Loading...
21-089 Approving Cost Share Agreement with the City of Greenwood for Shorewood's Share of Costs to Rehabilitate a Portion of Minnetonka BoulevardCITY OF SHOREWOOD COUNTY OF HENNEPIN STATE OF MINNESOTA RESOLUTION 21 — 089 RESOLUTION APPROVING COST SHARE AGREEMENT WITH THE CITY OF GREENWOOD FOR SHOREWOOD'S SHARE OF COSTS TO REHABILITATE A PORTION OF MINNETONKA BOULEVARD WHEREAS, Shorewood submitted a grant application to the State of Minnesota on behalf of Shorewood, Greenwood, and Deephaven for the rehabilitation of Minnetonka Boulevard; and, WHEREAS, The grant application was not awarded, and, WHEREAS, The City of Greenwood is proceeding with their portion of the roadway improvement project, and bid the project for the entire road segment and inquired if Shorewood would reimburse Shorewood -related costs for the project; and, WHEREAS, Shorewood has sufficient funds remaining in the 2021 Mill and Overlay street project due to favorable bidding; and WHEREAS, City staff has reviewed the project bid results and estimates and recommends that the City Council proceed with the project, NOW THEREFORE BE IT RESOLVED by the Shorewood City Council: 1. That the bid results are favorable and better than the city could receive if it bid the project separately. 2. There is value in the roadway being under construction one time. 3. Finds that Shorewood's costs are reasonable. 4. Approves the attached cost -share agreement with the City of Greenwood reimbursing an estimated $75,165.67 project costs, and approximately $18,000 in engineering costs. ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 231 day of August, 2021. bM4 _(W Sandie Thone, City Clerk _61 JerKifer Calbadie, Mayor COST -SHARING AGREEMENT THIS COST -SHARING AGREEMENT (the "Agreement") is entered into this day of , 2021 by and between the City of Shorewood, a municipal corporation under the laws of Minnesota ("Shorewood"), and City of Greenwood, a municipal corporation under the laws of Minnesota ("Greenwood"). That Shorewood and the Greenwood may hereinafter be referred to individually as a "Party" or, together, the "Parties." RECITALS A. Greenwood intends to undertake overlay improvements to Minnetonka Boulevard, a local city street located on the municipal boundary of Greenwood and Shorewood as depicted in the attached Exhibit A (the "Project"). B. Greenwood is willing to construct the Project if Shorewood agrees to share in the costs, and the Parties acknowledge that absent this Agreement and Shorewood's financial contributions toward the Project, that Greenwood would choose not to undertake to construct the full scope of the Project, particularly those elements that directly benefit Shorewood. C. Greenwood has obtained Project bids and has estimated a post -bid total Project cost of $75,165.67 based on bid quantities, which is contained on the attached Exhibit B (the "Post -Bid Estimate") along with an estimated $18,000 in engineering fees. The Post -Bid Estimate includes those elements that are within Shorewood's municipal boundary. D. The Parties wish to specify their respective responsibilities for Project costs as provided herein. AGREEMENT NOW, THEREFORE, in consideration of the mutual covenants and obligations contained herein, the Parties agree as follows: 1. Cost -Sharing Obligation; Project Construction. Upon execution of this Agreement, Shorewood hereby agrees to pay Greenwood $75,165.67, plus an estimated $18,000 in engineering fees which is identified thereon as the percentage attributable to the Project elements that directly benefit Shorewood. Upon such payment, Greenwood will endeavor to complete the Project, including the aforementioned elements, in accordance with the approved Project plans on file with Greenwood and subject to any modifications it deems necessary and in its sole discretion. 2. Project Completion; Final Cost Determination. The Project shall be completed by Greenwood on or before October 1, 2021, subject to unavoidable delays that are otherwise beyond Greenwood's control. Within 30 days of Project completion and final payment by Greenwood to its contractor and an accounting of all Project costs, which include 4820-2711-8834.2 engineering, administration, and observation, Greenwood shall request a reimbursement for payment to Shorewood. 3. Access to Shorewood Property; Communications. Shorewood hereby authorizes Greenwood, its agents, contractors, and employees to access Shorewood's property and any area contained thereon as it deems reasonably necessary in order to construct the Project. At Shorewood's request, the Greenwood shall communicate Project plans and timelines with Shorewood and keep Shorewood informed as to the same. 4. Termination. This Agreement shall terminate upon Project completion and, if required pursuant to Section 2. 