02-27-12 CC WS MinCITY OF SHORE WOOD
CITY COUNCIL WORK SESSION
MONDAY, FEBRUARY 27, 2012
MINUTES
CONVENE CITY COUNCIL WORK SESSION
5755 COUNTRY CLUB ROAD
COUNCIL CHAMBERS
6:00 P.M.
Mayor Lizee called the meeting to order at 6:02 P.M.
A. Roll Call
Present. Mayor Lizee; Councilmembers Siakel, and Zerby; Administrator Heck; Finance Director
DeJong; Planning Director Nielsen; and Engineer Landini
Absent: Councilmembers Hotvet and Woodruff
B. Review Agenda
Zerby moved, Siakel seconded, approving the agenda as presented. Motion passed 310.
2. 20 -YEAR MUNICIPAL WATER PLAN
Mayor Lizee thanked Staff for preparing a very impressive and extensive 20 -Year Water Plan and
accompanying report for expanding the City's municipal water system throughout the City. She stated the
report is very easy to understand.
Administrator Heck noted that preparation of the Water Plan was a group effort. He explained that
Director DeJong and Engineer Landini worked closely with Director Brown on preparing the detailed
spreadsheet for watermain extension (a copy of which is included in the meeting packet). Brown also
prepared the details, definitions and assumptions section of the report. He asked DeJong and Landini to
walk Council through the spreadsheet.
Director DeJong stated the Water Plan spreadsheet is fairly thorough and it mirrors the spreadsheet
prepared for the 20 -Year Pavement Management Plan (PMP) for each segment of roadway in the City.
DeJong explained the Water Plan spreadsheet shows each segment of roadway in the City and whether or
not watermain is installed. Director Brown identified what size watermain pipe would be needed and how
deep the pipe would have to go down into the ground based on information lie had available. Brown also
estimated the cost per segment of roadway to extend watermain. The Water Plan spreadsheet includes one
column for the estimated cost to install watermain by cutting open an existing roadway section that is not
scheduled for reconstruction and to restore the pavement. There is another column for the estimated cost
of installing watermain at the same time a segment scheduled for full reconstruction in the PMP is
reconstructed. The costs to install watermain are significantly less when done in conjunction with a
reconstruction effort.
DeJong then explained that Brown has identified segments where the watermain installed will have to be
over sized to meet water system demands over and above meeting the domestic supply demand (the
supply used by the consumer). The larger watermain is called a trunk watermain and it is 12 inches in
CITY OF SHOREWOOD WORK SESSION MEETING MINUTES
February 27, 2012
Page 2 of 6
diameter. It is needed to provide adequate flow to properties further away from the water towers. The
domestic supply watermain is 8 inches in diameter. The spreadsheet identifies what size pipe is needed
for each segment. It breaks out the installation cost for domestic supply as well as the cost to oversize the
watermain. For example, the estimated cost for installing watermain by cutting open an existing roadway
section and restoring the pavement along Country Club Road is $339,000 with $28,000 of it being for
oversizing the pipe. Ile stated property owners that will be served by the extension should not have to pay
the costs of oversizing.
DeJong went on to explain the spreadsheet identifies the number of existing lots per segment that will be
served. It calculates the cost per lot based on the cost for the domestic supply per segment. The per -lot
costs very significantly. The lowest cost is $6,108 and the highest cost is $118,000 (for a watermain
segment that would only serve one lot). He stated extending watermain to serve just one property doesn't
make financial sense. He explained the average per -lot cost is $15,093 based on 2012 dollars. The
average per -lot cost factors in the per -lot cost for segments that would serve only one property.
DeJong noted there aren't any watermain installation projects scheduled for 2012. They would have to be
in progress by now. He stated an attempt was made to coordinate watermain installation projects with
other pavement maintenance activities (seal coating as well as mill and overlay projects), noting that has
not been done in a lot of detail. If Council decides it wants to move forward with the Water Plan, Staff
can adjust the PMP so that maintenance will not be done to a roadway segment where watermain will be
installed a year or three later. For example, the PMP schedules Club Lane to be sealcoated in 2012 and
the Water Plan schedules watermain to be installed along that segment in 2013. He noted the meeting
packet contains a copy of a map prepared by Engineer Landini which shows where watermain is currently
installed, and it depicts where and when watermain will be installed based on the Water Plan.
