07-25-16 CC WS MinCITY OF SHOREWOOD
CITY COUNCIL WORK SESSION
MONDAY, JULY 25, 2016
MINUTES
1. CONVENE CITY COUNCIL WORK SESSION
5755 COUNTRY CLUB ROAD
COUNCIL CHAMBERS
6:00 P.M.
Mayor Zerby called the meeting to order at 6:08 P.M.
A. Roll Call
Present. Mayor Zerby; Councilmembers Labadie, Sundberg, and Woodruff; Administrator
Joynes; Finance Director DeJong; Planning Director Nielsen; Director of Public Works
Brown; and, Engineer Hornby
Absent: Councilmember Siakel
B. Review Agenda
Labadie moved, Woodruff seconded, approving the agenda as presented. Motion passed 4/0.
2. CAPITAL IMPROVEMENT PROGRAM AND 2017 GENERAL FUND BUDGET
DISCUSSION
Administrator Joynes explained that during Council's July 11, 2016, work session staff briefly reviewed
the Capital Improvement Program (CIP) and 2017 General Fund Budget. Based on that discussion this
evening he wants to start with an explanation of the Street Reconstruction Fund because it is one of the
funds that will go into a deficit state in 2017. The Street Reconstruction CIP had been adjusted over the
last few years based on discussions with Council. After the discussion about streets he will talk about the
General Fund and available resources.
Director DeJong explained the Equipment Replacement, Water, Sewer and Stormwater Management
Funds are all stable over the course of the CIP timeframe. It is possible some may enter into a minor
deficit state at some point but they should be close to being balanced by the end of the CIP timeframe.
The Park Improvement Fund will enter into a deficit state if more than about $200,000 in improvements
is made to parks after 2016.
The Trail Fund will go into a deficit state in 2018. The funding plan assumes the City will issue
Abatement Bonds in the amount of $1 million to fund the construction of the Smithtown Road east
sidewalk extension. In 2015 Council adopted a reimbursement resolution. That resolution indicated the
City's intent to fund the sidewalk with bond proceeds. That has to be done within 18 months of
construction of the project. It has to be done in 2016 or 2017. There is also an assumption that the
construction of a trail along Strawberry Lane will be funded with abatement from the Minnetonka School
District. If that does not come to fruition then funding for that sidewalk becomes a problem.
The Street Reconstruction CIP has the following roadways scheduled for reconstruction between 2017
and 2020: 2017 — Riviera Lane; 2018 — Mann Lane; 2020 — Seamans Drive. In 2021 Amlee Road,
CITY OF SHOREWOOD WORK SESSION MEETING MINUTES
July 25, 2016
Page 2 of 6
Manitou Lane and Glen Road are scheduled for reconstruction. There is a lot of stormwater management
work that must be done in conjunction with the reconstruction of those three roadways. Bonding will
have to be done to fund those projects. The revised 2017 CIP reflects that the improvements for roadways
on Enchanted Island and Shady Island have been advanced to 2017 provided the City of Minnetrista
makes improvements to the section of Enchanted Lane located in Minnetrista in 2017. The improvements
would mainly be mill and overlay but one roadway would be reconstructed. The estimated cost for those
improvements is $509,000. Advancing those improvements would result in the Street Reconstruction
Fund having an approximate deficit of $500,000 at the end of 2017. If the schedule for the improvements
to the roadways on the Islands is put back to 2023/2024 then there would not be a deficit in that Fund
until 2019 or 2020.
Director Brown explained roadways are scheduled to be maintained and replaced based on the PASER
(Pavement Surface Evaluation and Rating) System rating to a great extent. The roadways are rated in the
fall after the vast majority of patching has been done and sealcoating is complete. The newly patched and
sealcoated roadways will get a higher rating. A number of years ago staff developed a decision flowchart
that would help in determining what type of improvements should be made to a roadway — sealcoat and
overlay, reclamation or reconstruction. Council approved that flowchart. There has been general
agreement that the City's goal would be to maintain its roadways to a level 4 rating or higher. There are
seven City roadways that are currently rated below a 4. He asked if Council wants to continue to use the
PASER rating and flowchart to help determine when reconstruction should be done or does it want to use
some other criteria. He encouraged Council to have a serious discussion about how to fund roadway
reconstruction.
