Loading...
Western Shorewood Stormwater Management Plan Draft 1-23-20Western Shorewood Stormwater Management Plan Prepared for City of Shorewood DRAFT 1/23/2020 Western Shorewood Stormwater Management Plan Draft 1/23/2020 Contents 1 Introduction ............................................................................................................................................. ..............................1 1.1 Project Area ......................................................................................................................................... ..............................1 1.2 Past Studies ......................................................................................................................................... ..............................1 1.2.1 Hydrologic /Hydraulic Analysis Freeman Park Feasibility Study (April 2017) ....... ..............................1 1.2.2 Freeman Park Feasibility Study Summary Memorandum (May 2018) ................... ..............................1 1.2.3 Western Shorewood Water Resources Planning — MCWD Technical Review and Regulatory Analysis Memorandum (July 2018) ...................................................................................... ..............................1 1.2.4 HCRRA Stormwater Infrastructure Qualitative Failure Risk Analysis Memorandum (February 2018) ................................................................................................................................................ ............................... 2 1.3 Project Scope ...................................................................................................................................... ..............................2 1.4 Project Goals ....................................................................................................................................... ..............................3 2 Existing Conditions ................................................................................................................................ ..............................5 2.1 Summary of Drainage Issues ........................................................................................................ ..............................5 2.1.1 Shorewood Oaks ......................................................................................................................... ..............................5 2.1.2 Strawberry Lane ........................................................................................................................... ..............................6 2.1.3 Freeman Park ................................................................................................................................ ..............................6 2.1.4 Beverly Drive and Cajed Lane Wetlands ............................................................................. ..............................7 2.1.5 Grant Lorenz Channel ................................................................................................................ ..............................7 2.1.6 Noble Road .................................................................................................................................... ..............................9 2.2 XP -SWMM Model Updates ........................................................................................................... ..............................9 2.2.1 Design Storm Event Results ................................................................................................... .............................10 2.2.2 Potentially Impacted Structures ........................................................................................... .............................10 2.3 Water Quality Evaluation .............................................................................................................. .............................14 2.3.1 P8 Model Development ........................................................................................................... .............................14 2.3.2 Minnesota Board of Water and Soil Resources ( BWSR) .............................................. .............................14 2.3.3 Pollutant Loads & Existing Removals ................................................................................. .............................14 2.4 Other Background Information .................................................................................................. .............................19 2.4.1 Minnesota Department of Natural Resources (MnDNR) Public Waters ............... .............................19 2.4.2 United States Fish and Wildlife Service (USFWS) National Wetlands Inventory (NWI) ...............19 2.4.3 MCWD Functional Assessment of Wetlands (FAW) Inventory ................................. .............................19 P: \Mpls \23 MN \27 \23271686 Western Shorewood StormwaterM \WorkFiles\ Report\ WestemShorewoodStormwaterManagementPlan _DRAFT_012320120.docx 3 Proposed Conditions ........................................................................................................................... .............................23 3.1 Preliminary Alternatives Analysis ............................................................................................... .............................23 3.1.1 Planning Level Costs ................................................................................................................. .............................23 3.2 Preferred Alternatives Analysis ................................................................................................... .............................24 3.2.1 Shorewood Oaks ........................................................................................................................ .............................26 3.2.2 Strawberry Lane .......................................................................................................................... .............................29 3.2.3 Freeman Park ............................................................................................................................... .............................36 3.2.4 Beverly Drive and Cajed Lane Wetlands ............................................................................ .............................39 3.2.5 Grant Lorenz Channel ............................................................................................................... .............................42 3.2.6 Noble Road ................................................................................................................................... .............................49 4 Recommended Plan ............................................................................................................................. .............................52 4.1.1 Combined Evaluation ................................................................................................................ .............................52 4.1.2 Recommended Project Implementation, Cost, and Sequencing ............................. .............................57 4.1.3 Potential Funding Sources ...................................................................................................... .............................58 List of Tables Table 2 -1 Existing Conditions XP -SWMM Model Results for Flood Elevations and Potentially- Impacted Structures............................................................................................................................... .............................12 Table 2 -2 Grant Lorenz and Pebble Brook Creek Existing Conditions Results ............................ .............................13 Table 2 -3 Existing Conditions Summary of Annual P8 Pollutant Load Reductions ................... .............................17 Table 2 -4 Existing Conditions Summary of Annual Pollutant Loads Related to Erosion ......... .............................18 Table 3 -1 Preferred Alternatives Summary ................................................................................................ .............................25 Table 3 -2 Estimated Treatment Volumes to Meet MCWD Rules for Strawberry Lane CIP Project ...................30 Table 4 -1 Recommended Plan XP -SWMM Model Results for Flood Elevations and Potentially- Impacted Structures............................................................................................................................. ............................... 55 Table 4 -2 Recommended Plan XP -SWMM Results along the Grant Lorenz Channel and Pebble Brook Creek...................................................................................................................................... ............................... 56 Table 4 -3 Recommended Plan Estimated Pollutant Load Reductions .......................................... ............................... 56 Table 4 -4 Summary of Western Shorewood Stormwater Management Recommended Plan ........................... 58 Table 4 -5 Summary of Potential Grant Funding Sources ..................................................................... .............................60 List of Figures Figure 1 -1 Western Shorewood Project Area ............................................................................................. ..............................4 Figure 2 -1 Existing Conditions along the Grant Lorenz Channel (Upstream (a) to Downstream (d) from GrantLorenz Road) .............................................................................................................. ..............................8 Figure 2 -2 Existing Conditions Atlas 14 100 -Year, 24 -Eour Event Inundation ........................... ............................... 11 Figure 2 -3 Existing Conditions P8 Pollutant Model BMPs ................................................................. ............................... 16 Figure2 -4 MnDNR Public Waters .................................................................................................................. .............................20 Figure 2 -5 USFWS National Wetland Inventory ....................................................................................... .............................21 Figure2 -6 MCWD Wetland Inventory .......................................................................................................... .............................22 Figure 3 -1 Shorewood Oaks Preferred Alternatives (5O1, SO2) ........................................................ .............................28 Figure 3 -2 Strawberry Lane Preferred Alternative ( SL1) ........................................................................ .............................34 Figure 3 -3 Strawberry Lane Preferred Alternative ( SL2) ........................................................................ .............................35 Figure 3 -4 Freeman Park Preferred Alternative ( FP1) ............................................................................ .............................38 Figure 3 -5 Beverly Drive and Cajed Lane Preferred Alternative ( 131) ............................................... .............................41 Figure 3 -6 Grant Lorenz Preferred Alternative (GL1) ............................................................................. .............................47 Figure 3 -7 Grant Lorenz Preferred Alternative (GL2) ............................................................................. .............................48 Figure 3 -8 Noble Road Preferred Alternative ( NR1) ............................................................................... .............................51 Figure 4 -1 Western Shorewood Recommended Plan ......................................................................... ............................... 