Loading...
HomeMy WebLinkAbout09-14-26 CC Reg Mtg MinutesCITY OF SHOREWOOD CITY COUNCIL REGULAR MEETING MONDAY, SEPTEMBER 14, 2026 MINUTES CONVENE CITY COUNCIL REGULAR MEETING 5755 COUNTRY CLUB ROAD COUNCIL CHAMBERS 7:00 P.M. Mayor Labadie called the meeting to order at 7:00 P.M. A. Pledge of Allegiance B. Roll Call Present. Mayor Labadie; Councilmembers Maddy, Sanschagrin, Gorham, and DiGruttolo; City Attorney Shepherd; City Administrator Nevinski; City Clerk/HR DirectorThone; Planning Director Griffiths; Director of Public Works Morreim; Park and Recreation Director Czech; Finance Director Schmuck; and City Engineer Budde Absent: None C. Review Agenda Councilmember DiGruttolo requested that Item 5.A.i have a more recognizable title. She suggested that it read Gravity Investment Lot Combination and Anticipated Residential Development North of Watten Ponds. Mayor Labadie stated that the Parcel ID usually describes the item. She asked if the amendment would be acceptable. Planning Director stated that Staff is fine with the change. The Agenda Item, as written, is the technical description of the property since there is no address, but Staff is fine with the change. Maddy moved, Sanschagrin seconded, Approving the agenda as amended. Motion passed 5/0. 2. CONSENT AGENDA Councilmember Sanschagrin noted that he had a question about the Claims List and had sent the question in advance for Staff to answer. He stated that the City had $28,000 in Excel Energy charges for numerous properties. He asked whether that is an increase in cost for the City, what is driving the costs, and whether anything can be done to manage them. Finance Director Schmuck shared that Excel Energy provides electricity and gas to the City. Electricity used to pump the wells during drought and hot months is the most expensive of the year. She explained that, on average, the City pays about $14,000 to $15,000 a month. She added that those are the biggest drivers, and those expenses are funded with utility funds, not taxpayer dollars. Councilmember Sanschagrin asked if the average of $14,000 is going up over time. Finance Director Schmuck stated maybe $1,000 a year. Maddy moved, DiGruttolo seconded, Approving the Motions Contained on the Consent Agenda and Adopting the Resolutions Therein. CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 2 of 15 A. City Council Work Session Minutes B. City Council Regular Meeting Minutes C. Claims List D. Tree Removal Quote and Service Agreement E. 2026 Pavement Striping, Adopting RESOLUTION NO. 26-53U, "A Resolution to Award Contract for 2026 Pavement Striping City Project 26-02." Motion passed 5/0. 3. MATTERS FROM THE FLOOR No one wished to address the Council. 4. GENERAL BUSINESS A. Shorewood Community & Event Center Operational Analysis City Administrator Nevinski explained that ISG would be presenting to the Council, with time for questions to follow. He noted that additional dialogue could follow in subsequent work sessions. Claire Roth, Planner with ISG, explained that ISG is a multidisciplinary engineering firm that has been working with the City on the Shorewood Community and Event Center (SCEC) Operational Analysis. She shared that she has managed a variety of projects in the area. She noted that she would give a brief overview of the project purpose, the process followed, engagement with facility users, and the formation of a task force that helped guide the project and ultimately inform the recommendation. The broad purpose of the project was to conduct a study of the current operations of the facility, ultimately then develop a report which was shared in the Agenda Packet informing recommendations to improve usage and overall position the SCEC for long-term sustainability. She highlighted the project's key focus areas: facility operations, financial performance, community use, and market positioning. She gave a broad overview of the approach that was taken. Starting with a review of the available documents and data, next engaging the facility users in a survey and the formation of a task force, then the facility and operational assessment was done with a report being developed; ISG conducted things like market and benchmark analysis by looking at similar facilities throughout the metro, then diving into customer profile development and a marketing strategy, and finally providing a variety of scenarios that could be taken to guide the future of the facility. She shared a timeline of the project, with some conversation beginning in February 2025, which ultimately led to the facility assessment being done in Fall of 2025, which outlined recommendations for deferred maintenance for the facility for the next 15 years. This specific project kicked off in May with the formation of a task force and a document and data review. ISG met with the Task Force four times throughout the summer for two-hour sessions. She added that the Task Force was integral to the process, informing ISG through firsthand use of the facility and providing ideas and feedback as recommendations were developed. She noted that staff deployed a community survey with 18 questions, and approximately 70 individuals completed it. She highlighted a few survey findings. When asked about improvements or enhancements for the facility, respondents indicated that expanded programming and community events were the most desired CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 3of15 improvements. She noted that most survey respondents were existing users, which strongly supports increasing facility utilization. She noted that many survey respondents were recurring users, especially senior programming users. Other strong themes throughout the survey included the repeated need for marketing and facility awareness. She shared the Task Force recommendations and the information that guided the report and recommendations. The Task Force was a core group that served in an advisory capacity, providing community -based insight to support the project. She stated that 10 people served on the Task Force and were selected based on their past interactions with the facility or their current work or professional experience in relevant areas. She noted that the report documented conversations with the Task Force. She highlighted the key takeaways from the group: community value remains the foundation of future decision -making; increased usage represents the greatest opportunity; phase and align implementation with operational