Feasibility Report: Enchanted Island and Shady Island Street Reclamation Projectl►:
CITY OF
SHOREWOOD
FEASIBILITY REPORT
ENCHANTED ISLAND AND SHADY ISLAND
STREET RECLAMATION PROJECT
SHOREWOOD I HENNEPIN COUNTY I MINNESOTA
JANUARY 14, 2019
Prepared for:
City of Shorewood
5755 Country Club Road
Shorewood, MN 55331
CITY PROJECT NO. 18 -11
WSB PROJECT NO. R- 012809 -000
wsbl
FEASIBILITY REPORT
ENCHANTED ISLAND AND SHADY ISLAND
STREET RECLAMATION PROJECT
FOR THE
CITY OF SHOREWOOD
HENNEPIN COUNTY, MINNESOTA
CITY PROJECT NO. 18 -11
January 14, 2019
Prepared By:
wsb
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
wsb
January 14, 2019
Honorable Mayor and Council Members
City of Shorewood
5755 Country Club Road
Shorewood, MN 55331
Re: Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
o City of Shorewood Project No. 18 -11
6 WSB Project No. R- 012809 -000
Z
W
CO
0
3: Dear Mayor and Council Members
Transmitted herewith is the feasibility report for the above - referenced project. The report
°° addresses the street and minor drainage improvements, in accordance with the Capital
co Improvement Plan and Pavement Management Plan, along the following roadways:
cq
LD
° Enchanted Lane / Shady Island Road
• Enchanted Point from Enchanted Lane to the east terminus
° 0 Enchanted Drive from Enchanted Lane to the cul -de -sac
Ln
Ln 0 Dellwood Lane from Enchanted Lane to the cul -de -sac
• Enchanted Cove from Enchanted Drive to the cul -de -sac
Shady Island Circle
• Shady Island Point from Shady Island Circle to the cul -de -sac
a Shady Island Trail from Shady Island Circle to the cul -de -sac
a The proposed improvements include full depth reclamation of the existing street section and a full
0 width bituminous overlay. The report herein presents costs for the project as well as proposed
°
funding, including assessments, based on the City assessment policy and past practice
°
N
W We would be happy to discuss this report with you at your convenience. If you have any
questions, please do not hesitate to call me at (763) 512 -5257.
0
Sincerely,
W
W
WSB & Associates, Inc.
0)
W
CO is Eckman,
r Project Manager
CERTIFICATION
I hereby certify that this plan, specification, or report was prepared by me
or under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of Minnesota.
Date: January 14, 2019 License No. 49954
Quality Assurance /Quality Control:
Alyson Fauske, PE
Date: January 14, 2019 License No. 42437
Feasibility Report
Enchanted Island and Shad Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
TABLE OF CONTENTS
TITLE SHEET
LETTER OF TRANSMITTAL
CERTIFICATION SHEET
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY .......................................................................... ..............................1
2. INTRODUCTION ........................................................................................ ..............................2
2.1
Authorization ..................................................................................... ..............................2
2.2
Scope /Project Location .................................................................... ..............................2
2.3
Data Available ................................................................................... ..............................2
2.4
Project Background .......................................................................... ..............................2
3. EXISTING CONDITIONS
3
3.1
Surface ............................................................................................... ..............................3
3.2
Drainage ............................................................................................ ..............................3
3.3
Sanitary Sewer .................................................................................. ..............................3
3.4
Water Main ........................................................................................ ..............................3
3.5
Private Utilities ................................................................................. ............................... 3
4. PROPOSED IMPROVEMENTS .............................................................. ..............................4
4.1
Roadway ........................................................................................... ............................... 4
4.2
Drainage ............................................................................................ ..............................4
4.3
Sanitary Sewer .................................................................................. ..............................4
4.4
Water Main ........................................................................................ ..............................4
4.5
Wetlands ............................................................................................ ..............................4
4.6
Easements and Right -of- Way ......................................................... ..............................4
4.7
Permits and Approvals ................................................................... ............................... 5
4.8
Mailbox Replacement/ Relocation ................................................ ..............................5
4.9
Construction Access / Staging ....................................................... ..............................5
4.10
Public Involvement ........................................................................... ..............................5
5. FINANCING ................................................................................................ ..............................6
5.1 Opinion of Probable Construction Cost.
5.2 Funding Sources ....... ...............................
8
6. PROJECT SCHEDULE ............................................................................ ..............................7
7. CONCLUSIONS AND RECOMMENDATIONS .................................... ..............................8
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
APPENDIX A
Project Location Map
Typical Section
APPENDIX B
Existing Roadway Conditions Summary
APPENDIX C
Pavement Forensics Investigation on Enchanted Lane /Shady Islands prepared by
WSB February 2017
APPENDIX D
Cost Tables
APPENDIX E
Assessment Map
Assessment Roll
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
1. EXECUTIVE SUMMARY
The Enchanted Island and Shady Island Street Reclamation Project, City Project No. 18 -11, was initiated
by the City Council at their September 24, 2018, regular City Council meeting. Improvements proposed
for construction in 2019 include street reclamation of approximately 10,300 feet (1.95 miles) complete
with bituminous paving along the following roadways:
• Enchanted Lane / Shady Island Road
• Enchanted Point from Enchanted Lane to the east terminus
• Enchanted Drive from Enchanted Lane to the cul -de -sac
• Dellwood Lane from Enchanted Lane to the cul -de -sac
• Enchanted Cove from Enchanted Drive to the cul -de -sac
• Shady Island Circle
• Shady Island Point from Shady Island Circle to the cul -de -sac
• Shady Island Trail from Shady Island Circle to the cul -de -sac
A map illustrating the project location can be found on Figure 1 in Appendix A.
