CIP 2007-2011
CITY OF SHOREWOOD,
MINNESOT A
CAPIT AL
IMPROVEMENT PROGRAM
. Calendar Years 2007 - 2011
5755 Country Club Road, Shorewood, MN 55331
www.cLshorewood.mn.us
.
CITYOF ,
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOdo, MINNESOTA 55331:':8927 · (952) 474-3236
FAX (952) 474-0128 0 www.cLshorew6bd.mn.uSo9ityhall@<:i.shorewood.mn.us
CITYOFSHOREWOOD,
MINNESOTA
2007 -- 2011CAPIT AL IMPROVEMENT PROGRAM
j
ADOPTED DECEMBER 10,2007
~
~.1' PRINTED ON RECYCLED PAPER
CAPIT At IMPROVEMENT PROGRAM
2007-2011
TABLE OF CONTENTS
I. INTRODUCTION AND POLICy.............................................................. 1-10
II. TABLES
A. Department Summary.................;.............................................................. ..13
B. Projects by Department .................................... ...................................... 14-16
III. CAPITAL IMPROVEMENT PLAN PROJECTS
A. Equipment Replacement Fund ............................................................. 19-48
"
B. Local Street Reconstruction....................................................................49-60
C. Municipal State Aid Streets ................................................................... 61-64
D. Municipal Water System....... ................................................................. 65-76
E. Parks.......................................................................................................... 77-90
F. Public Facilities and Office Equipment ................................................91-98
G. Sanitary Sewer System ......................................................................... 99-110
H. Stormwater Management .................................................................. 111-:128
I. Technology & Office Equipment ........................................................ 129-136
I. INTRODUCTION
1
.. -','"
2
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us. cityhall@cLshorewood.mn.us
December 5, 2007
Honorable Mayor and City Councilmembers;
INTRODUCTION
We present to you the 2007 - 2011 Capital Improvement Program for the City of
Shorewood, MN. The Capital Improvement Program (CIP)is a coordinated_schedule of
-municipal capital projects, improvements, and purchases fo!, the years 2007 through 2011.
It consists of project proposals that irfcludethe 'project title, scheduled year, and the
funding sources for each project. It identifies sources of revenue to pay for the planned
capital project improvements and purchases.
T:HE BASICS
At its essence, a cn' is a planning tool for some specified period of time. The CIP lists
significant (hence theterml'capital") improvements in infrastructu~e and equipment that
the City should plan for. It becomes a financial planning tool that identifies funding
sources and funding availability, and helps decision-makers to determine ci.ffordability:.
With tb.e approval or amendment by the Council, the CIP provides an implementation
program for staff to work on;
,I
-
The League of Minnesota Cities' Handbook for Minnesota Cities contains the following-
discussion of Capital Improvement Budgeting; .
"Capital budgeting is a list of needed capital improvements, their order of priority,
and the means of financing them. Besides being one of the major tools of planning, a
c;apital budget can provide some or all of the following advantages:
. Keep the public informed of future needs and protect councilmembers from
pressure groups seeking projects rated low on the pri9rity list
. . Often reduce or stabilize the tax rate
#.
'-J PRINTED OrgECYCLED PAPER
CIP Transmittal Letter
December 2007 - Page 2
· Establish an orderly capital improvement program, preventing the peaks and
valleys in a community's debt retirement program
· Frequently allow a community to move gradually to a pay-as-you-go program
of capital expenditure financing for a considerable portion of its improvements
· Capital improvements take place in a logical and orderly manner, rather than
haphazardly.
· Integrate the plans and projects of all city departments and agencies,
eliminating conflicting and overlapping projects
· By insuring prior consideration for all capital improvements, it helps
guarantee ample time for detailed and careful planning of the actual program.
"The City puts improvement projects into a multiple-year capital improvement
program on the basis of the established priority. When the council reviews it in light
of the community's financial situation, it may find the city should defer some of the
projects beyond the improvement period and other projects indefinitely.
"Following this, the budget officer recommends projects for the corning budget year.
The recommendations, in effect, become the recommended program. Priorities in the
capital budget program for the following years remain tentative, and the council
should review them annually. At that time, the council should consider the addition
of new projects and the deletion of others."
A CIP is not a document set in stone. It is a snapshot of needs, schedule of improvements,
and schedule of financing, typically five years into the future. It is intended that the CIP
be reviewed and changed as physical conditions, financial conditions, and changes in
priorities occur.
THE CIP AND THE COMP PLAN
The City's CIP is an implementation program of the City's Comprehensive Plan. In fact,
Minnesota law provides that a City's planning commission is to review the CIP prior to its
adoption by the city council, although in practice this is seldom done unless a particular
project within the CIP appears to be inconsistent with the Comprehensive Plan.
WHAT TO INCLUDE IN THE CIP? .
Cities differ on the extent of projects they list in a CIP. Some almost become wish-lists,
containing a lot of ill-defined projects in the outer years of the program. Some have a
more limited scope, and include only projects on which commitments have been made, or
exclude projects that other units of govemmeht may have planned within the city's
boundaries.
4
CIP Transmittal Letter
December 2007 - Page 3
A CIP should be developed to combine realistic needs with realistic expectations about
expenditures. They should reflect the projects of other units of government (e.g.,
MnDOT, Hennepin County, watershed districts), when known, so that opportunities to
coordinate City projects can be identified.
The CIP can contain, as appendices, other schedules or lists of projects beyond the five-
year time horizon. For example, an equipment replacement program often extends out 20
years, so that the acquisition of equipment can be timed to assure that the annual balance
in the equipment replacement fund doesn't go in the red. Or, it may show that short-term
debt, such as equipment certificates, may need to be issued for critical pieces of
equipment.
There may be an incentive to list many projects, or have a general plan for roadways with
an annual outlay for them, within the CIP. The law is not clear that a road project needs
to be constructed in the year of financing; rather, the project(s) or outlays simply need to
be listed in the CIP. If projects or outlays are not listed, the CIP could be amended as
necessary to qualify them roadway bonds.
APPROACHES IN DEVELOPING THE CIP
Council has developed a philosophy about what is to be included when a CIP is
presented. The following points, subject to Council modification, are part of that
understanding.
· Projects in Shorewood's CIP are listed with particular care in terms of the
likelihood that they will be implemented in the first or second year of the
program.
. Projects listed in years three through five of the program identify projects and
opportunities that merit further evaluation.
. There are programs for on-going outlays for which individual projects are not
well-defined at this time. For instance, the City has a pavement management
program to assess the condition of local streets, and it is updated every year. It is
acceptable to budget funds for bituminous overlays each year without listing
specific streets after the first year;
. Placing a project or outlay in the CIP does not commit the City Council to
accomplish it. The Council's normal processes of authorizing studies to be
prepared and gaining public comment need to be followed. A CIP listing does not
in any way imply a done deal.
5
CIP Transmittal Letter
December 2007 - Page 4
2007-2011 CIP HIGHLIGHTS
· The Equipment Fund was modified to replace the water truck in 2007 rather than
2009, and the dump truck in 2009 rather than 2007.
· The Land & Open Space Acquisition Fund is discontinued and the balance is to be
transferred to the Stormwater Management Fund.
· The Public Facilities/Office Equipment Fund was split into a Public Facilities Fund
and a Technology/Office Equipment Fund. $100,000 is to be placed in the
Technology/Office Equipment Fund with the balance transferred to the Public
Facilities Fund.
· The Minnewashta Water Tower will be washed in 2007 and the SE Area Water
Tower will be refurbished in 2008.
· Increased funding for seal coating, "slurry", and overlay projects through transfers
from the General Fund. For 2008, this amount has been programmed at $300,000.
· The large capital improvement of the Amlee, Manitou, Glenn Road Stormwater
project, estimated at $540,500, was removed from the Local Street Reconstruction
Fund and the 2008 Stormwater Management budget. $100,000 has been budgeted
in the Stormwater Management budget for projects that are to be determined.
· $1.2 million for City Hall in 2008 is planned based on the Council's action to
pursue a specific design concept.
CONCLUSION
The 2007 - 2011 Capital Improvement Program was prepared according to the priorities
and direction from the City Council and Staff believes it provides a responsible plan to
balance the City's infrastructure needs and financial position.
Respectfully submitted,
L~
Bonnie Burton
Finance Director/Treasurer
d~jb
Lawrence Brown
Director of Public Works
~~
[ mes Landini
City Engineer
6
CITY OF SHOREWOOD
RESOLUTION NO. 07-087
A RESOLUTION ADOPTING A CAPITAL IMPROVEMENT PROGRAM
FOR THE YEARS 2007-2011
WHEREAS, the Shorewood City Council wishes to carefully plan and
coordinate City public capital purchases and projects over a five-year period matching
physical needs with financial resources; and
WHEREAS, City Staff has prepared and presented a proposal for a five-
year Capital Improvement Program to facilitate the planning and coordination of projects
for the years 2007-2011.
NOW, THEREFORE BE IT RESOLVED that the City Council hereby
adopts the Capital Improvement Program for the period of2007~2011. .
ADOPTED BY THE CITY COUNCIL of the City of Shorewood this
10th day of December, 2007.
O~GL-
Christine Lizee, Mayor
ATTEST:
7
Land
Use
COMPREHENSIVE
PLANNING PROCESS
Planning Inventory
Planning Tactics
Physical - Economic - Social
Transportation Community Population
Facilities
Property
Values
Policy Plan
Inventory Analysis
Planning &
Development
Policies
Goals and
Objectives
Implementation
1
"
8
Market
Potentials
CAPITAL IMPROVEMENTS FISCAL POLICY
GENERAL POLICY
Shorewood's Capital Improvements Program reflects an assessment of the community's needs
and its ability to pay for major improvements. It is founded on the policy that reinvestment
required for replacement, maintenance, or the increased efficiency of existing systems shall have
priority over investments for expansion of existing systems or the provision of new services.
FUNDING PRIORITIES
Capital spending proposals will generally be funded on the following priority basis:
1. Those projects necessary for contributing to the public health and welfare.
2. Those projects which will help to maintain an existing system.
3. Those projects that will make an existing system more efficient.
4. Those projects representing the expansion of an existing system for new service or
completely new public facility or service.
FUNDING PRINCIPLES
As a result, the following principles shall govern the implementation of the recommended
Capital Improvements Program:
1. The City will make all capital improvements in accordance with the adopted Capital
Improvements Program.
2. The City will develop a multi-year plan for CapitaLImprovements and update it
annually.
3. The City will coordinate development of the Capital Improvements Program with
development of the annual operating budget. Future optional costs associated with new
capital improvements will be projected and included in operation budget forecasts.
