Loading...
13-060CITY OF SHOREWOOD RESOLUTION NO. 13 -060 A RESOLUTION APPROVING WORK ORDERS 1, 2, AND 3 FOR SMITHTOWN ROAD SIDEWALK IMPROVEMENTS SAP 216 -101 -004 CITY PROJECT 13 -04 WHEREAS, the City of Shorewood Council awarded the contract for the construction of sidewalk along the southerly side of Smithtown Road from the City boundary with Victoria to the Lake Minnetonka (LRT) Regional Trail (approximately 10,000 feet in length) to Chard Tiling and Excavating, Inc. of Belle Plaine, Minnesota; and WHEREAS, the Capital Improvement Plan provides $1,200,000 for the improvement project; and WHEREAS, Work Orders 1, 2, and 3, are necessary to construct the storm drainage system and associated work; and WHEREAS, Work Orders 1, 2, and 3will increase the project construction costs in the amount of $25,169.79, from the original contract amount $1,070,672.75 to $1,095,842.54; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Shorewood, Minnesota: Work Orders I, 2, and 3 in the total amount of $25,169.79 is hereby approved. ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 23rd day of September, 2013. ATTEST: ILL Jean Panehyshyn, city er- _... _% At Zerb Y yor tAWDOTTP- 2160. 0112 -10 SHEET OF SHEETS State of Minnesota b Department of Transportation WORK [,ORDER - MINOR EXTRA WORK # 1 Contractor: Chard Tiling & Excavating, Inc. State Project No.216 -101 -004 Address; 26239 State Hwy 25, Belle Plaine, MN 56011 Federal Project No, Job Location: Smithtown Road, Shorewood MN Contract No. In accordance widr Standard Specifications 1103 and 1403, you are hereby authorized and instructed to do the work described herein. The Contract Documents included the removal of an existing storm sewer system and the installation of a new storm sewer system along Smithtown Road. During construction operation the Contractor found several unidentified buried culvers, drain tiles and phone ducts which caused the Engineer to modify the storm sewer design and layout, The Engineer directed the Contractor to Remove the existing buried culverts, cut additional holes into the Manholes to accomidate the drain tiles and provide bends in the pipe to work around the phone ducts, The Contractor agreed to perfonn the work but asked to be compensated for the additional labor and materials necessary to perform thetie operations, The Engineer agreed this constituted extra work, Payment for this work will be as outlined in the estimate quantity tabulation which is listed below, which includes all mobilization, labor, materials, disposal, equipment cost and .Prime Contractor mark up where applicable Tnereased ftems Item No. Description Unit Unit Price — Est€mated Quantity Amount *2104.501 Remove Sewer Pie Storm Lin. Ft. $2.75 30 $32.50 2500511 15" NI Pipe Culvert Lin, Ft. $34.00 30 $1,020.00 2501.51S... 15" CM Pipe Apron Each $136.00 2 $272.00 Modify Manholes 5009, 5013, 5014, 5016, 5018, 5022, & 5032 Lump Sum 1 $1,262.00 1 $1,262.00 Modify Manholes 5020, 5021, 5027, 5026, 5028, 5029 & 5030 Lum) Sum T $1,423.00 1 $1,423.00 Modify Manholes 5011,5014,5033A Lump Sum $1,35i.38 1 $1,351.88 TOTAL $5,411.38 Contract Amount is increased by: $5,411.38 O.K. Mn/DOT O.C.I.C. TES 08/28/13 Contract time is: Increased by _ (_JWorkutg Days I JCalendar Days ®Not changed Signature I Date Contractor Authorized *Assistant District Engineer * *L;-6 I'Agency ** `Consultant Contract Administrator * Required for Work Orders that exceed $25,000.00 ** Required if work funded wholly or in part by a Local Agency *** Recommendation for Approval Original to Project File Copy to Contractor, Construction and Innovative Contracting (submit with Final); Copy to Local Agency and MN/DOT Municipal Agreement Unit if funded wholly or in part by Local Agency Funds MdDOT TP- 2460 - 0112 -I0 SHEET OF S1-METS State of Minnesota - Department of Transportation WORK ORDER - MINOR EXTRA WORK # 2 Contractor: Chard Tiling & Excavating, Inc. State Project No.216 -101 -004 Address: 26239 State Hwy 25, Belle Plaine, MN 56011 Federal Project No, Job Location: Smitltown Road, Shorewood MN Contract No. in accordance with Standard Specifications 1103 and 1403, you are hereby authorized and instructed to do the worst described herein. The Contract Documents included the removal of an existing storm sewer system and the installation of a new storm sewer system along Smithtown Road. During construction operation. the