Feasibility Report: Enchanted Island and Shady Island Street Reclamation Projectl►: CITY OF SHOREWOOD FEASIBILITY REPORT ENCHANTED ISLAND AND SHADY ISLAND STREET RECLAMATION PROJECT SHOREWOOD I HENNEPIN COUNTY I MINNESOTA JANUARY 14, 2019 Prepared for: City of Shorewood 5755 Country Club Road Shorewood, MN 55331 CITY PROJECT NO. 18 -11 WSB PROJECT NO. R- 012809 -000 wsbl FEASIBILITY REPORT ENCHANTED ISLAND AND SHADY ISLAND STREET RECLAMATION PROJECT FOR THE CITY OF SHOREWOOD HENNEPIN COUNTY, MINNESOTA CITY PROJECT NO. 18 -11 January 14, 2019 Prepared By: wsb Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 wsb January 14, 2019 Honorable Mayor and Council Members City of Shorewood 5755 Country Club Road Shorewood, MN 55331 Re: Feasibility Report Enchanted Island and Shady Island Street Reclamation Project o City of Shorewood Project No. 18 -11 6 WSB Project No. R- 012809 -000 Z W CO 0 3: Dear Mayor and Council Members Transmitted herewith is the feasibility report for the above - referenced project. The report °° addresses the street and minor drainage improvements, in accordance with the Capital co Improvement Plan and Pavement Management Plan, along the following roadways: cq LD ° Enchanted Lane / Shady Island Road • Enchanted Point from Enchanted Lane to the east terminus ° 0 Enchanted Drive from Enchanted Lane to the cul -de -sac Ln Ln 0 Dellwood Lane from Enchanted Lane to the cul -de -sac • Enchanted Cove from Enchanted Drive to the cul -de -sac Shady Island Circle • Shady Island Point from Shady Island Circle to the cul -de -sac a Shady Island Trail from Shady Island Circle to the cul -de -sac a The proposed improvements include full depth reclamation of the existing street section and a full 0 width bituminous overlay. The report herein presents costs for the project as well as proposed ° funding, including assessments, based on the City assessment policy and past practice ° N W We would be happy to discuss this report with you at your convenience. If you have any questions, please do not hesitate to call me at (763) 512 -5257. 0 Sincerely, W W WSB & Associates, Inc. 0) W CO is Eckman, r Project Manager CERTIFICATION I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Date: January 14, 2019 License No. 49954 Quality Assurance /Quality Control: Alyson Fauske, PE Date: January 14, 2019 License No. 42437 Feasibility Report Enchanted Island and Shad Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 TABLE OF CONTENTS TITLE SHEET LETTER OF TRANSMITTAL CERTIFICATION SHEET TABLE OF CONTENTS 1. EXECUTIVE SUMMARY .......................................................................... ..............................1 2. INTRODUCTION ........................................................................................ ..............................2 2.1 Authorization ..................................................................................... ..............................2 2.2 Scope /Project Location .................................................................... ..............................2 2.3 Data Available ................................................................................... ..............................2 2.4 Project Background .......................................................................... ..............................2 3. EXISTING CONDITIONS 3 3.1 Surface ............................................................................................... ..............................3 3.2 Drainage ............................................................................................ ..............................3 3.3 Sanitary Sewer .................................................................................. ..............................3 3.4 Water Main ........................................................................................ ..............................3 3.5 Private Utilities ................................................................................. ............................... 3 4. PROPOSED IMPROVEMENTS .............................................................. ..............................4 4.1 Roadway ........................................................................................... ............................... 4 4.2 Drainage ............................................................................................ ..............................4 4.3 Sanitary Sewer .................................................................................. ..............................4 4.4 Water Main ........................................................................................ ..............................4 4.5 Wetlands ............................................................................................ ..............................4 4.6 Easements and Right -of- Way ......................................................... ..............................4 4.7 Permits and Approvals ................................................................... ............................... 