Mayor Zerby stated the information in the meeting packet indicates the 2015 rating is 6 for Riviera Lane,
for example, yet it is scheduled for reconstruction in 2017. Director Brown explained that the PASER
System recommends a roadway rating be increased to 8 or 9 after it has been patched and sealcoated. He
traditionally rates a recently patched and sealcoated roadway a 6 or 7 because it is not the same strength
as a brand new roadway that has been overlaid. In a few years that roadway will begin to show serious
deterioration. He thought Riviera Lane had been patched up tight and sealcoated which increased its
rating but its rating is going to drop quickly. Zerby asked if that follows the flowchart for determining a
roadway should be reconstructed. Brown stated he thought it would and noted he thought there may be
one or two inconsistencies in the list of ratings of roadways.
Zerby then stated that because Riviera Lane is the only roadway scheduled for reconstruction in 2017 he
assumes it must be in the worst condition. Brown explained some cities reconstruct the lowest rated
roadways first. That may not be the best thing to do because it does not pay to patch and sealcoat
roadways in very poor condition. Other cities invest in their mid -range roadways because they still have
good value and the investment reaps the best return.
Councilmember Woodruff stated Riviera Lane was rated a 7 in 2014 and a 4 in 2013. Yet there are other
roadways that carry a much higher volume of traffic. He then stated there is a PASER table that lists the
roadways in the order from the lowest ratings to the highest ratings. Shorewood Lane in the only one of
the lower rated roadways that is in the CIP. That makes no sense to him. It is a dead -end cul -de -sac in a
small residential area. He went on to state that Mann Lane was rated 6 and Maple Street a 5 in 2015.
They are scheduled for more significant improvements in 2018 yet there are lower rated roadways that
are not.
With regard to the roadways on the Islands, Woodruff stated two of them are rated 3 and 4 are rated 4
and the chart indicates they show rapid deterioration. If an opportunity presents itself to do a joint project
with Minnetrista he thought it makes sense to do so. He explained the City closed out 2015 with a
$412,000 surplus. The plan had been there would have been a deficit that would have to be covered with
CITY OF SHOREWOOD WORK SESSION MEETING MINUTES
July 25, 2016
Page 3 of 6
the use of reserves which he thought was close to $187,000. The $412,000 combined with the $187,000
would more than fund the improvements to the roadways on the Islands.
Director Brown stated past councils have encouraged staff to limit adjustments made to the Street
Reconstruction CIP because it makes it difficult to plan. He noted changes have to be made periodically
to the CIP because it is a living document. He explained that roadway conditions change from year to
year because of, for example, frost conditions. Therefore, inconsistencies can arise between the 20 -Year
Pavement Improvement Plan (PMP) and the CIP. He encouraged Council to pay more attention to how a
roadway is reacting than to its rating. He noted that Amlee Road, Manitou Lane and Glen Road have
passed the point of deterioration.
Mayor Zerby noted the City has 52 miles of roadways. He explained past councils and the current
Council have tried to use some logic in planning for improvements to roadways 20 years out. He
appreciates the benefits of having expert opinions influence the planning. Yet, Council has been trained
to rely primarily on the PASER ratings. Therefore, it is somewhat difficult to understand why roadways
rated as a 6 or 7 are going to be reconstructed or reclaimed before those rated a 3. He stated he always
thought it was the goal to have a PMP that was somewhat economic because it would be cheaper to
improve a roadway before it became quite deteriorated while at the same time getting as much life as
possible out of the roadways.
Engineer Hornby stated he thought it was prudent to maintain some of the roadways that have a higher
rating so they do not become too deteriorated. The different types of improvements have to be balanced
out over the years. He then stated that Director Brown knows a lot of history about the roadways because
of his long tenure with the City. He noted he drove on a roadway earlier in the day that looks fine but as
he drove it his vehicle was going up and down. That indicates to him that it has been patched a number of
times. That is why it is prudent to also factor past history into the ratings.