The total estimated project cost for the Enchanted Island and Shady Island Street Reclamation Project is
approximately $1,621,300. Funding for the project will be provided through the City's Street
Reconstruction Fund, Storm Water Fund, Sanitary Sewer Fund, and Special Assessments to benefitting
properties along Enchanted Point.
Proposed special assessments were based on the City of Shorewood past practice to assess for paving
roadways that are currently gravel. One hundred percent (100 %) of the total surface and drainage
improvements proposed to be assessed to benefitting properties. Properties along Enchanted Point are
proposed to be assessed approximately $13,620 /unit.
The project reconstruction can be completed, including bituminous paving and restoration items, in 2019.
This project is feasible, necessary, and cost effective from an engineering standpoint and should be
constructed as proposed herein. Financial feasibility will need to be considered by the City Council.
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
Page 1
2. INTRODUCTION
2.1 Authorization
On September 24, 2018, the Shorewood City Council authorized the preparation of an engineering
Feasibility Report for the Enchanted Island and Shady Island Street Reclamation Project. This project
has been designated as City Project No. 18 -11.
2.2 Scope /Project Location
The proposed project consists of street and minor drainage improvements along the following roadways:
• Enchanted Lane / Shady Island Road
• Enchanted Point from Enchanted Lane to the east terminus
• Enchanted Drive from Enchanted Lane to the cul -de -sac
• Dellwood Lane from Enchanted Lane to the cul -de -sac
• Enchanted Cove from Enchanted Drive to the cul -de -sac
• Shady Island Circle
• Shady Island Point from Shady Island Circle to the cul -de -sac
• Shady Island Trail from Shady Island Circle to the cul -de -sac
The proposed improvements include reclamation of the existing street section and full -width bituminous
overlay.
A map illustrating the project location can be found on Figure 1 of Appendix A.
2.3 Data Available
Information and materials used in the preparation of this report include the following:
• City of Shorewood Pavement Management Plan
• City of Shorewood record drawings
• City of Shorewood Assessment Policy
• City of Shorewood base and topographic maps
• Field observations of area and discussions with City staff
• Private utility maps
• Neighborhood Open House held November 28, 2018
2.4 Project Background
This project was initiated through the continued development and implementation of the City of
Shorewood's Pavement Management Plan. The Pavement Management Plan provides a schedule for
the various roadway improvements that are necessary to maintain the City streets in an effective and
efficient manner. The City of Shorewood evaluates all roadways within the City periodically using the
Pavement Surface Evaluation and Rating ( PASER). City streets are evaluated, and the pavement
management plan schedule revised according to the pavement condition ratings. The ratings of the
roadways within the Enchanted Island and Shady Island neighborhoods range from 4 to 7. The PASER
ratings for each roadway segment can be found in Appendix B.
The following conditions have been identified within the project area:
• Existing streets do not meet City minimum roadway standards with concrete curb and gutter.
• Deterioration of the existing streets including alligator cracking, edge cracking, transverse
cracking, and longitudinal cracking.
• The roadway exhibits drainage issues due to roadway deformation and inadequate drainage
systems (ditches or storm sewer).
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
Page 2
3. EXISTING CONDITIONS
3.1 Surface
Roadways within the Enchanted Island and Shady Island neighborhoods were originally constructed in
1973 and are experiencing various severities of distresses including alligator, block, transverse, and
longitudinal cracking, along with localized drainage issues. All roadways within the Enchanted Island and
Shady Island neighborhoods identified to be reclaimed consist of 16 -22- foot -wide rural section (no curb
and gutter) bituminous roadways apart from Enchanted Point. The existing roadway conditions can be
found in Appendix B.
Enchanted point currently exists as a 16- foot -wide rural section gravel roadway to approximately mid -
block. This section of roadway was Otta sealed prior to 2011. Otta sealing is the application of emulsified
asphalt to a gravel surface. As a result of the Neighborhood Open House held November 28, 2018,
property owners along Enchanted Point indicated approximately mid -block to the roadway terminus was
paved roughly 10 years ago by the individual property owners. These improvements were completed
without City approval or oversight and there is no indication these improvements were completed to City
standards.
Pavement cores taken within Enchanted Island and Shady Island indicate the existing asphalt thickness
ranges from 2.5 inches to 6.5 inches and aggregate base thickness ranges from 1.0 inch to 6 inches. A
copy of pavement forensic report is included in Appendix C of this report.
The project area is surrounded primarily by residential properties that contain landscaping, trees, and
numerous other private improvements beyond the edge of the roadway and within the City right -of -way.
3.2 Drainage
Enchanted Island and Shady Island roadways are currently graded as rural road sections consisting of
ditches and culverts to convey storm water runoff to the adjacent wetlands and ditch system ultimately
discharging to Lake Minnetonka.
3.3 Sanitary Sewer
The existing sanitary sewer system in the project area consists of 9- inch - diameter polyvinyl chlorinated
(PVC) pipe sewer and 8 -inch diameter ductile iron pipe (DIP) gravity sewer and 4 -inch diameter DIP
forcemain constructed in 1973.
An internal inspection, with a specially designed television camera, will be completed with final design to
determine the structural condition of the existing pipe and individual services.
3.4 Water Main
There is no existing watermain along Enchanted Island and Shady Island and properties are served by
private wells for water supply.
