical information and Stormwater Calculations prepared by others c. Erosion Control Plan d. Layout Plan e. Grading Plan f. Utility Plan g. Field Marking Plan h. Detail Plans to include curbs, piping systems, base section, irrigation details, and additional details as required to complete the installation of the field i. Furnish Sealed Drawings j. Attend up to one (1) coordination meeting with the Local Permitting Authority b) Mobilization and Demobilization to complete project c) Survey and layout to design and layout turf field d) Management to control our crew onsite for the duration of our work e) Earthwork to include striping and stockpiling existing topsoil for reuse around turf field, strip and remove remaining topsoil offsite and properly dispose, tolerance subgrade to achieve half percent grade ready for placement of base stone, and respread/ finish grade topsoil ready for restoration. f) Furnish and insta g) h) Install 6 x 12 nailer curb around perimeter of field. i) Furnish and install 2 x 4 nailer board attached to 6 x 12 concrete curb j) stone tolerance graded ready for turf installation k) One year warranty on all civil work l) This proposal and storm water calculations. However, the scope of work/services and associated pricing are subject to change in the event of: (i) design and/or construction requirements of the local permitting authorities which dictate a change in design and/or construction and/or (ii) existing site conditions which are concealed, unknown and/or differ from readily available published data for the region EXCLUSIONS: a) Any costs associated with necessary charges relating to the delineation of the field b) Unless otherwise specified, does not include any G-max testing c) The supply of manholes or clean-outs or grates, or supply of the manhole covers d) Any alteration or deviation from specifications involving extra costs, which alteration or deviation will be provided only upon executed change orders, and will become an extra charge over and above the offered price. e) The implementation of a storm water pollution prevention plan f) Soil Stabilization or remediation of any type g) Synthetic Track Surfacing h) Field event construction i) Supply or installation of fencing or any barrier not listed above j) Site security k) Boring for utilities l) Any electrical work m) Small vehicle to tow FieldTurf maintenance equipment n) Athletic equipment except listed above o) Asphalt paving City of Shorewood Badger Park Lacrosse Field Budget Estimate Friday, February 26, 2016 Page 4 of 4 p) Once subgrade has been established, a proof roll will be performed to ensure structural stability of the soils; in the event that unsuitable soils are encountered, a price to remedy these areas can be negotiated based on recommended methods per project Engineer. q) Installation of manholes, junction boxes, gabions, concrete rip wrap, storm drainage not related to the field construction, grate inlets and RCP. r) Relocation, removal and repair of existing utilities not limited to electrical conduits, power poles, water, sewer, gas, cable, telephone, owner placed conduits or communication feeds within the field of play s) Permitting Fees t) Landscaping or site restoration seeding/sodding u) All applicable taxes, bonding fees, prevailing wages, union labor or other labor law levies. NOTES: Notwithstanding any other document or agreement entered into by FieldTurf in connection with the supply and installation only of its product pursuant to the present bid proposal, the following shall apply: a) This bid proposal and its acceptance is subject to strikes, accidents, delays beyond our control and force majeure; b) c) FieldTurf requires a minimum of 21 days after receiving final approvals on shop drawings to manufacture, coordinate delivery and schedule arrival of installation crew. Under a typical field size and scenario, FieldTurf further requires approximately 120 days unencumbered access to the field to complete the field, subject to weather, other delays beyond the control of FieldTurf and force majeure. d) FieldTurf requires a suitable staging area. Staging area must be square footage of field x 0.12, have a minimum access of 15 feet wide by 15 feet high, and, no more than 100ft from the site. A 25 foot wide by 25 foot long hard or paved clean surface area located within 50 feet of the playing surface shall be provided for purposes of proper mixing of infill material. Access to any field will include suitable bridging over curbs from the staging area to permit suitable access to the field by low clearance vehicles. e) This proposal is based on a single mobilization. If the site is not ready and additional mobilizations are necessary, additional charges will apply. In particular, the pricing for Alternate #6 is contingent upon the synthetic turf being manufactured and shipped with the main field materials. f) FieldTurf shall be entitled to pursue all costs and expenses, including attorney fees, associated with collection procedures of payment of any past due invoice. g) h) The FieldTurf product carries an 8 year 3 rd The FieldTurf product in Alternate #6 carries a 5 year 3 rd party insured manufacturers warranty. The price is valid for a period of 90 days. The price is subject to increase if affected by an increase in raw materials, freight, or other manufacturing costs, a tax increase, new taxes, levies or any new legally binding imposition affecting the transaction. The price of the base preparation is subject to increase in the event FieldTurf encounters any of the following site conditions: soil contamination; bedrock; unknown utilities; underground springs; unstable or unsuitable ground; and any concealed or unknown conditions. SmartBuy Cooperative Purchasing Program. 888-209-0065, ext. 246 or via e-mail at eric.fisher@fieldturf.com. Be sure to visit our website at www.fieldturf.com