Mayor Liz&e reiterated the Water Plan is very impressive.
Councilmember Zerby asked if the capacity of the two existing water towers and the current wells could
serve the expansion of municipal water throughout the City. Engineer Landini stated Director Brown has
indicated the two towers and the wells would be able to serve the residential watermain expansion
identified in the Water Plan. Director DeJong clarified with the exception of the Islands in the City
because there is no infrastructure out there.
Mayor Lizee asked if the Cities of Minnetrista and Mound have municipal water that could be extended to
the Islands. Engineer Landini responded Mound has City water close to the area but he is not sure about
Minnetrista.
Mayor Liz& noted Council has asked Staff to develop the Water Plan. She clarified that Council is not
being asked to approve the Water Plan this evening. She asked Council if it wants the City to implement a
20 -Year Water Plan. She then asked if Council has any thoughts about what the water connection charge
should be. She noted the current connection charge is $10,000.
Councilmember Zerby suggested hiring an outside consultant with expertise in this area to help with
marketing municipal water and to help identify what the connection charge should be in order to entice
people to convert from private wells to City water. He commented older communities like the Cities of
Rochester and Red Wing have transitioned to municipal water. He expressed confidence that there must
be someone with the expertise and broader insight to help the City with this.
Councilmember Siakel noted she found the information provided to be very helpful. She appreciated the
fact that the information in the Water Plan and PMP are cohesive. She stated she does like the idea of
CITY OF SHOREWOOD WORK SESSION MEETING MINUTES
February 27, 2012
Page 3 of 6
having a 20 -Year Water Plan. She asked when the 20 years begins. She suggested focusing on the first 3 —
5 years of the 20 years. She recommended engaging the community in discussions about expanding the
City's water system. She stated she thought property owners would connect to City water if it was
available based on the residential survey results. She then stated communication to the residents is critical
and she thought that should be started sooner versus later. She commented that if she had the opportunity
to connect to City water she would do that and she noted she thought it would increase the value of her
property. She stated if property owners are provided with a 3 — 5 advance warning that water will be
extended to their area and options for when that does occur property owners would be more receptive to
the idea. She expressed her support for luring a consultant with expertise in this area to help with this
effort. She thanked Staff for their efforts.
Councilmember Zerby stated if property owners know what City water will be extended to their area in a
few years they may decide to do minor things to keep their wells functioning until that time. He then
stated there are a lot of opportunities to help entice property owners who have the option to connect to
City water but haven't done to do so. He also stated there is a definite need for a long -term water system
expansion plan.
Mayor Lizee asked if looping the water system (to ensure there is backup) was 'factored into the Water
Plan. Engineer Land ni explained the original water plan developed in the 1990s factored in a strategy for
creating loops in the system. That was factored into the PMP. Landini explained installing watenmain
along Country Club Road and Yellowstone Trail would create an excellent loop. They are some of the
first roads on the watermain installation schedule. He stated the first five years of the schedule are hitting
the loops and that will create the efficiencies for the Water System.
Mayor Lizee stated the next steps should be to focus on the next 3 — 5 years and soliciting public input.
She asked Staff to provide Council options for dates for a meeting with residents at the Southshore
Community Center regarding City water and the potential plans for expanding the City's water system.
Councilmember Siakel requested Council be provided an opportunity to preview a presentation for the
meeting. The presentation should address the history of City water and the plans for expansion. Council
should be present at the meeting to demonstrate its support. She suggested addressing the first few
expansion segments during the first meeting. She asked how to move forward with finding outside
expertise to help with this, noting this is a complicated and expensive issue.
Councilmember Zerby asked Director DeJong if he has done any analysis of the benefits of additional
revenues from new connections to City water. DeJong responded that to date no analysis has been done of
the revenue. DeJong explained that because there is sufficient water system infrastructure in place the cost
to produce more water is limited. There will be a slight increase in the use of electricity, and the amount
of chemicals used to treat the water. There will not be a need to add staff to support 100 — 200 additional
users of the system. lie noted he thought it would be cost effective to add more users.