3.5 Private Utilities
Private utilities within the project area include communications, gas, and electric facilities. A meeting will
be held with the utility companies during the final design stage to coordinate utility conflicts and
construction schedule. Private utility companies that have been identified with facilities in the general
project area include:
• Mediacom (Telephone /Internet)
• CenturyLink (Telephone /Internet)
• Frontier Communications (Telephone /Internet)
• Centerpoint Energy (Gas)
• Xcel Energy (Electric)
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
Page 3
4. PROPOSEDIMPROVEMENTS
4.1 Roadway
Improvements to the existing roadways are intended to improve the design strength of the pavement
system and provide a street surface with an extended life.
Improvements proposed within Enchanted Island and Shady Island consist of a bituminous pavement
reclamation apart from Enchanted Point. This roadway is proposed to be an aggregate reclamation.
Reclamation is the process by which the existing deteriorating roadway surface is reused as aggregate
roadway base for the new street section. The proposed roadways have been classified as residential
roadways and will be reclaimed and paved to match existing pavement widths with a 1 -foot gravel
shoulder to preserve the bituminous edges of the newly paved roadway, in accordance with City design
standards. Improvements to the roadways will consist of the following section: 2 inches of bituminous
wearing course, 2 inches of bituminous base course, and 8 inches of reclaimed aggregate base over of
an acceptable, compacted subgrade. Figure 2 in Appendix A shows the proposed typical section for
Enchanted Island and Shady Island.
Street grades are proposed to very closely match the existing grades to minimize construction impacts to
adjacent properties. Minor adjustments to some of the existing roadway vertical profiles will be proposed
to improve drainage conditions.
Additionally, Public Works has indicated the existing wood retaining wall along the access to Lift Station
17 (off of Shady Island Road) has restricted plowing operations as the retaining wall has begun to "lean"
towards the access road. The retaining wall was installed as a private improvement. Staff will coordinate
with the individual property owner during final design to address the restricted access.
4.2 Drainage
The proposed project will maintain the existing drainage patterns and discharge points to the greatest
extent possible. Drainage ditches will be maintained by clearing and regrading. Culverts will be replaced
with reinforced concrete pipe (RCP) as necessary to convey storm water runoff.
4.3 Sanitary Sewer
The proposed sanitary sewer improvements include adjusting existing manhole castings to the new
roadway surface with chimney seals to reduce inflow and infiltration of storm water into the manholes. It
is also proposed to repair damaged sanitary sewer as necessary following internal inspection (televising).
4.4 Water Main
Extension of the watermain is not proposed as a part of this project. The Water Fund is not sufficient to
fund watermain extension for these projects along with other projects within the City's Capital
Improvements. The project area is not contiguous to Shorewood's watermain system; water service to
this area would likely extend from the City of Mound through the City of Minnetrista and is not available at
this time.
4.5 Wetlands
Minor wetland impacts are anticipated as part of the construction and coordination /replacement will be
investigated further during final design.
4.6 Easements and Right -of -Way
It is anticipated that work will take place within the existing roadway right -of -way or within areas where the
City has prescriptive rights established for roadway and drainage. Additional permanent right -of -way or
easement acquisition may be required and will be determined during final design.
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
Page 4
4.7 Permits and Approvals
The anticipated permits, approvals required, and the respective regulatory agencies are listed below:
• Minnesota Pollution Control Agency (MPCA) (NPDES) Erosion /Stormwater Permit
• Minnehaha Creek Watershed District (MCWD) Erosion /Stormwater Permit
4.8 Mailbox Replacement / Relocation
It is the City's intent to salvage and reinstall the existing mailboxes and mailbox supports that may be
impacted with construction. In the event the condition of the existing mailbox support warrants
replacement prior to reinstallation, the City is proposing to salvage the existing mailbox and install a new
mailbox support that will meet both City standards and United States Postal Service (USPS)
requirements.
4.9 Construction Access / Staging
Construction of the proposed improvements will require limited resident access during the work day when
construction activities are in progress. However, the contractor will be required to provide access to
properties to the extent possible. City staff will work with the contractor to provide notice to residents for
activities that may affect access.
4.10 Public Involvement
A public informational open house meeting for the proposed project was conducted November 28, 2018.
Preliminary information was presented to attendees regarding the proposed improvements, schedule,
impacts associated with the project and what to expect during construction. Residents were encouraged
to share their knowledge of the project area, specifically any known areas of concern.
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
Page 5
5. FINANCING
5.1 Opinion of Probable Construction Cost
A detailed engineer's opinion of probable costs for the proposed improvements can be found in
Appendix D of this report. The opinion of probable cost incorporates bid prices from the 2018
construction season projected to a 2019 cost basis including a 10% construction contingency. Indirect
costs are typically budgeted at 25% of the construction cost and include engineering, legal, financing, and
administrative costs. These costs do not include the easement and acquisition process or the actual
easements themselves, if necessary.
The tables below provide a summary of the opinion of probable costs for the Enchanted Island and Shady
Island Street Reclamation Project:
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood, MN
Project Costs and Proposed Funding
Proposed Improvements
City
Special
Total
Responsibility
Assessments
Schedule A. - Enchanted Island and Shady Island
$1,376,200.00
$0.00
$1,376,200.00
Street Reclamation Improvements
Schedule B. - Enchanted Point Street Reclamation
$0.00
$245,100.00
$245,100.00
Improvements
Total Proposed Improvements
$1,376,200.00
$245,100.00
$1,621,300.00
5.2 Funding Sources
Funding for the project will be provided through the City's Street Reconstruction Fund, Storm Water Fund,
Sanitary Sewer Fund, and Special Assessments to benefitting properties along Enchanted Point.