54 List of Appendices, Attachments, or Exhibits Appendix A Western Shorewood Stormwater Management Plan: Preliminary Alternatives Review Meeting iv Presentation Slides (11/7/2019) Appendix B Western Shorewood Stormwater Management Plan: Preferred Alternatives Review Meeting Presentation Slides (12/18/2019) Appendix C Western Shorewood Stormwater Management Plan: City Council Work Session Presentation Slides (1/27/2020) Appendix D Western Shorewood Stormwater Management Plan: Open House Boards (TBD) Appendix E Western Shorewood Stormwater Management Plan: Preferred Alternatives Planning Level Engineer's Opinion of Probable Cost iv Certification I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Minnesota. Jennifer Koehler, PE Date MN PE #: 47500 Abbreviations ASTM American Society for Testing and Materials BWSR Board of Water and Soil Resources CFS Cubic feet per second CIP Capital Improvement Project CMP Corrugated Metal Pipe FAW Functional Assessment of Wetlands HCRRA Hennepin County Regional Railroad Authority HSG Hydrologic Soil Group MCWD Minnehaha Creek Watershed District MnDNR Minnesota Department of Natural Resources MPCA Minnesota Pollution Control Agency MSL Mean Sea Level NOAA National Oceanic and Atmospheric Administration NPDES National Pollution Discharge Elimination System NURP Nationwide Urban Runoff Program NWI National Wetland Inventory P8 Program for Predicting Polluting Particle Passage through Pits, Puddles, & Ponds PVC Polyvinyl Chloride PWI Public Waters Inventory RCP Reinforced Concrete Pipe SSURGO Soil Survey Geographic Database TP Total Phosphorus TSS Total Suspended Solids USFWS United States Fish and Wildlife Service Vi I Introduction Barr was directed by City of Shorewood staff to develop a comprehensive stormwater management plan (Plan) for the western portion of the City of Shorewood that has historic and ongoing drainage issues. This Plan builds off previous drainage investigations and feasibility studies completed for the City of Shorewood (WSB, 2017; WSB, 2018) and considers feedback provided by the Minnehaha Creek Watershed District (MCWD, 2018) and city staff. 1.1 Project Area The project area includes the western portion of the City of Shorewood from Highway 7 on the south, Edgewood Road to the north, Howards Point Drive to the west, and Seamans Drive to the east. Figure 1 -1 shows the watersheds included in the study area along with the six areas identified to have drainage concerns. These areas are further discussed in Chapter 2. 1.2 Past Studies 1.2.1 Hydrologic /Hydraulic Analysis Freeman Park Feasibility Study (April 2017) The Hydrologic /Hydraulic Analysis Freeman Park Feasibility Study was completed by WSB and Associates. Inc. for the City of Shorewood (dated April 5, 2017) which evaluated five drainage issues within the Freeman Park subwatershed. 1.2.2 Freeman Park Feasibility Study Summary Memorandum (May 2018) The Freeman Park Feasibility Study Summary Memorandum was completed by WSB and Associates. Inc. for the City of Shorewood (dated May 22, 2018) and summarized the recommendations and results from the Hydrologic /Hydraulic Analysis Freeman Park Feasibility Study. 1.2.3 Western Shorewood Water Resources Planning - MCWD Technical Review and Regulatory Analysis Memorandum (July 2018) The Western Shorewood Water Resources Planning — MCWD Technical Review and Regulatory Analysis Memorandum was completed by MCWD staff (dated July 26, 2018) and summarized the MCWD regulatory and CHAPTER SUMMARY technical analysis of the proposed series of drainage solutions for western Shorewood identified in the Freeman Park Feasibility Study Summary Memorandum. 1.2.4 HCRRA Stormwater Infrastructure Qualitative Failure Risk Analysis Memorandum (February 2018) The Hennepin County Regional Railroad Authority (HCRRA) Stormwater Infrastructure Qualitative Failure Risk Analysis was completed in 2018 along all the corridors within the HCRRA jurisdiction to evaluate the likelihood of stormwater infrastructure failure and the possible consequences of failure and help prioritize infrastructure maintenance and replacement efforts. The analysis used spatial data of HCRRA's stormwater infrastructure and other parameters related to topography, hydrology, soils, other county and public infrastructure data (roads, trails, railroads, structures, etc.), and stormwater infrastructure inspection data. This included evaluation of all known culverts and storm sewers crossing the Lake Minnetonka LRT Regional Trail through the City of Shorewood including the outlet located at Freeman Park. 1.3 Project Scope The scope of the Plan is to build off of previous work, recommendations, and review comments to further evaluate alternatives to improve drainage conditions in the six drainage areas shown in Figure 1 -1. This scope included: • Topographic survey of select areas including: o Pipe inverts, materials and structure details for the outlet from Freeman Park, at Smithtown Road (downstream of Freeman Park), at Edgewood Road, and at the outlet from wetland south of Beverly Drive. • Cross - sections along the Grant Lorenz Channel where private property access was granted • Survey not completed as part of this Plan included utility survey, tree survey, cross - sections along Pebble Brook (access not granted), or wetland delineations. Additional survey will need to be completed as the city progresses with the implementation of the recommendations from the Plan. • Updates to the existing conditions XP -SWMM model provided by WSB and evaluation of the Atlas 14 design storms for 1, 2, 10, and 100 -year, 24 hour events that can be used for the evaluation of drainage improvement alternatives • Development of inundation mapping and potentially impacted structures for the Atlas 14 100- year, 24 -hour design storm event • Creation of an existing conditions P8 model (based on the updated XP -SWMM model) to evaluated existing pollutant loads and removals that can be used for the evaluation of drainage improvement alternatives • Evaluation of drainage improvement alternatives for the six drainage areas identified by the city, including conceptual design, impacts on flood elevations and flows and water quality improvement (if applicable), planning level opinions of probable cost, and permitting consideration • Development of the Plan document • Meetings including alternative and plan review meetings with City and MCWD staff, a City Council work session and a public open house to review the preferred alternative, and presentation of the final plan to the City Council 1.4 Project Goals The intent of this Plan is to identify preferred drainage improvement options in areas of known drainage issues that can be incorporated into the City of Shorewood's larger capital improvement project (CIP) planning efforts. The Plan includes conceptual designs and recommendations for the preferred alternatives, planning level engineer's opinions of probable cost, permitting considerations, implementation phasing recommendations, and identification of potential partnerships and funding sources. 2 Existing Conditions The Plan investigates opportunities to improve drainage at six locations as CHAPTER identified by the City, including: SUMMARY • Shorewood Oaks (Area 1) • Strawberry Lane (Area 2) • Freeman Park (Area 3) • Beverly Drive and Cajed Lane Wetlands (Area 4) • Grant Lorenz Channel (Area 5) • Noble Road Area (Area 6) These areas have had historic and ongoing drainage issues. The following section summarizes the existing drainage issues and also summarizes the results of the existing conditions hydrologic and hydraulic modeling (XP- SWMM) and pollutant loading modeling (P8). 2.1 Summary of Drainage Issues 2.1.1 Shorewood Oaks Approximately 50 residences along Shorewood Oaks Drive and Oak Leaf Trail are served by a sump pump collection system that runs parallel to the roads in the development. The sump pump collection system includes the private foundation drains, sump pump discharge pipes from each residence, and two 6 -inch PVC collector pipes (both solid and perforated). Ultimately the 6 -inch collector pipes connect to a storm sewer manhole located at the low point on Shorewood Oaks Drive and drains north via the 48 -inch storm sewer to Freeman Park. Given the perforations in the 6 -inch PVC collector pipes, it is possible that the sump pump collection system is also intercepting and conveying groundwater in the area. The portion of the sump pump collection system within the right of way is owned and operated by the city, while the sump pump systems and connections to the larger system are private. The sump pump collection system discharges to the storm sewer manhole at the invert of the manhole (962.52 ft MSL) with much of the sump collection system below elevation 964.0 ft MSL. During larger, intense storm events, the storm sewer surcharges above the invert of the sump system for longer durations reducing the capacity of the system to convey water pumped by the private sump pump systems. During these conditions, sump pumps may not be able to keep up with pumping water collecting in the sumps and this can result in flooding of private property. 2.1.2 Strawberry Lane The Strawberry Lane area north of the HCRRA Lake Minnetonka LRT Regional Trail is prone to standing water adjacent to the roadway due to the flat topography along the section of road. Strawberry Lane currently had a rural road section with no curb and gutter and minimal storm sewer collection. There are two existing ponds located on the west side of Strawberry Lane, on the northwest and southwest side of the intersection of Strawberry Court and Strawberry Lane, connected by 12 -inch CMP pipe. Runoff from this area leaves the southernmost pond via a 12 -inch CMP pipe discharging to the east. Additionally, a perforated drain tile system was installed in the ditches parallel to the roadway in 1995 intending to help promote drainage of water from the area. Although city staff are not aware of any structures impacted by high water conditions, standing water in the low areas adjacent to the roadway remains an ongoing issue. Runoff from the northern portion of Strawberry Lane that does reach the existing ponds and downstream conveyance system eventually discharges to Pebble Brook Creek, which is drainage channel that receives intermittent flow, located east of Strawberry Lane and north of Peach Circle. During large storm events, runoff from the watershed collecting on the west side of Strawberry Lane overtops the existing roadway flowing overland east to Pebble Brook Creek. This channel is located on private property and conversations with city staff indicate that there is erosion along the drainageway. Flows from this area ultimately reach the storm sewer crossing at Smithtown Road and then discharges to the channel that runs parallel to Grant Lorenz Road (the Grant Lorenz channel). 2.1.3 Freeman Park The outlet structure located in Freeman Park on the south side of the Lake Minnetonka LRT Regional Trail results in significant and ongoing maintenance issues for Public Works staff with debris collecting and plugging the outlet structure. Reduced capacity at the outlet impacts peak water levels in the low area of Freeman Park during storm events, which can exacerbate conditions for the Shorewood Oaks sump pump collection system and can also result in temporary standing water on the sport /ball fields adjacent to the low area. Additionally, this outlet structure and storm sewer at the Lake Minnetonka LRT Regional Trail was flagged as critical by the HCRRA Stormwater Infrastructure Qualitative Failure Risk Assessment (Feb 2018), indicating pipejoint separation along the 48 -inch RCP pipe downstream of the outlet structure. Discharge from Freeman Park is currently controlled by an 18 -inch PVC pipe going into the outlet structure, with a control elevation of approximately 959.5 ft MSL. Flows from Freeman Park ultimately reach the storm sewer crossing at Smithtown Road and then discharges to the Grant Lorenz channel. Because of the size of this outlet and the storage in the low area of Freeman Park, this area already provides significant rate control of discharge to Smithtown Road and the Grant Lorenz channel. 2.1.4 Beverly Drive and Cajed Lane Wetlands There have been ongoing drainage issues around the two wetlands located near the intersection of Beverly Drive and Cajed Lane. One wetland is located south of Beverly Drive and the other wetland is located northwest of the intersection. The wetland located south of Beverly Drive is drained by the private 8 -inch tile line that drains north to Beverly Drive, through the backyards of homes located northwest of the intersection of Beverly Drive and Cajed Lane although the system has no official inlet in these backyards. The tile line continues north along Cajed Lane and ultimately discharges to the large wetland south of Edgewood Road before reaching Lake Minnetonka. The private tile line has collapsed north of Beverly Drive, resulting in flooding of the backyards of the adjacent homes and the southern portion of Woodside Cemetery. Prior to the tile line collapse, this low area in was primarily landlocked, with flows only draining to the north during the 100 -year storm event. However, with the collapsed tile line, this low area, which is nearly the same elevation as the wetland on the south side of Beverly Drive, is currently flooded by water from the wetland south of Beverly Drive. Additionally, a home on the wetland south of Beverly Drive is known to be at -risk of flooding with the surveyed low opening of the home being below the estimated peak flood elevations during the 10 -year and 100 -year events. 