5 4.8 Mailbox Replacement/ Relocation ................................................ ..............................5 4.9 Construction Access / Staging ....................................................... ..............................5 4.10 Public Involvement ........................................................................... ..............................5 5. FINANCING ................................................................................................ ..............................6 5.1 Opinion of Probable Construction Cost. 5.2 Funding Sources ....... ............................... 8 6. PROJECT SCHEDULE ............................................................................ ..............................7 7. CONCLUSIONS AND RECOMMENDATIONS .................................... ..............................8 Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 APPENDIX A Project Location Map Typical Section APPENDIX B Existing Roadway Conditions Summary APPENDIX C Pavement Forensics Investigation on Enchanted Lane /Shady Islands prepared by WSB February 2017 APPENDIX D Cost Tables APPENDIX E Assessment Map Assessment Roll Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 1. EXECUTIVE SUMMARY The Enchanted Island and Shady Island Street Reclamation Project, City Project No. 18 -11, was initiated by the City Council at their September 24, 2018, regular City Council meeting. Improvements proposed for construction in 2019 include street reclamation of approximately 10,300 feet (1.95 miles) complete with bituminous paving along the following roadways: • Enchanted Lane / Shady Island Road • Enchanted Point from Enchanted Lane to the east terminus • Enchanted Drive from Enchanted Lane to the cul -de -sac • Dellwood Lane from Enchanted Lane to the cul -de -sac • Enchanted Cove from Enchanted Drive to the cul -de -sac • Shady Island Circle • Shady Island Point from Shady Island Circle to the cul -de -sac • Shady Island Trail from Shady Island Circle to the cul -de -sac A map illustrating the project location can be found on Figure 1 in Appendix A. The total estimated project cost for the Enchanted Island and Shady Island Street Reclamation Project is approximately $1,621,300. Funding for the project will be provided through the City's Street Reconstruction Fund, Storm Water Fund, Sanitary Sewer Fund, and Special Assessments to benefitting properties along Enchanted Point. Proposed special assessments were based on the City of Shorewood past practice to assess for paving roadways that are currently gravel. One hundred percent (100 %) of the total surface and drainage improvements proposed to be assessed to benefitting properties. Properties along Enchanted Point are proposed to be assessed approximately $13,620 /unit. The project reconstruction can be completed, including bituminous paving and restoration items, in 2019. This project is feasible, necessary, and cost effective from an engineering standpoint and should be constructed as proposed herein. Financial feasibility will need to be considered by the City Council. Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 Page 1 2. INTRODUCTION 2.1 Authorization On September 24, 2018, the Shorewood City Council authorized the preparation of an engineering Feasibility Report for the Enchanted Island and Shady Island Street Reclamation Project. This project has been designated as City Project No. 18 -11. 2.2 Scope /Project Location The proposed project consists of street and minor drainage improvements along the following roadways: • Enchanted Lane / Shady Island Road • Enchanted Point from Enchanted Lane to the east terminus • Enchanted Drive from Enchanted Lane to the cul -de -sac • Dellwood Lane from Enchanted Lane to the cul -de -sac • Enchanted Cove from Enchanted Drive to the cul -de -sac • Shady Island Circle • Shady Island Point from Shady Island Circle to the cul -de -sac • Shady Island Trail from Shady Island Circle to the cul -de -sac The proposed improvements include reclamation of the existing street section and full -width bituminous overlay. A map illustrating the project location can be found on Figure 1 of Appendix A. 2.3 Data Available Information and materials used in the preparation of this report include the following: • City of Shorewood Pavement Management Plan • City of Shorewood record drawings • City of Shorewood Assessment Policy • City of Shorewood base and topographic maps • Field observations of area and discussions with City staff • Private utility maps • Neighborhood Open House held November 28, 2018 2.4 Project Background This project was initiated through the continued development and implementation of the City of Shorewood's Pavement Management Plan. The Pavement Management Plan provides a schedule for the various roadway improvements that are necessary to maintain the City streets in an effective and efficient manner. The City of Shorewood evaluates all roadways within the City periodically using the Pavement Surface Evaluation and Rating ( PASER). City streets are evaluated, and the pavement management plan schedule revised according to the pavement condition ratings. The ratings of the roadways within the Enchanted Island and Shady Island neighborhoods range from 4 to 7. The PASER ratings for each roadway segment can be found in Appendix B. The following conditions have been identified within the project area: • Existing streets do not meet City minimum roadway standards with concrete curb and gutter. • Deterioration of the existing streets including alligator cracking, edge cracking, transverse cracking, and longitudinal cracking. • The roadway exhibits drainage issues due to roadway deformation and inadequate drainage systems (ditches or storm sewer). Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 Page 2 3. EXISTING CONDITIONS 3.1 Surface Roadways within the Enchanted Island and Shady Island neighborhoods were originally constructed in 1973 and are experiencing various severities of distresses including alligator, block, transverse, and longitudinal cracking, along with localized drainage issues. All roadways within the Enchanted Island and Shady Island neighborhoods identified to be reclaimed consist of 16 -22- foot -wide rural section (no curb and gutter) bituminous roadways apart from Enchanted Point. The existing roadway conditions can be found in Appendix B. Enchanted point currently exists as a 16- foot -wide rural section gravel roadway to approximately mid - block. This section of roadway was Otta sealed prior to 2011. Otta sealing is the application of emulsified asphalt to a gravel surface. As a result of the Neighborhood Open House held November 28, 2018, property owners along Enchanted Point indicated approximately mid -block to the roadway terminus was paved roughly 10 years ago by the individual property owners. These improvements were completed without City approval or oversight and there is no indication these improvements were completed to City standards. Pavement cores taken within Enchanted Island and Shady Island indicate the existing asphalt thickness ranges from 2.5 inches to 6.5 inches and aggregate base thickness ranges from 1.0 inch to 6 inches. A copy of pavement forensic report is included in Appendix C of this report. The project area is surrounded primarily by residential properties that contain landscaping, trees, and numerous other private improvements beyond the edge of the roadway and within the City right -of -way. 3.2 Drainage Enchanted Island and Shady Island roadways are currently graded as rural road sections consisting of ditches and culverts to convey storm water runoff to the adjacent wetlands and ditch system ultimately discharging to Lake Minnetonka. 3.3 Sanitary Sewer The existing sanitary sewer system in the project area consists of 9- inch - diameter polyvinyl chlorinated (PVC) pipe sewer and 8 -inch diameter ductile iron pipe (DIP) gravity sewer and 4 -inch diameter DIP forcemain constructed in 1973. An internal inspection, with a specially designed television camera, will be completed with final design to determine the structural condition of the existing pipe and individual services. 3.4 Water Main There is no existing watermain along Enchanted Island and Shady Island and properties are served by private wells for water supply. 3.5 Private Utilities Private utilities within the project area include communications, gas, and electric facilities. A meeting will be held with the utility companies during the final design stage to coordinate utility conflicts and construction schedule. Private utility companies that have been identified with facilities in the general project area include: • Mediacom (Telephone /Internet) • CenturyLink (Telephone /Internet) • Frontier Communications (Telephone /Internet) • Centerpoint Energy (Gas) • Xcel Energy (Electric) Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 Page 3 4. PROPOSEDIMPROVEMENTS 4.1 Roadway Improvements to the existing roadways are intended to improve the design strength of the pavement system and provide a street surface with an extended life. Improvements proposed within Enchanted Island and Shady Island consist of a bituminous pavement reclamation apart from Enchanted Point. This roadway is proposed to be an aggregate reclamation. Reclamation is the process by which the existing deteriorating roadway surface is reused as aggregate roadway base for the new street section. The proposed roadways have been classified as residential roadways and will be reclaimed and paved to match existing pavement widths with a 1 -foot gravel shoulder to preserve the bituminous edges of the newly paved roadway, in accordance with City design standards. Improvements to the roadways will consist of the following section: 2 inches of bituminous wearing course, 2 inches of bituminous base course, and 8 inches of reclaimed aggregate base over of an acceptable, compacted subgrade. Figure 2 in Appendix A shows the proposed typical section for Enchanted Island and Shady Island. Street grades are proposed to very closely match the existing grades to minimize construction impacts to adjacent properties. Minor adjustments to some of the existing roadway vertical profiles will be proposed to improve drainage conditions. Additionally, Public Works has indicated the existing wood retaining wall along the access to Lift Station 17 (off of Shady Island Road) has restricted plowing operations as the retaining wall has begun to "lean" towards the access road. The retaining wall was installed as a private improvement. Staff will coordinate with the individual property owner during final design to address the restricted access. 