9
10
II. TABLES
1 1
12
Department
Equipment Replacement
Local Street Reconstruction
Municipal State Aid Streets
Municipal Water System
Parks
Public Facilities
Sanitary Sewer
Stormwater Management
T echnology/Oflice Equip
City of Shorewood, Minnesota
Capital Improvement Program
2007 thru 2011
DEPARTMENT SUMMARY
2007 2008 2009 2010 2011 Total
193,241 281,496 178,733 148,785 64,551 866,806
161,000 461,000 747,011 869,345 868,272 3,106,628
2,500,000 2,500,000
333,700 386,000 99,000 818,700
95,000 12,500 85,000 26,000 505,000 723,500
1,250,000 5,000 400,000 1,655,000
150,000 324,000 183,000 145,000 75,000 877,000
78,000 100,000 185,000 116,000 . 602,000 1,081,000
72,500 10,000 75,000 10,000 10,000 177,500
GRAND TOTAL 1,083,441 2,824,996 1,557,744 . 1,715,130 4,624,823 11,806,134
13
City of Shorewood, Minnesota
Capital Improvement Program
2007 thru 2011
PROJECTS BY DEPARTMENT
Department Project# Priority 2007 2008 2009 2010 2011 Total
!Equipment Replacement ,
Water Truck'/=ord 7000 E-07-45 nfa 50,000 50,000
F350 & Flatbed E-07-49 nfa 41,031 41,031
F350 4x4 Pickup wfplow E-07-55 nfa 35,349 35,349
Mower - Toro Groundsmaster 325D E-07-70 n/a 22,093 22,093
Diesel Fuel Trailer 500 Gallons E-07-71 nfa 7,827 7,827
Attach - Blower for Groundsmaster E-07-75 nfa 5,757 5,757
Attach - 1985 Cabs for Groundmaster E-07-82 nfa 5,050 5,050
Snow Thrower - John Deere 826 (1970) E-07-91 nfa 947 947
Snow Thrower - John Deere 826 (1972) E-07-92 nfa 947 947
Attach - Flail side mower E-07-93 nfa 16,160 16,160
Attach - Flail rear mower E-07-94 nfa 8,080 8,080
Ford 555 Backhoe E-08-22 nfa 70,257 70,257
Dump Truck - Ford L8000 (1988) E-08-33 nfa 147,205 147,205
Sweeper - Tennant 240 E-08-46 nfa 16,059 16,059
Speed Awareness Display E-08-51 nfa 24,088 24,088
Skid Steer - Bobcat 753 E-08-76 n/a 23,887 23,887
Dump Box Rehabilitation and Sander E-09-54 nfa 25,533 25,533
Dump Truck - Ford L8000 (1995) E-09-68 n/a 153,200 153,200
Tractor - Ford 3910 E-1O-35 nfa 39,094 39,094
Air Compressor-Ingersoll Rand 185 E-10-38 n/a 16,465 16,465
Trailer 12' Tops E-10-41 n/a 3,458 3,458
Dump 1 ton - 4 x 2 Ford F-350 E-10-52 n/a 54,131 54,131
GroundsmasterMower- Toro 328D E-10-57 n/a 26,314 26,314
Mower - Toro Walk Behind 44 E-10-73 n/a 3,308 3,308
Attach2 -1985 Cabs for Groundmaster E-10-82 nfa 6,015 6,015
Trailer 24' - Trail King E-11-21 nfa 23,111 23,111
Mower - Toro Groundmaster 328D (84) E-11-74 nfa 27,892 . 27,892
Sand Pro 3000 E-11-77 nfa 13,548 13,548
Equipment Replacement Total 193,241 281,496 178,733 148,785 64,551 866,806
ILocal Street Reconstruction I
Slurry Overlay LR-08-02 n/a 300,000 300,000
Harding Lane LR-09-01 1 586,011 586,011
Nelsine Drive LR-10-03 1 357,600 357,600
Meadowview Road LR-10-04 1 350,745 350,745
Rampart Court LR-11-01 1 171,572 171,572
Star Roads LR-11-02 1 535,700 535,700
Bituminous Overlays LR-11-100 nfa 95,000 95,000 95,000 95,000 95,000 475,000
Bituminous Sealcoating LR-11-99 nfa 66,000 66,000 66,000 66,000 66,000 330,000
Local Street Reconstruction Total 161,000 461,000 747,011 869,345 868,272 3,106,628
... 14
Department Project# Priority 2007 2008 2009 2010 2011 Total
!Mnnicipal State Aid Streets ~
Vine Hill Road - Mill and Overlay MSA-03-05 2,500,000 2,500,000
Municipal State Aid Streets Total 2,500,000 2,500,000
IMunicipal Water System ~
S.E. Area Lineshaft Well - Pull & Inspect W-07-02 nla 22,000 22,000
Amesbury Well Controls Replacement W-07-03 nla 55,000 55,000
Water Meter Radio Read Project W-07-05 nla 250,000 75,000 75,000 400,000
West Area Water Tower - Power Wash W-07-25 nla 6,700 6,700
SE Area Water Tower - painting W-OB-01 nla 270,000 270,OOG
Amesbury Lineshaft Well- Pull & Inspect W.OB-02 nla 23,000 23,000.
Woodhaven Well BkIg Demolition W-OB-03 nla 1B,000 1B,OOO
Boulder Bridge Well #2 - Pull & Inspect W-09-01 nla 24,000 24,000
Municipal Water System Total 333,700 386,000 99,000 818,700
IParks I
Badger Park-Football Field Lighting P-07-02 nla 95,000 95,000
Silverwood Park Resurface T ennislBasketball Court P-0S-01 nla 2,000 2,000
Cathcart Park-Repave Existing Trail P-OB-02 nla 3,000 3,000
Cathcart Park-Swing Set Replacement P-OB-04 nla 2,500 2,500
Freeman Park-Restoration Dug-outs P-09-01 nla 2,500 2,500
Cathcart Park-Resurface Magic Square P-09-02 nla 7,500 7,500
Manor Park Tennis Court Reconstruction P-09-03 nla 70,000 70,000
Silverwood Park-Bituminous Parking Lot P-10-01 nla 18,000 1B,ooO
Freeman Park-Picnic Shelter Rehab P-10~02 nla 3,000 3,000:
Freeman Park-Wetland Enhancement P-11-02 nla 500,000 500,000
Park Improvements P-11-99 nla 5,000 5,000 5,000 5,000 20,000
Parks Total 95,000 12,500 85,000 26,000 505,000 723,500
IPnblic Facilities ~
Civil Defense Sirens PF-07-05 nla 50,000 50,000
City Hall Project PF-0S-02 nla 1,200,000 1,200,000
5795 Country Club-Residence PF-09-01 nla 5,000 5,000
Public Works Addition (Bay wnift) PF-10-01 nla 400,000 400,000
Public Facilities Total 1,250,000 5,000 400,000 1,655,000
ISanitary Sewer ~
SCADA System 14 Lift Stations SS-07-02 nla 75,000 75,000
Lift Station 12 Rehab-5705 Christmas Lake Pl SS-OB-01 nla 110,000 110,000
Lift Station 16 Rehab-4915 Shady Island Rd SS-OB-02 nla 104,000 104,000
Portable Lift Station Control Panel SS-OB-03 nla 7,000 7,000
Lift Station 15 Rehab-4360 Enchanted Dr. SS-OB-06 nla 28,000 100,000 12B,000
Lift Station 17 Rehab-5295 Shady Island Rd SS-09-01 nla 8,000 70,000 7B,000
Annual Lift Station Inspect & Rehab SS-11-03 nla 25,000 25,000 25,000 25,000 25,000 125,000
Infiltration and Inflow Reduction SS-11-05 nla 50,000 50,000 50,000 50.000 50,000 250,000
Sanitary Sewer Total 150,000 324,000 183,000 145,000 75,000 877,OO(}
IStormwater Management I
15
Department Project# Priority 2007 2008 2009 2010 2011 Total
Water Management Plan STM-07-06 2 78,000 78,000
Project To-Be-Determined STM-08-02 nla 100,000 100,000
Harding Lane Drainage STM-09-01 1 97,000 97,000
Stratford PI Drainage STM-09-02 1 30,000 30,000
Lake South Auto Drainage STM-09-03 1 21,000 21,000
5830 Echo Rd Drainage STM-09-04 1 33,000 33,000
6180 Chaska Rd Drainage STM-09-05 1 4,000 4,000
Meadowview Rd Storm STM-10-01 3 15,000 15,000
Nelsine Dr Drainage STM-10-02 1 16,000 16,000
6180 Murray Drainage STM-10-03 1 36,000 36,000
5925 Grant Drainage STM-10-Q4 1 49,000 49,000
Lake Mary Outlet STM-11-02 1 505,000 505,000
Star Circle Storm STM-11-03 3 89,000 89,000
Rampart Ct. Drainage STM-11-04 1 8,000 8,000
Storm water Management Total 78,000 100,000 185,000 116,000 602,000 1,081,000
ITechnology/Office Equip ,
Financial Software Package T-07-01 nla 43,000 43,000
Network Server (Computer) Replacement T-07-02 nla 19,500 19,500
Phone System (VOIP or other) - City Hall T-09-01 nla 40,000 40,000
City Hall Copier & Maintenance Contract T-09-02 nla 25,000 25,000
Computer Upgrades T-11-06 nla 10,000 10,000 10,000 10,000 10,000 50,000
Technology/Office Equip Total 72,500 10,000 75,000 10,000 10,000 177,500
GRAND TOTAL 1,083,441 2,824,996 1,557,744 1,715,130 4,624,823 11,806,134
16
III. CAPIT AL IMPROVEMENT PLAN PROJECTS
17
18
A. EQUIPMENT
The Equipment Replacement Fund Schedule identifies the year that each piece of equipment
is likely to be replaced. The overall purpose of the schedule is to help identify the financial
!esources that will be necessary to maintain an economical Public Works fleet that meets the
City's needs. It is important to understand that the replacement schedule is typical for each
piece of equipment. It is the City's policy that equipment is to be replaced when necessary,
not just when scheduled. If a vehicle life can be reasonably extended beyond when it is
scheduled for replacement, the City will do so. If a vehicle has a recorded history of costly
repairs and an analysis indicates early replacement, a vehicle may be moved up in the
schedule. As such, schedule changes and equipment purchases are to be done with the City
Council's approval.
Financial projections attempt to forecast the resources that are needed for a 20-year period for
the Equipment Replacement Fund. This analysis makes certain assumptions with regard to
the foreseeable interest rates achieved on cash balances and the rate of inflation of purchasing
equipment. Council will notice that there are years where the fund is in deficit. The
approach recommended at this time is to monitor the Equipment Fund as it is updated
during the next few years.
19
City of Shorewood, Minnesota
Capital Improvement Program
2007 thru 2011
PROJECTS BY DEPARTMENT
Department Project# Priority 2007 2008 2009 2010 2011 Total
IEquipment Replacement ~
Water Truck-Ford 7000 E-C7-45 n/a 50,000 50,000
F350 & Flatbed E-C7-49 n/a 41,031 41,031
F350.4x4 Pickup w/plow E-C7-55 n/a 35,349 35,349
Mower - Toro Groundsmaster 325D E-07-70 n/a 22,093 22,093
Diesel Fuel Trailer 500 Gallons E-07-71 n/a 7,827 7,827
Attach - Blower for Groundsmaster E-07-75 n/a 5,757 5,757
Attach - 1985 Cabs for Groundmaster E-07-82 n/a 5,050 5,050
Snow Thrower - John Deere 826 (1970) E-07-91 n/a 947 947
Snow Thrower - John Deere 826 (1972) E-07-92 n/a 947 947
Attach - Flail side mower E-07-93 n/a 16,160 16,160
Attach - Flail rear mower E-07-94 n/a 8,080 8,080
Ford 555 Backhoe E-08-22 n/a 70,257 70,257
Dump Truck - Ford L8000(1988) E-08-33 n/a 147,205 147,205
Sweeper-Tennant 240 E-08-46 n/a 16,059 16,059
Speed Awareness Display E-08-51 n/a 24,088 24,088
Skid Steer - Bobcat 753 E-08-76 n/a 23,887 23,887
Dump Box Rehabilitation and Sander E-09-54 n/a 25,533 25,533
Dump Truck - Ford L8oo0 (1995) E-09-68 n/a 153,200 153,200
Tractor - Ford 3910 E-10-35 n/a 39,094 39,094
Air Compressor-Ingersoll Rand 185 E-10-38 n/a 16,465 16,465
Trailer 12' Tops E-10-41 n/a 3,458 3,458
Dump 1 ton - 4 x 2 Ford F-350 E-1O-52 n/a 54,131 54,131
Groundsmaster Mower- Toro 328D E-10-57 n/a 26,314 26,314
Mower - Toro Walk Behind 44 E-10-73 n/a 3,308 3,308
Attach2 - 1985 Cabs for Groundmaster E-10-82 n/a 6,015 6,015
Trailer 24' - Trail King E-11-21 n/a 23,111 23,111
Mower - Toro Groundmaster 328D (84) E-11-74 n/a 27,892 27,892
Sand Pro 3000 E-11-77 n/a 13,548 13,548
Equipment Replacement Total 193,241 281,496 178,733 148,785 64,551 866,806
GRAND TOTAL 193,241 281,496 178,733 148,785 64,551 866,806
20
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-07 -45
Project Name Water Truck-Ford 7000
Type Equipment PriOl"ity n/a
lJseful Life Unassigned Contact Engineer
Category PW: Vehicles Department Equipment Replacement
Fund #
Description I Total P,"oject Cost $50,000
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
EquipNehicles/Furnishings 50,000 50,000
Total 50,000 50,000
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 50,000 50,000
Total 50,000 50,000
l~ooW~~ I I
/
Friday. JalluOIY 25, 2008
21
,
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-07-49
Project Name F350 & Flatbed
Type Equipment Priority n/a
Useful Life Unassigned Contact Public Works Director
Category PW: Vehicles Department Equipment Replacement
Fund #
Description I Total PI'oject Cost $123,592
Justification I
Expenditures 2007 2008 2009 2010 2011 Total Future
EquipNehides/Fumishirigs 41.031 41.031 I 82,5611
Total 41,031 41,031 Total
Funding Sources 2007 2008 2009 2010 2011 Total Future
Equipment Replacement Fund 41,031 41,031 I 82.5611
Total 41,031 41,031 Total
I~ti_~~~ I I
!
I
I
Friday, JallulIIY 25, 2008
22
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Pl"Oject # E-07-55
Project Name F350 4x4 Pickup w/plow
Type Equipment Pl'iority nfa
Useful Life Unassigned Contact Engineer
Category PW: Vehicles Department Equipment Replacement
Fund #
Description I Total Pl"Oject Cost $98,654
Justification I
.
Prior Expenditures 2007 2008 2009 2010 2011 Total Future
I o I EquipNehiclesfFurnishings 35,349 35,349 I 63,3051
Total Total 35,349 35,349 Total
.