2.1.5 Grant Lorenz Channel The channel along Grant Lorenz Road begins north of the Smithtown Road, flows under several driveway culverts on the west side of Grant Lorenz Road and ending just downstream of Noble Road. The channel is approximately 1,800 feet long and conveys runoff from the entire watershed north of Smithtown Road, including the watersheds to Strawberry Lane and Pebble Brook area, Freeman Park, and a smaller watershed to the east of storm sewer crossing at Smithtown Road. The total watershed area is approximately 322 acres. The channel between Smithtown Road and Grant Lorenz Road appears to be stable (not eroding) with the banks being well- vegetated and the flows regularly connecting with the adjacent floodplain. However, downstream from Grant Lorenz Road, poorly vegetated banks in combination with high flows /velocities have resulted in ongoing erosion along banks, downcutting of the stream channel, and contributing sediment loads to the downstream wetland. Additionally, during high flows, water levels in the channel impact private property, historically overtopping the driveways and destroying several culverts. Figure 2 -1 shows recent photos of erosion along the Grant Lorenz channel downstream of Grant Lorenz Road taken in April 2019. The Grant Lorenz channel is located entirely on private property and the City of Shorewood currently does not have a drainage and utility easement over the length of the channel. Based on the results of the previous feasibility study, in 2018, the City of Shorewood purchased the approximately 5 acre parcel at 26245 Smithtown Road (between Smithtown Road and the Lake Minnetonka LRT Regional Trail) for the construction of a stormwater pond to provide both flood storage and rate control into the Grant Lorenz channel and water quality treatment (pollutant removal) of runoff from the contributing watersheds. a) c) b) d) Figure 2 -1 Existing Conditions along the Grant Lorenz Channel (Upstream (a) to Downstream (d) from Grant Lorenz Road) 2.1.6 Noble Road Based on conversations with City staff, our understanding is that the low point on Noble Road between Grant Lorenz Road and Edgewood Road is temporarily flooded during larger events (e.g. the 100 -year event). Also, the intersection of Noble Road and Grant Lorenz Road can be temporarily inundated during larger events (e.g. the 10 -year and 100 -year events). This is likely due to a reduction in the conveyance capacity of the Grant Lorenz channel north of Noble Road. Additionally, the as -built drawings indicated the culverts at Noble Road are two 48 -inch equivalent arch pipes with minimal cover. The drawing also indicates pipe inverts of 933.0 ft MSL while the MnDNR LiDAR data suggests the invert of the channel downstream of 935.5 ft MSL, suggesting there is approximately 2.5 feet of standing water in these pipes, also reducing their conveyance capacity. 2.2 XP -SWMM Model Updates For this study, Barr utilized the XP -SWMM model originally developed by WSB and Associates as part of the Hydrologic /Hydraulic Analysis Freeman Park Feasibility Study. However, model inputs were reviewed, and the model was updated based on additional information compiled as part of this study, especially in the areas around the key study areas. This additional information included: • Addition of subwatersheds around the Beverly Drive wetland the large wetland south of Edgewood Road • Subdivision of existing subwatersheds near Shorewood Oaks Drive and the north end of Grant Lorenz Road • As -built data provided by City staff • Outlet and storm sewer survey data collected by Barr at the following locations: • Beverly Drive (surveyors unable to located outlet from wetland, assumptions about system made based on conversation and information from City staff) • Freeman Park • Smithtown Road • Noble Road • Edgewood Road • Cross - section survey data collected by Barr along the Grant Lorenz channel where private property access was granted by property owners • Cross - section data based on Minnesota Department of Natural Resources (MnDNR) 2011 LiDAR elevation data along Pebble Brook • Tailwater boundary condition at Lake Minnetonka Gray's Bay Dam operating elevation I 2.2.1 Design Storm Event Results Once updated, the XP -SWMM model was used to evaluate the National Oceanic and Atmospheric Administration (NOAA) Atlas 14 design storm events using the nested storm distribution for the following events: • 1 -year, 24 -hour (2.49 inches; 100% chance of event happening in any given year) • 2 -year, 24 -hour (2.86 inches; 50% chance of event happening in any given year) • 10 -year, 24 -hour (4.25 inches; 10% chance of event happening in any given year) • 100 -year, 24 -hour (7.31 inches; 1% chance of event happening in any given year) The existing conditions peak flood elevations for the four design storm events are summarized by subwatershed in Table 2 -1. The existing slopes, bank full depth, peak flows, peak velocities, maximum depth, and estimated shear for the four design storm events for the modeled reaches of the Grant Lorenz channel and Pebble Brook are summarized in Table 2 -2. An approximate inundation map of the peak flood elevation for the Atlas 14 100 -year, 24 -hour design storm event was developed using the XP -SWMM model results and the MnDNR 2011 LiDAR elevation data using a level pool methodology in each modeled subwatershed. The approximate 100 -year inundation areas are shown in Figure 2 -2. 2.2.2 Potentially Impacted Structures To better understand potential flooding /drainage impacts, a GIS analysis was completed utilizing the Microsoft Building Footprints (2018) GIS layer and MnDNR 2011 LiDAR topographic data to estimate the approximate low opening on a structure (e.g. low opening assumed the lowest elevation along the structure edge). At a planning level, this will help understand the number of structures that may be impacted by flooding under existing conditions and also evaluate potential impacts from proposed drainage improvements. However, we would recommend collection of actual low opening survey data for the lowest structures around the targeted areas as the city moves forward with final design of the recommended projects. The number of potentially impacted structures are summarized in Table 2 -1. Structures are summarized as: • At -risk: the estimated 100 -year peak elevation is greater than the estimated low opening • Within 2 -feet of Freeboard: the estimated 100 -year peak elevation is lower than but within 2 -feet of the estimated low opening UN Table 2 -1 Existing Conditions XP -SWMM Model Results for Flood Elevations and Potentially- Impacted Structures bwatershedIll Flood Area Area ii Flood Elevation 10-year (ft.) 2-year MLNo. of buildings at risk No. of buildings within 2-ft freeboard A Grant Lorenz Channel 3.4 938.1 937.7 937.4 936.8 1 B Grant Lorenz Channel 7.2 941.5 940.1 939.0 938.6 -- -- BEV Beverly Dr. and Ca'ed Ln. Wetlands 23.4 953.3 951.8 950.9 950.6 1 C Grant Lorenz Channel 6.0 938.0 937.7 937.6 937.6 -- -- CAJ Beverly Dr. and Ca'ed Ln. Wetlands 7.5 949.0 948.1 947.5 947.3 -- 3 D Grant Lorenz Channel 1.8 948.1 946.3 940.9 940.3 1 -- E Grant Lorenz Channel 3.5 951.9 946.9 943.5 943.1 -- 1 F Grant Lorenz Channel 9.4 953.7 950.5 949.0 948.6 3 -- G Grant Lorenz Channel 15.6 953.8 951.5 950.3 949.6 1 2 H 8.7 956.5 953.5 952.4 952.2 -- -- 1 13.5 956.5 954.0 952.7 952.5 -- -- 1 6.4 956.5 954.6 954.1 954.0 1 1 K Freeman Park 63.1 969.5 966.5 963.3 962.4 -- -- L Strawberry Lane 8.4 970.5 970.3 969.6 968.9 5 M1 Strawberry Lane 22.4 971.9 971.7 971.6 971.5 3 M2 Strawberry Lane 6.5 971.0 970.8 970.7 970.6 1 3 N Strawberry Lane 4.9 969.1 968.3 967.0 966.8 -- O Strawberry Lane 7.1 970.6 970.3 969.5 968.9 -- 1 P 9.3 975.0 974.5 974.0 973.8 3 13 Q1 Shorewood Oaks 8.3 975.1 974.4 973.0 972.7 3 9 Q1.2 Shorewood Oaks 11.8 975.1 974.8 974.7 974.6 1 9 Q2 Shorewood Oaks 26.7 970.9 966.5 964.4 964.1 -- 2 Q3 Shorewood Oaks 4.6 974.5 1 969.9 969.5 969.5 1 3 Q4 Shorewood Oaks 2.6 974.5 973.2 973.1 973.0 4 R 4.7 969.4 969.1 968.6 968.4 2 S 47.1 976.4 975.2 974.7 974.6 -- -- U1 Grant Lorenz Channel 45.4 932.9 931.4 930.6 930.4 3 3 U2 Grant Lorenz Channel 14.2 935.3 931.4 930.6 930.4 -- 4 V 5.1 969.5 969.3 968.7 968.5 -- 4 WET 309.4 932.4 931.3 930.6 930.3 1 3 Table 2 -2 Grant Lorenz and Pebble Brook Creek Existing Conditions Results Grant Lorenz Channel G (upstream) 0.9 1.7 203.2 64.9 31.1 23.7 3.8 3.9 3.9 3.9 6.5 4.2 3.0 2.3 3.7 2.4 1.7 1.3 F 0.5 1.2 231.7 87.3 40.8 30.6 2.0 1.9 1.8 1.8 7.1 3.8 2.3 2.0 2.2 1.2 0.7 0.6 E 1.1 5.4 245.4 95.2 44.2 32.9 5.4 5.4 5.0 4.6 10.8 5.7 2.4 2.0 7.6 4.0 1.7 1.4 D 1.2 4.4 250.9 95.6 45.5 33.9 4.9 4.9 4.8 4.7 10.1 8.3 2.9 2.2 7.5 6.1 2.1 1.7 B 0.1 5 264.1 96.0 46.2 34.4 5.4 3.4 2.6 2.4 4.6 3.2 2.3 2.0 0.3 0.2 0.1 0.1 A (downstream) 1.2 3.8 267.6 98.4 47.2 35.3 6.6 5.3 4.2 4.1 4.1 3.7 3.4 2.8 3.0 2.7 2.5 2.0 Pebble Brook Creek Upstream 1.2 0.3 135.0 26.4 6.8 5.7 5.9 3.5 2.1 2.0 3.0 1.1 0.6 0.5 2.3 0.8 0.4 0.4 Downstream 2.0 2.2 134.3 26.4 6.8 5.7 4.5 3.3 2.1 2.0 5.8 2.5 1.7 1.5 7.1 3.1 2.1 1.9 2.3 Water Quality Evaluation 2.3.1 P8 Model Development To evaluate existing pollutant loads and removals by the existing ponds and wetlands in the watershed, a P8 (Program for Predicting Polluting Particle Passage through Pits, Puddles, and Ponds) water quality model (version 3.5) was developed based on the watershed, soils, storage, and infrastructure inputs from the existing conditions XP -SWMM model. An assumed permanent pool depth of 3 feet was used for wet ponds (based on review of aerial photos) modeled in P8, as no permanent pool storage information below the control elevation was included in the XP -SWMM model for the existing ponds and wetlands. The P8 model was used to estimate watershed runoff and pollutant loads from each subwatershed, utilizing the Nationwide Urban Runoff Program (NURP) median particle and pollutant load file (NURP50). We used hourly precipitation and daily average temperature data from the Minneapolis -St. Paul International Airport for continuous simulation for 18 years (2000 -2018) to estimate average annual pollutant loads and removals in the Western Shorewood project area. 2.3.2 Minnesota Board of Water and Soil Resources (BWSR) The P8 model is limited to evaluating pollutant loads generated by the watershed surfaces and can estimate pollutant removals using standard stormwater management practices. However, the P8 model cannot account for pollutant loads associated with erosion in- channel or along stream banks. The Minnesota BWSR Pollution Reduction Estimator (September 2010) was used to estimate sediment and total phosphorus loads from the erosion along Pebble Brook Creek and the Grant Lorenz channel. Historic survey data of the existing channels is not available to estimate the actual rate of erosion in these locations. As a result, for these planning level estimates, we have used our experience with other stream bank and channel erosion studies conducted in the Twin Cities area to estimate a rate of erosion given the dimensions of the existing channel and photos of the current conditions of the channel. 