capacity; and, finally, the strongest theme was the need for marketing, awareness, and a clear market position. She noted that other themes from conversations with the Task Force included the value of future partnerships; the idea that programming and rental strategies should reflect community needs and market demand; that operational capacity and staffing influence long-term success; and that financial sustainability should focus on cost recovery rather than full self-sufficiency. Jay Lotthammer, Development Strategist with ISG, stated he works on many park master plans, facility analyses, and business plans for community centers. Before joining ISG, he worked with the city of Brooklyn Park and Eden Prairie and oversaw other facilities like the SCEC that were similar in size and components. He hoped to bring that perspective to the Council. He noted that the Task Force wanted ISG to show the intangible benefits in the findings: community connection. The Task Force had a good mix of people, and ISG appreciated the opportunity to meet with them to get their perspective. He explained that many days at the SCEC look just like a senior center in other communities. Other intangible benefits include recreation, enrichment, and learning classes; civic life and community engagement; community identity and pride; and, finally, Staff offices and internal City events. He provided the current conditions, focusing more on operations and going beyond the facility assessment. The facility is active and appreciated, but ISG looked for opportunities, and there are certainly many. He shared that, given current affordability, cost increases could help revenue. ISG reviewed similar facilities to gauge local costs, which will give a good sense of where things are and identify opportunities to raise prices while still feeling valuable. He noted that SCEC staff is at capacity. He explained that sometimes two people work in the facility, but they are not fully working for the SCEC, with heavy reliance on volunteers. When ISG started the project, they discovered that the senior partners would be leaving at the end of the year. Based on what the seniors were doing, it is a good half-time position. He added that the City has been fortunate to have volunteers fill a part-time position. The volunteers answer phones, keep the building open when no one else is there, and organize the senior programs. He explained that during Task Force meetings, people commented that programs run themselves, but he pointed out that nothing really runs itself. When seniors step away, real people need to keep things going. He noted this is an opportunity for the new staff to serve more effectively. He said there are growth opportunities, which does not mean people are not trying, but the people there are at capacity. So what is being seen is a facility operating at the level it can with the effort currently allocated. He pointed out that capital investments need to continue to keep an aging building usable. He explained that, in talking about physical update opportunities, the first is the kitchen. The kitchen is full right now, though not fully functional, but with the events that have been taking place, it is more of a warming and cooling kitchen. The good news is the City does not have to replicate what is there, because that would be very expensive, but it could be changed to match how it is actually being used. The next update would be the activity room; the Task Force suggested slight modifications, such as updating the floor to accommodate the dance and CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 4 of 15 general use. He noted that the overall decor could be phased in, but it generated a lot of discussion. Then, following the guidelines laid out in the facility assessment, there are opportunities to improve the mechanical system. He shared that ISG suggests expanding the recurring uses, such as dance, looking at the underutilized time blocks, diversifying program offerings, and strengthening target market development. He noted many opportunities to improve social media and draw people in with different techniques. He explained that a few operational scenarios were put together based on a few accurate scenario assumptions. Current Staff are at capacity and have duties outside the SCEC; the South Shore Senior efforts have effectively created a half-time staff. He added that marketing efforts can increase, but with more people being driven to the SCEC, there needs to be enough staff to follow up on that increased use. He noted that each scenario is interchangeable and can be implemented over time. He asked the Council to keep that in mind. He explained that option one is recognizing that, as the senior effort pulls back, we stabilize things and do it as if staffing doesn't change. He added that fewer things will be offered and there are strategies to do that, but there is a potential for not having the SCEC open because there is not enough Staff. He noted the next option is to maintain, which could be done by adding a half-time person, so the current half-time person would go to full time and would be elevated in status as well. He shared that it does not provide much more activation of the facility, but it backfills what the seniors did. He added that having a Staff person in the role would be beneficial. The final option is to grow and activate, which would mean growing the half-time person into a full-time person and then adding another half-time person. The half-time person would recruit programs, seek out contractors, and follow up on new marketing initiatives to help the new use of the facilities grow. He shared the cost impact of each option. He noted going back to 2025 and talking about cost recovery because that came up as part of the Task Force. In 2025, the last actuals were $87,000 in revenue and $175,000 in expenses, so cost recovery was 50 percent. He encouraged the Council to base cost recovery on operating costs, not the total capital invested. One year could be $20,000, and the next $100,000. Cost recovery is a year - by -year operational metric, as 2025 points out. He added that in 2025, the City added $122,000 to the budget, which increased the fund balance. He shared that 2026 is tracking to budget, and 2027 reflects what the Council has heard, especially turning the part-time person into a full-time person. Scenario 1 would provide slightly better revenue and keep expenses lowest, with