4.2 Drainage The proposed project will maintain the existing drainage patterns and discharge points to the greatest extent possible. Drainage ditches will be maintained by clearing and regrading. Culverts will be replaced with reinforced concrete pipe (RCP) as necessary to convey storm water runoff. 4.3 Sanitary Sewer The proposed sanitary sewer improvements include adjusting existing manhole castings to the new roadway surface with chimney seals to reduce inflow and infiltration of storm water into the manholes. It is also proposed to repair damaged sanitary sewer as necessary following internal inspection (televising). 4.4 Water Main Extension of the watermain is not proposed as a part of this project. The Water Fund is not sufficient to fund watermain extension for these projects along with other projects within the City's Capital Improvements. The project area is not contiguous to Shorewood's watermain system; water service to this area would likely extend from the City of Mound through the City of Minnetrista and is not available at this time. 4.5 Wetlands Minor wetland impacts are anticipated as part of the construction and coordination /replacement will be investigated further during final design. 4.6 Easements and Right -of -Way It is anticipated that work will take place within the existing roadway right -of -way or within areas where the City has prescriptive rights established for roadway and drainage. Additional permanent right -of -way or easement acquisition may be required and will be determined during final design. Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 Page 4 4.7 Permits and Approvals The anticipated permits, approvals required, and the respective regulatory agencies are listed below: • Minnesota Pollution Control Agency (MPCA) (NPDES) Erosion /Stormwater Permit • Minnehaha Creek Watershed District (MCWD) Erosion /Stormwater Permit 4.8 Mailbox Replacement / Relocation It is the City's intent to salvage and reinstall the existing mailboxes and mailbox supports that may be impacted with construction. In the event the condition of the existing mailbox support warrants replacement prior to reinstallation, the City is proposing to salvage the existing mailbox and install a new mailbox support that will meet both City standards and United States Postal Service (USPS) requirements. 4.9 Construction Access / Staging Construction of the proposed improvements will require limited resident access during the work day when construction activities are in progress. However, the contractor will be required to provide access to properties to the extent possible. City staff will work with the contractor to provide notice to residents for activities that may affect access. 4.10 Public Involvement A public informational open house meeting for the proposed project was conducted November 28, 2018. Preliminary information was presented to attendees regarding the proposed improvements, schedule, impacts associated with the project and what to expect during construction. Residents were encouraged to share their knowledge of the project area, specifically any known areas of concern. Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 Page 5 5. FINANCING 5.1 Opinion of Probable Construction Cost A detailed engineer's opinion of probable costs for the proposed improvements can be found in Appendix D of this report. The opinion of probable cost incorporates bid prices from the 2018 construction season projected to a 2019 cost basis including a 10% construction contingency. Indirect costs are typically budgeted at 25% of the construction cost and include engineering, legal, financing, and administrative costs. These costs do not include the easement and acquisition process or the actual easements themselves, if necessary. The tables below provide a summary of the opinion of probable costs for the Enchanted Island and Shady Island Street Reclamation Project: Enchanted Island and Shady Island Street Reclamation Project City of Shorewood, MN Project Costs and Proposed Funding Proposed Improvements City Special Total Responsibility Assessments Schedule A. - Enchanted Island and Shady Island $1,376,200.00 $0.00 $1,376,200.00 Street Reclamation Improvements Schedule B. - Enchanted Point Street Reclamation $0.00 $245,100.00 $245,100.00 Improvements Total Proposed Improvements $1,376,200.00 $245,100.00 $1,621,300.00 5.2 Funding Sources Funding for the project will be provided through the City's Street Reconstruction Fund, Storm Water Fund, Sanitary Sewer Fund, and Special Assessments to benefitting properties along Enchanted Point. Proposed special assessments were based on the City of Shorewood past practice to assess for paving roadways that are currently gravel. One hundred percent (100 %) of the total surface and drainage improvements proposed to be assessed to benefitting properties. The method used to determine the special assessments to benefitting properties utilizes the "Per Lot" method and includes properties adjacent to Enchanted Point. This method is consistent with past City practice. Properties along Enchanted Point are proposed to be assessed approximately $13,620 /unit. The proposed assessment roll and a summary of the proposed assessment calculations are included in Appendix E of this report, along with an Assessment Map ID highlighting the benefitting properties. Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 Page 6 6. PROJECT SCHEDULE The proposed project schedule for the Enchanted Island and Shady Island Street Reclamation Project is as follows: Order Preparation of Feasibility Report .... ............................... Neighborhood Open House Held ............. ............................... Accept Feasibility Report /Set Public Improvement Hearing for Enchanted Point Improvements /Order Project ................... Public Improvement Hearing /Order Project for Enchanted Point Improvements .......... ............................... Approve Plans and Specifications /Authorize Ad for Bid............ OpenBids .................................................. ............................... Award Construction Contract ..................... ............................... Begin Construction .................................... ............................... Construction Substantially Complete ......... ............................... Declare Costs /Set Assessment Hearing ... ............................... Assessment Hearing ................................. ............................... Certify Assessments to County ................. ............................... September 24, 2018 November 28, 2018 .January 14, 2019 February 11, 2019 February 25, 2019 ... March 28, 2019 ........ April 8, 2019 .... April /May 2019 September 2019 September 2019 .......October 2019 ... November 2019 Schedule assumes all private utility and gas main relocation work is completed prior to start of construction. Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 Page 7 7. CONCLUSIONS AND RECOMMENDATIONS The Enchanted Island and Shady Island Street Reclamation Project includes the bituminous pavement reclamation along the following roadways: • Enchanted Lane / Shady Island Road • Enchanted Point from Enchanted Lane to the east terminus • Enchanted Drive from Enchanted Lane to the cul -de -sac • Dellwood Lane from Enchanted Lane to the cul -de -sac • Enchanted Cove from Enchanted Drive to the cul -de -sac • Shady Island Circle • Shady Island Point from Shady Island Circle to the cul -de -sac • Shady Island Trail from Shady Island Circle to the cul -de -sac Due to the poor structural condition of the roadways within Enchanted Island and Shady Island, the improvements proposed herein are recommended for construction in 2019. The total estimated cost for the Enchanted Island and Shady Island Street Reclamation Project is $1,621,300, funded through the City's Street Reconstruction Fund, Storm Water Fund, Sanitary Sewer Fund, and Special Assessments to benefitting properties along Enchanted Point. Right -of -way or easement acquisition costs are not included. This project is feasible, necessary, and cost - effective from an engineering standpoint. The project funding is subject to financial review by the City. Based on the information contained in this report, it is recommended to proceed with the improvements as outlined herein. Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 Page 8 APPENDIX A Project Location Map Typical Section Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 Sol l ° N , v � • p • ti ° u 3 • rn , �.. W • d =i6 N i Shay IslandTr co Oj' W 1• � a wm 14 a�ac tiea' � c R a � UT o ' _ p UJ poonna:joyg J � ' Minnetrista d e • r • W - • d • t • a v � ti• ,�o +a e O p G) O 00 N iL ^ U O O Z U/ •O d [O N W > Q U O z Z U 0 U �w O >E Lu Z C: E ' W Lo o L W O M� > m T W Z Of co �0 7) vW ra E p, J4 O N Y O N m U ra W O o • u f Q U m W W Q=)? ~ N ~ z ~a- C/)ma- (D N 00C/)DLo C/) W O � � U Z � U �• c �5 C5 —0 LU W ~ W Q' Q r Go a- Z 0 L ti — CN N N N a0 a zZ 7 I N N G + V °� E c6 •� C: O > m _ >% ra in N N o L co > � W co ° i _ O ° N U_ LL W U a_, 06 N N ZO O O ZO BO N N N N rl N N r-I r-I r-I r-I � Z J Q H W U Q z 0 z 0 U H a N Q D a 0 0 0 0 0 0 = Z J Z Z Z Lu Q Lu L DLu Q Q Q Q U Q U U J U Q Q Q O Z 2 Z Z W Z 2 2 2 DC W to W W O W to to to r/� APPENDIX B Existing Roadway Conditions Summary Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 EXISTING ROADWAY CONDITIONS Street From To Length Width PACER Rating Road Construction [ft] [ft] Enchanted Lane Minnetrista City Limits Bridge 3100 22 7 1973 Shady Island Road Bridge Shady Island Circle 1200 22 5 1973 Enchanted Point Enchanted Lane east terminus 1300 16 n/a 1973 Enchanted Drive Enchanted Lane north terminus 1600 20 4 1973 Dellwood Lane Enchanted Drive northwest terminus 650 20 6 1973 Enchanted Cove Enchanted