Loading...
05-023• CITY OF SHOREWOOD RESOLUTION NO. 05-023 A RESOLUTION AMENDING A CONDITIONAL USE PERMIT FOR THE EXPANSION OF ST. JOHN THE BAPTIST CHURCH'S CEMETERY OF THE RESURRECTION AND APPROVING THE CONSTRUCTION OF A MAUSOLEUM WHEREAS, St. John the Baptist Church (Applicant) proposes to build a mausoleum structure at the Cemetery of the Resurrection, located at 5425 Covington Road; and WHEREAS, the property is legally described as: "Cemetery of the Resurrection and Cemetery of the Resurrection Second Addition, Hennepin County, Minnesota. WHEREAS, the Shorewood Zoning Code allows cemeteries in residential zoning districts by conditional use permit (C.U.P.) subject to certain conditions; and WHEREAS, on 27 January 2003, the City Council granted the Applicant a conditional use permit approving a master plan for the future development of the cemetery (see Shorewood Resolution No. 03-007, on file at the Shorewood City Hall); and • WHEREAS, the approved master plan for the cemetery included the future construction of two mausoleum structures on the property; and WHEREAS, Shorewood Resolution No. 03-007 required that the conditional use permit be amended at such time as the mausoleum structures were to be constructed, and the applicant has now submitted a revised plan showing the first of the two mausoleum structures and the replacement of an existing maintenance building; and WHEREAS, the request was reviewed by the City Planner and his recommendations were duly set forth in a memorandum to the Planning Commission, Mayor and City Council, dated 28 January 2005, which memorandum is on file at City Hall; and WHEREAS, after required notice, a Public Hearing was held and the Applicant's application reviewed by the Shorewood Planning Commission at its regular meeting on 1 February 2005, the minutes of which meeting are on file at City Hall; and WHEREAS, the Applicant's request was considered by the City Council at its regular meeting on 28 February 2005, at which time the Planner's memorandum and the minutes of the Planning Commission were reviewed and comments were heard by the Council from the City staff. • NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Shorewood as follows: FINDINGS OF FACT The Applicant proposes to construct a mausoleum _structure as illustrated on Exhibits A-C, attached hereto and made a part hereof. 2. The proposed mausoleum will be one story in height and measures approximately 41' x 69' . 3. The mausoleum will provide for 364 crypts and 300 cremation niches. 4. The proposed maintenance building will be one story in height, measures 24' x 24', and will replace the existing maintenance building located on the property. CONCLUSIONS A. The proposed use of the property is consistent with its current zoning and with the Shorewood Comprehensive Plan. • B. Shorewood Resolution No. 03-007, approving a conditional use permit for the Cemetery of the Resurrection is hereby amended, subject to the following: • The site shall be developed in accordance with the conditions imposed as part of Resolution No. 03-007. 2. The proposed mausoleum shall be constructed as illustrated in Exhibits A-C, attached. 3. The proposed maintenance building shall be consistent with or better than the character of the existing maintenance building and shall comply with the 50-foot setback requirement on the north side of the subject property. 4. The existing maintenance building shall be removed from the site no later than 15 days after the completion of the new maintenance building. C. The City Clerk shall provide St. John the Baptist Church with a certified copy of this resolution for purposes of recording with the Hennepin County Recorder. D. This resolution must be recorded within 30 days of the Applicant's receipt of a certified copy hereof. -2- ADOPTED BY THE CITY COUNCIL of the City of Shorewood this 14th day of March, 2005. A ATTEST: Craig W,,1Gson, City Administrator/Clerk • Woody Love, Mayor -3-