a $66,000 difference. Scenario 2 is close to the 2027 budget proposal. Scenario 3 increases the half-time person and then adds another half-time person, which could be phased over time, but it would scale things up. Revenue would go up, and expenses would also go up, with a difference of $151,000. ISG played out what Scenario 3 would look like in a few years, and cost recovery could increase to 56 percent. He noted that it is hard to change cost recovery much because of the facility's small size and scale. He noted that the changes are based on increased volume and price increases, since it has been a while since that has happened. He added that one recommendation is to increase prices every year. He pointed out that, moving forward, it will be important to get direction from the Council on where they want it to go in terms of use, the types of use, and how much. He added that it takes people to do that, and staff is working as hard as they can at capacity right now. He noted another takeaway is the marketing portion and getting more expertise to handle some of the marketing. Over time, enhance customer experience and implement improvements. Councilmember Sanschagrin noted that he was confused by the reports because one strength was the facility's flexibility, but at the same time the facility is inflexible because of its size. He asked how that is reconciled. Mr. Lotthammer stated that the facility's flexibility is that the rooms can be used for a variety of things. The facility is what it is and cannot accommodate certain things. He shared strategies that could accommodate larger events. He noted a concern about parking and that, for a large event, the whole facility may need to be rented out. CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 5 of 15 Councilmember Sanschagrin asked whether the loss of volunteers could cause ISG to pause future energy around the facility. Mr. Lotthammer suggested viewing the situation as fortunate, with volunteers doing things that Staff would usually do. Many of the volunteers were like staff and deserve thanks and recognition for what has been done over the years. He stated that volunteers do not need to go away, but need to come back differently, in the usual intent of augmenting or enhancing the programs. He added that coordinating the volunteers would fall on the City Staff person. Volunteers are not necessarily looking to never volunteer again and will probably not just go away. Councilmember Sanschagrin noted that the City was basically misusing the volunteers. Mr. Lotthammer noted they were very generous in what they were doing. Councilmember Sanschagrin shared that the Council has been discussing a 70 percent cost recovery, which is not reflected in the scenarios. He asked whether that is not possible. Mr. Lotthammer explained that some programs at the SCEC operate at 70 percent, while many programs have expenses only related to them. He shared that 50 percent is a really good number; to get closer to 70 percent, the City would need to be more of a community center with more fitness and other amenities, and people would be charged $70 a month. He shared that some programs could be brought in to get closer to 50 to 60 percent, but getting there is not attainable. He added that because of the building's size and scale, some costs are fixed. Councilmember Sanschagrin pointed out that, on top of the capital investments, the City is underwater on the facility. Councilmember Gorham stated that, looking at the scenarios and the summary budget, things look a little grim. He pointed out that revenues in Scenario 1 would not really grow if all of the programming is cut. Mr. Lotthammer explained that, for Scenario 1, if the programs being charged for- rentals and dance classes- are cut, the cost could go up five percent, and that is driving the revenue. For programs that are not driving revenue, they may need to happen only on certain days of the week to make up for the lack of volunteers. He added that ISG did not try to be aggressive on the revenue, but rather realistic and maybe even conservative. Councilmember DiGruttolo stated that Shorewood is a relatively wealthy zip code. She asked whether the County or State provides any grants or services for senior programming. Mr. Lotthammer shared that there may be partnerships, but the money is generally used for specific programs, not to add to rental costs or pay rent. Those sorts of things rarely bring dollars, but they do bring people. He added that there would be things to explore, like naming rights or other types of donations, that may be possible. Getting the word out that there is a need may bring the right person forward. Councilmember DiGruttolo shared that she did some research and that grants are available for upgrading facilities, especially when there are seniors, to make the building ADA compliant and accessible. She asked if the options had been explored. She said the seniors have done a great job bringing in programming, but she read about programs in places like Northfield doing incredible 50/50 programs, and that program grants could help with the cost burden and provide new ideas and options. Mr. Lotthammer explained that seniors currently pay a membership, which is voluntary but could change if it is city -run. Part of the recommendation is that seniors would pay the membership so the free programs would generate some revenue. He added that they could look into grants, but that would take people and time. Councilmember Sanschagrin noticed on the survey that over 25 percent of users are not Shorewood residents. He asked how to handle that fairly for taxpayers. Mr. Lotthammer stated that this is usually handled as a non-resident fee policy, and that is one of the recommendations. That can be seen across the metro area and is done in a variety of ways, but it would be a policy CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 6 of 15 determination. Councilmember Sanschagrin asked if that had already been factored into the model. Mr. Lotthammer stated that it had. Councilmember DiGruttolo asked if the actual number of users was collected. Mr. Lotthammer stated that the number of uses was the available number. No one is tracking the number of users, and that would be hard to do. He added that few community centers do that. He added that some programs require registration and that could be looked up, but it has not necessarily been tabulated. He shared that right now