2.3.3 Pollutant Loads & Existing Removals Using the P8 pollutant loading model, we were able to quantify the estimated average annual total suspended solids (TSS) and total phosphorus (TP) pollutant load reductions by existing ponds and wetlands in the existing study area watershed. We also summarized the average annual pollutant removal efficiency (as a percentage of the pollutant load to the pond or wetland). For Pebble Brook Creek and the Grant Lorenz channel, the BWSR tool was used to estimate the existing annual TSS and TP loads resulting from erosion in these channels. With the reduction in peak flows and velocities in these channels along with the implementation of stabilization measures, these estimated numbers reflect the amount of pollutant reduction that could be achieved if improvements are made. 14 Figure 2 -3 shows the Western Shorewood project area and the ponds and wetlands that were modeled in the existing conditions P8 model. Table 2 -3 summarizes the P8 model estimated average annual TSS and TP pollutant removals as well as the estimated annual removal efficiencies of the ponds and wetlands, where appropriate. Table 2 -3 summarizes estimated annual TSS and TP loads resulting from erosion in the Pebble Brook Creek and Grant Lorenz channels. Table 2 -3 Existing Conditions Summary of Annual P8 Pollutant Load Reductions 17 A Grant Lorenz Channel -- -- -- -- -- B Grant Lorenz Channel Wet Pond 690 72% 1.3 43% BEV Beverly Dr. and Cajed Ln. Wetlands Wet Pond 1501 87% 3.1 57/0 ° C Grant Lorenz Channel -- -- -- -- -- CAJ Beverly Dr. and Cajed Ln. Wetlands -- -- -- -- D Grant Lorenz Channel -- -- -- -- -- E Grant Lorenz Channel -- -- -- -- -- F Grant Lorenz Channel -- -- -- -- -- G Grant Lorenz Channel -- -- -- -- -- J -- Wet Pond 620 32% 0.5 8.7% K Freeman Park Wet Pond 5842 65% 9.2 30% L Strawberry Lane Wet Pond 700 78% 1.4 48% M1 Strawberry Lane Wet Pond 2800 92% 6.2 65% M2 Strawberry Lane Infil assn n Basin 280 34% 0.4 7% N Strawberry Lane Wet Pond 384 65% 0.7 30% O Strawberry Lane Wet Pond 869 58% 1.9 21% Q1 Shorewood Oaks -- -- -- -- -- Q1.2 Shorewood Oaks -- -- -- -- -- Q2 Shorewood Oaks -- -- -- -- -- Q3 Shorewood Oaks -- -- -- -- -- Q4 Shorewood Oaks -- -- -- -- -- R-- -- -- -- -- S -- Wet Pond 2293 92% 5.0 64% U1 Grant Lorenz Channel Wet Pond 10512 71% 25.1 38% U2 Grant Lorenz Channel -- -- -- -- -- WET -- Wet Pond 4646 21% 4.9 5% 17 Table 2 -4 Existing Conditions Summary of Annual Pollutant Loads Related to Erosion R3 2.4 Other Background Information The following section outlines additional existing information for the Western Shorewood project area that was reviewed when determining potential permitting needs and requirements for projects. Although these inventories can help with planning, an actual wetland boundary determination will be required during the final design and permitting process for any project. 2.4.1 Minnesota Department of Natural Resources (MnDNR) Public Waters Public waters are all basins and watercourses that meet the criteria set forth in Minnesota Statutes, Section 103G.005, subd. 15 that are identified on Public Water Inventory maps and lists authorized by Minnesota Statutes, Section 103G.201. Most work done within a public waters basin or watercourse requires a permit from the MnDNR. Figure 2 -4 shows the MnDNR public waters within the Western Shorewood project area. 2.4.2 United States Fish and Wildlife Service (USFWS) National Wetlands Inventory (NWI) The USFWS is responsible for the mapping of wetlands across the country. To date, the NWI coverage includes nearly 100 percent of the contiguous United States, including the State of Minnesota. Using National Aerial Photography Program (NAPP) imagery (typically dated from 1978 through 1988) in conjunction with limited field verification, the USFWS identified and delineated wetlands, produced detailed maps on the characteristics and extent of the national wetlands and constructed a national wetlands database as part of the NWI. The NWI for the east - central portion of Minnesota was updated from 2010 -2013. Figure 2 -5 shows the location of potential wetlands identified in the NWI within the Western Shorewood project area. 2.4.3 MCWD Functional Assessment of Wetlands (FAW) Inventory In 2001 -2003, the MCWD undertook a Functional Assessment of Wetlands (FAW) within the entire Minnehaha Creek Watershed District. This assessment included the evaluation of the majority of wetlands within the MCWD, including the desktop assessment and verification of the presence of a wetland, the mapping of the approximate wetland boundaries and assessment of wetland functions. Figure 2 -6 shows the location of potential wetlands identified in the MCWD wetland inventory within the Western Shorewood project area. f 3 Proposed Conditions For proposed conditions, we built on the alternatives evaluated as part of the previous feasibility study, feedback from MCWD on the past feasibility study, along with input from City of Shorewood staff. As part of the current study, proposed conditions were evaluated in two phases that are discussed in more detail below. 3.1 Preliminary Alternatives Analysis For the preliminary alternatives evaluation, several high -level concepts were evaluated for each of the flood areas, using the XP -SWMM and P8 models, as appropriate. Planning level costs were also developed for each concept. Ultimately, the preliminary alternatives were discussed with City and MCWD staff at a meeting on November 7, 2019 including discussion of overall feasibility, permitting considerations, planning level costs, technical and engineering considerations /concerns, and anticipated project impacts. Based on the conversation and feedback at that meeting, preferred alternatives for each flood area were selected for further analysis. The focus of this report will be on the preferred alternatives evaluation (see Chapter 3.2) and the recommended implementation plan (see Chapter 4.0). However, Appendix A includes the slides presented and discussed at the November 7, 2019 meeting. 3.1.1 Planning Level Costs All planning level point opinions of probable cost presented in this study were developed for the alternatives based on the high -level conceptual design of each project. Although the point estimate is presented, there is cost uncertainty and risk associated with this concept -level cost estimate. The costs reported for the projects include contingencies (20 percent), engineering and design (25 percent), and estimated easement costs (as applicable). The costs do not include any wetland mitigation costs and assume that the excavated soils are not contaminated. The potential range from the point opinion of probable costs reflects the level of uncertainty, unknowns, and risk due to the conceptual nature of the individual project designs. Barr used industry resources for cost estimating (ASTM E 2516 11 Standard Classification for Cost Estimate Classification System) to provide guidance on cost uncertainty. Based on the current level 23 CHAPTER SUMMARY of design (planning level concept), the cost range is expected to vary by -30 percent to +50 percent from the planning level point opinion of probable costs. 3.2 Preferred Alternatives Analysis The preferred alternatives selected for each flood area were further developed and analyzed during this next phase of the study. As we moved through the evaluation of the preferred alternatives, we discussed interim results with City staff who provided further direction on the various concepts. The results of the preferred alternatives evaluation were discussed with City and MCWD staff at a second meeting on December 18, 2019. Appendix B includes the slides presented and discussed at the December 18, 2019 meeting. The following sections outline the preferred alternatives for each of the areas, based on the direction provided by City and MCWD staff. In some locations, there may be two options further discussed as the preferred alternatives. The discussion for each alternative includes description of the preferred alternatives, impacts of the alternative, planning level costs of the alternative, and permitting considerations. The summary the preferred alternatives and the planning level cost are included in Table 3 -1. However, the recommended plan for project implementation, based on the consideration of preferred alternatives outlined below, is summarized in Chapter 4.0 of this report. The planning level opinion of probable cost for each of the preferred alternatives is included in Appendix E. 24 Table 3 -1 Preferred Alternatives Summary , Area 1: Shorewood Oaks Alternative 5O1: Abandon sump system and daylight individual sumps at surface $190,000 Alternative S02: Separate sump system and drain via gravity to north of Lake Minnetonka LRT Regional Trail $580,000 Area 2: Strawberry Lane Alternative SL1: Storm sewer along Strawberry Lane and Smithtown Road to (Proposed) Smithtown Pond $890,000 Alternative SL2: Storm sewer along Strawberry Lane and Parcel Lines to (Proposed) Smithtown Pond $1,010,000 Area 3: Freeman Park Alternative FP1: Replace and lower outlet from Freeman Park $86,000 Area 4: Beverly Drive and Cajed Wetlands Alternative B1: Replace drainage system from Beverly Drive and along Cajed Lane $720,000 Area 5: Grant Lorenz Channel Alternative GL1: Maximized Smithtown Pond with extended detention outlet, iron enhanced sand filtration bench & Grant Lorenz channel stabilization $4,150,000 Alternative GL2: Tiered Smithtown Pond with extended detention outlet, iron enhanced sand filtration bench & Grant Lorenz channel stabilization $3,110,000 Area 6: Noble Road Alternative NR1: Expand downstream channel capacity $TBD3 1- Costs include contingencies (20 percent), engineering and design (25 percent), and estimated easement costs (as applicable) 2 - Point opinion of probable cost. However, based on the current level of design (planning level design), the cost range is expected to vary by -30 percent to +50 percent from the point opinion of cost. 3 —TBD: To be determined — based on recent conversations with the city we are performing further analysis at this location and will be developing a cost estimate for this location 25 3.2.1 Shorewood Oaks Through the feasibility study process, two preferred alternatives emerged as potential solutions to the Shorewood Oaks sump pump system surcharging issue. The two options included: • Alternative S01: Abandon sump system and daylight individual sumps at surface • Alternative S02: Separate sump system and drain via gravity to north of Lake Minnetonka LRT Regional Trail Figure 3 -1 shows the preferred alternatives for the Shorewood Oaks system and the contributing watersheds to the project area. Each alternative is further discussed in the following sections. Alternative SO I: Abandon sump system and daylight individual sumps at surface Alternative S01 includes the abandoning the sump pump collection system by disconnecting and capping each of the —50 individual homes from the collection system and allowing sump pumps to discharge to the ground surface. With this option, the location of each sump pump discharge should be able to drain via gravity overland to the storm sewer collection system and not exacerbate any existing surface drainage issues or impact existing infrastructure. Additionally, it is possible that the 6" perforated PVC collection system is intercepting and conveying groundwater from the Shorewood Oaks area and the system should remain in place to continue to facilitate this drainage. Complete disconnection from the sump system will eliminate the potential for the surcharging of the storm sewer system to result in flood individual residences. The planning level engineers opinion of probable cost is $190,000. Implementation of this alternative may be a cost covered by the private homeowners or as a shared cost between the private homeowners and the City of Shorewood. The anticipated permit required for this alternative would include the general plumbing permit and inspection.Alternative S02: Separate sump system and drain via gravity to north of Lake Minnetonka LRT Regional Trail Alternative S02 includes the separation of the sump pump collection system from the existing storm sewer system that discharges to Freeman Park. This would require the installation of a separate collection manhole and directional drilling an 8 -inch pipe that will discharge north of the Lake Minnetonka LRT Regional Trail to allow for gravity drainage. The location and elevation of proposed pipe discharge may be impacted by the alternative selected for the proposed Smithtown Pond (see discussion in Chapter 3.2.5) and should discharge above the proposed 100 -year flood elevation of the proposed pond to eliminate potential for surcharging of the sump pump collection system. Separation of the sump pump collection system as outlined above will eliminate the potential for the surcharging of the storm sewer system to result in flood individual residences. 26 The planning level engineers opinion of probable cost is $580,000. Implementation of this alternative may be a cost covered entirely by the private homeowners or a shared cost between the private homeowners and the City of Shorewood. The low area of Freeman Park is mapped as a wetland in both the NWI and the MCWD wetland inventories. Anticipated permits required for this alternative could include: • Permits from the HCRRA for the new pipe crossing at the regional trail • MCWD Erosion Control permit (if disturbance greater than 5,000 SF) • MCWD Wetland Protection permit o Wetland Conservation Act (WCA) (depending on impacts to wetland; may only be temporary impacts) • USACOE permit (depending on impacts to wetland area; may only be temporary impacts) 27 �� Sm w Rd' v�y�'�..t C '� '��a,'ym . �� +Ae� ` � ' � Fi' c � � ir.,✓ �1-�r. �- ��y + � �' # ./ a- � �-- Pebble Brook Creek �^- Grant Lorenz Channel Existing Storm Sewer '\ Existing Stormwater Pond • Proposed Structure — Proposed Storm Sewer Subwatersheds Contributing Subwatersheds Smithtown Pond Parcel n.pin County _tours 2011 10 Foot Contour 2 -Foot Contour FS, .