Proposed special assessments were based on the City of Shorewood past practice to assess for paving
roadways that are currently gravel. One hundred percent (100 %) of the total surface and drainage
improvements proposed to be assessed to benefitting properties.
The method used to determine the special assessments to benefitting properties utilizes the "Per Lot"
method and includes properties adjacent to Enchanted Point. This method is consistent with past City
practice.
Properties along Enchanted Point are proposed to be assessed approximately $13,620 /unit.
The proposed assessment roll and a summary of the proposed assessment calculations are included in
Appendix E of this report, along with an Assessment Map ID highlighting the benefitting properties.
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
Page 6
6. PROJECT SCHEDULE
The proposed project schedule for the Enchanted Island and Shady Island Street Reclamation Project is
as follows:
Order Preparation of Feasibility Report .... ...............................
Neighborhood Open House Held ............. ...............................
Accept Feasibility Report /Set Public Improvement Hearing for
Enchanted Point Improvements /Order Project ...................
Public Improvement Hearing /Order Project for
Enchanted Point Improvements .......... ...............................
Approve Plans and Specifications /Authorize Ad for Bid............
OpenBids .................................................. ...............................
Award Construction Contract ..................... ...............................
Begin Construction .................................... ...............................
Construction Substantially Complete ......... ...............................
Declare Costs /Set Assessment Hearing ... ...............................
Assessment Hearing ................................. ...............................
Certify Assessments to County ................. ...............................
September 24, 2018
November 28, 2018
.January 14, 2019
February 11, 2019
February 25, 2019
... March 28, 2019
........ April 8, 2019
.... April /May 2019
September 2019
September 2019
.......October 2019
... November 2019
Schedule assumes all private utility and gas main relocation work is completed prior to start of
construction.
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
Page 7
7. CONCLUSIONS AND RECOMMENDATIONS
The Enchanted Island and Shady Island Street Reclamation Project includes the bituminous pavement
reclamation along the following roadways:
• Enchanted Lane / Shady Island Road
• Enchanted Point from Enchanted Lane to the east terminus
• Enchanted Drive from Enchanted Lane to the cul -de -sac
• Dellwood Lane from Enchanted Lane to the cul -de -sac
• Enchanted Cove from Enchanted Drive to the cul -de -sac
• Shady Island Circle
• Shady Island Point from Shady Island Circle to the cul -de -sac
• Shady Island Trail from Shady Island Circle to the cul -de -sac
Due to the poor structural condition of the roadways within Enchanted Island and Shady Island, the
improvements proposed herein are recommended for construction in 2019. The total estimated cost for
the Enchanted Island and Shady Island Street Reclamation Project is $1,621,300, funded through the
City's Street Reconstruction Fund, Storm Water Fund, Sanitary Sewer Fund, and Special Assessments to
benefitting properties along Enchanted Point. Right -of -way or easement acquisition costs are not
included.
This project is feasible, necessary, and cost - effective from an engineering standpoint. The project
funding is subject to financial review by the City. Based on the information contained in this report, it is
recommended to proceed with the improvements as outlined herein.
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
Page 8
APPENDIX A
Project Location Map
Typical Section
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
Sol l ° N
,
v � •
p •
ti ° u
3 •
rn ,
�.. W •
d
=i6
N
i
Shay IslandTr
co
Oj' W 1• �
a
wm 14
a�ac tiea' �
c
R
a �
UT o
' _
p UJ
poonna:joyg
J � '
Minnetrista d
e •
r •
W -
•
d •
t •
a
v �
ti•
,�o +a
e
O
p
G) O
00
N
iL
^
U
O
O
Z
U/
•O
d
[O
N
W
>
Q
U
O
z
Z
U
0
U �w
O
>E
Lu
Z
C:
E
'
W Lo o L W
O
M�
> m
T
W Z Of
co �0 7) vW
ra
E
p,
J4
O N Y O N m
U ra
W
O
o •
u f
Q U m W
W Q=)?
~
N
~ z
~a- C/)ma- (D
N
00C/)DLo C/) W
O
�
�
U Z � U
�•
c �5 C5 —0 LU
W ~ W Q' Q
r
Go a- Z
0 L
ti —
CN
N N N a0
a
zZ
7
I
N N
G
+
V °�
E
c6
•� C:
O
> m
_
>% ra
in
N
N
o
L
co
>
�
W
co
°
i
_
O
°
N
U_
LL W
U
a_,
06
N N ZO O O ZO BO N N
N N rl N N r-I r-I r-I r-I
� Z J
Q H W U Q
z 0 z 0 U H
a
N Q D a 0 0 0 0 0 0
= Z J Z Z Z
Lu Q Lu L DLu Q Q Q
Q U Q U U J U Q Q Q
O Z 2 Z Z W Z 2 2 2
DC W to W W O W to to to
r/�
APPENDIX B
Existing Roadway Conditions Summary
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
EXISTING ROADWAY CONDITIONS
Street
From
To
Length
Width
PACER
Rating
Road
Construction
[ft]
[ft]
Enchanted Lane
Minnetrista City Limits
Bridge
3100
22
7
1973
Shady Island Road
Bridge
Shady Island Circle
1200
22
5
1973
Enchanted Point
Enchanted Lane
east terminus
1300
16
n/a
1973
Enchanted Drive
Enchanted Lane
north terminus
1600
20
4
1973
Dellwood Lane
Enchanted Drive
northwest terminus
650
20
6
1973
Enchanted Cove
Enchanted Drive
east terminus
240
16
4
1973
Shady Island Point
Shady Island Circle
north terminus
380
16
5
1973
Shady Island Trail
Shady Island Circle
north terminus
270
16
5
1973
Shady Island Circle
Shady Island Road
Shady Island Road
1100
16
5
1973
lift station road
Shady Island Road
east terminus
430
16
n/a
1973
APPENDIX C
Pavement Forensics Investigation on Enchanted Lane /Shady Islands
prepared by WSB February 2017
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
A
WS
701 Xenia Avenue South I Suite 300 1 Minneapolis, MN 55416 1 (763) 541 -4800
February 20, 2017
Mr. Paul Hornby
City Engineer
5755 Country Club Road
Excelsior, MN 55331
Re: Pavement Forensics Investigation on Enchanted Lane /Shady Islands
WSB & Associates is pleased to submit this pavement forensics report detailing the results of the
pavement coring which were obtained on February 17, 2017 on the proposed mill and overlay or
reclamation project areas in the City of Shorewood. The various characteristics of the pavement cores
were analyzed in order to assist in determining the appropriate pavement rehabilitation method for each
roadway segment.