Prior Funding Sources 2007 2008 2009 2010 2011 Total Future
I 01 Equipment Replacement Fund 35,349 35,349 I 63.3051
Total Total 35,349 35,349 Total
I Opemtional '-""'Other I I
Frida)', JlmullIY 25, 2008
23
:"
u_ - -- -- -----.----
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-07-70
Project Name Mower - Toro Groundsmaster 325D
Type Equipment Priority n/a
lJseful Life Unassigned Contact Public Works Director
Category PW: Small Tools & Equip Department Equipment Replacement
Fund #
Description I Total PI'oject Cost $105,264
Justification I
Expenditures 2007 2008 2009 2010 2011 Total Future
EquipNehicles/Furnishings 22.093 22.093 I 83.1711
Total 22,093 22,093 Total
Funding Sources 2007 2008 2009 2010 2011 Total Future
Equipment Replacement Fund 22.093 22,093 I 83.1711
Total 22,093 22,093 Total
I Op=tibnd ~a~~ I I
Friday, JIIllumy 25,2008
24
Capital Improvement Program
City of Shorewood, Minnesota
Project # E-07-71
Project Name Diesel Fuel Trailer 500 Gallons
Type Equipment
Useful Life
Category PW: Small Tools & Equip
Fund #
Description
I
Justification
I
Expenditures
EquipNehicles/Furnishings
Total
Funding Sources
Equipment Replacement Fund
Total
I Operational I~
.
2007 thru 2011
Priority n/a
Contact Public Works Di~ector
Department Equipment Replacement
Total pJ'oject Cost
$7,827
2007
7,827
7,827
2009
2008
2007
7,827
7,827
2009
2008
25
2010
2010
2011
2011
Total
7,827
7,827
Total
7,827
7,827
Frida)'. Jallllmy 25. 1008
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-07-75
Project Name Atta.ch - Blower for Groundsmaster
Type Equipment Priority nla
Useful Life Contact Public Works Director
Category PW: Small Tools & Equip Department Equipment Replacement
Fund #
Description 1 Total Project Cost $18,773
Justification I
Expenditures 2007 2008 2009 2010 2011 Total Future
EquipNehicles/Fumishings 5,757 5,757 j 13,0161
I
Total 5,757 5,757 Total
Funding Sources 2007 2008 2009 2010 2011 Total Future
Equipment Replacement Fund 5,757 5,757 I 13.0161
Total 5,757 5,757 Total
100000tional ~Other I I
Friday. Janumy 25. 2008
26
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-07 -82
Project Name Attach -1985 Cabs for Groundmaster
Type Equipment Priority nla
Useful Life Unassigned Contact Engineer
Category PW: Small Tools & Equip Department Equipment Replacement
Fund #
Description 1 Total Project Cost $5,050
Justification 1
,
Expenditures 2007 2008 2009 2010 2011 Total
EquipNehicles/Furnishings 5,050 5,050
Total 5,050 5,050
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 5,050 5,050
Total 5,050 5,050
.
I Op=tionM ~Oili~ I I
Frida)'. Jallumy 25. 2008
27
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Pt'ojcct # E-07-91
Project Name Snow Thrower - John Deere 826 (1970)
Type Equipment Priority n/a
Useful Life Unassigned Contact Engineer
Category Technology/Office Equipment Depat"tment Equipment Replacement
Fund #
Description I Total Pl"Oject Cost $3,216
Justification I
.
.
Expenditures 2007 2008 2009 2010 2011 Total Future
EquipNehideslFurnishings 947 947 i 2.2691
;
Total 947 947 Total
Funding Sources 2007 2008 2009 2010 2011 Total Future
Equipment Replacement Fund 947 947 I 2.2691
Total 947 947 Total
I OperationallmpactlOthe< I I
.
~.
Friday. Ji/IlUGlY 25, 2008
28
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-07-92
Project Name Snow Thrower - John Deere 826 (1972)
Type Equipment Priority nla
Useful Life Unassigned Contact Public Works Director
Category PW: Small Tools & Equip Department Equipment Replacement
Fund #
Description I Total PI'oject Cost $3,216 .
..
Justification I
Expenditures 2007 2008 2009 2010 2011 Total Future
EquipNehides/Furnishings 947 947 I 2,2691
Total 947 947 Total
Funding Sonrces 2007 2008 2009 2010 2011 Total Future
Equipment Replacement Fund 947 947 I 2.2691
Total 947 947 Total
I Opemtional ImpactlOlher I I
Friday. Jl1llualy25. 2(}{)8
29
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-07 -93
Project Name Attach - Flail side mower
Type Equipment PI;ority n/a
Useful Life Unassigned Contact Engineer I
Category PW: Small Tools & Equip Department Equipment Replacement
Fund #
Description I Total Project Cost $16,160
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
EquipNehicles/Furnishings 16,160 16,160
Total 16,160 16,160
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 16,160 16,160
Total 16,160 16,160
I ~tioo& ~.~~ I I
Frida)'. JalluGlY 25. 2008
30
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-07-94
Project Name Attach - Flail rear mower
Type Equipment Priority nla
Useful Life Unassigned Contact Engineer
Category PW: Small Tools & Equip Department Equipment Replacement
Fund #
Description I Total Pmject Cost $8,080
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
EquipNehicles/Fumishings 8,080 8,080
Total 8,080 8,080
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 8,080 8,080
Total 8,080 8,080
I Opemtionallmpact/Otber I I
Frida)'. Janumy 25. 2008
31
-- -- --------
Capital Improvement Program ' 2007 thru 2011
City of Shorewood, Minnesota
Project # E-08-22
Project Name Ford 555 Backhoe
Type Equipment Priority n/a
Useful Life Unassigned Contact Public Works Director
Category PW: Vehicles Department Equipment Replacement
Fund #
Description I Total Project Cost $70,257
-
,-
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
EquipNehicles/Fumishings 70,257 70,257
Total 70,257 70,257
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 70,257 70,257
Total 70,257 70,257
r OpemtiOnM hDp~~ I I
Fn'day. Janumy 25, 2008
32
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-08-33
Project Name Dump Truck - Ford L8000 (1988)
Type Equipment Priority nla
Useful Life Unassigned Contact Public Works Director
Category PW: Vehicles Department Equipment Replacement
Fund #
Description I Total Project Cost $147,205
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
EquipNehicles/Furnishings 147,205 147,205
Total 147,205 147,205
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 147,205 147,205
Total 147,205 147,205
I OpemUoW hnp~Ofu~ I I
Frida)'. Jallumy 25. 2008
33
Capital Improvement Program
City of SIiorewood, Minnesota
P,'oject # E-08-46
Project Name Sweeper - Tennant 240
Type Equipment
Useful Life Unassigned
Category PW: Vehicles
Fuud#
Description
Justification
Expenditures
EquipNehideslFumishings
Total
Funding Sources
Equipment Replacement Fund
Total
I OpemtionW ~rnoo
2007 thru 2011
P,'iority nla
Contact Public Works Director
Department Equipment Replacement
Total Project Cost
2007
2008
16,059
16,059
2007
2008
16,059
16,059
$54,545
2009
2009
34
2010
2010
2011
2011
Total
16,059
16,059
Total
16,059
16,059
Future
38.4861
Total
Future
38.4861
Total
Frid(l)', Jallumy 25. 2008
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-08-51
Project Name Speed Awareness Display
Type Equipment Priority nla
Useful Life Unassigned Contact Public Works Director
Category PW: Vehicles Department Equipment Replacement
Fllnd#
.
Description 1 Total PJ'oject Cost $24,088
Justification 1
Prior Expenditures 2007 2008 2009 2010 2011 Total
I 01 EquipNehides/Fumishings 24,088 24,088
Total Total 24,088 24,088
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 24,088 24,088
Total 24,088 24,088
I ~noo&~w~ I I
Frida)'. JallulIIY 25, 2008
35
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-08-76
Project Name Skid Steer - Bobcat 753
Type Equipment Priority nla
Useful Life 7 yrs Contact Public Works Director
Category PW: Vehicles Department Equipment Replacement
Fund #
Description I Total Project Cost $132,427
Justification I
Expenditures 2007 2008 2009 2010 2011 Total Future
EquipNehicleslFumishings 23,887 23,887 I 108,5401
Total 23,887 23,887 Total
Funding Sources 2007 2008 2009 2010 2011 Total Future
Equipment Replacement Fund 23,887 23,887 I 108,540 I
Total 23,887 23,887 Total
lOpemtiOnal Impact/Other I I
,
Friday. Jallumy 25. 2008
36
Capital Improvement Program
City of Shorewood, Minnesota
Project # E-09-54
Project Name Dnmp Box Rehabilitation and Sander
Type Equipmen!
Useful Life Unassigned
Category PW: Vehicles
Fund #
Description
I
Justification
I
Expenditures
EquipNehicleslFurnishings
Total
Funding Sources
Equipment Replacement Fund
Total
I Opemtionallmpact/Other
2007 thru 2011
PI'iority nla
Contact Public Works Director
Department Equipment Replacement
Total PI'oject Cost
2007
2007
$25,533
2008
2009
25,533
25,533
2008
2009
25,533
25,533
37
.
2010
2010
2011
2011
Total
25,533
25,533
Total
25,533
25,533
Frida)'. JanualY 25. 2008
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-09-68
Project Name Dump Truck - Ford L8000 (1995)
Type Equipment Priority nla
Useful Life Unassigned Contact Public Works Director
Category Technology/Office Equipment Department Equipment Replacement
Fund #
Description I Total Project Cost $153,200
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
EquipNehicleslFumishings 153,200 153,200
Total 153,200 153,200
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 153,200 153,200
Total 153,200 153,200
I OpeutiDnM ~Ofuet I I
i
Frida)'. JWlumy 25. 2008
38
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
PI'oject # E-10-35
Project Name Tractor - Ford 3910
Type Equipment Priority nla
Useful Life Unassigned Contact Public Works Director
Category PW: Vehicles Department Equipment Replacement
Fund #
Description 1 Total Project Cost $39,094
Justification 1
Expenditures 2007 2008 2009 2010 2011 Total
EquipNehidesfFurnishings 39,094 39,094
Total 39,094 39,094
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 39,094 39,094
Total 39,094 39,094
I Opemnon& ~U~ I I
"
Frida)', JanuOlY 25, 2008
39
Capital Improvement Program
City of Shorewood, Minnesota
2007 thru 2011
P,'oject# E-10-38
Project Name Air Compressor-Ingersoll Rand 185
Type Equipment
Useful Life Unassigned
Category PW: Small Tools & Equip
Fund #
Description
I
Justification
. I
Expenditures
EquipNehiclesfFumishings
Total
Funding Sources
Equipment Replacement Fund
Total
[OpeBtiOnW ImpacYMe<
Priority nfa
Contact Public Works Director
Department Equipment Replacement
Total P,'oject Cost
$16,465
2007
2009
2008
2007
2008
2009
40
2010
16,465
16,465
2010
16,465
16,465
2011
2011
Total
16,465
16,465
Total
16,465
16,465
Friday. JaIlumy 25. 2008
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-10-41
Project Name Trailer 12' Tops
Type Equipment Priority nla
Useful Life Unassigned Contact Public Works Director
Category PW: Vehicles Department Equipment Replacement
Fund #
Description I Total Project Cost $3,458
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
EquipNehicles/Furnishings 3,458 3,458
Total 3,458 3,458
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 3,458 3,458
Total 3,458 3,458
I OpemtiOnM ~cUOili~ I I
.
Friday. Jallumy 25. 2008
41
-- - ---------
.
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-IO-52
Project Name Dump 1 ton - 4 x 2 Ford F-350
Type Equipment Priority nfa
Useful Life Unassigned Contact Engineer
Category PW: Vehicles Department Equipment Replacement
Fund #
Description I Total P."oject Cost $54,131
Justification I
Prior Expenditures 2007 2008 2009 2010 2011 Total
I 01 EquipNehides/Fumishings 54,131 54,131
Total Total 54,131 54,131
. Prior Funding Sources 2007 2008 2009 2010 2011 Total
I 01 Equipment Replacement Fund 54,131 54,131
Total Total 54,131 54,131
[ Opemtional ImpactI01her I I
,
FI:i<'a)'. Jallumy 25. 2008
42
,
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-IO-57
Project Name Groundsmaster Mower- Toro 328D
Type Equipment P,'iority nfa
Useful Life Unassigned Contact Public Works Director
Category PW: Small Tools & Equip Department Equipment Replacement
Fund #
Description I Total Pmject Cost $125;372
Justification I
.