--d Oak -0\ \I !' MaPte Ave 0 100 200 300 Feet 1 r_.,.- \ O ii �L J�-� v l I / 1 �� "w3,��T` _ /� ."► � 1 inch -300 feet _ Oak ke i3 T (j � �v � ° SHO.WOOD 1 � 62 dstw % Shorewood Oaks .' " i ♦, 502 Separate sump system from storm system and µ`ms e ,nna d - on F y' Ak ` drain to north of regional trail Sol: Abandon mp system and require private property owners to daylight s f sump pump/ foundation dra ns at surface �-- Pebble Brook Creek �^- Grant Lorenz Channel Existing Storm Sewer '\ Existing Stormwater Pond • Proposed Structure — Proposed Storm Sewer Subwatersheds Contributing Subwatersheds Smithtown Pond Parcel n.pin County _tours 2011 10 Foot Contour 2 -Foot Contour FS, .--d Oak -0\ \I !' MaPte Ave 0 100 200 300 Feet 1 r_.,.- \ O ii �L J�-� v l I / 1 �� "w3,��T` _ /� ."► � 1 inch -300 feet _ Oak ke i3 T (j � �v � ° SHO.WOOD 1 � 62 dstw % Shorewood Oaks 3.2.2 Strawberry Lane Through the feasibility study process, two preferred alternatives emerged as potential solutions for the drainage issues along Strawberry Lane north of the Lake Minnetonka LRT Regional Trail. The two options included: • Alternative SL1: Storm sewer along Strawberry Lane and Smithtown Road to Proposed Smithtown Pond • Alternative SL2: Storm sewer along Strawberry Lane and Parcel Lines to Proposed Smithtown Pond Figure 3 -2 and Figure 3 -3 show the preferred alternatives SL1 and SL2, respectively, for the Strawberry Lane and the contributing watersheds to the project area. Each alternative is further discussed in the following sections. The City of Shorewood has identified a larger Capital Improvement Program (CIP) project along Strawberry Lane from Smithtown Road to W 6211 Street that will include full reconstruction of the street (including widening the road from —22 feet to —28 feet) along with the addition of an — 10 feet wide bike and pedestrian trail. The preferred alternative for drainage improvements will be implemented as part of the larger CIP project. Additionally, the preferred alternative for Strawberry Lane must be implemented concurrently with or after the construction of the proposed Smithtown Pond (see further discussion in Chapter 3.2.5). A portion of treatment provided by the proposed Smithtown Pond can be applied to the MCWD stormwater treatment requirements for linear projects. For this study, we've assumed the proposed iron enhanced sand filtration bench discussed as part of the Smithtown Pond project will be used to meet the MCWD stormwater treatment requirements. The following summarizes the MCWD treatment requirements for this linear project based on the current MCWD rules for linear projects with new or reconstructed area greater than 10,000 square feet but less than one acre, which apply to the new /increase in impervious surface: • No net increase in the peak runoff rate for the 1 -, 10- and 100 -year design storms • Abstraction of the first one inch of rainfall from the site's impervious surface o MCWD rules do indicate that if infiltration not possible, a minimum of 0.5 inch of abstraction from site's impervious surface must be achieved along with meeting the phosphorus reduction requirement. o MCWD only gives filtration 50% credit toward abstraction volume • No net increase in phosphorus loading from existing conditions • If the linear project includes the construction of a trail or sidewalk that will not exceed 12 feet in width and will be bordered on the downgradient side(s) by a pervious buffer averaging at least 29 one -half the width of the sidewalk or trail, the trail or sidewalk impervious area will be exempt from the required treatment area for the volume abstraction (infiltration) rule. During final design, the city will need to determine if the trail can be designed such that it will be exempt from MCWD stormwater treatment requirements. Review of the soil survey data for the area around Strawberry Lane and the Smithtown Pond area suggests that the soils are primarily C/D and B/D soils which indicate they have limited infiltration capacity and infiltration may not be possible. Soil boring data collected during final design will confirm soil types for stormwater design. However, to be conservative when developing the planning level costs, we assumed that infiltration will not be possible but that the project still will abstract 1 -inch of runoff from the impervious surfaces (rather than 0.5 inches), and filtration would be the treatment method (which only receives 50% credit toward the abstraction volume meaning the proposed BMP should be sized to treat double the runoff volume from the impervious surfaces (e.g. 2- inches of runoff)). Table 3 -2 summarizes the anticipated treatment volumes (infiltration (1 -inch of runoff) and filtration (2- inches of runoff)) for the full Strawberry Lane road reconstruction and trail project. Table 3 -2 Estimated Treatment Volumes to Meet MCWD Rules for Strawberry Lane CIP Project Alternative SL 7: Storm sewer along Strawberry Lane and Smithtown Road to Proposed Smithtown Pond To improve drainage along the portion of Strawberry Lane north of the regional trail, Alternative SL1 includes the installation of storm sewer inlets at the key low areas west of Strawberry Lane and the installation of an 18 -inch pipe that drains north to Smithtown Road and east along Smithtown Road to the proposed Smithtown Pond assuming maximized storage on the entire parcel (Alternative GL1). In this scenario, except for the high flows that overtop and flow east over Strawberry Lane and the discharges from the existing stormwater pond at the end of Peach Circle, most runoff from smaller storm events are diverted away from Pebble Brook Creek. Because of this reduction in flows to Pebble Brook Creek, we have assumed that further stabilization of this channel is not required. 30 Strawberry Lane Road Reconstruction 83,270 105,980 22,710 1,893 3,785 Strawberry Lane Trail 0 37,850 37,850 3,154 6,308 Total 83,270 143,830 60,560 5,047 10,093 Alternative SL 7: Storm sewer along Strawberry Lane and Smithtown Road to Proposed Smithtown Pond To improve drainage along the portion of Strawberry Lane north of the regional trail, Alternative SL1 includes the installation of storm sewer inlets at the key low areas west of Strawberry Lane and the installation of an 18 -inch pipe that drains north to Smithtown Road and east along Smithtown Road to the proposed Smithtown Pond assuming maximized storage on the entire parcel (Alternative GL1). In this scenario, except for the high flows that overtop and flow east over Strawberry Lane and the discharges from the existing stormwater pond at the end of Peach Circle, most runoff from smaller storm events are diverted away from Pebble Brook Creek. Because of this reduction in flows to Pebble Brook Creek, we have assumed that further stabilization of this channel is not required. 30 Since recent infrastructure improvements along Smithtown Road were completed in 2015, it was assumed that the pipe segment along Smithtown Road would be directional drilled south of all the existing utilities in the right -of -way to the proposed Smithtown Pond to minimize disturbance of the existing infrastructure. Given the offsets needed for directional drilling (typically 10 ft from existing utilities), the pipe may be located outside the existing right -of -way and a drainage and utility easement may be required for this length of pipe. Because the existing road overtops during the 10 -year and 100 -year events, the alternative assumes that this overflow to the east will be maintained so that there is no increase in the peak elevation of the 100 - year, 24 -hour design storm event on the west side of Strawberry Lane. These elevations and overflows will need to be further considered during final design of the roadway and trails of the larger CIP project. The proposed alternative reduces the peak elevations of water stored on the west side of Strawberry Lane during the 1 -, 2 -, and 10 -year, 24 -hour design storm events and maintains (no increase) in the 100 -year, 24 -hour design storm events. Since the flood elevations in the 100 -year design storm event are maintained, the number of potentially impacted structures is not expected to change. Although some water quality treatment will be required as part of the larger road reconstruction project and will be achieved in the proposed Smithtown Pond, the addition of the drainage infrastructure along Strawberry Lane will have minimal impact on water quality. However, by reducing discharges to the Pebble Brook Creek channel and reducing erosion, the project will provide some water quality benefit. The TSS and TP annual loads are estimated to be reduced by 0.04 tons per year and 0.04 pounds per year, respectively. The planning level engineers opinion of probable cost is $890,000. This cost focuses on the primary infrastructure required for improving drainage along the northern portion of Strawberry Lane, including targeted inlets /structures, storm sewer including the estimated directional drilling cost and purchase of drainage and utility easements along Smithtown Road. The costs do not reflect the larger road reconstruction costs and does not include the addition of curb and gutter or standard catch basins for road design for the length of Strawberry Lane or any storm sewer needed for the portion of Strawberry Lane south of the Lake Minnetonka LRT regional trail. The NWI identifies one of the low areas along the west side of Strawberry Lane as wetland. The proposed road reconstruction and drainage improvement project may result in temporary (or potentially permanent) impacts to this wetland. Anticipated permits required for this alternative may include: • Minnesota Pollution Control Agency (MPCA) National Pollution Discharge Elimination System (NPDES) Construction Stormwater Permit (if disturbance greater than 1.0 acres) • MCWD Erosion Control permit (if disturbance greater than 5,000 SF) • MCWD Stormwater Management permits for linear redevelopment project • MCWD Wetland Protection permit o Wetland Conservation Act (WCA) (depending on impacts to wetland; may only be temporary impacts) 31 • USACOE permit (depending on impacts to wetland area; may only be temporary impacts) Alternative SL2: Storm sewer along Strawberry Lane and Parcel Lines to Proposed Smithtown Pond To improve drainage along the portion of Strawberry Lane north of the regional trail, Alternative SL2 includes the installation of storm sewer inlets at the key low areas west of Strawberry Lane and the installation of a 24 -inch pipe along Strawberry Lane that ultimately drains east between private property parcelsto the proposed Smithtown Pond (see Figure 3 -3). The concept for Alternative SL2 can work with both the maximized and tiered concepts for Smithtown Pond (GL1, GI-2). In this scenario, we anticipate that the discharges from the existing stormwater pond at the end of Peach Circle will be intercepted and conveyed by the pipe to be located along the parcel line. Because of this, except for the high flows that overtop and flow east over Strawberry Lane, most runoff from smaller storm events are diverted away from Pebble Brook Creek. Because of this reduction in flows to Pebble Brook Creek, we have assumed that further stabilization of this channel is not required. To minimize disturbance of the trees along the parcel alignment to the east, it was assumed that the pipe segment along the parcel line would be directional drilled from Strawberry Lane to the proposed Smithtown Pond. This system would also capture the discharge from the existing stormwater pond at Peach Circle. Because the alignment along the parcel lines is entirely on private property, drainage and utility easement will be required for this length of pipe. Similar to Alternative SL1, the alternative assumes that this overflow to the east will be maintained so that there is no increase in the peak elevation of the 100 -year, 24 -hour design storm event on the west side of Strawberry Lane. These elevations and overflows will need to be further considered during final design of the roadway and trails of the larger CIP project. The proposed alternative reduces the peak elevations on the west side of Strawberry Lane during the 1 -, 2 -, and 10 -year, 24 -hour design storm events and maintains (no increase) in the 100 -year, 24 -hour design storm events. Since the flood elevations in the 100 -year design storm event are maintained, the number of potentially impacted structures does not change. Although some water quality treatment