Zerby commented that many service providers offer subsidies or incentives to new customers because
they will recoup the costs in the new subscription fees for their services. He asked if there is some short-
term subsidy the City can offer to entice people to connect to City water. DeJong responded that would be
a challenge because that could cause equity issues. DeJong stated he would have a difficult time justifying
charging new customers less than the $10,000 connection charge being that is what people have paid most
recently. He noted the average cost according to the spreadsheet calculations is that much more.
Zerby stated it may be helpful to add a column for additional revenue to the spreadsheet. He thought it
would grow exponentially over the years. DeJong stated that could be an interesting analysis but he has
CITY OF SHOREWOOD WORK SESSION MEETING MINUTES
February 27, 2012
Page 4 of 6
not had time to do that. DeJong suggested putting that on hold until Council decides if it wants to
continue to move forward with a 20 -Year Water Plan. He stated Staff will assemble some additional
information prior to a presentation at a public meeting.
Administrator Heck asked Directors DeJong and Nielsen and Engineer Landini if they think Council has
provided them with enough information to move the Water Plan forward. Ile also asked if they had a
clear idea of what type of outside resource assistance is needed. Is it to help market the plan or to cost out
the plan? He stated one of the questions that will be raised in the public meeting will be about the cost to
residents. He then stated he doesn't get the sense from Council that it wants to assess the property owners
for 100 percent of the cost to install the watermain. It's his understanding that Council wants Staff to
identity policy options for paying for the cost to expand the water system. I-Ie asked how the costs for the
expansion should be spread between the benefiting property owners, the City's residents and the City. He
reminded everyone of the resident who not too long ago told the City that he thought the $10,000
connection charge is too high because the watermain is already in place near his property.
Heck asked Councilmember Zerby what skill sets are needed for a consultant to help with this effort.
Zerby stated a person who has helped another municipality go through a similar process.
Councilmember Zerby agreed that Council needs to reassess the policy regarding the water connection
charge. He noted sometimes the City has subsidized the cost to some extent. He stated there has been
push back from property owners because of the $10,000 connection charge. He noted that the City of
Waconia splits the installation costs equally between the property owners and Waconia. He noted the City
doesn't assess for roadway maintenance; that cost is born by the entire City. He stated he would like to be
provided with what type of cost recovery strategies have worked for other municipalities.
Councilmember Siakel asked if the schedule in the PMP is fairly firm. She then asked if the consultant
could focus on watermain extension projects and associated roadway maintenance projects for the next
five or ten years.
Administrator Heck stated Council can decide what time period starting in 2013 a more firm and detailed
Water Plan and PMP should focus on. Siakel then asked when in 2013 the Plans would start. Siakel
reiterated a good communications plan is critical and she stated she supports hiring a consultant with the
necessary expertise to help with that.
Councilmember Zerby stated he would like there to be a Water Plan that goes out 20 years. He noted any
future Council can change things. Councilmember Siakel clarified she thought having a 20 -Year Water
Plan is a good idea but she thought the main focus should be on the first five years of the Plan. Mayor
Lizee and Zerby agreed with Siakel.
Mayor Lizee suggested Council agree to a 2012 goal of refining the water policy and confirming which
projects will be done in 2013.
Councilmember Siakel asked Staff if it has what it needs from Council to continue to move forward
Director DeJong stated during its regular meeting following this work session Council is going to
consider a resolution approving the specifications and estimate and authorizing the advertisement for bids
for the 2012 mill and overlay project. Club Lane is one of the roadways in that project, yet it is scheduled
for watermain installation and sealcoating in 2013. Fie suggested that before Council awards the bid it
decide if it wants to include Club Lane in that project should the 2013 watermain installation come to
fruition. He stated it makes sense to consider watermain installation when reconstruction occurs.
CITY OF SHOREWOOD WORK SESSION MEETING MINUTES
February 27, 2012
Page 5 of 6
DeJong explained that last week the City received a call from someone who was relocating their elderly
parents and needed to sell their property. The child found out there is a deferred assessment against the
property for watermain that was installed in 1996. The parents did not want to hook up to City water at
that time and they were over 65 years of age at that time so they qualified for the deferral. The assessment
at that time was $5,000. It is now over $10,000 when interest is factored in.