A total of 16 pavement cores were taken within the roadway segments. The locations of the pavement
cores are summarized in Figure 1 in this report and a summary of the pavement depths are shown on
Table 1 in this report.
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
C: \Users\aazary\Desktop \Coring \Shorewood Coring Results 01 17 17.d-
Mr. Paul Homby
February 20, 2017
Figure 1: Coring Locations
re 9 1
0 re 8
re 10
ore i3
ore 12 ore 7
ore 15 re 6
ore 11
ore 16
are 5
"ore 4
ore 3
ore 2
Building a legacy -your legacy.
Equal Opportunity Employer I wsbeng.com
C: \Users \amary\Desktop \Coring \Shorewood Coring Results 01 17 17.dmx
Mr. Paul Hornby
February 20, 2017
Table 1: Core Results
It should be noted that the areas that are being recommended for reclamation were found to have
underlying road mix material which is not structurally sound; this mix crumbles to the touch. There
was fabric found underlying Core 1 and Core 3. This should be made aware to the contractor prior to
construction.
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex
Aggregate Base
Recommendation
Core ID
Road Name
Bit Depth (inches)
Comments
1
Enchanted Lane
2.5
2 inches road mix
Reclamation
2
Enchanted Lane
9
2+ inches road mix
Reclamation
Sandy Gravel depth
Reclamation
3
Enchanted Lane
6.5
unknown
Sandy Gravel depth
Reclamation
4
Enchanted Lane
4.5
unknown
5
Enchanted Lane
5.5
5" Sandy Gravel
Reclamation
6
Shady Island Road
6
1" Sandy Gravel
Reclamation
6 inches Crushed
Reclamation
7
Shady Island Road
3.5
Limestone
8
Shady Island Trail
4
4 inches Limestone
Reclamation
6 inches Crushed
Reclamation
9
Shady Island Point
5
Limestone
6 inches Crushed
2" Mill and Overlay
10
Shady Island Circle
5.75
Limestone
11
Enchanted Drive
4.5
6 inches Class 5
2" Mill and Overlay
12
Enchanted Drive
4.5
6 inches Class 5
2" Mill and Overlay
13
Enchanted Cove
5.5
5 inches Class 5
2" Mill and Overlay
14
Enchanted Drive
4.5
6 inches Class 5
2" Mill and Overlay
15
Dellwood
3
4 inches Class 5
Reclamation
16
Dellwood
3.5
4 inches Class 5
Reclamation
It should be noted that the areas that are being recommended for reclamation were found to have
underlying road mix material which is not structurally sound; this mix crumbles to the touch. There
was fabric found underlying Core 1 and Core 3. This should be made aware to the contractor prior to
construction.
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex
Mr. Paul Hornby
February 20, 2017
Appendix A
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex
Mr. Paul Hornby
February 20, 2017
Enchanted Lane
CORE 2
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
IF s'
C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex
Mr. Paul Hornby
February 20, 2017
CORE 3
CORE 4
CORE 5
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex
Mr. Paul Hornby
February 20, 2017
Shady Island Road
CORE 6 C
Ll
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex
Mr. Paul Hornby
February 20, 2017
Shady Island Trail
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex
Mr. Paul Hornby
February 20, 2017
Shady Island Point
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex
Mr. Paul Hornby
February 20, 2017
Shady Island Circle
CORE AA)
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex
Mr. Paul Hornby
February 20, 2017
Enchanted Drive
CORE 11
CORE A-2
__& ON
ORE 14
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex
Mr. Paul Hornby
February 20, 2017
Enchanted Cove
CORE A-"3-
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex
Mr. Paul Hornby
February 20, 2017
Dellwood
h
CORE A-5
CORE A-0
Building a legacy —your legacy.
Equal Opportunity Employer I wsbeng.com
C:\ Users \aa ary\Desktop \Coring \Shorewood Coring Results 01 1717.doex
APPENDIX D
Cost Tables
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
Opinion of Probable Cost
WSB Project: Enchanted Island and Shady Island Street Reclamation Project Design By: KAK
Project Location: City of Shorewood Checked By: EE
City Project No.: 18 -11
WSBProjectNo: R- 012809 -000 Date: 1/8/2019
Item N o.
MN/DOT
Specification No.