the hard count is on the number of uses, not users. Councilmember DiGruttolo stated it is difficult to prioritize when that type of data isn't available. It would be good information to have. Mr. Lotthammer explained that a page in the report shows 678 different types of uses, broken down by program. That will give a good feel, but the programs do fluctuate. He added that a third party is dancing, so that information is not in the system for calculation. Councilmember Sanschagrin asked whether, during the review, ISG considered which events and markets cost the City money. Mr. Lotthammer shared that, in general, the one-time rentals are making money. The senior programs and programs the City might offer itself are not covering their costs. The rentals and the dance programs are making the most money. The task force asked about finding more of that because it would help the cost recovery, so that would be one area to explore. Councilmember Sanschagrin asked whether that is an area that could be improved and is not currently reflected in the model. Mr. Lotthammer said that is true. He added that the model reflected with dance is a good example of that. Councilmember DiGruttolo asked if the 47 to 56 percent cost recovery is the norm for most community centers. Mr. Lotthammer shared that, looking at senior centers, community centers, and art centers, the SCEC mix is absolutely the norm. He stated that the City has to get toward something like a Lifetime Fitness to charge more, but very few are above 70 percent. Councilmember DiGruttolo stated that the Minnetonka Community Center seems to hover around 70 percent, but it does not have any major amenities. She asked if the City could aspire to that. Mr. Lotthammer shared that a childcare component could help cover the cost or provide enough amenities. Councilmember Sanschagrin asked whether it is feasible for the SCEC to use part of it as a childcare facility. Mr. Lotthammer shared that, considering the amenities needed to support childcare, the building would probably become a childcare facility. Mr. Lotthammer thanked the Council for the honor of working with the Task Force and everything that they brought to the table. Mayor Labadie shared that Staff is hoping the Council will accept the analysis and the study. She asked whether Staff or the Council had any discussion points. Councilmember Sanschagrin pointed out that it would be good to get Park and Recreation Director Czech's feedback. Park and Recreation Director Czech said that, from his perspective, ISG did a great job on the report overall. The Task Force was a very skilled group that came from many different segments of the community. He shared that the loss of the Senior Partners is huge. Senior programming in other communities does not make much money but is a huge community asset and vital for members. He pointed out that the volunteers probably will not leave, but the City wants to make their experience enjoyable. For many of the volunteers, it is a job right now. He shared that having a skilled staff person would help direct the volunteers and improve their experience. He CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 7 of 15 explained that some things can be done, with marketing being a big one because many people did not know there was a community and event center, which is a problem. There were many ideas to get more people into the building and then offer more programs. He shared that many impactful things are happening right now. The Council will need to decide where the line is between cost recovery and utilization. He pointed out that the building is underutilized, but decisions will need to be made about whether utilization goes up and such. Councilmember Sanschagrin agreed that the volunteers should feel like it is less work. Mayor Labadie noted that she is worried that with the sheer number of volunteers and the super volunteers that were there all the time, a half-time person would not be able to duplicate that. She said stacking the time and making things more efficient would help. She asked if a half-time person would fill all of the hours. Mr. Czech stated that the City has to be realistic in its execution and that there will be an implementation phase, but the City will have to be flexible. He noted that he would hate to bring on a full team of people and not know what to do with them, but as things increase, the City could look more closely at something like the Scenario 3 model. Councilmember DiGruttolo asked if the City could write a letter of appreciation to all Task Force volunteers for the time and effort put into the meetings. City Administrator Nevinski stated that it could be done. Mayor Labadie shared that she understood the desire to increase the numbers, but she does not want to lose the existing programming. The programs at the SCEC have existed for a long time, and many people use them. Volunteers have tailored the programs to residents' interests, and many people participate. She pointed out that many SCEC events benefit the whole City, and she did not want to see any of that go away. She liked the concept of slowly increasing revenue and looking at it that way. Maddy moved, Gorham seconded, Accepting the SCEC Operational Analysis. Motion passed 5/0. Mayor Labadie shared that Council would continue to discuss this analysis. She asked if Staff is looking for anything else at this moment. City Administrator Nevinski asked whether Council had anything they felt strongly about regarding staffing, marketing, and the fee schedule. Mayor Labadie stated that she is concerned about marketing, specifically for Senior Partners members, because they sent out a newsletter. Hence, the City needs to find a way to keep people informed about upcoming events and ongoing activities. She noted that someone will need to do senior outreach to the community. Councilmember Gorham stated that step one is reviewing staffing. He would like to see an analysis of what maintaining does versus 1.5 FTE versus 2 FTE. What would that mean for programming? He added that it's hard to make a judgment call based on what each does on its face. He added that the analysis has some snippets, but he would want to see the duties of each FTE. Mayor Labadie stated those are great things that can come back in the future. Her concern is not losing programming, as well as adding additional programming. CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 8 of 15 Councilmember