Drive east terminus 240 16 4 1973 Shady Island Point Shady Island Circle north terminus 380 16 5 1973 Shady Island Trail Shady Island Circle north terminus 270 16 5 1973 Shady Island Circle Shady Island Road Shady Island Road 1100 16 5 1973 lift station road Shady Island Road east terminus 430 16 n/a 1973 APPENDIX C Pavement Forensics Investigation on Enchanted Lane /Shady Islands prepared by WSB February 2017 Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 A WS 701 Xenia Avenue South I Suite 300 1 Minneapolis, MN 55416 1 (763) 541 -4800 February 20, 2017 Mr. Paul Hornby City Engineer 5755 Country Club Road Excelsior, MN 55331 Re: Pavement Forensics Investigation on Enchanted Lane /Shady Islands WSB & Associates is pleased to submit this pavement forensics report detailing the results of the pavement coring which were obtained on February 17, 2017 on the proposed mill and overlay or reclamation project areas in the City of Shorewood. The various characteristics of the pavement cores were analyzed in order to assist in determining the appropriate pavement rehabilitation method for each roadway segment. A total of 16 pavement cores were taken within the roadway segments. The locations of the pavement cores are summarized in Figure 1 in this report and a summary of the pavement depths are shown on Table 1 in this report. Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com C: \Users\aazary\Desktop \Coring \Shorewood Coring Results 01 17 17.d- Mr. Paul Homby February 20, 2017 Figure 1: Coring Locations re 9 1 0 re 8 re 10 ore i3 ore 12 ore 7 ore 15 re 6 ore 11 ore 16 are 5 "ore 4 ore 3 ore 2 Building a legacy -your legacy. Equal Opportunity Employer I wsbeng.com C: \Users \amary\Desktop \Coring \Shorewood Coring Results 01 17 17.dmx Mr. Paul Hornby February 20, 2017 Table 1: Core Results It should be noted that the areas that are being recommended for reclamation were found to have underlying road mix material which is not structurally sound; this mix crumbles to the touch. There was fabric found underlying Core 1 and Core 3. This should be made aware to the contractor prior to construction. Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex Aggregate Base Recommendation Core ID Road Name Bit Depth (inches) Comments 1 Enchanted Lane 2.5 2 inches road mix Reclamation 2 Enchanted Lane 9 2+ inches road mix Reclamation Sandy Gravel depth Reclamation 3 Enchanted Lane 6.5 unknown Sandy Gravel depth Reclamation 4 Enchanted Lane 4.5 unknown 5 Enchanted Lane 5.5 5" Sandy Gravel Reclamation 6 Shady Island Road 6 1" Sandy Gravel Reclamation 6 inches Crushed Reclamation 7 Shady Island Road 3.5 Limestone 8 Shady Island Trail 4 4 inches Limestone Reclamation 6 inches Crushed Reclamation 9 Shady Island Point 5 Limestone 6 inches Crushed 2" Mill and Overlay 10 Shady Island Circle 5.75 Limestone 11 Enchanted Drive 4.5 6 inches Class 5 2" Mill and Overlay 12 Enchanted Drive 4.5 6 inches Class 5 2" Mill and Overlay 13 Enchanted Cove 5.5 5 inches Class 5 2" Mill and Overlay 14 Enchanted Drive 4.5 6 inches Class 5 2" Mill and Overlay 15 Dellwood 3 4 inches Class 5 Reclamation 16 Dellwood 3.5 4 inches Class 5 Reclamation It should be noted that the areas that are being recommended for reclamation were found to have underlying road mix material which is not structurally sound; this mix crumbles to the touch. There was fabric found underlying Core 1 and Core 3. This should be made aware to the contractor prior to construction. Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex Mr. Paul Hornby February 20, 2017 Appendix A Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex Mr. Paul Hornby February 20, 2017 Enchanted Lane CORE 2 Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com IF s' C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex Mr. Paul Hornby February 20, 2017 CORE 3 CORE 4 CORE 5 Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex Mr. Paul Hornby February 20, 2017 Shady Island Road CORE 6 C Ll Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex Mr. Paul Hornby February 20, 2017 Shady Island Trail Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex Mr. Paul Hornby February 20, 2017 Shady Island Point Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex Mr. Paul Hornby February 20, 2017 Shady Island Circle CORE AA) Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex Mr. Paul Hornby February 20, 2017 Enchanted Drive CORE 11 CORE A-2 __& ON ORE 14 Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex Mr. Paul Hornby February 20, 2017 Enchanted Cove CORE A-"3- Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex Mr. Paul Hornby February 20, 2017 Dellwood h CORE A-5 CORE A-0 Building a legacy —your legacy. Equal Opportunity Employer I wsbeng.com C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex APPENDIX D Cost Tables Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 Opinion of Probable Cost WSB Project: Enchanted Island and Shady Island Street Reclamation Project Design By: KAK Project Location: City of Shorewood Checked By: EE City Project No.: 18 -11 WSBProjectNo: R- 012809 -000 Date: 1/8/2019 Item N