Contractor found several unidentified buried culvers, drain tiles and phone ducts which caused the Engineer to modify the storm sewer design and layout. The Engineer directed the Contractor to remove the existing buried culverts, cut additional holes into the Manholes to accommodate the drain tiles and provide bends in the pipe to work around the phone ducts. The Contractor agreed to perform the work but asked to be compensated for the additional labor and materials necessary to perform these operations. The Engineer agreed this constituted extra work. Payment for this work will be as outlined in the estimate quantity tabulation which is listed below, which includes all mobilization, labor, materials, disposal, equipment cost and Prime Contractor mark up where applicable Increased Items Item No, Description Unit Unit Price Estimated Quantity Amount modify Manhole 5043 and Storm Sewer Station 124+00 -125 -1-00 Lum Sum $4,638.34 1 $4,638.34 Modify Manholes 5039, 5040B & 5041 Lump Sum $3,28132 1 $3,283.32 Modify Manholes 5044, 5046A & 5049 and Driveway Culvert Lump Sum $3,724.00 1 $3,724.00 TOTAL_ $11,645.66 Contract Amount is increased by: $11,645.66 O.K. Mn /DOT O.C,I.C. TES 08/30/13 MnDOT Estimating has approved this Work Order Contract time is: Increased by ❑ Workin Da s ❑Calendar Da s ®Not changed Signature Date Project Engineer /Supervisor Contractor Authorized Representative *Assistant District Engineer * *Local. Agency — ** *Consultant Contract Administrator * Required for Work Orders that exceed $25,000.00 * * Required if work funded wholly or in part by a Local Agency * ** Recommendation for Approval Original to Project File Copy to Contractor, Construction and innovative Contracting (submit with Final); Copy to Local Agency and MN /DOT Municipal Agreement Unit if funded wholly or in part by local Agency Funds Mn/DOT TP- 2460 - 0112 -10 SHEET OF SHEETS State of Minnesota - Department of Transportation WORK ORDER -MINOR EXTRA WORK # 3 Contractor: Chard Tiling & Excavating, Inc. State Project No.216- 101 -004 Address: 26239 State Hwy 25, Belle Plaine, MN 56011 Federal Project No. Job Vocation: Smithtown Road, Shorewood MN Contract No. In accordance with Standard specifications 1 103 and 1403, you are hereby authorized and instructed to do the work described herein, The Contract Documents included the removal of an existing storm sewer system and the installation of a new stonn sewer system along Smithtown Road. During construction operation the Contractor found several unidentified buried culverts, drain tiles and phone ducts which caused the Engineer to modify the storm sewer design and layout. The Engineer directed the Contractor to remove the existing buried culverts, cut additional holes into the Manholes to accommodate the drain tiles and provide bends in the pipe to work around the phone ducts. The Contractor agreed to perform the work but asked to be compensated for the additional labor and materials necessary to perform these operations, The Engineer agreed this constituted extra work. Payment for this work will be as outlined in the estimate quantity tabulation which is listed below, which includes all mobilization, labor, materials, disposal, equipment cost and Prime Contractor mark up where applicable Increased Items Item No. description Unit Unit Price Estimated Quantity Amount *Assistant District Engineer Modify Storm Sewer Station 136 +20 — 145 +22 Lump Sure $2,761,70 1 $2,761.70 Modify Manholes 5035, 5036, 50493, 5050 Lump Sum $1,905.50 1 $1,905.50 Modi 18" PVC Storm Pipe To Go Over Phone Duct Station 143 +75 Lump suin $3,445,55 1 $3,445,55 rClrAL $8,112.75 Contract Amount is increased by: $8,112.75 Group: Local Funding — Smithtown Rd N1nDOT Estimating has approved this Work Order Contract time is; Increased by ❑ Worldn Days []Calendar Days ®Not changed Signature Date Project Engineer /Supervisor Contractor Authorized Representative *Assistant District Engineer * *Local Agency ***Consultant Contract Administrator * Required for Work Orders that exceed $25,000.00 ** Required if work funded wholly or in part by a Local Agency * ** Recommendation for Approval OK MNIDot Estimating EDF 9 -13 -13 Original to Project File Copy to Contractor, Construction and Innovative Contracting (submit with Final); Copy to Local Agency and MN/DOT Municipal Agreement Unit if funded wholly or in part by Local Agency Funds