Sanschagrin asked what is in the current budget. City Administrator Nevinski stated it is Scenario 2, with the $67,000 needed to make up for a half-time FTE. Councilmember Gorham stated that the City currently has a half-time FTE, the budget includes one FTE, and this analysis recommends moving to two FTEs. City Administrator Nevinski pointed out that Scenario 3 would include two and a half FTEs. Mr. Lotthammer stated that it is important to recognize that currently, it may be reflected as one and a half, but not all of the effort is reflected in the SCEC. So, Scenario 2 takes the half -timer to a full timer, with those efforts filling all the work of the senior volunteers. He added that having one Staff member instead of multiple volunteers creates efficiencies. He explained that Scenario 3 takes Scenario 2 and adds .5 to it. He noted that even though bodies are doing the roles, they are not solely dedicated to the SCEC. Councilmember Sanschagrin pointed out that the SCEC is budgeted separately from parks, so the FTE being discussed should be limited to the SCEC budget. Mr. Lotthammer shared that FTEs differ from personnel expenditures, so only a small portion of Mr. Czech is reflected in the SCEC budget, and the same applies to the current half -timer. He added that the 2027 request is to add .5 FTE to the SCEC. B. Preliminary 2027 Budget, Proposed 2027 Tax Levy, and Establish Budget Hearing Date Finance Director Schmuck reviewed the preliminary 2027 budget, proposed 2027 tax levy, and established the budget date as found in the Agenda Packet. Mayor Labadie thanked Ms. Schmuck for all of the work that she has done. Councilmember Sanschagrin asked if the reduction for the UPS equipment for police and fire was included in the budget. Ms. Schmuck stated that it is not at this time because the equipment still needs to be purchased, even though fire did not approve it. Once the dollars are vetted, then the levy can be lowered, but doing that now is not recommended because someone will have to finance the other half. Councilmember DiGruttolo said it would make a difference because Shorewood's share differs for police and fire. City Administrator Nevinski stated that police is about 50 percent and fire is about a third. He shared that the system has been reviewed; it is currently a 60-kilowatt system, and they are looking into a 20-kilowatt system. How that translates into costs and pricing: the boards will meet next month, and there will be some cost savings. Councilmember Sanschagrin noted that Shorewood residents have been talking a lot about decreasing the levy. After reading the notes from the last meetings about antenna revenue, he proposed using the $177,000 of antenna revenue to cover SCEC costs, so that revenue would cover the SCEC shortfall. Ms. Schmuck stated that Staff would not recommend it, but if the Council wanted it, it could happen. Mayor Labadie asked Ms. Schmuck to elaborate on why Staff does not recommend that. Ms. Schmuck explained that the antennae are on Shorewood's water towers. The water fund infrastructure, staffing, property, taxes, insurance, and operations must support the antennae being on top of the water towers. Revenues should be in the same category as the related expenditures, so Staff recommends that the water fund receive those revenues as it did when the antenna rents originated. Councilmember Sanschagrin stated that he understands that position. A different perspective is that costs have been reduced in the water fund through decisions not to continue certain capital expenditures, and that this revenue is for the good of the community, as it was part of the general fund last year. He added that, at least to phase it in, Staff proposed using a portion of the antennae revenue for the general fund. He noted that it would be logical to tie that to the SCEC shortfall, so there is a revenue source to cover the cost for residents. Ms. Schmuck shared that, as indicated in the SCEC analysis presentation, the CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 9 of 15 shortfall is never going to go away for the SCEC, so the recommended phased approach was phased in over a couple of years and then eventually became 100 percent in the water fund. If the City does the stopgap in the SCEC fund, she did not see the revenues being returned to the water fund in a phased process. She added that only 50 percent of the residents in Shorewood are connected to City water, and they are the people paying for the water expenditures. So taking revenue that should be affiliated with those residents and turning it into a reduction for all Shorewood residents does not seem equitable either. She noted that the decrease of $49 or $138 in the annual increase in property taxes will warrant a larger increase in water rates. Councilmember Sanschagrin stated that they will increase less as a result. Ms. Schmuck explained that it would not be that significant. Staff will pull together the Long -Term Financial Management Plan, and it will be reflected there, but it would not have much impact. That will be before the Council in October. Councilmember DiGruttolo said it would have been great to have it before the decision needed to be made. Councilmember DiGruttolo asked if the 2025 audit is complete. Ms. Schmuck stated that it is just wrapping up and they are finalizing the next financial report, which will come at the next meeting. Councilmember DiGruttolo asked if Ms. Schmuck could tell the Council about the actual balances that might change. Ms. Schmuck shared that she is still entering the numbers in the correct spots, so she does not have the final numbers yet. She would not know them off the top of her head when looking at the Long -Term Financial Management Plan, which will put it all in perspective with the fund balances and the reserves the City has to accommodate the policies in place. Councilmember DiGruttolo asked whether anyone had shown the Council the table of increases. Ms. Schmuck stated that it would be part of the Long -Term Management Plan presentation. She shared that she has been short-staffed for a year and a half, and she is trying to get caught up, so she apologized but did not have that update yet. Maddy moved, Gorham seconded, Adopting RESOLUTION NO. 26-52, "A Resolution Adopting the 2027 Preliminary Tax Levy, Preliminary General Fund Budget, and Establishing the Budget Meeting Date." Motion passed 3/2 (Sanschagrin and DiGruttolo). C. Comprehensive Plan