Expenditures 2007 2008 2009 2010 2011 Total Future
EquipNehidesfFurnishings 26,314 .26,314 I 99,0581
I
Total 26,314 26,314 Total
Funding Sources 2007 2008 2009 2010 2011 Total Future
Equipment Replacement Fund 26,314 26,314 i 99,0581
Total 26,314 26,314 Total
I OpemtiDnal Impact/Other I I
Frida)'. JanulIry 25. 2008
43
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Pl'oject # E-IO-73
Project Name Mower - Toro Walk Behind 44
Type Equipment Pl'iority n/a
lJseful Life Unassigned Contact Public Works Director
Category PW: Small Tools & Equip Department Equipment Replacement
Fund #
Description I Total Project Cost $3,308
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
EquipNehicles/Furnishings 3,308 3,308
Total 3,308 3,308
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 3,308 3,308
Total 3,308 3,308
[OpemuoW ~acU~ I I
Frida)', JUllumy 25, 2008
44
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-10-82
Project Name Attach2 - 1985 Cabs for Groundmaster
Type Unassigned Priority nla
Useful Life Contact
Category Unassigned Department Equipment Replacement
Fund #
Description I Total PI'oject Cost $6,015
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
EquipNehicles/Fumishings 6,015 6,015
Total 6,015 6,015
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 6,015 6,015
Total 6,015 6,015
I Opemtio~ hnpacV~ I I
Frida)'. JlIllumy 25, 2008
45
Capital Improvement Program
City of Shorewood, Minnesota
Project # E-1l-21
Project Name Trailer 24' - Trail King
Type Equipment
Useful Life Unassigned
Category PW: Vehicles
Fund #
Description
Justification
Expenditures 2007
EquipNehicles/Fumishings
Total
Funding Sources 2007
Equipment Replacement Fund
Total
[ Opetationa1 ImpactlOlhe.
2007 thru 2011
Priority nla
Contact Public Works Director
Department Equipment Replacement
Total Project Cost
$23,111
2008
2009
2008
2009
46
2010
2010
2011
23.111
23,111
2011
23,111
23,111
Total
23.111
23,111
Total
23.111
23,111
Friday, JanulllY 25, 2008
.
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # E-1l-74
Project Name Mower - Toro Groundmaster 328D (84)
Type Equipment Priority nfa
lJseful Life 7 yrs Contact Public Works Director
Category PW: Vehicles Department Equipment Replacement
Fund #
Description I Total Pr!lject Cost $27,892
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
EquipNehiclesfFurnishings 27,892 27,892
Total 27,892 27,892
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 27,892 27,892
Total 27,892 27,892
I Operational ImpactlOlher I I
~
,
Friday, Jal1ullIY 25, 2008
41
Capital Improvement Program
City of Shorewood, Minnesota
Pl'oject # E-1l-77
Project Name Sand Pro 3000
Type Equipment
lJseful Life 15 yrs
Category PW: Vehicles
Fund #
Description
Justification
Expenditures 2007
EquipNellicles/Fumishings
Total
Funding Sources 2007
Equipment Replacement Fund
Total
I Op=Do~ hnpacifOOer
2007 thru 2011
Pl'iOl'ity n/a
Contact Public Works Director
Department Equipment Replacement
Total Project Cost
$13,548
2008
2009
2008
2009
48
2010
2010
2011
13,548
13,548
2011
13,548
13,548
Total
13,548
13,548
Total
13,548
13,548
Frida)', Jallumy 25. 2008
B. LOCAL STREET RECONSTRUCTION FUND
The Local Street Reconstruction Fund is established to build, reconstruct and
maintain all of the roadways within the City of Shorewood, except Municipal
State Aid (MSA) routes, State Trunk Highways, and County Roads.
The City of Shorewood maintains approximately 50 miles of local roadways.
Funds for such expenditures typically come from the General Fund. The City
has discussed the need to create and implement a roadway assessment policy for
public improvements to insure the longevity of the Local Roadway Fund.
The City Engineer evaluates all of the City's roadways on an annual basis.
Evaluations are recorded using the PHASER Pavement Management System to
assist in evaluating the priority of construction projects.
The following are project proposals for each local roadway project, an overall
project schedule, and funding source summary for the local roadway system.
~
49
50
City of Shorewood, Minnesota
Capital Improvement Program
2007 tbru 2011
PROJECTS BY DEPARTMENT
Department Project# Priority 2007 2008 2009 2010 2011 Total
ILocal Street Reconstrnction ,
Slurry Overlay LR.()8.02 nla 300,000 300,000
Harding Lane LR-09-01 1 586,011 586,011
Nelsine Drive LR.10-03 1 357,600 357,600
Meadowview Road LR-10-04 1 350,745. 350,745
Rampart Court LR-11-01 1 171,572 171,572
Star Roads LR-11-02 1 535,700 535,700
Bituminous Overlays LR-11-100 nla 95,000 95,000 95,000 95,000 95,000 475,000
Bituminous Sealcoating LR-11-99 nla 66,000 66,000 66,000 66,000 66,000 330,000
Local Street Reconstruction Total 161,000 461,000 747,011 869,345 868,272 3,106,628
GRAND TOTAL 161,000 461,000 747,011 869,345 868,272 3,106,628
51
Capital Improvement Program
City of Shorewood, Minnesota
Project # LR-08-02
Project Name Slurry Overlay
Type Unassigned
Useful Life
Category Unassigned
Fund #
Description
Justification
2007 thru 2011
Priority nla
Contact
Department Local Street Reconstruction
Total Project Cost
Expenditures 2007
Construction/Inspection
Total
2008
300,000
300,000
Funding Sources 2007
Local Street Reconstruction
Total
[ Opemtiond ~acYOfutt
2008
300,000
300,000
$300,000
2009
2009
52
2010
2010
2011
2011
Total
300,000
300,000
Total
300,000
300,000
Frida)', JlIJ!Umy 25, 2008
Capital Improvement Program
City of Shorewood, Minnesota
Project # LR-09-01
Project Name Harding Lane
Type Improvement
Useful Life Unassigned
Category Roadways/streets
Fund #
2007 thru 2011
Priority I Urgent
Contact Engineer
Department Local Street Reconstruction
Description I Total Project Cost $586,011
This project includes Pavement Reclamation from cul-de-sac to the cul-de-sac.
Justification
I
Expenditures
Construction/Inspection
Total
Funding Sources
Local Street Reconstruction
Total
I OpemtiDnallmpactIOtbor
2007
2008
2007
2008
53
2009
586,011
586,011
2009
586,011
586,011
2010
2010
, ..
, ;:5 4
c:: ::N
8:: :1 ~
~..,~.IO
&:IIW! J '. ~..
"gl: ;J:
;1:::
Srrrilhtown
Road
PROJECT
LOCATION
2011
Total
586,011
586,011
2011
Total
585,011
586,011
Frida)'. JalluolY 25. 2008
.-
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # LR-IO-03 NELSINE
Project Name Nelsine Drive I - - - -
,------
"0 DR
Type Improvement pJojority I Urgent 0:: ;1
i
Useful Life Unassigned Contact Engineer 1-
I '"
Category Roadways/streets Department Local Street Reconstruction , -'" N
l!1
1&1
Fund # 1 I PROJECT
, I LOCATION
Description I Total Project Cost $357,600
This project includes Pavement Reclamation from Eureka Road to Cul-de-sac.
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
Construction/l nspection 357,600 357,600
Total 357,600 357,600
Funding Sources 2007 2008 2009 2010 2011 Total
Local Street Reconstruction 357,600 357,600
Total 357,600 357,600
I Opetational Impa.vOthet I I
Frida)'. JallullIY 25. 2008
54
.
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota .
Project # LR-IO-04
Project Name Meadowview Road ! I
r-o ::2:' ,
0;0 == I I
0.. I I MEADOWVIEW
Type Improvement Priority I Urgent 00 ;:01 - - - - -
~C- - -- - - l
Useful Life Unassigned Contact Engineer gl I RD II
_m (1)1 I I
Category Roadways/streets Department Local Street Reconstruction 00 I I I I
Z-f ~I Z I-->;==- I
Fllnd# , I I
.
Description I Total Pl"Oject Cost $350,745
This project includes Pavement Reclamation from Valleywood Lane to Wild Rose Lane.
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
Construction/I nspection 350,745 350,745
Total 350,745 350,745
Funding Sources 2007 2008 '2009 2010 2011 Total
Local Street Reconstruction 350,745 350,745
Total 350,745 350,745
I 0pem~na1 ~actIOther I I
Friday. .Ialluaty 25, 2008
55
Capital Improvement Program
City of Shorewood, Minnesota
Project # LR-ll-Ol
Project Name Rampart Court
Type Improvement
Useful Life Unassigned
Category Roadways/streets
Fund #
2007 thru 2011
Priority 1 Urgent
Contact Engineer
Department Local Street Reconstruction
Description I Total Project Cost $171,572
This project includes Pavement Reclamation from Wood Dr. to Cul-de-sac.
Justification
I
Expenditures
Construction/I nspection
Total
Funding Sources
Local Street Reconstruction
Total
lOpemtiO~ ~acU~
2007
2008
2007
2008
2009
2009
56
2010
2010
RAMPART
CT il
":.-_::. N
11'000' .-
Dr.
PROJECT
LOCATION
2011
171,572
171,572
Total
171,572
171,572
.2011
171,572
171,572
Total
171,572
171 ,572
Friday, JlIllumy 25, 2008
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # LR-ll-02 ~
<(
Project Name Star Roads .... N
,
,j STAR
Type Unassigned Priority 1 Urgent II~CIR
1<(
Useful Life Contact 'f-
,m ....
Category Unassigned Department Local Street Reconstruction .- ....
. Smithtown
Fund # Road
PROJECT
LOCATION
Description I Total Project Cost $535,700
.
Justification .1
Expenditures 2007 2008 2009 2010 2011 Total
Construction/Inspection 535,700 535,700
Total 535,700 535,700
Fundin,g Sources 2007 2008 2009 2010 2011 Total
Local Street Reconstruction 535,700 535,700
Total 535,700 535,700
I Opemtiow ~~Oiliu I I
Frida)'. Jallumy 25. 2008
57
.
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # LR-1l-99
Project Name Bituminous Sealcoating
Type Improvement Priority n/a
Useful Life Unassigned Contact Engineer
Category Roadways/streets Department Local Street Reconstruction
Fund #
Description I Total Project Cost $577,000
The City has traditionally allocated funds annually towards bituminous seal coating.
Justification I
Prior Expenditures 2007 2008 2009 2010 2011 Total
I 247,0001 Construction/I nspection 60,500 60,500 60,500 66,000 66,000 313,500
Total Contingencies 5,500 5,500 5,500 16.500
Total 66,000 66,000 66,000 66,000 66,000 330,000
Prior Funding Sources 2007 2008 2009 2010 2011 Total
I 247,000 I Local Street Reconstruction 66,000 66,000 66,000 66,000 66,000 330,000
Total Total 66,000 66,000 66,000 66,000 66,000 330,000
[OperntiOnd~U~ I I
Friday. Jallumy 25, 2008
58
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Pl'oject # LR-ll-IOO
Project Name Bituminous Overlays
Type Improvement PriOl'ity n/a
Useful Life Unassigned Contact Engineer
Category Roadways/streets Department Local Street Reconstruction
Fuud#
Description I Total Pl'oject Cost $845,000
The City has traditionally allocated funds annually towards bituminous overlay projects. It is recommended that this amount be $95,000 per year,
Justification I
Prior Expenditures 2007 2008 2009 2010 2011 Tot~l
I 370,000 I Construction/Inspection 83,750 83,750 83,750 95,000 95,000 441 ,250
Total Contingencies 11,250 11,250 11.250 33,750
Total 95,000 95,000 95,000 95,000 95,000 475,000
Prior Funding Sources 2007 2008 2009 2010 2011 Total
I 370,000 I Local Street Reconstruction 95,000 95,000 95,000 95,000 95,000 475,000
Total Total 95,000 95,000 95,000 95,000 95,000 475,000
I Operational ImpactJOther I I
Frida)'. Jallumy 25. 2008
59
60
C. MUNICIPAL STATE AID ROADWAYS
Municipal State Aid (MSA) roadways are collector routes throughout the City that have
been designated by the City and reviewed and approved by the State as MSA eligible
routes. The Minnesota Department of Transportation's Office of State Aid provides gas
tax dollars, collected at the gas pump, to municipalities that have a population in excess
of 5,000. These funds are to be used to build, reconstruct, and maintain MSA routes.
The intent of the state aid system is to insure that a uniform network of roadways exists
as a motorist travels throughout the metropolitan area. The amount of MSA routes that
a municipality may designate is a maximum of 20 percent of City's total roadway
length. For the City of Shorewood, this equates to just over 9.29 miles of roadway.
Table 2 below lists the current designated MSA routes.
MSA Route From To Mileage
Smithtown Rd. Victoria Border Country Club Rd. 2.40
Howards Pt. Rd. Smithtown Rd. Edgewood Rd. 0.78
Edgewood Rd. Howard's Pt. Rd. Grant Lorenz Rd. 0.72
Country Club Rd. Yellowstone Trail Trunk Highway 7 0.44
Yellowstone Trail Country Club Rd. Lake Linden Dr. 1.26
Lake Linden Dr. Yellowstone Tr. Trunk Highway 7 0.40
Old Market Rd. Trunk Hwy 7 Covington Rd. 0.45
Covington Rd. Old Market Rd. Vinehill Road 0.43
Apple Road Mill Street Chanhassen City 0.33
Limit
Vinehill Road Broms Boulevard Townline Road 1.38 .