Description
Unit
Estimated
Total Quantity
Estimated Unit
Price
Estimated Total
Cost
Schedule A. - Enchanted Island and Shady Island Reclamation Improvements
1
2021.501
MOBILIZATION
L S
1
$47,000.00
$47,000.00
2
2101.505
CLEARING
TREE
20
$400.00
$8,000.00
3
2101.505
GRUBBING
TREE
20
$400.00
$8,000.00
4
2104.502
REMOVE DRAINAGE STRUCTURE
EACH
4
$500.00
$2,000.00
5
2104.502
REMOVE MAIL BOX SUPPORT
EACH
5
$25.00
$125.00
6
2104.502
SALVAGE SIGN
EACH
30
$15.00
$450.00
7
2104.503
REMOVE SEWER PIPE (STORM)
L F
700
$10.00
$7,000.00
8
2104.503
REMOVE CONCRETE CURB
L F
100
$5.00
$500.00
9
2104.503
SAWING CONCRETE PAVEMENT (FULL DEPTH)
L F
500
$5.00
$2,500.00
10
2104.503
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
L F
1200
$3.50
$4,200.00
11
2104.504
REMOVE BITUMINOUS DRIVEWAY PAVEMENT
S Y
1300
$3.50
$4,550.00
12
2104.504
REMOVE CONCRETE DRIVEWAY PAVEMENT
S Y
600
$6.50
$3,900.00
13
2104.518
REMOVE RETAINING WALL
S F
200
$15.00
$3,000.00
14
2104.601
SALVAGE MISCELLANEOUS STRUCTURES
L S
1
$2,500.00
$2,500.00
15
2104.602
SALVAGE & REINSTALL MAILBOX
EACH
65
$100.00
$6,500.00
16
2105.504
GEOTEXTILE FABRIC TYPE 4
S Y
80
$5.00
$400.00
17
2105.603
MINOR GRADING
LUMP SUM
1
$2,500.00
$2,500.00
18
2123.610
STREET SWEEPER (WITH PICKUP BROOM)
HOUR
40
$150.00
$6,000.00
19
2215.504
FULL DEPTH RECLAMATION
SQ YD
20000
$5.00
$100,000.00
20
2331.603
JOINT ADHESIVE
L F
1000
$1.00
$1,000.00
21
2357.506
BITUMINOUS MATERIAL FOR TACK COAT
GAL
1100
$4.00
$4,400.00
22
2360.504
TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY
S Y
1300
$45.00
$58,500.00
23
2360.509
TYPE SP 9.5 WEARING COURSE MIX (3,C)
TON
2600
$85.00
$221,000.00
24
2360.509
TYPE SP 12.5 WEARING COURSE MIX (3,B)
TON
2600
$65.00
$169,000.00
25
2422.618
WOOD RETAINING WALL
S F
200
$25.00
$5,000.00
26
2501.502
12" CS PIPE APRON
EACH
10
$500.00
$5,000.00
27
2501.502
15" CS PIPE APRON
EACH
10
$600.00
$6,000.00
28
2501.502
12" RC PIPE APRON
EACH
4
$750.00
$3,000.00
29
2501.502
15" RC PIPE APRON
EACH
4
$850.00
$3,400.00
30
2501.503
12" CS PIPE CULVERT
L F
180
$35.00
$6,300.00
31
2501.503
15" CS PIPE CULVERT
L F
180
$38.00
$6,840.00
32
2503.503
12" RC PIPE SEWER DESIGN 3006 CLASS V
L F
80
$45.00
$3,600.00
33
2503.503
15" RC PIPE SEWER DESIGN 3006 CLASS V
L F
80
$45.00
$3,600.00
34
2503.602
CONNECT TO EXISTING STORM SEWER
EACH
1
$1,000.00
$1,000.00
35
2504.602
IRRIGATION SYSTEM REPAIR
EACH
5
$200.00
$1,000.00
36
2505.601
UTILITY COORDINATION
LS
1
$1,500.00
$1,500.00
37
2506.502
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL
EACH
2
$2,200.00
$4,400.00
38
2506.502
CONSTRUCT DRAINAGE STRUCTURE DESIGN G
EACH
2
$2,200.00
$4,400.00
39
2506.502
ADJUST FRAME AND RING CASTING (SANITARY)
EACH
46
$500.00
$23,000.00
40
2506.602
CHIMNEY SEALS
EACH
46
$250.00
$11,500.00
41
2511.507
RANDOM RIPRAP CLASS III
C Y
40
$200.00
$8,000.00
42
2531.503
CONCRETE CURB AND GUTTER DESIGN B618
L F
1000
$22.00
$22,000.00
43
2531.504
6" CONCRETE DRIVEWAY PAVEMENT
S Y
600
$65.00
$39,000.00
44
2535.503
BITUMINOUS CURB
LIN FT
1000
$25.00
$25,000.00
45
2540.602
MAIL BOX (TEMPORARY)
EACH
65
$50.00
$3,250.00
46
2540.602
MAIL BOX SUPPORT
EACH
5
$100.00
$500.00
47
2557.602
REPAIR DOG FENCE
EACH
5
$200.00
$1,000.00
48
2563.601
TRAFFIC CONTROL
L S
1
$5,000.00
$5,000.00
49
2564.502
INSTALL SIGN PANEL
EACH
30
$15.00
$450.00
50
2564.518
SIGN PANELS TYPE C
S F
32
$65.00
$2,080.00
51
2571.524
CONIFEROUS TREE 8' HT B &B
EACH
5
$650.00
$3,250.00
52
2571.524
DECIDUOUS TREE 2.5" CAL B &B
EACH
5
$650.00
$3,250.00
53
2573.501
STABILIZED CONSTRUCTION ENTRANCE
LS
1
$1,000.00
$1,000.00
54
2573.502
STORM DRAIN INLET PROTECTION
EACH
8
$200.00
$1,600.00
55
2573.503
SILT FENCE, TYPE MS
L F
9000
$2.00
$18,000.00
56
2573.503
SEDIMENT CONTROL LOG TYPE WOOD FIBER
L F
9000
$3.00
$27,000.00
57
1 2575.504
EROSION CONTROL BLANKET CATEGORY 3
S Y
500
$5.00
$2,500.00
58
1 2575.508
SEED MIXTURE 25 -151
LB
1000
$5.00
$5,000.00
Opinion of Probable Cost
WSB Project:
Enchanted Island and Shady Island Street Reclamation Project
Design By:
KAK
Project Location:
City of Shorewood
Checked By:
EE
City Project No.:
18 -11
WSBProjectNo:
R- 012809 -000
Date:
1/8/2019
MN/DOT
Estimated
Estimated Unit
Estimated Total
Item N o.
