21-063 To Prepare Feasibility Study for Birch Bluff Improvements Project, City Project 21-01CITY OF SHOREWOOD
COUNTY OF HENNEPIN
STATE OF MINNESOTA
RESOLUTION 21-063
A RESOLUTION TO PREPARE FEASIBILITY STUDY FOR BIRCH BLUFF
IMPROVEMENTS PROJECT
CITY PROJECT 21-01
WHEREAS, the current Capital Improvement Plan (CIP) identifies Birch Bluff
Improvements project for construction in 2023 from Grant Lorenz Road to the Tonka
Bay city limits. The project includes full street reconstruction to the city standard of 28
feet wide with concrete curb & gutter, storm sewer, ponding, addition of watermain, a
segment of trail from Eureka Rd to Tonka Bay City limits, along with any necessary
repairs to the existing sanitary sewer; and
WHEREAS, the Birch Bluff Improvements expand and improve the city's water
distribution system and fire protection, provide necessary improvements to the city
streets, and allow for opportunities to address and correct long term drainage issues;
and
WHEREAS, the City Council as appointed Bolton & Menk as the City Engineer and will
prepare the feasibility report and preliminary design for the Birch Bluff Improvements
project; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
SHOREWOOD, MINNESOTA AS FOLLOWS:
1. The City Council of the City of Shorewood, Minnesota authorizes Bolton & Menk
to complete a feasibility study for the Birch Bluff Improvements project.
Passed by the City Council of Shorewood, Minnesota this 14t" day of June, 2021.
Je 94fer Labadie, Mayor
A st: - bm
", h al a
San fie Thone, City Clerk