Director Brown noted staff will attempt to resolve any inconsistencies. He then stated that during the July
11 council work session and again earlier in this discussion Councilmember Woodruff brought up traffic
volume on roadways. If Council wants volume to be factored into the scheduling of improvements staff
would like to know that.
Councilmember Woodruff stated that 6 to 7 years ago a former member of Council asked what the
difference was in the longevity and cost of reclaiming a roadway versus reconstructing a roadway. It was
his recollection that at that time Director Brown explained a reclaimed road would last about 15 — 20
years and a reconstructed road would last 30 plus years and a reclaim would cost about one -third the cost
of reconstruction. The same amount of service life could be achieved for about two- thirds the cost of
reconstruction. There was also discussion about what other reasons there would be to reconstruct a
roadway and stormwater management needs was mentioned.
Woodruff expressed his preference to reclaim a roadway twice and get a 30 — 40 year service life rather
than spend 30 percent more for a roadway with the same service life.
Mayor Zerby noted he recollected having that discussion. Stormwater management issues and edge issues
are factored into the decision flowchart for determining reconstruction versus reclamation.
Councilmember Woodruff suggested transferring the 2015 budget surplus into the Street Reconstruction
Fund and then Council can decide the priorities for fixing roadways. The money is needed in that fund
anyway.
CITY OF SHOREWOOD WORK SESSION MEETING MINUTES
July 25, 2016
Page 4 of 6
Woodruff stated that Strawberry Lane was rated a 7 in 2014 and 2015. He questioned the appropriateness
of reconstructing a roadway for $1 million in order to build a trail.
Mayor Zerby stated he thought there are drainage issues with Strawberry Lane and clarified that he was
not an engineer or a public works director.
Director Brown explained Strawberry Lane was the first roadway that was reconstructed when he first
started with the City 21 years ago. At that time a reclaim project was modified to deal with a roadway
that was not in very good shape. It has been a very stable roadway because of that. He noted the proposed
trail along Strawberry Lane cannot be constructed economically without tearing up the roadway. That is
why Strawberry Lane and West 62nd Street are currently slated for 2017.
Director DeJong highlighted the funding graph for the Street Reconstruction Fund. It shows about a
$500,000 deficit in 2017, 2018 and 2019. The deficit gets a little bigger in 2020. Some hard choices
about funding have to be made in 2021 when it comes to paying for reconstruction of Amlee Road,
Manitou Lane and Glen Road.
He reiterated the funding plan for the Trail Fund assumes the City will issue Abatement Bonds for the
Minnetonka Country Club (MCC) in the amount of $1 million to fund the construction of the Smithtown
Road east sidewalk extension. It also assumes that the construction of a trail along Strawberry Lane will
be funded with $852,000 in abatement from the Minnetonka School District from the MCC development.
The Galpin Lake Road trail segment is scheduled for reconstruction in 2018 and the assumption is it will
be funded with Minnesota State Aid (MSA) funds. It will take four years of the City's MSA allocation to
pay for that.
Mayor Zerby asked if staff thinks the City can meet the abatement funding needs by the end of 2016.
Councilmember Woodruff explained the City will have to pay the contractor for the Smithtown Road
east sidewalk extension this year but it does not need to receive the abatement funds until 2017. Director
DeJong clarified it would require a short-term interfund loan from one of the funds to the Trail Fund until
the City issues the Abatement Bonds.
Director DeJong displayed a graph of the projected balance in the Trail Fund through 2024. He noted the
balance goes into a deficit state with the construction of the Galpin Lake Road trail segment and comes
out of a deficit state in 2021.
DeJong reviewed the major elements in the draft 2017 General Fund Budget.
➢ The preliminary General Fund levy increase is 2 percent. That is the base level needed to
maintain services.
➢ It includes a salary reserve of 0.5 percent for office staff and Public Works union personnel. The
union contract has to be renegotiated for 2017.
➢ It includes $40,000 for contract forestry activities; the same as in 2016.
➢ The $50,000 included for a compensation study and transition planning in 2016 has been
removed for 2017. That work will be completed in 2016.
➢ It includes $85,000 for consultant services to update the Shorewood Comprehensive (Comp)
Plan.
➢ Those changes will put the 2017 anticipated deficit at $194,735. That compares to $180,148 in
2016.