Total 8.59
Table 2
It should be noted that the MnDOT Office of State Aid allows municipalities to use the
dollars held in an account at the State on a reimbursement basis. In addition, the state
will allow cities to borrow a maximum of three times the annual construction allotment
received by the City to complete a project. All design, construction, and documentation
must adhere to MSA rules to be eligible for reimbursement.
~"-
61
62
Department
City of Shorewood, Minnesota
Capita/Improvement Program
2007 thru 2011
PROJECTS BY DEPARTMENT
Project# Priority 2007
2009
2010
2011
Total
IMnnicipal State Aid Streets I
Vine HiH Road - Mill and Overlay
Municipal State Aid Streets Total
GRAND TOTAL
2008
MSA-03-05
2,500,000
2,500,000
2,500,000
2,500,000
2,500,000
2,500,000
63
Thursday, December 06, 2007
Capital Improvement Program
City of Shorewood, Minnesota
2007 thru 2011
P.-oject # MSA-03-05
Project Name Vine Hill Road - Mill and Overlay
Type Improvement
Useful Life Unassigned
Category State Aid Roadways
Fund #
Priority I Urgent
Contact Engineer
Department Municipal State Aid Streets
Description I Total P.-oject Cost $2,500,000
The City of Minnetonka has indicated that they would like to enter into a cooperative MSA project to mill and overlay Vine Hill Road. Both Cities
share Vine Hill Road as a common corporate boundary.
Justification
I
Expenditures
Constructionllnspection
Total
Funding Sources
MSA Funding
Total
I Opemtional Impact/Other
.
2007
2010
2008
2009
2007
2010
2008
2009
64
2011
2,500,000
2,500,000
2011
2,500,000
2,500,000
Total
2,500,000
2,500,000
Total
2,500,000
2,500,000
Friday, Jallumy 25, 2008
D. MUNICIPAL WATER SERVICE
The City of Shorewood has approximatelyl,400 individual service connections to the
municipal water system. Other residents obtain water through individual residential
wells. The City of Shorewood operates and maintains five separate well houses, with a
total of seven wells to service the customers. For reference, the following table provides
some basic information of the City's systems.
Facility Well Aquifer Depth of Year Reserve
Name No. Well (Ft) Installed
Badger 1 Shakopee- 372 1981 Minnewashta Water Tower
Jordan
Boulder 1 Franconia- 640 1981 Minnewashta Water Tower
Bridge Iron -Gale
2 Franconia- 640 1981 Minnewashta Water Tower
Iron -Gale
S.E. Area 1 Jordan 415 1987 Waterford Water
Tower
Amesbury 1 S1. Peter - 528 1973 5000 Gal Hydro-
Jordan pneumatic Tank
2 Shakopee 326 1982 5000 Gal Hydro-
pneumatic Tank
Woodhaven 1 Shakopee- 480 1979 4000 Gal Hydro-
Jordan pneumatic Tank
The Amesbury and W oodhaven wells are hydro-pneumatic systems. These types of
systems are designed for a small neighborhood system. The MN Departmentof Health
recommends that the number of connections served by these types of systems should
not exceed twenty-five. The current number of connections exceeds this amount.
The Badger Field and Boulder Bridge well houses are interconnected via a trunk
watermain on Smithtown Road to the Minnewashta Water Tower. This tower is located
at 26352 Smithtown Road, on the Minnewashta Elementary School property by way of
an easement. This structure has a capacity of 500,000 gallons. The water servicing this
. area is not treated, with the exception of the addition of chlorine and fluoride.
The Southeast area well is connected to the Waterford water tower located at 5500 Old
Market Road. This structure is located on City property and has a capacity of 400,000
gallons. Water from this well is treated for iron removal, along with the addition of
chlorine, and fluoride prior to delivery to the distribution system.
65
"
66
Department
City of Shorewood, Minnesota
Capital Improvement Program
2007 thru 2011
PROJECTS BY DEPARTMENT
Project# Priority 2007
2008
2009
2010
Total
IMunicipal Water System
S.E. Area Lineshaft Well - Pull & Inspect
Amesbury Well Controls Replacement.
WaterMeter'Radio Read Project
West Area Water Tower - Power Wash
SE Area Water Tower - painting
Amesbury Lineshaft Well - Pull & Inspect
Woodhaven Well Bldg Demolition
Boulder Bridge Well #2 - Pull & Inspect
Municipal Water System Total
GRAND TOTAL
,
W-07-02
W-07-03
W-07-05
W-07-25
W-08-01
W-08-02
W-08-03
W.09-01
n/a 22,000
n/a 55,000
n/a 250,000 75,000
n/a 6,700
nla 270,000
n/a 23,000
n/a 18,000
nla
333,700 386,000
333,700 386,000
2011
75,000
22,000
55,000
400,000
6,700
270,000
23,000
18,000
24,000
818,700
24,000
99,000
99,000
818,700
67
Capital Improvement Program
City of Shorewood, Minnesota
2007 thru 2011
Pl'oject # W -07 -02
Project Name S.E. Area Lineshaft Well- Pull & Inspect
Type Improvement
lJseful Life 5 yrs
Category Water: Wells
Fund # 601
Priority n/a
Contact Engineer
Department Municipal Water System
Description I Total Pl'oject Cost $22,000
This project includes pulling, iQspection and repair of the SE Area lineshaft pump, Pumps are to be pulled and inspected on a 5-year rotation.
Justification
I
Expenditures
Construction/Inspection
Contingencies
2007
19,000
3.000
22,000
2008
2009
2010
2011
Total
19,000
3,000
22,000
Total
Funding Sources
Municipal Water Fund
2007
22,000
22,000
2008
2009
2010
2011
Total
22.000
22,000
Total
I OperationallmpactlOthe<
Frida)'. Janumy 25. 2008
68
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Pt'oject # W -07-03
Project Name Amesbury Well Controls Replacement
Type Improvement Priority n/a
llseful Life Unassigned Contact Engineer ~
Category Water: Wells Department Municipal Water System
Fund #
Description 1 Total Pt'oject Cost $55,000
Amesbury well control project for interconnection.
Justification I
Expenditures 2007 2008 2009 2010 . 2011 Total
Construction/I nspection 55,000 55,000
Total 55,000 55,000
Funding Sources 2007 2008 2009 2010 2011 Total
Municipal Water Fund 55,000 55,000
Total 55,000 55,000
I OpemtionW hnpa~ I I
Frida)". JallulIIY 25, 2008
.i'; .. - 69
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
P,'oject # W -07-05
Project Name Water Meter Radio Read Project
Type Improvement Priority nla
Useful Life. Unassigned Contact Engineer
Category Water: Distribution Department Municipal Water System
Fund # 601 .
Description I Total Project Cost $400,000
This project includes conversion of all water meters to a radio read system.
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
Water System Improvement 250,000 75,000 75,000 400,000
Total 250,000 75,000 75,000 400,000
Funding Sources 2007 2008 2009 2010 2011 Total
Municipal Water Fund 250,000 75,000 75,000 400,000
Total 250,000 75,000 75,000 400,000
I Opemtiona1 ~cVOther I I
Frida)", Jalluwy 25. 2008
70
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # W-07-25
Project Name West Area Water Tower - Power Wash
Type Improvement PriOl.jty n/a
Useful Life Contact
Category Water: Towers Department Municipal Water System
Fund #
Description I Total Pmject Cost $6,700
Power wash the West Area Water Tower.
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
Water System Improvement 6,700 6,700
Total 6,700 6,700
Funding Sources 2007 2008 2009 2010 2011 Total
Municipal Water Fund 6,700 6,700
Total 6,700 6,700
I Operationalln<>acdOth.. I I
,
I
Friday. Janumy 25, 2008
71
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
P,'oject # W -08-01
Project Name SE Area Water Tower - painting
Type Improvement Priority nla
Useful Life Unassigned Contact Engineer
Category Water: Towers Depa..tment Municipal Water System
Fund # 601
Description I Total P,'oject Cost $270,000
This project includes preparation, painting, and rehabilitation ofthe exterior surface of the S.E. Area Water tower. This structure has not been
painted since construction was completed.
Justification 1
Expenditures 2007 2008 2009 2010 2011 Total
Construction/I nspection 270,000 270,000
Total 270,000 270,000
I
Funding Sources 2007 2008 2009 2010 2011 Total
Municipal Water Fund 270,000 270,000
Total 270,000 270,000
I Opemtional Impact/Other I I
.
"
. .
Friday, ./(I/l1Ill1)' ]j, ]008
72
Capital Improvement Program
City of Shorewood, Minnesota
2007 thru 2011
Project # W -08-02
Project Name Amesbury Lineshaft Well- Pull & Inspect
Type Improvement
Useful Life Unassigned
Category Water: Wells
Fund #
Priority n/a
Contact Engineer
Department Municipal Water System
Description 1 Total Project Cost $23,000
Project includes pulling, inspection and repair of the Amesbury Iineshaft pump. Pumps are to be pulled and inspected on a 5-year rotation.
Justification
I
Expenditures
Construction/Inspection
2007
2008
23,000
23,000
2009
2010
2011
Total
23,000
23,000
Total
Funding Sources
Municipal Water Fund
2007
2008
23,000
23,000
2009
2010
2011
Total
23,000
23,000
Total
I OpemtionallmpactJOther
Frida)'. JalluUlY 25. 2008
73
----- --
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # W -08-03
Project Name Woodhaven Well Bldg Demolition
Type Improvement Priority n/a
Oseful Life Contact
Category Water: Wells Department Municipal Water System
Fund#
Description I Total Project Cost $18,000
Justification I
Expenditures 2007 2008 2009 2010 2011 T o'tal
Construction/Inspection 18,000 18.000
Total 18,000 18,000
Funding Sources 2007 2008 2009 2010 2011 Total
Municipal Water Fund 18,000 18,000
Total 18,000 18,000
I Opemtional hopactlOOer I I
-
Frida)'. JlInuary 25, 2008
74
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # W-09-01
Project Name Boulder Bridge Well #2 - Pull & Inspect
Type Improvement Priority n/a
Useful Life 5yrs Contact Engineer
Category Water: Wells Department Municipal Water System
Fund # 601
Description I Total Pmjeet Cost $24,000
Project includes pulling, inspection and repair of Boulder Bridge well #21ineshaft pump. Pumps are to be pulled and inspected on a 5-year
rotation.
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
Construction/Inspection 24,000 24,000
Total 24,000 24,000
.
Funding Sources 2007 2008 2009 2010 2011 Total
Municipal Water Fund 24,000 24,000
Total 24,000 24,000
I ~tiow~aW~ I I
Friday, Janumy 25. 2008
I
75 i
76
E. PARKS
Over the past few years, the Park Commission has focused on park management,
education and minor infrastructure improvements. Periodically, each park is
reviewed for its capital expenditure needs and known or anticipated
maintenance items. The Park Commission then develops the Park Capital
Improvement Program and these proposed park projects are included in this
report. Management strategies are defined to best use the resources available.
77
78
City of Shorewood, Minnesota
Capital Improvement Program
2007 tbru 2011
PROJECTS BY DEPARTMENT
Department
Project# Priority 2007
2008
2009
2010
2011
Total
IParks ,
Badger Park-FootbaU Field Lighting P-07-02 nla 95,000 95,000
Silverwood Park Resurface T ennislBasketball Court P.08-01 nla 2,000 2,000
Cathcart Park-Repave Existing Trail P-08-02 nla 3,000 3,000
Cathcart Park-Swing Set Replacement P-08-04 nla 2,500 2,500
Freeman Park-Restoration Dug-outs P-09-01 nla 2,500 2,500
Cathcart Park-Resurface Magic Square P-09-02 nla 7,500 7,500
Manor Park Tennis Court Reconstruction P-09-03 nla 70,000 la,OOO
Silverwood Park-Bituminous Parking Lot P-10-01 nla 18,000 18, 000
Freeman Park-Picnic Shelter Rehab P-10-02 nla 3,000 3,000
Freeman Park-Wetland Enhancement P-11-02 nla 500,000 500,000
Park Improvements P-11-99 nla 5,000 5,000 5,000 5,000 20,000
Parks Total 95,000 12,500 85,000 26,000 505,000 723,500
GRAND TOTAL 95,000 12,500 85,000 26,000 505;000 723,500
79
Capital Improvement Program 2007 thru 2011
~
City of Shorewood, Minnesota
Project # P-07-02
Project Name Badger Park-Football Field Lighting
Type Equipment Priority nla
Useful Life 15 yrs Contact
ClItegory Park improvements Department Parks
Fund # 402
Description I Total PJ"oject Cost $95,000
Replace football field lighting at Badger Field.
Justification . I .
