Loading...
22-079 Approving a Preliminary Plat for Maple Shores for Property Located at 20430 Radisson and Four Adjacent Vacant PropertiesCITY OF SHOREWOOD COUNTY OF HENNEPIN STATE OF MINNESOTA A RESOLUTION APPROVING A PRELIMINARY PLAT FOR MAPLE SHORES FOR PROPERTY LOCATED AT 20430 RADISSON AND FOUR ADJACENT VACANT PROPERTIES WHEREAS, Chamberlain Capital, LLC. (the "Applicant"), has submitted a request for a preliminary plat under the Shorewood City Code and under Chapter 462 of Minnesota Statutes ; and WHEREAS, the property is legally described as: Lot 24, Radisson Inn Addition, and Tracts A, B, C, D, H, 1, J, and K, Registered Land Survey No 730, all in Hennepin County, Minnesota; and WHEREAS, the request for the preliminary plat has been submitted in the manner required for the platting of land and the review of variances under the Shorewood City Code and under Chapter 462 of Minnesota Statutes, and all proceedings have been duly consistent thereunder; and, WHEREAS, said preliminary plat is consistent with the Shorewood Comprehensive Plan and the regulations and requirements of the laws of the State of Minnesota and the City Code of the City of Shorewood, subject to the conditions listed herein. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Shorewood that the preliminary plat to be called "Maple Shores" is hereby approved, subject to the following conditions: 1. The preliminary plat is approved contingent on the approval of Ordinance 591 approving a rezoning and Resolution 22-078 approving a PUD Concept and Development Stage Plan for Maple Shores. 2. The preliminary plat for seven lots for single and two-family homes and an outlot is approved according to the plans and materials received March 22 and 23, May 19, June 15 and 30, 2022. 3. With the final plat application, the Applicant shall submit all information required for the PUD final plan/final plat in the zoning and subdivision regulations, as well as the following, consistent with City Code, and the engineering guidelines/specifications: a. The homeowner association (HOA) documents, which must include disclosures on the maximum impervious surface coverage per lot and language addressing maintenance of the wetland buffers and signage, stormwater features, subdivision monument signage and all other common elements, as well as prohibitions on accessory buildings, storage of recreation vehicles or equipment outside the home and the requirement that two parking spaces in the garage must be reserved for passenger vehicles. b. The legal descriptions for the conservation easements (at the distance required by the DNR) and the maintenance agreement. The legal descriptions must include the entirety of the parcel within the lake, wetland and the farther extent of either the city's or MCWD's wetland buffer. c. An evaluation completed by a certified arborist of the questionable ash trees noted on the inventory with documentation of any ash borer disease. d. The construction management plan including, but not limited to: the haul route for the material to be exported, contractor parking, how deliveries will be made without blocking public streets, where storage of materials will occur on site, hours of construction, reference the erosion control plan and how often streets will be swept. The off-street parking area must be available until the permit for the last structure is issued. The city reserves the right to prohibit construction parking on the private drive to ensure adequate access of emergency vehicles. e. The assignment of impervious surface coverage for each lot not to exceed 25 percent for the total development or the design of the storm water management plan for the subdivision, whichever is less. f. Revised plans consistent with the Engineer's Memo dated August 17, 2022; the DNR's memo dated July 17, 2022; the Excelsior Fire Marshalls comments dated July 13, 2022; and as follows: 1) Revise the tree preservation plan to show the location of tree preservation fencing and indicate removal of trees 165 and 166 located in the right-of-way. To be considered saved, no activity is permitted within the drip line of tree. 2) Revise the landscaping plan to: 1) add additional trees in the common areas where they wouldn't obstruct the storm water and would obscure off -site visibility of the retaining wall; 2) provide a plant schedule with the size of all trees at planting consistent with the tree preservation policy; 3) indicate the ground cover proposed throughout the development and the disturbed portions of the public right-of-way; and 4) any proposed plantings that would be used to reestablish the disturbed portions of wetland buffers, if applicable. 3) Revise the grading plan to identify: a) the location of wetland buffer monuments at each lot line and as the buffer changes direction and b) which buffer monuments would be used, the City's or the watershed's. 4. Prior to release of the subdivision for recording, the Applicant shall submit the following: a. Executed conservation easements, executed development and maintenance agreements, financial guarantees as required by the development agreement, and the final draft of the HOA documents. b. Payment of fees for local sanitary sewer access, watermain connection, and park dedication in the amounts required at the time of final plat approval. c. Any required permits from other agencies. 5. Prior to issuance of any building permits, the Applicant shall submit or complete the following: a. The applicant shall submit a soils/geotechnical report from a licensed professional engineer permits that indicates the soils present on the site and brought in are adequate to support the construction of the buildings and other improvements. b. The applicant shall submit recorded copies of all documents, such as the plat, development agreement, maintenance agreement, separate easements, HOA documents, etc. 6. The preliminary plat shall expire in 180 days if the Applicant has not submitted a complete application for final plat. The Applicant may request an extension to the approval subject to the requirements of Section 1202.03 Subd. 2. f. (3). 2 ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 22nd day of August, 2022. 5—eiferXabadie, Mayor ATTEST: -,--I Sandie Thone, City Clerk