DeJong questioned how to ensure enough property owners will hook up to the watermain after it is
installed to make it pay off. He stated there is no way to project that. Therefore, there is no way to project
when the City will receive the additional water revenues. He noted there are a number of properties that
could be connected to City water but the property owners have chosen not to connect to it. He asked
Council if it wants to create a policy that requires property owners to connect to City water within a
defined number of years after watermain being installed.
Councilmember Zerby stated he thinks the reason that there are around 300 properties that are not
connected to available watermain is because the cost to connect is too high. From his vantage point it is a
conversion problem; converting from well water to City water. He then stated the City is trying to find the
answer to that problem. He went on to state being on City water is the way of the future for a number of
reasons with one of them being safe water. Hopefully outside expertise can help the City figure out how
to entice property owners to convert. He also stated the City could mandate property owners connect to
City water as soon as it is available to them. Or the connection charge could be lowered to something they
will accept, noting that is his desire.
Director DeJong stated it makes Staff nervous to hear it is too expensive to hook up to City water for a
cost of $10,000 knowing the calculated average per -lot cost to install watermain is slightly over $15,000.
He then stated that lie knows of other municipalities that when they have installed city water have run into
opposition from residents. He indicated he anticipates similar opposition to the 20 -Year Water Plan. He
stated using modest inflation assumptions the cost to implement the Water Plan will be close to $30
million.
Mayor Liz6e agreed there are a lot of policy items that have to be addressed.
Administrator Heck summarized his understanding of the concerns and desires he heard Council express
this evening. There is a desire for Staff to identify meeting date options and to prepare a presentation
about the history of the water system and plans for expanding it. Staff is to find out what outside
resources are available for hire to help refine the 20 -Year Water Plan with a strong focus on the first five
years; and, to review and refine if necessary the financial analysis including revenues. There is desire for
Staff to identify various policy options regarding installing watermain, connecting to watermain and
charging for the connections for Council to consider.
Heck stated the Water Plan provides Council with a lot of information but not enough for it to approve the
Plan. Before that can be considered Council needs community input and additional financial analysis.
Council also needs to consider options about how to pay for the expansion over the next few years. He
noted that it will take at least 2 — 2.5 months at a minimum to get policy related options together and to do
some additional financial analysis. He explained Rusty Feld, Senior Vice President with Northland
Securities, worked with the City on developing a new water rate structure. He asked Director DeJong if
Mr. Fifield could do the cash flow analysis and how long it will take to do that. DeJong stated he isn't
sure if Mr. Fifield is the right person to do ensure looping of water system expansion is factored in
appropriately, but he is capable of doing the financial analysis.
CITY OF SHOREWOOD WORK SESSION MEETING MINUTES
February 27, 2012
Page 6 of 6
Heck indicated there may be a need to hire two consultants with different areas of expertise; one with
engineering expertise and one to do additional financial analysis. He stated he thought it will take at three
months to do what Council is asking for.
Director DeJong stated Staff will need to obtain formal authorization from Council to engage a
consultant. That will not happen until Council's March 12, 2012, meeting. After that it will take time to
get proposals from various consultants and authorization to accept a proposal.
Administrator Heck stated he thought WSB & Associates conducted the 1990s water study. Engineer
Landini clarified WSB & Associates did not exist at that time, and he stated he thought OSM did that
work.
Heck then stated the next step for Staff is to provide Council with a proposal for getting outside
consulting services for consideration during its March 12` or March 26 meeting. Staff will research
when the Southshore Community Center is available for a public meeting.
Mayor Liz& suggested giving Staff until the March 26` meeting to present a proposal for consultants.
3. ADJOURN
Siakel moved, Zerby seconded, Adjourning the City Council Work Session of February 27, 2012, at
6:49 P.M. Motion passed 310.
RESPECTFULLY SUBMITTED
Christine Freeman, Recorder
it
J
ATTEST
Christine Liz6e, Mayor
, fi t 7 arLe it 2? ,
Je 9 n Panchyshyn, Deput City 6erk