will be required as part of the larger road reconstruction project and will be achieved in the proposed Smithtown Pond, the addition of the drainage infrastructure along Strawberry Lane will have minimal impact on water quality. However, by reducing discharges to the Pebble Brook Creek channel and reducing erosion, the project will provide some water quality benefit. The TSS and TP annual loads are estimated to be reduced by 0.04 tons per year and 0.04 pounds per year, respectively. The planning level engineers opinion of probable cost is $1,010,000. This cost focuses on the primary infrastructure required for improving drainage along the northern portion of Strawberry Lane, including targeted inlets /structures, storm sewer including estimated directional drilling cost and purchase of drainage and utility easements along the parcel line to Smithtown Pond. The costs do not reflect the larger road reconstruction costs and does not include the addition of curb and gutter or standard catch 32 basins for road design for the length of Strawberry Lane or any storm sewer needed for the portion of Strawberry Lane south of the Lake Minnetoka LRT regional trail. The NWI identifies one of the low areas along the west side of Strawberry Lane as wetland and a small wetland that may fall along the alignment of the directionally drilled pipe. The proposed road reconstruction and drainage improvement project may result in temporary (or potentially permanent impacts to this wetland. Anticipated permits required for this alternative may include: • Minnesota Pollution Control Agency (MPCA) National Pollution Discharge Elimination System (NPDES) Construction Stormwater Permit (if disturbance greater than 1.0 acres) • MCWD Erosion Control permit (if disturbance greater than 5,000 SF) • MCWD Stormwater Management permits for linear redevelopment project • MCWD Wetland Protection permit o Wetland Conservation Act (WCA) (depending on impacts to wetland; may only be temporary impacts) • USACOE permit (depending on impacts to wetland area; may only be temporary impacts) 33 Pebble Brook Creek Existing Storm Sewer C3 misting Stormwater Smithtown Pond Alternative (GL1) Pond • Proposed Structure a � — Pro d Storm Sewer pose / c r. /`3 .W+�al, r 1 Smithtown Pond ;i (Maximized) Subwatersheds Contributing Subwatersheds ,s Hennepin County ♦ / - Contours 2011 4' r+ .•6i _ — 10 Foot Contour 2 -Foot Contour 1 r y,�_ ,,ll//�,��ttt SL1: I stall 18 st or. sewer a long Strawberry Lane _ _ .i • � and Smithtown Road to Smithtown Pond 0 150 300 r �(� Feet F f \J \(Q,/ 1 inch = 300 feet � K I s rn oe SHOREWOOD cz Strawberry Lane c- ref_ � � . r , r dz�d ssW . v �bz d-'St% Preferred Alternative B� —'oElm A �'o� 3.2.3 Freeman Park Through the feasibility study process, one preferred alternative emerged as the solution for the drainage issues at the outlet structure at Freeman Park, south of the Lake Minnetonka LRT Regional Trail. The preferred alternative includes: • Alternative FP1: Replace and lower outlet from Freeman Park Figure 3 -4 shows the preferred alternative FP1, and the contributing watersheds to the project area. The preferred alternative is further discussed in the following section. Alternative FP 7: Replace and lower outlet from Freeman Park The existing 18 -inch pipe and storage in the low area of Freeman Park already serves to reduce peak discharges from the watershed to Smithtown Road and the downstream Grant Lorenz channel, so increasing pipe sizes and discharge downstream is not recommended. At the same time, surcharging of the storm sewer and high tailwater conditions at Freeman Park, have contributed to the issues related to the Shorewood Oaks sump pump collection system, so reductions in peak flood elevations in Freeman Park is desired. Alternative FP1 includes removing and replacing the existing outlet structure and 48 -inch storm sewer with a new, lowered (elevation 957.5 ft MSL, — 2 feet lower than existing) outlet structure along with a new 18 -inch pipe crossing at the regional trail. A small amount of grading will be required to lower the elevation of the system. The design of the new outlet structure should help prevent accumulation of debris at the outlet and provides flow capacity even with the accumulation of some debris at the outlet structure inlet. The conceptual outlet structure as modeled for this alternative is included on Figure 3 -4; however, during final design, the city may select a different configuration as long as it meets the hydraulic needs and minimizes the amount of maintenance needed. The proposed alternative reduces the peak elevations at Freeman Park during the 1 -, 2 -, and 10 -year, 24- hour design storm events and maintains (no increase) in the 100 -year, 24 -hour design storm events. The adjacent ball fields have minimal inundation during the 1 -, 2 -, and 10 -year storm events with the proposed alternative. The Freeman Park outlet structure is not anticipated to have any water quality improvement benefit. The planning level engineers opinion of probable cost is $86,000. Because the HCRRA flagged outlet structure and pipe crossing at the regional trail as critical and in need of replacing, implementation of this alternative may be a shared cost between the HCRRA and the City of Shorewood. The low area of Freeman Park is mapped as a wetland in both the NWI and the MCWD wetland inventories. Anticipated permits required for this alternative could include: 36 • Permits from the HCRRA for the new pipe crossing at the regional trail • MCWD Erosion Control permit (if disturbance greater than 5,000 SF) • MCWD Waterbody Crossing and Structures permit (if comes into contacted with bed or bank) • MCWD Wetland Protection permit o Wetland Conservation Act (WCA) (depending on impacts to wetland; may only be temporary impacts) • USACOE permit (depending on impacts to wetland area; may only be temporary impacts) 37 CONCEPTUAL OUTLET CONFIGURATION W,,w, �` • t E Smithtown Pond Alternative (GL1, GL2) i{ ..r FP1: Replace and lower outlet from Freeman Park to 957.5 ft MSL 1 51 , -. `-��•`��t ,:,� !"I`ficty "� .� � Ml^ �' F' +: % � -_,� I �\ \\ I� �� %S ) �C Y v i � l aa.a. ly o� zro). an 1 _- .62n ,�II�� �V(`,/ ww Pebble Brook Creek -M-- Grant Lorenz Channel Existing Storm Sewer Existing Stormwater Pond • Proposed Structure _ Proposed Storm Sewer Smithtown Pond Parcel Subwatersheds Contributing Subwatersheds Hennepin County Contours 2011 10 -Foot Contour 2 -Foot Contour O 0 200 400 Feet 1 inch = 400 feet SHOREWOOD 3.2.4 Beverly Drive and Cajed Lane Wetlands Through the feasibility study process, one preferred alternative emerged as the solution for the drainage issues at the Beverly Drive and Cajed Lane wetlands. The preferred alternative includes: • Alternative 131: Replace drainage system from Beverly Drive and along Cajed Lane Figure 3 -5 shows the preferred alternative 131, and the contributing watersheds to the project area. The preferred alternative is further discussed in the following section. Alternative B7: Replace drainage system from Beverly Drive and along Cajed Lane Alternative 131 assumes that the currently collapsed 8 -inch tile system is replaced with a similarly sized (8- inch) system from the Beverly Drive wetland along Cajed Lane to the large wetland south of Edgewood Road. The assumption is that the existing 8 -inch system would be filled and left in place and much of the new piping would be installed via directional drilling to reduce surface disturbance. Additionally, an inlet will be added to the low area in the backyards northwest of the intersection of Beverly Drive and Cajed Lane; however, the proposed inlet will need to connect to the system along Cajed Lane after the discharge from the Beverly Drive wetland has dropped in elevation to prevent water in the wetland from flooding the backyards (similar to the conditions with the existing collapsed pipe). This system has historically been a private drainage system and the city will likely have to obtain drainage and utility easements over the alignment on private property. Several alternatives considering upsizing the drainage system (up to a 24 -inch pipe) from the Beverly Drive wetland to the large wetland south of Edgewood Road were evaluated; however, the flood risk of the known home on the Beverly wetland could not be eliminated even with these increased pipe sizes. City staff indicated that there may be future opportunities on this property to reduce or eliminate the structure flood risk through floodproofing efforts or future sale /redevelopment of the parcel. The proposed alternative slightly reduces the peak flood elevations on the Beverly Wetlands during the 1 -, 2 -, 10 -, and 100 -year, 24 -hour design storm events. In the low area in the backyards northwest of the intersection of Beverly Drive and Cajed Lane, the alternative reduces the peak flood elevations during the 1 -, 2 -, 10 -, and 100 -year, 24 -hour design storm events. Additionally, the estimated number of structures within 2 -feet of freeboard is reduced by 2 in the backyards of properties northwest of Beverly Drive and Cajed Lane. Replacing the drainage system from the Beverly Drive wetland is not anticipated to have any water quality improvement benefit. The planning level engineers opinion of probable cost is $720,000. 39 The wetland south of Beverly Drive is mapped by both the NWI and the MCWD wetland inventories and the backyard area northwest of Beverly Drive and Cajed Lane is mapped as wetland in the MCWD inventory. Anticipated permits required for this alternative could include: • Minnesota Pollution Control Agency (MPCA) National Pollution Discharge Elimination System (NPDES) Construction Stormwater Permit (if disturbance greater than 1 acre) • MCWD Erosion Control permit (if disturbance greater than 5,000 SF) • MCWD Waterbody Crossing and Structures permit (if comes into contacted with bed or bank) • MCWD Wetland Protection permit o Wetland Conservation Act (WCA) (depending on impacts to wetland; may only be temporary impacts) • USACOE permit (depending on impacts to wetland area; may only be temporary impacts) 40 ,y ��IOP �— �� —..,� - 'a tea- c t♦ � I � � �, � BI rft�d9e La — 4 \\ aa yyp "N nt�, Existing Storm Sewer ., - Q Cj Existing Stormwater Pond • Proposed Structure .. ... Proposed Storm Sewer Subwatersheds Contributing } l / • \ Subwatersheds , �.{. Hennepin County Contours 2011 10 Foot Contour 2 -Foot Contour B7" Replace system (8) from Beverly Drive Wetland to wetland north of Smithtow Road, _ and add inlet and storm sewer (8') in to area , a I -- t "de of C )ed Lane �i.fst i a.?ma. iti IIrrk 1 I 0 100 200 v r R Feet 1 inch = 200 feet Beverly L� F� 5 w SHOREWOOD Y t r � /TI D Wetlands Preferred Alternative �% 3.2.5 Grant Lorenz Channel Through the feasibility study process, two preferred alternatives emerged as potential solutions for the drainage issues along the Grant Lorenz channel downstream of Smithtown Road. The two options included: • Alternative GL1: Maximized Smithtown Pond with extended detention outlet & Grant Lorenz channel stabilization • Alternative GL2: Tiered Smithtown Pond with extended detention outlet & Grant Lorenz channel stabilization Figure 3 -6 and Figure 3 -7 shows the preferred alternatives GL1 and GL2, respectively, for the Grant Lorenz channel and the contributing watersheds to the project area. Each alternative is further discussed in the following sections. Alternative GL 7: Maximized Smithtown Pond with extended detention outlet, iron enhance sand filtration bench & Grant Lorenz channel stabilization Alternative GL1 includes the construction of a stormwater pond (Smithtown Pond) on the parcel at 26245 Smithtown Road to provide flood storage and rate control for discharges to the Grant Lorenz channel as well as additional water quality treatment of flows from the contributing watershed. This includes all subwatershed located south of Smithtown Road, including runoff from the local watershed (subwatershed 1), Pebble Brook Creek (subwatershed H), Freeman Park (subwatershed K), and subwatershed J (see Figure 2 -2 for subwatershed identification). The grading of Smithtown Pond for Alternative GL1 maximizes the footprint of storage on the parcel providing both water quality treatment and flood storage below the existing 100 -year, 24 -hour design storm event elevation using an extended detention outlet structure. The conceptual outlet structure of Smithtown Pond is a notched weir with an 18 -inch wide notch at the pond's normal water level (952.0 ft MSL) and a 6 -foot weir at an elevation of 953.0 ft MSL. The outlet structure would tie into the existing two 42 -inch RCP culverts that discharge north under