Amendment & Rezoning Due to Recent Municipal Boundary Adjustment Planning Director Griffiths reviewed the Comprehensive Plan Amendment and rezoning in the Agenda Packet. Councilmember Sanschagrin asked what is driving this. It is because Excel Energy owns that property, so the City is annexing that, and then three other plots were found to trade. Planning Director Griffiths stated that a year ago, the City Council held a work session where Staff explained the situation. Staff found that people in the community generally know Excel no longer operates out of that facility, so when Staff looked at the area, they realized the City of Tonka Bay owned part of the property. When properties fall under multiple jurisdictions, it creates a tricky situation. He added that Staff also discovered three other properties in a similar situation, where existing owners must deal with multiple cities for everything from property taxes to utility bills to voting. At the Council's direction, Staff worked with Tonka Bay to clean up the properties so all the small slivers of property shown on the map go with the larger piece of property. He noted that Excel did not request this; the city initiated it. If Excel Energy ever wanted to change this, they CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 10 of 15 would have to apply for a separate Comprehensive Plan Amendment in the future. He pointed out that the boundaries have already shifted and, from Staff's perspective, changes are needed so regulations are in place if anything happens in the future. Councilmember Sanschagrin asked about a property on the map and if it was the same parcel as the parent property next to it. Planning Director Griffiths shared that they are two separate properties. He noted that Excel owns three parcels, and he pointed them out on the map on the screen. He stated that the municipal boundary has already shifted, so the properties are now in Shorewood, but no Comprehensive Plan or Zoning District is assigned to the properties. Staff is working to put the rules in place so they are prepared. Councilmember DiGruttolo stated that the last time the Council talked about the Comprehensive Plan, they were forced to change some zoning from commercial to residential. She asked why it would not be done now if it could happen again in the future. Planning Director Griffiths noted that he expected the Council would have to go through the process again as part of the Comprehensive Plan update. He pointed out that the Council could wait; however, the question is who is leading the charge. Typically, a project proposer would initiate this, and the City would know exactly what is coming forward. During the previous Comprehensive Plan update, the City discussed the property, but decided to hold off and leave things as they are. Staff is working with that direction. He stated that Council could wait and play the Met Council's number game, and that waiting would offer little benefit because the City would get more credit with the Met Council in the density calculations. He noted that those conversations would come with the Comprehensive Plan update. Councilmember DiGruttolo noted a mismatch in the information: the Staff letter and the future use land maps stated public/semi-public, but the language in Resolution No. 26-51 states commercial. She said she did not know whether it mattered. Planning Director Griffiths said that was a good catch and asked when the motion was made to make it public/semi-public. DiGruttolo moved, Sanschagrin seconded, Changing the language to say public/semi- public instead of commercial on Resolution No. 26-51. Motion passed 5/0. Maddy moved, Sanschagrin seconded, Adopting RESOLUTION NO. 26-51, "A Resolution Approving a Comprehensive Plan Amendment for 5 Parcels Located at Parcel ID 3311723110089, 3311723110045, 3311723120020, 3311723120001, and 3311723120090 Due to a Recent Municipal Boundary Adjustment with the City of Tonka Bay." ORDINANCE NO. 633, "An Ordinance Amending Section 1201.09, Subd. 2 of the Shorewood Zoning Code — The Shorewood Zoning Map for 5 Parcels Located at Parcel ID 3311723110089, 3311723110045, 3311723120020, 3311723120001, and 3311723120090." RESOLUTION NO. 26-56, "A Resolution Approving the Summary Publication for Ordinance 633 Amending Section 1201.09, Subd. 2 of the Shorewood Zoning Code — The Shorewood Zoning Map for 5 Parcels Located at Parcel ID 3311723110089, 3311723110045, 3311723120020, 3311723120001,and 3311723120090." Motion passed 5/0. D. Street Sign Sale CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 11 of 15 Public Works Director Morreim reviewed the street sign sale as found in the Agenda Packet. Councilmember Sanschagrin asked if all the signs were street signs or if there were other types. Public Works Director Morreim stated that the ones saved are all street signs; others are recycled. Maddy moved, Sanschagrin seconded, Approving the Plan to Sell the Retired Street Signs. Motion passed 5/0. E. Safe Routes to School Grant — Galpin Lake Trail City Engineer Budde provided an overview of the Safe Routes to School grant, as included in the Agenda Packet. Councilmember DiGruttolo stated that in December, when the Council asked about the grant, Staff estimated the City portion would be roughly $112,000, and it is now $134,428, which is $22,428 more. She asked why that is. City Engineer Budde explained that two factors are at play: the grant dollars have slowly gone down because, based on what the City initially identified in previous estimates, construction costs have been coming down, so MnDOT bases it on the low bid. He reminded the Council that the project is in MnDOT right-of-way, so staff had Council approve the plan set in January or February. The design was completed and submitted to MnDOT, but it must go through their review process, which has drawn significant criticism. When MnDOT came back to the City, they said they needed more information on the proposed retaining wall design. He continued that Staff intended to get soil borings before presenting it, but access to the area was so challenging that it was not done, and the intent was to get the borings when the contractor came in to clear the trees. MnDOT was not okay with that, so the City awarded a separate contract to remove the trees to get a soil boring. Once that was done, it identified about 10 to 15 feet of poor soils beneath the lake. Hence, the City worked with MnDOT and the geotechnical