Loading...
22-022 To Provide Final Design Direction for Strawberry Lane, City Project 19-05CITY OF SHOREWOOD COUNTY OF HENNEPIN STATE OF MINNESOTA RESOLUTION 22-022 A RESOLUTION TO PROVIDE FINAL DESIGN DIRECTION FOR STRAWBERRY LANE CITY PROJECT 19-05 WHEREAS, the current Capital Improvement Plan (CIP) identifies improvements to Strawberry Lane Reconstruction and Trail project from West 62nd Street to Smithtown Road and includes street reconstruction, walking trail, watermain, and drainage improvements; and WHEREAS, the city prepared a Feasibility Study and Scoping Document for Strawberry Lane and Trail project that summarized the costs and impacts of multiple roadway alignments with varying widths and sidewalk/trail configurations; and WHEREAS, the city hosted an Open House to gather resident feedback on the various alternatives; and WHEREAS, overwhelming feedback from adjacent residents to the project would prefer a six -foot -wide sidewalk on the east side of the roadway adjacent to the back of curb to minimize impacts to yards, trees, and other features along the corridor; and WHEREAS, many residents adjacent to the project would prefer a 24 foot wide roadway with no on street parking compared to the proposed 26 foot wide roadway that allows on street parking. However, staff believes having a 26-foot-wide roadway that allows on street parking is in the best interest of the community as it will provide convenience for residents, calm traffic speeds, and provide separation from vehicles and pedestrians; and WHEREAS, may residents adjacent to the project prefer the roadway south of the Lake Minnetonka Regional Trail follow the western alignment and require the acquisition of additional easements from properties on the west side; and WHEREAS, the city will pursue the western alignment of Strawberry Lane and negotiate with the residents on the west side of the roadway for the acquisition of required easements. and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD, MINNESOTA AS FOLLOWS: 1. The City Council of the City of Shorewood, Minnesota directs staff to incorporate a six -foot -wide concrete sidewalk on the east side of Strawberry Lane adjacent to the back of curb, a 26-foot-wide roadway that allows on street parking, and south of the Lake Minnetonka Regional Trail to follow the western alignment If condemnation is required staff shall provide an update on the final alignment for the area south of the Lake Minnetonka Regional Trail by May 9, 2022. Passed by the City Council of Shorewood, Minnesota this 28t" ay of February 2022. ieKniferlabadie, Mayor A st: ZZL Sandie Thone, City Clerk CITY OF SHOREWOOD COUNTY OF HENNEPIN STATE OF MINNESOTA RESOLUTION 22-022 A RESOLUTION TO PROVIDE FINAL DESIGN DIRECTION FOR STRAWBERRY LANE CITY PROJECT 19-05 WHEREAS, the current Capital Improvement Plan (CIP) identifies improvements to Strawberry Lane Reconstruction and Trail project from West 62nd Street to Smithtown Road and includes street reconstruction, walking trail, watermain, and drainage improvements; and WHEREAS, the city prepared a Feasibility Study and Scoping Document for Strawberry Lane and Trail project that summarized the costs and impacts of multiple roadway alignments with varying widths and sidewalk/trail configurations; and WHEREAS, the city hosted an Open House to gather resident feedback on the various alternatives; and WHEREAS, overwhelming feedback from adjacent residents to the project would prefer a six -foot -wide sidewalk on the east side of the roadway adjacent to the back of curb to minimize impacts to yards, trees, and other features along the corridor; and WHEREAS, many residents adjacent to the project would prefer a 24 foot wide roadway with no on street parking compared to the proposed 26 foot wide roadway that allows on street parking. However, staff believes having a 26-foot-wide roadway that allows on street parking is in the best interest of the community as it will provide convenience for residents, calm traffic speeds, and provide separation from vehicles and pedestrians; and WHEREAS, may residents adjacent to the project prefer the roadway south of the Lake Minnetonka Regional Trail follow the western alignment and require the acquisition of additional easements from properties on the west side; and WHEREAS, the city will pursue the western alignment of Strawberry Lane and negotiate with the residents on the west side of the roadway for the acquisition of required easements. However, if istFiGtly to and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD, MINNESOTA AS FOLLOWS: 1. The City Council of the City of Shorewood, Minnesota directs staff to incorporate a six -foot -wide concrete sidewalk on the east side of Strawberry Lane adjacent to the back of curb, a 26-foot-wide roadway that allows on street parking, and south of the Lake Minnetonka Regional Trail to follow the western alignment if cdoes not Feq iFe the need for Gondemnatier If condemnation is required staff shall --,-- uuvrr. alignment.adjust the design to the eastern ' provide an update on the final alignment for the area south of the Lake Minnetonka Regional Trail by May 9, 2022. Passed by the City Council of Shorewood, Minnesota this 28th day of February 2022. Jennifer Labadie, Mayor Attest: Sandie Thone, City Clerk