Smithtown Road to the Grant Lorenz channel. The flood pool (from the proposed NWL (952.0 ft MSL) to the existing 100 -year elevation (956.5 ft MSL)) provides 13.7 acre -feet of storage. However, given the elevations and slope of this site, to develop flood storage requires significantly more excavation than the actual flood storage provided, which adds significant cost to this alternative. The design of basin also needs to accommodate the proposed storm sewer discharge from Alternative FP1. The permanent pool volume for water quality treatment (1.5 acre -ft) assumes a pond with 3 feet of depth below the NWL. Additional water quality treatment is provided with the construction of an iron - enhanced sand filter (IESF) bench adjacent to the pond, where stored water above the normal water level can spill 42 into the bench and that can store 12- inches of water over the media that will be filtered before discharging via a perforated draintile collection system connected to the pond outlet structure. The intent of the IESF bench would be to meet the MCWD stormwater management requirements for the City's larger Strawberry Lane road reconstruction project (see discussion in Chapter 3.2.2). This concept assumes that the Smithtown Pond will include the largest estimated IESF bench, assuming the road reconstruction project will need to treat all new impervious surface from the roadway reconstruction and the addition of a trail. Most erosion within the Grant Lorenz channel is occurring in the channel downstream of Grant Lorenz Road. Currently, the city does not have a drainage and utility easement for this channel which is located entirely on private property. We have assumed that all access to the project would be from the east (Grant Lorenz Road) to minimize impacts to private property and would try to minimize tree removal which would preserve the screening and tree canopy in this area. In addition to the reduced flows resulting from Smithtown Pond, targeted channel stabilization will reduce further bank erosion and incising of the channel. Given the current channel conditions and shading by the tree canopy, the proposed stabilization measures include: • realigning the culvert on Grant Lorenz Road, • constructed rock riffles generally spaced as shown on Figure 3 -6 to create stepped shallow pools to reconnect flows with the floodplain, provide for energy dissipation, and reduce velocities on the channel banks • targeted grading and biostabilization of banks with shade tolerant vegetation, and • targeted hard armoring of select banks based on anticipated flow patterns. With the maximized Smithtown Pond configuration, the peak flood elevation for the 100 -year, 24 -hour design storm event on the south side of Smithtown Road is maintained from existing conditions. The peak flood elevations for the 1 -, 2 -, and 10 -year, 24 -hour design storm events are reduced. Additionally, with the extended detention outlet structure, flows to the Grant Lorenz channel are reduced significantly for all design storm events (ranging from 21 %to 50 %, depending on the event and location). Additionally, 100 - year flood elevations are reduced along the channel and reduce the estimated number of potentially impacted structures by 4. Water quality improvements for the maximized Smithtown Pond alternative include: • The wet retention pond removes 3,409 pounds of TSS and 9.1 pounds of TP annually • The IESF, assuming treatment of all new impervious surfaces from the Strawberry Lane road reconstruction project, removes 382 pounds of TSS and 2.3 pounds of TP annually • The flow reduction and targeted stabilization in the Grant Lorenz channel could reduce TSS loading by 1.1 tons per year and TP loading by 1.1 pounds per year. 43 The planning level opinion of probable cost is $4,150,000. Anticipated permits required for this alternative include: • Minnesota Pollution Control Agency (MPCA) National Pollution Discharge Elimination System (NPDES) Construction Stormwater Permit (if disturbance greater than 1 acre) • MCWD Erosion Control permit (if disturbance greater than 5,000 SF) • MCWD Waterbody Crossing and Structures permit (if comes into contacted with bed or bank) • MCWD Wetland Protection permit o Wetland Conservation Act (WCA) (depending on impacts to wetland; may only be temporary impacts) • USACOE permit (depending on impacts to wetland area; may only be temporary impacts) Alternative GL2: Tiered Smithtown Pond with extended detention outlet, iron enhanced sand filtration bench & Grant Lorenz channel stabilization Alternative GL2 includes the construction two tiered ponds on the parcel at 26245 Smithtown Road to provide water quality treatment, flood storage, and rate control for discharges to the Grant Lorenz channel. The tiered design will only be able to work with Strawberry Lane Alternative SL2. The design will help manage flows from the subwatersheds located south of Smithtown Road, including runoff from the local watershed (subwatershed 1), Pebble Brook Creek (subwatershed H), Freeman Park (subwatershed K), and subwatershed J (see Figure 2 -2 for subwatershed identification). This tiered approach reduces the amount of excavation needed to provide the flood storage, rate control, and water quality treatment volumes, given the existing slope and elevations on the parcel. The proposed upper and lower basins are separated by an earthen berm with an embankment elevation of 963.0 ft MSL and includes the use of two extended detention outlet structures at both the upper and lower basins. For the upper basin, the grading creates a wet pond with a NWL of 958.0 ft MSL and is drained to the lower basin through a 10 -inch pipe draining to the lower basin. The permanent pool volume for water quality treatment (0.99 acre -ft) assumes a pond with 3 feet of depth below the NWL. The flood pool (from the proposed NWL (958.0 ft MSL) to the proposed 100 -year elevation (962.8 ft MSL)) provides 6.3 acre -feet of storage. Although this conceptual design fully contains the 100 -year peak elevation for the estimated runoff to the upper basin, the embankment could be designed to serve as an emergency overflow to the lower basin. The final design of this upper basin also needs to accommodate the new proposed storm sewer discharge from Alternative SL2. For the lower basin, the grading creates a wet pond with a NWL of 952.0 ft MSL. The conceptual outlet structure for the lower basin of Smithtown Pond is a notched weir with a 12 -inch wide notch at the pond's normal water level of 952.0 ft MSL, and a 7 -foot span at an elevation of 952.5 ft MSL. The outlet structure would tie into the existing two 42 -inch RCP culverts that discharge north under Smithtown Road to the Grant Lorenz channel. The permanent pool volume for water quality treatment (0.94 acre -ft) assumes a 44 pond with 3 feet of depth below the NWL. The flood pool (from the proposed NWL (952.0 ft MSL) to the existing 100 -year elevation (956.5 MSL)) provides 7.7 acre -feet of storage. The final design of this lower basin also needs to accommodate the proposed storm sewer discharge from Alternative FP1. The lower basin also includes additional water quality treatment is provided with the construction of an iron - enhanced sand filter (IESF) bench adjacent to the pond and this feature will be sized similarly as outlined in Alternative GL1. Additionally, the proposed stabilization in the Grant Lorenz channel will be the same as outlined in Alternative GL1. With the tiered Smithtown Pond configuration, the peak flood elevation for the 100 -year, 24 -hour design storm event in the upper basin is 962.8 ft MSL. In the lower basin, the peak flood elevation for the 100 - year, 24 -hour design storm event on the south side of Smithtown Road is maintained from existing conditions. The peak flood elevations for the 1 -, 2 -, and 10 -year, 24 -hour design storm events are reduced. Additionally, with the tiered basin and extended detention, flows to the Grant Lorenz channel are reduced significantly for all design storm events (from 20% to 36 %, depending on the event and location within the channel). Additionally, 100 -year flood elevations are reduced along the channel and reduce the estimated number of potentially impacted structures by 4. Water quality improvements for the tiered Smithtown Pond alternative include: • The wet retention pond of the upper basin removes 403 pounds of TSS and 1.4 pounds of TP annually • The wet retention pond of the lower basin removes 3,068 pounds of TSS and 7.8 pounds of TP annually • The IESF, assuming treatment of all new impervious surfaces from the Strawberry Lane road reconstruction project, removes 454 pounds of TSS and 2.6 pounds of TP annually • The flow reduction and targeted stabilization in the Grant Lorenz channel could reduce TSS loading by 1.1 tons per year and TP loading by 1.1 pounds per year. The planning level opinion of probable cost is $3,110,000. The MCWD wetland inventory indicates a small wetland located south of Smithtown Road. Additionally, both the NWI and the MCWD wetland inventory indicate there are several wetlands along the Grant Lorenz channel. Anticipated permits required for this alternative include: • Minnesota Pollution Control Agency (MPCA) National Pollution Discharge Elimination System (NPDES) Construction Stormwater Permit (if disturbance greater than 1 acre) • MCWD Erosion Control permit (if disturbance greater than 5,000 SF) • MCWD Waterbody Crossing and Structures permit (if comes into contacted with bed or bank) • MCWD Wetland Protection permit 45 o Wetland Conservation Act (WCA) (depending on impacts to wetland; may only be temporary impacts) • USACOE permit (depending on impacts to wetland area; may only be temporary impacts) 46 Barr Footer: A- IS 10 ] 1, 2020 -01 -16 16:54 File: I: \Pr jeCt V3 \27\1666 \Maps\Repor kFig,r _3 -6 Werte,.Sho,e oo G,.tL m.n Ch ... el GL1.mxd User: TA02 s _M* �a -'.,.1''� Noble Rd An ii ✓liih lit Wlld ROSe,L� -.- N � � i GL1: Realign culvert on Grant Lorenz Road, and channel stabilization with constructed rock riffles, targeted hard armoring, and grading with vegetation establishment i e N �GL1: Maximize Smithtown Pond storage with extended detention f \ outlet and iron - enhanced sand filtration bench (IESF) `I 11I{ , ,1111F Strawberry Lane Alternative (S 1) j Iron- enhanced sand filter bench Strawberry Ct - i i y � \ Pebble Brook Creek Constructed Rock Riffles Hennepin County Contours 2011 ^�— Grant Lorenz Channel _ Other Targeted Channel Stabilization 10 -Foot Contour O Grant Lorenz Channel Existing Storm Sewer Subwatersheds 2 -Foot Contour N Preferred K Existing Stormwater Pond Contributing Subwatersheds 0 100 200 Alternative - • Proposed Structure 0 CTTY OP — Proposed Storm Sewer SHOREWOOD Feet E3R Smithtown Pond (Maximized) 0 1 inch = 200 feet FIGURE 3-6 Barr Footer: A- IS 10 ] 1, 2020 -01 -16 16:5] File: I: \ProjeCt V3 \27\1666\Maps\Reports\Fig,r _3 -7 Werte,.Shorew00d GrantL m.n Ch ... el GI_2.mxd User: TA02 s Nobld Rd An ✓�il 11111 Wlld Rose,L�,- rt ` r GL2: Realign culvert on Grant Lorenz Road, and channel stabilization with constructed rock riffles, targeted hard armoring, and grading with vegetation establishment i GL2: Tiered Smithtown Pond storage with extended detention outlet and iron - enhanced sand filtration bench (IESF) /' j % , - Iron - enhanced sand filter bench . U Strawberry Lane Alternative (SL2) r �1 i _ I l • �� r L \ % ! / 3 tra bV rry (a +n... Pebble Brook Creek A Constructed Rock Riffles Hennepin County Contours 2011 ^ti•^- Grant Lorenz Channel _ Other Targeted Channel Stabilization - 10 -Foot Contour Grant Lorenz Existing Storm Sewer Subwatersheds 2 -Foot Contour N Channel O KExisting Stormwater Pond Contributing Subwatersheds Preferred 0 100 200 Alternative • Proposed Structure 0 - Proposed Storm Sewer CT YOP SHOREWOOD 0 Feet BARR Smithtown Pond (Tiered) 1 inch = 200 feet FIGURE 3-7 3.2.6 Noble Road Through the feasibility study process, options were evaluated for the two areas along Noble Road. For the crossing at the low point on Noble Road, two preliminary alternatives were evaluated, including raising the road and raising the road and replacing the culvert crossings. However, the discussion with City staff in November indicated that the temporary flooding at this low point did not warrant the estimated cost of the proposed alternatives at this time and no further analysis was performed for this location. Given the limited road width and right of way along Grant Lorenz Road, there may be limited opportunity to raise grade at the intersection Noble Road and Grant Lorenz Road enough to eliminate the temporary inundation that occurs at the intersection. However, there