Expenditures 2007 2008 2009 2010 2011 Total
Park Lighting 95,000 95,000
Total 95,000 95,000
~
Funding Sources 2007 2008 2009 2010 2011 Total
Park Fund 95,000 95,000
Total 95,000 95,000
I Operational ImpactiOthe< I I
Frida)', Jallumy 25. 2008
80
.
Capital Improvement Program
City of Shorewood, Minnesota
Project # P-08-01
Project Name Silverwood Park Resurface TennislBasketball Court
2007 thru 2011
Type Improvement
lJseful Life Unassigned
Category Park improvements
Fund #
Pl'iority nla
Contact Engineer
Department Parks
Description I Total PI'oject Cost $2,000
The City of Shorewood has postponed the reconstruction of several tennis courts by resurfacing the courts with a latex overlay. This has worked
well in the past in prolonging the life of the surface. It is proposed that the Silverwood Park tennislbasketball court be resurfaced in the year 2007,
Justification
I
Expenditures
Resurfacing tennis court
2007
2008
2,000
2,000
2009
2010
2011
Total
2,000
2,000
Total
Funding Sources
Park Fund
2007
2008
2,000
2,000
2009
2010
2011
Total
2,000
2,000
Total
I~~~W~
Frida)', January 25, 2008
81
Capital Improvement Program
City of Shorewood, Minnesota
Pl'oject # P-08-02
Project Name Cathcart Park-Repave Existing Trail
Type Unassigned
Useful Life
Category Unassigned
Fund #
Description
Justification
Expenditures 2007
Construction/l nspection
Total
Funding Sources 2007
Park Fund
Total
l~tioo&~
Priority nla
Contact
Department Parks
Total Project Cost
2008
3,000
3,000
2008
3,000
3,000
2007 thru 2011
$3,000
2009
2009
82
2010
2010
2011
2011
Total
3,000
3,000
Total
3,000
3,000
Frida)', Janumy 25, 2008
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # P-08-04
Project Name Cathcart Park-Swing Set Replacement
Type Unassigned P,oiority nla
Useful Life Contact
Category Park improvements Department Parks
Fund #
Description I Total P,'ojectCost $2,500
Justification 1
Expenditures 2007 2008 2009 2010 2011 Total
EquipNehicleslFurnishings 2,500 2,500
.
Total 2,500 2,500
Funding Sources 2007 2008 2009 2010 2011 Total
Park Fund 2,500 2,500
Total 2,500 2,500
I ~mtionW hnpawOili~ I I
Friday. Jallumy 25. 2008
83
Capital Improvement Program
City of Shorewood, Minnesota
Pl'oject # P-09-01
Project Name Freeman Park-Restoration Dug-outs
Type Unassigned
Useful Life
Category Unassigned
Fund #
Description
Freeman Park - Restore dug-outs
Justification
Expenditures
Building Restoration-Siding
Total
Funding Sources
Park Fund
Total
I Opemnonal ImpacVOOer
P,'iority n/a
Contact
Department Parks
Total P,'oject Cost
2007
2007
2008
2008
2007 thru 2011
$2,500
2009
2,500
2,500
2009
2,500
2,500
84
2010
2010
2011
2011
Total
2,500
2,500
Total
2,500
2,500
Frida)'. JalluOIY 25. 2008
Capital Improvement Program
City of Shorewood, Minnesota
Project # P-09-02
Project Name Cathcart Park-Resurface Magic Square
Type Unassigned
Useful Life
Category Park improvements
Fund #
Description I
Cathcart Park - Resurface Magic Square
Justification
I
Expenditures 2007
Construction/Inspection
Total
Funding Sources 2007
Park Fund
Total
I OperationallmpactlO1he.
Priority n/a
Contact
Dellartment Parks
Total Pmject Cost
2008
2008
2007 thm 2011
$7,500
2009
7,500
7,500
2009
7,500
7,500
85
2010
2010
2011
2011
Total
7,500
7,500
Total
7,500
7,500
Frida)', JalllllllY 25, 2008
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
P,'oject # P-09-03
Project Name Manor Park Tennis Court Reconstruction
Type Unassigne.d Priority nfa
Oseful Life Contact
Category Unassigned Department Parks
Fund #
Description I Total Pl"Oject Cost $70,000
Manor Park tennis court reconstruction.
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
Resurfacing tennis court 70,000 70,000
Total 70,000 70,000
Funding Sources 2007 2008 2009 2010 2011 Total
Park Fund 70,000 70,000
Total 70,000 70,000
l ()p<tationaJ ~acUOther I I
Frida)'. Jalluwy 25. 2008
86
.
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # P-IO-Ol
Project Name Silverwood Park-Bituminous Parking Lot
Type Unassigned Priority nla
Useful Life Contact
Category Unassigned Department Parks
Fund #
Description I Total Project Cost $18,000
Silverwood Park - Bituminous overlay parking lot.
Justification -I
Expenditures 2007 2008 2009 2010 2011 Total
Constructionll nspection 18,000 18,000
Total 18,000 18,000
Funding Sources 2007 2008 2009 2010 2011 Total
Park Fund 18,000 18,000
Total 18,000 18,000
I OpeNuond ~Ofu~ I I
Frida)'. JalluOIY 25. 2008
87
Capital Improvement Program
City of Shorewood, Minnesota
Project # P-IO-02
Proj~ct Name Freeman Park-Picnic Shelter Rehab
Type Unassigned
Usefl!l Life
Category Park improvements
Fllnd#
Description
Justification
Expenditures 2007
Construction/Inspection
Total
Funding Sources 2007
Park Fund
Total
[ OpetationallmpactlOther
Priority n/a
Contact
Department Parks
Total Project Cost
2008
2008
2007 thru 2011
$3,000
2009
2010
3,000
3,000
2009
2010
3,000
3,000
88
2011
2011
Total
3,000
3,000
Total
3,000
3,000
Frida)'. Jal1umy 25, 2008
Capital Improvement Program
City of Shorewood, Minnesota
Project # P-ll-02
Project Name Freeman Park-Wetland Enhancement
2007 thru 2011
Type Equipment
lJseful Life Unassigned
Category Park improvements
Fund #
Priority nla
Contact Engineer
Department Parks
Description I Total Project Cost $500,000
Freeman Park WEIC was presented to the previous Commissioners who thought it to be a viable project, ifalte~ative-funding sources can be
obtained. Efforts at this time are to seek out grants and funding merchanisms.
Justification
I
Expenditures
Wetland Enhancement
2007
2008
2009
2010
2011
500,000
500,000
Total
500,000
500,000
Total
I Opemtiona1lmpactlOther
Friday, Jallumy 25, 2008
89
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # P-1l-99
Project Name Park Improvements
Type Improvement Priority n/a
Oseful Life Unassigned Contact Engineer
Category Park improvements Department Parks
Fund #
Description I Total Project Cost $20,000
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
Construction/Inspection 5,000 5,000 5,000 5,000 20,000
Total 5,000 5,000 5,000 5,000 20,000
Funding Sources 2007 2008 2009 2010 2011 Total
Park Fund 5,000 5,000 5,000 5,000 20,000
Total 5,000 . 5,000 5,000 5,000 20,000
I Operation& ImpacUOther I I
Frida)'. JallulIIY 25. 2008
90
F. PUBLIC FACILITIES
The Public Facilities fund provides for the design, construction, and major
maintenance needs of public facilities not already designated under a separate
fund.
The main projects that have been identified include the remodel or
reconstruction of the City office administration building, maintenance of the 5795
Country Club Road residence located next to the City offices, and at a future
date, construction of a public works addition that will include a bay with a lift.
91
92 -
City of Shorewood, Minnesota
Capital Improvement Program
2007 thru 2011
PROJECTS BY DEPARTMENT
Department
Project# Priority 2007
2008
2009
2010
2011
Total
IPublic Facilities
I
Civil Defense Sirens
City HaU Project
5795 Country Club-Residence
Public Works Addition (Bay wllift)
PF-07-05
PF-OB-02
PF-09-01
PF-10-lJ1
nla
nla
nla
nla
50,000 SO,OOO
1,200,000 1,200,000
5,000 5,000
400,000 400,000
1,250,000 5,000 400,000 1,655,000
1,250,000 5,000 400,000 1,655,000
Public Facilities Total
GRAND TOTAL
93
Capital Improvement Program
City of Shorewood, Minnesota
Project # PF-07-05
Project Name Civil Defense Sirens
Type Improvement
Useful Life Unassigned
Category Public Facilities/Buildings
Fund #
Description
Justification
Expenditures
EquipNehideslFumishings
Total
Funding Sources
Public Facilities Fund
Total
I Opetational Impact/01her
, I
2007' thru 2011
Priority n/a
Contact Engineer
Department Public Facilitie&,.
Total Project Cost
$50,000
2007
2008
50,000
SO,OOO
2009
2007
2008
50,000
SO,OOO
2009
94
2010
2010
2011
2011
Total
50,000
SO,OOO
Total
50,000
50,000
Friday. JallullIY 25. 2008
Capital Improvement Program
City of Shorewood, Minnesota
2007 thru 2011
Project # PF -08-02
Project Name City Hall Project
Type Improvement
Useful Life Unassigned
Category Public Facilities/Buildings
Fund #
Priority nla
Contact Finance
Department Public Facilities
Description 1 Total pJ'oject Cost $1,200..000
The funding shown fOT this project shows the estimate for replacing City Hall. Further study may result in a decision to remodel City Hall, which
presumably would have a lesser cost.
Justification
1
Expenditures
Construction/l nspeclion
2007
2008
1,200,000
1,200,000
2009
2010
2011
Total
1,200,000
1,200,000
Total
Funding Sources
General Obligation Bonds
2007
2008
1,200,000
1,200,000
2009
2010
2011
Total
1,200,000
1,200,000
Total
I OpentiOnM ~~
Frida)", Jallumy 25,2008
95
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Pl'oject # PF-09-01
Project Name 5795 Country Club-Residence
Type Unassigned Pl'iority n/a
Useful Life Contact Engineer
Category Public FacilitieslBuildings Department Public Facilities
Fund #
Description I Total Project Cost $5,000
Improvements to 5795 Country Club Rd building (residence next to City Hall),
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
Construction/l nspection 5,000 5,000
Total 5,000 . 5,000
Funding Sources 2007 2008 2009 2010 2011 Total
General Fund 5,000 5,000
Total 5,000 5,000
I Operationallnq>act/Other I '41 I
Frida)'. .Ii/mlluy 25. 2008
96
Capital hnprovement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # PF-IO-Ol
Project Name Public Works Addition (Bay w/lift).
Type Improvement Priority n/a
Useful Life Unassigned Contact Engineer
Category Department Public Facilities
Fund #
Description I Total Project Cost $400,000
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
Construction/Inspection 400,000 400,000
Total 400,000 400,000
Funding Sources 2007 2008 2009 2010 2011 Total
General Fund . 400,000 400,000
Total 400,000 400,000
[ Opemrional1nq=u~ I I
Frida)'. Jl1llumy 25. 2008
97
98
G. SANITARY SEWER SYSTEM
All of the City of Shorewood is served by the municipal sanitary sewer system.
The City system includes approximately 62 miles of sanitary sewer lines with 14 lift
stations. The City of Shorewood system ultimately drains to the Metropolitan Council
of Environmental Services - Blue Lake facility in Shakopee, Minnesota.
Currently, the City is focusing its efforts on lift station rehabilitation and reduction of
infiltration and inflow into the sanitary sewer system.
99
100
City of Shorewood, Minnesota
Capital Improvement Program
2007 thru 2011
PROJECTS BY DEPARTMENT
Department Project# Priority 2007 2008 2009 2010 2011 Total
ISanitary Sewer I
SCADA System 14 Lift Stations 55-07-02 nfa 75,000 75,000
Lift Station 12 Rehab-5705 Christmas Lake PI. 55-08-01 nfa 110,000 110,000
Lift Station 16 Rehab-4915 Shady Island Rd 55-08-02 nfa 104,000 104,000
Portable Lift Station Control Panel 55-08-03 nfa 7,000 7,000
Lift Station 15 Rehab-4360 Enchanted Dr. 55-08-06 nfa 28,000 100,000 128,000
Lift Station 17 Rehab-5295 Shady Island Rd 55-09-01 nfa 8,000 70,000 78,000
Annual Lift Station Inspect & Rehab 55-11-03 nfa 25,000 25,000 25,000 25,000 25,000 125,000
Infiltration and Inflow Reduction 55-11-05 nfa 50,000 50,000 50,000 50,000 50,000 250,000
Sanitary Sewer Total 150,000 324,000 183,000 145,000 75,000 8n,OOO
GRAND TOTAL 150,000 324,000 183,000 145,000 75,000 877,000
..