Specification No.
Description
Unit
Total Quantity
Price
Cost
Schedule A. - Enchanted Island and Shady Island Reclamation Improvements
59
2575.508
HYDRAULIC MULCH MATRIX
LB
10300
$2.00
$20,600.00
60
2575.510
PRUNETREES
HOUR
20
$100.00
$2,000.00
61
2575.604
SEEDING (INCL TOPSOIL AND FERT)
ACRE
4.2
$10,000.00
$42,000.00
Subtotal Schedule A. - Enchanted Island and Shady Island Street Reclamation Improvements
$985,045.00
+10% Contingency
$98,504.50
Subtotal Schedule A. - Enchanted Island and Shady Island Street Reclamation Improvements
$1,083,549.50
+ 27% Indirect Costs
$292,558.37
Total Schedule A. - Enchanted Island and Shady Island Street Reclamation Improvements
$1,376,107.87
Opinion of Probable Cost
WSB Project: Enchanted Island and Shady Island Street Reclamation Project Design By: KAK
Project Location: City of Shorewood Checked By: EE
City Project No.: 18 -11
WSBProjectNo: R- 012809 -000 Date: 1/8/2019
Item No.
MN/DOT
Specification No.
Description
Unit
Estimated
Total Quantity
Estimated Unit
Price
Estimated Total
Cost
Schedule B. - Enchanted Point Reclamation Improvements
62
2021.501
MOBILIZATION
LS
1
$8,400.00
$8,400.00
63
2101.505
CLEARING
TREE
10
$400.00
$4,000.00
64
2101.505
GRUBBING
TREE
10
$400.00
$4,000.00
65
2104.502
REMOVE MAIL BOX SUPPORT
EACH
2
$25.00
$50.00
66
2104.502
SALVAGE SIGN
EACH
5
$15.00
$75.00
67
2104.503
REMOVE SEWER PIPE (STORM)
L F
200
$10.00
$2,000.00
68
2104.503
SAWING CONCRETE PAVEMENT (FULL DEPTH)
L F
50
$5.00
$250.00
69
2104.503
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
L F
400
$3.50
$1,400.00
70
2104.504
REMOVE BITUMINOUS DRIVEWAY PAVEMENT
S Y
60
$3.50
$210.00
71
2104.504
REMOVE CONCRETE DRIVEWAY PAVEMENT
S Y
400
$6.50
$2,600.00
72
2104.601
SALVAGE MISCELLANEOUS STRUCTURES
L S
1
$1,000.00
$1,000.00
73
2104.602
SALVAGE & REINSTALL MAILBOX
EACH
18
$100.00
$1,800.00
74
2105.504
GEOTEXTILE FABRIC TYPE 4
S Y
40
$5.00
$200.00
75
2123.610
STREET SWEEPER (WITH PICKUP BROOM)
HOUR
10
$150.00
$1,500.00
76
2215.504
FULL DEPTH RECLAMATION
SQ YD
2400
$5.00
$12,000.00
77
2331.603
JOINT ADHESIVE
L F
100
$1.00
$100.00
78
2357.506
BITUMINOUS MATERIAL FOR TACK COAT
GAL
200
$4.00
$800.00
79
2360.504
TYPE SP 9.5 WEARING COURSE MIX (2,C) (3.0" THICK) DWY
S Y
400
$45.00
$18,000.00
80
2360.509
TYPE SP 9.5 WEARING COURSE MIX (3,C)
TON
310
$85.00
$26,350.00
81
2360.509
TYPE SP 12.5 WEARING COURSE MIX (3,B)
TON
310
$65.00
$20,150.00
82
2501.502
12" CS PIPE APRON
EACH
4
$500.00
$2,000.00
83
2501.502
15" CS PIPE APRON
EACH
6
$600.00
$3,600.00
84
2501.502
12" RC PIPE APRON
EACH
2
$750.00
$1,500.00
85
2501.502
15" RC PIPE APRON
EACH
2
$850.00
$1,700.00
86
2501.503
12" CS PIPE CULVERT
L F
80
$35.00
$2,800.00
87
2501.503
15" CS PIPE CULVERT
L F
120
$38.00
$4,560.00
88
2503.503
12" RC PIPE SEWER DESIGN 3006 CLASS V
L F
40
$45.00
$1,800.00
89
2503.503
15" RC PIPE SEWER DESIGN 3006 CLASS V
L F
40
$45.00
$1,800.00
90
2504.602
IRRIGATION SYSTEM REPAIR
EACH
2
$200.00
$400.00
91
2505.601
UTILITY COORDINATION
L S
1
$500.00
$500.00
92
2506.502
ADJUST FRAME AND RING CASTING (SANITARY)