o. MN/DOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost Schedule A. - Enchanted Island and Shady Island Reclamation Improvements 1 2021.501 MOBILIZATION L S 1 $47,000.00 $47,000.00 2 2101.505 CLEARING TREE 20 $400.00 $8,000.00 3 2101.505 GRUBBING TREE 20 $400.00 $8,000.00 4 2104.502 REMOVE DRAINAGE STRUCTURE EACH 4 $500.00 $2,000.00 5 2104.502 REMOVE MAIL BOX SUPPORT EACH 5 $25.00 $125.00 6 2104.502 SALVAGE SIGN EACH 30 $15.00 $450.00 7 2104.503 REMOVE SEWER PIPE (STORM) L F 700 $10.00 $7,000.00 8 2104.503 REMOVE CONCRETE CURB L F 100 $5.00 $500.00 9 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) L F 500 $5.00 $2,500.00 10 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) L F 1200 $3.50 $4,200.00 11 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y 1300 $3.50 $4,550.00 12 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT S Y 600 $6.50 $3,900.00 13 2104.518 REMOVE RETAINING WALL S F 200 $15.00 $3,000.00 14 2104.601 SALVAGE MISCELLANEOUS STRUCTURES L S 1 $2,500.00 $2,500.00 15 2104.602 SALVAGE & REINSTALL MAILBOX EACH 65 $100.00 $6,500.00 16 2105.504 GEOTEXTILE FABRIC TYPE 4 S Y 80 $5.00 $400.00 17 2105.603 MINOR GRADING LUMP SUM 1 $2,500.00 $2,500.00 18 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 40 $150.00 $6,000.00 19 2215.504 FULL DEPTH RECLAMATION SQ YD 20000 $5.00 $100,000.00 20 2331.603 JOINT ADHESIVE L F 1000 $1.00 $1,000.00 21 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GAL 1100 $4.00 $4,400.00 22 2360.504 TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY S Y 1300 $45.00 $58,500.00 23 2360.509 TYPE SP 9.5 WEARING COURSE MIX (3,C) TON 2600 $85.00 $221,000.00 24 2360.509 TYPE SP 12.5 WEARING COURSE MIX (3,B) TON 2600 $65.00 $169,000.00 25 2422.618 WOOD RETAINING WALL S F 200 $25.00 $5,000.00 26 2501.502 12" CS PIPE APRON EACH 10 $500.00 $5,000.00 27 2501.502 15" CS PIPE APRON EACH 10 $600.00 $6,000.00 28 2501.502 12" RC PIPE APRON EACH 4 $750.00 $3,000.00 29 2501.502 15" RC PIPE APRON EACH 4 $850.00 $3,400.00 30 2501.503 12" CS PIPE CULVERT L F 180 $35.00 $6,300.00 31 2501.503 15" CS PIPE CULVERT L F 180 $38.00 $6,840.00 32 2503.503 12" RC PIPE SEWER DESIGN 3006 CLASS V L F 80 $45.00 $3,600.00 33 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V L F 80 $45.00 $3,600.00 34 2503.602 CONNECT TO EXISTING STORM SEWER EACH 1 $1,000.00 $1,000.00 35 2504.602 IRRIGATION SYSTEM REPAIR EACH 5 $200.00 $1,000.00 36 2505.601 UTILITY COORDINATION LS 1 $1,500.00 $1,500.00 37 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL EACH 2 $2,200.00 $4,400.00 38 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN G EACH 2 $2,200.00 $4,400.00 39 2506.502 ADJUST FRAME AND RING CASTING (SANITARY) EACH 46 $500.00 $23,000.00 40 2506.602 CHIMNEY SEALS EACH 46 $250.00 $11,500.00 41 2511.507 RANDOM RIPRAP CLASS III C Y 40 $200.00 $8,000.00 42 2531.503 CONCRETE CURB AND GUTTER DESIGN B618 L F 1000 $22.00 $22,000.00 43 2531.504 6" CONCRETE DRIVEWAY PAVEMENT S Y 600 $65.00 $39,000.00 44 2535.503 BITUMINOUS CURB LIN FT 1000 $25.00 $25,000.00 45 2540.602 MAIL BOX (TEMPORARY) EACH 65 $50.00 $3,250.00 46 2540.602 MAIL BOX SUPPORT EACH 5 $100.00 $500.00 47 2557.602 REPAIR DOG FENCE EACH 5 $200.00 $1,000.00 48 2563.601 TRAFFIC CONTROL L S 1 $5,000.00 $5,000.00 49 2564.502 INSTALL SIGN PANEL EACH 30 $15.00 $450.00 50 2564.518 SIGN PANELS TYPE C S F 32 $65.00 $2,080.00 51 2571.524 CONIFEROUS TREE 8' HT B &B EACH 5 $650.00 $3,250.00 52 2571.524 DECIDUOUS TREE 2.5" CAL B &B EACH 5 $650.00 $3,250.00 53 2573.501 STABILIZED CONSTRUCTION ENTRANCE LS 1 $1,000.00 $1,000.00 54 2573.502 STORM DRAIN INLET PROTECTION EACH 8 $200.00 $1,600.00 55 2573.503 SILT FENCE, TYPE MS L F 9000 $2.00 $18,000.00 56 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER L F 9000 $3.00 $27,000.00 57 1 2575.504 EROSION CONTROL BLANKET CATEGORY 3 S Y 500 $5.00 $2,500.00 58 1 2575.508 SEED MIXTURE 25 -151 LB 1000 $5.00 $5,000.00 Opinion of Probable Cost WSB Project: Enchanted Island and Shady Island Street Reclamation Project Design By: KAK Project Location: City of Shorewood Checked By: EE City Project No.: 18 -11 WSBProjectNo: R- 012809 -000 Date: 1/8/2019 MN/DOT Estimated Estimated Unit Estimated Total Item N o. Specification No. Description Unit Total Quantity Price Cost Schedule A. - Enchanted Island and Shady Island Reclamation Improvements 59 2575.508 HYDRAULIC MULCH MATRIX LB 10300 $2.00 $20,600.00 60 2575.510 PRUNETREES HOUR 20 $100.00 $2,000.00 61 2575.604 SEEDING (INCL TOPSOIL AND FERT) ACRE 4.2 $10,000.00 $42,000.00 Subtotal Schedule A. - Enchanted Island and Shady Island Street Reclamation Improvements $985,045.00 +10% Contingency $98,504.50 Subtotal Schedule A. - Enchanted Island and Shady Island Street Reclamation Improvements $1,083,549.50 + 27% Indirect Costs $292,558.37 Total Schedule A. - Enchanted Island and Shady Island Street Reclamation Improvements $1,376,107.87 Opinion of Probable Cost WSB Project: Enchanted Island and Shady Island Street Reclamation Project Design By: KAK Project Location: City of Shorewood Checked By: EE City Project No.: 18 -11 WSBProjectNo: R- 012809 -000 Date: 1/8/2019 Item