101
Capital Improvement Program
City of Shorewood, Minnesota
Project # SS-07-02
Project Name SCADA System 14 Lift Stations
Type Unassigned
, lJseful Life
Category Sanitary Sewer
Fund #
Priority nla
Contact
Department Sanitary Sewer
Description Total Project Cost
SCADA Communication System 14 Lift Stations
Justification
Expenditures
EquipNehicles/Furnishings
Total
Funding Sources
Sanitary Sewer Fund
Total
I Operation,.! ImpactJOtber
2007
75,000
75,000
2008
2007
75,000
75,000
2008
102
..
2007 tllru 2011
$75,000
2,009
2009
2010
2010
2011
2011
Total
75,000
75,000
Total
75,000
75,000
Frida)', Jallumy 25, 2008
Capital Improvement Program
City of Shorewood, Minnesota
PI'oject # SS-08-01
Project Name Lift Station 12 Rehab-5705 Christmas Lake Pt.
Type Improvement
Useful Life Unassigned
Category Sanitary Sewer
Fund # 611
Priol'ity n/a
Contact Engineer
Department Sanitary Sewer
Description I Total Project Cost
This project involves design and reconstruction of Lift Station #12.
Justification
I
.
Expenditures 2007
Planning/Design/Survey
Construction/Inspection
Total
Funding Sources
Sanitary Sewer Fund
Total
I OperatiOn& ImpacYOOu
2008
19,000 .
91,000
110,000
2007
2008
110,000
110,000
103
2007 thru 2011
$110,000
2009
2009
2010
2010
2011
2011
Total
19,000
91,000
110,000
Total
110,000
110,000
Frida)". JallullIY 25, 2008
Capital Improvement Program
City of Shorewood, Minnesota
2007 thru 2011
Project # SS-08-02
Project Name Lift Station 16 Rehab-4915 Shady Island Rd
Type Improvement
Useful Life 5 yrs
Category Sanitary Sewer
Fund # 611
Priority n/a
Contact Engineer.
Department Sanitary Sewer
Description Total Project Cost
This project involves reconstruction of Lift Station #16.
$104,000
Justification
Expenditures 2007 2008 2009 2010 2011 Total
Planning/Design/Survey 25,000 25,000
Construction/Inspection 69,500 69,500
Contingencies 9,500 9,500
Total 104,000 104,000
.
Funding Sources
Sanitary Sewer Fund
2007
2008
104,000
104,000
2009
2010
2011
Total
104,000
104,000
Total
I Operational I=tlOth",
Friday. JanualY 25, 2008
104
Capital Improvement Program
City of Shorewood, Minnesota
Project # 88-08-03
Project Name Portable Lift 8tation Control Panel
Type Equipment
lJseful Life 5 yrs
Category Unassigned
Fund #
Description
Portable lift station control panel.
Justification
Expenditures 2007
EquipNehicleslFumishings
Total
..
Funding Sources
Sanitary Sewer Fund
Total
I Opemtiona1lmpact/Olh",
.a:.-
2007 thru 2011
Priority n/a
Contact Public Works Director
Department Sanitary Sewer
Total PI'oject Cost
2007
2008
7,000
7,000
2008
7,000
7,000
105
$7,000
2009
2009
2010
2010
2011
,
-'
2011
Total
7,000
7,000
Total
7,000
1,000
Friday, Jal/uGlY 25,2008
Capitallmprovement Program
City of Shorewood, Minnesota
Project # SS-08-06
Project Name Lift Station 15 Rehab-4360 Enchanted Dr.
2007 thru 2011
Type Improvement
Useful Life 5 yrs
Category Sanitary Sewer
Fund # 61 I
Priority n/a
Contact Engineer
Department Sanitary Sewer
Description Total PI'oject Cost
This project involves design and reconstruction of Lift Station #15.
$128,000
Justification
Expenditures 2007 2008 2009 2010 2011 Total
Planning/Design/Survey 28,000 28,000
Construction/Inspection 100,000 100,000
Total 28,000 100,000 128,000
Funding Sources
Sanitary Sewer Fund
2007
2008
28,000
28,000
2009
100,000
100,000
2010
2011
Total
128,000
128,000
Total
I Operationallmpactloth...
Friday, Jl/llUOIY 25. 2008
106
Capital Improvement Program
City of Shorewood, Minnesota
2007 thru 2011
Project # SS-09-01
Project Name Lift Station 17 Rehab-5295 Shady Island Rd
Type Improvement
Useful Life 5 yrs
Category Sanitary Sewer
Fund # 611
Priority n/a
Contact Engineer
Department Sanitary Sewer
Description l Total PI'oject Cost
This project involves design and reconstruction of Lift Station #17.
$78,000
Justification
1
Expenditures 2007 2008 2009 2010 2011 Total
Planning/Design/Survey 8,000 8,000
Construction/I nspection 70,000 70,000
Total 8,000 70,000 78,000
Funding Sources 2007
Sanitary Sewer Fund
2008
2009
8,000
8,000
2010
70,000
70,000
2011
Total
78,000
78,000
Total
I Operntiow bDp~~
Frida)'. )alluUlY 25. 2008
107
-- --
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # SS-11-03
Project Name Annual Lift Station Inspect & Rehab
Type Unassigned P,oiority n/a
lJseful Life Contact
Category Sanitary Sewer Department Sanitary Sewer
Fund #
Description I Total P,ooject Cost $125,000
Annual lift station service check, inspect and rehab.
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
Construction/Inspection 25,000 25,000 25,000 25,000 25,000 125,000
Total 25,000 25,000 25,000 25,000 25,000 125,000
Funding Sources 2007 2008 2009 2010 2011 Total
Sanitary Sewer Fund 25,000 25,000 25,000 25.000 25,000 125,000
Total . 25,000 25,000 25,000 25,000 25,000 125,000
l~mtionW ~aw~ I I
Frida)'. Jllllumy 25. 2008
108
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
.
Project # 88-11-05
Project Name Infiltration and Inflow Reduction
Type Improvement Priority nla
Useful Life 5yrs Contact Engineer
Category Sanitary Sewer Department Sanitary Sewer
Fund # 611
.
Description I Total Project Cost $300,000
This item is an annual project to reduce the costs of infiltration and inflow.
Justification I
Prior Expenditures 2007 2008 2009 2010 2011 Total
I 50,000 I Construction/Inspection 50,000 50,000 50,000 50,000 50,000 250,000
Total Total 50,000 50,000 50,000 50,000 50,000 250,000
Prior Funding Sources 2007 2008 2009 2010 2011 Total
I 50,000 I Sanitary Sewer Fund 50,000 50,000 50,000 50,000 50,000 " 250,000
Total Total 50,000 50,000 50,000 50,000 50,000 250,000
I Opemtional ~Otber I I
.
-
Frida)'. JllllUlIIY 25. 2008
109
110
H. STORMWATER MANAGEMENT FUND
The majority of the City of Shorewood lies within the Minnehaha Creek Watershed District
(MCWD). The remaining portion, in the southeast comer of the city, lies within the Riley
Purgatory Bluff Creek Watershed District (RPBCWD).
Under statutory authority, each municipality may elect to designate a watershed district or
districts as the responsible Governmental Unit(s) (RGU) to manage stormwater on behalf of
the City. The City of Shorewood has designated the MCWD and the RPBCWD as the RGUs.
The RPBCWD will relinquish the RGU designation back to the City onMay I, 2008. In
compliance with a legislative mandate, the City of Shorewood has prepared a
Comprehensive StormwaterManagement Plan that was approved by the City of Shorewood
in the Year 2000. The plan has been approved by the MCWD.
The focus of many of the stormwater management issues in years past has been to resolve
local drainage issues, and to acquire funding for construction of the Gideon Glen Project.
. In order to do this, the City Council elected to encumber $30,000 per year to fix local drainage
issues. The City Engineer was authorized to dedicate these funds to local projects, providing
that each project did not exceed $5,000 per project.
111
112
City of Shorewood, Minnesota
Capital Improvement Program
2007 thru 2011
PROJECTS BY DEPARTMENT
Department Project# Priority 2007 2008 2009 2010 2011 Total
!Stormwater Management ~
Water Management Plan STM-07-06 2 78,000 78,000
Project To-Be-Determined STM-08-02 n/a 100,000 100,000
Harding Lane Drainage STM-09-01 1 97,000 97,000
Stratford PI Drainage STM-09-02 1 30,000 30,000
Lake South Auto Drainage STM-09-03 1 21,000 21,000
5830 Echo Rd Drainage STM-09-04 1 33,000 33,000
6180 Chaska Rd Drainage STM-09-05 1 4,000 4,000
Meadowview Rd Stonn STM-10-01 3 15,000 15,000
Nelsine Dr Drainage STM-10-02 1 16,000 16,000
6180 Murray Drainage STM-10-03 1 36,000 36,000
5925 Grant Drainage STM-10-04 1 49,000 49,000
Lake Mary Outlet STM-11-02 1 505,000 505,000
Star Circle Stonn STM-11-03 3 89,000 89,000
Rampart Ct Drainage STM-11-04 1 8,000 8,000
Stormwater Management Total 78,000 100,000 185,000 116,000 602,000 1,081,000
GRAND TOTAL 78,000 100,000 185,000 116,000 602,000 1,081,000
113
Capital Improvement Program
City of Shorewood, Minnesota
Project # STM-07-06
Project Name Water Management Plan
Type Unassigned
Useful Life 5 yrs
Category Stonnwater Management
Fund # 631
Description
Justification
Expenditures
Stormwater Management Fund
Total
Funding Sources
Stormwater Management Fund
Total
..
I Opemtiond I~acV~
I
2007 thru 2011
Priority 2 Very Important
Contact Engineer
Department Stonnwater Management
Total Project Cost
$78,000
2007
78,000
78,000
2008
2009
2007
78,000 .
78,000 .
2009
2008
114
2010
2010
2011
2011
Total
78,000
78,000
Total
78,000
78,000
Frida)'. Janul/IY 25. 2008
Capital Improvement Program
City of Shorewood, Minnesota
PI'oject # STM-08-02
Project Name Project To-Be-Determined
Type Unassigned
lJseful Life
Category Unassigned
Fund #
Description
Justification
Expenditures 2007
Construction/Inspection
Total
Funding Sources 2007
Stormwater Management Fund
Total
I Opemtioo& hnpacU~
2007 thru 2011
Priority nla
Contact
Department Storrnwater Management
Total PI'oject Cost
2008
100,000
100,000
2008
100,000
100,000
$100,000
2009
2009
115
2010
2010
2011
2011
Total
100,000
100,000
Total
100,000
100,000
Friday. JalluOIY 25. 2008
Capital Improvement Program
City of Shorewood, Minnesota
Project # STM-09-01
Project Name Harding Lane Drainage
Type Improvement
Useful Life Unassigned
Category Stormwater Management
Fund # 631
2007 thru 2011
PJ"iority I Urgent
Contact Engineer
Department Stormwater Management
Description Total pJ'oject Cost $97,000
Involves installation of tile lines, catch basin structure and cross culvert across Harding.
Justification
Expenditures
Constructionllnspection
Total
Funding Sources
Stormwater Management Fund
Total
I OpemtiOn& ~aWOili~
2007
2008
2009
97,000
97,000
2007
2008
2009
97,000
97,000
116
2010
2010
2011
2011
,,54
ci I I N
'0; : ' C)
~':~':~
0): j-----;Ne J ~
'i+ : ;:r:
3:'
Smithlown
Road
PROJECT
LOCATION
Total
97.000
97,000
Total
97,000
97,000
I
Frida)'. Jallul11Y 25, 2008
Capital Improvement Program
City of Shorewood, Minnesota
Project # STM-09-02
Project Name Stratford PI Drainage
Type Improvement
Useful Life Unassigned
Category StOlmwater Management
Fund # 631
2007 thru 2011
Priority 1 Urgent
Coutact Engineer
Department Stormwater Management
Description Total Project Cost $30,000
Involves installation oftile lines, catch basin structure and cross culvert across Nelsine.
Justification
Expenditures
Construction/Inspection
Total
Funding Sources
Stormwater Management Fund
Total
I 0pemti0naI ImpacUOther
2007
2008
2009
30,000
30,000
;",
2007
2008
2009
30,000
30,000
117
2010
2010
2011
2011
Total
30,000
30,000
Total
30,000
30,000
Friday. JallullIY 25, 2008
Capital Improvement Program
City of Shorewood, Minnesota
P,"oject #
STM-09-03
Project Name Lake South Auto Drainage
Type Improvement
Useful Life Unassigned
Category Stormwater Management
Fund # 631
2007 thru 2011
Priority 1 Urgent
Contact Engineer
Department Stormwater Management
Description Total Project Cost $21,000
Involves installation of tile lines, catch basin structure and cross culvert across Nelsine.