engineer to determine the best solution for constructing something in that location. The City had to go through more revisions and iterations to get something MnDOT was okay with building into their right-of-way and to address the underlying poor soils without completely excavating them out. Ultimately, they landed on constructing a reinforced soil slope, which is different than a retaining wall that was proposed. He shared that they had many conversations about staging and timing, so if this is approved, the process would allow time for the fill to settle over the winter, and final paving would take place in spring 2027. Construction costs went down, but engineering costs went up to address the problems. He pointed out that this section of the project is pinched between the Highway 7 guardrail and the lake. Permitting requirements for the lake means the City cannot go closer to the lake; the trail has a limited footprint. Councilmember Sanschagrin noted that it looks like a challenging design. He asked how confident Staff is that it will last. City Engineer Budde explained how it is set up: Staff completed a preliminary design of the reinforced soil slope. The City requires in the contract that the contractor submit an engineer -approved reinforced soil slope design. That ensures the design cost is a contractor cost and is reimbursed through the grant. He added that he is confident the contractor will develop an engineered, constructible solution that helps balance the risks of the underlying poor soils. Councilmember Gorham asked if the design is a delegated design and the contractor will submit something when they start. City Engineer Budded shared that if the City awards the contract, one of the first things the contractor will do is engage their wall designer to get a design as a shop CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 12 of 15 drawing. The City will review it with the structural and geotechnical engineers to confirm the proposed solution is the best option. Councilmember Gorham shared that another project on Yellowstone is similar and complicated. He noted that it is an exciting project for the people on that side of Highway 7, phase one of access in that area. City Engineer Budde noted that at least three parents reached out saying they thought it would be ready for school, but he told them it would not be this year. Parents are paying attention to the project. Mayor Labadie asked what year the City did the Legislative bus tour in the project area. City Engineer Budde stated it was in 2021, before the Planning grant. Maddy moved, Sanschagrin seconded, Adopting RESOLUTION NO. 26-055, "A Resolution Approving the Safe Routes to School Grant Agreement for the Galpin Lake Trail Project; City Project 25-01 Grant Terms and Conditions SAP NO. 216-010-010." Motion passed 5/0. F. Galpin Lake Trail Construction Contract City Engineer Budde further explained the Galpin Lake Trail Construction Contract from the last Item, as found in the Agenda Packet. Councilmember Sanschagrin asked how long it would be before more maintenance is done on it for the settlement after the June 18 date. City Engineer Budde said he is not sure and will not know until they go out there, clear some of the soil, and work with a contractor to see what it looks like. The soil borings that were received indicated up to three inches of settlement, so they hope most of that will go away. He pointed out that it is pitched to Highway 7, so even if it settles to the lakeside, it flattens out a little better and still stays ADA compliant. He noted that there is some risk with it. The ultimate solutions brought up were hundreds of thousands of dollars more expensive, more damaging to the environment, and required more coordination with MnDOT. This is the economic trade-off between being able to do the project and fitting into the existing footprint. Councilmember Sanschagrin asked if there would be a fence along the lakeside. City Engineer Budde shared that there would be a fence along the entire lakeside, essentially closing off the area because there is a drop-off of five to six feet at the worst. Councilmember Sanschagrin asked if the cost was already included for the fence. City Engineer Budde shared that it is. Councilmember DiGruttolo asked who pays for additional fill, testing, drainage plates, or settlement beyond the assumptions. City Engineer Budde explained that, as part of construction and because it is State Aid funded or eligible, the City must follow a materials -control schedule that specifies how often testing is needed for the fill and the pavement. That has to be followed. Any testing beyond that would be a City expense. Councilmember Gorham asked whether Staff had any concerns about Boulder Creek, Inc. doing the work. City Engineer Budde admitted he had never worked with them, but he had reached out to some colleagues. Boulder Creek, Inc. is based in Wilmar and is a fairly new company, but he spoke with the owner, who has a solid resume with the last 20 years working on similar projects. He added that Boulder Creek, Inc. is a general contractor, so they do little of the work themselves and subcontract most of it. He noted that it is a unique model, but after speaking with the owner, he feels confident moving forward with Boulder Creek, Inc. CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 13 of 15 Councilmember Gorham asked if Highway 7 will need to be shut down. City Engineer Budde stated that Highway 7 will not be shut down, but a lane will be closed. The contractor plans to close a lane when bringing in the material; this requires a permit, and the contractor must submit a traffic control plan that both the City and MnDOT approve. Councilmember Gorham asked if MnDOT is okay with a lane closure. City Engineer Budde shared that they are. There has not been much discussion, but the field manuals allow it; it is usually not allowed during peak hours. The City will see what MnDOT says. Sanschagrin moved, Gorham seconded, Adopting RESOLUTION NO. 26-054, "A Resolution to Award a Construction Contract for Galpin Lake Trail Project; City Project 25- 01." Motion passed 5/0. G. Limited Use Permit with MnDOT — Galpin Lake Trail City Engineer Budde reviewed the Limited Use Permit as found in the Agenda Packet. Councilmember DiGruttolo asked whether, if MnDOT decides in the future to cut off access or remove the trail, the City would have to pay back the grant. City Engineer Budde stated no. He is not aware of any timeframe with the grant to keep the structure in place. Councilmember DiGruttolo stated that with all the uncertainty, she did not want the City to be on the hook to pay it back. Maddy moved, Gorham seconded, Adopting RESOLUTION NO. 26-057, "A Resolution for a Limited Use Permit for the Galpin Lake Trail Project; City Project 25-01 SAP NO. 216-010- 010." Motion passed 5/0. 