5. Governing Law and Amendments. This Agreement shall be governed by the laws of the State of Minnesota and may only be modified or amended with the written consent of both Parties. 6. Binding Agreement. This Agreement constitutes the entire agreement between the Parties regarding this matter and is binding on the Parties until it expires or is terminated as provided herein. 7. Indemnification. Greenwood and Shorewood agree to indemnify and hold the other, its successors, and assigns, harmless from all claims, demands, damages, assessments, costs and expenses, including attorneys' fees, arising out of or relating to the Project. 8. Not Construed Against Drafter. The language of this Agreement shall not be interpreted in favor of or against any Party as the drafter of this Agreement. 9. Incorporation. The recitals contained herein and the exhibits attached hereto are incorporated in and made part of this Agreement. 10. Representations. Each Party executing this Agreement represents to the other that those signing below on its behalf are authorized to enter into this Agreement and to bind its organization to its terms and conditions. 11. Counter2arts. For the convenience of the parties, any number of counterparts hereof may be executed and each such executed counterpart shall be deemed an original, but all such counterparts together shall constitute one and the same Agreement. [signature pages to follow] 2 4820-2711-8834.2 IN WITNESS WHEREOF, the parties to this Cost -Sharing Agreement have caused these presents to be executed as of the day and year aforesaid. CITY OF GREENWOOD Debra Kind, Mayor Nalisha Williams, City Clerk CITY OF SHOREWOOD Jennifer Labadie, Mayor Sandie Thone, City Clerk 4820-2711-8834.2 EXHIBIT A A-1 4820-2711-8834.2 10,146,11 4820-2711-8834.2 COST EXHIBIT A APPORTIONMENT 2021 STREET IMPROVEMENTS CITY OF GREENWOOD, MN ITEM NO. ITEM APPROX. NOTES QUANT. UNIT BID CITY OF GREENWOOD CITY OF SHOREWOOD UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT BASE BID 1 MOBILQATION 1 LUMP SUM $7,500.00 57,50000 0.50 $3,750.00 0.50 $3,750.00 2 TRAFFIC CONTROL 1 LUMPTUM $6,90000 56,90000 0.50 $3,45000 0.50 $3,450.00 3 REMWE STORM STRUCTURE IANY 1111 1 EACH $700.00 570000 0.50 $350.00 0.50 sm..00 0 FULL DE PTH RECLAMATION HP DEPTH) 4500 SQYD $3.30 $5,850.00 2,250.C10 $2,92500 2,25000 $2,925.00 5 SAWCUT BITH MINOUS (ANY THICKNESS) .1 LIN FT $001 $385 19300 5193 19200 51.92 6 COMMON E%CAVATION 111 1W CUYD $3,W 53WDO 50.00 $18DOU 50.CO STRUM ] RE MOVE EMESS RECLAIM MATERIAL (LV) 65U CUYD $18.00 $11,700.00 325 GO $5,850.00 325 NO $5,85D. 8 RESUSE E%CEST RECLAIM FOR TI1All(N)(P) 80 CUYD $13.50 $3,080.00 8000 $1,080.00 9 REMMEBRUMIHOOS TRAIL LAW THICKNESS) 300 SQYD 54W $1,200.00 30000 5L,200.00 10 TYPE SP 12.5 NON -WEARING COURSE MIX (3,0) 5. TON $74.(IO $39,220.. 265.00 $19,61000 26500 $19,610.00 33 TYPE SP 9.5 WEARING COURSE MI%(3,B) I. TON $74.70 $39,591.00 265.00 5191795.50 265.00 539,795.50 12 TYPE SP 9.5 WEARING COURSE MIX (2,R) (TRAIL) L. TON 59300 $9,30000 100.00 $9,300.00 13 BITUMINOUSCURS 765 LIN ET $7.00 $5,355IO 382.50 $2,677,50 382.50 $2,677.50 14 AOeOT MANHOLE 4 EACH $1,275.00 551100.00 2.00 $1,550.00 200 $2,55000 15 12' RC PIPE SEWER LCL V) 3U LIN ET $12000 $3,60DO0 1500 $1.8OD 15'. $1180"00 16 CONSTRUCT DRAINAGE STRUCTURE IDES 2'%3') 3 EACH $2,350.00 $7,050.00 1.. 53,S1500 I- $3,525DO 1] CONSTRUCT 0" DRAINAGE STRUCTURE ] EACH $3,220.00 $3,22000 0.50 51,610.D0 0.50 $1,6100O 18 CONN ECT TO EXISTING STORM SEWER 2 EACH $57000 51..ELL I.00 $570.00 ]DO 5570.00 19 CHIMNEY SEAL 4 EACH $215.00 586000 20J $430.00 2,00 $43000 20 STORM DRAIN INELT PROTECTION 5 LIN FT $130.00 $6.GO 2.50 $32500 2.SO $32500 21 B101W 2. IN ET 53.55 $71000 ID000 $35500 1110.00 $355.00 22 TOP5011BORROWILV) 60 CUYD $72,20 $4,332.00 3000 $2,166W 30.G0 $2,166.00 23 HYOROMULCH(WITH 25-1515EED MIX) 6U0 TQYO $2A5 51,47000 3000K) $73500 30000 $73500 24 SOO, TYPE LAWN 90 SQYD $27.25 $2,452,50 4500 $1,226,25 45.00 $1,226.25 25 4-INCHE DOUBLE YELLOW I- LINK $0,62 $72540 58500 $362.70 585.00 5362.70 26 4-INCHE WHITE 263. LIN ET $0.32 SM EO 1,315.W $420.80 1,31500 $420.80 27 LANDSCAPE ALLOWANCE 1 ALLOWANCE $1,000.00 $1,000.00 0.50 $50000 0.50 $SDOCQ $1611911435 $86,745.68 $)5,365.67 CITY OF GREENWOOD CONSTRUCTION PLANS FOR 2021 STREET IMPROVEMENTS STREET & STORM SEWER CONSTRUCTION OF MINNETONKA BOULEVARD JULY,2021 SNEETTITLE