Justification
Expenditures
Construction/l nspection
Total
Funding Sources
Stormwater Management Fund
Total
l Op.mnonm~~OOu
2007
2008
2009
21,000
21,000
2007
2009
21,000
21,000
2008
118
2010
2010
2011
2011
Total
21,000
21,000
Total
21,000
21,000
Friday. Jallumy 25. 2008
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # STM-09-04
Project Name 5830 Echo Rd Drainage
Type Improvement Pl"iority I Urgent
llseful Ufe Unassigned Contact Engineer
Category Stormwater Management Department Stormwater Management
Fuud # 631
Description I Total Project Cost $33,000
Involves installation of tile lines, catch basin structure and cross culvert across Nelsine.
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
Construction/I nspection 33,000 33,000
Total 33,000 33,000
Funding Sources 2007 2008 2009 2010 2011 Total
Stormwater Management Fund 33,000 33,000
. 33,000 33,000
Total
I Opet8tionallnq>act/Otber I I
Frida)'. Janumy 25, 2008
1t9
Capital Improvement Program
City of Shorewood, Minnesota
Project # STM-09-05
Project Name 6180 Chaska Rd Drainage
Type Improvement
Useful Life Unassigned
Category Stormwater Management
Fund # 631
2007 tllru 2011
Priority 1 Urgent
Contact Engineer
Department Stormwater Management
Description Total Pmject Cost $4,000
Involves installation of tile lines, catch basin structure and cross culvert across Nelsine.
Justification
Expenditures
Construction/Inspection
Total
Funding Sources
Stormwater Management Fund
Total
l OpemtionW ~~~
2007
2008
2009
4,000
4,000
2007
2008
2009
4,000
4,000
120
2010
2010
2011
2011
Total
4,000
4,000
Total
4,000
4,000
Friday. Janumy 25. 2008
Capital Improvement Program
City of Shorewood, Minnesota
Project # STM-IO-Ol
Project Name Meadowview Rd Storm
Type Unassigned
Useful Life
Category Stormwater Management
Fund #
Description
Justification
Expenditures
Constructionllnspection
Total
2007 thru 2011
P,'iority 3 Important
Contact Engineer
Department Stormwater Management
Total Project Cost
$15,000
2007
2008
2009
Funding Sources 2007
Stormwater Management Fund
2008
2009
Total
10000ti~ ~00m
....:...
121
2010
15,000
15,000
2010
15,000
15,000
~i I
!!!. :1
>, 'I,
~ 1-_._ - :.. ...
010 N
01 a::
~I
Wild Rose Ln
PROJECT
LOCATION
2011
Total
15,000
15,000
2011
Total
15,000
15,000
Friday, Janumy 25, 2008
Capital Improvement Program
City of Shorewood, Minnesota
PI'oject# STM-IO-02
. Project Name Nelsine Dr Drainage
Type Improvement
lJseful Life Unassigned
Category Stormwater Management
Fund # 631
2007 thru 2011
Priority I Urgent
Contact Engineer
Department Stormwater Management
Description Total Project Cost $]6,000
Involves installation of tile lines, catch basin structure and cross culvert across Nelsine.
Justification
Expenditures
Construction/l nspection
Total
Funding Sources
Stormwater Management Fund
Total
I Opemtionol ~acUOili~
2007
2008
2009
2007
2009
2008
122
2010
16,000
16,000
2010.
16,000
16,000
NELSINE
DR
~ ; 12 N
l!!
IiI!
I I PROJECT
!. LOCATION
2011
2011
Total
16,000
16,000
Total
16,000
16,000
Frida)'. JallullIY 25.2008
Capit31 Improvement Program
City of Shorewood, Minnesota
Project # STM-IO-03
Project Name 6180 Murray Drainage
Type Improvement
Useful Life Unassigned
Category Stonnwater Management
Fund # 631
2007 thru 2011
Priority I Urgent
Contact Engineer
Department Stormwater Management
Description Total Project Cost $36,000
Involves installation oftile lines, catch basin structure and cross culvert across Nelsine.
Justification
Expenditures
Construction/Inspection
Total
Funding Sources
Stormwater Management Fund
Total
I OperationallmpactlOther
2007
2008
2009
2007
2008
2009
123
2010
36,000
36,000
2010
36,000
36,000
2011
2011
Total
36,000
36,000
Total
36,000
36,000
Friday, January 15, 1008
Capital Improvement Program
City of Shorewood, Minnesota
Pt'oject# STM-IO-04
Project Name 5925 Grant Drainage
Type hnprovement
Useful Life Unassigned
Category Stormwater Management
Fund # 631
2007 thru 2011
Priority 1 Urgent
Contact Engineer
Department Stormwater Management
Description Total Project Cost $49,000
Involves installation oftile lines, catch basin structure and cross culvert across Nelsine.
Justification
Expenditures
Constructionllnspection
Total
Funding Sources
Stormwater Management Fund
Total
I Opemnonm fmpac"~
2007
2008
2009
2007
2008
2009
124
2010
49,000
49,000
2010
49,000
49,000
2011
2011
Total
49,000
49,000
Total
49,000
49,000
Frida)'. JanllOlY 25. 2008
Capital Improvement Program
City of Shorewood, Minnesota
Project # STM-ll-02
Project Name Lake Mary Outlet
Type Unassigned
Useful Life Unassigned
Category Stonnwater Management
Fund # 631
2007 tl1m 2011
Priority 1 Urgent
Contact Engineer
Department Stonnwater Management
Description Total Project Cost
Currently Lake Mary does not have an outlet
Justification
Expenditures
Storrnwater Management Fund
Total
Funding Sources
Stormwater Management Fund
Total
I Opemnow ~W~
$505,000
2007
2009
2008
2007
2008
2009
J 25
2010
2010
..15J'fJ'-
~
\ "'ct"N
~"'"
\
,// ( \U~
"-.
MARY -......,"-... !
\ v
LAKE ;' N
I
PROJE~:;"1 \"
LOCATION ,~_) 11'.
~..~S1011"
2011
505,000
505,000
2011
505,000
505,000
'j,
Total
505,000
505,000
Total
505,000
505,000
Friday, JlIl1umy 25. 2008
Capital Improvement Program
City of Shorewood., Minnesota
Project # STM-ll-03
Project Name Star Circle Storm
Type Improvement
Useful Life
Category Stonnwater Management
Fund #
Description
Justification
Expenditures 2007
Construction/lnspection
Total .
Funding Sources
Stormwater Management Fund
Total
I Opemtiona1 JmpactJOther
2007 thru 2011
Priority 3 Important
Contact Engineer
Department Stormwater Management
Total Project Cost
$89,000
2008
2009
2007
2008
2009
126
2010
2010
2011
89,000
89,000
2011
89,000
89,000
:5 N
:i STAR
i 1 a: GIR
I<{
If-
liC/)
..Smilhlown
Road
PROJECT
LOCATION
Total
89,000
89,000
Total
89,000
89,000
Friday, Janumy 25, 2008
Capital Improvement Program
City of Shorewood, Minnesota
Projeet# STM-ll-04
Project Name Rampart Ct. Drainage
Type Improvement
Useful Life Unassigned
Category Stonnwater Management
Fund # 631
2007 thru 2011
Priority 1 Urgent
Contact Engineer
Department Stonnwater Management
Description Total Project Cost $8,000
Involves installation of tile lines, catch basin structure and cross culvert across Nelsine.
Justification
Expenditures
Construction/Inspection
Total
Funding Sources
Stormwater Management Fund
Total
I OperationBl '-cVOther
2007
2008
2009
2007
2008
2009
127
2010
2010
RAMPART
CT ~
.- N
WoOd-
Dr.
PROJECT
LOCATION
2011
8,000
8,000
Total
8,000
8,000
2011
8,000
8,000
Total
8,000
8,000
Friday. ]ullumy 25.2008
;,1,~
128
I. TECHNOLOGY AND OFFICE EQUIPMENT FUND
The Technology and Office Equipment fund provides for the purchase and
replacement of major office equipment needs. These items include copy
machines, computer hardware and software, and technology related items, in an
on-going effort to ensure the crity's technology and computer network needs are
met in order to promote efficiency and accuracy.
129
130
City of Shorewood, Minnesota
Capital Improvement Program
2007 thru 2011
PROJECTS BY DEPARTMENT
Department
Project# Priority 2007
2008
2009
2010
2011
To1al
ITechnology/Office Equip
Financial Software Package
Network Server (Computer) Replacement
Phone System (VOIP or other) - City Hall
City Hall Copier & Maintenance Contract
Computer Upgrades
I
T-07.01
T-07-02
T-09-01
T-09-02
T-11-06
nfa 43,000 43,000
nfa 19,500 19,500
nfa 40,000 40,000
nfa 25,000 25,000
nfa 10,000 10,000 10,000 10,000 10,000 50,000
72,500 10,000 75,000 10,000 10,000 1n,500
72,500 10,000 75,000 10,000 10,000 1n,500
Technology/Office Equip Total
GRAND TOTAL
131
Capital Improvement Program
City of Shorewood, Minnesota
Project # T-07-01
Project Name Financial Software Package
Type Improvement
Useful Life
Category Technology/Office Equipment
Fund #
Description
2007 thru 2011
P,'iority n/a
Contact Finance
Department Technology/Office Equip
Total Project Cost
$43,000
Justification
Replacement of current financial software, which is about 10 years old.
Expenditures
Computer software
Total
Funding Sources
Technology/Office Equipment
Total
I OpeIationa1 Impact/Other
2007
43,000
43,000
2008
2009.
2007
43,000
43,000
2008
2009
132
2010
2010
2011
2011
Total
43,000
43,000
Total
43,000
43,000
Friday, JlIllumy 25, 2008
Capital Improvement Program
City of Shorewood, Minnesota
2007 thru 2011
PI'ojeet # T -07-02
Project Name Network Server (Computer) Replacement
Type Improvement
Useful Life Unassigned
Category Technology/Office Equipment
Fuud # 401
Priority n/a
Contact Unassigned
Department Technology/Office Equip
Description I Total PI'ojeet Cost
This project proposes to replace the computer network on a 5 year basis.
$19,500
Justification
I
Prior Expenditures 2007 2008 2009 2010 2011 T oial
I o I Computer workstations 19,500 19,500
Total Total 19,500 19,500
Funding Sources
Technology/Office Equipment
Total
2007
19,500
19,500
2008
2009
2010
2011
Total
19,500
19,500
I ~mti_~~~
Friday. JanuQlY 25. 2008
133
Capital Improvement Program
City of Shorewood, Minnesota
2007 thru 2011
Project # T-09-01
Project Name Phone System (VOIP or other) - City Hall
Type Equipment
Useful Life
Category Technology/Office Equipment
Fund #
Priority n/a
Contact Unassigned
Department Technology/Office Equip
Description I Total Pt'oject Cost $40,000
New telephone system for City Hall.
Justification I
Expenditures 2007
EquipNehides/Fumishings
2008
2009 2010
40,000
40,000
2011
Total
40,000
40,000
Total
Funding Sources 2007
Technology/Office Equipment
Total
2008
2009 - 2010
40,000
40,000
2011
Total
40,000
40,000
I OpemtionW ~"00m
Friday. Jallumy 25. 2008
134
--
Capital Improvement Program 2007 thru 2011
City of Shorewood, Minnesota
Project # T -09-02
Project Name City Hall Copier & Maintenance Contract
Type Equipment PriOl;ty n/a
Useful Life Unassigned Contact Unassigned
Category Technology/Office Equipment Department Technology/Office Equip
Fund #
Description I Total Project Cost $46,000
. The last time the copier was replaced at City Hall was This copier serves the entire City Staff in addition to publication of all City Council
and Commission documentation.
Justification I
Prior Expenditures 2007 2008 2009 2010 2011 Total
I 21,000 I copier & maintenance 25,000 25,000
Total Total 25,000 25,000
.-
Prior Funding Sources 2007 2008 2009 2010 2011 Total
I 21,0001 Technology/Office Equipment 25,000 25,000
Total Total 25,000 25,000
I Operati~ ~.cOOilier I .
I
.
Frida)". JalluOIY 25, 2008
135
Capital Improvement Program
City of Shorewood, Minnesota
Project # T -11-06
Project Name Computer Upgrades
Type Equipment
Useful Life 5 yrs
Category Technology/Office Equipment
Fund # 401
2007 thru 2011
Priority n/a
Contact Finance
Department Technology/Office Equip
Description Total Project Cost $80,000
This project proposes to replace obsolete computer hardware and software systems (approximately three workstations per year).
Justification
Computer equipment replacement.
Prior
30,0001
Total
Expenditures
Computer workstations
Total
Prior
30,000 I
Total
Funding Sources
Technology/Office Equipment
Total
Operational Impact/Other
Increased staff efficiency.
2007
10,000
10,000
2007
10,000
10,000
2008
10,000
10,000
2008
10,000
10,000
136
2009
10,000
10,000 .
2009
10,000
10,000
2010
10,000
10,000
2010
10,000
10,000
2011
10,000
10,000
2011
10,000
10,000
Total
50,000
50,000
Total
50,000
50,000
Frida)'. .ltlllUlIIY 25. 2008