DeJong explained General Fund reserves were e $4,502,000 at the end of 2015. The City's General Fund
Balance Policy stipulates a reserve level of 55 — 60 percent of the next year's operating expenditures.
CITY OF SHOREWOOD WORK SESSION MEETING MINUTES
July 25, 2016
Page 5 of 6
Sixty percent of the year -end balance would be $3,608,000. That leaves $894,000 available for use (the
difference between the two amounts). For 2016 the budget anticipates the use of approximately $180,000
in reserves. That leaves an undesignated balance of $714,000 above the 60 percent that could be
available for use.
Councilmember Woodruff stated the General Fund Budget Summary Municipal Buildings Materials and
Supplies line item is $21,300; the same as the 2016 budgeted amount. In prior years the actual
expenditures had been between $54,000 and $60,000. He asked staff to review that. Director DeJong
explained the contract with Warner Connect is about $35,000 annually and that has been recoded into
Support Services and Charges.
Woodruff asked why the budget for Police went up. Administrator Joynes stated Shorewood's portion of
the funding is 49.5 percent and the increase accounts for that. Joynes noted the Police budget reflects the
costs for an additional officer.
Woodruff stated the Public Works Services Personnel, Materials and Supplies, and Support Services and
Charges categories include the same amounts for 2017 as were budgeted for 2016. The amount for
Personnel is more than $100,000 higher than the actual expenditures for 2013 — 2015. The budgeted
amounts for the other two categories are much higher than the actuals for 2014 and 2015. He asked staff
to look at the run rate for those three categories. He noted the same thing applies to the same three
categories in Parks Maintenance and in Recreation; the 2016 approved budget amounts are the same as
the proposed 2017 amounts.
Mayor Zerby stated the Revenues Licenses and Permits 2015 actual amount was $275,567 yet the 2017
budgeted amount is $209,180. With the MCC development starting he thought 2017 should be higher
than 2015. Director DeJong stated past practice has been that revenues should be budgeted such that
there is a 50 percent chance the actual amounts would be higher. For expenses there should be a less than
a 50 percent chance that they would higher than budget. Zerby expressed his preference to have a tighter
forecast. DeJong stated when there is a downturn in those revenues it usually lasts for a few years. He
thought it was a lean budget. Zerby stated based on the average of 2014 and 2015 actuals a minimum of
$30,000 could easily be added to the 2017 budgeted amount.
Zerby expressed his opposition to budgeting $85,000 in 2017 to outsource the update of the Comp Plan.
That amount is a salary. He thought the new planner should be able to do some of that. Councilmember
Woodruff noted he agrees with Zerby and stated he could support either taking it out or leaving it in.
Woodruff stated if it is left in the budget it presents an opportunity to underspend significantly. He then
stated that Director Nielsen intends to retire early in 2017 and maybe the City could hire him as a
consultant to work on that update. He assumed those services would cost less than $85,000. Zerby
expressed his preference to take it out of the 2017 budget and noted that if there is a need for consulting
services he thought Council could find a way to fund them.
Director DeJong stated staff will try to and resolve the anomalies in the 2017 Street Reconstruction CIP.
Staff will also make adjustments in the General Fund Budget.
Mayor Zerby stated the South Lake Minnetonka Police Department ( SLMPD) Coordinating Committee
has recommended a 2017 SLMPD Operating Budget for approval by the SLMPD member City Councils.
Councilmember Labadie stated the Public Services Support Services /Charges includes a line item for
drug testing. The 2016 and 2017 budgeted amount is $1,800 yet actual amounts for 2013 — 2015 ranged
from $50 to $504. She asked who gets drug tested. Director Brown explained federal standards require
random drug testing of Public Works personnel and that is done by an independent organization.
CITY OF SHOREWOOD WORK SESSION MEETING MINUTES
July 25, 2016
Page 6 of 6
3. ADJOURN
Woodruff moved, Sundberg seconded, Adjourning the City Council Work Session of July 25, 2016,
at 6:53 P.M. Motion passed 4/0.
RESPECTFULLY SUBMITTED,
Christine Freeman, Recorder
ATTEST:
i L
JeWn Panchyshyn, Ci let
Scott ffby, M or