is an opportunity to expand capacity of the conveyance system and reduce the frequency that the road becomes inundated, as outlined in the following preferred alternative: • Alternative NR1: Expand downstream channel capacity Figure 3 -8 shows the preferred alternatives NR1 for the Noble Road site and the contributing watersheds to the project area. The alternative is further discussed in the following section. Alternative NR 1: Expand downstream channel capacity Review of the MnDNR LiDAR data indicates that the Grant Lorenz channel bankfull flow area decreases moving downstream (north) from Noble Road, suggesting the channel limits discharge from this area. To alleviate this condition, the cross - sectional area of the channel north of Noble Road could be expanded before it discharges into the wetland to the north. Alternative NR1 includes the expansion the channel conveyance capacity north of Noble Road. Currently, the city does not have a drainage and utility easement for this channel which is located entirely on private property. Expanding the channel capacity will include lowering the channel invert to better match the inverts of the existing culverts and reduce the amount of standing water in the pipes. Additionally, the flow area of the channel should be expanded to match the conveyance capacity of the two existing culverts (22.8 SF of flow area). Based on the MnDNR LiDAR data, this means potentially doubling the bankfull conveyance capacity of the channel north of Noble Road. With the implementation of Smithtown Pond, peak flows and peak elevations are reduced in the Grant Lorenz channel, which will help reduce the depth of inundation at the intersection of Noble Road and Grant Lorenz Road. With the expansion of the channel conveyance capacity, the overtopping of the intersection should be further reduced. No water quality improvements are anticipated with the proposed channel expansion. 49 The planning level opinion of probable cost is $TBD and the project would likely be implemented at the same time as the channel stabilization identified in Alternatives GL1 and GL2. Both the NWI and the MCWD wetland inventory indicate there are several wetlands along the Grant Lorenz channel. Anticipated permits required for this alternative include: • Minnesota Pollution Control Agency (MPCA) National Pollution Discharge Elimination System (NPDES) Construction Stormwater Permit (if disturbance greater than 1 acre) • MCWD Erosion Control permit (if disturbance greater than 5,000 SF) • MCWD Waterbody Crossing and Structures permit (if comes into contacted with bed or bank) • MCWD Wetland Protection permit o Wetland Conservation Act (WCA) (depending on impacts to wetland; may only be temporary impacts) • USACOE permit (depending on impacts to wetland area; may only be temporary impacts) 50 l 4 94 r NR1: Increase downstream channel capacity north of Noble Road /9q0 N bl Rd rl p - BARR A_ q_ — Increase channel capacity gf- Constructed Rock Riffles t •.fF' Recommended 1 s Structures S r V_ Recommended Storm Sewer Other Targeted Channel Stabilization J 1 `� ~ y� - -^-•- Grant Lorenz • Proposed £' �•.. Subwatersheds 1 k"Ki x Hennepin County 7"^ Contours 2011 10 -Foot l \ 2 -Foot ( / }�� \��`•�� Existing Storm Pond Stormwater \ Pond Oontnb 960 a o'. Subwatersh ersheds S fY O 0 100 3p Feet 1 inch= 118 feet '� CTTYOP \� ,�, - OREWOOD 4 Recommended Plan After evaluating the preferred alternatives outlined in Chapter 3.2 and receiving feedback from City and MCWD staff, the following sections outline a final recommended plan for stormwater management and drainage improvements in the Western Shorewood project area. The recommended plan includes a combination of several preferred alternatives to help address the various drainage issues in the different flood areas. 4.1.1 Combined Evaluation We recommend the following preferred alternatives for implementation to improve drainage and water quality in the identified problem areas: • Alternative S02: Abandon sump system and daylight individual sumps at surface • Alternative SL2: Storm sewer along Strawberry Lane and Parcel Lines to Proposed Smithtown Pond • Alternative FP1: Replace and lower outlet from Freeman Park • Alternative B1: Replace drainage system from Beverly Drive and along Cajed Lane • Alternative GI-2: Tiered Smithtown Pond with extended detention outlet, iron enhanced sand filtration bench & Grant Lorenz channel stabilization • Alternative NR1: Expand downstream channel capacity The recommended plan including the conceptual proposed infrastructure for each of the recommended projects is shown in Figure 4 -2. A combined XP- SWMM model run was completed that reflects full implementation of the recommended plan. The results, including peak flood elevations and the number of potentially impacted structures in the subwatersheds, are summarized in Table 4 -1, which also summarizes the change from existing conditions. Table 4 -2 summarizes the impacts to the flows in Pebble Brook Creek and the Grant Lorenz channel. Overall, the recommended plan improves drainage, reduces peak flood elevations for smaller storm events, and either reduces or maintains peak flood elevations for larger storm events (e.g. 100 - year). 52 CHAPTER SUMMARY Additionally, the recommended alternatives provide opportunities for water quality improvements in several flood areas, including an iron - enhanced sand filtration for treatment of runoff from Strawberry Lane, retention basins in Smithtown Pond, reduction in flows to Pebble Brook Creek, and reductions in flow to and stabilization of the Grant Lorenz channel. The anticipated pollutant load reductions from the implementation of the recommended plan are summarized in Table 4 -3. 53 Table 4 -1 Recommended Plan XP -SWMM Model Results for Flood Elevations and Potentially- Impacted Structures Subwaters _�___� 2 -��r No. of buildings at risk No. of buildings within 2 -ft freeboard Change in at risk buildings Change in buildings within 2 -ft freeboard o 'SUbwatersheds H and 1 were merged with subwatershed I in the proposed condi5ons modeling for Smifimwn Pond Table 4 -2 Recommended Plan XP -SWMM Results along the Grant Lorenz Channel and Pebble Brook Creek Table 4 -3 Recommended Plan Estimated Pollutant Load Reductions Average Annual T55 Removal (lbs /yr) Average Annual T55 &moval Efficiency Average An T P(lbs /yr) rage Annual TP Removal Efficiency ( %) Smithtemn Pond -Tiered ® ® ®® Lovaer Basin or Pond TereL ® ® ®® rr rr•. ® rr rr•. r r- rPebble ®�� Table 4 -3 Recommended Plan Estimated Pollutant Load Reductions Average Annual T55 Removal (lbs /yr) Average Annual T55 &moval Efficiency Average An T P(lbs /yr) rage Annual TP Removal Efficiency ( %) Smithtemn Pond -Tiered ® ® ®® Lovaer Basin or Pond TereL ® ® ®® rr rr•. ® rr rr•. r r- 4.1.2 Recommended Project Implementation, Cost, and Sequencing Table 4 -4 summarizes the recommended projects for each location within the study area along with the planning level point opinion of probable cost, anticipated project sequencing, and other implementation considerations. Ultimately these projects will be incorporated into the larger city CIP and exact dates will be determined through that planning process. 57 Table 4 -4 Summary of Western Shorewood Stormwater Management Recommended Plan Project Planning Levelw Project ment;J Opinion Probable Area 1: Shorewood Oaks Alternative S01: Abandon sump $190,000 Independent of system and daylight individual other projects sumps at surface Area 2: Strawberry Lane Alternative SL2: Storm sewer along $1,010,000 Constructed Strawberry Lane and Parcel Lines to concurrently with or Proposed Smithtown Pond after Smithtown Pond Area 3: Freeman Park Alternative FP1: Replace and lower $86,000 Constructed after outlet from Freeman Park Smithtown Pond completion Area 4: Beverly Drive and Cajed Wetlands Alternative B1: Replace drainage $720,000 Independent of system from Beverly Drive and other projects along Cajed Lane Area 5: Grant Lorenz Channel Alternative GL2: Tiered Smithtown $3,110,000 Stabilization Smithtown Pond Pond with extended detention constructed design should outlet, iron enhanced sand filtration concurrently with or consider future bench & Grant Lorenz channel after Smithtown discharges from SL2 stabilization Pond and FP1 Area 6: Noble Road Alternative NR1: Expand $TBD3 Constructed with downstream channel capacity channel stabilization (GL2) Total Project Implementation $5,116,000 Cost 1 - Costs include contingencies (20 percent), engineering and design (25 percent), and estimated easement costs (as applicable) 2 - Point opinion of probable cost. However, based on the current level of design (planning level design), the cost range is expected to vary by -30 percent to +50 percent from the point opinion of cost. 3 —TBD: To be determined — based on recent conversations with the city we are performing further analysis at this location and will be developing a cost estimate for this location 4.1.3 Potential Funding Sources The primary funding sources for the implementation of the recommended alternatives of the Western Shorewood Stormwater Management Plan will be the City of Shorewood utility fund and bond proceeds. Several of these projects have already been incorporated into the City's CIP. For some projects, there are 58 potential partnerships that may provide cost -share opportunities or special assessments that could help fund project implementation. These include: • Partnership with the HCRRA to cost -share the implementation of FP1 (Freeman Park outlet) • Opportunity for cost -share or special assessment for implementation of S01 (Shorewood Oaks sump system abandonment) Additionally, there are a variety of grant programs that the City could apply for to assist in funding some of these projects. These programs are offered by several entities and for varying types of projects. The potential grant opportunities are summarized in Table 4 -5. MCWD has offered assistance to the city in pursuing some of these grant funds given the comprehensive planning approach the city has taken to alleviate some of the stormwater management and drainage issues in Western Shorewood. 59 Table 4 -5 Summary of Potential Grant Funding Sources Grant Program Sponsor Agen_ Typical Projects Funded Level of Funding Assistance Typical Application Deadlines Clean Water Fund Or State of Competitive CWF grant for projects and practices that will Varies — 25% local Applications typically Programs - Projects MN /BWSR protect or restore water quality in lakes, rivers or streams, or match required due mid to late summer and Practices Grant will protect groundwater or drinking water. with grant projects selected by end of year Natural Resources Hennepin Implementation of larger projects that improve water quality Up to $100,000 per Applications are Grant — County or preserve, establish or restore natural areas. Ideal for project (typical accepted all year. Funds Opportunity Grant projects documented as part of management plans. projects range from are limited and awarded $25,000 to $50,000). on a first -come, first - No match required serve basis Conservation MnDNR Restoration or enhancement of prairies, wetlands, forests, or $5,000- $400,000 Multiple deadlines per Partners Grant habitat for fish, game or wildlife in Minnesota 10% non -state match year (typically one per Program requirement; project quarter) cost cap of $575,000 Five Star & Urban National Fish Projects aiming to improve water quality, watersheds, and Awards range from Applications typically Waters Restoration and Wildlife species and habitats they support including restoration efforts, $20,000 to $50,000 due in January each year Program Foundation stormwater management, and water quality monitoring along Required 1:1 match with targeted community outreach, education and stewardship Local Trail MnDNR Program to promote relatively short trail connections between Grants range from Applications are typically Connections Grant where people live and desirable locations — improving $5,000 to $150,000 due in the spring significant connectivity Required match of 25% 60 Appendix A Western Shorewood Stormwater Management Plan: Preliminary Alternatives Review Meeting Presentation Slides 1/7/2019 Appendix B Western Shorewood Stormwater Management Plan: Preferred Alternatives Review Meeting Presentation Slides 12/18/2019 Appendix C Western Shorewood Stormwater Management Plan: City Council Work Session Presentation Slides 1/27/2020 Appendix D Western Shorewood Stormwater Management Plan: Open House Boards TBD Appendix E Western Shorewood Stormwater Management Plan: Preferred Alternatives Planning Level Engineer's Opinion of Probable Cost