EACH
6
$500.00
$3,000.00
93
2506.602
CHIMNEY SEALS
EACH
6
$250.00
$1,500.00
94
2511.507
RANDOM RIPRAP CLASS III
C Y
20
$200.00
$4,000.00
95
2531.503
CONCRETE CURB AND GUTTER DESIGN B618
L F
100
$22.00
$2,200.00
96
2531.504
6" CONCRETE DRIVEWAY PAVEMENT
S Y
60
$65.00
$3,900.00
97
2535.503
BITUMINOUS CURB
LIN FT
200
$25.00
$5,000.00
98
2540.602
MAIL BOX (TEMPORARY)
EACH
18
$50.00
$900.00
99
2540.602
MAIL BOX SUPPORT
EACH
2
$100.00
$200.00
100
2557.602
REPAIR DOG FENCE
EACH
2
$200.00
$400.00
101
2563.601
TRAFFIC CONTROL
LS
1
$1,500.00
$1,500.00
102
2564.502
INSTALL SIGN PANEL
EACH
5
$15.00
$75.00
103
2564.518
SIGN PANELS TYPE C
S F
32
$65.00
$2,080.00
104
2571.524
CONIFEROUS TREE 8' HT B &B
EACH
2
$650.00
$1,300.00
105
2571.524
DECIDUOUS TREE 2.5" CAL B &B
EACH
2
$650.00
$1,300.00
106
2573.501
STABILIZED CONSTRUCTION ENTRANCE
LS
1
$1,000.00
$1,000.00
107
2573.503
SILT FENCE, TYPE MS
L F
2000
$2.00
$4,000.00
108
2573.503
SEDIMENT CONTROL LOG TYPE WOOD FIBER
L F
2000
$3.00
$6,000.00
109
2575.504
EROSION CONTROL BLANKET CATEGORY 3
S Y
100
$5.00
$500.00
110
2575.508
SEED MIXTURE 25 -151
LB
200
$5.00
$1,000.00
111
2575.508
HYDRAULIC MULCH MATRIX
LB
1500
$2.00
$3,000.00
112
2575.510
PRUNE TREES
HOUR
10
$100.00
$1,000.00
113
2575.604
SEEDING (INCL TOPSOIL AND FERT)
ACRE
0.6
$10,000.00
$6,000.00
Subtotal Schedule B. - Enchanted Point Reclamation Improvements $175,400.00
+10% Contingency $17,540.00
Subtotal Schedule B. - Enchanted Point Reclamation Improvements $192,940.00
+ 27% Indirect Costs $52,093.80
Total Schedule B. - Enchanted Point Reclamation Improvements $245,033.80
TOTAL ENCHANTED ISLAND AND SHADY ISLAND STREET RECLAMATION PROJECT $1,621,141.67
APPENDIX E
Assessment Map
Assessment Roll
Feasibility Report
Enchanted Island and Shady Island Street Reclamation Project
City of Shorewood Project No. 18 -11
WSB Project No. R- 012809 -000
Document Path: K:\ 012809- 000 \GIS \MapsVAssessmentMap.mxd Date Saved 1/4/201994603AM (� \)
J N �
+J fA O
�
O
LO
°o
LO
IWO
Ii
t
® z-q<
U
Ul
1 �
O
^L
LL
r
N
U)
. M
N
a Cn Z
70
. 0
� O
Miffn—efri ' - _ a)
cn
- 0
L9 Jw
N
W u C)
Q U
0
c-
-------------------
. .
. .
. .
. .
. .
. .
. .
. .
. .
- -
- -
- -
- -
- -
- -
- -
- -
- -
. .
. .
z
. .
z z
. .
z z
. .
z z
. .
z z
. .
z z
. .
z z
- -\
E
o
U
. .
U U
. .
U U
. .
U U
. .
U U
. .
U U
. .
U U
. .
U u
. .
u u
. .
o
\ \
\ \
\ \
\ \\
\
\ \)
\
\ \
\ \)
I I
I I
izi
I I
I
I I
I I
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
Iq
10
. . z
. .
7-27-22""IMM,",
Z Z
z
z
Z2
2
Z2
Z2 Z2
22 Z2
Z2
Z. Z.
Z. Z.
Z. Z.
2z
<
�<�
z
e
0
z z
� z
0 z
z z
z z
z z
\\
\
5
5
z
5 5
E 5
zz 5
5 5
5 5
5 5
.
. .
El
E] E]
El
El El
El El
El El
zo-Z
z 0
z z
< <
<
<
< <
< <
< <
u
u
lu
u u
u
<Z
, u
u u
u z
z
z
I
z z
z
u z
zu zu
zu zu
z z
NN
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
00000000=0MOMOM08=08
z z
z z
z z
z z
z z
z z
z z
z z
z z
lu lu
z z
lu lu
z z
lu lu
z z
lu lu
z z
lu lu
z z
lu lu
z z
lu lu
z z
lu lu
z z
lu lu
z z
TH'I'l
1
0
0
\\(
\\
z
C..
z
z
z
:_\
\))
»)\((
\:
\
{\
z 6
_
I
�u
� Z
2
0 2�
1
U,
I ou
t�:.
u. 8.
u
�. u.
zu
E