5. STAFF AND COUNCIL REPORTS AND DISCUSSION A. Staff i. Gravity Investment Lot Combination and Anticipated Residential Development North of Watten Ponds Planning Director Griffiths provided an overview of the request, as outlined in the Agenda Packet. He noted that this process is normally handled administratively, not on the Council's Agenda. City Attorney Shepherd noted that this is routine. Still, given its proximity to the Watten Ponds project and the adjacent subdivision, the City provided extra notice to the Council and the public. Regarding the EAW, he reminded the Council of their decision. He noted that the EAW petition requested that it involve not only the two lots in the Watten Ponds subdivision proposals, but also other lots. The Council's resolution, however, confined the project to the two -lot Watten Ponds subdivision; it does not include this parcel. He shared that, as the EAW process plays out, it does not give the Council any ability to impact the lot combination. CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 14 of 15 Councilmember Sanschagrin asked whether it is appropriate for the City to work with Gravity Investment, since it is involved in litigation against the City. City Attorney Shepherd shared that the City is not really working with them; they are a property owner and have property rights. Gravity Investment is complying with Hennepin County and the City's codes; they cannot be treated differently because they are litigating against the City for a different matter. The City must follow its policies and not apply them discriminatorily because it has a beef with them. Councilmember Sanschagrin noted that he was concerned that it would impact the litigation somehow. City Attorney Shepherd shared that it would not. Tentative Upcoming Agenda Topics Mayor Labadie shared that the document would stand on its own. Public Works Director Morreim shared that the pavement sealing and crack filling projects were completed last week. Some sweeping of material on the pavement -sealing streets will begin soon. Fiber installation for Midco continues mostly on the East side of Shorewood, and progress is posted on their website; they hope to be done this fall. He said the City is still in a drought, and less water is being pumped with the cooler weather, but the City is seeing the effects of not having much rain; more rain is needed. Councilmember Sanschagrin asked how the wells are doing in terms of water capacity. Public Works Director Morreim stated that the City is fine. Public Works Director Morreim explained that during drought months, the wells run 10 to 12 hours a day to meet demand; in January, the wells run four to five hours every other day. That is a significant difference between the months. Councilmember Sanschagrin said he has not seen the pumps, but they are pretty big. Public Works Director Morreim agreed. Planning Director Griffiths shared that the most recent Shore Report includes several Planning Department activities. Staff is seeking resident feedback on trees, and the Planning Commission is taking the first steps to update the Tree Preservation Policy. He happily reported that the City already has about 40 responses and asked the Council to share survey information. He said staff is working hard to get the deer management program up and running for the fall. They will work with hunters to get things going in early October, with hunt dates to follow and more information to come. He shared that many Comprehensive Plan update events are coming up: September 16 at the SCEC from 6:00 P.M. to 8:00 P.M.; there will be a Citywide visioning session. He shared that everyone is invited and much of the Planning Commission would be in attendance. He hoped to see Council at Movie in the Park on September 19, or to host an open house on the islands the next week. He mentioned that he would have information from the first survey at the next meeting. Councilmember Gorham asked what the movie would be at Movie in the Park. Planning Director Griffiths stated Zootopia 2. City Administrator Nevinski shared that the Public Safety Open House is October 1 at Station 1. He noted that the Interim Fire Chief is working with a candidate for the interim administrative role, which will hopefully be finalized soon. Fire has advertised the Fire Marshal/Assistant Chief role and has several candidates, and there have been discussions about how that role will interact with the cities. CITY OF SHOREWOOD REGULAR COUNCIL MEETING MINUTES SEPTEMBER 14, 2026 Page 15 of 15 B. Mayor and City Council Councilmember DiGruttolo thanked City Administrator Nevinski for the email sent before Labor Day and would like to see more of those. Councilmember Gorham agreed. He pointed out that there is no work session on October 12, and the speed -limit discussion from the work session could be moved to that day. Councilmember Sanschagrin shared that he would be at the Comprehensive Plan update on Wednesday. Mayor Labadie shared that that morning there was a Highway 7 discussion as part of the Southwest Corridor Transit Coalition. They went through Highways 5, 212, and 7. The first two are underway and nearing completion. The Coalition highlighted where the funds for Highways 5 and 212 came from, and much of it came from the county. So, for Highway 7, the County will be a place to try for more funding. She added that federal fly funding is important, but no one is applying for Highway 7. She added that she was going to get some slides from the meeting on successes at different levels. She noted that that afternoon she met with the Regional Council of Mayors, with the first speaker being Secretary of State Steve Simon. She encouraged everyone to hear him speak if they were able. It gave all the mayors in the room confidence in the election system. She added that the speech was bipartisan. 6. ADJOURN Maddy moved, Sanschagrin seconded, Adjourning the City Council Regular Meeting of September 14, 2026, at 9:50 P.M. Motion passed. ATTEST: e_44'e Z:n�_ P16fet/Labadie, Mayor Sandie Thone, City Clerk