No. MN/DOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost Schedule B. - Enchanted Point Reclamation Improvements 62 2021.501 MOBILIZATION LS 1 $8,400.00 $8,400.00 63 2101.505 CLEARING TREE 10 $400.00 $4,000.00 64 2101.505 GRUBBING TREE 10 $400.00 $4,000.00 65 2104.502 REMOVE MAIL BOX SUPPORT EACH 2 $25.00 $50.00 66 2104.502 SALVAGE SIGN EACH 5 $15.00 $75.00 67 2104.503 REMOVE SEWER PIPE (STORM) L F 200 $10.00 $2,000.00 68 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) L F 50 $5.00 $250.00 69 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) L F 400 $3.50 $1,400.00 70 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y 60 $3.50 $210.00 71 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT S Y 400 $6.50 $2,600.00 72 2104.601 SALVAGE MISCELLANEOUS STRUCTURES L S 1 $1,000.00 $1,000.00 73 2104.602 SALVAGE & REINSTALL MAILBOX EACH 18 $100.00 $1,800.00 74 2105.504 GEOTEXTILE FABRIC TYPE 4 S Y 40 $5.00 $200.00 75 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 10 $150.00 $1,500.00 76 2215.504 FULL DEPTH RECLAMATION SQ YD 2400 $5.00 $12,000.00 77 2331.603 JOINT ADHESIVE L F 100 $1.00 $100.00 78 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GAL 200 $4.00 $800.00 79 2360.504 TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY S Y 400 $45.00 $18,000.00 80 2360.509 TYPE SP 9.5 WEARING COURSE MIX (3,C) TON 310 $85.00 $26,350.00 81 2360.509 TYPE SP 12.5 WEARING COURSE MIX (3,B) TON 310 $65.00 $20,150.00 82 2501.502 12" CS PIPE APRON EACH 4 $500.00 $2,000.00 83 2501.502 15" CS PIPE APRON EACH 6 $600.00 $3,600.00 84 2501.502 12" RC PIPE APRON EACH 2 $750.00 $1,500.00 85 2501.502 15" RC PIPE APRON EACH 2 $850.00 $1,700.00 86 2501.503 12" CS PIPE CULVERT L F 80 $35.00 $2,800.00 87 2501.503 15" CS PIPE CULVERT L F 120 $38.00 $4,560.00 88 2503.503 12" RC PIPE SEWER DESIGN 3006 CLASS V L F 40 $45.00 $1,800.00 89 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V L F 40 $45.00 $1,800.00 90 2504.602 IRRIGATION SYSTEM REPAIR EACH 2 $200.00 $400.00 91 2505.601 UTILITY COORDINATION L S 1 $500.00 $500.00 92 2506.502 ADJUST FRAME AND RING CASTING (SANITARY) EACH 6 $500.00 $3,000.00 93 2506.602 CHIMNEY SEALS EACH 6 $250.00 $1,500.00 94 2511.507 RANDOM RIPRAP CLASS III C Y 20 $200.00 $4,000.00 95 2531.503 CONCRETE CURB AND GUTTER DESIGN B618 L F 100 $22.00 $2,200.00 96 2531.504 6" CONCRETE DRIVEWAY PAVEMENT S Y 60 $65.00 $3,900.00 97 2535.503 BITUMINOUS CURB LIN FT 200 $25.00 $5,000.00 98 2540.602 MAIL BOX (TEMPORARY) EACH 18 $50.00 $900.00 99 2540.602 MAIL BOX SUPPORT EACH 2 $100.00 $200.00 100 2557.602 REPAIR DOG FENCE EACH 2 $200.00 $400.00 101 2563.601 TRAFFIC CONTROL LS 1 $1,500.00 $1,500.00 102 2564.502 INSTALL SIGN PANEL EACH 5 $15.00 $75.00 103 2564.518 SIGN PANELS TYPE C S F 32 $65.00 $2,080.00 104 2571.524 CONIFEROUS TREE 8' HT B &B EACH 2 $650.00 $1,300.00 105 2571.524 DECIDUOUS TREE 2.5" CAL B &B EACH 2 $650.00 $1,300.00 106 2573.501 STABILIZED CONSTRUCTION ENTRANCE LS 1 $1,000.00 $1,000.00 107 2573.503 SILT FENCE, TYPE MS L F 2000 $2.00 $4,000.00 108 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER L F 2000 $3.00 $6,000.00 109 2575.504 EROSION CONTROL BLANKET CATEGORY 3 S Y 100 $5.00 $500.00 110 2575.508 SEED MIXTURE 25 -151 LB 200 $5.00 $1,000.00 111 2575.508 HYDRAULIC MULCH MATRIX LB 1500 $2.00 $3,000.00 112 2575.510 PRUNE TREES HOUR 10 $100.00 $1,000.00 113 2575.604 SEEDING (INCL TOPSOIL AND FERT) ACRE 0.6 $10,000.00 $6,000.00 Subtotal Schedule B. - Enchanted Point Reclamation Improvements $175,400.00 +10% Contingency $17,540.00 Subtotal Schedule B. - Enchanted Point Reclamation Improvements $192,940.00 + 27% Indirect Costs $52,093.80 Total Schedule B. - Enchanted Point Reclamation Improvements $245,033.80 TOTAL ENCHANTED ISLAND AND SHADY ISLAND STREET RECLAMATION PROJECT $1,621,141.67 APPENDIX E Assessment Map Assessment Roll Feasibility Report Enchanted Island and Shady Island Street Reclamation Project City of Shorewood Project No. 18 -11 WSB Project No. R- 012809 -000 Document Path: K:\ 012809- 000 \GIS \MapsVAssessmentMap.mxd Date Saved 1/4/201994603AM (� \) J N � +J fA O � O LO °o LO IWO Ii t ® z-q< U Ul 1 � O ^L LL r N U) . M N a Cn Z 70 . 0 � O Miffn—efri ' - _ a) cn - 0 L9 Jw N W u C) Q U 0 c- ------------------- . . . . . . . . . . . . . . . . . . - - - - - - - - - - - - - - - - - - . . . . z . . z z . . z z . . z z . . z z . . z z . . z z - -\ E o U . . U U . . U U . . U U . . U U . . U U . . U U . . U u . . u u . . o \ \ \ \ \ \ \ \\ \ \ \) \ \ \ \ \) I I I I izi I I I I I I I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Iq 10 . . z . . 7-27-22""IMM,", Z Z z z Z2 2 Z2 Z2 Z2 22 Z2 Z2 Z. Z. Z. Z. Z. Z. 2z < �<� z e 0 z z � z 0 z z z z z z z \\ \ 5 5 z 5 5 E 5 zz 5 5 5 5 5 5 5 . . . El E] E] El El El El El El El zo-Z z 0 z z < < < < < < < < < < u u lu u u u <Z , u u u u z z z I z z z u z zu zu zu zu z z NN Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00000000=0MOMOM08=08 z z z z z z z z z z z z z z z z z z lu lu z z lu lu z z lu lu z z lu lu z z lu lu z z lu lu z z lu lu z z lu lu z z lu lu z z TH'I'l 1 0 0 \\( \\ z C.. z z z :_\ \)) »)\(( \: \ {\ z 6 _ I �u � Z 2 0 2� 1 U, I ou t�:. u. 8. u �. u. zu E